Driving and Parking Directions to the Calgary TELUS Convention Centre

Total Page:16

File Type:pdf, Size:1020Kb

Driving and Parking Directions to the Calgary TELUS Convention Centre Driving and Parking Directions to The Calgary TELUS Convention Centre Follow these driving directions to access the Calgary Parking Authority parkade located underground at the Calgary TELUS Convention Centre. From Calgary International Airport 1. Exit terminal to Barlow Trail (turn left at lights) 2. Turn left at lights onto Airport Trail 3. Follow to Deerfoot Trail south to Memorial Drive west 4. Memorial Drive west to 4th Avenue (City Center) 5. 4th Avenue to 1st Street SE 6. Left onto 1st Street SE 7. Follow 1st Street SE to 7th Avenue (C-Train tracks) 8. Cross over 7th Avenue (C-Train tracks) 9. 2nd right driveway is underground parkade (green “P” sign) From Northeast Calgary 1. Deerfoot Trail south to Memorial Drive west 2. Memorial Drive west to 4th Avenue (City Center) 3. 4th Avenue to 1st Street SE 4. Left onto 1st Street SE 5. Follow 1st Street SE to 7th Avenue (C-Train tracks) 6. Cross over 7th Avenue (C-Train tracks) 7. 2nd right driveway is underground parkade (green “P” sign) From Northwest Calgary 1. Crowchild Trail south to 9th Avenue 2. 9th Avenue to Macleod Trail SE 3. Macleod Trail SE to 6th Avenue 4. Turn left onto 6th Avenue (stay in left lane) 5. Follow 6th Avenue west, to first set of lights (1st Street SE) 6. Turn left onto 1st Street SE, follow south 7. Cross over 7th Avenue (C-Train tracks) 8. 2nd right driveway is underground parkade (green “P” sign) From Macleod Trail SE/SW 1. Follow Macleod Trail travelling north to 6th Avenue SE 2. Turn left onto 6th Avenue SE (stay in left lane) 3. At next lights, turn left onto 1st Street SE 4. Follow 1st Street SE to 7th Avenue (C-Train tracks) 5. Cross over 7th Avenue (C-Train tracks) 6. 2nd right driveway is underground parkade (green “P” sign) From Deerfoot Trail SE 1. Deerfoot Trail travel north to Memorial Drive west 2. Memorial Drive west to 4th Avenue (City Center) 3. 4th Avenue to 1st Street SE 4. At next lights, turn left onto 1st Street SE 5. Follow 1st Street SE to 7th Avenue (C-Train tracks) 6. Cross over 7th Avenue (C-Train tracks) 7. 2nd right driveway is underground parkade (green “P” sign) .
Recommended publications
  • Building for Lease
    FOR LEASE BUILDING 1625 100TH AVENUE NE CALGARY, ALBERTA L BUILDING L 257,580 SF DISCOVER Oxford Airport Business Park is a master-planned, flagship business park adjacent to Calgary International Airport that will be comprised of 4 million square feet of premier industrial, office, hotel and amenity retail space. The site is strategically located at the gateway to the airport with outstanding access to Country Hills Boulevard, Airport Trail Deerfoot Trail, and Stoney Trail. Construction is of the highest quality, featuring environmentally efficient design along with modern, functional features and appealing aesthetics. Contact: Dan Alexander – Director, Industrial Leasing | 403.206.6449 | [email protected] BUILDING SPECIFICATIONS Site Area: 13.26 acres Floor Slab: 7” reinforced with 25 kg/m3 steel fibers and 12,400 lb. pt. load Zoning: I-G – General Industrial Zoning Main Power Service: 2000A @ 347/600V, 3 Phase Building Size: 257,580 SF Lighting: LED c/w motion sensors Available Area: 257,580 SF Sprinklers: ESFR System Minimum Bay Size: 42,900 SF Trailer Parking: +/- 64 Typical Column Grid: 55’ X 40’ (60’ depth at staging bay) Lease Rate: Market Building Depth: 260’ Additional Rent: $3.60 PSF Ceiling Height: 32’ clear Available: August 2019 Loading Doors: • 36 dock doors c/w 40,000 lb pneumatic levelers • 2 ramped grade doors • 29 doors available in knock-out positions KEY DEVELOPMENT FEATURES • Brand new construction with state-of-the-art features • Dock and ramped grade loading • Large, medium and small bay configuration
