Regulatory Setting

Federal

Safe and Complete Streets Act of 2011 (HR 1780 & S 1056)

On May 5, 2011, Representatives Matsui and LaTourette of introduced HR 1780, the Safe and Complete Streets Act of 2011, on the U.S. House floor. On May 24, 2011, Senator Harkin of Iowa and several other senators introduced a companion bill, S 1056, on the U.S. Senate floor. These bills were crafted to ensure that all users of the transportation system, including bicyclists, pedestrians, children, transit users, older adults, and disabled people, are able to travel safely and conveniently on the nation’s roadways. At present, the bills remain in committee awaiting approval to be reviewed by their respective whole legislative bodies.

Americans with Disabilities Act (ADA)

The Americans with Disabilities Act (ADA) legislation prohibits discrimination on the basis of disability. Other Federal laws which affect the design, construction, alteration, and operation of facilities include the Architectural Barriers Act (ABA) of 1968 and the Rehabilitation Act of 1973. These laws apply to all Federally-funded facilities. The ADA applies to facilities, both public (Title II) and private (Title III), which are not Federally-funded. Newly constructed and altered facilities covered by Titles II and III of the ADA must be readily accessible to and usable by people with disabilities. In July 1999, the U.S. Department of Transportation (USDOT) issued an Accessibility Policy Statement pledging a fully accessible and multimodal transportation system. Accessibility in Federally-assisted programs is governed by the USDOT regulations (49 CFR part 27) implementing Section 504 of the Rehabilitation Act (29 U.S.C. 794).

State

California Manual on Uniform Traffic Control Devices

Caltrans adopted the 2012 California Manual on Uniform Traffic Control Devices (California MUTCD) to provide uniform standards and specifications for all official traffic control devices in California. This action was taken pursuant to the provisions of California Vehicle Code Section 21400 and the recommendation of the California Traffic Control Devices Committee (CTCDC). The CTCDC has requested and received a letter to confirm substantial conformance from the Federal Highway Administration (FHWA) for the 2012 California MUTCD.

Public Review Draft Existing Conditions Report Page 3-63 Page 3-63 October 2015

SIA PLAN UPDATE

California Vehicle Code

The California Vehicle Code was most recently updated in January 2015. The code contains state statutes governing vehicle ownership, registration, and operation. Bicycles are one classification of vehicle that is defined and regulated by this legislation.

California Complete Streets Act of 2008

On September 30, 2008, Governor Schwarzenegger signed Assembly Bill (AB) 1358, the California Complete Streets Act of 2008. Complete streets are characterized in the act in terms of a “balanced, multimodal transportation network.” Upon any substantive revision of the circulation element of their general plans, local jurisdictions are required by this law to plan for a network that “meets the needs of all users of streets, roads, and highways, defined to include motorists, pedestrians, bicyclists, children, persons with disabilities, seniors, movers of commercial goods, and users of public transportation, in a manner that is suitable to the rural, suburban, or urban context of the general plan” (Gov. Code § 65302(b)).

California Streets and Highways Code (Section 890-894.2)

This section of California Code is also known as the California Bicycle Transportation Act. This legislation establishes the responsibilities of State and local agencies with regard to bicycle safety, signage, traffic control, right-of-way, and other matters related to non-motorized and particularly bicycle transportation. The California Bicycle Act establishes minimum efforts in data collection and planning that local government must accomplish to remain compliant. The State also maintains a State Transportation Fund allocation called the Bikeway Account. These funds are dedicated to the construction and maintenance of bicycle facilities.

Local

Placer County General Plan

The County General Plan provides goals, policies, and implementation programs for non- motorized transportation (Goal 3.D and 5.D) to provide a safe, comprehensive, and integrated system of facilities for non-motorized modes of transportation.

Sunset Industrial Area Plan

The Sunset Industrial Area Plan was developed to address the issues affecting the development of the Sunset Industrial Area which was set aside for industrial development. The 1997 plan’s circulation plan diagram depicted the functional classification of existing and proposed streets, roadways, and highways in the Sunset Industrial Area. The plan refined and implemented the goals and polices of the Placer County General Plan.

Page 3-64 Public Review Draft Existing Conditions Report October 2015

TRANSPORTATION AND CIRCULATION | 3

The Placer County Regional Transportation Plan and Sacramento Area Council of Governments Metropolitan Transportation Plan/Sustainable Communities Strategy

The Placer County Transportation Planning Agency (PCTPA) developed and adopted the Regional Transportation Plan (RTP). As the forum for making decisions about the regional transportation system in Placer County, the PCTPA develops and adopts various plans and strategies that serve to not only make the best use of State and Federal transportation funds, but also to fulfill the requirements of the agency’s State designation as the Regional Transportation Planning Agency (RTPA) for Placer County. Regional Transportation Plan documents the policy direction, actions, and funding recommendations that are intended to meet the short- and long- range transportation needs of Placer County. The PCTPA is part of a larger metropolitan planning jurisdiction (El Dorado, Placer, Sacramento, Sutter, Yolo, and Yuba Counties), which is coordinated by SACOG. The PCTPA’s two most recent RTPs are incorporated into SACOG’s regional planning processes through the 2012 Metropolitan Transportation Plan/Sustainable Communities Strategy (MTP/SCS).

