East Link Extension Washington Into East King County, and South of University of Washington Bel-Red/130Th Sea-Tac International Airport

Total Page:16

File Type:pdf, Size:1020Kb

East Link Extension Washington Into East King County, and South of University of Washington Bel-Red/130Th Sea-Tac International Airport Lynnwood Link Light Rail System Mountlake Terrace 185th 145th Downtown Redmond In 2008, voters approved the Sound Transit 2 Not funded for construction Plan. Link will expand the current system from Northgate SE Redmond Seattle north into Snohomish County, across Lake Roosevelt Redmond Technology Center U District Overlake Village East Link Extension Washington into East King County, and south of University of Washington Bel-Red/130th Sea-Tac International Airport. OCTOBER 2016 Capitol Hill Spring District/120th Westlake/Seattle Wilburton University Street Bellevue Downtown Bellevue Pioneer Square East Main Downtown to Int’l District/Chinatown South Bellevue Redmond Technology Center Stadium Judkins Mercer SODO Park Island 10 minutes Beacon Hill Mount Baker Columbia City Othello South Bellevue Rainier Beach to Stadium Tukwila/Int’l Blvd 20 minutes SeaTac/Airport Link in service Angle Lake Under construction Kent/Des Moines For information in alternative formats, call 1-800-201-4900/ In final design S 272nd Not funded for TTY Relay: 711 or email [email protected]. construction In planning Federal Way Bellevue East Link Alignment Downtown to University Of Washington Map Key 30 minutes Station P Park & Ride Redmond Link in service Technology Center P NE 40th Tunnel route Elevated route Overlake Bellevue to Surface and 520 Village existing bridges Spring District/ Sea-Tac Airport 120th Light rail under P 55 minutes construction Bel-Red/ 52nd Ave NE includes transfer Future extension Wilburton 130th 1 Lake NE 8th St Washington NE 6th St Bellevue Downtown Bellevue to East Main Main St International District station Intl District/ Chinatown Mercer 20 minutes Judkins Park Island Rainier Ave S P S P South Bellevue Sound Transit plans, builds and operates regional transit systems and services to improve mobility for Central Puget Sound. 23rd Ave Sound Transit l 401 S. Jackson St. l Seattle, WA 98104-2826 l 1-800-201-4900 / TTY Relay: 711 l [email protected] l soundtransit.org 77th Ave SE 80th Ave SE East Link Extension Timeline 2006–2011 Planning & Environmental Review 2011–2015 Final design 2015 / 2016 Construction 2023 Anticipated start of service East Link Extension is a key element of the regional mass East Link is part of the new light rail extensions being Get Involved Stay Informed transit system approved by voters in 2008. This 14-mile built north, south and east from Seattle. By 2030, The fastest and most reliable way to receive information light rail line will benefit local communities and support about 50,000 riders will use East Link every day. Sound Transit is committed to working with local about East Link Extension, including meeting regional growth with fast, frequent and reliable light jurisdictions and the community to deliver East Link announcements, is to sign up for email updates at rail service, connecting Seattle to the Eastside’s biggest Up Next Extension on time and within budget. www.soundtransit.org/subscribe. You can also visit population and employment centers. The project builds on Sound Transit is advancing design work from Final design offers many opportunities for residents, Sound Transit’s website at www.soundtransit.org. Sound the Link light rail system running between Sea-Tac Airport approximately 30 percent to 100 percent completion. neighborhood organizations, property owners and Transit outreach staff is accessible by phone, email and and downtown Seattle, as well as the University Link Early construction activity is underway. We are businesses to get involved. During final design, is available to meet in person. For more information, Extension that is scheduled to open in 2016. working with service providers to relocate utilities community members are encouraged to comment on contact East Link Community Outreach, 206-398-5470 in advance of construction. Heavy civil construction station design, public art, station naming and more. or [email protected] begins in 2016. Sound Transit will hold widely-advertised outreach meetings and events at key design milestones to inform and engage the public. International District/ Mercer Island Bellevue Downtown Spring District/120th Redmond Technology Chinatown Station Station Station Station Center Station Judkins Park Station South Bellevue Station East Main Station Wilburton Station Bel-Red/130th Overlake Village Station Station I-90 – Seattle/ South Bellevue Downtown Bellevue Bel-Red Overlake Mercer Island Connecting to the Link light rail system The South Bellevue Station will include Light rail in this area will serve the dense The two stations in Bel-Red will Serving as the terminus for East Link, light at the International District/Chinatown a parking structure with approximately central business district, providing access support the City of Bellevue’s land rail in the Overlake corridor will include two Station in the Downtown Seattle Transit 1,500 stalls at the site of the existing to employment, education, and recreation use plans for the Bel-Red corridor; new stations running along SR 520. The Tunnel, this segment includes two new South Bellevue Park-and-Ride lot. The and helping accommodate the anticipated including future development of the Overlake Village Station will support transit- stations, both located on the I-90 center East Main Station will increase travel 14,000 new housing units and 38,000 120th and 130th station areas as oriented development land use by the City of roadway with pedestrian connections to options for south Bellevue residents jobs generated by 2030. Key destinations transit oriented urban communities. Redmond. The Overlake Transit Center Station local sidewalks, buses and bike trails. and commuters, as well as employees include Bellevue’s downtown core, The Bel-Red/130th Station will include will be a major transit hub for connections in businesses located east of 112th Bellevue Transit Center and the medical a 300-stall park-and-ride. between public transit and private Avenue SE. centers on the east side of I-405. transportation services while providing increased parking for over 300 cars and covered bicycle facilities for over 100 bikes. .
