Franklin Building -112 28Th Street SE Calgary, Alberta

Total Page:16

File Type:pdf, Size:1020Kb

Franklin Building -112 28Th Street SE Calgary, Alberta FOR LEASE Multiple Suites 2,443 - 26,644 ± SF Franklin Building -112 28th Street SE Calgary, Alberta Property Features CONTACT AGENTS FOR MORE INFORMATION • 4 Suite options from 2,443 ± SF, 8,956 ± SF to 26,644 ± SF • Professionally developed Class ‘B’ office space on two floors Daniel Goldstrom • Located close to shops, services and the LRT Station +1 403 809 8326 [email protected] • Easy access to Calgary International Airport and the Downtown core Steve Seiler • Ample parking available on site +1 403 818 9837 [email protected] • Certified Go-Green building • Available Immediately THIS BROCHURE IS INTENDED FOR INFORMATION PURPOSES ONLY AND SHOULD NOT BE RELIED UPON FOR ACCURATE FACTUAL INFORMATION BY THE RECIPIENTS HEREOF. THE INFORMATION CONTAINED HEREIN 833 34th Avenue SE IS BASED ON INFORMATION WHICH NAI ADVENT DEEMS RELIABLE, HOWEVER, NAI ADVENT ASSUMES NO RESPONSIBILITY FOR THE DEGREE OF ACCURACY OF SUCH INFORMATION, NOR DOES NAI ADVENT Calgary, Alberta T2G 4Y9 REPRESENT OR WARRANT THE INFORMATION CONTAINED HEREIN. RECIPIENTS HEREOF SHOULD CONDUCT +1 403 984 9800 THEIR OWN INVESTIGATIONS TO DETERMINE THE ACCURACY OF INFORMATION CONTAINED HEREIN. THE INFORMATION CONTAINED HEREIN IS SUBJECT TO CHANGE WITHOUT NOTICE. A LICENSED ASSOCIATE OF naiadvent.com NAI ADVENT IS A PRINCIPAL OF THE OWNER OF THE PROPERTY. FOR LEASE Multiple Suites 2,443 - 26,644 ± SF Subject Property Barlow Trail NE Trail Barlow Memorial Drive East SE Street 36 30th Street Centre Avenue 28th Street Street 28th CONTACT AGENTS Daniel Goldstrom Steve Seiler FOR MORE INFORMATION +1 403 809 8326 +1 403 818 9837 [email protected] [email protected] 833 34th Avenue SE Calgary, Alberta T2G 4Y9 +1 403 984 9800 naiadvent.com FOR LEASE Multiple Suites 2,443 - 26,644 ± SF Property Details Total Area: 50,577 ± SF Operating Costs: $11.61 psf Number of Floors: 2 Realty Tax: $2.50 psf Year Built: 1978 Additional Rent: $14.11 psf Renovated: 2001 Parking: 153 Surface Stalls Typical High-Rise Floor: 26,600 sf Parking Ratio: 1/330 sf Total Office Space: 26,644 sf Exterior Finish: Brick Total Retail Space: 23,933 sf Safety & Access: Fire Detection/ Security System Suite Options Suite 101: 6,290 ± SF 7 Large offices Suite 102: 2,666 ± SF Large office area with a kitchen Suite 103: 2,443 ± SF Improved Suite ideal for medical/dental office Suite 200: 26,644 ± SF Full Floor in good condition CONTACT AGENTS Daniel Goldstrom Steve Seiler FOR MORE INFORMATION +1 403 809 8326 +1 403 818 9837 [email protected] [email protected] 833 34th Avenue SE Calgary, Alberta T2G 4Y9 +1 403 984 9800 naiadvent.com FOR LEASE Floor Plan Suite 101 6,290 ± SF CONTACT AGENTS Daniel Goldstrom Steve Seiler FOR MORE INFORMATION +1 403 809 8326 +1 403 818 9837 [email protected] [email protected] 833 34th Avenue SE Calgary, Alberta T2G 4Y9 +1 403 984 9800 naiadvent.com FOR LEASE Floor Plan Suite 102 2,666 ± SF CONTACT AGENTS Daniel Goldstrom Steve Seiler FOR MORE INFORMATION +1 403 809 8326 +1 403 818 9837 [email protected] [email protected] 833 34th Avenue SE Calgary, Alberta T2G 4Y9 +1 403 984 9800 naiadvent.com FOR LEASE Floor Plan Suite 103 2,443 ± SF CONTACT AGENTS Daniel Goldstrom Steve Seiler FOR MORE INFORMATION +1 403 809 8326 +1 403 818 9837 [email protected] [email protected] 833 34th Avenue SE Calgary, Alberta T2G 4Y9 +1 403 984 9800 naiadvent.com FOR LEASE Floor Plan Suite 200 26,644 ± SF CONTACT AGENTS Daniel Goldstrom Steve Seiler FOR MORE INFORMATION +1 403 809 8326 +1 403 818 9837 [email protected] [email protected] 833 34th Avenue SE Calgary, Alberta T2G 4Y9 +1 403 984 9800 naiadvent.com.