Placer County Regional Bikeway Plan

As the regional transportation planning agency for Placer County, the Placer County Transportation Planning Agency (PCTPA) developed and adopted the Placer County Regional Bikeway Plan in 2002. The plan was established to provide a regional system of bikeways for transportation and recreational purposes. The plan focuses on regional connectors and key routes to provide access to activity centers within the county.

Placer County Transition Plan for County-Maintained Roadways

Placer County adopted a Transition Plan to comply with the American with Disabilities Act of 1990. The plan was conducted as a self-evaluation of all handicap ramps within the county and created a database rating each ramp within the county to identify deficiencies. The plan identified a list of priorities for ramp upgrades and developed a capital improvement list to make modifications, repairs, and/or replacements.

Public Review Draft Existing Conditions Report Page 3-65 Page 3-65 October 2015

SIA PLAN UPDATE

SECTION 3.5 RAILWAYS FACILITIES Existing Conditions

In California, operates all State-supported intercity rail services. Caltrans provides operating funds to Amtrak for the in-state rail services. Amtrak operates three in-state routes: Capital Corridor (Auburn to San Jose), San Joaquin (Bay Area/Sacramento to Bakersfield), and Pacific Surfliner (San Luis Obispo to San Diego). These routes connect with each other and with Amtrak’s four long-distance train routes that link California to other states. The Capital Corridor provides one daily round trip train service between Auburn and Sacramento.

The Civic Center Amtrak station in Roseville is the nearest rail station that connects the SIA to the regional rail services. There are two daily trains currently running between Sacramento- Roseville-Auburn with a plan for potential service increase. The rail station can be accessed from the SIA using a fixed-route bus service operated by the City of Roseville. Park-and-ride lots at all three Amtrak stations in Placer County have been experiencing overflow for daily commuters. These lots have recently expanded their capacity.

Within the SIA, Union Pacific Rail Road (UPRR) owns the right-of-way for both passenger and freight rail services and operates freight trains through Placer County. Current rail network serves freight transport between the area and other regions in California, as well as 22 other states. The Roseville Yard, located in the city of Roseville just south of the project site, is the largest rail facility on the U.S. west coast, with a capacity of 1,800-2,300 cars per day on eight receiving and departure tracks. Figure 3-10 shows the existing rail network in the SIA.

Page 3-66 Public Review Draft Existing Conditions Report October 2015

LIA I CALEDON H

Sunset Area Plan | Figure 3-10

rn Ravine Existing Railroad Facilities bu PERDITA Au LINCOLN PLACER COUNTY Freight Railroad Facilities

Planning Area

Aitken Aitken Rd Twelve Bridges Dr City Limits

BAYBERRY y Western Regional Sanitary Landfill w FiddymentRd k P er E Catlett Rd in o J E

«¬65

Athens Ave t

C

y

e

ll

a

V

r e d n u h T Western Regional

Sanitary Landfill N BlvdFoothills

IndustrialAve

SPUR

Sunset Blvd W

TY PIUTE Cyber Ct Wildcat Blvd

E G S A Tara Ct ROCKLIN

Sunset Blvd Sunset Blvd Y E S R JE

At Menlo Drh erto Tinker Rd n Rd Nichols Dr West Oaks Blvd

CincinnatiAve VIN Veterans Dr E k ee Justice Center Dr Cr ve ro Pleasant G

Duluth AveDuluth ROSEVILLE ARNOLD

wy Pk n e d y a H

N Holt Pkwy 160 acres L

o n e t r e Crawford Pkwy e 40 B VAIL l v 10 d ¯ S MAPLE CREEK Roseville 00.25 0.5 1 1.5 Amtrak Station Miles Blue Oaks Blvd Date: 01-26-2015

Woodcreek Oaks Blvd Foothills Blvd

WashingtonBlvd Source: Caltrans, Placer County, 2015

LAM E S MAR O

RK MENDOTA R R TRANSPORTATION AND CIRCULATION | 3

Regulatory Setting

State

California State Rail Plan

Caltrans prepares the California State Rail Plan every two years in accordance with Section 14036 of the California Government Code, which serves as an examination of passenger and freight rail transportation in the state of California. The State rail system combines intercity, commuter, and freight rail. Intercity rail includes State-supported corridor routes and Amtrak long distance routes. All three systems share the same infrastructure that is generally owned by private railroads, and in some cases, public entities. The State Rail Plan focuses on these rail systems because they share the same infrastructure. The State supports the Pacific Surfliner between San Diego and San Luis Obispo, the San Joaquin between Bay Area/Sacramento and Bakersfield, and the Capitol Corridor between San Jose and Auburn. Services intended to meet primarily local needs are developed as commuter and urban rail services rather than intercity. In California, Amtrak currently operates all State-supported intercity rail services under provisions of the Federal Rail Passenger Service Act (49 U.S.C. 24101).

