AGENDA CALIFORNIA TRANSPORTATION COMMISSION October 21-22, 2020 Via Webinar

Total Page:16

File Type:pdf, Size:1020Kb

AGENDA CALIFORNIA TRANSPORTATION COMMISSION October 21-22, 2020 Via Webinar AGENDA CALIFORNIA TRANSPORTATION COMMISSION www.catc.ca.gov October 21-22, 2020 Via Webinar Wednesday, October 21, 2020 1:00 PM Commission Meeting *Via GoToWebinar, Teleconference and Webcast only, per Executive Order N-29-20 Thursday, October 22, 2020 9:00 AM Commission Meeting *Via GoToWebinar, Teleconference and Webcast only, per Executive Order N-29-20 *On March 17, 2020 Governor Newsom issued Executive Order, N-29-20. This order removes the requirement that a location be made available for the public to gather for purposes of observing and commenting at the meeting. Members of the public will need to attend the meeting remotely via one of the options listed below. To view the live webcast of this meeting, please visit: https://www.youtube.com/channel/UCASI3gyTEuhZffC13RbG4xQ To participate on Day 1 of the meeting via computer: Please visit: https://attendee.gotowebinar.com/register/7340614914743516175 There, you will be provided dial in information, instructions for participation, an access code, and audio pin to join the meeting. If you wish to only listen to day 1 of the meeting: Phone Number: (562) 247-8422, Access Code: 898-346-482 To participate on Day 2 of the meeting via computer: Please visit: https://attendee.gotowebinar.com/register/6795357202924760335 There, you will be provided dial in information, instructions for participation, an access code, and audio pin to join the meeting. If you wish to only listen to day 2 of the meeting: Phone Number: (415) 655-0060, Access Code: 277-291-628 NEXT REGULARLY SCHEDULED CTC MEETING (Subject to Change): CTC Meeting – December 2-3, 2020 via webinar CTC MEETING ESTIMATED TIMED AGENDA October 21-22, 2020 NOTICE: Times identified on the agenda are estimates only. The Commission has the discretion to take up agenda items out of sequence. The Commission may adjourn earlier than estimated. Unless otherwise noticed in the specified book item, a copy of this meeting notice, agenda, and related book items will be posted 10 calendar days prior to the meeting on the California Transportation Commission (Commission) Website: www.catc.ca.gov. Questions or inquiries about this meeting may be directed to the Commission staff at (916) 654-4245, 1120 N Street (MS-52), Sacramento, CA 95814. If any special accommodations are needed for persons with disabilities, please contact Doug Remedios at (916) 654-4245. Requests for special accommodations or interpretation services should be made as soon as possible but no later than at least five working days prior to the scheduled meeting. Improper comments and disorderly conduct are not permitted. In the event that the meeting conducted by the Commission is willfully interrupted or disrupted by a person or by a group so as to render the orderly conduct of the meeting infeasible, the Chair may order the removal of those individuals who are willfully disrupting the meeting. *“A” denotes an “Action” item; “I” denotes an “Information” item; “C” denotes a “Commission” item; “D” denotes a “Department” item; “F” denotes a “U.S. Department of Transportation” item; “R” denotes a Regional or other Agency item; and “T” denotes a California State Transportation Agency (CalSTA) item. Page 2 CTC MEETING ESTIMATED TIMED AGENDA October 21-22, 2020 GENERAL BUSINESS Tab Item Description Ref# Presenter Type* Agency* 1 Roll Call 1.1 Hilary Norton I C 2 Approval of Minutes for August 12-13, 2020 1.2 Hilary Norton A C 3 Approval of Minutes for July 17, 2020 Joint California 1.13 Hilary Norton A C Transportation Commission, Department of Housing and Community Development, and California Air Resources Board Meeting 4 Commissioner Meetings for Compensation 1.5 Hilary Norton A C REPORTS Tab Item Description Ref# Presenter Type* Agency* 5 Commission Executive Director 1.3 Mitch Weiss A C 6 Commissioner Reports 1.4 Hilary Norton A C 