Recommended publications
  • Annual Meeting TUESDAY, MAY 16Th, 6:00Pm for 6:30Pm BELLEVUE CHURCH of CHRIST – 1212 104TH AVE SE
    Surrey Downs Community Club Annual Meeting TUESDAY, MAY 16th, 6:00pm for 6:30pm BELLEVUE CHURCH OF CHRIST – 1212 104TH AVE SE Suggested Annual Dues of $30 per household can be paid at the meeting PROPOSED OFFICERS FOR 2017-18 President: Scott Lampe First Vice-President: Ken Rosenow Secretary: David Slight Treasurer: Charles Fisher Vice-Presidents: Rossen Atanassov, Mary Hoole, Tim Horsfall, Leonard Marino, Beth Muller, Steve Hall, Rich Strophy, Jim Tran, Keith Zhang Other topics … • Treasurer's Report • Park Redevelopment • Light Rail • Construction update • South Bellevue Park n Ride • Traffic Mitigation • Calendar of Activities • Any Other Business Treasurer’s Report Revenue from dues and donations: $1710 Expenses: $ 436 Balance: $1591 Expenses were much reduced in 2016-2017 Annual picnic was very inexpensive this year at $259 Holiday party was also inexpensive (Church Rental only ) Annual meeting costs No change in amount of expenses foreseen The court house has gone ☺ First markers showing the position of new buildings City has the park redesign in the 2018/2019 budget Primary Path designed for asphalt, secondary paths crushed gravel Walking paths have been pulled away from residents property lines (increased buffer with plantings) Construction will start in March / April 2018 Surrey Downs Park Plan With access to the park removed from 112th, the only park access will be from within Surrey Downs community Park will be a neighborhood park versus a community park which means no scheduled activities 1 4 Park design decreased in intensity and major features pulled away from neighboring houses 5 1. Small Parking lot – entrance on North end.