California Passenger Rail System: 20-Year Improvement Plan

Amtrak conducted a major community-based planning initiative that identified rail corridor needs for the statewide rail network. This planning process aimed to achieve a statewide consensus on passenger rail planning, enhance a complementary relationship between growing passenger and freight rail services, and promote sustained sources of funding for rail corridor development. This report includes the following:

. Describes the 20-year vision of each corridor in terms of service expansion, increased speeds, trip time, operational reliability, capacity and ridership; . Lists the improvements to achieve the corridor’s goal; and . Identifies required funding for infrastructure and rolling stock at the project and corridor level.

Local

The Placer County Regional Transportation Plan and Sacramento Area Council of Governments Metropolitan Transportation Plan/Sustainable Communities Strategy

The Placer County Transportation Planning Agency (PCTPA) developed and adopted the Regional Transportation Plan (RTP). As the forum for making decisions about the regional

Public Review Draft Existing Conditions Report Page 3-69 October 2015

SIA PLAN UPDATE transportation system in Placer County, the PCTPA develops and adopts various plans and strategies that serve to not only make the best use of State and Federal transportation funds, but also to fulfill the requirements of the agency’s State designation as the Regional Transportation Planning Agency (RTPA) for Placer County. Regional Transportation Plan documents the policy direction, actions, and funding recommendations that are intended to meet the short- and long- range transportation needs of Placer County. The PCTPA is part of a larger metropolitan planning jurisdiction (El Dorado, Placer, Sacramento, Sutter, Yolo, and Yuba Counties), which is coordinated by SACOG. The PCTPA’s two most recent RTPs are incorporated into SACOG’s regional planning processes through the 2012 Metropolitan Transportation Plan/Sustainable Communities Strategy (MTP/SCS).

Regional Rail Implementation Plan

The PCTPA, along with regional partners at Sacramento Regional Transit (RT, the Yolo County Transportation District, Solano Transportation Authority, and the Contra Costa Transportation Authority), worked cooperatively on a Regional Rail Implementation Plan to explore a system between Auburn and Oakland. As part of the 2002 State Transportation Improvement Program (STIP), the PCTPA pledged support for the Regional Rail concept by programming $3 million for track improvements needed to accommodate increased rail frequency to Placer County.

Page 3-70 Public Review Draft Existing Conditions Report October 2015

TRANSPORTATION AND CIRCULATION | 3

SECTION 3.6 GOODS MOVEMENT Existing Conditions

Interstate freeways, transcontinental railways, a deep-water shipping channel, and major airports give Placer County easy access to many major markets and facilitate easy goods movement. Most freight transportation in Placer County is provided by truck mode. Various transportation elements that promote freight in the region are discussed below.

Highways

Highways provide direct access from Placer County to surrounding regions, placing cities such as San Francisco, Reno, and Salt Lake City within one day’s travel. Access via I-80 and more than 820 miles of connected highways permit rapid goods movement. SR 65 provides access from I-80 north to Lincoln and Marysville. I-5 links Placer County with Oregon and Washington in the north, and Los Angeles and San Diego in the south. Highway 99 travels north and south through the agricultural regions of the San Joaquin and Sacramento Valley.

Within the SIA, there is existing terminal access (STAA) truck route designation for Blue Oaks Boulevard, Foothills Boulevard, and Industrial Avenue that can provide access for trucks exceeding the California length limit. Fiddyment Road is designated as an existing California legal truck route. Figure 3-11 presents existing truck routes within the study area. Highway 65 and Placer Parkway provide direct truck access and help with goods movement. I-80 provides indirect access for the SIA that allows truck traffic to travel through Placer County. Athens Avenue is currently serving as a major truck route for Western Regional Sanitary Landfill operated by Western Placer Waste Management Authority. It is expected that a completion of future Placer Parkway will diverge the truck traffic from Athens Avenue.

Airports

Airports connect Placer County to the greater northern America and beyond. The region is served by two international airports (Sacramento International Airport and Reno/Tahoe International Airport) and one air cargo airport (Mather Airport). In addition, Lincoln Regional Airport, Auburn Municipal Airport, and Tahoe-Truckee Airport provide general and corporate aviation.

Port of West Sacramento

The Port of West Sacramento is an operating, deep-water port that offers a complete line of services to both shippers and receivers of cargo. Its location near I-80 and I-5 gives trucks easy access. Major transcontinental railways also serve the Port, operating on the Port’s own track

Public Review Draft Existing Conditions Report Page 3-71 October 2015

SIA PLAN UPDATE system. Additionally, the Port of West Sacramento provides environmental protection, enabling it to handle many sensitive cargoes.