7 CalSTA Secretary 1.6 David S. Kim I T 8 Caltrans Director 1.7 Toks Omishakin I D 9 FHWA California Division Administrator 1.11 Vincent Mammano I F 10 Regional Agencies Moderator 1.8 Ivan Garcia I R 11 Rural Counties Task Force Chair 1.9 Woodrow Deloria I R 12 Self-Help Counties Coalition Executive Director 1.10 Keith Dunn I R 13 Transit Operators Update 1.14 Jeffrey Tumlin I R POLICY MATTERS Tab Item Description Ref# Presenter Type* Agency* 14 Update on the National Freight Strategic Plan 4.6 Laura Pennebaker I C David Wonnenberg Ryan Endorf 15 State and Federal Legislative Matters 4.1 Paul Golaszewski A C 16 Budget and Allocation Capacity 4.2 Paul Golaszewski I D Keith Duncan 17 Interagency Equity Efforts and Coordination 4.3 Brigitte Driller I C Jeanie Ward-Waller Avital Barnea 18 Evaluation of Caltrans’ Effectiveness in Reducing 4.4 Teri Anderson A C Deferred Maintenance and Improving Conditions on the State Highway System 19 Status of the 2020 SHOPP Complete Streets 4.5 Teri Anderson I D Reservation. Bruce De Terra 20 Comments on the Draft California Transportation 4.7 Laura Pennebaker A C Plan 2050 21 Update on the Interregional Transportation Strategic 4.28 Laura Pennebaker I D Plan Marlon Flournoy 22 Update on Executive Order N-73-20: State 4.8 Jose Oseguera I C Broadband Action Plan Development Lori Pepper Elizabeth Dooher 23 2020 Status Report of the Active Transportation 4.14 Beverley Newman- I C Program Burckhard 24 TIMED ITEM: 3:00 PM 4.16 Laurie Waters I C Hearing on the 2021 Active Transportation Program – Quick-Build Project Pilot Program Staff Recommendations 25 Adoption of 2021 Active Transportation Program – 4.17 Laurie Waters A C Quick-Build Project Pilot Program Resolution G-20-74 26 Adoption of the FY 2020-21 Road Maintenance and 4.20 Zack Taylor A C Rehabilitation Account Local Streets and Roads Funding Subsequent Report of Eligible Cities. Resolution G-20-75 Page 3 CTC MEETING ESTIMATED TIMED AGENDA October 21-22, 2020 INFORMATION CALENDAR Tab Item Description Ref# Presenter Type* Agency* 27 Informational Reports on Allocations Under 2.5f. I D Delegated Authority -- Emergency G-11 Allocations (2.5f.(1)): $40,836,600 for 19 projects. -- SHOPP Safety Sub-Allocations (2.5f.(3)): $48,836,000 for eight projects. -- Minor G-05-16 Allocations (2.5f.(4)): $4,224,000 for four projects. Monthly Reports on the Status of Contract Award for: Tab Item Description Ref# Presenter Type* Agency* 28 State Highway Projects, per Resolution G-06-08 3.2a. I D 29 Local Assistance STIP Projects, per Resolution 3.2b. I D G-13-07 30 Local Assistance ATP Projects, per Resolution 3.2c. I D G-15-04 31 Pre-Construction SHOPP Support Allocations, per 3.3 I D Resolution G-06-08 Quarterly Reports – Fourth Quarter – FY 2019-20 Tab Item Description Ref# Presenter Type* Agency* 32 Caltrans Finance Report 3.5 I D 33 Report on Fiscal Year 2019-20 Right of Way Annual 3.12 I D Allocation Other Reports Tab Item Description Ref# Presenter Type* Agency* 34 Update on the Minor B project list under the 2020-21 3.1 I D SHOPP Minor Construction Program. 35 Final Close-Out Report on the 2019-20 Minor 3.4 I D Program allocation. 36 Third Quarter - Balance Report on AB 1012 “Use It or 3.6 I D Lose It” Provision for Federal Fiscal Year 2018 Unobligated RSTP and CMAQ Funds 37 Quarterly Report – Local Assistance Annual Allocation 3.7 I D for the Period Ending June 30, 2020 38 Proposition 1A High-Speed Passenger Train Bond 3.8 I D Program – Semi-Annual Report 39 Proposition 1B – Semi Annual Report 3.13 I D --Corridor Mobility Improvement Account (3.13a.) --Route 99 Corridor Program (3.13b.) --Local Bridge Seismic Retrofit Program (3.13c.) --State-Local Partnership Program (3.13d.) --Traffic Light Synchronization Program (3.9e.) --Highway-Railroad Crossing Safety Account (3.13f.) --Intercity Rail Improvement Program (3.13g.) --Trade Corridors Improvement Fund (3.13h.) 40 Transit and Intercity Rail Capital Program – Program 4.22 I D Update Page 4 CTC MEETING ESTIMATED TIMED AGENDA October 21-22, 2020 BEGIN CONSENT CALENDAR Tab Item Description Ref# Presenter Type* Agency* 41 Approval of Projects for Future Consideration of Funding: 2.2c.