Pur 14-16 Summary of Tender Document

Total Page:16

File Type:pdf, Size:1020Kb

Pur 14-16 Summary of Tender Document SARAWAK ENERGY BERHAD From: Distribution Procurement & Contract, Distribution Department, Kuching 93050, Sarawak, Malaysia. Our Ref.: PUR 14/16/WAK Date: 22 March 2016 To: UPK Registered Tenderers Head VIIB, Class II or above Sub-Head 2b or above or Sub-Head 7b or above & CIDB G3 or above, Category ME (E04 & E05) Menara Sarawak Energy, No. 1, The Isthmus, 93050 Kuching, Sarawak. Dear Sir/Madam, TENDER FOR OVERHEAD LINE VEGETATION CLEARING AT BINTANGOR, JULAU, PAKAN, BELAWAI AND TANJUNG MANIS IN SARIKEI, CENTRAL REGION TENDER REF.: PUR 14/16 You are cordially invited to tender for services listed in the attached schedule. Please refer to Tender Document for the instructions & conditions to tender. Tenders are to be submitted in sealed plain envelope marked: 1. “CONFIDENTIAL” – TENDER FOR OVERHEAD LINE VEGETATION CLEARING AT BINTANGOR, JULAU, PAKAN, BELAWAI AND TANJUNG MANIS IN SARIKEI, CENTRAL REGION 2. Tender Ref.: PUR 14/16 3. Closing date and time: 13 April 2016 at 3.00 p.m. 4. The warning: Do Not Open Before The Closing Date And Time addressed to: The Chief Executive Officer, Sarawak Energy Berhad, c/o The Officer-In-Charge, Tender Box, Level 1 (Ground Floor) North Wing, No. 1, The Isthmus, Menara Sarawak Energy, 93050 Kuching, Sarawak. or hand-delivered to: The Officer-In-Charge, Tender Box, Level 1 (Ground Floor) North Wing, No. 1, The Isthmus, Menara Sarawak Energy, 93050 Kuching, Sarawak. Sarawak Energy Berhad. and to reach the Tender Box addressed above on or before 13 April 2016 at 3.00 p.m . Yours faithfully, (Leonora Liong Peh Ling) for CHIEF EXECUTIVE OFFICER TENDER FOR OVERHEAD LINE VEGETATION CLEARING AT BINTANGOR, JULAU, PAKAN, BELAWAI AND TANJUNG MANIS IN SARIKEI, CENTRAL REGION SECTION I - INSTRUCTIONS TO PERSONS TENDERING 1. The Tenderer must be a registered Contractor with the following:- a) UPK under Works Head VIIB, Class II under the following sub-heads; • 2b (Overhead Line up to 33kV) or above or • 7b (for Vegetation Clearing works up to 33kV) or above b) CIDB Grade G3 or above, Category ME, E04 (Low Voltage Installation) & E05 (High Voltage Installation) Tenderers are required to submit proof of UPK and CIDB registrations together with their tender submission. 2. This tender is for OVERHEAD LINE VEGETATION CLEARING AT BINTANGOR, JULAU, PAKAN, BELAWAI AND TANJUNG MANIS IN SARIKEI, CENTRAL REGION . The specifications for this tender cover the following areas: (a) Bintangor Zone The whole of Meradong District including Kelupu Road, Bakong Road, Meradong Road, Bulat Road up to Scheme B, Sg. Nyamuk, Sg. Petai, Sg. Sian up to Kpg. Lebaan and all feeder roads and tee-offs therein. Bintangor-Paradom Road up to HT pole 150 and all feeder roads and tee-offs therein. KJD Road up to Rh. Uming 8 th Mile KJD Road and all feeder roads and tee-offs therein. Bintangor-Sarikei Link and all feeder roads and tee-offs therein. (b) Julau Zone The whole Julau District including KJD Road from open point 266 (Meradong/Julau District Boundary) and Julau/Kanowit Road from pole 48 (Julau/Kanowit District Boundary) up to tee-offs therein. The feeder roads includes Tr. Kuyok Road, Bukit Tinggi Road, SRK Ng. Naman, Celcom and feeders from 33kV Julau Substation. The feeder roads from 33kV Julau Substation includes Local Sub, Town Sub, Sg. Nyamok, Education Office, Rh. Selaut, Rh. Banjang Jikang and SMK Julau. Pakan and Julau Boundary up to US92 (include Lemayong and the 33/11kV step down transformer) (c) Pakan Zone This zone covers all HT and LT distribution lines connected from US92 (not including step down transformer to Lemayung) towards Pakan Power Station 33/11kV Substation and all HT and LT distribution lines connected from Pakan Power Station 33/11 kV Substation towards the whole Pakan Town. (d) Belawai & Tanjung Manis The whole of HT and LT feeders of Tanjung Manis, Rejang, Jerijeh, Belawai, Serdang, Ng. Semah and Teluk Gelam. The above include all other areas defined under the respective station boundary and new lines constructed during the contract period as advised by SESCO authorized personnel from time to time. PUR 14/16/WAK 2/10 TENDER FOR OVERHEAD LINE VEGETATION CLEARING AT BINTANGOR, JULAU, PAKAN, BELAWAI AND TANJUNG MANIS IN SARIKEI, CENTRAL REGION A minimum of TWO (2) Group/Gang Leaders holding relevant valid non-technical competency certificate(s) issued by the Company is required for this Contract. The Tenderer must tender for the whole work by filling GENUINE unit rates in the Schedule(s) of Rates and the Tenderer is not allowed to submit the unit rates in the Schedule of Rates which is considered as manipulative to the Company. The Company reserves the right to reject, any tender submission for any acts of fraud or considered as manipulative. 