Recommended publications
  • Direction to the Rimrock Resort Hotel from the Calgary International Airport 1A Crowchild Trail
    2 Beddington Trail 3 Country Hill Blvd. Trail Barlow Direction to the Rimrock Resort Hotel from the Calgary International Airport 1A Crowchild Trail Deerfoot Trail NE 201 Country Hill Blvd. Harvest Hills Blvd. 2 2A 14 St NW Mountain Avenue, P.O. Box 1110, Stoney Trail. Nosehill Dr. Shaganappi Trail Barlow Trail Barlow Banff, Alberta Canada T1L 1J2 1A Sarcee Trail Calgary John Laurier Blvd. International Crowchild Trail Nosehill Natural Airport 1 Phone: (403) 762-3356 Environment Park Fax: (403) 762-4132 Deerfoot Trail NE John Laurier Blvd. McNight Blvd 5 Trans Canada Highway 1A McNight Blvd 1 Centre St Centre 2 Trans Canada Highway 6 Sarcee Trail 4 1 1 East From Calgary Town Of Banff Deerfoot Trail SE Trans Canada Highway To Town of Banff 5 7 Banff Avenue To Town of Banff City of Calgary West To Lake Louise Mt. Norquay Road Fox Cougar Check Points ad Banff AvenueDeer Ro ain nt ou l M ne 1 Moose n Tu From the Airport, take Barlow Trail (Left Turn). Squirrel Moose Gopher Street Marten Elk 2 Turn left on Country Hills Blvd. Beaver Muskrat Otter Linx StreetWolf Wolf 3 St. Julien Turn left (South) onto Stoney Trail. Bear Caribou 4 Turn right (Westbound) onto Highway 1 (Trans Buffalo Banff Avenue Buffalo Canada Highway). 8 Bow River 5 Follow highway 1 West to Banff National Park. 9 Canada Place Casscade Gardens 6 Take the Banff, Lake Minnewanka exit and turn left at the stop sign on to Banff Avenue. Avenue Mountain 7 Follow Banff Avenue through town and across the Bow River bridge.
