ACMC May 2019

Total Page:16

File Type:pdf, Size:1020Kb

ACMC May 2019 Aboriginal Heritage Act 1972 Meeting of the Aboriginal Cultural Material Committee (ACMC) Section 18 Notices to be discussed at the ACMC meeting to be held via Zoom on 9 February 2021 Applicant Land Purpose Bellevue Gold Project. Construction and operation of a mine including but not limited to exploration drilling, installation of mine infrastructure such as pits, underground development Tenements M36/24, M36/25, and and production, ventilation rises, waste rock dumps, tailings Bellevue Gold Ltd M36/299, Bellevue Gold Mine, facility, accommodation camp, access tracks, mine pits, Leinster, Goldfields. processing plant, power station, water storage facilities, water and waste water treatment plants, and communications equipment. Bullsbrook Urban Development. To develop Lot 1396 as the Second Stage of a 250ha greenfield urban development at Bullsbrook within the fabric of an existing Bullsbrook township. The overall development will yield at some 2500 lots as well as a major district-level, mixed use Town Centre, Lot 1396 on Plan 249040, CT Amex Bullsbrook with some 25,000sqm of retail on a 10ha site, in addition to a 1837/306, 38 Chittering Road, Pty Ltd primary school, child care and medical facilities and district Bullsbrook, Perth. level playing fields and public open space, including a foreshore reserve along Ki-it Monger Brook & a formalised walk trail within the Brook & cultural interpretation to commemorate Aboriginal heritage. The development will include the usual urban infrastructure & services. Brockman River on Great Northern Highway, Bridges 0676 and 0682. Planned preventative maintenance works and future replacement of Bridges 0676 and 0682 on the Great Northern Highway. The type of maintenance works that will Great Northern Highway, Bindoon, be undertaken include (but not limited to); drainage Land Act Numbers 11513706, maintenance, expansion joint maintenance, stringer bolting, 11957411 and 11513707, Victoria shim repair, scour repair, pile banding, halfcap repair, bracing Plains, Land Act Numbers and waler repair, sign maintenance, sheeting repair, Main Roads 11294595 and 11282911, Lot 861 wingcap repair, pile repair, stringer repair, guardrail repair, Western Australia on Plan 058593, CT 3155/571, Land fastener maintenance, fullcap/sillbeam repair, kerb and road Act Number 11739728, Shire of surface repair, geotechnical bore testing, future replacement Chittering, Shire of Victoria Plains, of the bridge, potential temporary side-track/detour for traffic Wheatbelt. at Bridge 0682, ongoing maintenance to road and bridge, vegetation clearing works (such as removal of debris and minor vegetation from bridge decks, drainage scuppers, and under the bridges). Works will involve ground disturbance to river beds and banks. Road Reserve, Albany Highway, Serpentine-Jarrahdale, Land Act Number 11518512, Lot 2886 on Plan 240270, CT 3146/582 Albany Albany Highway, Solus Road realignment. Section of Albany Highway, Wandering, Land Act Highway located around the intersection with Solus Road Number 375477, Reserve 39826, and approximately 30km to the south east of Byford (SLK 63 Main Roads Albany Highway, Wandering, Land to SLK 67) will be realigned to eliminate substandard curves Western Australia Act Number 375477, Reserve 5913, in the current road. The works will consist of vertical and Albany Highway, Wandering, Land horizontal re-alignments, associated clearing works, Act Number 375465, Forest associated signs and pavement markings, services Reserve 22, Albany Highway, relocation and future maintenance. Wandering, Land Act Numbers 375465 and 1050477, Shire of Wandering, Perth. Bunbury Outer Ring Road (Northern and Central) Gap areas – construction and ongoing maintenance - between