BUILDING G up to 47,250 Sq.Ft. Available for Lease

Total Page:16

File Type:pdf, Size:1020Kb

BUILDING G up to 47,250 Sq.Ft. Available for Lease HOPEWELL AIRPORT PARK BUILDING G Up to 47,250 sq.ft. available For Lease HOPEWELL – IN ALL THE RIGHT PLACES™ designed to be building g — up to 47,250 sf available Trust Hopewell to put your business in all the right places PROJECT DESCRIPTION Hopewell Airport Park is a four building, 24 acre HOPEWELL development ideally positioned in the city’s northeast quadrant. Building G offers 144,128 square feet of premium distribution warehouse and light manufacturing space. AIRPORT PARK This development is anchored by an outstanding location and defined by Hopewell’s class-leading reputation for TAKE YOUR superlative design and quality. Tenants will benefit from a range of lease options starting BUSINESS TO from 14,484 square feet and up. Ample ceiling heights, efficient bay dimensions and loading access make Hopewell NEW HEIGHTS Airport Park the ideal development for businesses who demand maximum functionality in a highly desirable area. Put your business on the map with an unbeatable location and trademark Hopewell quality/assurance —put your business at Hopewell Airport Park today. HOPEWELL AIRPORT PARK BUILDING G HIGHLIGHTS DETAILS • OPCosts (2017) $3.55 per • Designed to achieve LEED ® • Available immediately • 47,250 square feet available certification. square foot • Buildings are constructed • Tenant sizes starting from • 200 amp 600 volt power per • Immediate proximity to to the highest quality 14,484 square feet tenant Deerfoot Trail, QE2 (Highway featuring modern and • Building Depth of 197’ #2), Barlow Trail, Country functional design and • 7” floor slab, capable of • Typical bay 197’x 55’ and 197’x Hills Boulevard, Stoney Trail appealing aesthetics 14,500 lb single leg racking 37’ (ring road) and the Calgary load • Custom design office • 28’ clear ceiling heights International Airport. • 9 - 9’ x 10’ dock loading with improvements to suit • ESFR sprinkler system 35,000 lb hydraulic levellers • Designed for single or multi- tenant’s requirements at each door tenant uses • T5 Lighting to 30 FC building g floorplan BUILDING G 197’ 144,128 SF LEASED TENANT A TENANT B LEASED 32,766 SF 14,484 SF 55’ 37’ 47’ * proposed demising options DESIGNED TO GIVE YOUR BUSINESS THE COMPETITIVE EDGE PROPERTY HIGHLIGHTS address BUILDING G 13,433.31 SM (144,128 SF) Building G: 10770 25 Street NE Building F: 10760 25 Street NE Calgary, AB building size Building G: 144,128 square feet Building F: 96,200 square feet available space BUILDING F 8,930.14 SM (96,200 SF) Building G: 47,250 square feet Building F: 19,421 square feet site size 24 acres STREET N.E. TH 25 land use classification BUILDING E Airport Light Industrial 8,930.14 SM (96,123 SF) permitted uses General warehousing and light manufacturing development plans 484,000 square feet of multi-tenant warehouse/ BUILDING D distribution space 13,656.00 SM (147,000 SF) road access All-turns, signalized intersection at Freeport Boulevard & Barlow Trail location LEGEND Immediate proximity to leased hopewell airport park Deerfoot Trail (QE2 /Highway #2), Barlow Trail, Country available for lease site plan Hills Boulevard, Stoney Trail (ring road) and the Calgary International Airport. FUNCTIONAL DESIGN, OUTSTANDING QUALITY DEVELOPMENT SPECIFICATIONS • Constructed to LEED (Leadership in • 9’ x 10’ overhead doors complete with 40 Energy & Environmental Design) certified oz Neoprene covered foam seals, adjustable standards, a set of rated building standards curtain header and dock lights at each door intended to improve energy efficiency, and and complete with 35,000 lb 7’ x 8’ deep environmental aspects and sustainability hydraulic dock levelers and bumpers of the built environment. • ESFR Sprinkler system • Heavy duty paving in loading areas and in • Gas fired suspended infra-red low intensity truck access areas in-line heating units and ceiling hung high • R-20 EPDM roof membrane with 12 lbs. efficiency unit heaters gravel ballast. • 1600 amp 600 volt main service • Building consists of pre-stressed insulated • T5H0 lighting in the warehouse providing precast concrete panels with vertical 30 FC rib profile used for warehouse. Overall • Width of pad is 45’ continuous along dock effective insulation value of R15 loading area. hopewell development corporation A Reputation Built on Performance disclaimer: Renderings and sketches are artist’s representation only, and may not be accurate. Dimensions, sizes, features, amenities and layouts are approximate only, and are subject