Bellevue, Washington

Total Page:16

File Type:pdf, Size:1020Kb

Bellevue, Washington PARK 120 BELLEVUE, WASHINGTON BUILDING A: 636 120TH AVE NE | BUILDING B: 626 120TH AVE NE BUILDING C: 616 120TH AVE NE | BUILDING D: 606 120TH AVE NE TONY ULACIA | 425.646.5244 | [email protected] ERIC HAEHL | 425.646.5266 | [email protected] PARK 120 BELLEVUE, WASHINGTON D Year Built: 1980/1981 Square Footage: 636 120th Ave NE / Building A 20,647 SF 626 120th Ave NE / Building B 20,647 SF 616 120th Ave NE / Building C 20,647 SF 606 120th Ave NE / Building D 20,647 SF Total Square Footage 82,588 SF Rental Rate: $25.00-$26.00 per rentable square foot, NNN Operating Expenses: 2020 Estimated Operating Expenses: $10.17/RSF. Tenant is separately metered for electrical C Load Factors: Per 1996 BOMA standards (varies) extremely efficient space with low load factors Approximately 4 stalls for every 1,000 square feet of usable area. Surface is free, Parking/Rates: reserved stalls currently $100.00 per stall per month Fiber Optics: Providers of fiber optics include Xfinity / Comcast and CenturyLink Park 120 is near the up and coming Spring District and a stone’s throw to Downtown Bellevue. There Area Amenities: are abundant food, grocery, and retail amenities within walking distance or a short drive without having to cross I-405 Conveniently located just off of Bellevue’s main drag of NE 8th with unmatched access to I-405 (via NE Location: 8th and NE 4th) at the midpoint between I-90, and SR-520. At this location, there is ample opportunity for tenants to take full advantage of the Light Rail with two stops under a 6 minute walk to Park 120 Ownership: Sheen’s Bellevue One Property Management: Rob Gasca Real Estate Group LLC B Tony Ulacia | 425.646.5244 | [email protected] Leasing: Eric Haehl | 425.646.5266 | [email protected] PROPERTY HIGHLIGHTS A ABUNDANT CLOSE PROXIMITY WALKING DISTANCE LOCATED 2 BLOCKS DIRECT ACCESS TO PARKING AVAILABLE TO RESTAURANTS TO NUMEROUS RETAIL AWAY FROM SUITES WITH PERSONAL WITH ACCESS AT & FOOD SERVICES AMENITIES BELLEVUE’S FUTURE RESTROOM FACILITIES 120TH AVE NE LIGHT RAIL STATION A B PARK 120 BELLEVUE, WASHINGTON 120TH AVE. 120TH AVAILABLE SPACE BUILDING B 626 120TH NE AVENUE, BELLEVUE, WA 98005 Suite RSF Available Avail. Date Rental Rate Comments C 201 5,391 RSF Now $25-26/RSF, NNN Click to view Virtual Tour BUILDING C 616 120TH NE AVENUE, BELLEVUE, WA 98005 Suite RSF Available Avail. Date Rental Rate Comments 100 4,822 RSF 12/1/2021 $25-26/RSF, NNN 204 2,660 RSF Now $25-26/RSF, NNN BUILDING D 606 120TH NE AVENUE, BELLEVUE, WA 98005 D Suite RSF Available Avail. Date Rental Rate Comments 103 2,048 RSF Now $25-26/RSF, NNN Click to view Virtual Tour The information contained herein has been given to us by the owner or sources which we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. Prospective tenants should carefully verify all information contained herein. A COMMUNITY OF CONVENIENCE Bellevue Transit Center Future EastLink Station 120TH AVE NE NE 8TH ST Future Wilburton Station Future PARK 