(1) A D 01-Hum-36, PM 0.1/1.65 Alton Shoulder Widening Project Widen Shoulders on State Route 36 in Humboldt County. (MND) (PPNO 2379) (SHOPP) Resolution E-20-85 (Related Item under Ref. 2.5b.(2)) 01-Hum-36, PM 10.5/10.8 Carlotta Curve Improvement Project Improve curves and widen shoulders on State Route 36 in Humboldt County. (MND) (PPNO 2415) (SHOPP) Resolution E-20-86 (Related Item under Ref. 2.5b.(2)) 03-Pla-80, PM 2.6/3.1 Atlantic/Eureka Interstate-80 Westbound On-ramp Widening Project Expand the Atlantic/Eureka Westbound on-ramp and replace the Miner’s Ravine Bridge on Interstate 80 in Placer County. (MND) (PPNO 5113) (SHOPP) Resolution E-20-87 (Related Item under Ref. 2.5b.(1)) 04-Mrn-01, PM 22.8/33.0, 45.0/50.5 Marin State Route 1 Capital Preventive Maintenance Project Extend the life of the existing pavement and make other improvements on State Route 1 in Marin County. (MND) (PPNO 1480A) (SHOPP) Resolution E-20-88 (Related Item under Ref. 2.5b.(2)) 05-SB-217, PM 0.9/1.4 State Route 217 San Jose Creek Bridge Replacement Project Replace the existing San Jose Creek Bridge on State Route 217 in Santa Barbara County. (MND) (PPNO 2386) (SHOPP) Resolution E-20-102 (Related Item under Ref. 2.5b.(2)) 06-Ker-58, PM 6.0/15.4 Reward Capital Maintenance Project Rehabilitate pavement on State Route 58 in Kern County.
Recommended publications
  • Columbia River I-5 Bridge Planning Inventory Report
    Report to the Washington State Legislature Columbia River I-5 Bridge Planning Inventory December 2017 Columbia River I-5 Bridge Planning Inventory Errata The Columbia River I-5 Bridge Planning Inventory published to WSDOT’s website on December 1, 2017 contained the following errata. The items below have been corrected in versions downloaded or printed after January 10, 2018. Section 4, page 62: Corrects the parties to the tolling agreement between the States—the Washington State Transportation Commission and the Oregon Transportation Commission. Miscellaneous sections and pages: Minor grammatical corrections. Columbia River I-5 Bridge Planning Inventory | December 2017 Table of Contents Executive Summary. .1 Section 1: Introduction. .29 Legislative Background to this Report Purpose and Structure of this Report Significant Characteristics of the Project Area Prior Work Summary Section 2: Long-Range Planning . .35 Introduction Bi-State Transportation Committee Portland/Vancouver I-5 Transportation and Trade Partnership Task Force The Transition from Long-Range Planning to Project Development Section 3: Context and Constraints . 41 Introduction Guiding Principles: Vision and Values Statement & Statement of Purpose and Need Built and Natural Environment Navigation and Aviation Protected Species and Resources Traffic Conditions and Travel Demand Safety of Bridge and Highway Facilities Freight Mobility Mobility for Transit, Pedestrian and Bicycle Travel Section 4: Funding and Finance. 55 Introduction Funding and Finance Plan Evolution During
    [Show full text]
  • Transportation
    Transportation - 373 - City of San Diego Fiscal Year 2021 Adopted Budget Page Intentionally Left Blank Transportation The Transportation Department's Capital Improvements Program provides for the installation and improvement of various transportation infrastructure and systems. The Department plans and programs right-of-way capital improvement projects including resurfacing of asphalt streets, reconstruction of concrete streets and sidewalks, rehabilitation of bridges, construction of pedestrian, bicycle and vehicular improvements, and upgrading obsolete streetlight circuits. 