Railroad Facilities

Railroad facilities for freight are owned by Union Pacific Rail Road (UPRR). UPRR owns the right-of-way and operates a 915-acre rail yard in Roseville that provides east-west transcontinental freight services. It is also a major freight classification facility for northern California.

Trucking Services

Trucking services are well established and support the reputed agricultural industry in the region. They move the majority of produce from fields to processing plants. Additionally, trucking services support the Greater Sacramento Area’s manufacturing base by transporting goods produced by the industries in the region. Trucks serve other businesses that send and receive daily shipments, making it clear that trucking is a major transportation service component available in Placer County.

Regulatory Setting

Federal

Surface Transportation Assistance Act

The 1982 Surface Transportation Assistance Act (STAA) designates certain routes to allow large trucks to operate on the interstate and certain primary routes; collectively, these are called the National Network. These routes, referred to as STAA routes, call for providing turning radii that can accommodate movements by large, articulated trucks.

State

California State Rail Plan

Caltrans prepares the California State Rail Plan every two years in accordance with Section 14036 of the California Government Code, which serves as an examination of passenger and freight rail transportation in the state of California. The State rail system combines intercity, commuter, and freight rail. Intercity rail includes State-supported corridor routes and Amtrak long distance routes. All three systems share the same infrastructure that is generally owned by private railroads, and in some cases, public entities. The State Rail Plan focuses on these rail systems because they share the same infrastructure.

Page 3-72 Public Review Draft Existing Conditions Report October 2015

TRANSPORTATION AND CIRCULATION | 3

Caltrans District 3 Goods Movement Study

Caltrans District 3 developed the District 3 Goods Movement Study to help improve the efficiency of goods movement within the district and throughout California. The study identifies challenges and opportunities for improving goods movement and how they are considered and addressed from the local, regional, and district perspective.

Local

The Placer County Regional Transportation Plan and Sacramento Area Council of Governments Metropolitan Transportation Plan/Sustainable Communities Strategy

The Placer County Transportation Planning Agency (PCTPA) developed and adopted the Regional Transportation Plan (RTP). As the forum for making decisions about the regional transportation system in Placer County, the PCTPA develops and adopts various plans and strategies that serve to not only make the best use of State and Federal transportation funds, but also to fulfill the requirements of the agency’s State designation as the Regional Transportation Planning Agency (RTPA) for Placer County. Regional Transportation Plan documents the policy direction, actions, and funding recommendations that are intended to meet the short- and long- range transportation needs of Placer County. The PCTPA is part of a larger metropolitan planning jurisdiction (El Dorado, Placer, Sacramento, Sutter, Yolo, and Yuba Counties), which is coordinated by SACOG. The PCTPA’s two most recent RTPs are incorporated into SACOG’s regional planning processes through the 2012 Metropolitan Transportation Plan/Sustainable Communities Strategy (MTP/SCS).

SACOG Regional Goods Movement Study

In 2006, SACOG conducted a study to address the long-term freight mobility issues within the region. The goal of the study was to understand freight transportation within the SACOG region, recognize the implications of planning and policy decisions on goods movement, and identify trade-offs as needed. SACOG is currently preparing a set of alternatives to incorporate recommendations into the MTP/SCS.

Public Review Draft Existing Conditions Report Page 3-73 October 2015

SIA PLAN UPDATE

This page is intentionally left blank.

Page 3-74 Public Review Draft Existing Conditions Report October 2015

LIA I CALEDON H

Sunset Area Plan | Figure 3-11

rn Ravine Truck Routes bu PERDITA Au LINCOLN PLACER COUNTY CA Legal

STAA Terminal Access

Planning Area

Aitken Aitken Rd Twelve Bridges Dr

BAYBERRY City Limits y w FiddymentRd k P er E Catlett Rd in Western Regional Sanitary Landfill o J E

«¬65

Athens Ave t

C

y

e

ll

a

V

r e d n u h T Western Regional

Sanitary Landfill N BlvdFoothills

IndustrialAve

SPUR

Sunset Blvd W

TY PIUTE Cyber Ct Wildcat Blvd

E G S A Tara Ct ROCKLIN

Sunset Blvd Sunset Blvd Y E S R JE

At Menlo Drh erto Tinker Rd n Rd Nichols Dr West Oaks Blvd

CincinnatiAve VIN Veterans Dr E k ee Justice Center Dr Cr ve ro Pleasant G

Duluth AveDuluth ROSEVILLE ARNOLD

wy Pk n e d y a H

N Holt Pkwy 160 acres L

o n e t r e Crawford Pkwy e 40 B VAIL l v 10 d ¯

S MAPLE CREEK00.25 0.5 1 1.5 Miles Blue Oaks Blvd Date: 01-26-2015

Woodcreek Oaks Blvd Foothills Blvd

WashingtonBlvd Source: Caltrans STAA, Placer County, 2015

LAM E S MAR O

RK MENDOTA R R TRANSPORTATION AND CIRCULATION | 3

SECTION 3.7 TRANSPORTATION PLANS AND PROGRAMS

Existing Conditions

Plans and Programs

Placer County developed a Capital Improvement Programs (CIP) that identifies roadway improvements needed to serve future transportation demands on the County’s roadway network. Based on the 2014 CIP, there are three roadways within the Sunset Benefit District based on Placer County Traffic Mitigation Fees that are subject to improvements. These improvements are as follows:

