East Link Site Map South Bellevue to Overlake Transit

Total Page:16

File Type:pdf, Size:1020Kb

East Link Site Map South Bellevue to Overlake Transit 3-105 I-90 E320 E335 SOUTH BELLEVUE DOWNTOWN S Bellevue Station DBB GCCM N (2.2 MILES) (1.8 MILES) BELLEVUE WAY SE NE 2ND ST NE 8TH ST NE 12TH ST LEGEND: 112TH AVE SE 112TH AVE NE - STATIONS SE 15TH ST - GARAGES SE 8TH ST SE 6TH ST I-405 - ELEVATED MAIN ST - AT GRADE 1116TH AVE NE - RETAINED CUT BNSF ROW - RETAINED FILL - TUNNEL I-90 SR520 120TH AVE NE EXXX - PACKAGE NUMBER DBB - DESIGN BID BUILD E330 124TH AVE NE GCCM - GENERAL CONTRACTOR TUNNEL CONSTRUCTION MANAGER DBB (0.5 MILES TUNNEL, D/B - DESIGN BUILD BEL-RED RD BEL-RED TRACK IN E335) 130TH AVE NE E340 EAST LINK SITE MAP BEL-RED 132TH AVE NE DBB (1.0 MILES) 134TH AVE NE SOUTH BELLEVUE TO OVERLAKE TRANSIT CENTER SR520 NE 16TH ST NE 24TH ST 136TH PL NE 140TH AVE NE BEL-RED RD BEL-RED 148TH AVE NE NE 40TH ST Overlake Village Station Overlake Transit BEL-RED RD Center Station AT GRADE W/ 156TH AVE NE CENTER PLATFORM CITY LIMITS & 320 STALL PARK-N-RIDE GARAGE 3-107 System map East Link Extension Lynnwood East Link community outreach Mountlake Terrace Shoreline We want to hear from you! During final design, there will be opportunities to provide Community Guide to Final Design TBD Future expansion feedback on station design, including amenities such as bicycle facilities, pedestrian and not currently Northgate funded for construction bus connections and public art. During final design, Sound Transit will: Roosevelt Downtown Overlake Redmond • Keep the public informed with briefings, public meetings and frequent updates to the U District Transit Center University of SE Redmond website Washington Overlake Village Length: 14 miles 130th Capitol Hill 120th • Ask for public input before making big decisions about design Hospital Ride times: Westlake/Seattle Bellevue Transit Center • Consider and address public input whenever it is technically and financially feasible University Street East Main Mercer Island to University of Project benefits Pioneer Square Washington: 20 minutes • Report back to the public about how input was considered Intl District/Chinatown South Bellevue Stadium East Link Extension will benefit local communities and support regional • Notify residents, property owners and businesses before conducting work in the field Rainier Mercer South Bellevue to Sea-Tac Airport: SODO Island 50 minutes growth with fast, frequent and reliable light rail service, connecting Seattle Beacon Hill to the Eastside’s biggest population and employment centers. Sound Mount Baker Overlake Transit Center to Bellevue Columbia City Transit’s goal is to deliver a light rail system that serves the region and is Othello Transit Center: 10 minutes Rainier Beach compatible with its surrounding communities. Link in service Rider projection: About 50,000 riders Stay involved during final design Tukwila/Intl Blvd Under construction SeaTac/Airport will use East Link every day by 2030 The project builds on the Central Link light rail system that runs between Attend community meetings at key design milestones and stay informed throughout final In design Angle Lake Budget: $2.8 billion (2010 $) Sea-Tac Airport and downtown Seattle and the University Link Extension In planning/planned design by: visiting the project website: www.soundtransit.org/eastlink and subscribing to Kent/Des Moines the East Link listserv. For more information, or to request a briefing for your organization, Start of service: Targeted 2023 that is scheduled to open in 2016. East Link is one of the new light rail S 272nd Future expansion contact Community Outreach staff at [email protected] or 206-398-5470. not currently extensions Sound Transit is building north, south and east from Seattle. Federal Way funded for Transit Center construction East Link alignment Overlake Transit Center P NE 40th Overlake 520 Village 120th 130th P NE 16th St Hospital Ave NE 152nd Lake NE 8th St Washington NE 6th St Bellevue Map Key Transit Center Station P Park & Ride East Main Link in service Main St Tunnel route Elevated route Intl District/ Surface and Mercer existing bridges Chinatown Light rail under Rainier Island construction Future extension P Rainier Ave S P South Bellevue 23rd Ave S 77th Ave SE 80th Ave SE 2006-2011 2011-2015 2015-2022 Targeted 2022 Targeted 2023 Planning and Final design Testing & East Link environmental Construction (we are here) pre-operations in service review Sound Transit plans, builds, and operates regional transit systems and services to improve mobility for Central Puget Sound. Sound Transit