    [Show full text]
  • 7Kh $Oehuwd *D]Hwwh
    7KH$OEHUWD*D]HWWH PART 1 _______________________________________________________________________ ________________________________________________________________________ Vol. 94 EDMONTON, SATURDAY, NOVEMBER 14, 1998 No. 21 _______________________________________________________________________ ________________________________________________________________________ PROCLAMATION [GREAT SEAL] CANADA PROVINCE OF ALBERTA H.A. “Bud” Olson, Lieutenant Governor. ELIZABETH THE SECOND, by the Grace of God, of the United Kingdom, Canada, and Her Other Realms and Territories, QUEEN, Head of the Commonwealth, Defender of the Faith P R O C L A M A T I O N To all to Whom these Presents shall come GREETING Doug Rae, Acting Deputy Minister of Justice and Acting Deputy Attorney General. WHEREAS section 3 of the Special Waste Management Corporation Act Repeal Act provides that that Act comes into force on Proclamation; and WHEREAS it is expedient to proclaim the Special Waste Management Corporation Act Repeal Act in force: NOW KNOW YE THAT by and with the advice and consent of Our Executive Council of Our Province of Alberta, by virtue of the provisions of the said Act hereinbefore referred to and of all other power and authority whatsoever in Us vested in that behalf, We have ordered and declared and do hereby proclaim the Special Waste Management Corporation Act Repeal Act in force on November 1, 1998. IN TESTIMONY WHEREOF We have caused these Our Letters to be made Patent and the Great Seal of Our Province of Alberta to be hereunto affixed. WITNESS: THE HONOURABLE H. A. “BUD” OLSON, Lieutenant Governor of Our Province of Alberta, in Our City of Edmonton in Our Province of Alberta, this 28th day of October in the Year of Our Lord One Thousand Nine Hundred and Ninety-eight and in the Forty-seventh Year of Our Reign.
    [Show full text]
  • 25690-D01-2020 (Corrigenda)
    Decision 25690-D01-2020 (Corrigenda) Barlow Solar Park Ltd. Corrigenda to Decision 25690-D01-2020 Barlow Solar Park November 16, 2020 Alberta Utilities Commission Decision 25690-D01-2020 (Corrigenda) Barlow Solar Park Ltd. Barlow Solar Park Proceeding 25690 Application 25690-A001 November 16, 2020 Published by the: Alberta Utilities Commission Eau Claire Tower, 1400, 600 Third Avenue S.W. Calgary, Alberta T2P 0G5 Telephone: 310-4AUC (in Alberta) 1-833-511-4AUC (outside Alberta) Fax: 403-592-4406 Website: www.auc.ab.ca Alberta Utilities Commission Calgary, Alberta Decision 25690-D01-2020 (Corrigenda) Barlow Solar Park Ltd. Proceeding 25690 Barlow Solar Park Application 25690-A001 1. On October 14, 2020, the Alberta Utilities Commission issued Decision 25690-D01-20201 approving the application from Barlow Solar Park Ltd. to construct and operate a 27-megawatt solar power plant, designated as the Barlow Solar Park, in the city of Calgary (the project). 2. In Decision 25690-D01-2020, the Commission included a condition of approval related to Rule 033: Post approval Monitoring Requirements for Wind and Solar Power Plants. The condition was imposed in error because Alberta Environment and Parks did not prepare a renewable energy referral report for the project given its specific circumstances and it neither required nor recommended post-construction monitoring. 3. Decision 25690-D01-2020 also stated in error that ENMAX Power Corporation had “… confirmed its willingness to connect the power plant to ENMAX’s 25-kilovolt electric distribution system provided that Barlow Solar can demonstrate compliance with applicable rules, standards and ENMAX’s interconnection requirements.” No connection voltage was stipulated by ENMAX.
    [Show full text]
  • Transportation Funded and Unfunded Infrastructure Lists 2015-2024
    Transportation Funded and TT2014-0308 Unfunded Infrastructure List 2015-2024 ATTACHMENT 2 Transportation Funded and Unfunded Infrastructure Lists 2015-2024 The figures in this attachment show all of the projects and annual programs that are required for construction between 2015 and 2024 (approximately $5.6 billion in value). Each figure indicates which projects or programs will receive full or partial funding, and which will continue to be unfunded. The priority of both funded and unfunded projects is also provided, which will assist Council and Administration in allocating new sources of funding when any become available. Figure 2.1 is a map showing the location of each funded and unfunded project. Figures 2.2 through 2.6 provide a table showing the projects and annual programs broken down by infrastructure category. Each table provides the priority, planned construction date, funded and unfunded costs, and estimated operating cost impact. The figures are: Figure 2.2 – Mobility Hubs and Transit Corridors Figure 2.3 – Goods Movement and Traffic Growth Figure 2.4 – Transportation Network Optimization Figure 2.5 – Lifecycle and Asset Management Figure 2.6 – Support Functions The prioritization levels for each of the projects in the above figures are as follows: APPROVED – the project has received previous budget approval from Council. REQUIRED – the project must be undertaken to fulfill Council direction, or to support other projects identified in the plan. HIGH / MEDIUM – reflects the relative priority of all other projects within the plan (Low priority projects fall outside the 10-year Investing in Mobility horizon). Figure 2.7 summarizes the estimated operating cost increases (excluding new transit revenues from the rapid transit corridors) that are shown in Figures 2.2 through 2.6.