    [Show full text]
  • Addendum 3.1
    ADDENDUM 3.1 SECTION 00 73 00 SPECIAL CONDITIONS ADDENDUM 3.1 TABLE OF CONTENTS Note: Special Conditions SC-1.01 through SC-11.04 are numbered to correspond to the General Conditions. SC-1.01 DEFINITIONS .......................................................................................... 3 SC-2.04 CONTRACTOR’S PROJECT MANAGEMENT AND SUPERVISION ...... 3 SC-3.02 COORDINATION WITH OTHERS ........................................................... 4 SC-6.01 CONTRACT TIME ................................................................................ 21 SC-7.08 PERMITS, FEES, AND NOTICES ........................................................ 36 SC-7.11 OWNERSHIP OF WORK PRODUCT ................................................... 38 SC-9.02 SCHEDULE OF VALUES ..................................................................... 42 SC-10.02 DELAYS ................................................................................................ 44 SC-11.04 PARTNERING ....................................................................................... 46 APPENDIX A KING COUNTY METRO TRACK ACCESS PERMIT PROCESS .......... 48 APPENDIX B TRACK ALLOCATION REQUEST/WORK PERMIT FORM .................. 51 APPENDIX C DOWNTOWN TUNNEL/STATION ACCESS PERMIT/WORK PERMIT REQUEST FORM .................................................................................. 53 Northgate & East Link Extensions Section 00 73 00 RFFP No. CN 0115-14 Systems GC/CM Special Conditions Link Contract N830/E750 DECEMBER 2017 CO 001 MARCH 2018 CO 008 JUNE 2018 CO 016
    [Show full text]
  • RCW 39.10 Alternative Public Works Contracting General Contractor/Construction Manager (GC/CM) And/Or Design-Build (DB)
    State of Washington Capital Projects Advisory Review Board (CPARB) Project Review Committee (PRC) APPLICATION FOR RECERTIFICATION OF PUBLIC BODY RCW 39.10 Alternative Public Works Contracting General Contractor/Construction Manager (GC/CM) and/or Design-Build (DB) The CPARB PRC will consider recertification applications based upon agency’s experience, capability, and success in undertaking Alternative Public Works Contracting utilizing the General Contractor/Construction Manager (GCCM) and/or Design-Build (DB) project delivery process. Incomplete applications may delay action on your application. 1. Identification of Applicant a) Legal name of Public Body (your organization): Central Puget Sound Regional Transit (dba Sound Transit) b) Address: 401 S. Jackson Street, Seattle, WA 98104-2826 c) Contact Person Name: Nick Datz Title: Manager, Procurement and Contracts d) Phone Number: 206-398-5236 Fax: N/A E-mail: [email protected] e) Effective Dates of current Certification GC/CM 5/28/2018 DB f) Type of Certification Being Sought GC/CM X DB 2. Experience and Qualifications for Determining Whether Projects Are Appropriate for GCCM and/or DB Alternative Contracting Procedure(s) in RCW 39.10 (RCW 39.10.270 (2)(a)) Limit response to two pages or less. If there have been any changes to your agency’s processes addressing items (a) and (b) below, please submit the revised process chart or list. (a) The steps your organization takes to determine that use of GCCM and/or DB is appropriate for a proposed project; and (b) The steps your organization
    [Show full text]
  • East Link Light Rail Shoreline the Eastside Will Be Able to 145Th Ride Between Snohomish County and East Link Stations Northgate Without Changing Trains
    PRESORTED STANDARD Union Station U.S. POSTAGE 401 S. Jackson PAID January 2012 SEATTLE, WA Seattle, WA 98104-2826 PERMIT NO. 1801 PROJECT UPDATE East Link is on the way! What you need to know Photography by MBjork © 2010 This document was printed on paper certified by the Forest Stewardship Council (FSC) by a FSC certified printer. 67.5k • 1/12 Lynnwood Mountlake Terrace Passengers to and from East Link light rail Shoreline the Eastside will be able to 145th ride between Snohomish County and East Link stations Northgate without changing trains. East Link will be Roosevelt Brooklyn Overlake University of 120th 130th Transit Center Washington OPEN for service Overlake Village Capitol Hill Hospital Bellevue Transit Center SERVING Westlake/Seattle University Street East Main 2023 Pioneer Square South Bellevue Intl District/Chinatown Stadium Rainier Mercer SODO Island 50,000 Beacon Hill daily riders by 2030 Mount Baker Columbia City Othello Rainier Beach Tukwila/Intl Blvd East Link SeaTac/Airport S 200th Link in service Under construction Kent/Des Moines Final Design Redondo/Star Lake In plannning Where we’ve been Planning for the East Link project to build light rail from environmental analysis, numerous opportunities for public engagement downtown Seattle to Overlake kicked off in 2006. In 2008, and preliminary engineering. voters approved East Link as part of the ST2 ballot measure. It’s been a busy five years, and we’re looking forward to furthering our Since then, the East Link team has brought forward detailed relationships in the community
    [Show full text]
  • CENTRAL DISTRICT DEVELOPMENT OPPORTUNITY 2605 & 2609 E Cherry St, Seattle, WA 98122 Exclusive Listing Agents
    CENTRAL DISTRICT DEVELOPMENT OPPORTUNITY 2605 & 2609 E Cherry St, Seattle, WA 98122 Exclusive Listing Agents TIM McKAY DAN CHHAN SAM WAYNE MATT KEMPER Senior Vice President Senior Vice President Senior Vice President Vice President +1 206 223 5586 +1 206 223 1265 +1 206 515 4498 +1 206 515 4495 [email protected] [email protected] [email protected] [email protected] Confidentiality & Disclaimer Colliers International has been retained as the exclusive listing broker for the xx Apartments in the city of Seattle, Washington. The Seller will consider offers on an all cash basis. Legal documents and reports summarized in this Offering Memorandum are not intended to be comprehensive statements of the terms or contents of such documents and reports. Although the Seller and Colliers International believe the information to be accurate, interested parties should conduct an independent investigation and reach conclusions without reliance on materials contained herein. The Seller reserves the right, for any or no reason, to withdraw the property from the market. The Seller has no obligation expressed or implied, to accept any offer. Further, the Seller has no obligation to sell the property unless and until the Seller executes and delivers a signed contract of sale on terms acceptable to the Seller, in its sole discretion. The material contained in this Offering Memorandum is confidential, under the terms and conditions of a Confidentiality Agreement, which has been executed by the recipient as Reviewer, and furnished solely for the purpose of considering the purchase of the property described herein and is not to be copied and/or used for any other purpose, or made available to any other person without the express written consent of Colliers International or the Seller.