to change without notice. The Developer reserves the right to make modifications to the information contained herein. E. &. O. E. LOCATION BENEFITS Calgary’s northeast is fast becoming the preferred location for warehouse and light EXACTLY industrial tenants—and no development is better situated than Hopewell Airport Park. Immediate access to Deerfoot Trail (QE2 /Highway #2), Barlow Trail, Country Hills Boulevard, Stoney Trail (ring road) and the Calgary International Airport provides tenants with unequaled efficiency and ease when transporting goods or materials to WHERE YOU and from Hopewell Airport Park. The development’s premium location offers significant advantages to employees, NEED TO BE customers and suppliers with multiple access points from all quadrants. Employees will appreciate the direct transit routes serving the development including route 100 from the McKnight Westwinds LRT Station. Add up the locational advantages and it’s clear where you need to be. Welcome to Hopewell Airport Park. outstanding access to key transportation routes STONEY TRAIL NE STONEY TRAIL NE HOPEWELL AIRPORT PARK COUNTRY HILLS BLVD NE IL RA BUS STOP 36 ST NE T OT BUS STOP 25 ST NE RFO 4668 DEE FREEPORT BLVD NE 9675 BARLOW TRAIL NE 19 ST NE 100 AVE NE N AIRPORT TRAIL NE AIRPORT TRAIL TUNNEL CALGARY INTERNATIONAL AIRPORT HOPEWELL AIRPORT PARK IS DESIGNED TO BE As one of Canada’s largest and most dynamic commercial developers, Hopewell is committed to conducting our business activities in an HOPEWELL’S environmentally conscious manner. We support the principles of sustainable development and integrate GREEN POLICY the following considerations into our core business activities: SUSTAINABLE SITES MATERIALS & RESOURCES Hopewell undertakes: Hopewell undertakes : • Environmental Construction Operations (ECO) Plan - developed • Recycling Program - onsite during construction with material- and implemented on all sites specific container bins for wood, cardboard, concrete and metal • Erosion / Siltation Control - limiting the impact of storm water (also refer ECO Program under SS above) runoff into storm water management ponds and/or rivers/streams • Recycling - of paper, glass, aluminum and plastics used in • Environmental Site Reviews - to determine impact onsite everyday operations development • Accurate Estimation - of material orders to reduce recycling • Site Development Coverage - maximized to lower the demands on and waste consumption of land (subject to controls by Land Use Policies and • Utilization of Regional Materials - for building materials and parking requirements of municipalities) components • Farming Operations - portions of land not immediately under site • Enduring Buildings - constructed through selection of durable development will be farmed (wherever possible) to provide green building materials cover, minimize dust control and storm runoff and keeping land productive until commencement of site development • Storm Water Runoff - managed and controlled onsite including INDOOR ENVIRONMENTAL QUALITY measures for quality and quantity control to comply and exceed (wherever possible) municipal guidelines Hopewell undertakes: • Shielded Light Fixtures - utilized wherever possible to mitigate • Cleaning - of product and equipment prior turn over light pollution and promote the use of “Dark Sky” lighting policies • Ventilation - of building during construction • Implementation - of spill prevention and clean-up program • Adherence to WHMIS WATER EFFICIENCY • HVAC Systems - provided to suit specific outdoor climate • Smoke-free job site Hopewell will install : • MSDS Sheets - for products obtained • Low Flow Plumbing Fixtures - implementing the use of low water • HVAC Equipment -with economizer damper controls volume plumbing fixtures, including motion sensors • Low Emitting VOC Materials Use - adhesives, sealants, carpet, • Timers on Irrigation Systems (where applicable) paints and coatings • Green Cleaning Products - Hopewell promotes their use by retail property management and retail tenants ENERGY AND ATMOSPHERE Beyond the inclusions and policies noted above, Hopewell welcomes Hopewell undertakes : your inquiries and actively considers additional environmentally- • HVAC Systems - commissioned by certified industry technicians friendly features and specifications. Contact us today to learn more • T5 and T8 Fluorescent Interior Lighting - wherever possible about the many ways the Hopewell Airport Park development (versus HP sodium & metal halide) reflects our Green commitment. THE NAME TO TRUST FOR QUALITY & SERVICE HOPEWELL DEVELOPMENT For