Forrest and Bussell Highways. Construction, upgrade and operation of approximately 19km of freeway-standard dual carriageway Main Roads To be advised and principal shared path and associated bridges, Western Australia intersection realignments, interchanges and other infrastructure including, but not limited to culverts, lighting, noise barriers, fencing, landscaping, road safety barriers and signs. Kwinana Freeway, Thelma Street to Cale Street Riverwall Revetment Rehabilitation. To conduct riverwall rock revetment rehabilitation works along the banks of the Swan Kwinana Freeway, Como, Land Act River, adjacent to the Kwinana Freeway between SLK 4.02 Numbers 1259195 and 1259196, and 4.70 (Thelma Street to Cale Street). The proposed works Reserve 33804, Lot 12510 on Plan include, removal of existing principal shared pathway (PSP) P243198, CT 3119/156, Kwinana Main Roads to fix and patch up eastern side of the existing wall, Freeway, Land Act Number 236021 Western Australia approximately 0.5–1m below natural surface will be and Reserve 48325, Lot 300 on excavated for initial base layer of armour rock to be Plan P047450, CT 3151/547, embedded, drainage works – extension, replacement and Kwinana Freeway, Como, Land Act ongoing maintenance of drainage outlets and outlet Number 11713863, Perth. structures, reinstatement of the PSP, rehabilitating the area with landscaping works and ongoing maintenance and future upgrades of the riverwall. Helena River, construction of a new bridge and associated works including ongoing maintenance on Lloyd Street, Reserve 39636, Lot 10804 on Plan Midland. The new Lloyd Street will cross the Helena River P216670, CT 3144/599, Whiteman and will allow for connection from the Great Eastern Highway Road, Midland, Land Act Number Bypass to Midland in the City of Swan. This will require the 194433, Stirling Crescent, construction of a new bridge (Bridge 5343) and road at this Hazelmere, Land Act Number location. The new bridge will accommodate two dual-lanes 11050315, Reserve 53724, Lot 300 for traffic with a public shared path on the west and a footpath on Plan P033263, CT 3172/335 on the east. The proposed bridge will be a steel structure to Stirling Crescent, Hazelmere, Land Main Roads maximise the span across the entirety of the Helena River Act Number 11050319, Stirling Western Australia channel with a skew span of c.50m. Earthen Crescent, Hazelmere, Land Act batters/embankments will be put in place on either side of the Number 11802223, Lot 825 on Plan bridge to accommodate the new road alignment. These P413916, CT 2956/499, Stirling batters/embankments will be constructed within the river Cresent, Hazelmere, Land Act floodplain and will be sloped to maximise re-vegetation Number 12327625, Lot 700 on Plan opportunities. Works will involve vegetation clearing and P400757, CT 3171/655 Whiteman initial geotechnical works. Culverts will be placed south of the Road, Midland, Land Act Number proposed bridge structure. Ongoing maintenance and 12081539, Perth. upgrades to the road and bridge will be undertaken into the future. Swan River Crossings – Fremantle Traffic and Rail Bridges Replacement and associated works. To replace the existing Fremantle Traffic Bridge and to modify the adjacent Fremantle Rail Bridges, located along and adjacent to Queen Victoria Street in Fremantle. Associated works are, provision of an improved pedestrian/cyclist pathway along Queen Victoria Street across the proposed new traffic bridge, Main Roads 27 land parcels within Fremantle. roadworks to tie into Queen Victoria Street north of the river Western Australia before Tydeman Road, realignment of Queen Victoria Street, modification of Queen Victoria Street/Canning Highway intersection, geotechnical investigations (land and water- based), sediment analysis and