Swan River Crossings Frequently Asked Questions

Total Page:16

File Type:pdf, Size:1020Kb

Swan River Crossings Frequently Asked Questions MAY 2021 Swan River Crossings Frequently Asked Questions Project overall bridge do not align, which to determine the future of any increases the difficulty of remnant structure. What is the project all about? skippering vessels between the How is the project being The Swan River Crossings Project structures. will replace the Fremantle Traffic delivered? Bridge (Queen Victoria Street) and Why can’t you maintain the The Fremantle Bridges Alliance increase passenger and freight rail current traffic bridge? (FBA) has been formed to continue capacity, efficiency and Approximately $23.5 million has project development activities productivity. It is being designed been spent over the last five years complete the design and build the to improve safety for road and to repair the bridge, including new traffic and rail bridge river users, improve traffic flows costly repairs in 2016. The repair infrastructure. The Alliance is made and improve pedestrian and cyclist works focused on minimising the up of Main Roads, Laing O’Rourke connections over the Swan River risks of vessels hitting the bridge. Australia Construction, Arup and to North Fremantle Station. The bridge continues to be Australia and WSP Australia. This maintained however, the bridge's type of contract is common for Why is Main Roads replacing the piers, deck and other structures large public infrastructure projects Fremantle Traffic Bridge? continue to deteriorate and the and ensures that the best team of The bridge was built in 1939 and bridge needs to be replaced. WA Government and industry was expected to last for 40 years. Ongoing maintenance will not specialists is in place. The structure has been extend the life of the deteriorating Why do we need a new rail deteriorating over several years timber. Restoring the timber like- bridge? and, despite extensive for-like will not meet current strengthening and maintenance bridge design standards and Currently, freight and passenger work, it needs to be replaced. The durability requirements. services share one rail bridge. The bridge does not meet current Swan River Crossings project will design standards for road lanes Will the existing bridge be build a new rail bridge exclusively and footpath widths. The demolished? for passenger trains, significantly navigational clearances under the The project team is investigating improving the current situation for bridge are the lowest and the opportunity to retain a portion both passengers and freight-users. narrowest of all Swan River bridges of the existing bridge over the Having different train systems up to the Causeway in East Perth. water. As the project progresses share a section of track not only The biggest risk to the bridge in its the team will continue to liaise with requires complex management but current state is vessel impact and the Heritage Council, key is impacting the volume of freight the piers between the road and rail stakeholders and the community that can be shifted by rail. Rail freight currently takes more than recommendation on the proposed passenger and freight trail lines to 105,000 trucks off our roads each alignment solution. crossover each other on both sides year, but this is nearing capacity. of the river. In addition to Unless we improve the current Alignment options increasing the cost and complexity situation to maximise the use of What has been considered in the of the build, a western alignment rail, more freight will have to be alignment options assessment? would impact the efficiency and shifted by trucks on our roads, Four alignments have been safety of the area and require particularly in the port precinct, considered and the Alliance has lengthy operational closures of depending on when containers been assessing the technical both rail services. move from Fremantle’s Inner requirements for each. This Building into the Inner Harbour Harbour. Independent research assessment of alignment options would restrict activities at the shows Fremantle residents strongly has been considering the following eastern berths, which are the only prefer containers on rail than on key areas: berths engineered to handle WA’s roads. design–road and rail design heavy break-bulk cargoes A new passenger rail bridge will compliance including vehicles, mining and separate freight and rail passenger agricultural equipment, and large lines, improve services for constructability–programming, project materials such as items for