almost 20 years, businesses of all sizes and in all industries have trusted Hopewell Development, one of Canada’s leading commercial developers, to deliver intelligent and highly personalized leasing solutions. From site selection planning and design to financing, construction management and leasing, our team of experienced associates delivers customized solutions that meet the needs of tenants and owners through every phase of the development process. Hopewell Development is the industrial and retail development division of the Hopewell Group of Companies, a Calgary-based firm, with an extensive track record in all aspects of industrial & commercial real estate development across Canada. Hopewell Development has developed and sold more than 15 million square feet of industrial and retail space in the Greater Toronto Area, southwestern Ontario and all major centres across Western Canada. Learn more about the Hopewell difference today HopewellDevelopment.com CONTACT US TODAY LEASING INQUIRIES | FOR MORE INFORMATION Patricia Cayen director, industrial leasing 403.298.8120 [email protected] HopewellDevelopment.com.
Recommended publications
  • Building for Lease
    FOR LEASE BUILDING 1625 100TH AVENUE NE CALGARY, ALBERTA L BUILDING L 257,580 SF DISCOVER Oxford Airport Business Park is a master-planned, flagship business park adjacent to Calgary International Airport that will be comprised of 4 million square feet of premier industrial, office, hotel and amenity retail space. The site is strategically located at the gateway to the airport with outstanding access to Country Hills Boulevard, Airport Trail Deerfoot Trail, and Stoney Trail. Construction is of the highest quality, featuring environmentally efficient design along with modern, functional features and appealing aesthetics. Contact: Dan Alexander – Director, Industrial Leasing | 403.206.6449 | [email protected] BUILDING SPECIFICATIONS Site Area: 13.26 acres Floor Slab: 7” reinforced with 25 kg/m3 steel fibers and 12,400 lb. pt. load Zoning: I-G – General Industrial Zoning Main Power Service: 2000A @ 347/600V, 3 Phase Building Size: 257,580 SF Lighting: LED c/w motion sensors Available Area: 257,580 SF Sprinklers: ESFR System Minimum Bay Size: 42,900 SF Trailer Parking: +/- 64 Typical Column Grid: 55’ X 40’ (60’ depth at staging bay) Lease Rate: Market Building Depth: 260’ Additional Rent: $3.60 PSF Ceiling Height: 32’ clear Available: August 2019 Loading Doors: • 36 dock doors c/w 40,000 lb pneumatic levelers • 2 ramped grade doors • 29 doors available in knock-out positions KEY DEVELOPMENT FEATURES • Brand new construction with state-of-the-art features • Dock and ramped grade loading • Large, medium and small bay configuration
    [Show full text]
  • Airport Trail Interchanges
    Page 1 of 6 Item # 7.2.1 Transportation Report to ISC: UNRESTRICTED Calgary Planning Commission CPC2019-0749 2019 June 20 Airport Trail Interchanges EXECUTIVE SUMMARY The Airport Trail Phase 2 program completes the Airport Trail corridor from Deerfoot Trail to Stoney Trail, supporting the unimpeded flow of goods and vehicles to and from the Calgary International Airport, the growing logistics business around the Airport, and development in the City’s Northeast communities. The program is funded in partnership by the Government of Canada ($50 million), the Government of Alberta ($27.7 million), the Calgary Airport Authority ($20 million, plus half the land costs) and the City ($20.65 million, plus half the land costs). The $153.35 million program includes the following projects: 1. Extension of tender-ready Airport Trail NE, from 36 Street to 60 Street NE (under Construction); 2. Construction of ring road access at Stoney Trail NE (southbound Stoney to westbound Airport Trail NE (in Preliminary Design); and 3. Construction of two grade – separated bridge structures and associated ramps at 19 Street NE and Barlow Trail NE, crossing over Airport Trail NE. This report provides an overview of the third project listed above. ADMINISTRATION RECOMMENDATION: That Calgary Planning Commission RECEIVE AND ACCEPT this report for information. PREVIOUS COUNCIL DIRECTION / POLICY On 2018 July 30 at the Combined Meeting of Council, Council approved a budget appropriation of $153.35 million to Program 859- Airport Trail Phase 2 (TT2018-0856). This followed previous Council direction: - 2012 December 03 – Council approved ‘Airport Trail Functional Planning Study’ (TT2012-0658). - 2014 May 26 – 2015 -2024 Investing in Mobility – Airport Trail was included as an unfunded transportation infrastructure project list (TT2014-0308).
