ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014 ^'^I',,. " ;;^, *

Main Roads Western Australia ^ ,,^\\\^^"' ' 10 6 1201, jL ^ ^j^. ^^;^ 91!estionNo. I. . Hon Ken TroversMLCosked-

(1) Whoistz{dies, styotegies orplons is Ihe Department carryeni!yworking on?

Answer:

As part of its activities, Main Roads undertakes numerous short, medium and long tenn studies, strategy development and plans. Given the significantresourcesthat would be required to respond to this broad and farreaching question, Main Roads would be happy to provide information in regard to specific enquiries to the Coriumittee.

,^ ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONS ONNOTICE

Thursday, 12 June2014

Main Roads Western Australia

QuestionN0 2. . Hon Ken TravelsMLCasked-

(2) When is ilexpec/ediho//he 8114dy, strategy orp/on will be coinpleied?

Answer:

Not applicable

c^;^__ ESTIMATESANDFINANCIALOPERt\. TIONSCOMMITTEE

QUESTIONS ONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

Question No. 3. . Hon Ken TrQversMLCosked-

(3) inIQtis the current estimated of die when the plan will be publically released?

Answer:

Not applicable

} ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

Question No. 4. . Hon Ken TroveISMLCosked-

(4) 11'710iis Ihe esiimo/edtold/ cosiqfthe study, snore^? orp/on ondhow much will be spent in the 20/4/15 Financial year?

Answer:

Not applicable

} Iz: ..\ to -; o ^.. ^ s: 1< =, FF co 33 CS ^. = C. , ^! S>., 1.1 ~. = ^ .^; o *!3 Q .~ C" ^3 -! Q =. ,^. ;, -,. ;^ o 83 o ~. ~* ^, .< ^ ^ ;^~ ^ e. , ;;-- co ^ ^ CD ;S Q, N I!^ ~. ,~. 0'1 CJD :^ SI =: S>., CD = -; co - ;s \< :::: -. = CD ;s a ;^ *:^.; =^ - ,\, >.. >^ = e :=: ~ - -; ;s > .^. !,:I = t, , ^ ;;^ co ;^-, I;; -. o0 =: ^ >.. < a, ... Z ^:3 CS ^. ,~, ^, ^ s> I;; 10 ;s ^ I^ ^ ,~ I^:: ;s b~ I!^ Z < c> co > Q -; ,.~ ^ Z < S; CS o a ;^. ^ s> s^, Z CJD >... *,, E" Q o ;s o CS Z >^ :5; Z E^ ;s~ Q o ,~ = 93 ^ = ;^ a - Q I!^ ~L o S> Z co S;-- \ a CS e> o ~F Cb ;^ ;^ *!^ ^ ,^ = Let -; C^ C:> I^ E^ \\ ~. ;s~ CS ;:^ ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

91, es/ion No. 6. . Hon Ken Travels MLC OSked-

(61) Can Ihe Minister provide a summory of cycling expenditz!re ondihe name dyedchprq/'ect in each/indriciolyeor since 2009/10?

Answer:

Attachment I provides a summary of completed cycling infrastructure from 2009-10 to 2012-13. 2013-14 cycling projects are still being completed and costs finalised.

^.^ Attachment I- Response to Question 6

YEAR PROJECT LOCATION COST FUNDING SOURCE 2009-10 Construction of I kin of West Swan Road to Great $2,700,000 State PSP Northern Highway adjacent to Reid Hi hwa 2009-10 Detailed design for 2 kin TonkinHighway to Bassendean $78,000 State ofPSP Train Station adjacent to - Midland railline 2009-10 Detailed design for 0.5 Claremont Train Station to $50,000 State kin ofPSP Shenton Road underpass, adjacent to Perth- rail line 2009-10 Detailed design for PSP Shenton Station to LOGh Street $50,000 State Station, adjacent to Perth- Fremantle railline 2009-10 Construction of2 kin of PSP adjacentto Kwinana $100,000 State edge repairs and Freeway- various locations retaining 2009-10 Construction of 600 in of West Coast Highway- adjacent $213,000 State on-road facilities to ScarboroughBeachRoad 2009-10 Construction of 4.3 kin GreatNorthemHighway- $3,249,495 Federal of on-road and shared HaddrillRoad to Lennard Street path facilities 2009-10 Construction of 2.6 k in Warineroo Road Duplication- $4,973,874 State of shared path and on loondalup Drive to Wallawa road facilities Street 2009-10 Construction of I kin of Perth to Fremantle PSP from $480,000 State PSP lighting Claremontto Swanbourne 2009-10 Construction of 0.7 kin at Daddow Unknown Part of larger ofPSP Road Bridge project - cycling componentcannot be detennined 2009-10 Maintenance Various $222,000 State 2009-10 TOTAL $12,116,369 2010-11 Construction of new link Garratt Road/Whatley Crescent $125,000 State to MidlandPSP and intersection improvements modifications to intersection 2010-11 Construction of 01 kin Midland PSP at Graham Farmer $110,000 State PSP improvement Freeway/East Parade intersection 2010-11 Construction of 4.1 kin Annadale PSP between $250,000 State ofPSP WeIshpoolRoad and Lacey Street 2010-11 Construction of 0.5 kin Fremantle PSP between Shenton $575,000 State ofPSP Road and Claremont Station 2010-11 Maintenance and PSP Various Locations $2,140,000 State Designs 2010-11 TOTAL $3,200,000 2011-12 Construction of 1.6 kin BussellHighway between $48,000 State of 1.5 metre sealed Chambers Road and Island shoulders both sides Brook 2011-12 Construction of 1.6 kin Coalfields Highway on the $48,000 State of 1.5 metre sealed Allanson westsection shoulders both sides 2011-12 Construction of 2.4 kin Between Tonkin Highway and $2,700,000 DOT funded of Perth to Midland PSP Bassendean Station (State)