3. The Tender must be made on the accompanying Form of Tender with all the blanks therein and all the Schedules of Rates duly filled in ink and signed. Tender rates must include all incidental and contingent expenses. 4. No alteration is to be made in the Form of Tender or in the Schedules thereto except in filling up the blanks as directed. Any amendments in filling up the blanks must be made with the Tenderer’s authorised signature/ initial and the Tenderer’s Company stamp. If these instructions were not fully complied with, the tender shall be rejected. 5. Any erasures, alteration or correction to the Tender Documents shall be done in pen and initialed by the person authorized to sign the Tender. Correction using correction fluid/tape will be rejected. 6. The Tenderer, however is at liberty to add any further details that he may deem desirable and, in the event of his so doing, must print or type such details and annex the added matter to the tender submitted by him. Such additional details shall not be binding upon the Company unless they are approved by the Company and incorporated in the contract. 8. Incomplete tender submission will be rejected. 9. If the Tenderer has any doubt as to the meaning of any portion of the General Conditions or of the Specifications, he shall when submitting his tender, set out in his covering letter, the interpretation on which he relies. 10. The Tenderer is to submit with his tender in order of the relevant clauses, a statement of any departures from the Specifications. 11. The rates offered in the tender should be without consideration of the details/departures from the Specifications. If there is addition or deduction of the tender rates by virtue of the Company adopting those details/departures, then such additional/reduced sum should be stated in the annexed documents. 12. The Company will not be responsible for any expenses or losses, which may be incurred by any Tenderer in the preparation of his tender. 13. Bond/Securities (a) All Bonds, i.e. Tender Bond and/or Performance Bond shall be secured in Ringgit Malaysia for all International Tenderers and some Local Tenderers. The Bonds shall be furnished in any one of the following form and issued to the Company:- i. Cash/Cheque; ii. Bank Draft issued by a bank licensed to operate in Malaysia/Cashier Order; iii. Bankers Guarantee must be unconditional and irrevocable and issued by a bank licensed to operate in Malaysia or in the case of a foreign Tenderer, bonded by a foreign bank; PUR 14/16/WAK 3/10 TENDER FOR OVERHEAD LINE VEGETATION CLEARING AT BINTANGOR, JULAU, PAKAN, BELAWAI AND TANJUNG MANIS IN SARIKEI, CENTRAL REGION (b) In the case whereby, the Bonds are issued by a bank that is not licensed to operate in Malaysia, measures should be taken to ensure that the financial institution is reputable and credible. For example, a foreign bank with ‘AAA’ rating accredited by Moody’s Corporation would be an acceptable bank even though it is not licensed to operate in Malaysia. A list of Licensed Banking Institution in Malaysia can be found in Bank Negara Malaysia’s web portal. (c) All Bonds shall be submitted in the format provided by the Company and acceptable by a bank licensed to operate in Malaysia. 14. Tender Bond (a) For local tenders with estimated tender sum of above RM 2,000,000.00, the amount of Bid Bond/ Earnest Money, required to accompany the tender, shall be 2% of the tender sum subject to a maximum of RM 100,000.00 (Ringgit Malaysia One Hundred Thousand). (b) Any Tender offer not accompanied by a Tender Bond, if it is required, shall be rejected. (c) Tender Bond must be valid for a period of four (4) months from the date of the Tender closing. (d) Tender Bond shall be issued in accordance with the Company’s standard format (Form PUR/4) by a bank licensed to operate in Malaysia or such other format as approved by the Company. (e) Should it become necessary to extend the validity period of the Tender and the Tender Bond, the Company will request in writing to all those who submitted the Tenders for such extension before the expiry date thereof. Tenderers shall have the right to refuse to grant such extension without forfeiting their Tender Bond. The Tender Bond of Tenderers who refuses to grant the Company’s request for an extension of the validity of their respective Tender Bond will have the Tender Bond returned to them. However, they are deemed to have waived their right to further participate in the Tender. (f) Tender Bond submitted by the unsuccessful Tenderer shall be returned as promptly as possible upon the successful Tenderer being awarded with the contract and furnished the Performance Bond to the Company.