community and industry, allow for staging and space the METRONET infrastructure work. rail maintenance to occur, and considerations Main Roads previously said there minimise the growth of container design quality–placemaking, was not enough room to build movements on our roads. urban design and architectural between the existing bridges, I’ve seen a barge in the river elements what has changed? near the old bridge, has environmental and heritage– There is limited space available construction already begun? statutory requirements between the existing road and rail Before construction commences bridges, with ‘pinch points’ on the road(including pedestrians and geotechnical investigations in the northern abutment. Focussed cyclists), river and rail Swan River are required to help efforts over the past two months operations–impacts on inform and guide the design of the have challenged previously bridges and the bridge alignments. stakeholders during accepted technical requirements Main Roads will be undertaking construction and at and assumptions to determine these investigations until the end completion of works what can be built in the available of June 2021, on both the east and value for money. space. west sides of the existing If Westport is shifting the With construction staging, design Fremantle Traffic Bridge. container port to Kwinana, why innovations and recently available What stage is the project at now can’t we build the new crossings technical data (such as geophysical (May2021)? in Fremantle Port? results) the Alliance technical Following community feedback Work is now underway to specialists have identified an received last year on the proposed determine the timetable for optimised cross-section that can fit alignment, we are now transitioning the container trade between the existing infrastructure. reconsidering options for the from the Inner Harbour to This solution does increase the alignment of the new bridge. Kwinana. The Fremantle Traffic duration of the construction Additional technical review has Bridge needs to be replaced program. been completed and we are now sooner than this. The road and rail Where is the Principal Shared seeking community feedback on tie-ins needed for a bridge west of Path (PSP) going? the alignment options we have the existing rail bridge (and into The connectivity of pedestrian and looked at, before making a Fremantle Port) would require cycling infrastructure is an important objective for the project reserve to install parking facilities. options and help guide the final but the design can not be finalised Providing access from Canning recommendation. until an alignment for the bridge Highway presents a significant How can I have input into structures is determined. The safety risk given the number of design, heritage, placemaking Alliance will be seeking community vehicles, which use this section of and/or connectivity? and stakeholder input into the PSP road. design over the coming months. After the Options Assessment Could the new road bridge and phase, we will be undertaking What is the anticipated distance the rail bridge be built as one design development work between the new traffic bridge structure? throughout 2021. We will be and the closest North Fremantle Yes –it is technically possible to actively seeking stakeholder and properties, and will this vary combine the road and rail community involvement into depending on the alignment infrastructure into one integrated heritage interpretation, bridge option chosen? structure. However, an integrated aesthetics, public amenity The current road (Queen Victoria road and rail structure generates outcomes and the connectivity of Street) is 26 metres away from the new technical issues including pedestrian and cycling paths. If edge of the south building at the impacts on Fremantle Port’s access these, or any other aspects, are of apartments on the north side of at Gate 3 and complex design and interest to you, please register your the Swan River. functionality issues at the interest on the feedback form in intersection of Canning Highway our interactive platform to be The previous alignment released and Beach Street. The additional involved in these future by Main Roads in 2020 (current cost associated with resolving consultations. Option 3) would place the new these issues, and likely long rail road approximately 11 metres closures, has eliminated this from Construction impacts away from the edge of this our Options Assessment. When will the construction building. begin? Community engagement Options 1 and 2 would place the Early works are expected to new road approximately 25 metres How can I have my say on the commence in late 2021, with away and Option 4would place the alignment options? construction ramping up in 2022. new road 22 metres away. The new The project team is out and about Will I hear noise and feel road and rail bridge structures will in Fremantle seeking community vibrations during construction? be constructed with modern and stakeholder input into the techniques and can be expected to Options Assessment. You can Some
