SYSTEM IMPACT ASSESSMENTS a Total of Three (3
Northland Power Solar Empire L.P., Northland Power Solar Martin’s Meadows L.P., Northland Power Solar Abitibi L.P., Northland Power Solar Long Lake L.P. Exhibit H Tab 1 Schedule 1 Page 1 of 1 SYSTEM IMPACT ASSESSMENTS A total of three (3) SIAs and Addendums have been completed and finalized by the IESO for the four (4) Generation Projects and associated Transmission Facilities. They are described as follows: Project/Facility Date of Final Description SIA/Addendum Empire, Martin’s January 6, 2011 Study of the original connection point of the three Meadows and Abitibi (3) sites on 115 kV HONI circuit A5H. Long Lake January 6, 2011 Study of the original connection point of Long Lake on 115 kV HONI circuit C2H. Empire, Martin’s May 15, 2012 Addendum #1 – Study of the combined Meadows, Abitibi and connection of the four (4) sites on 115 kV HONI Long Lake circuit C2H (connection of Empire, Martin’s Meadows and Abitibi moved to the connection point of Long Lake). Copies of the above SIAs accompany this Application at Exhibit H, Tab 1, Schedule 2. Northland Power Solar Empire L.P., Northland Power Solar Martin’s Meadows L.P., Northland Power Solar Abitibi L.P., Northland Power Solar Long Lake L.P. Exhibit H Tab 1 Schedule 2 SYSTEM IMPACT ASSESSMENTS Copies of SIAs IESO_REP_0666 System Impact Assessment Report Northland Power Solar Martin’s Meadows, Abitibi and Empire CONNECTION ASSESSMENT & APPROVAL PROCESS Final Report CAA ID 2010-403, 2010-406, 2010-409 Applicant: Northland Power Solar Martin’s Meadows L.P, Northland Power Solar Abitibi L.P Northland Power Solar Empire L.P Market Facilitation Department January 6, 2011 System Impact Assessment Report Document ID IESO_REP_0666 Document Name System Impact Assessment Report Issue 1.0 Reason for Issue Final Report Effective Date January 6, 2011 ii System Impact Assessment Report System Impact Assessment Report Northland Power Solar Martin’s Meadows, Abitibi and Empire Acknowledgement The IESO wishes to acknowledge the assistance of Hydro One in completing this assessment.
[Show full text]