MAIN ROADS Western Australia Page I of2 Question 6 2011-12 Construction of 3.5 kin between $5,500,000 State ofPSP MittabookaAvenue and Cainboon Road 2011-12 Signals Upgrade Annadale PSP at Belmont Park $4,000 State 2011-12 Construction of 01 kin MitchellPSP at BeachRoad $20,000 State fencing upgrade Underpass 2011-12 TOTAL $8,320,000 2012-13 Construction of 12.5 kin Dampier Highway between $500,000 Federal/State. of cycle lanes MadiganRoadandBumup Road Works completed December 2012 2012-13 Construction of 4.1 kin between $3,000,000 Federal/State. of on road cycle lanes KooyongRoad and Tonkin Highway 2012-13 Construction of4 km of Bunbury Outer Ring Road Stage $2,180,000 Federal/State. 2 metre sealed shoulder land for Outer Ring Road and Bunbury PortAccess Road 3 kin of 1.5 metre sealed Stage 2 shoulder including provision of paths and 2 bridges for future shared paths 2012-13 Construction of 0.2 kin Fremantle PSP at City West $356,853 State of slow points, improvements to drainage and path surfacing 2012-13 Construction of 0.5 kin PSP between Claremont Station $570,400 State ofPSP bollard lighting and Swanbourne Station installed 2012-13 Improvements to 0.5 kin KwinanaFreeway approaches to $100,000 State ofPSP the Parry Avenue unde ass 2012-13 Construction of4 kin of Great Eastern Highway/}

MAIN ROADS Western Australia Page 2 of 2 Question 6 ^:?

'AleJes pe0^11JOJ JOIS!UnV 91/1 01JeJeJ OSeeia (0-e

'JoinsUV

6798pnqpaAo/dd0 91/1 SIIoz{, 11 (9 JIMads 99 pinoz/sPMaz, !3,109a/ I!ownOp foalOSP00}I' 91/1p!p jolt11 (9 ''''1.1, ,. ,,/" 198pnq IUnOOOf. '!Sri. 11 DawnO/IP00}!" 91/1 3410/9/naypU?dX9/0 SI!019p 9111 91n joltjj (O

-\so pal0 ',,!11nooo}, Dawno/J prion',, 9111 01 121'211 (1)

-paysDp77V SI9AD/J Way UOH .I 'ON IfO!/Sail6

12!112.1!SriV UJejsa/\\, spiZ0^11 in!12n

t'10Z aunt zj 'figpsJniiL

1,131LON NO SNOILS:,:110

1.1:":LL11\1,110;> SNOILV^111.1JO TVl;>NYNl. !I UNV SalLV, 111LS:,: ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

91!esiion No. 8. . Hon Ken Travels MLC Qsked-

(8) 1/4/87 10 Ihe "COQ!/ieldsHighwoy" grid/1481 to the EsiimQ/es Hearing 25November 2013, 91!88non 3 Attachmen/ I in relation 10 roadt, pgrodes east of Collie, ondjbr each ploy'ect listed; grid ask - o) Whatis the esiimatedcost, by What ore the details of the works required, c) When will works be commence, . onof (4) When will works be coinple/ed?

Answer: a-d) The attachment mentioned by the Member was apreliminary list of desired network priority improvementsto address freight needsinthe Wheatbelt area

The Liberal Government recently committed to provide $28 million to improve safety and remove dangerous sections of the Coalfields Highway. This is in addition to $25 million already allocated in the firsttenn of Goverimient.

The attachment Inst has been refined

The identified needsthathave been funded or are in the process of being funded by Main Roads are . The $53m upgrade of 19.4 km of priority sections of the Coalfields Highway betweenjust west of the Wellington Dam tnnioff and Collie as well as a 4 kin extension of the slow vehicle climbing lane on Roelands Hill from . The 4 kin eastbound (uphill) climbing lane extension on Roelands Hints expected to be completed by June 2014. To date, 9.2 kin of the upgrade has been completed. The remaining 10.2 kin upgrade is currently scheduled to collmience in March 2015 and be completed by June 2016, subjectto National Park excision being completed. . Improvements to the /Collie-Lake King Road intersection at Arthur River. A budget of $10m is currently allocated from the Safer Roads Program for the upgrade and works are expected to commence in 2015-16 and be completed in 2016-17, subjectto selection of the appropriate treatment option, . The staged realignment and removal of curves on Collie-Lake King Road at Gibbs Siding and Bowelling. A budget of $10m is currently allocated from the Safer Roads Program for the upgrade and works are expected to coriumence in 2014-15 and be completed in 2015-16 at Gibbs Siding and 2016-17 at Bowelling (subject to the timely excision of State Forest) . $6m is in process of being funded to recondition and sealshoulders at selected locations along the Collie-Lake King Road. Once the funding has been allocated, the project can be developed up andprojecttimelines detennined. ^-. . Main Roads has also undertaken a preliminary strategic assessment of the existing road network west of A1bany Highway to identify potential improvements to accotrrrnodate additional truck traffic in the medium to long tenn, including the need for increased overtaking opportunities and safety barriers. Additional medium to long-tenn treatments may include other items originally listed on Attachment I