    [Show full text]
  • National Trade Corridors Fund – Airport Trail Phase 2
    Item #7.1 Transportation Report to ISC: UNRESTRICTED SPC on Transportation and Transit TT2018-0856 2018 July 19 Page 1 of 4 National Trade Corridors Fund – Airport Trail Phase 2 EXECUTIVE SUMMARY On July 6, 2018, the Federal Government announced a commitment of $50 million towards funding Airport Trail – Phase 2 from the National Trade Corridors Fund. The project’s scope includes an extension of Airport Trail from 36th St to 60th St, construction of two new grade separated interchanges at 19th St and Barlow Tr., and construction of a southbound to westbound ramp at Stoney Trail and Airport Trail. Additional funding was committed by The Government of Alberta ($27.7 million). The Calgary Airport Authority will contribute $20 million through a previous agreement with The City. Airport Trail is planned as a vital east-west corridor in Calgary. The work under this project will complete the corridor from Deerfoot Trail to Stoney Trail, will support the unimpeded flow of goods and vehicles to and from the Airport, will support the growing logistics business around the Airport, and open up new areas for development in The City’s growing northeast. Approval for budget appropriation of the total project budget amount ($153.35 million) is being requested at this time for an amount of $38.15 million. This amount will allow administration to move forward with construction of the project and the outstanding land acquisition. ADMINISTRATION RECOMMENDATION: That the SPC on Transportation and Transit recommend that Council: 1. Approve the budget appropriation of $153.35 million to Program 859 – Airport Trail N.E.
    [Show full text]
  • North Calgary Regional Transportation Study for Information
    ...... Calgary North Calgary Regional Intergovernmental Transportation Study Affairs Committee Kara Wolfe, P. Eng . May 16, 2019 NCRTS - Presentation to IGA May 16,2019 CITY OF CALGARY Calgary RECEIVED Presentation Outline IN LEGAL TRADITIONS ROOM MAY 1 6 2019 ITEM: 6. 9 .J: G.A- 4,/9- 05% ~ 5 tt-:\o c.+,' 0 11] CITY CLERK'S OFFICE I. Study Background 11. Study Process Ill. Evaluation Framework IV. Growth Assumptions V. Transit Network VI. Transportation Network Findings VI I. Project Prioritization VI 11. Next Steps NCRTS - Presentation to IGA May 16, 2019 2 Calgary Study Background I. Request from Alberta Transportation Deputy Minister to Calgary, RVC and Airdrie II. Cochrane and Chestermere - group expanded Ill. North Calgary Region Committee (NCRC) - Five municipalities and Alberta Transportation IV. Technical work and facilitation of NCRC collaboration by ISL V. Project milestones and key decisions - consensus of the NCRC VI. CMRB participated in meetings ,- NCRTS - Presentation to IGA May 16 2019 . · · · 3 l, Calgary Study Area _I I- - NCRTS Study Area (this study) ------~-------, 1 CMRB Boundary I .... - - - - - ... - - ~ - - - - S&ECRTS Study Area (underway now) .' ,, \_~.. r ~ ·- ' \~ I \, NCRTS - Presentation to IGA May 16, 2019 4 Calgary Study Process Stage 2 Stage 1 Stage 3 Network Modelling & Network Context Evaluation Network Prioritization .• Data Collection • Network Analysis • Project Evaluation ,. Land Use Inputs • Option Evaluation • Project Prioritization • Network Options 1. 2028 and 2039 • Reporting • Evaluation Framework I 1 Horizons N - rese Calgary Evaluation Framework I. Evaluation of network options, project prioritization II. Referenced existing frameworks including: i. The City of Calgary TIIP Multiple Criteria Analysis ii. Alberta Transportation iii.
