Railway Safety Systems

Total Page:16

File Type:pdf, Size:1020Kb

Railway Safety Systems RAILWAY SAFETY SYSTEMS PRODUCT PORTFOLIO ABOUT US Company ALTPRO was established and is currently manufacturing 900 in 1994 and has over 20 years of different systems and devices - all its experience in research, development safety products have been certified and production of safety-signalling according to EU standards for SIL4 by equipment for rolling stock and in- the independent assessment bodies frastructure. Based on the company’s such as TÜV Rheinland. Since the very „know-how“ ALTPRO products have beginning ALTPRO has invested in its been fully developed and produced most valuable resources - it’s employees, in Croatia and have proved their com- and today it employs more than 110 Altpro HQ petitiveness on the global market. experts in the fields of research, With its complete safety-signalling development, engineering, production product range for rolling stock and and maintenance. infrastructure, ALTPRO is one of the few producers of such equipment in the world. Through a net of distribu- tors and representatives, ALTPRO products are present on the markets of more than 45 countries on 6 continents. ALTPRO has developed Testing poligon SIGNALLING AND SAFETY SYSTEMS FOR RAILWAY INFRASTRUCTURE RLC23 Central Device LEVEL CROSSING PROTECTION SYSTEM 1 Level crossing protection system 1 RLC23 is the ideal solution for instal- lation on the existing unprotected or future level crossings on the line with or without any signalling infrastructure; as well as an easy replacement of ex- 2 isting old LC protection systems. Sim- ple configuration of generic RLC23 system is achieved by using PC / Windows configuration wizard. All types of road signals, barriers / half- 3 VUR Lightning barriers and train driver’s indication Protection Module signals can be used according to the 4 local national regulations. ZK24-2 Interface with any type of station in- Rail Wheel Sensor terlocking system (relay or micropro- 5 cessor based) is provided in the sta- 2 tion, on the remote control unit. The system is certified for SIL4, as well as tested according to EN 50125- 3 and 50121-4 (EMC), by independent safety assessor TÜV Rheinland. KS11 PB13 CS - LHR LED Driver’s Half-barrier Road Signal Indication Signal 4 3 5 TRAIN DETECTION Train detection through wheel sensor signals is the safest technology of railway vehicle detection. Depending on application and project, it is possible to use two types of devices for train detection: train detection devices, which detect the train presence over the counting point i.e. rail wheel sensor (Train Detection System TDR14, Train Detector UTR / ITR); OUTDOOR EQUIPMENT axle counter, which acquires and stores information about the number ZK24-2 Rail Wheel Sensor of axles that have passed over the counting point, and displays the information about the axle number on each section (Axle Counter BO23). Axle Counter BO23 and Train Detection System TDR14 are certified for SIL4 by independent safety assessor TÜV INDOOR EQUIPMENT Rheinland. UTR Train Detector TDR14 Train Detection BO23 Axle Counter Lightning protection modules System VUR ZGK BO23 UTR / TDR14 BO23 indoor equipment ZK24-2 and VUR in winter conditions UTR and TDR14 indoor equipment LIGHT RAIL APPLICATION BO23-MT Axle Counter ZK24-M Rail Wheel Sensor ZK24-M3 Rail Wheel Sensor SK24-2 Sensor Installation Box Specific conditions of urban rail require Sensor ZK24-2 and with ZK24-M specific products. Basic application of series for rubber-tyred metro, monorail Axle Counter BO23-MT is for LRT and APM vehicles. Sensor installation section occupancy control (Metro, Tram, box SK24-2 for sensor installations in Monorail, APM) for both block section embedded tracks provides mechanical and station section occupancy control protection for up to 20 tons. with no trackside electronics. BO23-MT is compatible with standard Rail wheel ZK24-M on track SAFETY SYSTEMS FOR ROLLING STOCK AUTOMATIC TRAIN PROTECTION SYSTEM AUTOSTOP automatic train protection system based on INDUSI (PZB) principle is designed in order to increase the safety of railway traffic. If the driver doesn’t comply with safety regulations, the system activates brakes (initiates automatic braking). Automatic train protection system consists of central device RAS 8385, locomotive and track balises (magnets) and signalling and operating elements located in the locomotive cabin. Track and locomotive balises are certified in TÜV Rheinland according 1 2 3 to 50121-3, 50121-4 and 50125- LLC0512 RAS8385 PM500 and PM1020 3. RAS8385 is tested according to Locomotive Central Device Track Balise EN50155, EN 50121-3 and EN 61373. Balise Cabin A 2 3 Restriction 6 1 Acknowledge Override Dead Man’s Pneumatic Control Release installation (SIFA) km/h Speedometer Pushbutton Foot 4 switch 1 5 Alarm km/h Speed sensor 2 3 DEAD MAN’S SYSTEM (SIFA) The dead man’s control system is designed for all kinds of rail vehicles UP1-D, UP1 Foot Switch ZS Three-tone Sound Device UDB1 and consists of control unit UDB1, Electronic Dead Man’s Control Unit foot switch UP1/UP1-D and three - tone sound indicator ZS24 / ZS72 / ZS110. The function of the system is to control the alertness of the loco- motive driver. In case that the driver, for whatever reason, is not alert, light 4 5 6 and sound signals are produced and eventually the braking process is initiated. SIFA is tested according to EN50155, EN 50121-3 and EN 61373. Tel: +385 1 6011 700, Fax: +385 1 3666 078 www.altpro.hr Copyright @ Altpro. d.o.o Velika cesta 41, 10 020 Zagreb, Croatia [email protected] v. 1. 2016..