<^^~ Upgrades are identified as follows:

." .... , ....,...- - I prbj6. gt'pest;ri^fj^tit ;..*i. ";,:';':'.- ' :. ::'; :.-:.' ~ , ~-. F. .,, : :..-, , .,,,.., ., .~ . . . .,,. .

,':@!i^;-'7;^;;:'!;^';^it:;;if:^j^:@';j^lit^.^^*to. ^.;^:I^tit^it!i^:.^

. , . , I:^St'W;;st TruckRqU. tel ,

.It^pid^. T@Wrt;Sit^ Safety aid'Aji. ^hity, '-. East Secti^n . = Improve Grade and Vertical Sight Lines

. ' Ri^ajigj. Sthsjafyd^f^ Curve^ . lit^p. ve, Sight-^in^s allntersebtj6n , .,.. " , , . , * . . . . E;^^I-W^^intok Rout^'^Wei;t Sectioti: .. 'litpj6yej^I^n;site$^fe^I^h^ Adjedty.

:. I^^MOVE:'I^OA!>...... ,. ,.. ..jRA'!NOONSjRAifyt .. . ,-..,.... ,. East WestTruck Route - East Section Improve Town-site Safety and Amenity I^rid9i^'9394 " Slub$tandatd. Width. by Ith-. Bridge h^s been prop^ed

,R^^I^o1^with(:ulyert. ,... ,.... . --~ ' '.' " ' Bridge 0395 Substandard Width by fin - Bridge Strength Issue (75% ofT44) Replace with Culvert 'Bridge. q^35 " -': . - ' ' ' ' ' ^ow H^adjoom ,, 06^t!cityUfikrt^lily- I^^^lace'with ^tilt^it:. Bridge 0412 Substandard Width by 1.4m - Widen Bridge

..

'!^flage,^ ... q'545'.'-' ..,.. ," "' ""~' ' " "Sir^Stand^idlyidih:by o. 9tj ,:^!idg^. Siten^to Issue-(63% of'14j). *-.

,R^;^!ace:With,.,...... ~ Wid^i'strqcjor6 ...... ,.I'- :, ""^ ' I" Bridge 0439 Substandard Width by 0.3m - Replace with Culvert .-.. .. E^i^tW^^t'Ttu. at. .R6tifo . 1,111iP. !^!grownsjt^ $at^fy, .an^ A1h^tidy, ,:West $eeliory . Widen and Seal Shoulder Works - Sections currently sealed less than 7m

-- ...... - .. ,, . . I^6^!19n I^u^SI^^daid ^^TVe ally":!unption , White. W^ill^oad , . . . , Widen and Seal Shoulder Works - Sections currently sealed less than gin

...... Widen aidsedl Shoulder Wdrks , Sections cuffentiy sealad. I^$5 than'7th , . , . , ,. Realgn Substandard Curve atV" Junction - Tincurrin Road

'. " ...... , ...... * ..~ .. .

...... ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONS ONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

Question No. 9. Hon Ken TravelsMLCosked-

(9) IPhaiissz{es hQve been identified at the interseciion of Albany Highway gridArthz!r ROQd (to Wagin)? - o) IPhaiworks have been identified 10 oddress the issues oilhis intersection, b) Whotis the estimQiedcost of works, c) What money is curleni!y Qllocoied in the budgei/or Ihis innersection, . and 41 When ore works expected to commence o1this interseciion? e) When ore worksexpectedto be coinple/ed?

Answer:

The numbers of heavy vehicles crossing the intersection will increase a) A significant upgrade of the currentstaggered T-alignment to address limited sight distance for westbound vehicles approaching from the eastisrequired. A number of proposals are being considered including a modified staggered T-junction, with overtaking lane and aroundabout. b) Yetto be confinned as options are under review butthe current budgetis $10m. c) $10m d) 2015-16, subjectto selection of the appropriate treatment option e) 2016-17, subjectto selection of the appropriate treatment option

4 ESTIMATESANDFINANCIALOPERz\. TIONSCOMMITTEE

Ql. JESTIONSONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

91, es/ionN0. 10. . Hon Ken TrQvers MLCasked-

(10) Whatissz!es hove been idenij/iedaithe intersection of Albany Highwoy andthe Coq!/ie/dsHighwQy? - a) Whotworks have been ideni;/iedto address the issues ajihis intersection? b) Whatis the estimated cost of works? c) Who/ money is currently allocated in Ihe budget/br this intoIsection? 41 When ore works experted10 commence at this interseciion? e) When are works expec/edto be coinp/81ed?