    [Show full text]
  • Calgary Airport Trail Tunnel Temperature Monitoring
    39th IABSE Symposium – Engineering the Future September 21-23 2017, Vancouver, Canada Calgary Airport Trail Tunnel Temperature Monitoring Nathan Murdoch, B.Sc., E.I.T., Azita Azarnejad Ph.D., P.Eng., FCSCE CH2M HILL Canada Limited (CH2M), 540, 12 Avenue SW, Calgary Alberta, T2R 0H4, Canada Ved Sharma, Ph.D., P.Eng., Jadwiga Kroman, M.Sc., P.Eng., FCSCE The City of Calgary Transportation Infrastructure, 3rd floor Rocky Mountain Plaza, 615 – Macleod Trail SE, Calgary, Alberta, T2P 2M5, Canada Contact: [email protected] Abstract The Calgary Airport Trail Tunnel (CATT) is a 620-m-long roadway tunnel constructed under the Calgary International Airport’s (YYC’s) new parallel runway and three associated taxiways owned by The City of Calgary (The City) on land leased from YYC. The CATT was designed according to the Canadian Highway Bridge Design Code (CHBDC). The question arose during the design stage if the tunnel, which is a buried structure, would be subjected to the same temperature effects (range and gradient) given in CHBDC for bridges. To investigate this question for future designs, a system of wireless sensors was installed in the CATT to monitor temperatures with data being collected remotely. The paper includes an overall explanation of the CATT’s design, temperature monitoring instrumentation, and initial findings, including comparisons with temperatures recorded outside the tunnel, and the temperature range and differential provided by the CHBDC. Keywords: Tunnel; temperature; monitoring; wireless sensors; reinforced concrete. The CATT was designed according to the Canadian 1 Introduction Highway Bridge Design Code (CHBDC or code), The Calgary International Airport (YYC) undertook which gives an effective temperature range for the Airport Development Program to allow the Calgary of -43 to 38 degrees Celsius (°C).
    [Show full text]
  • Transportation Funded and Unfunded Infrastructure Lists 2015-2024
    Transportation Funded and TT2014-0308 Unfunded Infrastructure List 2015-2024 ATTACHMENT 2 Transportation Funded and Unfunded Infrastructure Lists 2015-2024 The figures in this attachment show all of the projects and annual programs that are required for construction between 2015 and 2024 (approximately $5.6 billion in value). Each figure indicates which projects or programs will receive full or partial funding, and which will continue to be unfunded. The priority of both funded and unfunded projects is also provided, which will assist Council and Administration in allocating new sources of funding when any become available. Figure 2.1 is a map showing the location of each funded and unfunded project. Figures 2.2 through 2.6 provide a table showing the projects and annual programs broken down by infrastructure category. Each table provides the priority, planned construction date, funded and unfunded costs, and estimated operating cost impact. The figures are: Figure 2.2 – Mobility Hubs and Transit Corridors Figure 2.3 – Goods Movement and Traffic Growth Figure 2.4 – Transportation Network Optimization Figure 2.5 – Lifecycle and Asset Management Figure 2.6 – Support Functions The prioritization levels for each of the projects in the above figures are as follows: APPROVED – the project has received previous budget approval from Council. REQUIRED – the project must be undertaken to fulfill Council direction, or to support other projects identified in the plan. HIGH / MEDIUM – reflects the relative priority of all other projects within the plan (Low priority projects fall outside the 10-year Investing in Mobility horizon). Figure 2.7 summarizes the estimated operating cost increases (excluding new transit revenues from the rapid transit corridors) that are shown in Figures 2.2 through 2.6.