120 Spring District Station BUILDING A: 636 120TH AVE NE | BUILDING B: 626 120TH AVE NE BUILDING C: 616 120TH AVE NE | BUILDING D: 606 120TH AVE NE PARK 120 BELLEVUE, WASHINGTON FUTURE ESTIMATE LIGHT RAIL TRAVEL TIMES Wilburton Station > Bellevue CBD 2 minutes Wilburton Station > Microsoft Headquarters 16 minutes EAST MAIN STATION OPENING 2023 Wilburton Station > Seattle’s International District 21 minutes Wilburton Station > U District 34 minutes Wilburton Station > SeaTac Airport 55 minutes MAIN ST NE 4TH PARK 120 NE 8TH NE 10TH BELLEVUE DOWNTOWN STATION OPENING 2023 NE 12TH CURRENT ESTIMATE DRIVING THE SPRING WILBURTON STATION TRAVEL TIMES OPENING 2023 DISTRICT Park 120 > Downtown Kirkland 9 minutes Park 120 > Microsoft Headquarters 12 minutes SPRING DISTRICT / 120TH STATION OPENING 2023 Park 120 > Downtown Seattle 16 minutes BUILDING A: 636 120TH AVE NE | BUILDING B: 626 120TH AVE NE BUILDING C: 616 120TH AVE NE | BUILDING D: 606 120TH AVE NE PARK 120 BELLEVUE, WASHINGTON BUILDING B - FLOOR 2 + Suite 201 - 5,391 RSF + Available Now + 3 large conference rooms + 1 small Conference room + Open work space + 4 private offices + Kitchenette + Views of Downtown Bellevue CLICK TO VIEW VIRTUAL TOUR TONY ULACIA | 425.646.5244 | [email protected] ERIC HAEHL | 425.646.5266 | [email protected] BUILDING A: 636 120TH AVE NE | BUILDING B: 626 120TH AVE NE BUILDING C: 616 120TH AVE NE | BUILDING D: 606 120TH AVE NE PARK 120 BELLEVUE, WASHINGTON BUILDING C - FLOOR 1 + Suite 100 - 4,822 RSF + Available December 1, 2021 + 1 large conference rooms + Private offices + Kitchenette TONY ULACIA | 425.646.5244 | [email protected] ERIC HAEHL | 425.646.5266 | [email protected] BUILDING A: 636 120TH AVE NE | BUILDING B: 626 120TH AVE NE BUILDING C: 616 120TH AVE NE | BUILDING D: 606 120TH AVE NE PARK 120 BELLEVUE, WASHINGTON BUILDING C - FLOOR 2 + Suite 204 - 2,660 RSF + Available Now 11 7-1/4" RISERS + Views of Downtown Bellevue 11 7-1/4" RISERS DN DN PARK 120 BUILDING C SHEEN'S BELLEVUE ONE, LLC 616 120TH AVENUE, NE PROJECT: 21-0129-00 DATE: 03/17/2021 FILE: 616 12th AVE NE, 2 DRAWN: MT TONY ULACIA | 425.646.5244 | [email protected] ERIC HAEHL | 425.646.5266 | [email protected] CHECKED: SH FLOOR PLAN - SECOND FLOOR BUILDING C - SUITE 204: AS-BUILT PLAN MARCH 17TH, 2021 02 BUILDING A: 636 120TH AVE NE | BUILDING B: 626 120TH AVE NE BUILDING C: 616 120TH AVE NE | BUILDING D: 606 120TH AVE NE PARK 120 BELLEVUE, WASHINGTON BUILDING D - FLOOR 1 + Suite 103 - 2,048 RSF + Available Now + Large conference room 7'' 11'' 7'' 11'' + Open work space UP UP + Kitchenette CLICK TO VIEW VIRTUAL TOUR pc PARK 120 BUILDING D SHEEN'S BELLEVUE ONE, LLC 606 120TH AVENUE, NE PROJECT: 21-0129-00 DATE: 03/17/2021 FILE: 606 12th AVE NE, 1 DRAWN: MT TONY ULACIA | 425.646.5244 | [email protected] ERIC HAEHL | 425.646.5266 | [email protected] CHECKED: SH FLOOR PLAN - FIRST FLOOR BUILDING D- SUITE 103: AS-BUILT PLAN MARCH 17TH, 2021 01 PARK 120 BELLEVUE, WASHINGTON TONY ULACIA | 425.646.5244 | [email protected] ERIC HAEHL | 425.646.5266 | [email protected].