Answer:

Eastbound vehicles approaching Albany Highway on the western leg of the Collie-Lake King Road are required to start an uphill climb from a stationary position leading to slow speeds on Albany Highway. This creates a large speed differential between entering trucks and through traffic a) This intersection is to be modified in conjunction with the eastern leg of the Collie-Lake King Road/A1bany Highway intersection at Arthur River. b-e) Refer to the answer provided to QuestionN0 9

C^., ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

Question No. 11. . Hon Ken TravelsMLCasked-

(11) 11'71aiissz, es have been identified ajihe Gibbs Corner (intersec/ion of Goldenng North Rod4)? a) 17/10/1, yolks hove been identified 10 oddress the issues ajihis section of road? b) Whoiis the esiimQiedcost of works? c) What money is currently allocQtedin the budgetfor Ihissection of road? 41 When are works expected to commence? e) mien Qre works expected 10 be completed?

Answer

Substandard geometry. a) Staged realignment and removal of curves b) $10mto addressthe substandard geometry at Gibbs Siding and at Bowelling. c) $10m to addressthe substandard geometry at Gibbs Siding and at Bowelling. co 2014-15. e) 2015-16

C^, ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

Question No. 12. . Hon Ken TroveISMLCosked-

(12) inIQ/isSI!es have been identified ajihe Bowel/ing Curves section of the COQ!/ie/ds Highway? 41 17/10/1-uorks hQve been identified 10 Qddress the issues Qt this seciion of road? by Whatis the estimQiedcost qfworks? q) What money is curlenib) allocaied in the budgetjbr this seciion of road? 41 When are works expected to commence? e) When ore works expected to be coinp/eied?

Answer: a-d) Refer to the answer provided to QuestionN0 11. e) 2016-17, subjectto timely State Forest excision.

C::^, ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

Ql. TESTIONSONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

9118siionN0.13. . Hon Ken TroversMLCQsked-

(13) Has the Government received onyreques/s 10 buildpQssing lanes on Ihe Coalfields Highwaysince 2012?

Answer

Yes

C^ ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

Question No. 14. . HonKen TravelsMLCasked-

(14) Is Ihe Governmeniconsidering buildingpassing lanes on the COQ!/ie/dsHighwoy 10 assisiin the moriagement of increased volumes of groin 11/4cks? q) y'yes, D A1whoi/OGOtions, ' ond 2) Whatis the estimQtedcost dyedch IOCQ/ion? 3) When are works expected to commence? 4) When ore works expeciedio be completed? by yno, whynoi?

Answer: a-b) Main Roads has undertaken apreliminary strategic assessment of the existing road network west of Albany Highway to identify potential improvementsto accommodate additional truck traffic in the medium to long-tenn. Local goverirrnent feedback of preferred locations for passing lanes will be taken into consideration as part of this process. Once completed, Main Roads' costed strategic assessment and recommendations will be submitted to Goverirrnent for funding consideration and prioritisation. This strategic assessment is expected to be completed in the first quarter of 2015.

^.. o o" 93 ,\ ^^ ^ to I= -; ^. s: =. CD ^ 83 CS -. = C. , ^; ~F = -g o ,~ o -I Q >^ =. >^ I^ < <3. <^: ^;^. b, ;s o 83 co o co 83 < -F> co , I^: =. I-* .!:^: <^: ;:^ ^., co - FF -; ;:S 'c: S> !^ ,~, N t^ o =.. co o C. , =, , 0'1 ^ e- ^ CD = -; O" '=; :5; ^:s. , ~ co - ;= ;^.' ;=.: at ;s. , ::^ -. = ^. CD CS ,~ C, . CS a a ;= -.. ;s ^ I^ 13 j*, d ;s ;^;, ;S' >o = e >. ^ o S>., CS CS o CD Q garb >,^ - -; co > ^. e, , ;s = o co co 93 s; ^; : ;^; -. co ;S:- ^ S: d^. :^; ^ >. CD CS 9a CS ;S. , s> a, >, . < ^ Z co CS -. a, ^ co 10 FF ;^'^; '^~ rt,;^' *,, ^ a; ^. ,^ ^ 11^ ^ ^ :^. :;^:^s ^ I^ FF to C:> \ ~ t~ Z o C, i C> -; d ' ;:;I^; ;^ ^ o ;-< '^ s> :3 ^s \0' S; o a -r> CS CS;s ^ r> SZ. ~ ;^, Z ~ '*, S> S^. co , 0:3 ^I P, F^ ;s. , \ S>., o -" o ,<:: ,,., ;s. C: Z >^ o S: <6;=;~ Z 11^ o I= ;s' >< I o CD ~. ,- . CS -; C. , to I- Q. . <6 ;s -; CD C. , a ^ -I eb ,~ CD Q I^ o Q. , S; ;s CS Z ^ ^ co ,<: ^; ,~ a ,^ C> ,.~ P: o d (^~, -.. CS I^ I= co e> =: FF Q -, -; ^:S ,^ -; CS 1:21 ;;; 11^ SI, ^

* ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

Ql. JESTIONSONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

91!esrionN0. 16. . Hon Ken Travels MLCasked-

16. 11<, 181to the Tonkin HighwQyExtension to South WestHighwQy, ondQsk- (1) HgS Ihe Community Working Growp coinple/ed Iheir work? b) ^'yes, hos a report been coinpleied? c) ly"'yes, will Ihe Minister loble it and ifno, why noi? 41 Has a business cdSe beenprepared/br this extension? e) ^'yes will the Minister fable ii?