Recommended publications
  • Route Restrictions for the Transport of Explosives
    Dangerous Goods Safety Guide Route restrictions for the transport of explosives May 2019 1 Adelaide Terrace, East Perth WA 6004 Postal address: Locked Bag 100, East Perth WA 6892 Telephone: (08) 6251 2300 [email protected] www.dmirs.wa.gov.au Contents Introduction .............................................................................................................. 3 Restricted transport areas ....................................................................................... 3 Restricted area boundaries – Perth CBD ............................................................................................ 3 Restricted area boundaries – Graham Farmer Freeway tunnel ....................................................... 4 Restricted area boundaries – Fremantle CBD.................................................................................... 4 Stopping of placarded vehicles within the metropolitan area.......................................................... 4 Selecting routes for placarded vehicles transporting explosives ....................... 6 Further information .................................................................................................. 7 DGS Guidance Note Route restrictions for transport of explosives Page 2 of 7 Introduction Route restrictions apply for transporting explosives within Western Australia, as prescribed by the Dangerous Goods Safety (Explosives) Regulations 2007. These restrictions only apply to vehicles that require placards (i.e. vehicles transporting Risk Category 2
    [Show full text]
  • Victoria Park Place Plan Volume 7 Victoria Park Place Plan
    VOLUME 7 VICTORIA PARK PLACE PLAN VOLUME 7 VICTORIA PARK PLACE PLAN BELMONT PARK GRAHAM FARMER FWY N An Introduction OPTUS STADIUM PERTH STADIUM STATION to Victoria Park MATAGARUP BRIDGE PERTH CBD 1KM The Victoria Park Place Plan is a collection of ‘place- BURSWOOD STATION CROWN PERTH based’ action plans that guide the allocation of funding and resources in the neighbourhood. MINERAL SWAN RIVER RESOURCES Victoria Park is the heritage heart of the Town. It is home PARK to numerous character cottages from the early 20th century, many of which have been lovingly restored, as PERTH AIRPORT 5KM well as leafy streetscapes and several state-registered VICTORIA PARK CENTRAL VICTORIA PARK STATION heritage buildings. McCallum Park and Taylor Reserve provide opportunities for recreation and events with SHEPPERTON RD ALBANY HWY stunning views of the Perth skyline. Albany Highway offers an eclectic range of local businesses and is home to the WELSHPOOL INDUSTRIAL AREA Town of Victoria Park’s administration offices. Victoria CARLISLE STATION Park is the gateway to the Town from the CBD, and a THE PARK CENTRE much-loved place to live and visit. OAT ST STATION TAFE - CARLISLE WELSHPOOL STATION TAFE - BENTLEY TECHNOLOGY PARK 1 CURTIN UNIVERSITY VOLUME 7 VICTORIA PARK PLACE PLAN Snapshot Pre-Settlement The Noongar people are the original inhabitants of the south-west of Western Australia, with Whadjuk being the HISTORIC language group for the area now known as the Town of Victoria Park. The Whadjuk people have a close connection to this country and the Derbarl Yerrigan (Swan River). The provision of fresh water and hunting grounds made the banks of the Derbarl Yerrigan regular camping spots.
    [Show full text]
  • Causeway Coast Way