Recommended publications
  • Annual Meeting TUESDAY, MAY 16Th, 6:00Pm for 6:30Pm BELLEVUE CHURCH of CHRIST – 1212 104TH AVE SE
    Surrey Downs Community Club Annual Meeting TUESDAY, MAY 16th, 6:00pm for 6:30pm BELLEVUE CHURCH OF CHRIST – 1212 104TH AVE SE Suggested Annual Dues of $30 per household can be paid at the meeting PROPOSED OFFICERS FOR 2017-18 President: Scott Lampe First Vice-President: Ken Rosenow Secretary: David Slight Treasurer: Charles Fisher Vice-Presidents: Rossen Atanassov, Mary Hoole, Tim Horsfall, Leonard Marino, Beth Muller, Steve Hall, Rich Strophy, Jim Tran, Keith Zhang Other topics … • Treasurer's Report • Park Redevelopment • Light Rail • Construction update • South Bellevue Park n Ride • Traffic Mitigation • Calendar of Activities • Any Other Business Treasurer’s Report Revenue from dues and donations: $1710 Expenses: $ 436 Balance: $1591 Expenses were much reduced in 2016-2017 Annual picnic was very inexpensive this year at $259 Holiday party was also inexpensive (Church Rental only ) Annual meeting costs No change in amount of expenses foreseen The court house has gone ☺ First markers showing the position of new buildings City has the park redesign in the 2018/2019 budget Primary Path designed for asphalt, secondary paths crushed gravel Walking paths have been pulled away from residents property lines (increased buffer with plantings) Construction will start in March / April 2018 Surrey Downs Park Plan With access to the park removed from 112th, the only park access will be from within Surrey Downs community Park will be a neighborhood park versus a community park which means no scheduled activities 1 4 Park design decreased in intensity and major features pulled away from neighboring houses 5 1. Small Parking lot – entrance on North end.
    [Show full text]
  • Addendum 3.1
    ADDENDUM 3.1 SECTION 00 73 00 SPECIAL CONDITIONS ADDENDUM 3.1 TABLE OF CONTENTS Note: Special Conditions SC-1.01 through SC-11.04 are numbered to correspond to the General Conditions. SC-1.01 DEFINITIONS .......................................................................................... 3 SC-2.04 CONTRACTOR’S PROJECT MANAGEMENT AND SUPERVISION ...... 3 SC-3.02 COORDINATION WITH OTHERS ........................................................... 4 SC-6.01 CONTRACT TIME ................................................................................ 21 SC-7.08 PERMITS, FEES, AND NOTICES ........................................................ 36 SC-7.11 OWNERSHIP OF WORK PRODUCT ................................................... 38 SC-9.02 SCHEDULE OF VALUES ..................................................................... 42 SC-10.02 DELAYS ................................................................................................ 44 SC-11.04 PARTNERING ....................................................................................... 46 APPENDIX A KING COUNTY METRO TRACK ACCESS PERMIT PROCESS .......... 48 APPENDIX B TRACK ALLOCATION REQUEST/WORK PERMIT FORM .................. 51 APPENDIX C DOWNTOWN TUNNEL/STATION ACCESS PERMIT/WORK PERMIT REQUEST FORM .................................................................................. 53 Northgate & East Link Extensions Section 00 73 00 RFFP No. CN 0115-14 Systems GC/CM Special Conditions Link Contract N830/E750 DECEMBER 2017 CO 001 MARCH 2018 CO 008 JUNE 2018 CO 016
    [Show full text]
  • RCW 39.10 Alternative Public Works Contracting General Contractor/Construction Manager (GC/CM) And/Or Design-Build (DB)
    State of Washington Capital Projects Advisory Review Board (CPARB) Project Review Committee (PRC) APPLICATION FOR RECERTIFICATION OF PUBLIC BODY RCW 39.10 Alternative Public Works Contracting General Contractor/Construction Manager (GC/CM) and/or Design-Build (DB) The CPARB PRC will consider recertification applications based upon agency’s experience, capability, and success in undertaking Alternative Public Works Contracting utilizing the General Contractor/Construction Manager (GCCM) and/or Design-Build (DB) project delivery process. Incomplete applications may delay action on your application. 