other minimal disturbance activities to bed of Swan River, services relocation, future maintenance and upgrades of all infrastructure in the Activity Area. All works will have ground disturbing impact to the river bed and banks. Brookton Highway, Armadale, Land Bridge 4903, Canning River, Agostino Road and Bridge Act Number 11559719, Reserve 0375, Kangaroo Gully, Brookton Highway, City of Armadale 47884, Lot 3090 on Plan 36443, CT replacement, repair works and ongoing maintenance. To 3134/939 Brookton Highway, Land replace Bridge 4903 and carry out repair works on Bridge on Act Numbers 11398094 and 0375. The following activities are proposed on the bridges, 11398099, Agostino Road, Bridge 4903 replacement of bridge with a new bridge and Armadale, Land Act Numbers ongoing repairs throughout the life of the bridge, Bridge 0375, Main Roads 11866582 and 11975091, Reserve initial repairs include timber sheeting repair, pile pot repair, Western Australia 232, Lot 500 on Plan 91048, CT guardrail repair, halfcap repairs, embankment stabilising, 3163/45 Agostino Road, Armadale, rock protection repairs, abutment and wingwall restoration. Land Act Numbers 352397, 352402, Ongoing repairs will be required for this bridge throughout its 352404 and 352405, Reserve life. The works at both bridges will involve the excavation of 48327, Lot 316 on Plan 47441, CT the riverbed, and include any future maintenance of the 3151/546 Agostino Road, bridges (including replacements) and upgrades to the road. Armadale, Land Act Number The proposed works are required to be undertaken by Main 11717230, Perth. Roads in order to preserve the safety of the driving public. Lot 1199 on Plan 203629, CT 2817/293, 1199 Thomas Road, Casuarina, Lot 3 on Plan 86318, CT 2817/295, 3 Thomas Road, Casuarina, Lot 9011 on Plan 410834, CT 2926/375, 650 Thomas Road, Casuarina, Lot 9012 on Plan 410834, CT 2926/376, 650 Thomas North Casuarina Development, Thomas Road, Commercial Road, Casuarina, Lot 9013 on Plan Land Development. Earthworks
Recommended publications
  • Risky Roads Survey Results 2014 Metropolitan Local Government Areas: Risky Roads Survey Results 2014 2014
    Metropolitan Regional Local Government Areas: Risky Roads Survey Local Results 2014 Government Areas 2014 Risky Roads Survey Results 2014 Metropolitan Local Government Areas: Risky Roads Survey Results 2014 2014 in those areas. Alarmingly in regions like the Wheatbelt two out of three road deaths were local Executive Summary residents on local roads. While we can all do our part to improve the attitudes of drivers we must also work towards The RAC represents over 800,000 Western Australian members and advocates on their behalf on improving the road environment to meet the needs of road users now and into the future. matters including affordable motoring, environmental sustainability, public transport and safe road The results from the Risky Roads campaign are publicly available at www.rac.com.au/riskyroads use. The RAC represents all road users on the WA Road Safety Council and has strong alliances with local government, Main Roads WA (MRWA) and community road safety organisations. Having a safe road environment is important for all road users because the right infrastructure can be the difference between a fatal crash and a minor collision. Last year on average one person died on WA roads nearly every two days. The RAC’s Risky Roads campaign is WA’s biggest public infrastructure survey and is undertaken to provide a snapshot of community perceptions, insight for road authorities and assist in identifying trends in traffic flow, infrastructure and safety. The 2014 campaign ran during April and May, providing Western Australians’ the opportunity to express their views and nominate sub-standard roads and intersections throughout the state.