2020 CIP Accomplishments In Fiscal Year 2020, the Transportation & Storm Water Department, in coordination with the Public Works Department, completed capital projects including the construction of many pedestrian, bikeway, roadway, and traffic improvement projects. Many of these projects help to reach Climate Action Plan goals. During Fiscal Year 2020, the City paved 53.1 miles and slurry sealed 123.9 miles of streets and replaced 1.8 mile of concrete streets. Transportation projects that completed construction in Fiscal Year 2020 include: • AC Overlay Group 1502 • AC Overlay Group 1511, JOC7 • AC Overlay Street Paving Group 1601 • Academy St & Catalina Blvd Sidewalks • ADA S/W La Jolla Shore & Calle Corta • Ash Street & Richmond Street Sidewalk • Asphalt Resurfacing Group 1502 Option • Asphalt Resurfacing Group 1704 • Balboa Avenue Corridor • City Street Lights - 25 Locations • Citywide Street Lights GF Group 15 • Coast Blvd Sea Cave Emergency Stabilization Project
    [Show full text]
  • Jacobs Center Directions
    JACOBS CENTER DIRECTIONS EHC’s 2016 Annual Awards Celebration Email: [email protected] 404 Euclid Avenue Phone: (619) 527-6161 San Diego, CA 92114 DIRECTIONS B Y C A R From Downtown Take G Street east to the Martin Luther King Freeway (Hwy. 94) and exit at Euclid Avenue south. Take a right on Market Street. Take a left at Market Creek Plaza Driveway. Event Parking in the lot on the right. From Mission Valley or Interstate 8 Go south on Interstate 805, exit east at the Martin Luther King Freeway (Hwy. 94) and exit at Euclid Avenue south. Take a right on Market Street. Take a left at Market Creek Plaza Driveway. Event Parking in the lot on the right. From North County Go south on Interstate 805, exit east at the Martin Luther King Freeway (Hwy. 94) and exit at Euclid Avenue south. Take a right on Market Street. Take a left at Market Creek Plaza Driveway. Event Parking in the lot on the right. From East County Go west on the Martin Luther King Freeway (Hwy. 94) and exit at Euclid Avenue south. Take a right on Market Street. Take a left at Market Creek Plaza Driveway. Event Parking in the lot on the right. From South Bay Go North on Interstate 805, exit east at the Martin Luther King Freeway (Hwy. 94) and exit at Euclid Avenue south. Take a right on Market Street. Take a left at Market Creek Plaza Driveway. Event Parking in the lot on the right. B Y B U S Market Creek is steps away from the convenient Euclid Transit Station, near the corner of Euclid Avenue and Market Street.Several bus lines service the Euclid Transit Station from all areas of San Diego.
    [Show full text]
  • Mission Valley Groundwater Aquifer
    General Information Mission Valley Groundwater Aquifer Overview • General Information Home • History • Contact Information • Geology • Water Emergencies • Pueblo Water Rights • Your Plumbing System • Grand Jury Report 2013 • Customer Outreach • Water Supply Contamination & Clean-up Status • Press Releases • History o Contamination Chronology • Clean-up Status o Spill Prevention, Control, And Countermeasure Plan (SPCC) and Barrier Containment • Regional Water Quality Control Board Oversight o Documents Water Supply Development • Conceptual Project • Field Investigations • Model Development OVERVIEW The Mission Valley Aquifer (MVA) follows the course of the San Diego River from Mission Gorge on the east to the Pacific Ocean on the west and is bound by its valley walls and covers about 6.2 square miles. The MVA is typical of riverine aquifers of southern California consisting of deposits of primarily gravel and sand conducive for high- yielding groundwater wells. Mission Valley, its aquifer and river system, provided water to help establish and sustain the San Diego Mission dating back to 1769. A well field in the MVA, that spanned a distance from where Qualcomm Stadium is located to the Interstate 805 & Interstate 8 interchange, served as one of the City of San Diego’s (City’s) primary sources of drinking water from about 1914 until 1936. The City owns a special water right called a Pueblo right, which is a prior and paramount right to all of the water of the San Diego River (surface and underground). Eventually it was understood that local water supplies would not meet the ultimate demand for water, thus the City began importing water in the late 1940s.