Answer: a) Yes by Yes c) No. Main Roads needsto further reviewthe report'sreconnnendations and estimated project cost. These further investigations will be completed by the end of 2014. d) The Ministerial Coriumunity Working Group's report is the strategic business case forthe highway extension e) Refer to Part(c).

,^ ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June2014

Maim Roads Western Australia

91, esiion No. 17. . Hon KTravers Qsked-

17<1er to the Sty"81Roods ondBridges Progrom, andask-

(d) 17/10tis the expected expenditurejbr 20/4/15? ^) Whatp"qi',, is willb^/wad, dj?om limp", eram in 20/4/15?

Answer: a) $35m by A draft 2014-15 Safer Roads and Bridges Program is currently being finalised by Main Roads before being forwarded to the Minister for Transport for consideration and approval.

^.~ ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONS ONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

9148siion 18. . Hon Ken TravelsMLCosked-

18. Ir<181 to BudgetPqper N0 2, Volume 2, atpQge 818 "Complete Works, Minor Works (inclz!des Blacks>^oldnd UrgentMinor Works) 20/3/14Program, gridosk- o) Can yoz{provide a breakdown of the prey'ecis and Qinoz!nithot has be spent/61 each ploy'eci? b) How much of Ihis money is/?om the Blackspoiprogram? c) How much of this money TPOs originally provided by the Commonweol/h ond/or whichprq/'ects? Answer: a) Refer Attachment I. The Minor Works projectsin the Capital Investment Program section of the Budget Papersincludes Black Spot works but only Black Spot worksthat are to be capitalised as a Main Roads asset. This would generally exclude works on local roads, unless the works are traffic signals. As such, only part of the total Black Spot program will be listed as Minor Works projects. b-c) Refer Attachment I

C:^ Attachment, - Response to Question 18

Project Description Exp Estimate Blackspot Commonwealth Funded North West Coastal Highway- Widen Seal and sealshoulders 10,673

City of NGdlansd;Town of CottesloeProvision of Lighting 9,801 Black Spot Development of a High Wide Loads Corridor 43,471 City of Armadale installTraffic Control Signals 70,720 Black Spot Commonwealth Fundin City of Armadale - installTraffic Control Signals and realignment;install channelisation and CUI-de- 150,000 Black Spot Commonwealth Sac two Intersections Funding

City of Warmero0 - install Traffic Control Signals; and additional protected rightturn lane 15,111 Black Spot Commonwealth Funding Shire ofMurray - install Traffic Control Signals 301,064 Black S of City ofFremantle - installRight Turn Pockets; Seagulllsland in the Median and cover sump 8,241 Black Spot

RailCrossin jin rovements 800,000 Replace Traffic Control Signal Lanterns with LED Technology 1,704,000 Construct 2 Overtaking Lanes northbound and southbound 308,999

City of Annadale Construct TCS & installAdvance Warning Flashing Lights 96,000 Black Spot Commonwealth Fundin Traffic Signal Safety Improvements 465,000 Traffic Signal Controller Re lacement program 2,329,349 Upgrade Equipment and Systems 1,679,785 Extend I Construct Short Overtaking Lanes 2,963,837 Town ofClaremont- install Overhead MastArms and Left Turn Slip Lane and upgrade signals with 101,400 Black Spot Commonwealth LED lamps Funding Town ofClaremont-Modify Traffic Control Signals install Overhead Mast Anus Replace Lanterns 21,400 Black Spot Commonwealth with LED Lamps Funding Various intersections in the Metropolitan Area - Right Turn Filter Removal 68,145 Black Spot Minorlm rovements on Rivenvalls and Foreshore Erosion 1,000,432

MAIN ROADS Western Australia Page I of 5 014#270436 Project Description Exp Estimate Black Spot Commonwealth Funded Albany Lake Grace Rd- Recondition shoulders and widen seal 14,022