    [Show full text]
  • ECY Running Map:Layout 1.Qxd
    Pathways from the Eau Claire YMCA GOING EAST 13. EDWORTHY PARK LOOP (15.1 km): Head west on the South side of the river beyond the CPR Rail 1. LANGEVIN LOOP (3.5 km): Go East on the South side of the river, past Centre Street underpass. way Crossing at Edworthy Park. Cross Edworthy Bridge to the North side of the river and head East. Cross over at the Langevin Bridge and head West. Return via Prince’s Island Bridge. Return to the South side via Prince’s Island Bridge. 2. SHORT ZOO (6.1 km): Go East on the South side of the river past Langevin Bridge to St George’s 14. SHOULDICE BRIDGE (20.4 km): Cross Prince’s Island Bridge to the North side of the river and head Island footbridge. Cross to the North side via Baines Bridge. Return on the North side heading West West to Shouldice Bridge at Bowness Road. Return the same way heading East. via Prince’s Island Bridge. 15. BOWNESS PARK via BOW CRESCENT (32.4 km): Follow North side of river going West from 3. LONG ZOO (7.6 km): Go East on the South side of the river over 9th Avenue Bridge. Travel through Prince’s Island to Bowness Road. Cross over Shouldice Bridge. Follow Bow Crescent, 70th Street, and the zoo to Baines Bridge. Return heading west on the North side of the river, crossing back via 48th Avenue to Bowness Park. Make loop of paved road (West) and return to YMCA same way. pathway around zoo and returning through Prince’s Island.
    [Show full text]
  • Macleod Place +1 403 266 5544 5920 & 5940 Macleod Trail S CALGARY, AB
    CODY WATSON Associate Vice President 403 571 8760 [email protected] BRITTANY BLOCK Senior Associate 403 571 8756 [email protected] MATT LANNON Associate Vice President 403 571 8824 [email protected] FOR LEASE Colliers International 900, 335 8th Avenue SW Calgary, AB T2P 1C9 www.colliers.com/calgary Macleod Place +1 403 266 5544 5920 & 5940 Macleod Trail S CALGARY, AB Accelerating success. FOR LEASE | 5920 & 5940 Macleod Trail S, Calgary | AB Building Amenities Available Space On-site fitness facility includes showers and lockers OCCUPANCY MACLEOD PLACE I DATE *demisable to Suite 300 - 5,410 square feet 2,579 SF immediately Conference centre available for tenant use for no additional Suite 400 - 5,852 square feet immediately charge. > Large Room: 90 person Suite 460 - 2,138 square feet immediately occupancy Contiguous to > Kitchen area Fourth Floor - immediately 9,476 square feet Gaucho Brazilian Barbecue and The Daily Grind are located on the main floor of Macleod Place. Also within close priximity are restaurants such as Cultures, JOEY Chinook, Cravings Market Restaurant, Original Joe’s Restaurant & Bar, OCCUPANCY and Los Mariachis Mexican MACLEOD PLACE II Restaurant DATE Suite 202 - 3,133 square feet immediately Ample 90-minute free visitor parking available Suite 402 - 2,761 square feet immediately Suite 602 - 3,161 square feet immediately Suite 640 - 821 square feet immediately Quick and easy access to Macleod Trail, Glenmore Suite 700 - 12,089 square feet August 1, 2020 Trail, and close proximity to Deerfoot Trail Suite 800 - 12,082 square feet September 1, 2020 9-minute walk to the Chinook LRT ANNUAL NET RENT PARKING Market Rates Apply One (1) stall per 460 square feet Telus Fibre Optic enabled $110 per stall/month for surface OPERATING COSTS AND TAXES > $16.97 per square foot > $140per stall/month for covered [2019 estimated] > Hourly parking available for visitors Building Amenities > The on-site gym is fully-equipped with free weights, elliptical and treadmill machines, in addition to stationary bicycles and a squat rack.