. Foothills Boulevard between County Line and Athens Avenue – construct two lanes with a total cost of $7,907,200 ($1,464,300 through Frontage Improvement Funding and $6,442,800 through the County Traffic Impact Fee). . Foothills Boulevard at Pleasant Grove Creek – construct a bridge with a total cost of $1,757,200 ($439,300 through the City of Roseville and $1,317,900 through the County Traffic Impact Fee). . Industrial Avenue between County Line and SR 65 – shoulder widening with a total cost of $805,300 ($366,100 through Frontage Improvement Funding and $439,300 through the County Traffic Impact Fee). . Sunset Boulevard between SR 65 and Cincinnati Avenue – widen to four lanes with a total cost of $1,757,200 through the County Traffic Impact Fee. . Sunset Boulevard at UPRR/Industrial Avenue – construct overcrossing with a total cost of $11,880,000 ($7,194,200 through the County Traffic Impact Fee and $4,685,800 to be determined for revenue source). . Sunset Boulevard between Cincinnati Avenue and Foothills Boulevard – construct two lanes with a total cost of $1,610,700 ($1,171,400 through Frontage Improvement Funding and $439,300 through the County Traffic Impact Fee).

Public Review Draft Existing Conditions Report Page 3-77 October 2015

SIA PLAN UPDATE

In addition to CIP projects, regional transportation improvement projects are also identified within the SIA. These improvements are as follows:

. A 15-mile long Placer Parkway connecting between SR 70/99 and SR 65. A total cost for the project is approximately $660 million with $10 million funded through the South Placer Regional Transportation Authority (SPRTA). Approximately $500 million will also be collected from the new development areas to fund the Placer Parkway project. . SR 65 HOV Lanes between post mile 4.89 and 12.84. A total cost of the project is $109.27 million as described in the 2011 Report on the State Route 65 Corridor System Management Plan. . SR 65 widening from I-80 to the Lincoln Bypass. The estimated total cost of the widening is $95 million as described in the SPRTA project list. Approximately $67 million of the funding will come from SPRTA fees. . SR 65 interchange improvements at Sunset Boulevard and Blue Oaks Boulevard. These improvements are being funded through the Highway 65 Joint Powers Authority Fee Program.

Page 3-78 Public Review Draft Existing Conditions Report October 2015

TRANSPORTATION AND CIRCULATION | 3

SECTION 3.8 COSTS AND REVENUES FOR MAJOR IMPROVEMENTS

Existing Conditions

Revenues for Major Improvements

Regional Road Network

Placer County developed the 2027 Regional Transportation Plan (September 2005) that includes short- and long range projects that the Placer County Transportation Planning Agency (PCTPA) can be funded within the 20-year time frame. Through 2027, the funding applicable to regional roads are from Federal, state, and local sources. These sources are as follows:

. Federal – Regional Surface Transportation Program (RSTP), (Transportation Enhancement Activities Program (TEA), and Congestion Mitigation and Air Quality Program (CMAQ). . State – Regional Transportation Improvement Program (RTIP). . Local – Local Transportation Fund (LTF), fuel tax subventions, and traffic impact fees (including the County fee program and additional fees from the Tier II fee programs, including those of the SPRTA for regional improvements, the Placer Parkway fee on new development areas, and the SR 65 JPA fee for interchange improvements on SR 65).

Based on current law, policy, and projected economic activity, a total revenue forecast for regional roadway network during the planning period is $510 million, which can be broken down by committed funding sources as follows:

. RSTP - $52 million . RTIP and TEA - $224 million . Interregional Transportation Improvement Program (ITIP) - $109 million . Regional Impact Fee - $125 million

Transit

Transit improvement projects are eligible for LTF, FTA Section 5307, and FTA Section 5311 funds. The LTF estimates a total of $746 million over 20 years for transit purpose. The FTA Section 5307 fund is used primarily for capital transit purchase for urbanized areas, which is estimated to be $26M over twenty years. The FTA Section 5311 fund is for the rural area of

Public Review Draft Existing Conditions Report Page 3-79 October 2015

SIA PLAN UPDATE

Placer County and is estimated to be $4.2 million over 20 years. This fund is split among Colfax, Lincoln, and Placer County.