    [Show full text]
  • Glenmore Trail and Ogden Road Interchange Project #1
    Ward 9 Update: Glenmore Trail and Ogden Road August 10, 2015 Interchange Project #1 Team Ward 9 Dear Ward 9 Neighbours, Councillor Investing in long-term infrastructure projects that keeps our city Gian-Carlo Carra moving and plans for our future growth is a top priority for City Council. Though these projects are absolutely necessary for us to tackle some of our transportation problems, there can be some short-term headaches and frustrations that come when major infrastructure projects are under construction. The goal of your Team Ward 9 is to keep you as up-to-date as possible when major infrastructure projects are underway and let you know how they may affect your community. Communication and Last week, the Glenmore Trail and Ogden Road S.E. Interchange Community Liaison Project started construction and is expected to be complete in Katie Hope late - 2017. When the project is finished it will create a free flow roadway with no signal lights between Barlow Trail S.E. and Sarcee Trail S.W. Communication and The project will initially start with the Glenmore Trail detour, which Community Liaison is expected to be complete in spring 2016. This detour will allow Eric Peters for traffic to flow through the area while the new roadway and interchange are being constructed, which will take approximately 18 months. There will also be temporary lane restrictions and closures Communication and Community Liaison through the time frame of the project. Shelaine Chapple Right now, you may feel some of the construction impacts of piling (installing foundations for the new bridges), which may include loud noises and vibrations.
    [Show full text]
  • TSB Newsletters Can Be Viewed At
    Technical Standards Branch VOLUME 7, Issue 1, September 2008 Editor’s Remarks This edition of the Technical Standards Branch (TSB) Newsletter contains articles on Alberta’s Regional Traffic Management Centre (TMC) Demonstration Project, a Geotechnical Instrumentation Workshop, the 7th International Conference on Managing Pavement Assets (ICMPA), Strategies to Reduce Wildlife Vehicle Collisions on Rural Alberta Highways Workshop, Winter Friction Testing and Technology Transfer and Technical Training. Allan Kwan Editor-in-Chief Highwood Pass on Highway 40 Associate Editors Tricia Hurry Roger Skirrow………….………Ron Stoski IN THIS ISSUE Alberta’s Regional Traffic Management Centre (TMC) Demonstration Project...........……......2 Geotechnical Instrumentation Workshop………………………………...…………………….….7 7th International Conference on Managing Pavement Assets ………………………...…….…..8 Strategies to Reduce Wildlife Vehicle Collisions on Rural Alberta Highways Workshop……………….9 Winter Friction Testing ……………................................................................................................11 Technology Transfer // \\ Technical Training..................................................................................13 1 Alberta’s Regional Traffic Management Centre (TMC) Demonstration Project Allan Lo Highway Operations Calgary TMC As the growth in Alberta’s economy and population continues to escalate, the Province recognizes the need The TMC is approx. 130 m2 (1,400 sq. ft.) and is home to manage ever-growing demands for safe and efficient to multiple
    [Show full text]