1. Identification of Applicant a) Legal name of Public Body (your organization): Central Puget Sound Regional Transit (dba Sound Transit) b) Address: 401 S. Jackson Street, Seattle, WA 98104-2826 c) Contact Person Name: Nick Datz Title: Manager, Procurement and Contracts d) Phone Number: 206-398-5236 Fax: N/A E-mail: [email protected] e) Effective Dates of current Certification GC/CM 5/28/2018 DB f) Type of Certification Being Sought GC/CM X DB 2. Experience and Qualifications for Determining Whether Projects Are Appropriate for GCCM and/or DB Alternative Contracting Procedure(s) in RCW 39.10 (RCW 39.10.270 (2)(a)) Limit response to two pages or less. If there have been any changes to your agency’s processes addressing items (a) and (b) below, please submit the revised process chart or list. (a) The steps your organization takes to determine that use of GCCM and/or DB is appropriate for a proposed project; and (b) The steps your organization
    [Show full text]
  • Public Involvement Summary Table of Contents
    East Link Extension February 25, 2014 East Main Station Segment 60% Design Open House Public Involvement Summary Table of Contents 1 Background 2 Overview 2 Notification 3 Open house overview 4 Comment summary 4 East Main Station Design 7 Construction impacts 8 How do you plan to use East Link? 9 Permanent station naming 10 Next steps Sound Transit East Link Background East Link Extension is a key element of the regional mass stretching more than 50 miles. By 2030, about 50,000 transit system approved by voters in 2008. This 14-mile riders will use East Link every day. light rail line will benefit local communities and support East Link is advancing in final design. During this phase, regional growth with fast, frequent and reliable light project architects and engineers define the light rail system, rail service, connecting Seattle to the Eastside’s biggest determining the technical specifications for the stations, population and employment centers. bridges, tracks and other elements as well as construction The project builds on the Central Link light rail system methods and sequencing. The Sound Transit art program, running between Sea-Tac Airport and downtown Seattle STart, also begins work to select station artists and artworks and the University Link and S. 200th Link Extensions that during final design. Sound Transit hosted a public meeting are scheduled to open in 2016. East Link is part of the new in May 2013 to share design plans and we have since light rail extensions being built north, south and east from advanced design to approximately 60 percent completion.
    [Show full text]
  • East Link Light Rail
    East Link light rail Segment C: Downtown Bellevue July 2011 Segment Details Segment C serves downtown Bellevue with alternatives running from approximately SE 6th and NE 12th Streets. Sound Transit evaluated 10 alternatives in the 2011 Final Environmental Impact C9T Statement (FEIS). C11A There are two preferred alternatives in this segment: a cut-and- cover tunnel along 110th Avenue NE (C9T) and an at-grade alignment on 108th Avenue NE (C11A). C9T begins on the east side of 112th Avenue SE, then transitions C9T C11A to the west side at SE 6th Street before turning west into a tunnel C9T portal on Main Street. C9T then turns north under 110th Avenue C11A NE to the Bellevue Transit Center Station at NE 4th Street. C9T turns east at NE 6th Street and exits the tunnel portal, transitions to an elevated profile in the center of NE 6th Street, and then crosses to the north side of NE 6th Street to pass over 112th Avenue NE, I-405, and 116th Avenue NE to the elevated Hospital Station in the former BNSF Railway corridor. C11A begins on the east side of 112th Avenue SE, then travels C9T & C11A on the south side of Main Street in a retained cut to the 108th Station and turns north at-grade over Main Street to the center of 108th Avenue NE. At NE 6th Street, C11A turns east in the center of the street to the at-grade Bellevue Transit Center Station. C11A then crosses 110th Avenue NE at-grade, transitioning to a C9T & C11A (Preferred Alternatives) and other EIS Alternatives retained-fill and then an elevated profile before crossing 112th Avenue NE, I-405, and 116th Avenue NE to the elevated Hospital Station in the former BNSF Railway corridor.