    [Show full text]
  • Driving in Wa • a Guide to Rest Areas
    DRIVING IN WA • A GUIDE TO REST AREAS Driving in Western Australia A guide to safe stopping places DRIVING IN WA • A GUIDE TO REST AREAS Contents Acknowledgement of Country 1 Securing your load 12 About Us 2 Give Animals a Brake 13 Travelling with pets? 13 Travel Map 2 Driving on remote and unsealed roads 14 Roadside Stopping Places 2 Unsealed Roads 14 Parking bays and rest areas 3 Litter 15 Sharing rest areas 4 Blackwater disposal 5 Useful contacts 16 Changing Places 5 Our Regions 17 Planning a Road Trip? 6 Perth Metropolitan Area 18 Basic road rules 6 Kimberley 20 Multi-lingual Signs 6 Safe overtaking 6 Pilbara 22 Oversize and Overmass Vehicles 7 Mid-West Gascoyne 24 Cyclones, fires and floods - know your risk 8 Wheatbelt 26 Fatigue 10 Goldfields Esperance 28 Manage Fatigue 10 Acknowledgement of Country The Government of Western Australia Rest Areas, Roadhouses and South West 30 Driver Reviver 11 acknowledges the traditional custodians throughout Western Australia Great Southern 32 What to do if you breakdown 11 and their continuing connection to the land, waters and community. Route Maps 34 Towing and securing your load 12 We pay our respects to all members of the Aboriginal communities and Planning to tow a caravan, camper trailer their cultures; and to Elders both past and present. or similar? 12 Disclaimer: The maps contained within this booklet provide approximate times and distances for journeys however, their accuracy cannot be guaranteed. Main Roads reserves the right to update this information at any time without notice. To the extent permitted by law, Main Roads, its employees, agents and contributors are not liable to any person or entity for any loss or damage arising from the use of this information, or in connection with, the accuracy, reliability, currency or completeness of this material.
    [Show full text]
  • Coastal Land and Groundwater for Horticulture from Gingin to Augusta
    Research Library Resource management technical reports Natural resources research 1-1-1999 Coastal land and groundwater for horticulture from Gingin to Augusta Dennis Van Gool Werner Runge Follow this and additional works at: https://researchlibrary.agric.wa.gov.au/rmtr Part of the Agriculture Commons, Natural Resources Management and Policy Commons, Soil Science Commons, and the Water Resource Management Commons Recommended Citation Van Gool, D, and Runge, W. (1999), Coastal land and groundwater for horticulture from Gingin to Augusta. Department of Agriculture and Food, Western Australia, Perth. Report 188. This report is brought to you for free and open access by the Natural resources research at Research Library. It has been accepted for inclusion in Resource management technical reports by an authorized administrator of Research Library. For more information, please contact [email protected], [email protected], [email protected]. ISSN 0729-3135 May 1999 Coastal Land and Groundwater for Horticulture from Gingin to Augusta Dennis van Gool and Werner Runge Resource Management Technical Report No. 188 LAND AND GROUNDWATER FOR HORTICULTURE Information for Readers and Contributors Scientists who wish to publish the results of their investigations have access to a large number of journals. However, for a variety of reasons the editors of most of these journals are unwilling to accept articles that are lengthy or contain information that is preliminary in nature. Nevertheless, much material of this type is of interest and value to other scientists, administrators or planners and should be published. The Resource Management Technical Report series is an avenue for the dissemination of preliminary or lengthy material relevant the management of natural resources.
    [Show full text]
  • 82452 JW.Rdo
    Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 WSD Item 9.1.19 H PP TONKIN HS HS HWY SU PICKERING BROOK HS ROE HS TS CANNING HILLS HS HWY MARTIN HS HS SU HS GOSNELLS 5 8 KARRAGULLEN HWY RANFORD HS P SOUTHERN 9 RIVER HS 11 BROOKTON SU 3 ROAD TS 12 H ROLEYSTONE 10 ARMADALE HWY 13 HS ROAD 4 WSD ARMADALE 7 6 FORRESTDALE HS 1 ALBANY 2 ILLAWARRA WESTERN BEDFORDALE HIGHWAY WSD THOMAS ROAD OAKFORD SOUTH WSD KARRAKUP OLDBURY SU Location of the proposed amendment to the MRS for 1161/41 - Parks and Recreation Amendment City of Armadale METROPOLITAN REGION SCHEME LEGEND Proposed: RESERVED LANDS ZONES PARKS AND RECREATION PUBLIC PURPOSES - URBAN Parks and Recreation Amendment 1161/41 DENOTED AS FOLLOWS : 1 R RESTRICTED PUBLIC ACCESS URBAN