l 401 S. Jackson St. l Seattle, WA 98104-2826 l 1-800-201-4900 / TTY Relay: 711 l [email protected] l www.soundtransit.org 3-109 What to expect during final design How Sound Transit designs light rail East Link is moving into final design, the process that will advance the design from approximately 30 percent to 100 percent The following design principles guide Sound Transit’s team of architects and completion. During final design, Sound Transit will prepare the project for construction by: engineers. These guiding principles are based upon Sound Transit’s prior STart experience, coordination with local jurisdictions, and best practices from light • Developing station designs • Acquiring right-of-way rail professionals across the country. Sound Transit is committed to creating • Conducting field work • Identifying architectural elements memorable experiences for its riders and • Promote safety and security within Sound Transit facilities and the fostering livable and walkable communities • Coordinating permits • Defining the construction schedule and methods surrounding community throughout the region. During final design, • Incorporating art into design • Partnering with local jurisdictions (example: Station area • Develop a Link light rail system that is accessible to all users Sound Transit will hire artists to work with planning) • Maintain a common look and feel throughout the regional Link light rail the design team and seek input from the 100 percent design system public to create artwork that provides a Design milestones strong visual identity, welcoming sense of • Reflect individual community character through design features and art place, and meaningful connection to the Start • Build durable, long-lasting light rail infrastructure surrounding area. Final design kick-off 60 percent design 90 percent design construction • Promote sustainability by improving the environment, encouraging healthy (Spring 2013) (Second half of 2013) (2014) (targeted communities and supporting a vibrant local economy (*we are here) 2015) • Station design • Design continues • Complete design • Non-station design elements • Determine construction • Refine staging areas and (rail, walls, bridges, etc.) schedule and sequencing truck haul routes • Lead artist joins design team • Identify construction • Incorporate mitigation from STart methods, refine staging measures areas and truck haul routes • Refine staging areas • Advance STart Design progress • Incorporate mitigation measures • Incorporate mitigation measures • Begin property acquisition process • Begin permitting process Standard design features Reflecting community character Sound Transit uses standard design features across the light rail In addition to the standard design features, Sound Transit • Review and comment on • Review and comment on • Present final design of project system, to minimize cost and maintain a unified look. Here are will design East Link to reflect the unique character of the design design • Business outreach some examples of standard design features: communities it serves. The design team will seek public input on the following design elements: • Individual meetings with • Business outreach • Construction outreach • Station lighting property owners • Individual meetings with • Signage and wayfinding elements • Artwork (STart) outreach • Provide input on permanent property owners • Station naming Community • Platform paving station names • Construction outreach • ORCA card vending machines • Landscaping and hardscaping • STart: Meet the artists • Station seating • Fence and railings • Bicycle storage • Noise and retaining walls • Tunnel portals • Equipment screening Sustainability Safety • Bicycle and pedestrian access at station Sound Transit’s commitment to sustainability serves as the Sound Transit stations are designed using Crime backbone in building and operating a regional transit system Prevention through Environmental Design (CPTED) that will benefit users for years to come. East Link will to enhance site security. These design guidelines improve the environment, while connecting people with jobs call for open, spacious, and well-lit light rail stations and amenities, to create and maintain healthy communities that promote safety for all users. Attention is and a strong economy. We will use sustainable design and given to clear sight lines and visibility along with construction methods, such as selecting renewable materials eliminating or minimizing dark or hiding areas, and and using mitigation measures to improve the environment. station structures that block visibility. 3-110 .