    Causeway Coast Way Sweeping bays, sandy beaches, dramatic cliffs and world class natural heritage await you on the Causeway Coast Way RATHLIN Welcome to the PORTSTEWART ISLAND BALLYCASTLE Causeway Coast Way This superb, two-day walking route takes you along Northern Ireland's most celebrated coastline. High cliffs, secluded beaches and numerous historic and natural Benbane Head landmarks are just some of the 6 Sheep Island treats on offer. With frequent access Giant’s Causeway Carrick-a-rede Island White points and terrain suitable for all fit Dunseverick Park Bay Castle BALLINTOY walkers, this is one route you'll remember for years to come. The Skerries A2 PORTBALLINTRAE 7 Ramore Head 4 Clare A2 1 Wood BUSHMILLS B BALLYCASTLE B17 B17 A2 A2 Broughgammon PORTRUSH Wood East Strand, Portrush 17 4 B 4 PORTSTEWART A Ballycastle Moycraig 67 Forest 9 B Contents 2 Wood B B 1 A 8 8 6 Capecastle 04 - Section 1 5 Cloonty A Wood 2 Wood Portstewart to Portrush Mazes B 7 4 Wood 7 6 7 06 - Section 2 B1 2 B6 1 B Portrush to Portballintrae B 14 7 6 7 08 - Section 3 6 8 B67 B B Route is described in an clockwise direction. Portballintrae to Giant’s COLERAINE However, it can be walked in either direction. Causeway 10 - Section 4 Giant’s Causeway to Key to Map Dunseverick Castle SECTION 1 - PORTSTEWART TO PORTRUSH (10km) 12 - Section 5 Dunseverick Castle to SECTION 2 - PORTRUSH TO PORTBALLINTRAE (9.3km) Ballintoy Harbour SECTION 3 - PORTBALLINTRAE TO THE GIANT’S CAUSEWAY (4.3km) 14 - Section 6 Ballintoy Harbour to Ballycastle SECTION 4 - GIANT’S CAUSEWAY
    [Show full text]
  • Swan River Crossings Fremantle Traffic Bridge Condition
    FACT SHEET FEBRUARY 2021 Swan River Crossings Fremantle Traffic Bridge Condition In late 2020, we sought feedback from the community and stakeholders about the Swan River Crossings Project. Key issues raised included the current condition of the Fremantle Traffic Bridge and the impact on navigational safety. The Fremantle Traffic Bridge was opened The remaining timber elements continue The scouring is spreading upstream and in 1939 with an expected 40 year life and to deteriorate. Many are hidden from in time, large portions of the bridge has served its function well beyond that view, in particular underwater decay of timber piers will no longer be supported. time. The bridge’s structure has been the bridge supports. deteriorating over a number of years Durability Ongoing maintenance will not extend the and despite extensive strengthening and life of the deteriorating timber. Replacing Durability is a concern. In the past we maintenance works, the bridge needs to the timber elements like-for-like is not have encapsulated the wooden piles with be replaced. considered sustainable. concrete. However, over time the concrete has been undermined and cracked, Repairs and maintenance Scour allowing access for the teredo (marine Over time, the required repairs to the borers) to further deteriorate the wooden Scour is impacting the stability of the bridge have meant timber elements piles. timber piles and has created a hole in have been replaced/or strengthened by the riverbed - 12 metres and growing. There is ongoing deterioration of timber steel and concrete. The road lanes and Ongoing scour of the river bed has the deck planks and timber bearers, resulting footpath widths do not meet current potential to significantly reduce the load in large potholes on the deck, which have design standards.
    [Show full text]
  • NORTH FREMANTLE RAILWAY BRIDGE COLLAPSE 1926 an Accident Waiting to Happen?
    NORTH FREMANTLE RAILWAY BRIDGE COLLAPSE 1926 An accident waiting to happen? Heather Campbell In July 1926 very heavy rains in the South West of Western Australia caused ‘extensive washaways’ in the railway system1 and were thought to be responsible for the collapse of the Fremantle Railway Bridge on 22 July of that year. This was the second railway bridge across the Swan River and had been opened in November 1895. The first bridge, completed in August 1880, was for construction traffic for the Fremantle – Perth – Guildford railway line. This second bridge, was more substantial than the first and capable of taking heavier locomotives.2 The condition of the bridge caused comment almost from its opening. In December 1897 concern was expressed about its stability due to dredging of the harbour, the strength of the tide and the potential for cargo boats and steamers to collide with it3. Again, in October 1903, ‘some alarm’ was expressed but the foundations were found to be safe and secure4. None the less, in August 1905 questions were again being asked about the ‘dangerous nature of the substructure’ of the bridge.5 Fremantle Railway Bridge and houses on Riverside Road, Fremantle, 1907 (SLWA 009669PD) Location of the 2nd railway bridge, c 1890s? (SLWA MAPR0000346) Its condition remained a concern and in 1911: ‘… a couple of engine-drivers got a sudden shock the other day when crossing it. They swore that they distinctly felt the bridge rocking beneath the train, and heard ominous noises. The matter was reported at once, and the station masters from Fremantle and North Fremantle procured an engine and investigated things.