    [Show full text]
  • California Highways and Public Works
    Install traffic signals, highway light­ San Joaquin Road. Estimated cost, Rights-of-way on various state high­ ing and channelization at the intersec­ $67,000; State's share, $56,000; balance way routes-$9,468,000, including ap­ tion of MacArthur Boulevard (new to be shared by the county and New­ proximately $4,000,000 on Interstate State Route 7 3) and Palisades Road- port Beach. 405 (San Diego Freeway). SAN DIEGO-IMPERIAL COUNTIES PROJECTS Imperial County limit of Camp Mathews and 0.5 mile and near Escondido, a distance of 2. 3 Construct four-lane U.S. 99-State south of Carmel Valley Road in San miles. Estimated cost, $500,000. Sign Route 111 Expressway between Diego with interchanges at Genesee Widen the Clairemont Mesa Boule­ State Sign Route 98 in Calexico and Avenue, Sorrento Valley Road, and vard Overcrossing from two lanes to County Road 16, 0.5 mile south of the the future Interstate 805 Freeway in four and revise the interchange con­ future Interstate 8 Freeway; and Sorrento Valley, a distance of 3.4 nections to U.S. 395 in San Diego. Es­ widen and resurface State Sign Route miles. Estimated cost, $6,230,000. timated cost, $390,000; State's share, 111 between County Road 16 and U.S. Construct eight-lane section for fu­ $340,000; city, $50,000. 80 east of El Centro. Estimated cost, ture San Diego Freeway (Interstate Construct four-lane State Sign $2,350,000. 5) between 0.1 mile south of San Route 67 Freeway between 1.5 miles Widen and resurface State Sign Marcos Road near Encinitas and 4.4 and 3.2 miles north of Interstate 8 Route 98 between 0.1 mile west of miles south of State Sign Route 78 near Santee.
    [Show full text]
  • Leave the House Alone
    SUNRISE MONDAY EDmO JANUARY 7. 2008 Qkegonian t. ______~~c=~~~c=~ --------_:~~~~~~~ PORTLAND, OREGON 3REAKING NEWS AT OAEGONLlYLCOM WINNER Of THE 2007 fUUTZE~ PRIZE FOR BREAKING NEWS •• EDITORIALS TH.EOREGONIAN. MONOAY,JANUARY7,2008 THE OPINION OF THE OREGONIAN EDITORIAL BOARD Leave the house alone n the gritty southem edge of the transit cleared, as Tri-Met acquired various properties even after a 2004 environmental impact statement mall, where Interstate 405 dumps com­ and tore them down to make way for the tracks. concluded that the transit work would have mini~ muters into downtown, stands a lonely The Figo House is so isolated by construction work mal impact on his property. At the same time, the O vestige of old Portland, the Figo House now, it's hard even to reach Acker's office. State Historic Preservation Office agreed that the (named after the owner's dog.) It is channing to think that, when the work is house shouldn't be disturbed by the transit project It's a well·kept example of the Victorian archi­ done, the Figo House would again be accessible without some undefined measures, such as reloca­ tecture that has almost vanished from the central and situated by a busy light-rail station and the tion, to mitigate the changes. But TriMel says sub­ city. Unlike the last few remaining old houses state's largest university. But, of course, the transit sequent revisions to the light-rail route have put downtown, ~uch as the lovely but vacant halianale agency doesn't sec il that way. II wants 10 strip the the Figo House in tht' way.