DEFERRED City of Armadale H HOSPITAL RAILWAYS HS HIGH SCHOOL CENTRAL CITY AREA TS TECHNICAL SCHOOL PORT INSTALLATIONS INDUSTRIAL CP CAR PARK U UNIVERSITY STATE FORESTS SPECIAL INDUSTRIAL CG COMMONWEALTH GOVERNMENT WATER CATCHMENTS SEC STATE ENERGY COMMISSION RURAL SU SPECIAL USES CIVIC AND CULTURAL WSD WATER AUTHORITY OF WA PRIVATE RECREATION P PRISON WATERWAYS RURAL - WATER PROTECTION ROADS : PRIMARY REGIONAL ROADS METROPOLITAN REGION SCHEME BOUNDARY OTHER REGIONAL ROADS armadaleloc.fig N 26 Mar 2009 Produced by Mapping & GeoSpatial Data Branch, Department for Planning and Infrastructure Scale 1:150 000 On behalf of the Western Australian Planning Commission, Perth WA 0 4 Base information supplied by Western Australian Land Information Authority GL248-2007-2 GEOCENTRIC
    [Show full text]
  • Swan River Crossings Fremantle Traffic Bridge Condition
    FACT SHEET FEBRUARY 2021 Swan River Crossings Fremantle Traffic Bridge Condition In late 2020, we sought feedback from the community and stakeholders about the Swan River Crossings Project. Key issues raised included the current condition of the Fremantle Traffic Bridge and the impact on navigational safety. The Fremantle Traffic Bridge was opened The remaining timber elements continue The scouring is spreading upstream and in 1939 with an expected 40 year life and to deteriorate. Many are hidden from in time, large portions of the bridge has served its function well beyond that view, in particular underwater decay of timber piers will no longer be supported. time. The bridge’s structure has been the bridge supports. deteriorating over a number of years Durability Ongoing maintenance will not extend the and despite extensive strengthening and life of the deteriorating timber. Replacing Durability is a concern. In the past we maintenance works, the bridge needs to the timber elements like-for-like is not have encapsulated the wooden piles with be replaced. considered sustainable. concrete. However, over time the concrete has been undermined and cracked, Repairs and maintenance Scour allowing access for the teredo (marine Over time, the required repairs to the borers) to further deteriorate the wooden Scour is impacting the stability of the bridge have meant timber elements piles. timber piles and has created a hole in have been replaced/or strengthened by the riverbed - 12 metres and growing. There is ongoing deterioration of timber steel and concrete. The road lanes and Ongoing scour of the river bed has the deck planks and timber bearers, resulting footpath widths do not meet current potential to significantly reduce the load in large potholes on the deck, which have design standards.
    [Show full text]
  • 4. Environmental Survey Results
    Northam WWTP: Environmental Impact Assessment ● 43 4. ENVIRONMENTAL SURVEY RESULTS 4.1 SITE DESCRIPTIONS AND HABITAT ASSESSMENT Table 4-1 Summarised habitat descriptions for each site Site (representative image) Description Burlong Pool (control site upstream of WWTP) Burlong Pool is an analogue site located 9.5 km upstream of the WWTP discharge and is of similar size and condition to the potential impact site, Katrine Pool. It is one of the 16 priority rehabilitation pools identified by the DoW (2007). Situated between farmland with highly disturbed riparian vegetation consisting of fragments of native vegetation on right bank and predominantly exotic grasses, and good coverage on the left bank. Local grazing. Highly eroded banks in places as a result of vegetation clearing. Limited shading of the channel. Submerged and emergent macrophytes present (~30% of channel). Small amount of woody debris present. Deep channel in parts and heavily vegetated with macrophytes, although noticeably less after February 2017 floods. A small culvert at the road crossing/bridge allows pool formation as the river dries. Report to the Water CoRporation of Western Australia www.hydrobiology.biz Northam WWTP: Environmental Impact Assessment ● 44 Site (representative image) Description Mortlock (Mortlock River upstream WWTP) A control site situated at the edge of Northam township on the Mortlock River, just upstream from the confluence with the Avon River, and assessed for water quality only. The Mortlock River is known to be a significant contributor to nutrient and salt concentrations in the lower Avon River. The site is situated between grazing land and a public recreation/parking area (Enright Park Corroborree Site), with a small cement weir/river walkway presenting a physical barrier to fish passage in some flows.