Recommended publications
  • Funding Application
    1 of 13 Funding Application Competition Regional FHWA Application Type Corridors Serving Centers Status submitted Submitted: April 8th, 2020 5:12 PM Prepopulated with screening form? No Project Information 1. Project Title On-Demand Feeder-to-Fixed Route Connections to Transit Program 2. Regional Transportation Plan ID N/A 3. Sponsoring Agency King County Metro 4. Cosponsors N/A 5. Does the sponsoring agency have "Certification Acceptance" status from WSDOT? Yes 6. If not, which agency will serve as your CA sponsor? N/A Contact Information 1. Contact name Eric Irelan 2. Contact phone 206-477-3862 3. Contact email [email protected] Project Description 1. Project Scope Metro will contract with a service provider to provide on-demand feeder-to-fixed route (F2FR) service for two years at three newly expanded transit hubs located in Regional Centers: Federal Way Transit Center, Overlake Village Station, and Auburn Transit Center. Customers within an approximately two-mile radius of these transit centers will be able to request rides through an app or call center, get picked up within 15 minutes, and rideshare with other customers to and from the transit hub located in the Regional Center and destinations within the service area. The service is intended to be available all-day; exact service hours determined based on community input, fixed-route transit service hours, projected ridership demand, and final costs. Proposed project costs include: service design and operations, marketing and promotions, community engagement, evaluation and information sharing. The on-demand F2FR services provided by this project will fill critical gaps in transit service, directly benefiting 900,000 residents and 850,000 employees located within the F2FR directly benefiting 900,000 residents and 850,000 employees located within the F2FR 2 of 13 service areas or within the catchment areas for the routes directly serving the transit hubs (ESRI 2019).
    [Show full text]
  • East Link Extension Update System Expansion Committee
    East Link Extension Update System Expansion Committee 01/14/21 Why we are here • Provide a project update on the East Link Extension construction progress • Increase contract contingency request for: • E130 contingency increase request (M2021-04) • E340 contingency increase request (M2021-05) • E335 contingency increase request (M2021-06) 2 2012-15 2016 2017 2018 2019 2020 2021 2022 2023 2024 Final Design We are here E130 – Seattle to South Bellevue (I-90) E320 South Bellevue E330 Downtown Bellevue Tunnel E335 Downtown Bellevue to Spring District E340 Bel-Red E360 SR520 to Redmond E750 Systems Pre-Revenue Float Revenue Service Challenges / Upcoming Milestones Challenges • COVID-19 Impacts • Station Schedules and Systems Access • Redmond Technology Station Garage Upcoming Milestones • Mercer Island Transit Interchange – Bids Due (Q1 2021) • South Bellevue (E320) Substantial Completion (Q1 2021) • Bel-Red (E340) Substantial Completion (Q1 2021) • I-90 (E130) Substantial Completion (Q2 2021) • Overlake (E360) Substantial Completion (Q2 2021) 4 Judkins Park Station 5 Mercer Island Station 6 Mercer Island Transit Interchange 7 South Bellevue Station 8 East Main Station 9 Bellevue Downtown Station 10 Wilburton Station 11 Spring District/120th Station 12 Bel-Red/130th Station 13 Overlake Village Station 14 Redmond Technology Station 15 Redmond Technology Station Garage 16 Q2 2021 Weekend Closures • Weekend #1: • Pioneer Square Temp Platform Removal • Weekend #2: • Signaling Work • Traction Power • Weekend #3: • Pioneer Square Temp Platform Removal
    [Show full text]
  • Sound Transit Current Service
    PSRC Funding Application Competition Regional FTA Application Main Competition Status submitted Submitted: March 17th, 2017 11:48 AM Prepopulated with screening form? Yes Project Information 1. Project Title Purchase 11 New High Capacity Transit Buses 2. Transportation 2040 ID Exempt 3. Sponsoring Agency Sound Transit 4. Cosponsors N/A 5. Does the sponsoring agency have "Certification Acceptance" status from WSDOT? N/A 6. If not, which agency will serve as your CA sponsor? N/A 7. Is your agency a designated recipient for FTA funds? Yes 8. Designated recipient concurrence N/A Contact Information 1. Contact name Monica Overby 2. Contact phone 2066894979 3. Contact email [email protected] Project Description 1. Project Scope This project will purchase eleven High Capacity Transit (HCT) buses needed to provide 15,000 additional ST Express bus hours. The new service is estimated to increase ridership by a range of 1,400 to 2,800 riders per weekday. Sound Transit's ST Express Bus service provides fast, frequent, reliable service connecting major population and employment centers in the Central Puget Sound region. ST Express provides limited stops and serves twenty-five transit centers and over thirty park & rides linking the three-county region. The ST Express system is experiencing challenges meeting its service standards and performance due to buses being overcrowded, delaying schedule and service reliability. These buses will ultimately support the entire network of ST Express bus routes that serve 23 designated regional centers in Snohomish, Pierce and King Counties For this application, Sound Transit is focusing the eleven buses on routes experiencing the most severe overcrowding and schedule reliability issues.