    [Show full text]
  • A27 Route Strategy Introduction
    A27 Route Strategy Introduction This presentation covers ● Study objectives ● Guiding Principles ● Initial options sifting ● Three package assessment ● Preferred package assessment – Description – Cost – Cost benefit analysis ● Wider impacts ● Complementary strategy ● Delivery plan ● Conclusions 2 Study Objectives Specific objectives for the schemes were defined that reflected challenges and opportunities in the study area: ● Improve journey times and journey time reliability for strategic (longer distance traffic) on the A27, whilst ensuring the dual function of the A27 as a longer distance strategic route and a local access route is maintained; ● Improve access by private and public transport to key employment and regeneration areas within Coastal West Sussex; ● Enable proposed housing, employment and retail growth to take place within Coastal West Sussex without undue congestion; ● Improve connectivity to/from the Manhood Peninsula (including Selsey and the Witterings). A set of guiding principles were developed to steer decision making. 3 Guiding Principles Strategic: ● Study objectives need to fit with wider transport and government objectives, including those of WSCC and the Highways Agency; ● Interventions should be affordable and achievable in the short term, but should not prejudice longer term aspirations for the route (considered at this stage to be the Chichester fly-overs, Arundel By-pass and Worthing by-pass); ● Complementary local transport strategies will be required for Chichester, Arundel, and Worthing / Lancing to lock in the benefits of the identified strategy, and address residual problems on the network; ● Wider impacts on local traffic will need to be considered alongside improvements for strategic traffic on the A27 itself. E.g. Options such as closing of roundabouts or banning right turns, which benefit through movements on the A27, may have significant adverse impacts on access to urban areas or use of other local routes.
    [Show full text]
  • 71, !,/!^ O OYBUSW LLMLA TREASURER; MINISTERFORTRANSPOR
    . V I 2110/11'. r ' ^---^---- ---.--^--~ Tre surer; M nisterfor Transp rt; Fisheries ^. Our ref 30-43928 Ms Samantha Parsons Committee Clerk Estimates and Financial Operations Committee Legislative Council Parliament House PERTHWA6000 Dear Ms Parsons Further to the Hon Ken Travers MLC's letter dated 2 December 2013, in relation to the Estimates and Financial Operations Committee 2012-, 3 Agency Annual Report Hearings on Thursday, 25 November 2013, please find attached the responses to the additional questions submitted by Legislative Council Members for Main Roads Western Australia Yours sincerely ^/ 71, !,/!^ o OYBUSW LLMLA TREASURER; MINISTERFORTRANSPOR I 9 DEC 2013 Level, 3, Dumas House, 2 Havelock Street, West Perth, Western Australia, 6005 Telephone' +61 8 6552 6400 Facsimile: +61 8 6552 6401 Email' minister buswell@dpc. wa gov. au ESTIMATES AND FINANCIAL OPERATIONS COMMITTEE QUESTIONS ON NOTICE SUPPLEMENTARYINFORMATION Monday, 25 November 2013 Main Roads Western Australia Question NOAi. Hon Keri Travers MLC asked- Whatis the original and new time frame forthe following projects a. CumnAvenue, b. OldMandurah Tramc Bridge; and c. EatonDrive Answer I'~' The changes in the budgeted cash flows for Cumn Avenue, Old Mandurah Traffic Bridge and Eaton Drive Bridge are 20.2^,:;!: 20.3-, 4 20,445 20,546- 20,647 2017-, 8 ($ 000) $ 000 ($ 000) ($ 000) ($ 000 $ 000) Curtin 2 000 5 000 33 000 Avenue Original New I 000 I 000 5 000 20 000 13 000 Old Mandurah 300 I 700 3 000 7 000 28 000 Traffic Original Bridge New 300 300 700 I 700 3 000 34 000 Eaton I Drive Original , 000 17 000 ,, Brid e New I 000 I 000 16 000 Page I ESTIMATESAND FINANCIAL OPERATIONS COMMITTEE QUESTIONS ON NOTICE SUPPLEMENTARY INFORMATION Monday, 25 November 2013 Main Roads Western Australia Question NOA2.