    [Show full text]
  • Green Line: Update on Funding, Staging and Delivery ATTACHMENT 1
    TT2015-0881 Green Line: Update on Funding, Staging and Delivery ATTACHMENT 1 Green Line Update on Funding, Staging and Delivery December 2015 Revision1.0 TT2015-0881 GREEN LINE FUNDING STAGING AND DELIVERY/Att1.pdf Page 1 of 97 ISC: Unrestricted Green Line: Update on Funding, Staging and Delivery TT2015-0881 GREEN LINE FUNDING STAGING AND DELIVERY/Att1.pdf Page 2 of 97 ISC: Unrestricted Green Line: Update on Funding, Staging and Delivery CONTENTS 1. THE GREEN LINE: CALGARY’S NEXT LIGHT RAIL TRANSIT LINE ..............................................4 2. MOBILITY STRATEGY .......................................................................................................................6 3. GREEN LINE CORRIDOR ................................................................................................................16 4. GREEN LINE PROJEct ...................................................................................................................24 5. QUANTIFYING THE INVESTMENT IN THE GREEN LINE ............................................................32 6. FINDINGS FROM A SCAN OF CANADIAN CITIES .....................................................................40 7. FUNDING AND FINANCING .........................................................................................................45 8. STAGING OPTIONS ........................................................................................................................56 9. RETURN ON INVESTMENT ............................................................................................................60
    [Show full text]
  • Blue Line to Airport
    Attachment 3 TT2020-1289 Airport Transit Connector – Blue Line to Airport Connecting the Blue Line LRT from 88 Ave NE Station to the Airport, this project brings travelers and employees to and from the Calgary International Airport, with a stop in the NE industrial area, via a new transit line. 2048 WEEKDAY RIDERSHIP 13,000 CAPITAL COST $600,000,000 NET ANNUAL OPERATING COST $6,800,000 BENEFITS SCORE 75 Station names for display purposes only and subject to change. Additional Considerations • Dependent on future construction of Blue Line Length 6 km NE to 88 Avenue Station. • Coordination required with Airport Trail NE Readiness No interchanges and Calgary International Airport master planning and infrastructure investments. Technology People Mover • Current Airport demand is met by Routes 100 and 300, future travel demand forecasted increases support mode progression to a higher Trip Generators Airport capacity rapid transit connection. • Functional planning complete. • Operating cost primarily based on increased service hours and frequency on the Airport Connector. • Moderate risk to ridership in Increased Crisis COVID-19 recovery scenario due to decreased airport travel. • Supports Calgary’s Economic Strategy by connecting rapid transit lines and enhancing access between the Centre City, airport and the region. ISC: UNRESTRICTED TT2020-1289 ATTACHMENT 3 Page 1 of 20 Attachment 3 TT2020-1289 Airport Transit Connector – Green Line to Airport Connecting the Green Line LRT from 96 Ave N Station to the Airport, this project brings travelers and employees to and from the Calgary International Airport, with several industrial area stops, via a new transit line. 2048 WEEKDAY RIDERSHIP 9,500 CAPITAL COST $750,000,000 NET ANNUAL OPERATING COST $-3,200,000 BENEFITS SCORE 59 Station names for display purposes only and subject to change.