    [Show full text]
  • Avon Valley National Park Flora and Fauna Guide
    Parks of the Perth Hills Avon Valley The place to… Be… National Park See… Flora and Fauna Guide Do… Landscape The sides of the Avon Valley slope steeply down to the plateau, which is about 200m above the river level. The area is undulating, with soil types including lateritic sands, loams and gravels, and is partly within the Red Swamp Brook and Brockman River catchments. The river valley forms the division between the drier northern forest, dominated by wandoo, and the southern forest, dominated by jarrah Plants The park contains wandoo woodlands and jarrah more typical of the drier northern and eastern Darling plateau. Fuschia grevillea (Grevillea bipinnatifida), roadside tea-trees, coneflowers, balgas and zamias are common elements of the understorey, which is generally sparse. The park also contains the Fringed Lily (Thysanotus anceps), a rare species found only in a few localities in the Darling Range north-east of Perth. Along the river are large flooded gums. Granite outcrops add to the diversity of the park. A variety of low shrubs and small lichens and mosses cling to the rocks. WANT TO KNOW MORE ABOUT WA’S PLANTS AND ANIMALS? The Department of Environment and Conservation have a series of pocket sized field guides available called “Bush Books’. They are available at most DEC offices and good bookshops. Titles include; Bush Tucker Plants of the South-West Common Trees of the South-West Forests Common Wildflowers of the South-West Forests Fungi of the South-West Forests Orchids of the South-West Australian Birds of Prey Bugs in the Backyard Common Birds of the Backyard Common Birds of the South West Forests Frogs of Western Australia Mammals of the South West Snakes of Western Australia Threatened and Rare Birds of Western Australia Waterbirds of South West Wetlands Fauna Echidnas are common in all habitats within the park.
    [Show full text]
  • Achievement Ride Routes 2015
    ACHIEVEMENT RIDE ROUTES 2015 50 km Achievement Ride From Burswood take the bike path along South Perth foreshore, under the Narrows Bridge and onto the Kwinana Freeway shared path to Success. Turn off at Armadale Rd to Success (Cockburn Gateway) shops for refreshments. Return to Burswood reverse route. 75 km Achievement Ride From Burswood take the bike path along South Perth foreshore, under the Narrows Bridge and onto Kwinana Freeway shared path to Success (Cockburn Gateway) shops for a coffee break. Return to bike path and continue south to Thomas Rd. The Shell Service Station on Thomas Road 150 m west of the Freeway sells food. Return to Burswood reverse route. 100 km Achievement Ride From Burswood take the bike path along South Perth foreshore under Narrows Bridge and onto Kwinana Freeway bike path south to Baldivis. Turn off at Safety Bay Rd to Hungry Jacks, 650 m west of the Freeway. Return to Burswood reverse route. 150 km Achievement Ride From Burswood take the bike path along South Perth foreshore under Narrows Bridge and onto Kwinana Freeway bike path south to Baldivis. Turn off at Safety Bay Rd to Hungry Jacks, 650 m west of Freeway. Top up water here as there are no water stops along the route south. Return to freeway bike path & continue south. Distances below are from Hungry Jacks. Left through tunnel under road at 23 km Turning point for 150 km is the Nambeelup Brook Bridge at 25 km. Return to Burswood reverse route. 200 km Achievement Ride From Burswood take the bike path along South Perth foreshore under Narrows Bridge and onto the Kwinana Freeway bike path south to Baldivis.