    [Show full text]
  • Cycle Count Data 2014/15
    Cycle count data 2014/15 Introduction Perth’s cycle network is monitored using 34 permanent bicycle counters located primarily on PSPs and RSPs in the Perth Metropolitan Area (Appendix A). These counters provide an accurate, continuous count of bicycle riders at each of the counter locations. The counters have been installed progressively since mid-2008 as the network has developed. While the counters provide an accurate picture of cycling at the counter sites there are numerous cycling routes which are not captured in the current counter network. For this reason, the analysis within this section should be considered as indicative rather than definitive indicators of cycling trends in the Perth Metropolitan Area. Overall Indicators Perth CBD Cycling travel into and out of the Perth Central Business District (CBD) is estimated using eight counters located on the CBD periphery (ten from 2014/15). These sites represent an incomplete cordon of cyclist movements into and out of the CBD, particularly on the road network towards North Perth. They will underestimate the amount of cycling activity into and out of the Perth CBD. During 2014/15 there was an average of 10,500 riders crossing the Perth CBD cordon per day across the ten sites, increasing to 11,200 on weekdays (Figure 1.1). Overall, there has been a decrease in cycling across the cordon of 4% between 2013/14 and 2014/15. Most of the decrease is attributable to a 5% decline in weekday cycling demand; weekend demand has been stable over the period. Figure 1.1: Average daily cyclists across the Perth CBD cordon Cycle count data 2014/15 Page 1 of 13 Almost all of the decrease in cycling across the Perth CBD cordon can be attributed to very substantial decreases in cycling at the Narrows Bridge east abutment and Riverside Drive at Causeway Bridge (Figure 1.3).
    [Show full text]
  • LAKE PONTCHARTRAIN CAUSEWAY HAER LA-21 and SOUTHERN TOLL PLAZA Causeway Boulevard Metairie Jefferson Parish Louisiana
    LAKE PONTCHARTRAIN CAUSEWAY HAER LA-21 AND SOUTHERN TOLL PLAZA Causeway Boulevard Metairie Jefferson Parish Louisiana PHOTOGRAPHS COPIES OF COLOR TRANSPARENCIES WRITTEN HISTORICAL AND DESCRIPTIVE DATA HISTORIC AMERICAN ENGINEERING RECORD National Park Service U.S. Department of the Interior 100 Alabama Street, SW Atlanta, Georgia 30303 HISTORIC AMERICAN ENGINEERING RECORD LAKE PONTCHARTRAIN CAUSEWAY AND SOUTHERN TOLL PLAZA HAER LA-21 Page 1 Location: The Lake Pontchartrain Causeway spans Lake Pontchartrain from Causeway Boulevard in Metairie, Jefferson Parish to Highway 190, Mandeville, St. Tammany Parish, Louisiana. The southern Toll Plaza was located at the Jefferson Parish terminus of the Lake Pontchartrain Causeway. The Northern Terminus of the Lake Pontchartrain Causeway is located at 30.365 and -90.094167. The Southern Terminus is located at 30.02 and - 90.153889. This information was acquired using Google Earth imagery. There are no restrictions on the release of this information to the public. USGS Quadrangle maps (7.5 minute series): (north to south) Mandeville, Spanish Fort NE, West of Spanish Fort NE, Indian Beach There are no restrictions on this information. Owner: Greater New Orleans Expressway Commission Present Use: Vehicle Bridge Significance: When completed in 1956, the Lake Pontchartrain Causeway was the world’s longest bridge. This record was broken by completion of the parallel span in 1969. At 23.87 miles long, the Causeway is the world’s longest continuous span over water. The prestressed, pre-cast concrete structural system displays mid-twentieth century technology that typifies modern bridge construction techniques. In addition, the Causeway is significant in the development of the Jefferson and St.
    [Show full text]
  • Westport Beacon 8 Why Fremantle Can't Handle the Long-Term Freight
    Why Fremantle can’t handle the long-term freight task alone ISSUE 8 | AUGUST 2019 | PORT OPERATIONS AND SUPPLY CHAIN Image courtesy of Fremantle Ports Fremantle presents It may surprise many people to see that a stand-alone Fremantle option has not made Westport’s shortlist a unique challenge of fve options. Why not? for Westport BUT BEFORE WE BEGIN, it is very important to point out that while Infrastructure Australia, whose Westport’s work shows Fremantle won’t remain Perth’s stand-alone infrastructure assessment process container port for the long-term, the Inner Harbour will continue to be Westport is following, requires Perth’s primary container port until the new port is established. projects to look at optimising Westport is now working on the trigger points and timings around existing infrastructure as the frst when new infrastructure, including the new port, will be required. step before building anything new. A major focus of this work will be identifying the community’stolerance It is accepted that the Inner Harbour levels for increasing amenity impacts, such as traffc congestion and is operating well below its berth or rail noise, as well as industry’s willingness to change their operating shipping capacity, so an assumption practices. However, building a new port takes time and it may take up can be made that Fremantle should to a decade to deliver. remain Perth’s primary container port well into the future. Why spend Additionally, it should be noted that billions of dollars on a new port if Fremantle Ports’ jurisdiction includes it’s not needed? both the Inner and Outer Harbours.