    [Show full text]
  • Leschi/Judkins Park
    LESCHI/JUDKINS PARK DEVELOPMENT SITE SEATTLE SBD CAPITOL HILL PIONEER SQUARE JUDKINS PARK CENTRAL DISTRICT LESCHI KIRKLAND REDMOND UNIVERSITY DISTRICT FREMONT WALLINGFORD MADISON VALLEY QUEEN ANNE CAPITOL SLU MADISON HILL PARK MADRONA SEATTLE CBD CENTRAL BELLEVUE DISTRICT LESCHI LESCHI/JUDKINS PARK DEVELOPMENT SITE FUTURE JUDKINS PARK LIGHT RAIL STATION (2023) MT. BAKER BEACON HILL MERCER ISLAND INDUSTRIAL DISTRICT OFFERING Amazing Leschi/Judkins Park Opportunity! How often do you find a perfect project that literally bridges Seattle & Eastside Employment Hubs & is smartly sited in a charming neighborhood w/ coveted amenities & parks? It’s rare. This sizeable, partially permitted 20 townhouse project w/ an unbeatable location is a mere .5 mi to upcoming Eastlink Light Rail station, which will seamlessly connect Seattle & Eastside employment options. Your end-user pool just doubled. Look to the post-COVID urban lifestyle demand this project offers. 3 tax parcels- 25,451 sq ft in total, zoned LR2. If Light Rail & local mixed-use redevelopment hubs don’t excite you, perhaps the short 15 min drive to all Major employment centers of DT Seattle, SLU & Bellevue will. Seller is pursuing permits for a 20-unit townhouse project currently in the entitlement process, past Design Review with the City of Seattle. NAME Leschi/Judkins Park Development Site 800 28th Ave S, Seattle, WA 98144 ADDRESS 811 29th Ave S, Seattle, WA 98144 2801 S Dearborn St, Seattle, WA 98144 PARCEL NUMBERS 636290-0265, 056700-0612, 056700-0614 LOT SQUARE FEET 9,779 + 7,946 + 7,726 = 25,451 Square Feet ZONING LR2 (M) PRICE $6,300,000 PRICE PER LOT FOOT $246 PROPOSED DEVELOPMENT 20 Townhouses TERMS Cash Out This information has been secured from sources we believe to be reliable, but we make no representations or warranties, expressed or implied, as to the accuracy of the information.
    [Show full text]
  • System Access Fund 2019 Awards with Project Descriptions
    This following tables identify the projects awarded System Access Funds in September 2019 by the Sound Transit Board of Directors. Snohomish Subarea Jurisdiction Project Title & Description Amount Citywide Bicycle Improvements. This project will add bike lanes and sharrows (pavement markings indicating that the travel lane should be shared with bicycles) along multiple City of Edmonds $925,000 corridors through road diets and other striping revisions on 100th Avenue W/9th Avenue N, Bowdoin Way, and 80th Avenue W, and roadway widening on 228th Street SW. Everett Station Nonmotorized Access Improvements. This project will improve the comfort and safety of people walking and biking in the neighborhood by creating a safe and comfortable walking and biking route with clear wayfinding City of Everett $1,900,000 from Everett Station to Downtown Everett at the corner of the Angel of the Winds Arena. Project elements include lighting, sidewalks, marked bikeways, and signage along both sides of the almost 2,000-foot corridor. Scriber Creek Trail Redevelopment. This project will upgrade an existing 1.5-mile trail into a Class 1 shared-use path. This phase will construct approximately 2,000 linear feet City of Lynnwood of trail, establishing an elevated structure where appropriate $2,500,000 and will connect the Lynnwood Transit Center to the closest residential neighborhood, parks, and an important employment center. Veteran’s Memorial Park Light Rail Connector. This project will upgrade an existing 1.5-mile trail into a Class 1 shared-use path. This phase will construct approximately 2,000 linear feet City of Mountlake of trail, establishing an elevated structure where appropriate $500,000 Terrace and will connect the Lynnwood Transit Center to the closest residential neighborhood, parks, and an important employment center.