    [Show full text]
  • Groundwater Information for Management of the Ellen Brook, Brockman River and Upper Canning Southern Wungong Catchments
    GROUNDWATER INFORMATION FOR MANAGEMENT OF THE ELLEN BROOK, BROCKMAN RIVER AND UPPER CANNING SOUTHERN WUNGONG CATCHMENTS Salinity and Land Use Impacts Series Groundwater in 3 catchments of the Swan-Canning rivers SLUI 12 GROUNDWATER INFORMATION FOR MANAGEMENT OF THE ELLEN BROOK, BROCKMAN RIVER AND UPPER CANNING SOUTHERN WUNGONG CATCHMENTS by R. A. Smith, R. Shams, M. G. Smith, and A. M. Waterhouse Resource Science Division Water and Rivers Commission WATER AND RIVERS COMMISSION SALINITY AND LAND USE IMPACTS SERIES REPORT NO. SLUI 12 SEPTEMBER 2002 i Groundwater in 3 catchments of the Swan-Canning rivers SLUI 12 Salinity and Land Use Impacts Series Acknowledgments The authors acknowledge help and advice from; The Advisory Committee (below) to the Swan Hydrogeological Resource Base and Catchment Interpretation Project Department Representative Agriculture Western Australia Gerry Parlevliet Conservation and Land Management Rob Towers Community Peter Murray (Chair) CSIRO Dr John Adeney Edith Cowan University Dr Ray Froend Environmental Protection Authority Wes Horwood, Jane Taylor Local Government Authority Mick McCarthy, Veronica Oma Ministry for Planning David Nunn, Marie Ward, Alan Carman-Brown Swan Catchment Centre Peter Nash Swan River Trust Dr Tom Rose, Declan Morgan, Adrian Tomlinson Mr Ken Angel (Agriculture Western Australia), Mr Robert Panasiewicz (formerly Water and Rivers Commission), and Mr Syl Kubicki (formerly Water and Rivers Commission). Recommended Reference The recommended reference for this report is: SMITH, R. A., SHAMS, R., SMITH M. G., and WATERHOUSE, A. M., 2002, Groundwater information for management of the Ellen Brook, Brockman River and Upper Canning Southern Wungong catchments: Western Australia, Water and Rivers Commission, Salinity and Land Use Impacts Series Report No.
    [Show full text]
  • NORTH FREMANTLE RAILWAY BRIDGE COLLAPSE 1926 an Accident Waiting to Happen?
    NORTH FREMANTLE RAILWAY BRIDGE COLLAPSE 1926 An accident waiting to happen? Heather Campbell In July 1926 very heavy rains in the South West of Western Australia caused ‘extensive washaways’ in the railway system1 and were thought to be responsible for the collapse of the Fremantle Railway Bridge on 22 July of that year. This was the second railway bridge across the Swan River and had been opened in November 1895. The first bridge, completed in August 1880, was for construction traffic for the Fremantle – Perth – Guildford railway line. This second bridge, was more substantial than the first and capable of taking heavier locomotives.2 The condition of the bridge caused comment almost from its opening. In December 1897 concern was expressed about its stability due to dredging of the harbour, the strength of the tide and the potential for cargo boats and steamers to collide with it3. Again, in October 1903, ‘some alarm’ was expressed but the foundations were found to be safe and secure4. None the less, in August 1905 questions were again being asked about the ‘dangerous nature of the substructure’ of the bridge.5 Fremantle Railway Bridge and houses on Riverside Road, Fremantle, 1907 (SLWA 009669PD) Location of the 2nd railway bridge, c 1890s? (SLWA MAPR0000346) Its condition remained a concern and in 1911: ‘… a couple of engine-drivers got a sudden shock the other day when crossing it. They swore that they distinctly felt the bridge rocking beneath the train, and heard ominous noises. The matter was reported at once, and the station masters from Fremantle and North Fremantle procured an engine and investigated things.