  • CALGARY ENVELOPE | 2020 CALGARY ENVELOPE | 2020 Grow Your Business with Money Saver
    SINCE 1996 IT’S LIE GETTING MONE IN OUR MAILO™ SINCE 1996 IT’S LIE GETTING MONE IN OUR MAILO™ CALGARY ENVELOPE | 2020 CALGARY ENVELOPE | 2020 Grow your business with Money Saver SINCE 1 IT’S LIE GETTING MONE IN OUR MAILO™ SINCE 1 IT’S LIE GETTING MONE IN OUR MAILO™ OVER Thousand 385 TOTAL CIRCULATION PER ISSUE Published 10x per year 28 Distribution Areas Reaching 387,500 homes Circulation: 3,875,000/year “ Canada’s most Delivering“ a targeted recognized & trusted audience for local, envelope for everyday savings on thousands Coupons make regional & national of products and consumers advertisers. services. 48% more likely to Let’s plan purchase sooner your mailings. DESIGNED. PRINTED. DELIVERED. Canada’s Leading Direct Mail Company, Focused on digitally-integrated, data-driven results. OVER 18,000 Helping Canadians Save, Businesses Grow and Neighbourhoods Thrive. CANADIAN BUSINESSES CANADIAN OWNED & OPERATED SERVED 1.866.993.0600 | DRMG.COM To advertise: 1.866.993.0600 | DRMG.COM REACHING 387,500 HOMES | 28 DISTRIBUTION ZONES MONEY SAVER ENVELOPE | CALGARY EDITION | 2020 1 T4B, T4A 12,500 T4S T4E PUBLISHINGISSUE CALENDAR * HWY 11A * 2 T4S, T4P, T4N, T4R, T4E 25,000 2 ISSUE IN HOMES WEEK OF: ART DUE DATE 3 T1Y T2A 12,500 T4P 1 Mar March 9 February 18 4 T2A, T1X 12,500 RD TAYLOR RED DEER 2 Apr April 13 March 23 5 T2C, T2Z 12,500 271 ROAD RANGE 50 ST 6 T2E, T1Y 12,500 T4N 3 May May 11 April 21 32 ST 7 T2J, PARTIAL T2X 12,500 4 Jun June 8 May 20 T4R 1 2 HWY 8 T2K, T2E 12,500 5 July July 13 June 22 28 19 ST AIRDRIE 9 T2L, T2M, T2K 12,500 6
    [Show full text]
  • Deerfoot Trail Study
    Phase 1 June 2016 Deerfoot Trail Online Mapping Tool What We Heard Study Report Table of Contents What we heard and what we asked ............................................................................................ 2 Verbatim Comments .................................................................................................................. 4 Stoney Trail North .................................................................................................................. 4 Country Hills Boulevard .......................................................................................................... 6 96 Avenue N.E. / Airport Trail ................................................................................................. 7 Beddington Trail N.E. ............................................................................................................10 64 Avenue N.E. .....................................................................................................................16 McKnight Boulevard N.E........................................................................................................20 32 Avenue N.E. .....................................................................................................................36 16 Avenue N.E. / Highway 1 ..................................................................................................44 Memorial Drive N.E. ..............................................................................................................49 Blackfoot
    [Show full text]
  • Calgary Vacancy by Submarket Districts Office Market Report Supplement