    [Show full text]
  • Crowchild Trail Study Project Update
    Transportation Report to ISC: UNRESTRICTED SPC on Transportation and Transit TT2016-0599 2016 July 20 Page 1 of 11 CROWCHILD TRAIL STUDY – PROJECT UPDATE EXECUTIVE SUMMARY This report is an update to Council on the achievements of the Crowchild Trail Study, and contains recommendations to advance the design and construction of short-term improvements to the corridor, beginning Q4 2016. Since the last project update, Phase 3: Concept Identification of the study concluded with a set of ideas and concepts developed and evaluated with Calgarians for possible short-, medium-, and long-term changes and upgrades to Crowchild Trail. Throughout late-October and November 2015, Calgarians shared over 500 unique ideas for possible changes to Crowchild Trail, from over 400 participants that attended ten in-person events, and over 1,900 online submissions. Ideas gathered ranged from short-term, “quick-fix” optimization and local improvement ideas, through to ideas that could support continued growth and development of the City for the years and decades to come. Throughout February and March 2016, Calgarians had an opportunity to see how the ideas look when applied to the Crowchild Trail corridor. They also had an opportunity to evaluate and refine a group of ideas against the project’s three key principles, learn about why some of the ideas did not move forward for further consideration, and see which ideas would be explored in Phase 4: Concept Evaluation. Ideas evaluated and confirmed by Calgarians and the project team were used to develop preliminary concepts for evaluation and feedback in Phase 4. Phase 4 of the study launched in May 2016.
    [Show full text]
  • Deerfoot Trail Study December 2020 Contents
    Deerfoot Trail Study December 2020 Contents Background and Fast Facts ...............................................04 Study Goals, Objectives and Outcomes .......................06 Study Phases and Timeline ...............................................08 Identifying Challenges .......................................................12 What We Heard, What We Did ..........................................14 Developing Improvement Options................................18 Option Packages ...................................................................20 Option Evaluation ................................................................32 Recommended Improvements .......................................36 A Phased Approach for Implementation .....................44 Next Steps ...............................................................................52 2 The City of Calgary & Alberta Transportation | Deerfoot Trail Study Introduction The City of Calgary and Alberta Transportation In addition to describing the recommended are pleased to present the final recommendations improvements to the Deerfoot Trail corridor, this of the Deerfoot Trail Study. document provides a general overview of the study The principal role of the Deerfoot Trail within The process which involved a comprehensive technical City of Calgary is to provide an efficient, reliable, and program and multiple engagement events with safe connection for motor vehicle traffic and goods key stakeholders and city residents. movement within, to, and from the city. These key
    [Show full text]
  • Direction to the Rimrock Resort Hotel from the Calgary International Airport 1A Crowchild Trail
    2 Beddington Trail 3 Country Hill Blvd. Trail Barlow Direction to the Rimrock Resort Hotel from the Calgary International Airport 1A Crowchild Trail Deerfoot Trail NE 201 Country Hill Blvd. Harvest Hills Blvd. 2 2A 14 St NW Mountain Avenue, P.O. Box 1110, Stoney Trail. Nosehill Dr. Shaganappi Trail Barlow Trail Barlow Banff, Alberta Canada T1L 1J2 1A Sarcee Trail Calgary John Laurier Blvd. International Crowchild Trail Nosehill Natural Airport 1 Phone: (403) 762-3356 Environment Park Fax: (403) 762-4132 Deerfoot Trail NE John Laurier Blvd. McNight Blvd 5 Trans Canada Highway 1A McNight Blvd 1 Centre St Centre 2 Trans Canada Highway 6 Sarcee Trail 4 1 1 East From Calgary Town Of Banff Deerfoot Trail SE Trans Canada Highway To Town of Banff 5 7 Banff Avenue To Town of Banff City of Calgary West To Lake Louise Mt. Norquay Road Fox Cougar Check Points ad Banff AvenueDeer Ro ain nt ou l M ne 1 Moose n Tu From the Airport, take Barlow Trail (Left Turn). Squirrel Moose Gopher Street Marten Elk 2 Turn left on Country Hills Blvd. Beaver Muskrat Otter Linx StreetWolf Wolf 3 St. Julien Turn left (South) onto Stoney Trail. Bear Caribou 4 Turn right (Westbound) onto Highway 1 (Trans Buffalo Banff Avenue Buffalo Canada Highway). 8 Bow River 5 Follow highway 1 West to Banff National Park. 9 Canada Place Casscade Gardens 6 Take the Banff, Lake Minnewanka exit and turn left at the stop sign on to Banff Avenue. Avenue Mountain 7 Follow Banff Avenue through town and across the Bow River bridge.