Recommended publications
  • PROVÁDĚCÍ NAŘÍZENÍ KOMISE (EU) 2019/773 Ze Dne 16
    27.5.2019 CS Úřední věstník Evropské unie L 139 I/5 PROVÁDĚCÍ NAŘÍZENÍ KOMISE (EU) 2019/773 ze dne 16. května 2019 o technické specifikaci pro interoperabilitu týkající se subsystému „provoz a řízení dopravy“ železničního systému v Evropské unii a o zrušení rozhodnutí 2012/757/EU (Text s významem pro EHP) EVROPSKÁ KOMISE, s ohledem na Smlouvu o fungování Evropské unie, s ohledem na směrnici Evropského parlamentu a Rady (EU) 2016/797 ze dne 11. května 2016 o interoperabilitě železničního systému v Evropské unii (1) a zejména na čl. 5 odst. 11 uvedené směrnice, vzhledem k těmto důvodům: (1) Článek 11 rozhodnutí Komise v přenesené pravomoci (EU) 2017/1474 (2) vymezuje konkrétní cíle pro vypracování, přijetí a přezkum technických specifikací pro interoperabilitu (TSI) železničního systému v Unii. (2) Podle čl. 3 odst. 5 písm. b) a f) rozhodnutí (EU) 2017/1474 by TSI měly být přezkoumány s cílem zohlednit vývoj železničního systému Unie a souvisejících činností v oblasti výzkumu a inovací a aktualizovat odkazy na normy. (3) Podle čl. 3 odst. 5 písm. c) rozhodnutí (EU) 2017/1474 by TSI měly být přezkoumány s cílem uzavřít zbývající otevřené body. Je třeba zejména vymezit rozsah otevřených bodů týkajících se provozu a rozlišit mezi příslušnými vnitrostátními předpisy a pravidly vyžadujícími harmonizaci prostřednictvím práva Unie s cílem umožnit přechod na interoperabilní systém a vymezit optimální úroveň technické harmonizace. (4) Dne 22. září 2017 Komise v souladu s čl. 19 odst. 1 nařízení Evropského parlamentu a Rady (EU) 2016/796 (3) požádala Agenturu Evropské unie pro železnice (dále jen „agentura“), aby připravila doporučení pro provedení výběru konkrétních cílů stanovených v rozhodnutí (EU) 2017/1474.