South Western Highway - Drainage Improvements 58,583 South Western Highway - Widening (Preconstruction Works) 71,479 South Western Highway - Widening (Preconstruction Works) 13,949 City of Stirling Modify Traffic Control Signals with new righttum arrows 17,070 Black Spot Commonwealth Funding City of Stirling - Modify Traffic Control Signals with new righttum arrows 24,000 Black Spot Commonwealth Funding City of Rockingham - Modify Traffic Control Signals with righttum arrows(withoutfilter) protected 692,000 Black Spot Commonwealth rightturn lanes and LEDs Funding City of Cockbum - install mast anus on approaches and install LEDs 60,000 Black Spot Commonwealth Funding City of Stirling - Modify Traffic Control Signals and extend righttum pockets 30,872 Black Spot Commonwealth Funding City of Cockbum - Modify TCS by installing righttum arrow withoutfilter for vehicles, installMast 58,000 Black Spot Commonwealth Arms and install LED lamps Funding WA Pavement AssetResearch Centre Ca italProjects 333,500 City of PerthModify Traffic Control Signals and revise existing lane widths 33,060 Black Spot Commonwealth Funding Traffic Control System Network Im rovements (includes in Network Conversion) 500,000 Shire ofBoddington - Seal Shoulderst0 0.5m wide 485,209

City of Bunbury - Modify Signals - Preventrighttum filter installnew righttum arrow and LED 28,566 Black Spot Commonwealth lanterns Funding City of Bunbury - Modify Signals - Preventrighttum filter installLED lanterns and clear median 38,755 Black Spot Commonwealth Funding Shire of Augusta Margaret River- Widen seal and jin rove road alignment 367,729 Black S of Karrinyu Rd Installation of Traffic Controlsi nals 20,513 South Coast Highway-construct kerbside acceleration lane in SCH for lefttum traffic 40,222 Black S of

MAIN ROADS Western Australia Page 2 of 5 014#270436 Project Description Exp Estimate Blackspot Commonwealth Funded - Construct Chanelisation Left and Chanelisation Right Type intersection 582,113 Commonwealth Funding Kiinberley Region- Upgrade Culvert 905,504 Black S of Intersection improvements including relocation of bus bay 1,538,742 City of Gosnells - Construct Traffic Control Signals at intersection 200,000

Tonkin Hay O tic Fibre Cable and CCTV 274,814 RailCrossing Improvements Local Roads 3,783,860 Toodyay Rd - Seal Shoulders and jin rove assing o ortunities 388,225 Black Spot Tonkin Highway - Construct an Amenity Wall 272,007 Donnybrook Koionu Road - Re lace bridge with culverts 636,742 Connection of Traffic Control Signalsto our Fibre O tic Cable Network 59,708 Electrical & ITS Asset Ty e A roval and Testing 129,999 U grade FreewayUnderBridge Li hting 169,191 Expansion ofCCTV Coverageto KeyNetworkLocations 100,000 City of Bunbury - Nation Building Black Spot- installnew TCS with righttum arrow no filter 360,000 Black Spot Commonwealth upgrade lighting and extend left and righttum pockets Funding MitchellFreeway - Modify Freeway Off Ramp 328,83 I RCO andRefurbish BridgeAlbanyLake Grace Road 641,966 MitchellFreeway - Install Safety Barriers 2,473,295 Black Spot Great Eastern Hi hway Install Mast Auns 43,668 Black S or MeIville-Mandurah Highway - Partial signals and install acceleration lane 161,976 Black S ot -Modify filters 70,485 Black S ot Bridge 950 - Reconstruct footpath and repair/replace bearers andjoists 655,528

BrandHighway-Bridge 0665 ConstructRco & DeckRe airs 615,260 Shire of Dormybrook Balingup -- Constructrighttum lane - 864,247

City of Busselton -- Seal Shoulders to loin wide and install audible edgelines 1,791,592

MAIN ROADS Western Australia Page 3 of5 D, 4#270436 Project Description Exp Estimate Black Spot Commonwealth Funded City ofJoondalup - Modify TCS extend righttum pocket 90,000 Black Spot Commonwealth Funding City ofJoondalup - Modify TCS turning off rightturn filter extend existing righttum pocket 90,000 Black Spot Commonwealth Funding City of Stirling - Construct TCS with rightturn arrows (without filter) 240,000 Black Spot Commonwealth Funding Town of Cambridge - Modify TCS preventrighttum filter Upgrade to LED and extend righttum 132,000 Black Spot Commonwealth pocket(west) and lefttum pocket(east) Funding Goomalling - Improve intersection by providing right and left turning pockets and converting to 118,779 Black Spot staggered Ts. installmedians islands and clear vegetation and upgrade City of Perth -- Modify TCS diamond phase to traffic signalsimprove pavement arrows LED 125,600 Black Spot Commonwealth upgrade to reduce rear end crashes Funding City of loondalup Modify TCS to include a righttum arrow 39,000 Black Spot Commonwealth Fundin Town of Cottesloe - Extend rightturn pocket(north and south) extend left torn pocket(west) upgrade 285,000 Black Spot Commonwealth TCS to LED overhead Mast Aum on Eastern Leg and installislands Funding

City of Stirling - Modify TCS preventrighttum filter LED allsignals and overhead mast arms 180,000 Black Spot Commonwealth (north) Funding City of Swan- Modify TCS apply antiskid treatment on lefttum approach 65,000 Black Spot Commonwealth Funding City of Perth - Modify TCS diamond phase to traffic signals build east bound median to provide 95,836 Black Spot Commonwealth projected righttum pocket and new westbound righttum pocket Funding City of Stirling - Modify TCS new righttum arrows(without filter) east and west approaches LED 240,000 Black Spot Commonwealth TCS - all approaches Funding Albany Lake Grace Rd-Extend culverts and installpre-cast end walls, clean/clear associated 1,400,380 drainage. Widen existing road sealto allow for 2x3. Sin wide traffic lanes Bridge 0020 - Shire of Williams - Replace all Stringers & Reinforced Concrete Overlay 483,244