    [Show full text]
  • Deerfoot Trail Study
    Phase 1 June 2016 Deerfoot Trail Online Mapping Tool What We Heard Study Report Table of Contents What we heard and what we asked ............................................................................................ 2 Verbatim Comments .................................................................................................................. 4 Stoney Trail North .................................................................................................................. 4 Country Hills Boulevard .......................................................................................................... 6 96 Avenue N.E. / Airport Trail ................................................................................................. 7 Beddington Trail N.E. ............................................................................................................10 64 Avenue N.E. .....................................................................................................................16 McKnight Boulevard N.E........................................................................................................20 32 Avenue N.E. .....................................................................................................................36 16 Avenue N.E. / Highway 1 ..................................................................................................44 Memorial Drive N.E. ..............................................................................................................49 Blackfoot
    [Show full text]
  • Deerfoot Trail Study December 2020 Contents
    Deerfoot Trail Study December 2020 Contents Background and Fast Facts ...............................................04 Study Goals, Objectives and Outcomes .......................06 Study Phases and Timeline ...............................................08 Identifying Challenges .......................................................12 What We Heard, What We Did ..........................................14 Developing Improvement Options................................18 Option Packages ...................................................................20 Option Evaluation ................................................................32 Recommended Improvements .......................................36 A Phased Approach for Implementation .....................44 Next Steps ...............................................................................52 2 The City of Calgary & Alberta Transportation | Deerfoot Trail Study Introduction The City of Calgary and Alberta Transportation In addition to describing the recommended are pleased to present the final recommendations improvements to the Deerfoot Trail corridor, this of the Deerfoot Trail Study. document provides a general overview of the study The principal role of the Deerfoot Trail within The process which involved a comprehensive technical City of Calgary is to provide an efficient, reliable, and program and multiple engagement events with safe connection for motor vehicle traffic and goods key stakeholders and city residents. movement within, to, and from the city. These key
    [Show full text]
  • Welcome to the Deerfoot Trail Study Open House
    Deerfoot Trail Study Welcome to the N Deerfoot Trail Study Open House Thank you for coming! Please come in and have a look at the information boards. The project team will be happy to answer your questions. Feedback forms are available here and at calgary.ca/deerfoot until June 30, 2016. Public input from this first phase will be used to help confirm the problems we are trying to solve, and understand Calgarians’ priorities about where and how they use the road. In partnership with 2016-0656 Deerfoot Trail Study About the Study The City of Calgary (The City) and Alberta Transportation (AT) are working together to study Deerfoot Trail, between the Stoney Trail interchanges in the north and south. The study will consider a variety of freeway management strategies — including some new to Calgary — to recommend safety and reliability improvements. The focus will be on making the most of the existing infrastructure, planning for future growth and aligning with the Calgary Transportation Plan. The study will define and recommend a program of upgrades for Deerfoot Trail by: Identifying the existing and future travel needs on the corridor, and any associated impacts on the surrounding communities. Engaging the public, community groups Deerfoot Trail looking north at 17 Avenue S.E. / Blackfoot Trail and stakeholders to identify users and demands for the corridor, and build a range of potential solutions. Recommending safety and mobility Deerfoot Trail looking south at Peigan Trail improvements for people who drive and take transit. Improving air quality and reducing vehicular emissions as part of a goal to reduce greenhouse gas emissions and Interchange at Deerfoot Trail and 16 Avenue North reduce the time needed to travel to and within the corridor.
    [Show full text]
  • Routeahead: a Strategic Plan for Transit in Calgary
    A Strategic Plan for Transit in Calgary calgary.ca | contact 311 Onward/ Enable public transit, walking and cycling as the preferred mobility choices for more people. project evaluation criteria The evaluation criteria used Each category contains a in RouteAhead is based on number of sub-categories three categories: land use, that were given a value customer experience and based on the relative merits project characteristics. of the project. 120 LAND USE · Supports Activity Centres and Corridors · Primary Transit Network Connectivity and Alignment · Population and Jobs Intensity CUSTOMER EXPERIENCE PROJECT CHARACTERISTICS · Increases Travel Time Advantage · Serves High Ridership Corrider · Contributes to Lifecycle Maintenance · Overcomes Issues of Reliability and Delay and Asset Management · Increases Passenger Capacity · Capital Cost · Improves Overall Mobility of the Transportation Network Other The rating of projects including the availability and building maintenance, Considerations using these criteria is of capital and operating are required to keep the in Project one tool to assist Council funds, Calgary Transit system running. These will Evaluation and Administration operational requirements be captured as part of the determine which projects and coordination with Investing in Mobility plan to construct and when. other business units as well as being identified Many other factors should and City departments. in the RouteAhead plan. be considered when Other capital programs, determining a detailed such as bus purchases construction
    [Show full text]