    [Show full text]
  • WSHFC | Fixed Transit Infrastructure in King County
    9 9 Fixed Transit InfrastructRure in King C1 ounty S 9 205TH T H h t Aurora Village Transit Center 5 I 1 - 4 B 0 a 5 ll 2 in 2 g 5 e r R S 190th N 185th St & Aurora Ave N Bothell Transit Center Woodinville Duvall ell Both W o 175th od N 175th St & Aurora Ave N in vi 03 h lle 2 t D 4 R 175th u S 2 va 170th 2 ll W h t o o 5 d 1 in N 160th St & Aurora Ave N v il le S R i e m d o m n d o s n d n i N 145th St & Aurora Ave N a h M t y t 5 i 1 C 145th e k a C L a N 135th St & Aurora Ave N r e n l a a t i h d o t N 130th St & Aurora Ave N R n n 0 o o o 0 s v D 1 e A v u e v l 125th t a l l d o o 133rd y w t i h n C t e 6 e 30th e 1 5 128th r k Totem Lake Transit Center 1 a G L Northgate 124th N 105th St & Aurora Ave N h Northgate Station Transit Center t 8 9 an m N 100th St & Aurora Ave N ol H 95th R e t l d e R m N 90th St & Aurora Ave N v a o e S v n s e T d o n A ll NW 85th St & 15th Ave NW o i W T N 85th St & Aurora Ave N n y H R t E a el t o ov H h o e N t Y k d 5 r i 3 1 n a 0 v 5 M i l l e 75th h t 5 3 h t 2 1 6th 85th NE 87th St & 148th Ave NE NW 65th St & 15th Ave NW Roosevelt Station 65th Kirkland Transit Center h t t n Redmond Transit Center a i 5 h r o t 1 o P 5 r d 2 u n R a e A S ed h k m NW Market St & 15th Ave NW t o a n 1 d L 1 50th 5 0 4 NE Old Redmond Rd & 148th Ave NE NW Leary Way & 15th Ave NW - I 4 0 L N 45th St & Aurora Ave N 5th a 2 k Brooklyn Station 5 L e e R a L S 5 r h E a S a y t m 0 m e k r 5 s 4 o e m n ic 1 - if I c a W a P m Re a i dm s s h o h NE 51st St & 148th Ave NE nd B i F n a N e l l ic g l C k l it e University
    [Show full text]
  • BEAR CREEK Apartments OFFERING
    BEAR CREEK apartments OFFERING Paragon Real Estate Advisors is pleased to exclusively offer for sale the Bear Creek Apartments, an 8 – unit apartment building located in the highly sought after and walkable Redmond neighborhood. The property has undergone a complete high-end renovation to both the interior and exterior of the building. With a BEAR CREEK WalkScore of 84 and modern looking units, the Bear Creek apartments Apartments cater well to tenants who work in the strong tech employment markets on the Eastside. NAME Bear Creek Apartments ADDRESS 17121 NE 80th St, Redmond WA 98052 TOTAL UNITS 8 BUILT 1984 SQUARE FEET 7,408 Total Net Rentable PRICE $3,300,000 PRICE PER UNIT $412,500 PRICE PER FOOT $445.46 CURRENT GRM/CAP 18.1/4.0% MARKET GRM/CAP 15.0/5.0% LOT SIZE 14,549 Square Feet ZONING R30 This information has been secured from sources we believe to be reliable, but we make no representations or warranties, expressed or implied, as to the accuracy of the information. References to square footage or age are approximate. Buyer must verify all information and bears all risk for inaccuracies. SEATTLE CBD UNIVERSITY OF WASHINGTON BELLEVUE BRIDLE TRAILS KIRKLAND STATE PARK MARYMOOR PARK REDMOND TOWN CENTER INVESTMENT HIGHLIGHTS Rare opportunity to purchase Eastside location apartments 8 well appointed homes High end renovation; marble, tile, hardwoods, stainless steel All units have washer and dryers 12 covered parking spaces Located in the heart of Redmond Private decks with territorial views Large dedicated storage units for each unit BEAR CREEK apartments LOCATION HIGHLIGHTS Redmond is the seventh most populous city in King County and the 15th most populous city in the State of Washington.