Bridge 0596 - Shire ofQuairading - Reinforced Contrete Overlay 1,230,2 11

MAIN ROADS Western Australia Page 4 of5 014#270436 Project Description Exp Estimate Blackspot Commonwealth Funded Shire of East Pilbara - Construct channelisation treatment(Righttum pocket) 398,655 Black Spot

City ofKalgoorlie Boulder- Upgrade Culvert 787,112 Kiinberly Region- U ado Culvert including Guardrail 749,999 NWCH-intersection improvements for righttum lane 102,717 Black Spot Orrong Road Installflashing lightsto warn motorists of guard controlled school crossing (crossing 44,162 notin 40 kph schoolzone) Charles Street - install flashing lights to warn motorists of guard controlled school crossing (crossing 21,685 not in 40 kph school zone) Collie Lake King Road intersection Upgrade 405,965 Koionup-Pingrup Rdhistallnew intersection on south side passing bulge and rightturn pocket on the 245,895 Commonwealth north side Funding Bridge 4078 - Reinforced Concrete Overlay and Substructure Repairs 1,200,000

South Coast Highway-Construct Passin Lanes 100,000 City ofKalgoorlie Boulder- Upgrade Culvert 406,233 Toodyay Road - Develop intersection treatments for nine intersections along the route to address 149,999 safety concerns Detailed design of Foundation Intelegent Transport System and associated hardware 826,999

MAIN ROADS Western Australia Page 5 of 5 Df4#270436 ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONS ONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

Question No. 19. Hon Ken TravelsMLCasked-

19 Ir

Answer: a-c) Dueto the nature of this program, works are riotscheduled in advance and the State Black Spot Program is signed off by the Minister for Transport at the start of each financial year.

<1^ ESTll\IATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONS ONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

Question No. 20: HonKenTravers MLC asked-

20. 1148r to BudgetPoper N0 2, Volume 2 at page 819 "New Works, Minor works (includes B/QckE;p010nd UrgeniMinor Works:, I 2015-16Progrom, ondusk- o) Canyonprovide o breakdown of the ploy'ecis and omot!nt that is expec/ed to be SIPeni for eachprq/'ect? b) How milch of Ihis money is/?om the Block$potprogrom? c) How march of this money wos originally provided by the Commonwealth and/or whichprqj'ects? Answer: a-c) Due to the nature of this program, works are riotscheduled in advance and the State Black Spot Program is signed off by the Minister for Transport at the start of each financial year.

^.. ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June2014

Main Roads Western Australia guesiionN0. 21. . HonKen TravelsMLCosked-

21. 1/4/'81 10 BudgeiPoperN0 2, Volume 2 dipage 819 "New Works, Minor works (includes Blacksj?o1 and UrgeniMinor Works) 2016-17Program, qndosk- Q) Conyoz, provide a breakdown of the ploy'ects ondarnot!nithatis expected 10 be spentjbr eqchprqject? b) How much of Ihis money isfrom the Blockspoiprogram? c) How much of this money was originally provided by the Commonwealth und/by which ploy'ecis?

Answer: a-c) Due to the nature of this program, works are not scheduled in advance and the State Black Spot Program is signed off by the Minister for Transport at the start of each financial year

<1^^ ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

Ql. JESTIONS ONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

91{es/ion No. 22. ' Hon Ken TravelsMLCosked-

22. 1/4/'81 to BudgetPqper N0 2, Volume 2 dipage 819 "New Works, Minor works (includes Blacksj70/and UrgentMinor Works) 2017-18Program, andosk- by Canyonprovide Q breakdown of the ploy'ec/s ondqmot!nithotis expected 10 be spentfor eachprqjeci? b) How much of Ihis money is/?om Ihe Black$potprogrom? c) How much of this money was originally provided by Ihe Commonwealth ond/by which ploy'ects?

Answer: a-c) Due to the nature of this program, works are not scheduled in advance and the State Black Spot Program is signed off by the Minister for Transport at the start of each financial year.

<:11^ ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONS ONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

Question No. 23. . HonKen TravelsMLCasked-

23. 17<1er 10 Ihe intoIsec/ion of Belkshire RoadandRoe Highi-voy, andask- o) How much is allocated in the 20/4/15 Sidle Budgei/br Ihisprqjec/? b) Whichprogrom is Ihis money allocated in?

Answer: a-b) Subsequent to the State Budget papers being published, the Commonwealth and State Governments have agreed to jointly fund the construction of a grade separation of the intersection of Berkshire Road and . The funding source forthis project will be the Nation Building Program.