    [Show full text]
  • Influence of Train Control System on Railway Track Capacity
    DAAAM INTERNATIONAL SCIENTIFIC BOOK 2012 pp. 419-426 CHAPTER 36 INFLUENCE OF TRAIN CONTROL SYSTEM ON RAILWAY TRACK CAPACITY HARAMINA, H.; BRABEC, D. & GRGIC, D. Abstract: The basic advantage of the train control methods based on the moving block technology compared to the fixed blocks where the headways of the slower trains, regarding their longer blocking times affects negatively the line capacity, lies in the fact that the position and the length of the moving blocks adapts to the position, dynamic characteristics, and actual speed of the successive train. Regarding a higher possibility for influence on the train movement characteristic during the moving block train operation, better traffic fluidity with more regular traffic flow can be achieved. Considering this fact an amount of regular recovery and buffer times needed for railway timetable stability can be decreased and thus more train paths in a particular dedicated time window can be added. In this way the moving block technology can increase the capacity of a railway line, especially in case of high density lines with significant heterogeneity of traffic. Key words: train control system, railway infrastructure capacity, moving block Authors´ data: Dr. Sc. Haramina, H[rvoje]; dipl.ing. Brabec, D[ean]* Dr. Sc. Grgić, D[amir]**; *University of Zagreb, Faculty of Transport and Traffic Sciences, Vukelićeva 4, Zagreb, Croatia, **Hrvatske željeznice, Mihanovićeva 12, Zagreb, Croatia; [email protected], [email protected], [email protected] This Publication has to be referred as: Haramina H[rvoje]; Brabec, D[ean] & Grgić, D[amir] (2012). Influence of Train Control System on Railway Track Capacity, Chapter 36 in DAAAM International Scientific Book 2012, pp.
    [Show full text]
  • Next Generation Train Control (NGTC): More Effective Railways Through the Convergence of Main-Line and Urban Train Control Systems
    Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 14 ( 2016 ) 1855 – 1864 6th Transport Research Arena April 18-21, 2016 Next Generation Train Control (NGTC): more effective railways through the convergence of main-line and urban train control systems Peter Gurník a,* aUNIFE – The European Rail Industry, 221 avenue Louise, B-1050 Brussels, Belgium Abstract The main scope of Next Generation Train Control (NGTC) project is to analyse the commonality and differences of required functionality for mainline and urban lines and develop the convergence of both European Train Control System (ETCS) and Communication Based Train Control (CBTC) systems, determining the level of commonality of architecture, hardware platforms, and system design that can be achieved. This will be accomplished by building on the experience of ETCS and its standardised train protection kernel, where the different manufacturers can deliver equipment based on the same standardized specifications and by using the experience the suppliers have gained by having developed very sophisticated and innovative CBTC systems around the world. The paper focuses on the analyses of the already produced NGTC Functional Requirements Specifications and is summarizing other project activities on various train control technology developments suitable for future train control systems. © 2016 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (©http://creativecommons.org/licenses/by-nc-nd/4.0/ 2016The Authors. Published by Elsevier B.V..). PeerPeer-review-review under under responsibility responsibility of Road of Road and Bridgeand Bridge Research Research Institute Institute (IBDiM) (IBDiM). Keywords: Railways; signalling; automation; ERTMS / ETCS; CBTC; ATO; ATP; ATS; FRS, SRS; Moving Block; IP Radio Communication; GNSS * Corresponding author.
    [Show full text]
  • ERTMS/ETCS - Indian Railways Perspective
    ERTMS/ETCS - Indian Railways Perspective P Venkata Ramana IRSSE, MIRSTE, MIRSE Abstract nal and Balise. Balises are passive devices and gets energised whenever Balise Reader fitted on Locomo- European Railway Traffic Management System tive passes over it. On energisation, balises transmits (ERTMS) is evolved to harmonize cross-border rail telegrams to OBE. Telegram may consist of informa- connections for seamless operations across European tion about aspect of Lineside Signal, Gradients etc., nations. ERTMS is stated to be the most performant Balises are generally grouped and unique identifica- train control system which brings significant advan- tion will be provided to each balise. It helps to detect tages in terms of safety, reliability, punctuality and the direction of train. There four types of balises ex- traffic capacity. ERT.MS is evolving as a global stan- ist based their usage - Switchable, Infill, Fixed and dard. Many countries outside Europe - US, China, Repositioning balises. Switchable balises will be pro- Taiwan, South Korea and Saudi Arabia have adopted vided near lineside signals and they transmit aspect ERTMS standards for train traffic command and con- of lineside signal, permanent speed restrictions, gra- trol. dient information etc., Infill balises are provided in advance of signals to convey aspect of lineside signals earlier than Switchable balises. Fixed balises convey 1 Introduction information in regard to temporary speed restrictions and Repositioning balises provides data corrections. Signalling component of ERTMS has basically Balises transmit data in long or short telegrams four components - European Train Control System and those pertaining to direction. They are of two (ETCS) with Automatic Train Protection System, types - standard and reduced.