    [Show full text]
  • The Bulletin in MEMORIAM: WILLIAM J
    ERA BULLETIN — SEPTEMBER, 2020 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 63, No. 9 September, 2020 The Bulletin IN MEMORIAM: WILLIAM J. MADDEN, 1947-2020 Published by the Electric Railroaders’ by Jeff Erlitz Association, Inc. P. O. Box 3323 Grand Central Station New York, NY 10163 For general inquiries, or Bulletin submissions, contact us at bulletin@erausa. org or on our website at erausa. org/contact Editorial Staff: Jeff Erlitz Editor-in-Chief Ron Yee Tri-State News and Commuter Rail Editor Alexander Ivanoff North American and World News Editor David Ross Production Manager Copyright © 2020 ERA This Month’s Cover Photo: Public Service of New Jer- sey double-truck motor cars 2282 and 2235 on Main Avenue & Glendale Street in Nutley, New Jersey on February 11, 1936. Unknown photographer William J (Bill) Madden during a station stop on the Canadian at Thunder Bay, Ontario, July 24, 1977. Jeff Erlitz photograph With deep sadness, I must pass along the around 1970, initially on Saturday mornings In This Issue: news that William Madden passed away on and then on Monday evenings. Like most of Assorted Wednesday, August 12, at the age of 73 due us, he could be found collating, stamping Travels from to complications from COVID-19. envelopes, and bagging sacks of mail for Bill, as everyone knew him, joined the Elec- both the New York Division Bulletin and Na- the First Half of tric Railroaders’ Association on February 21, tional’s Headlights. When the ERA began 2020…Page 18 1964 and was member number 3062. He offering Life memberships, Bill was one of probably started volunteering at headquar- the few members who took up that offer.
    [Show full text]
  • East Link Extension Update System Expansion Committee
    East Link Extension Update System Expansion Committee 01/14/21 Why we are here • Provide a project update on the East Link Extension construction progress • Increase contract contingency request for: • E130 contingency increase request (M2021-04) • E340 contingency increase request (M2021-05) • E335 contingency increase request (M2021-06) 2 2012-15 2016 2017 2018 2019 2020 2021 2022 2023 2024 Final Design We are here E130 – Seattle to South Bellevue (I-90) E320 South Bellevue E330 Downtown Bellevue Tunnel E335 Downtown Bellevue to Spring District E340 Bel-Red E360 SR520 to Redmond E750 Systems Pre-Revenue Float Revenue Service Challenges / Upcoming Milestones Challenges • COVID-19 Impacts • Station Schedules and Systems Access • Redmond Technology Station Garage Upcoming Milestones • Mercer Island Transit Interchange – Bids Due (Q1 2021) • South Bellevue (E320) Substantial Completion (Q1 2021) • Bel-Red (E340) Substantial Completion (Q1 2021) • I-90 (E130) Substantial Completion (Q2 2021) • Overlake (E360) Substantial Completion (Q2 2021) 4 Judkins Park Station 5 Mercer Island Station 6 Mercer Island Transit Interchange 7 South Bellevue Station 8 East Main Station 9 Bellevue Downtown Station 10 Wilburton Station 11 Spring District/120th Station 12 Bel-Red/130th Station 13 Overlake Village Station 14 Redmond Technology Station 15 Redmond Technology Station Garage 16 Q2 2021 Weekend Closures • Weekend #1: • Pioneer Square Temp Platform Removal • Weekend #2: • Signaling Work • Traction Power • Weekend #3: • Pioneer Square Temp Platform Removal
    [Show full text]
  • Motion No. M2021-46 Easements with City of Bellevue As Part of the East Link Extension
    Motion No. M2021-46 Easements with City of Bellevue as part of the East Link Extension Meeting: Date: Type of action: Staff contact: System Expansion Committee 08/12/2021 Recommend to Board Ron Lewis, DECM Executive Director Board 08/26/2021 Final action Faith Roland, Director, Real Property Rhonda Thomsen, Real Property Project Manager Proposed action Authorizes the chief executive officer to grant two permanent easements to the City of Bellevue to construct, operate, and maintain sewer facilities on Sound Transit owned property as part of the East Link Extension at no cost to the City. Key features summary • Resolution No. R2018-40, the Board’s Procurement and Delegated Authority Policy, requires all permanent easements (excluding standard utility easements that service Sound Transit) be approved by the Board. • This action will grant two permanent easements to the City of Bellevue comprising of air, surface, and subsurface rights on the portion of Sound Transit property located between 111th Ave SE and 112th Ave SE in Bellevue, WA. • Easement locations and size: o Easement 1: EL193, Lots 27 through 31, Block 8 of Surrey Downs No 2, for 217 square feet o Easement 2: EL197/198, Lots 1 and 2, Block 8, Surrey Downs No 1, for 2,164 square feet • The City of Bellevue requires these easements to construct, operate, and maintain their sewer facilities. • No monetary consideration need be exchanged due to Sound Transit’s guideway and station location interfering with the City of Bellevue’s existing sewer line. • Granting the easements to the City of Bellevue will not impact Sound Transit’s planned use of the property to construct, operate, and maintain facilities for the East Link light rail project.