    [Show full text]
  • Federal Register/Vol. 65, No. 233/Monday, December 4, 2000
    Federal Register / Vol. 65, No. 233 / Monday, December 4, 2000 / Notices 75771 2 departures. No more than one slot DEPARTMENT OF TRANSPORTATION In notice document 00±29918 exemption time may be selected in any appearing in the issue of Wednesday, hour. In this round each carrier may Federal Aviation Administration November 22, 2000, under select one slot exemption time in each SUPPLEMENTARY INFORMATION, in the first RTCA Future Flight Data Collection hour without regard to whether a slot is column, in the fifteenth line, the date Committee available in that hour. the FAA will approve or disapprove the application, in whole or part, no later d. In the second and third rounds, Pursuant to section 10(a)(2) of the than should read ``March 15, 2001''. only carriers providing service to small Federal Advisory Committee Act (Pub. hub and nonhub airports may L. 92±463, 5 U.S.C., Appendix 2), notice FOR FURTHER INFORMATION CONTACT: participate. Each carrier may select up is hereby given for the Future Flight Patrick Vaught, Program Manager, FAA/ to 2 slot exemption times, one arrival Data Collection Committee meeting to Airports District Office, 100 West Cross and one departure in each round. No be held January 11, 2000, starting at 9 Street, Suite B, Jackson, MS 39208± carrier may select more than 4 a.m. This meeting will be held at RTCA, 2307, 601±664±9885. exemption slot times in rounds 2 and 3. 1140 Connecticut Avenue, NW., Suite Issued in Jackson, Mississippi on 1020, Washington, DC, 20036. November 24, 2000. e. Beginning with the fourth round, The agenda will include: (1) Welcome all eligible carriers may participate.
    [Show full text]
  • I-405, SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project (MP 21.79 to 27.06)
    JULY 2020 ENVIRONMENTAL ASSESSMENT I-405, SR 522 Vicinity to SR 527 Express Toll Lanes Improvement Project (MP 21.79 to 27.06) Mill Creek N 5 405 Canyon Park 527 Bothell Kenmore 522 522 Woodinville Kirkland 405 Lake Washington 520 520 Bellevue Title VI Notice to Public It is the Washington State Department of Transportation’s (WSDOT) policy to assure that no person shall, on the grounds of race, color, national origin or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participation in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with WSDOT’s Office of Equal Opportunity (OEO). For additional information regarding Title VI complaint procedures and/or information regarding our non-discrimination obligations, please contact OEO’s Title VI Coordinator at (360) 705-7090. Americans with Disabilities Act (ADA) Information This material can be made available in an alternate format by emailing the Office of Equal Opportunity at [email protected] or by calling toll free, 855-362-4ADA (4232). Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711. Notificación de Titulo VI al Público Es la política del Departamento de Transporte del Estado de Washington el asegurarse que ninguna persona, por razones de raza, color, nación de origen o sexo, como es provisto en el Título VI del Acto de Derechos Civiles de 1964, ser excluido de la participación en, ser negado los beneficios de, o ser discriminado de otra manera bajo cualquiera de sus programas y actividades financiado con fondos federales.
    [Show full text]
  • NSIAD-92-56 U.S.-Mexico Trade: Survey of U.S. Border Infrastructure Needs
    United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-244050 November 27, 199 1 The Honorable Lloyd Bentsen Chairman, Committee on Finance United States Senate Dear Mr. Chairman: As you requested, we have reviewed current and projected U.S. border infrastructure needs associated with increased U.S.-Mexican trade. This report provides information on such needs as inspector staffing, inspection facilities, highways and bridges, and coordination in border management and planning efforts. Our interim study was entitled U.S.-Mexico Trade: Concerns About the Adequacy of Border Infrastructure (GAO/h’sIm-91-228, May 16, 1991). As agreed with your office, unless you publicly announce its contents earlier, we plan no further distribution of this report until 30 days from its issue date. At that time, we wilI send copies to the Customs Service; the Immigration and Naturalization Service; the General Services Administration; the International Boundary and Water Commission; the Department of State; the highway departments of Texas, New Mexico, Arizona, and California; and other congressional committees. Copies will also be made available to others on request. Please contact me at (202) 275-4812 if you or your staff have any questions concerning this report. The major contributors to this report are listed in appendix I. Sincerely yours, Allan I. Mendelowitz, Director International Trade, Energy, and Finance Issues Trade and commercial traffic between the United States and Mexico Purpose have grown significantly in recent years. The capacity of existing border infrastructure to accommodate traffic is being strained, and anticipated expansion of trade is expected to intensify traffic pressures at the border.