    [Show full text]
  • View / Open TM Database Composite.Pdf
    • • • • TRANSPORTATION-MARKINGS • DATABASE • COMPOSITE CATEGORIES • CLASSIFICATION & INDEX • • • -­ • III III • 1 TRANSPORTATION-MARKINGS: A STUDY IN CO.MMUNICATION MONOGRAPH SERIES Alternate Series Title: An Inter-modal Study of Safety Aids Transportatiol1-Markings Database Alternate T-M Titles: Transport [ation] Mark [ing]s / Transport Marks / Waymarks T-MFoundations, 4th edition, 2005 (Part A, Volume I, First Studies in T-M) (3rd edition, 1999; 2nd edition, 1991) Composite Categories A First Study in T-M: The US, 2nd edition, 1993 (Part B, Vol I) Classification & Index International Marine Aids to Navigation, 2nd edition, 1988 (parts C & D, Vol I) [Unified First Edition ofParts A-D, University Press ofAmerica, 1981] International Traffic Control Devices, 2nd edition, 2004 (Part E, Volume II, Further Studies in T-M) (lst edition, 1984) Part Iv Volume III, Additional Studies, International Railway Signals, 1991 (Part F, Vol II) International Aero Navigation Aids, 1994 (Part G, Vol II) Transportation-Markil1gs: A Study il1 T-M General Classification with Index, 2nd edition, 2004 (Part H, Vol II) (1st edition, 1994) Commllnication Monograph Series Transportation-Markings Database: Marine Aids to Navigation, 1st edition, 1997 (I'art Ii, Volume III, Additional Studies in T-M) TCDs, 1st edition, 1998 (Part Iii, Vol III) Railway Signals. 1st edition, 2000 (part Iiii, Vol III) Aero Nav Aids, 1st edition, 2001 (Part Iiv, Vol III) Composite Categories Classification & Index, 1st edition, 2006 (part Iv, Vol III) (2nd edition ofDatabase, Parts Ii-v,
    [Show full text]
  • LUCKNOW | THURSDAY | SEPTEMBER 10, 2020 City 02
    ,%% - B & C 1 & C 1 C .012.34&$# ./ . 0 1.23 /.24 ! > 542=5 =--22A') A3.44--'4 4)5)3!-% 5-)53!4%2 5!=-- !/5-) -3->2424'4! 2!5232 5!=25 4523! 5A42.?A% ) ",-+;:../ 86; D 4 11 4*'*'*5 4#% %* + P !4%4)5 fter their unsuccessful bids Ato breach the Line of Actual Control (LAC) in the last few days, China has start- ed deploying more troops on * the Pangong Tso (lake) indi- cating that it was not ready for immediate disengagement. Q %%%R ) )%% The Chinese have also added muscle to their air power # + by deploying more than 150 aircraft and helicopters on their side of the LAC in Ladakh. Not willing to take any chances the '3' IAF has also deployed its front line fighter jets including the n a day of high drama wit- SU-30, MIG-29, and Jaguars at Inessed in Mumbai’s upmarket forward bases all along the Pal Hill area, the demolition 4,000 km long LAC stretching squad of the Shiv Sena-run from Ladakh in the west to Brihanmumbai Municipal to a virtual trial of destruction Arunachal Pradesh in the east. Corporation (BMC) pulled caused by a swift and elaborate This ramping up of troops down Kangana Raut’s office at demolition carried out by the by China comes days after Bandra (illegal portions) by the BMC workers at her bungalow, India, in a defensive move on time the Bombay High Court which houses the office of her August 29-30, occupied heights ordered a stay on the process, film production company, in the north bank of the lake ! # ! even as an aggrieved actress Manikarnika Films Pvt Ltd.