    AVISON YOUNG Q1 2018 - Calgary Vacancy by SubMarket Districts Office Market Report Supplement downtown calgary office vacancy by location Downtown Calgary Office Vacancy by Location 70% 62.3% 60% 15.9% 50% 41.0% 40% 38.6% 4.4% 2.0% 33.7% 32.4% 4.3% 29.8% 30% 3.3% 26.9% 3.1% 25.6% 25.6% 24.3% 24.4% 0.9% 24.4% 24.0% 0.6% 23.6% 23.3% 22.9% 22.3% 0.0% 46.4% 6.7% 7.2% 20% 6.6% 7.9% 17.8% 10.1% 7.8% 16.4% 36.7% 36.6% 0.0% 12.2% 29.2% 29.4% 3.6% 26.0% 26.7% 25.0% 24.3% 24.4% 11.0% 10% 18.8% 16.3% 17.2% 4.7% 17.8% 14.5% 15.7% 13.9% 12.9% 11.1% 6.3% 0% 0.0% Class Class A Class B Class C Overall Class Class A Class B Class C Overall Class Class A Class B Class C Overall Class Class A Class B Class C Overall AA AA AA AA All Downtown Central Core West Core East Village 45.7 msf 30.0 msf (66%) 11.0 msf (24%) 4.7 msf (10%) Headlease Vacancy Sublease Vacancy Headlease Vacancy Sublease Vacancy beltline calgary office vacancy by location Beltline Calgary Office Vacancy by Location 30% 26.1% 25% 23.0% 22.2% 7.9% 20.3% 4.8% 19.9% 20% 4.7% 0.0% 18.5% 17.3% 17.5% 15.9% 6.8% 15.0% 5.4% 15% 0.2% 5.4% 14.3% 0.0% 9.7% 11.9% 0.0% 8.7% 10.6% 10.0% 10% 19.9% 0.0% 18.2% 18.1% 17.5% 3.9% 8.1% 0.0% 14.8% 6.1% 14.3% 13.1% 13.5% 12.2% 0.0% 11.9% 4.8% 5% 0.0% 10.0% 3.3% 8.1% 7.2% 7.6% 6.7% 0.0% 6.1% 1.7% 4.8% 0.0% 3.3% 1.7% 0.0% 0% 0.0% Class A Class B Class C Overall Class A Class B Class C Overall Class A Class B Class C Overall Class A Class B Class C Overall Class A Class B Class C Overall All Beltline Beltline Core 17th Avenue Mission Sunalta 8.3 msf 6.3 msf (77%) 0.4 msf (5%) 1.4 msf (16%) 0.2 msf (2%) Headlease Vacancy Sublease Vacancy Headlease Vacancy Sublease Vacancy Susan Thompson, Research Manager | 403.232.4344 | [email protected] © 2018 Avison Young Real Estate Alberta Inc.
    [Show full text]
  • Traffic Bylaw 26M96
    OFFICE CONSOLIDATION BYLAW NUMBER 26M96 BEING A BYLAW OF THE CITY OF CALGARY TO CONTROL AND REGULATE TRAFFIC ON STREETS WITHIN THE CITY * * * * * * * * * * * * * * * * * * * * * * * * * * (Amended By Bylaw Number’s 52M96, 3M97, 10M97, 12M97, 30M97, 35M97, 41M97, 42M97, 3M98, 19M98, 33M98, 35M98, 41M98, 18M99, 19M99, 32M99, 38M99, 39M99, 45M99, 46M99, 52M99, 1M2000, 28M2000, 30M2000, 29M2000, 35M2000, 36M2000, 41M2000, 24M2001, 25M2001, 32M2001, 35M2001, 36M2001, 42M2002, 47M2003, 7M2003, 24M2003, 29M2003, 34M2003, 35M2003, 36M2003, 38M2003, 8M2004, 9M2004, 10M2004, 42M2004, 46M2004, 21M2005, 35M2005, 43M2005, 53M2005, 54M2005, 14M2006, 20M2006, 21M2006, 22M2006, 24M2006, 25M2006, 32M2006, 33M2006, 34M2006, 49M2006, 51M2006, 59M2006, 33M2007, 35M2007, 45M2008, 66M2008, 50M2009, 58M2009, 59M2009, 17M2010, 18M2010, 23M2010, 37M2010, 43M2010, 44M2010, 53M2010, 3M2011, 13M2011, 35M2011, 39M2011, 41M2011, 42M2011, 44M2011, 45M2011, 46M2011, 53M2011, 54M2011, 55M2011, 56M2011, 27M2012, 30M2012, 36M2012, 37M2012, 40M2012, 41M2012, 14M2013, 34M2013, 35M2013, 38M2013 (EFFECTIVE 2013 October 31), 41M2013, 12M2014, 38M2014, 39M2014, 42M2014, 44M2014) WHEREAS the Highway Traffic Acts authorizes a municipality to regulate and control vehicle, animal and pedestrian traffic and parking on the streets and on other property within the municipality; AND WHEREAS the Municipal Government Act allows a municipality to pass bylaws and delegate authority with respect to streets under its direction, control and management and transport thereon; NOW, THEREFORE,
    [Show full text]
  • List of Hazardous Waste Generators