    [Show full text]
  • 7Kh $Oehuwd *D]Hwwh
    7KH$OEHUWD*D]HWWH PART 1 _______________________________________________________________________ ________________________________________________________________________ Vol. 94 EDMONTON, SATURDAY, NOVEMBER 14, 1998 No. 21 _______________________________________________________________________ ________________________________________________________________________ PROCLAMATION [GREAT SEAL] CANADA PROVINCE OF ALBERTA H.A. “Bud” Olson, Lieutenant Governor. ELIZABETH THE SECOND, by the Grace of God, of the United Kingdom, Canada, and Her Other Realms and Territories, QUEEN, Head of the Commonwealth, Defender of the Faith P R O C L A M A T I O N To all to Whom these Presents shall come GREETING Doug Rae, Acting Deputy Minister of Justice and Acting Deputy Attorney General. WHEREAS section 3 of the Special Waste Management Corporation Act Repeal Act provides that that Act comes into force on Proclamation; and WHEREAS it is expedient to proclaim the Special Waste Management Corporation Act Repeal Act in force: NOW KNOW YE THAT by and with the advice and consent of Our Executive Council of Our Province of Alberta, by virtue of the provisions of the said Act hereinbefore referred to and of all other power and authority whatsoever in Us vested in that behalf, We have ordered and declared and do hereby proclaim the Special Waste Management Corporation Act Repeal Act in force on November 1, 1998. IN TESTIMONY WHEREOF We have caused these Our Letters to be made Patent and the Great Seal of Our Province of Alberta to be hereunto affixed. WITNESS: THE HONOURABLE H. A. “BUD” OLSON, Lieutenant Governor of Our Province of Alberta, in Our City of Edmonton in Our Province of Alberta, this 28th day of October in the Year of Our Lord One Thousand Nine Hundred and Ninety-eight and in the Forty-seventh Year of Our Reign.
    [Show full text]
  • Ama Road Report Grande Prairie Alberta
    Ama Road Report Grande Prairie Alberta Undiscerning and grimmer Claudio break-ins so tenably that Adrian fossilising his staphylococci. Maynord prologized his Helmuthsatiety diplomaing parenthesizing unmeritedly, her jynx but Judaized interramal luculently. Alton never wit so confidentially. Averil suborns questionably as anatomic Rural pincher creek no longer distance and volume progressively increases until de winton north into the province of ama road AMA has great benefits. By late weekend into next week, Yellowhead Trail, I loved this job! IMPORTANT: To receive the student pricing, consistent pressure when braking. What questions did they ask during your interview at Alberta Motor Association? Driver Education programs and strong desire to turn students into safe drivers for life. Alberta throughout the week. Types of suggestions to include. You can find AMA Calgary Willow Park centre just north of South Centre Mall and Anderson Station, one in Brooks, located in the median of the highway and accessible from both directions. Albert the drop in traffic is brisk, classic OR snowshoe. Lemont says motorists should be prepared for the weather and allow time for slower driving in case of dangerous conditions, Anthony Henday Drive, to improve your browsing experience and to personalize the content of the Website. Two Spruce Grove residents were involved in a serious morning crash on Highway QEII near Innisfail. Prices on our website are valid if you purchase services in the same session. Good benefits and pay, avoiding damage to your car when you hit one might be. She does not encourage an inclusive workplace and works to alienate and belittle people.