    [Show full text]
  • Enhanced ETCS L2/L3 Train Control System
    Advanced Train Control Systems 113 Enhanced ETCS_L2/L3 train control system D. Emery Laboratory for Intermodality and Transport Planning (LITEP), École polytechnique fédérale de Lausanne (EPFL), Switzerland Abstract The last decade has seen the development of the European Train Control System ERTMS/ETCS. This Automatic Train Protection system (ATP) was designed in three versions: ETCS_Level 1, 2 and 3. ETCS_Level_3 uses moving blocks and provides short headways. However, ETCS_Level 2 may also offer short headways provided suitable length of each block sections. The proposed train control system could be seen as an enhancement of ETCS-Level 2 or Level 3. The main advantage of this new control system is to provide shorter headways than ETCS can. This offers the potential for capacity increases, particularly for busy High Speed Lines (HSL). Keywords: ATP, braking curves, capacity, ETCS, ERTMS, headway, high speed line (HSL), interlocking, moving block, Semi-Automatic Train Operation (SATO). 1 Interoperability, safety and capacity with ETCS 1.1 ETCS for interoperability and safety The European Train Control System was firstly developed to offer to the European Rail community a common Automatic Train Protection system in replacement of the existing ones. In theory, this is needed urgently as more than Table 1: ETCS and some ATP spot transmission. Crocodile KVB Indusi, PZB ETCS L1 (France, Belgium) (France) (Germany) and higher Transmission Electric through Transponder Magnetic Transponder system mechanical contact WIT Transactions on State of the Art in Science and Engineering, Vol 46, © 2010 WIT Press www.witpress.com, ISSN 1755-8336 (on-line) doi:10.2495/978-1-84564-494-9/13 114 Advanced Train Control Systems 15 different and incompatible ATP systems equip the European main rail networks (cf.
    [Show full text]
  • Diapositiva 1
    2016 third quarter YTD results Analysts Conference Call October 31, 2016 Agenda and contents Page • Introduction Roberto Corsanego, Head of IR 2 • Overview Andrew Barr, CEO 3-11 • Financials Roberto Carassai, CFO 12-14 • Q&A session 15 • Back up information 16-19 • Accounting definitions 20-22 • Glossary of rail terminology 23-28 2 9M 2016 Results - Main Orders Booked Country Project Name Customer Value (M€) Taiwan Sanying Line MRT System NCTG DRTS 220 Strathclyde Partnership U.K. Glasgow Metro (maintenance included) 135 for Transport Belgium Brussels Metro Lines 1&5 STIB 88 High Speed Line Turin - Milan - Naples Italy RFI 75 Rome - Florence route Australia Auto Haul - variation order Rio Tinto 48 USA LIRR Ronkonkoma LIRR 38 Dhaya Maju Malaysia KVDT 37 Infrastrucure Various EU/Asia Components Various 37 USA Components Various 35 Various EU/Asia Service & Maintenance Various 35 France 2016 Maintenance RATP 27 Delhi Metro Rail India Noida Metro 26 Corporation Limited Sweden Ester Line 2 Trafikverket 21 U.K. Ferriby Gilberdjke Network Rail 20 3 Q3 2016 Main Events - Brussels Metro (1/2) Ansaldo STS signed a contract with Société des Transports Intercommunaux de Bruxelles (STIB), worth Euro 88 million, for the automatization of the lines 1 & 5, as part of the modernization programme of the Brussels metro (so called Pulsar project). Within the modernization project Ansaldo STS will supply STIB with its Driverless CBTC based solutions, to increase the operational performance, efficiency and safety of the East-West metro axis (lines 1 & 5) with a total length of 35.5 km serving 37 stations, and a total fleet of 60 trains.
    [Show full text]
  • Finished Vehicle Logistics by Rail in Europe
    Finished Vehicle Logistics by Rail in Europe Version 3 December 2017 This publication was prepared by Oleh Shchuryk, Research & Projects Manager, ECG – the Association of European Vehicle Logistics. Foreword The project to produce this book on ‘Finished Vehicle Logistics by Rail in Europe’ was initiated during the ECG Land Transport Working Group meeting in January 2014, Frankfurt am Main. Initially, it was suggested by the members of the group that Oleh Shchuryk prepares a short briefing paper about the current status quo of rail transport and FVLs by rail in Europe. It was to be a concise document explaining the complex nature of rail, its difficulties and challenges, main players, and their roles and responsibilities to be used by ECG’s members. However, it rapidly grew way beyond these simple objectives as you will see. The first draft of the project was presented at the following Land Transport WG meeting which took place in May 2014, Frankfurt am Main. It received further support from the group and in order to gain more knowledge on specific rail technical issues it was decided that ECG should organise site visits with rail technical experts of ECG member companies at their railway operations sites. These were held with DB Schenker Rail Automotive in Frankfurt am Main, BLG Automotive in Bremerhaven, ARS Altmann in Wolnzach, and STVA in Valenton and Paris. As a result of these collaborations, and continuous research on various rail issues, the document was extensively enlarged. The document consists of several parts, namely a historical section that covers railway development in Europe and specific EU countries; a technical section that discusses the different technical issues of the railway (gauges, electrification, controlling and signalling systems, etc.); a section on the liberalisation process in Europe; a section on the key rail players, and a section on logistics services provided by rail.