    [Show full text]
  • Agency Progress Report: 2019 Q4
    Agency Progress Report Capital Programs U District Station 120th Ave. Station Northgate Link Ext. East Link Ext. Hilltop Tacoma Link Ext. OMF OMF East December | 2019 Prepared by Project Control & VE | Design, Engineering & Construction Management Editor’s Note Sound Transit’s Quarterly Agency Progress Report summarizes projects and major contracts status, risk, and performance for capital projects. Due to timing differences in the production of the APR and the ST financial statements, actual cost data presented in the APR may not match the quarterly financial statements. However, the actual cost data is reconciled to the financial statements on a monthly basis. We always appreciate any suggestions you might have for future refinements to this document. To be added to the distribu- tion list for this report or to make suggestions, please contact Aniekan Usoro at (206) 398-5000. The Agency Progress Report can also be found on the web at http://www.soundtransit.org/get-to-know-us/documents- reports/agency-progress-reports. SOUND TRANSIT Central Puget Sound Regional Transit Authority Union Station 401 S. Jackson St. Seattle, WA 98104-2826 Reception: (206) 398 5000 Facsimile: (206) 398 5499 CHAIR Agency Progress Report John Marchione Redmond Mayor TABLE of CONTENTS VICE CHAIRS Executive Summary 1 Kent Keel University Place Mayor Link Light Rail 5 Paul Roberts University Link Extension 11 Everett Councilmember Northgate Link Extension 15 Lynnwood Link Extension 35 BOARD MEMBERS Nancy Backus I-90 Two-way Transit/HOV Ops 51 Auburn Mayor East
    [Show full text]
  • Active Transportation Plan Appendix a Regional Bicycle Network Maps
    Active Transportation Plan Appendix A Regional Bicycle Network Maps and Gap List Regional Bicycle Network Development Map Series KEY by SMART Corridors West Snohomish 2 East Snohomish 2 East Snohomish 1 West Snohomish 1 North Eastside Kitsap NW King King 1 NE King 1 SW Eastside South Kitsap King 1 King 2 and Vashon Island SE King 1 SW West King 2 SE King 2 Pierce 1 West Pierce 2 East Pierce 1 East Pierce 2 H T E 204TH 7 2 4 204TH 04T 8 H B K PINE PC-44-b 0 E NELSON A KT-3 T L 1 H D H - D Y Y S T ELLISPORT O E 1 E E N R G L 1 O E 3 N N E 1 B V 2 T N R W D D E 1 I U I N A I N T S S R E C S E K T L M L Y E L S E U G L Y E I L 220 TH N L H W O A K 1 H 60 TH M V D K T C N T 6 2 O T N 6 6 H C - E H G T A 1 C T 4 O E Y S 0 4 1 P O 9 D E T 232ND - D R R d S H R 1 PC U C -44-d T 3 ²³ P PC I -44- 7 c C 1 0 S H 6 144TH 1 S 1 I G H O Y L T L D R E 8 B L M S 1 A L T Highline 1 N H A H Kent DesMoines P&R T V P H G 4 I H T A Community College SR 3 5 02 C L T R N N H L 4 *# E S W T - O 9 T 8 4 C R T 1 128TH 4 S O K 1 E M C - N R CREVISTO a O L C D L I D H O H T C 4 K H K T 3 WO T ODHILL C S 1 6 1 O 2 3 1 C S 1 A A S I L 112TH E L U P H B S D N T R T 0 I N E 7 L 2 H N R L E 2 G E O 1 I P M M N H R S Y A S EHMEL Y O E C 100TH A E W R I K H C M L N C S O A L A B A B H M A A J U Y OLSON V V T P V I R E U W A N LRT 272nd Station T H H HALL C B H N T A 6 E D M 92ND C 94TH 8 B C N U u S 2 J s A h 8 HN C E UG m I R VA C H Y H a T C SOU E n ²³ K H C S T H T r A H R a A 6 L T i R l 8 E 1 Talehquah Ferry Terminal L 6 B A 6 O D 6 SE R H O ROSEDALE E V S R I I K
    [Show full text]
  • Employing Life-Cycle Assessment and Comparative Analysis to Reveal Holistic Perspectives in Regional Sustainable Development