Aviation

The Auburn Municipal Airport and Lincoln Regional Airports serve the SIA. The Auburn Municipal Airport is funded through State and Federal grant programs. The Lincoln Regional Airport is funded by the Federal Airport Improvement Program and local sources.

Non-Motorized and Low-Speed Transportation

Improvement projects related to non-motorized transportation are eligible for both CMAQ and TEA funds. CMAQ funding focuses on air quality-related projects, and TEA funding has been folded in with RTIP. It is expected that $57 million will be available for CMAQ projects. The Transportation Development Act (TDA) allows one-quarter cent State sales tax to be spent on transit related projects. State law allows 2 percent of TDA funds to be spent for bicycle and pedestrian projects. These funds are anticipated to generate $15 million through 2027.

Page 3-80 Public Review Draft Existing Conditions Report October 2015

TRANSPORTATION AND CIRCULATION | 3

SECTION 3.9 KEY TERMS

Annual Average Daily Traffic (AADT). The total volume of traffic passing a point or segment of a highway facility in both directions for one year divided by the number of days in a year. AADT is typically measured by taking one two-week sample during each of the four seasons (fall, winter, spring, summer) and averaging.

Average Daily Traffic (ADT). The average number of two-way vehicles passing a specific roadway location in a 24-hour period. Averaging times are typically over three days (Tuesday – Thursday) for weekday conditions and seven days for a full week.

Bicycle Boulevard. A shared roadway (bicycles and motor vehicles share the space without marked bike lanes) where the through movement of bicycles is given priority over motor vehicle travel on those streets.

California Emergency Management Agency (Cal EMA). Cal EMA Strives to enhance safety and preparedness in California through strong leadership, collaboration, and meaningful partnerships. Cal EMA is responsible for the coordination of overall state agency response to major disasters in support of local government. The Agency is responsible for assuring the state’s readiness to respond to and recover from all hazards – natural, manmade, war-caused emergencies and disasters – and for assisting local governments in their emergency preparedness, response, recovery, and hazard mitigation efforts.

Capitol Corridor. An Amtrak train service route between Auburn–Sacramento–San Francisco–San Jose.

Capital Improvement Programs. A list of transportation improvements needed to serve the future transportation demands that can be funded in whole or partially through various sources.

Clear Path of Travel. Refers to the realm of a sidewalk that is between the curb and back of pavement that is free from obstacles such as utility infrastructure.

Congestion Mitigation and Air Quality (CMAQ). The funding program under Federal transportation legislation that targets a reduction of congestion and/or improvement of air quality.

Curb Ramp. A ramp that is graded from the sidewalk surface to the roadway surface for use by wheeled pedestrians, such as wheelchair users, baby strollers, and those using assistive walkers.

Federal Transit Administration (FTA). An agency within the U.S. Department of Transportation that provides financial and technical assistance to local public transit systems, including buses, subways, light rail, commuter rail, monorail, trolleys, inclined railways, and

Public Review Draft Existing Conditions Report Page 3-81 October 2015

SIA PLAN UPDATE people movers. The FTA also oversees grants and provides regulatory oversight to State and local transit providers.

Highway Capacity Manual (HCM). A publication of the Transportation Research Board (TRB) that contains concepts, guidelines, and procedures for computing the capacity and quality of service of various roadway facilities for all modes of travel (driving, walking, biking, and taking transit).

Level of Service (LOS). A qualitative measure for the travel experience along a roadway or at an intersection. A scale of A to F is used to indicate the level of service, with “A” as the best quality and “F” as the worst quality.

Local Transportation Fund (LTF). A funding source under the Transportation Development Act for jurisdictions to operate local transit systems. The LTF is funded by ¼ percent of the statewide sales tax returned to the county of origin.

Long-Term Bicycle Parking. Bicycle parking meant to accommodate employees, students, residents, commuters, and others expected to park on a regular basis for more than four hours. This parking is to be provided in a secure, weather-protected manner and location. Long-term parking type will be a bicycle locker, a locked room with standard racks and access limited to bicyclists only, or standard racks in a monitored location.

Manual on Uniform Traffic Control Devices (MUTCD). A Federal Highway Administration document that provides uniform standards and specifications for all official traffic control devices in the nation. Caltrans uses the federal document to create a California- specific MUTCD.

Mid-block Crossing. A designated pedestrian crossing that is not located at a roadway intersection.

Pedestrian Bulb-out. An extension of a sidewalk into the roadway at a street crossing location. Bulb-outs reduce pedestrian roadway crossing distances, prevent vehicles from parking too close to a pedestrian crossing, and increase the visibility between pedestrians and motorists.

Public Transportation Modernization, Improvement, and Service Enhancement Account (PTMISEA). Provides funds for rehabilitation, safety or modernization improvements, capital service enhancements or expansions, new capital projects, bus rapid transit improvements, or for rolling stock procurement, rehabilitation, or replacement. Funds in this account were appropriated by the Legislature to the State Controller’s Office (SCO) for allocation in accordance with Public Utilities Code formula distributions: 50 percent allocated to Local Operators using the formula in Section 99314 and 50 percent to Regional Entities using the formula in Section 99313.