    [Show full text]
  • Analysis of Level Crossing Safety in Europe and Beyond
    Deliverable D1.1 Analysis of level crossing safety in Europe and beyond Due date of deliverable: 20/11/2017 Actual submission date: 30/11/2017 © Copyright 2017 SAFER-LC Project (project funded by the European Commission). All rights reserved. No part of this document may be copied, reproduced, disclosed or distributed by any means whatsoever, including electronic without the express permission of the International Union of Railways (UIC), Coordinator of the EU SAFER-LC Project. The same applies for translation, adaptation or transformation, arrangement or reproduction by any method or procedure whatsoever. The document reflects only the author’s views and neither INEA nor the Commission is liable of any use that may be made of the information contained therein. The use of the content provided is at the sole risk of the user. Project details Project acronym SAFER-LC SAFER Level Crossing by integrating and optimizing road-rail Project full title infrastructure management and design Grant Agreement no. 723205 Call ID and Topic H2020-MG-2016-2017, Topic MG-3.4-2016 Project Timeframe 01/05/2017 – 30/04/2020 Duration 36 Months Coordinator UIC – Marie-Hélène Bonneau ([email protected]) Document details Title Analysis of level crossing safety in Europe and beyond Workpackage WP1 Date of the document 28/11/2017 Version of the document 04 Responsible partner FFE Reviewing partner Task1.1 partners Status of the document Final Dissemination level Public Document history: Revision Date Description 01 30/10/2017 First Draft 02 21/11/2017 Final Deliverable
    [Show full text]
  • 150610 Level Crossings European Union Safety Indicators
    Level crossings - European Union common safety indicators (ref. Directive 2014/88/EU) NB - not legal text, and may contain errors Common safety indicators 1 1. Indicators relating to accidents 1.1. Total and relative (to train-kilometres) number of significant accidents and a break-down for the following types of accidents: – – level crossing accident, including accident involving pedestrians at level crossing, and a further break- down for the five types of level crossings defined in point 6.2, – Each significant accident shall be reported under the type of the primary accident, even if the consequences of the secondary accident are more severe (e.g. a derailment followed by a fire). 1.2. Total and relative (to train-kilometres) number of persons seriously injured and killed by type of accident divided into the following categories: – passenger (also relative to total passenger-kilometres and passenger train-kilometres), – employee or contractor, – level crossing user, – trespasser, – other person at a platform – other person not at a platform 5. Indicators to calculate the economic impact of accidents Total in euro and relative (to train-kilometres): – number of deaths and serious injuries multiplied by the Value of Preventing a Casualty (VPC), – cost of damages to environment, – cost of material damages to rolling stock or infrastructure, – cost of delays as a consequence of accidents. Safety authorities shall report the economic impact of significant accidents. The VPC is the value society attributes to the prevention of a casualty and as such shall not form a reference for compensation between parties involved in accidents. 6. Indicators relating to technical safety of infrastructure and its implementation 6.2.
    [Show full text]
  • Automated System Testing of an Automatic Train Protection System
    Computers in Railways XII 71 Automated system testing of an automatic train protection system B. Friman & T. Andreiouk Ansaldo-STS Sweden AB, Sweden Abstract The testing of safety critical software is becoming more and more automated. Automated testing has the advantage that the tests can be carried out much more frequently and with more numerous test cases. For low level unit testing, there are several good tools available, such as Aunit. For system testing, however, the test framework normally has to be specifically tailored for each project, since it has to deal with external interfaces, e.g. man-machine-interfaces, and sensor and control interfaces. For efficient operation, it is desirable that an automated framework for system testing shall be able to serve both in a pure software set- up, where most of the development is done, and in a hardware set-up, which is as close as possible to the environment where the product shall operate. This paper describes an automated system testing framework for a SIL 4 safety critical train protection system. The testing framework can be used both in the pure SW set- up and in the HW set-up, and is able to extract its test cases from readable Test Specification documents and also produce high quality Test Protocol documents. Approximately 98% of the system tests have been automated in this project. The project in question is the development of STM’s (Specific Transmission Modules) for Sweden, Norway and Finland. The STM’s carry out train protection on national equipped lines – lines that are not equipped with the ERTMS (European Rail Transport Management System).
    [Show full text]