    [Show full text]
  • Roosevelt Station
    NORTHGATE LINK EXTENSION Roosevelt Station JULY 2012 Northgate Link Extension key design milestones where you can get involved. As the The Northgate Link Extension is a key part of the regional project moves to construction, Sound Transit will continue mass transit system approved by voters in 2008. to keep the public informed and address any issues that may arise. The 4.3-mile light rail project will provide a fast, reliable option for getting through one of the region’s most Issues for final design congested traffic areas. The Northgate Link Extension n Station architectural features includes stations at Northgate, the Roosevelt neighborhood n Details of pedestrian and bus connections and the University District. n Bicycle facilities at the station When the Northgate Link Extension opens in late 2021, it n Finalizing route of tunnel will be part of the 36 miles of new light rail lines running north, east and south from Seattle. n Construction schedule and methods n Redevelopment opportunities adjacent to station Roosevelt Station n Public art and artist selection Roosevelt Station, located underground just west of 12th Avenue Northeast across from Roosevelt High School, will have entrances at Northeast 65th and Northeast 67th Roosevelt Station streets. The Roosevelt Station will serve the surrounding neighborhoods and the Roosevelt business district, including NE 67th St Roosevelt Square. North By the year 2030, approximately 8,000 people a day are Entrance Roosevelt Future High School forecast to board light rail at Roosevelt Station.
    [Show full text]
  • Public Involvement Summary Table of Contents
    East Link Extension February 25, 2014 East Main Station Segment 60% Design Open House Public Involvement Summary Table of Contents 1 Background 2 Overview 2 Notification 3 Open house overview 4 Comment summary 4 East Main Station Design 7 Construction impacts 8 How do you plan to use East Link? 9 Permanent station naming 10 Next steps Sound Transit East Link Background East Link Extension is a key element of the regional mass stretching more than 50 miles. By 2030, about 50,000 transit system approved by voters in 2008. This 14-mile riders will use East Link every day. light rail line will benefit local communities and support East Link is advancing in final design. During this phase, regional growth with fast, frequent and reliable light project architects and engineers define the light rail system, rail service, connecting Seattle to the Eastside’s biggest determining the technical specifications for the stations, population and employment centers. bridges, tracks and other elements as well as construction The project builds on the Central Link light rail system methods and sequencing. The Sound Transit art program, running between Sea-Tac Airport and downtown Seattle STart, also begins work to select station artists and artworks and the University Link and S. 200th Link Extensions that during final design. Sound Transit hosted a public meeting are scheduled to open in 2016. East Link is part of the new in May 2013 to share design plans and we have since light rail extensions being built north, south and east from advanced design to approximately 60 percent completion.
    [Show full text]
  • East Link Light Rail
    East Link light rail Segment C: Downtown Bellevue July 2011 Segment Details Segment C serves downtown Bellevue with alternatives running from approximately SE 6th and NE 12th Streets. Sound Transit evaluated 10 alternatives in the 2011 Final Environmental Impact C9T Statement (FEIS). C11A There are two preferred alternatives in this segment: a cut-and- cover tunnel along 110th Avenue NE (C9T) and an at-grade alignment on 108th Avenue NE (C11A). C9T begins on the east side of 112th Avenue SE, then transitions C9T C11A to the west side at SE 6th Street before turning west into a tunnel C9T portal on Main Street. C9T then turns north under 110th Avenue C11A NE to the Bellevue Transit Center Station at NE 4th Street. C9T turns east at NE 6th Street and exits the tunnel portal, transitions to an elevated profile in the center of NE 6th Street, and then crosses to the north side of NE 6th Street to pass over 112th Avenue NE, I-405, and 116th Avenue NE to the elevated Hospital Station in the former BNSF Railway corridor. C11A begins on the east side of 112th Avenue SE, then travels C9T & C11A on the south side of Main Street in a retained cut to the 108th Station and turns north at-grade over Main Street to the center of 108th Avenue NE. At NE 6th Street, C11A turns east in the center of the street to the at-grade Bellevue Transit Center Station. C11A then crosses 110th Avenue NE at-grade, transitioning to a C9T & C11A (Preferred Alternatives) and other EIS Alternatives retained-fill and then an elevated profile before crossing 112th Avenue NE, I-405, and 116th Avenue NE to the elevated Hospital Station in the former BNSF Railway corridor.