    [Show full text]
  • Figure 1. Regional Location Map
    Figure 1. Regional Location Map - 2 - INTRODUCTION SCOPE AND PURPOSE OF THE PLAN The updated San Ysidro Community Plan (Plan) is a comprehensive revision of the original plan adopted in 1974 and includes the urbanized portion of the Tijuana River Valley. The update was authorized at the City Council budget hearings of July 1987 and work on the project began in December of that year. The Planning Department, with the assistance of the San Ysidro Planning and Development Group, has studied San Ysidro’s major issues and challenges and has developed alternative solutions to realize the community’s potential. Included in the Plan is a set of recommendations based upon those alternative solutions to guide the development and the redevelopment of the San Ysidro community. Formal adoption of the revised Plan requires that the Planning Commission and City Council follow the same procedure of holding public hearings as was followed in adopting the original community plan. Adoption of the Plan also requires an amendment of the Progress Guide and General Plan (General Plan) for the City, which will occur at the first regularly scheduled General Plan amendment hearing following adoption of this Plan. Once the Plan is adopted, any amendments, additions or deletions will require that the Planning Commission and City Council follow City Council Policy 600-35 regarding the procedure for Plan amendments. Although this Plan sets forth procedures for implementation, it does not establish new regulations or legislation, nor does it rezone property. The rezoning and design controls recommended in the Plan will be enacted concurrently with Plan adoption.
    [Show full text]
  • Cialis Daily Pill
    MOBILITY 21’s “IMBY” LIST** Twenty-one Critical Transportation Projects “In My Backyard” to Improve Mobility throughout Southern California** One Region. One Voice. One Future. Mobility 21, the leading Southern California transportation coalition, works to find solutions to the region’s pressing transportation issues. The transportation infrastructure investment need in Southern California exceeds $625 billion to improve mobility, reduce congestion and improve air quality for the 21 million residents. Congress is developing the next 6-year transportation funding bill that could help address improving the livability and mobility of Southern California residents. State and local government continues to face challenges in funding the region’s many infrastructure and transportation needs. Partnering with the federal government as it develops legislation for implementing Southern California’s $625 billion infrastructure improvement plan will be a high priority in the upcoming months. Mobility 21 has identified example transportation projects below that are included in the $625 billion plan that would improve mobility, congestion and air quality throughout Southern California. Mobility 21 will work with its partners to find funding solutions for these and other “must-do” projects in the region. Rail Safety Positive Train Control (PTC) Positive Train Control (PTC) is a predictive collision avoidance technology designed to stop a train before an accident occurs. PTC will help save lives by preventing train-to-train collisions, speeding and over-speed derailments, incursions into work zones along the tracks and movement of a train through a switch left in the wrong position. Reducing Congestion Interstate-10 Freeway Corridor One of the most heavily-used trade routes in the nation, the I-10 corridor is also one of the most congested.
    [Show full text]
  • The Bridges of San Diego County: the Art of Civil Engineering
    The Bridges of San Diego County: The Art of Civil Engineering Christine Robbins Every bridge represents a problem solved, a challenge overcome, a connection made. San Diego, with its abundance of hills, mesas, and canyons, showcases the art of bridge building. Civil engineers took on the task and were lauded for their work in this poem: They have built magnificent bridges where the nation’s highways go; O’er perilous mountain ridges and where great rivers flow. Wherever a link was needed between the new and the known They have left their marks of Progress, in iron and steel and stone. There was never a land too distant nor ever a way too wide, But some man’s mind, insistent, reached out to the other side. They cleared the way, these heroes, for the march of future years. The march of Civilization—and they were its Pioneers. —Portion of “The Bridge Builders,” a poem by Evelyn Simms The American Society of Civil Engineers (ASCE) considers bridges an important aspect of civil engineering. According to the organization’s policy statement; “Bridges are a visible icon of the Civil Engineer’s art. Historic bridges are important links to our past, serve as safe and vital transportation routes in the Author Christine Robbins acknowledges contributions by Civil Engineers Tim Shell, PE, of the City of Vista and Wade Durant, PE, Pete Smith, PE, ENV SP, and Clark Fernon, PE, of T.Y. Lin International. The author wishes to acknowledge all those who generously shared their recollections of working on some of the bridges discussed in the article.
    [Show full text]