    List of Alberta Hazardous Waste Generators Land Policy Alberta Hazardous Waste Generator Contacts Company Name Address Contact 1037128 Alberta Ltd o/a Alberta Hotel PO Box 430 Vegreville AB T9C 1R4 Kun Whan Kim 1038900 Alberta Ltd 10945 - 101 AVE Grande Prairie AB Ed McKenzie 1049601 BC Ltd 350 - 7th AVE SW, Suite 2800 Calgary AB T2P 3N9 Michael Baleja 1057974 Alberta Ltd o/a Global Dewatering 16813 - 128A Ave Edmonton AB T5V 1K9 John Devaney 1065579 Alberta Ltd. 42148 Hwy 1 Calgary AB T3Z 2P2 Fiona Kreschuk 1111041 Alberta Ltd. 14325 - 114 AVE Edmonton AB T5M 2Y8 Carmello Mirante 1131895 Alberta Ltd - operating as J.C. Metals P.O. Box 58 Dunmore AB T0J 1A0 Jennifer Millen 1142386 Alberta Ltd. 11404 143 ST Edmonton AB T5M 1V6 Bernie Westover 1148447 Alberta Ltd. c/o MDC Property Services Ltd 200, 1029 17th AVE SW Calgary AB T2T 0A9 Gary Dundas 1204612 Alberta Ltd. #3 - 5504 - 1A ST SW Calgary AB Kulu Punia 1207201 Alberta Limited (Crossroads Esso) PO Box 509 Viking AB T0B 4N0 Kimook Shin 1228002 Alberta Ltd. 72130 R.P.O. Glenmore Landing Calgary AB T2V 5H9 Robert Hoang 1-2-3 Development Inc. 207 Atkinson Lane Fort McMurray AB T9J 1E8 Scott Tenhuser 1237776 Alberta Ltd o/a Dragons Breath Production Testing & Hot Shot 51112 Rge Rd 270 Spruce Grove AB T7Y 1G7 Mike Hall Find hazardous waste information for industry: https://www.alberta.ca/hazardous-waste-industry.aspx ©2018 Government of Alberta | Published: August 2018 | Page 1 of 178 Alberta Hazardous Waste Generator Contacts Company Name Address Contact 1240796 Alberta Ltd.
    [Show full text]
  • Welcome to the Deerfoot Trail Study Open House
    Deerfoot Trail Study Welcome to the N Deerfoot Trail Study Open House Thank you for coming! Please come in and have a look at the information boards. The project team will be happy to answer your questions. Feedback forms are available here and at calgary.ca/deerfoot until June 30, 2016. Public input from this first phase will be used to help confirm the problems we are trying to solve, and understand Calgarians’ priorities about where and how they use the road. In partnership with 2016-0656 Deerfoot Trail Study About the Study The City of Calgary (The City) and Alberta Transportation (AT) are working together to study Deerfoot Trail, between the Stoney Trail interchanges in the north and south. The study will consider a variety of freeway management strategies — including some new to Calgary — to recommend safety and reliability improvements. The focus will be on making the most of the existing infrastructure, planning for future growth and aligning with the Calgary Transportation Plan. The study will define and recommend a program of upgrades for Deerfoot Trail by: Identifying the existing and future travel needs on the corridor, and any associated impacts on the surrounding communities. Engaging the public, community groups Deerfoot Trail looking north at 17 Avenue S.E. / Blackfoot Trail and stakeholders to identify users and demands for the corridor, and build a range of potential solutions. Recommending safety and mobility Deerfoot Trail looking south at Peigan Trail improvements for people who drive and take transit. Improving air quality and reducing vehicular emissions as part of a goal to reduce greenhouse gas emissions and Interchange at Deerfoot Trail and 16 Avenue North reduce the time needed to travel to and within the corridor.
    [Show full text]