    [Show full text]
  • East Link Light Rail Draft EIS -- Excerpts Only
    See the Fact Sheet for persons who may be contacted for additional information concerning this document. Abstract Sound Transit proposes to construct and operate an Downtown Redmond via either Redmond Way or the eastern extension of the Link light rail system BNSF Railway corridor. Alternatives considered providing urban transportation improvements in the include a No Build Alternative, one alternative for Central Puget Sound metropolitan region. The East Segment A, five alternatives for Segment B, six Link project would connect to the rail system’s Initial alternatives for Segment C, four alternatives for Segment in downtown Seattle and extend the system Segment D, three alternatives for Segment E, and four east to Mercer Island, Bellevue, and Redmond. maintenance facility alternatives. Overall, the project Alternatives are considered in five geographic would have between 10 and 13 stations. Interim segments in this EIS. Segment A, Interstate 90, termini could occur at the east end of Segment C or connects downtown Seattle to Mercer Island and any station in Segments D or E. Construction is South Bellevue via I-90. Segment B, South Bellevue, expected to start in 2013, with operation under way connects I-90 to approximately SE 6th Street along one between 2020 and 2021. The analysis and impact of three corridors: Bellevue Way, 112th Avenue SE, or information in this EIS addresses potential long-term the BNSF Railway right-of-way. Segment C, and short-term impacts of transportation; acquisitions, Downtown Bellevue, would travel through displacements and relocations; land use; economics; downtown Bellevue between approximately SE 6th social impacts, community facilities, and Street and an I-405 crossing at either NE 6th Street or neighborhoods; visual and aesthetic resources; air NE 12th Street on either an at-grade, elevated, or quality and greenhouse gas; noise and vibration; tunnel profile.
    [Show full text]
  • Overlake Village Station Fact Sheet
    Fall 2020 Overlake in Redmond East Link Extension Line opening 2023 Downtown Redmond 2024 148th Ave NE 150th Ave NE 520 Bike Trail Light rail is coming North Bellevue Community Park to the Eastside NE 40th St The Overlake segment of East Link Link light rail Redmond NE 42nd St continues north from Bel-Red adjacent Technology Microsoft Overlake segment to SR 520, and will serve Overlake Surface Microsoft NE 40th St Commons neighborhoods and businesses. When Elevated service begins in 2023, East Link will operate as part of the new 2 Line, serving Station 520 NE 36th St Parking 19 stations between Redmond Technology and Northgate. In 2024, 2-Line service Goldsmith will extend to Lynnwood and downtown N Neighborhood Park Redmond NE 31St Way Redmond with six additional stations. NE 31St St Project benefits Overlake • The 2 Line will connect Redmond, Village Bellevue, Mercer Island and Seattle with high-capacity, frequent service 20 152nd Ave NE 140th Ave NE 156th Ave NE hours per day. NE 29th Pl • Supports the City of Redmond’s Overlake Village Neighborhood Plan. 148th Ave NE NE 24th St • Accomodates future growth and 520 planned transportation improvements. Bellevue • Increases park-and-ride capacity at te a g NE 20th St Redmond Technology Station. th r o N o t • A pedestrian and bicycle bridge at Highland Overlake Village Station, funded by the Park NE Bel-Red Rd City of Redmond, will span SR 520 to connect neighboring communities with light rail service. • Microsoft is redeveloping its central Travel times from Redmond Technology: campus, which includes building a pedestrian bridge that links both Chinatown/International District in 30 minutes sides of SR 520 to Redmond University of Washington in 40 minutes Technology Station.