    [Show full text]
  • Sound Transit 2020 Progress Report: Seattle Area
    Expanding your transit choices 2020 Progress Report Seattle area Doubling your destinations within the next 5 years Seattle area residents: During the next five years, Sound Transit is dramatically changing how we all get around the region. From 2021 to 2024, we’ll more than double your Link light rail destinations, opening new service to Northgate, Bellevue, Lynnwood, Federal Way, Redmond and the Hilltop neighborhood in Tacoma. Also by 2024, we’ll launch new Stride bus rapid transit on I-405, SR 518, SR 522 and NE 145th, and open new parking and access improvements at Sounder stations. At the same time, we’re advancing other Link and Sounder projects described in this report, making it easier for you to get to work and home and to Seahawks games, college classes and Tacoma Dome concerts. This progress report is just one way for us to stay in touch. For more information, check out our website, subscribe to updates and get involved with the projects that interest you most. Peter Rogoff, Sound Transit CEO soundtransit.org/2020report More inside: pg. 2-6 Milestones we’re meeting to bring new transit to the Seattle area pg. 7 The system we’re building, including timelines for new service pg. 10-11 Tips for riding Sound Transit and where we can take you pg. 12-13 How we finance construction and operation of the expanded system At Sound Transit we are connecting more people to more places to make life better and create equitable opportunities for all. 1 More transit for the Seattle area Link light rail Shoreline Current service South/145th
    [Show full text]
  • Group Name Here
    West Seattle Transportation Coalition May 25, 2017 Sound Transit district 3 counties: King | Pierce | Snohomish 51cities 800,000 more people by 2040 More than 40% 3 million of the state’s residents population Constructing projects Northgate Link • 3 new stations • opening 2021 East Link • 10 new stations • opening 2023 Lynnwood Link • 4 new stations • construction in 2018 • opening 2023 Tacoma Link • 6 new stations • construction in 2018 • opening in 2022 *Northgate Link 23 new Link stations by 2023 MoreMeeting riders growing every demand year Source: Sound Transit ridership reports, service implementation plan and financial plan. 176 M Ridership (millions) 42 M PROJECTED 18.8 M ACTUAL 2009 2016 2041 System expansion Every few years new light rail, bus rapid transit and commuter rail stations open throughout the region, providing fast, reliable alternatives to congested roads More information on each project: soundtransit.org/system-expansion 2016 Light rail • University of Washington, Capitol Hill, Downtown Seattle, Sea-Tac Airport, Angle Lake • Tacoma Dome to Theater District Sounder rail • Everett to Seattle • Lakewood/Tacoma to Seattle ST Express bus • 28 regional bus routes 2021 Light rail • U District, Roosevelt, Northgate 2022 Light rail • Tacoma Link to Martin Luther King/South 19th St 2023 Light rail • Shoreline, Mountlake Terrace, Lynnwood • Mercer Island, Bellevue, Spring District, Redmond (Overlake) Sounder • Sounder south parking and access improvements 2024 Light rail • SE and Downtown Redmond • Kent/ Des Moines, Federal Way Bus • BRT - Lynnwood to Burien • BRT - SR 522 to NE 145th • North Sammamish park-and-ride Sounder • Sounder north added parking 2030 Light rail • Alaska Junction, Avalon, Delridge • South Federal Way, Fife, East Tacoma, Tacoma Dome 2031 Light rail infill stations • NE 130th St • South Graham St • South Boeing Access Rd 2035 Light rail and new downtown tunnel • Ballard, Interbay, Smith Cove, Seattle Center, S.
    [Show full text]