    [Show full text]
  • Macleod Trail Corridor Study TT2015-0183 Information Brochure ATTACHMENT 2
    Macleod Trail Corridor Study TT2015-0183 Information Brochure ATTACHMENT 2 MACLEOD TRAIL CORRIDOR STUDY A balanced approach to transportation planning 2015-0626 calgary.ca | contact 311 Onward/ Providing more travel choices helps to improve overall mobility in Calgary’s transportation system. TT2015-0183 Macleod Trail Corridor Study - Att 2.pdf Page 1 of 12 ISC: Unrestricted Macleod Trail Corridor Study Information Brochure 100 YEARS OF MACLEOD TRAIL: PAST, PRESENT, FUTURE Photo of Macleod Trail circa 1970. The City of Calgary, Corporate Records, Archives. Photo of Macleod Trail circa 2005. The City of Calgary, Corporate Records, Archives. Macleod Trail, as we know it today, has remained much the same since the 1960’s. It was, and continues to be, characterized by low-rise buildings accompanied by paved parking lots and poor infrastructure for pedestrians. The development of low-density land use and long distances between destinations or areas of interest has encouraged driving as the primary way for people to get to and from key destinations along Macleod Trail. What will Macleod Trail look like Because people will be living within walking or cycling distances to businesses and major activity centres over the next 50 years? (e.g. shopping centres), there will be a need for quality Many of the older buildings along Macleod Trail are sidewalks, bikeways, and green spaces that help enhance approaching the end of their lifecycle. Now is an safety of road users and improve the overall streetscape. opportune time to put in place conditions that will help guide a different type of land use and development along PEOPLE WILL HAVE ACCESS TO SAFE, Macleod Trail for the next 50 years.
    [Show full text]
  • Airport Trail Interchanges
    Page 1 of 6 Item # 7.2.1 Transportation Report to ISC: UNRESTRICTED Calgary Planning Commission CPC2019-0749 2019 June 20 Airport Trail Interchanges EXECUTIVE SUMMARY The Airport Trail Phase 2 program completes the Airport Trail corridor from Deerfoot Trail to Stoney Trail, supporting the unimpeded flow of goods and vehicles to and from the Calgary International Airport, the growing logistics business around the Airport, and development in the City’s Northeast communities. The program is funded in partnership by the Government of Canada ($50 million), the Government of Alberta ($27.7 million), the Calgary Airport Authority ($20 million, plus half the land costs) and the City ($20.65 million, plus half the land costs). The $153.35 million program includes the following projects: 1. Extension of tender-ready Airport Trail NE, from 36 Street to 60 Street NE (under Construction); 2. Construction of ring road access at Stoney Trail NE (southbound Stoney to westbound Airport Trail NE (in Preliminary Design); and 3. Construction of two grade – separated bridge structures and associated ramps at 19 Street NE and Barlow Trail NE, crossing over Airport Trail NE. This report provides an overview of the third project listed above. ADMINISTRATION RECOMMENDATION: That Calgary Planning Commission RECEIVE AND ACCEPT this report for information. PREVIOUS COUNCIL DIRECTION / POLICY On 2018 July 30 at the Combined Meeting of Council, Council approved a budget appropriation of $153.35 million to Program 859- Airport Trail Phase 2 (TT2018-0856). This followed previous Council direction: - 2012 December 03 – Council approved ‘Airport Trail Functional Planning Study’ (TT2012-0658). - 2014 May 26 – 2015 -2024 Investing in Mobility – Airport Trail was included as an unfunded transportation infrastructure project list (TT2014-0308).