    [Show full text]
  • East Link Extension Washington Into East King County, and South of University of Washington Bel-Red/130Th Sea-Tac International Airport
    Lynnwood Link Light Rail System Mountlake Terrace 185th 145th Downtown Redmond In 2008, voters approved the Sound Transit 2 Not funded for construction Plan. Link will expand the current system from Northgate SE Redmond Seattle north into Snohomish County, across Lake Roosevelt Redmond Technology Center U District Overlake Village East Link Extension Washington into East King County, and south of University of Washington Bel-Red/130th Sea-Tac International Airport. OCTOBER 2016 Capitol Hill Spring District/120th Westlake/Seattle Wilburton University Street Bellevue Downtown Bellevue Pioneer Square East Main Downtown to Int’l District/Chinatown South Bellevue Redmond Technology Center Stadium Judkins Mercer SODO Park Island 10 minutes Beacon Hill Mount Baker Columbia City Othello South Bellevue Rainier Beach to Stadium Tukwila/Int’l Blvd 20 minutes SeaTac/Airport Link in service Angle Lake Under construction Kent/Des Moines For information in alternative formats, call 1-800-201-4900/ In final design S 272nd Not funded for TTY Relay: 711 or email [email protected]. construction In planning Federal Way Bellevue East Link Alignment Downtown to University Of Washington Map Key 30 minutes Station P Park & Ride Redmond Link in service Technology Center P NE 40th Tunnel route Elevated route Overlake Bellevue to Surface and 520 Village existing bridges Spring District/ Sea-Tac Airport 120th Light rail under P 55 minutes construction Bel-Red/ 52nd Ave NE includes transfer Future extension Wilburton 130th 1 Lake NE 8th St Washington NE 6th St Bellevue Downtown Bellevue to East Main Main St International District station Intl District/ Chinatown Mercer 20 minutes Judkins Park Island Rainier Ave S P S P South Bellevue Sound Transit plans, builds and operates regional transit systems and services to improve mobility for Central Puget Sound.
    [Show full text]
  • East Link Extension Overlake Pre-Final Design
    East Link Extension November 19, 2013 Overlake Pre-Final Design Open House Public Involvement Summary Table of contents 1 Background 2 Overview 2 Notification 3 Open house overview 4 Comment summary 4 Overlake segment design 6 Construction impacts 7 Overlake Village Station design 8 Overlake Village potential pedestrian-bicycle bridge 9 Overlake Transit Center Station design 11 Overlake Transit Center potential pedestrian- bicycle bridge 12 Permanent station naming comment summary 14 Supplemental outreach 15 Next steps Sound Transit East Link Background East Link Extension is a key element of the regional mass In 2011, Sound Transit completed environmental review transit system approved by voters in 2008. This 14-mile and received a federal Record of Decision to build East Link. light rail line will benefit local communities and support East Link began advancing to pre-final design in Overlake regional growth with fast, frequent and reliable light in 2012. During pre-final design, project architects and rail service, connecting Seattle to the Eastside’s biggest engineers define the light rail system, determining the population and employment centers. technical specifications for the stations, bridges, tracks The project builds on the Central Link light rail system and other elements, as well as construction methods and running between Sea-Tac Airport and downtown Seattle. sequencing. The Sound Transit art program, STart, also East Link is part of the new light rail extensions being built begins work to select station artists and artworks during north, south and east from Seattle. When East Link opens, final design. There are multiple opportunities for the with a targeted date of 2023, 10 stations, serving Seattle, community to help influence design elements and stay Mercer Island, Bellevue, Bel-Red and Overlake in Redmond informed as East Link moves forward.
    [Show full text]
  • 130Th Avenue NE Transit-Oriented Development Opportunity Study and Financial Assessment
    East C rrid r Implementati n Support 130th Avenue NE Transit-Oriented Development Opportunity Study and Financial Assessment PHASE 2 REPORT DECEMBER 2013 Otak, Inc. In association with: BAE Urban Economics and Nelson\Nygaard Consulting Associates Puttman Infrastructure GROWING TRANSIT COMMUNITIES PARTNERSHIP | East Corridor Implementation Support | DECEMBER 2013 The Growing Transit Communities Partnership is funded by the Sustainable Communities Regional Planning Grant Program of the U.S. Department of Housing and Urban Development. The work that provided the basis for this publication was supported by funding under an award with the U.S. Department of Housing and Urban Development. The substance and findings of the work are dedicated to the public. The author and publisher are solely responsible for the accuracy of the statements and interpretations contained in this publication. Such interpretations do not necessarily reflect the views of the Government. 130TH AVENUE NE TRANSIT-ORIENTED DEVELOPMENT Opportunity Study and Financial Assessment GROWING TRANSIT COMMUNITIES PARTNERSHIP | East Corridor Implementation Support | DECEMBER 2013 AAcckknnoowwlleeddggeemmeennttss Project Management Team of the East Corridor Task Force The following members of the East Corridor Task Force are serving on the Project Management Team for the East Corridor Implementation Support Project: Wes Edwards – King County Tom Hinman – Redmond Community Representative Emil King – City of Bellevue Doug Mathews – Bellevue Community Representative Lori Peckol – City of Redmond Tracy Reich – Impact Capital Kelly Rider – Housing Development Consortium Seattle-King County Arthur Sullivan – A Regional Coalition for Housing (ARCH) Alternates: Paul Inghram – City of Bellevue Sarah Stiteler – City of Redmond Puget Sound Regional Council, Growing Transit Communities Partnership Ben Bakkenta, Program Manager Mary Pat Lawlor, Program Manager Cameron Duncan, Planning Technician Consultants Otak, Inc.—Prime Mandi Roberts, Project Manager Kurt Creager Tom Litster Jenny Ngo BAE Urban Economics, Inc.