Page 3-82 Public Review Draft Existing Conditions Report October 2015

TRANSPORTATION AND CIRCULATION | 3

Public Use Microdata Sample (PUMS). A set of untabulated records about individual people or housing units. The Census Bureau produces the PUMS files so that data users can create custom tables that are not available through pretabulated (or summary) American Community Survey data products.

Regional Surface Transportation Program (RSTP). The funding program included in the Federal transportation legislation that can be used for most transportation purposes.

Regional Transportation Improvement Program (RTIP). A programming document that inventories the projects and amounts to be funded by the County.

Regional Transportation Plan (RTP). A State required transportation planning document that lists existing transportation conditions, forecasts needs, and a funding-constrained list of improvement projects for a 20 year horizon.

Sharrows. A roadway marking indicating shared use by bicycles and motorized vehicles.

Short-Term Bicycle Parking. Parking provided to accommodate visitors and customers, who are parking for less than four hours. Bicycle racks meeting County standards satisfy this need.

STAA Truck. A legal truck to operate on routes that are part of the National Network based on the Surface Transportation Assistance Act of 1982.

State Transportation Improvement Program (STIP). A multi-year capital improvement program of transportation projects on and off the State Highway System, funded with revenues from the Transportation Investment Fund and other funding sources. STIP programming generally occurs every two years.

State Transit Assistance Fund. The State Transit Assistance budget provides funding for allocation to local transit agencies to fund a portion of the operations and capital costs associated with local mass transportation programs.

Traffic Impact Fee. A fee imposed on a new development project to pay for the whole or a portion of public infrastructure improvement costs. The fee is identified by a contribution of the projected traffic at affected public roadway facilities.

Transportation Demand Management (TDM). Strategies that emphasize a more efficient use of the existing transportation network by focusing on the movement of people and freight as opposed to motor vehicles. TDM strategies are developed to encourage walking, biking, using public transit, carpooling, flexible work schedules, and telecommuting.

Transportation Development Act (TDA). The TDA provides significant sources of funding for public transportation through the Local Transportation Fund (LTF) and the State Transit

Public Review Draft Existing Conditions Report Page 3-83 October 2015

SIA PLAN UPDATE

Assistance Fund (STA). Funds are allocated to communities based on population, taxable sales, and transit performance, and are used to address unmet transit needs. LTF dollars may be used for local streets and roads projects when a community can demonstrate that all transit needs have been met. The TDA also requires local jurisdictions to assess unmet transit needs before allocating funds to specific programs or projects.

Transportation Enhancement Activities (TEA). The funding program included in the Federal transportation legislation that aims to provide enhancements over and above those normally provided for transportation projects.

Transportation Systems Management (TSM). Operational strategies that are designed to increase the capacity and efficiency of existing transportation facilities without roadway capacity increasing projects. TSM strategies may include traffic signal timing management, pavement management, and the use of intelligent transportation systems (ITS).

Union Pacific. A train operator that provides freight train service in 23 states across the U.S with over 32,000 route miles.

Vehicle Miles of Travel (VMT). A unit of measurement of vehicle travel made by a vehicle, such as an automobile, van, pickup truck, or motorcycle. Each mile traveled is counted as one vehicle-mile regardless of the number of persons in the vehicle.

Page 3-84 Public Review Draft Existing Conditions Report October 2015

TRANSPORTATION AND CIRCULATION | 3

SECTION 3.10 REFERENCES Roadways

2015 California Vehicle Code, https://www.dmv.ca.gov/portal/wcm/connect/c3d57c91-d5e5- 4af7-96d0-d9470b4262f3/veh_code.pdf?MOD=AJPERES.

AB1600 Traffic Impact Fee Mitigation.

California Highway Patrol, https://www.chp.ca.gov/.

California Manual on Uniform Traffic Control Devices, 2012 Edition California Department of Transportation.

Caltrans Performance Measurement System (PeMS), http://pems.dot.ca.gov/.

Caltrans Traffic Data, http://traffic-counts.dot.ca.gov/2013all/Route60-70.html.

Caltrans Truck Traffic Data, http://www.dot.ca.gov/hq/traffops/saferesr/trafdata/docs/2013_aadt_truck.pdf.

Countywide General Plan Final Environmental Impact Report, July 1994.

Guide for the Preparation of Traffic Impact Studies, State of California Department of Transportation, December, 2002.

Highway Capacity Manual 2010 Edition, Transportation Research Board.

Manual on Uniform Traffic Control Devices (MUTCD), 2009 Edition, FHWA.

Placer County Air Pollution Control District, http://www.placer.ca.gov/Departments/air.

Placer County General Plan, Countywide General Plan Policy Document, May 2013.