    [Show full text]
  • National Trade Corridors Fund – Airport Trail Phase 2
    Item #7.1 Transportation Report to ISC: UNRESTRICTED SPC on Transportation and Transit TT2018-0856 2018 July 19 Page 1 of 4 National Trade Corridors Fund – Airport Trail Phase 2 EXECUTIVE SUMMARY On July 6, 2018, the Federal Government announced a commitment of $50 million towards funding Airport Trail – Phase 2 from the National Trade Corridors Fund. The project’s scope includes an extension of Airport Trail from 36th St to 60th St, construction of two new grade separated interchanges at 19th St and Barlow Tr., and construction of a southbound to westbound ramp at Stoney Trail and Airport Trail. Additional funding was committed by The Government of Alberta ($27.7 million). The Calgary Airport Authority will contribute $20 million through a previous agreement with The City. Airport Trail is planned as a vital east-west corridor in Calgary. The work under this project will complete the corridor from Deerfoot Trail to Stoney Trail, will support the unimpeded flow of goods and vehicles to and from the Airport, will support the growing logistics business around the Airport, and open up new areas for development in The City’s growing northeast. Approval for budget appropriation of the total project budget amount ($153.35 million) is being requested at this time for an amount of $38.15 million. This amount will allow administration to move forward with construction of the project and the outstanding land acquisition. ADMINISTRATION RECOMMENDATION: That the SPC on Transportation and Transit recommend that Council: 1. Approve the budget appropriation of $153.35 million to Program 859 – Airport Trail N.E.
    [Show full text]
  • North Calgary Regional Transportation Study for Information
    ...... Calgary North Calgary Regional Intergovernmental Transportation Study Affairs Committee Kara Wolfe, P. Eng . May 16, 2019 NCRTS - Presentation to IGA May 16,2019 CITY OF CALGARY Calgary RECEIVED Presentation Outline IN LEGAL TRADITIONS ROOM MAY 1 6 2019 ITEM: 6. 9 .J: G.A- 4,/9- 05% ~ 5 tt-:\o c.+,' 0 11] CITY CLERK'S OFFICE I. Study Background 11. Study Process Ill. Evaluation Framework IV. Growth Assumptions V. Transit Network VI. Transportation Network Findings VI I. Project Prioritization VI 11. Next Steps NCRTS - Presentation to IGA May 16, 2019 2 Calgary Study Background I. Request from Alberta Transportation Deputy Minister to Calgary, RVC and Airdrie II. Cochrane and Chestermere - group expanded Ill. North Calgary Region Committee (NCRC) - Five municipalities and Alberta Transportation IV. Technical work and facilitation of NCRC collaboration by ISL V. Project milestones and key decisions - consensus of the NCRC VI. CMRB participated in meetings ,- NCRTS - Presentation to IGA May 16 2019 . · · · 3 l, Calgary Study Area _I I- - NCRTS Study Area (this study) ------~-------, 1 CMRB Boundary I .... - - - - - ... - - ~ - - - - S&ECRTS Study Area (underway now) .' ,, \_~.. r ~ ·- ' \~ I \, NCRTS - Presentation to IGA May 16, 2019 4 Calgary Study Process Stage 2 Stage 1 Stage 3 Network Modelling & Network Context Evaluation Network Prioritization .• Data Collection • Network Analysis • Project Evaluation ,. Land Use Inputs • Option Evaluation • Project Prioritization • Network Options 1. 2028 and 2039 • Reporting • Evaluation Framework I 1 Horizons N - rese Calgary Evaluation Framework I. Evaluation of network options, project prioritization II. Referenced existing frameworks including: i. The City of Calgary TIIP Multiple Criteria Analysis ii. Alberta Transportation iii.
    [Show full text]