    [Show full text]
  • Chapter 5: Regional Transportation
    Chapter 5: Regional Transportation Introduction Redmond has a two-part role in regional transportation. First, many of the city’s transportation facilities are part of the regional travel network. Redmond’s streets carry regional pass-through traffic in addition to serving local circulation and access needs. Second, Redmond has interests in and relies on regional transportation projects and services that are the responsibility of other public agencies, including the Washington State Department of Transportation (WSDOT), Sound Transit, and King County Metro. Redmond participates in regional transportation policymaking in a variety of settings, including standing committees (e.g., Eastside Transportation Partnership, King County Regional Transit Committee, and King County Growth Management Planning Council), task forces (e.g., the SR 520 Bridge Replacement and HOV Program, and I-90 Tolling), and representation on major regional transportation policy bodies (e.g. the Puget Sound Regional Council, Sound Transit Board). This chapter identifies Redmond’s regional transportation issues and interests, and the actions needed to support the Transportation Master Plan’s (TMP) strategies to prepare for light rail, strongly support urban centers, increase travel choices and mobility, improve neighborhood access, and increase freight mobility. Examples include: supporting Sound Transit 3 planning to extend East Link light rail to Downtown Redmond; implementation of the SR 520 Multimodal Corridor Study, improving regional corridors and increasing access to Redmond’s urban centers through better highways, streets, and trails; more effective transit connections between regional transit and jobs and housing, eliminating gaps in transit service between neighborhoods; and greater use of technology for the movement of people, freight, and goods.
    [Show full text]
  • John Tiscornia TRANSPORTATION NETWORK Multimodal Transportation Network Bellevue Is a Regional Hub with More Than 140,000 Residents and Nearly 150,000 Jobs
    2019 John Tiscornia TRANSPORTATION NETWORK Multimodal transportation network Bellevue is a regional hub with more than 140,000 residents and nearly 150,000 jobs. It’s critical that the city’s transportation network support our current population and future growth. We do this by supporting multiple options. We are dedicated to getting people where they need to go in Bellevue -- safely and efficiently. Amidst our growth, traffic congestion has become a greater challenge. More drivers are using city parallel arterials to reach their destinations. In response, several city-led initiatives are shaping Bellevue’s distinct urban character to better accommodate people who want to drive, walk, bike and take transit. These include: • Downtown Livability Initiative • Smart City strategy • BelRed Transformation • Vision Zero Action Plan • Pedestrian and Bicycle Implementation Initiative • Bike Share pilot program • Grand Connection project Within neighborhoods, more safety improvements, congestion reduction, sidewalk, bike lanes and maintenance projects are being funded by a 20-year, voter-approved neighborhood transportation levy. CITY OF BELLEVUE PAGE 2 ACCESS BELLEVUE TRANSPORTATION NETWORK More broadly, Bellevue is working closely with regional partners to improve transportation connections: • Sound Transit – Expanding light rail service to East King County with East Link service in 2023. • King County Metro – “Ride2” pilot program provides “first and last mile” shuttle service to and from Eastgate Park-and-Ride. • King County’s Eastside Rail Corridor – Development of a regional pedestrian-bicycle trail, part of which is already open in Bellevue. • Washington State Department of Transportation – Interstate 405 Renton to Bellevue Widening and Express Toll Lanes project will improve mobility and reduce congestion.
    [Show full text]