Placer County Regional Transportation Plan 2010 – 2035, September 2010.

Placer Parkway Phase 1 Transportation Analysis Report, January 2001.

State Route 65 Corridor System Management Plan, Caltrans District 3, May 2009.

Surface Transportation Assistance Act Routes (STAA – Federal Designation).

The California Complete Streets Act of 2008.

Public Review Draft Existing Conditions Report Page 3-85 October 2015

SIA PLAN UPDATE

The Moving Ahead for Progress in the 21st Century Act (MAP-21), http://www.fhwa.dot.gov/map21/.

The State Route 65 Capacity and Operational Improvements (COI) Transportation Analysis Report, January 2015.

Village 11 Project, Supplement to the Lincoln Crossing Specific Plan EIR, May 2012.

Transit Services

Placer County General Plan, Countywide General Plan Policy Document, May 2013.

The California Complete Streets Act of 2008.

Caltrans’s Transportation Development Act, http://www.dot.ca.gov/hq/MassTrans/State- TDA.html.

Federal Transit Administration, http://www.fta.dot.gov/.

Placer County Transit, http://www.placer.ca.gov/Departments/Works/Transit/PCT.

Public Transit in Placer County, http://www.placer.ca.gov/departments/works/transit.

Roseville Transit, http://www.roseville.ca.us/transportation/roseville_transit/default.asp.

The Americans with Disabilities Act, http://www.ada.gov/.

Title VI of the Civil Rights Act of 1964. 42 U.S.C. § 2000d et seq., http://www.dol.gov/oasam/regs/statutes/titlevi.htm.

Placer County Short Range Transit Plan, October 2011.

Placer County Regional Transportation Plan 2010 – 2035, September 2010.

Non-Motorized Facilities

2015 California Vehicle Code, https://www.dmv.ca.gov/portal/wcm/connect/c3d57c91-d5e5- 4af7-96d0-d9470b4262f3/veh_code.pdf?MOD=AJPERES.

California Manual on Uniform Traffic Control Devices, 2012 Edition California Department of Transportation.

County of Placer Transition Plan for County Maintained Roadways, February 2009.

Page 3-86 Public Review Draft Existing Conditions Report October 2015

TRANSPORTATION AND CIRCULATION | 3

Manual on Uniform Traffic Control Devices (MUTCD), 2009 Edition, FHWA.

Placer County General Plan, Countywide General Plan Policy Document, May 2013.

Placer County Public Works Americans with Disabilities Act Services, http://www.placer.ca.gov/departments/works/adadpw.

Placer County Regional Bikeway Plan, September 2002.

Placer County Regional Transportation Plan 2010 – 2035, September 2010.

Placer County Transportation Planning Agency, Bikeway Planning, http://pctpa.net/bikeway- planning/.

The Americans with Disabilities Act, http://www.ada.gov/.

The California Complete Streets Act of 2008.

Railway Facilities

Amtrak California Passenger Rail System: 20-Year Improvement Plan, March 2001.

California Passenger Rail System: 20-Year Improvement Plan, http://149.136.20.80/rail/dor/assets/File/Amtrak_20_yr_Plan_Technical.pdf.

California State Rail Plan, http://californiastaterailplan.dot.ca.gov/.

Capitol Corridor, http://www.capitolcorridor.org/.

Placer County Transportation Planning Agency, Regional Rail http://pctpa.net/projects/regional-rail/.

Union Pacific – J.R. Davis Rail Yard, https://www.up.com/aboutup/facilities/davis/index.htm.

Regional Rail Implementation Plan, September 2005.

Caltrans California State Rail Plan, May 2013.

Placer County Regional Transportation Plan 2010 – 2035, September 2010.

Goods Movement

Sacramento Area County Association of Governments Regional Goods Movement Study, September 2006.

Public Review Draft Existing Conditions Report Page 3-87 October 2015

SIA PLAN UPDATE

California State Rail Plan, http://californiastaterailplan.dot.ca.gov/.

Local Truck Route, http://www.dot.ca.gov/hq/traffops/trucks/truckmap/local-truck- routes.htm.

Placer County Airport Map, http://www.placer.ca.gov/maps/general%20county%20maps/countyairports.

Port of West Sacramento, http://www.cityofwestsacramento.org/city/depts/cmo/port_of_west_sacramento/.

Union Pacific – J.R. Davis Rail Yard, https://www.up.com/aboutup/facilities/davis/index.htm.

Caltrans California State Rail Plan, May 2013.

Caltrans District 3 Goods Movement Study, February 2015.

Placer County Regional Transportation Plan 2010 – 2035, September 2010.

Transportation Plans and Programs

Countywide Capital Improvement Programs, Placer County, December 2014.

Costs and Revenues for Major Improvements

Placer County Regional Transportation Plan 2027, Placer County, September 2005.

Page 3-88 Public Review Draft Existing Conditions Report October 2015