<1^. ESTIMATES AND FINANCIAL OPERATIONS COMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June2014

Main Roads Western Australia

Question No. 24. . Hon Ken TrQversMLCasked-

24. . Hon KTrovers usked- o) mien will MR\, 4 commence the installing of adveriising billboards on the Mitchell FreewayandKwinanoFreeway? by Will Ihere be any cosis involved/61Moin Roads? c) ^'yes, how much hqs been o110coied in the 20/4/15 SIo/e budgetjbr this ploy'ect?

Answer a) 2015 by No c) Notapplicable

q ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June2014

Main Roads Western Australia

Question No. 25. . Hon Ken TroveISMLCQsked-

25. . Will the Minister table a copy of/he completed study on the/eosibi/to) of upgrading OrlongROQdbetPveen the GreatEasiern Highway gridLeoch Highi-uoy (elevated expressway)?

Answer

No. This is a long-terniproject. The feasibility study only produced preliminary concepts of possible options. More investigation would need to be undertaken by Main Roads before any options could be presented to Government for funding consideration.

c;I ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June2014

Main Roads Western Australia

91, es/ion N0 26. . Hon Ken TrQvers MLC asked-

(26) Why has there been a $3m increase in Ihe cost of the Gibb River Roddprqjecisince 20/3/14 budget?

Answer:

In the 2013-14 Budget Papersthe Gibb River Road project had an estimated total cost of $56 5 15 000. In the 2014-15 Budget Papers the estimated total cost has risen to $59 122 000. The increased funding of $2 607 000 has been included on this project to enable more of the prioritised worksto be carried out.

^.~ ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

Question No. 27. . Hon Ken TrQversMLCasked-

(27) Why has Ihere been a $4m increase in the cost of the Golc^ie/dsHighwoy Will!rid 10 Meekothorroprq/'ectsince 20/3/14?

Answer:

Additional funds have been allocated to widen the existing sealed surface and extend the seal near Meekatharra

C^, ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June 2014

Main Roads Western Australia

Question No. 28. Hon Ken TraversMLCosked-

(28) Why has Ihe Soulh 11'881ern HighwayDonnybrook10 Greenbt{shespyqject been/wrther d

Answer:

While capital funding has been deferred, ongoing upgrades have been completed utilising the Safer Roads Program and Regional Run Off Road Programs as funding sources.

Between 2009-10 and 2013-14 $12.4m has been expended from the Safer Roads Program improving the 14 km section of South Western Highway between Manjimup and the Pemberton turnoff. Highlighted works during this period include:

. 2009-10 - $1.05m (Safer Roads)to widen a 1.6 kmsection near Greenbushes; . 2010-11- $33m (Safer Roads)to reconstruct and widen the 2 kilnorth approach to Balingup; . 2010-11 and 2012-13 - $0.34m (Regional Run Offjto provide audible edge lines from Dormybrook to Bridgetown . 2012-13 and & 2013-14 - $3.4m (Safer Roads) to widen and improve a 1.1 km curved section immediately south of Dormybrook (completed April2014) anallocation of $1. Sin is being sought in 2014-15 from the Safer Roads Programto widen a 1.4 kin section near Greenbushes.

^.- ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

Ql. JESTIONSONNOTICE

Thursday, 12 June 2014

Maim Roads Western Australia

91{esiionN0. 29. ' Hon Ken TroveIs MLC OSked-

(29) Whatis the estimoiedcosiqfihe LloydSireett!riderpass? a) How milch is allocated in the budgei/or this ploy'eci? b) Where in the budgetis theft!riding allocoied? 41 How much offhis money is Sidle OPPropriotions?

Answer:

$86m a) $68. Sin b) Included in total cost of services. The projectis on a local govenunentroad and is not individually listed in budget papers. c) $68. Sin

q- ESTIMATESANDFINANCIALOPERATIONSCOMMITTEE

QUESTIONSONNOTICE

Thursday, 12 June2014

Main Roads Western Australia

9148siion No. 30. . Hon Ken TroveIs MLC OSked-

(30) 174erto the F1emQnile TradicBridge, andosk-

(d) When does the Minisier expect the riskQssessmeniqfthis bridge to be coinpleied? (b) When does the Minister expecithe reporti-uill be madepublic? (c) 17'71Qiwork is curleni!y being underjoken on o replacement bridge? (tl) Does this work inclt4de Q new roadondrailbridge? (e) 17'710tis the IQtest esiimQ/edcostfor a new F1emQnile 100dr'rail Bridge?

Answer: a) The most recentrisk assessment is a report titled 'Holistic treatment of the F1emoni/e Rail gridTrqfiic Bridges' which is ajoint Public TransportAuthority/Main Roads WA report This report assesses the different risks of a collision at each bridge and then considers the works proposed to protect each structare to ensure a consistent approach has been taken to develop the treatments. The report also assesses the residual risk of the effects of a vessel impact on each bridge after Main Roads completes the treatments cumently proposed. b) The report is expected to be available in the second halfof2014. c) Main Roadsis currently undertaking works which will reduce the risk of damage to the bridge in the case of a vessel collision. d) Refer to Part (c). e) Estimates from June 2012 of the cost of replacement of the Fremantle Traffic Bridge range from $189m (standard road bridge) to $233m (combined rainroad bridge)

Q^