    [Show full text]
  • Perth Causeway Bridges
    Heritage Panel perth’s causeway bridges - a story of three crossings - HISTORY OF THE CAUSEWAY SITE THIRD CAUSEWAY CROSSING 1952 EMINENT PERSONS ASSO CI ATED WITH THE 1952 BRIDGES Local indigenous people had been crossing the river on foot for thousands of years before the first The 1867 bridges were modified several times during their life. In 1899 they were widened by Sir Ross McLarty Premier of Western Australia 1947 - 1953 recorded European visit when sailors from Dutch navigator Willem de Vlamingh’s ships rowed the addition of a footpath, widened again and strengthened in 1904 and widened again in 1933. Mr Jim Young Commissioner Main Roads WA 1941 - 1953 up the river in January 1697, giving the name ‘Swan’ to the river, because of the prevalence of Serious planning to replace the bridges took place during the 1930s. In this period considerable Mr Digby Leach Commissioner Main Roads WA 1953 - 1964 black swans. Just over 100 years later, in 1801, the French expedition, under the command of work was done to dredge the river to provide much wider navigation channels. Nicolas Baudin, visited Western Australia. Sailors from the Naturaliste ventured up the river to the Mr Ernie Godfrey Bridge Engineer Main Roads WA 1928 - 1957 In 1944 Main Roads Bridge Engineer E.W.C. Godfrey submitted a proposal to Commissioner J.W. Causeway site and named the island at the centre of the area after midshipman Francois Heirisson. Young to build two new bridges upstream of the existing ones with a 19 metre wide deck. The Later still, Captain Stirling, in exploring the river in 1827, had difficulties in having to have his combined length of the two bridges was to be 341 metres.
    [Show full text]
  • FY 19 Causeway Report
    STATE OF LOUISIANA Legislative Fiscal Office BATON ROUGE Post Office Box 44097 Capitol Station John Carpenter Baton Rouge, Louisiana 70804 Legislative Fiscal Officer Phone: 225.342.7233 Fax: 225.342.7243 To: The Honorable Cameron Henry, Chairman Joint Legislative Committee on the Budget The Honorable Members of the Joint Legislative Committee on the Budget From: Colleen Gil, Fiscal Analyst John Carpenter, Legislative Fiscal Officer Date: October 19, 2018 Subject: GREATER NEW ORLEANS EXPRESSWAY COMMISSION FY 19 BUDGET ANALYSIS The Greater New Orleans Expressway Commission (GNOEC) staff annually prepares its budget for approval by the Commissioners in accordance with its bond indenture. Upon approval by the GNOEC, the budget is then submitted to the Legislative Fiscal Office. The GNOEC approved the budget and submitted the approved budget to the Legislative Fiscal Office on August 22, 2018. Prior to the submission of the annual operating budget to the Joint Legislative Committee on the Budget (JLCB) for its approval or rejection, the Legislative Fiscal Office reviews the submission of the budget for mathematical accuracy and content. In addition, the Legislative Fiscal Office prepares an analysis of the budget submitted by the GNOEC and provides this report to the Joint Legislative Committee on the Budget (JLCB) for its consideration. BUDGET SUMMARY, FISCAL YEAR 2018-19 Greater New Orleans Expressway Commission Estimated Approved Actual Actual Approved Year End Requested FY 18 Page FY 16 FY 17 FY 18 FY 18 FY 19 vs. FY 19 No. Notes Means of Finance Tolls $16,543,981 $16,130,365 $15,938,076 $16,341,000 $16,422,000 3.0% 2, 7-9 Tolls - Increase $0 $4,077,080 $8,359,465 $7,890,000 $7,930,000 -5.1% 2, 7-9 Toll Increases Highway Fund No.
    [Show full text]