    [Show full text]
  • Proposed Upgrade and Widening of Brookton Highway (Armadale to Brookton)
    Proposed upgrade and widening of Brookton Highway (Armadale to Brookton) Main Roads Western Australia Report and recommendations of the Environmental Protection Authority Environmental Protection Authority Perth, Western Australia Bulletin 697 August 1993 THE PURPOSE OF THIS REPORT This report contains the Environmental Protection Authority's environmental assessment and recommendations to the Minister for the Environment on the environmental acceptability of the proposal. Immediately following the release of the report there is a 14-day period when anyone may appeal to the Minister against the Environmental Protection Authority's report. After the appeal period, and determination of any appeals, the Minister consults with the other relevant ministers and agencies and then issues his decision about whether the proposal may or may not proceed. The Minister also announces the legally binding environmental conditions which might apply to any approvaL APPEALS If you disagree with any of the contents of the assessment report or recommendations you may appeal in writing to the Minister for the Environment outlining the environmental reasons for your concern and enclosing the appeal fee of $10. It is important that you clearly indicate the part of the report you disagree with and the reasons for your concern so that the grounds of your appeal can be properly considered by the Minister for the Environment. ADDRE.SS Hon Minister for the Environment 12th Floor, Dumas House 2 Havclock Street WEST PERTH W A 6005 CWSlNGDATE Your appeal (with the $10
    [Show full text]
  • 71, !,/!^ O OYBUSW LLMLA TREASURER; MINISTERFORTRANSPOR
    . V I 2110/11'. r ' ^---^---- ---.--^--~ Tre surer; M nisterfor Transp rt; Fisheries ^. Our ref 30-43928 Ms Samantha Parsons Committee Clerk Estimates and Financial Operations Committee Legislative Council Parliament House PERTHWA6000 Dear Ms Parsons Further to the Hon Ken Travers MLC's letter dated 2 December 2013, in relation to the Estimates and Financial Operations Committee 2012-, 3 Agency Annual Report Hearings on Thursday, 25 November 2013, please find attached the responses to the additional questions submitted by Legislative Council Members for Main Roads Western Australia Yours sincerely ^/ 71, !,/!^ o OYBUSW LLMLA TREASURER; MINISTERFORTRANSPOR I 9 DEC 2013 Level, 3, Dumas House, 2 Havelock Street, West Perth, Western Australia, 6005 Telephone' +61 8 6552 6400 Facsimile: +61 8 6552 6401 Email' minister buswell@dpc. wa gov. au ESTIMATES AND FINANCIAL OPERATIONS COMMITTEE QUESTIONS ON NOTICE SUPPLEMENTARYINFORMATION Monday, 25 November 2013 Main Roads Western Australia Question NOAi. Hon Keri Travers MLC asked- Whatis the original and new time frame forthe following projects a. CumnAvenue, b. OldMandurah Tramc Bridge; and c. EatonDrive Answer I'~' The changes in the budgeted cash flows for Cumn Avenue, Old Mandurah Traffic Bridge and Eaton Drive Bridge are 20.2^,:;!: 20.3-, 4 20,445 20,546- 20,647 2017-, 8 ($ 000) $ 000 ($ 000) ($ 000) ($ 000 $ 000) Curtin 2 000 5 000 33 000 Avenue Original New I 000 I 000 5 000 20 000 13 000 Old Mandurah 300 I 700 3 000 7 000 28 000 Traffic Original Bridge New 300 300 700 I 700 3 000 34 000 Eaton I Drive Original , 000 17 000 ,, Brid e New I 000 I 000 16 000 Page I ESTIMATESAND FINANCIAL OPERATIONS COMMITTEE QUESTIONS ON NOTICE SUPPLEMENTARY INFORMATION Monday, 25 November 2013 Main Roads Western Australia Question NOA2.
    [Show full text]