    Employing life-cycle assessment and comparative analysis to reveal holistic perspectives in regional sustainable development by Samuel J. Wilson A Thesis Submitted in partial fulfillment of the requirements for the degree Master of Environmental Studies The Evergreen State College June 2014 © 2014 by Sam Wilson. All rights reserved. This Thesis for the Master of Environmental Studies Degree by Samuel J. Wilson has been approved for The Evergreen State College by ________________________ Martha L. Henderson, PhD Director, Graduate Program on the Environment Member of the Faculty ________________________ Date ABSTRACT Employing life-cycle assessment and comparative analysis to reveal holistic perspectives in regional sustainable development Samuel J Wilson To combat climate change, rapid population growth, and sprawl, many urban areas are increasing public transit infrastructure. In Seattle, Washington, the first regional extension of a central light-rail line is planned to open its doors in 2023. This study closely examines the climate change mediation potential of the extension, known as East Link. While the system’s pollution reduction potential was addressed in an environmental impact statement, it did not include the impact from manufacturing construction and infrastructure materials. Previous studies have shown construction materials to be the single largest source of greenhouse gasses over a transit system’s life cycle (Chester and Horvath, 2009; Chester et al 2012). This study aims to fill this gap by conducting a life-cycle assessment of East Link’s construction materials. The results of the life-cycle assessment show a vast underestimate of greenhouse gas impacts in the East Link environmental impact statement. Additionally, this study provides a comparative analysis of historic regional transit and development policy in Seattle and Portland, a city that has had success in early adoption of regional light-rail.
    [Show full text]
  • Feds Offer Big Grants for Puget Sound-Area Transit Projects
    Seattle Times, 2/10/16 http://www.seattletimes.com/seattle-news/transportation/feds-offer-big-grants-for-puget-sound-area-transit- projects/?utm_source=The+Seattle+Times&utm_campaign=63ef1b0dd1- Morning_Brief_2_10_2016&utm_medium=email&utm_term=0_5beb38b61e-63ef1b0dd1-120294717 Feds offer big grants for Puget Sound-area transit projects Originally published February 9, 2016 at 8:19 pm Updated February 9, 2016 at 10:02 pm The Federal Transit Administration has offered grants to a First Avenue streetcar line, Community Transit’s Swift 2 bus-rapid transit line, and Northgate-Lynnwood Link light rail. The grants would have to be approved by Congress first, but history suggest that will happen. by Mike Lindblom Seattle Times transportation reporter Uncle Sam is offering to contribute $1.2 billion toward Sound Transit’s light-rail line from Northgate to Lynnwood, according to the president’s proposed budget — just one of three huge transit gifts in the pipeline for Puget Sound travelers. The proposed First Avenue streetcar line could win another $75 million in federal money, which suddenly places Seattle’s third streetcar corridor on the political fast track. And the feds want to give an additional $43 million toward Community Transit’s Swift 2 bus- rapid transit line connecting Bothell, Mill Creek, Everett’s McCollum Park and Paine Field. The three awards, and many others proposed around the country by the Federal Transit Administration, must still be ratified by Congress in its transportation budget. Each represents at least half the capital cost, and would stoke the transit-construction frenzy under way throughout the region. Sound Transit is already building a new Northgate Station, to open in 2021, followed by plans to reach North Seattle, Shoreline, Mountlake Terrace and Lynnwood with another 8½ miles of track by 2023, for a total $2.35 billion.
    [Show full text]