Recommended publications
  • Dewan Undangan Negeri Sarawak Aturan Urusan
    DEWAN UNDANGAN NEGERI SARAWAK ATURAN URUSAN MESYUARAT PERSIDANGAN HARI KEDUA MESYUARAT KEDUA BAGI PENGGAL KETIGA DEWAN UNDANGAN NEGERI SARAWAK KELAPAN BELAS SELASA, 06 NOVEMBER 2018 (28 SAFAR 1440H) JAM 9:00 PAGI 1. Bacaan Doa oleh Setiausaha DUN Sarawak 2. Pemasyhuran daripada Tuan Speaker 3. Pertanyaan-Pertanyaan Bagi Jawapan-Jawapan Lisan 1. YB IR AIDEL BIN LARIWOO (N.24 SADONG JAYA) Bertanya kepada Menteri Pendidikan, Sains dan Penyelidikan Teknologi Apakah status pembinaan sekolah-sekolah daif di Sarawak? 2. YB ENCIK RIPIN BIN LAMAT (N.72 LAMBIR) Bertanya kepada Menteri Kerajaan Tempatan dan Perumahan Apakah tindakan dan perancangan pihak Kerajaan untuk mengawal harga tempat kediaman yang semakin meningkat dan tidak mampu dibeli oleh mereka yang berpendapatan sederhana dan rendah? 3. YB ENCIK ROLLAND DUAT ANAK JUBIN (N.48 MELUAN) Bertanya kepada Menteri Utiliti Apakah perancangan Kerajaan untuk membina “Tangki Air Paras Tinggi” di Bukit Agok Jalan Meluan/Nanga Entabai untuk mengatasi masalah tekanan air yang rendah di kawasan tersebut? 4. YB ENCIK SAFIEE BIN AHMAD (N.43 DARO) Bertanya kepada Menteri Pembangunan Infrastruktur dan Pengangkutan Bilakah projek Jambatan Batang Lassa dan Jambatan Batang Paloh akan dimulakan pelaksanaannya? 5. YB DATO' SRI HUANG TIONG SII (N.45 REPOK) Bertanya kepada Menteri Kerajaan Tempatan dan Perumahan Adakah Kerajaan mempunyai perancangan untuk menaiktaraf sistem perparitan yang usang dan/atau rosak yang membahayakan para pengguna dari Jalan Repok ke Simpang CTC? 6. YB ENCIK SEE CHEE HOW (N.11 BATU LINTANG) To ask the Chief Minister What is the total of placement of deposits received by DBOS by the end of October 2018 and what is the total sum of credit facilities that has been approved and given out? 7.
    [Show full text]
  • SUPPLY, ERECTION and COMMISSIONING of JULAU 33/11Kv SUBSTATION, SARIKEI
    Volume 1 – Part I, Section 2 – Tender Particulars SUPPLY, ERECTION AND COMMISSIONING OF JULAU 33/11kV SUBSTATION, SARIKEI SARAWAK ENERGY BERHAD TENDER DOCUMENTS – CONTRACT REF. NO.: PLS-188006-E VOLUME 1 PART I – TENDER PROCEDURES SECTION 2 – TENDER PARTICULARS This Section specifies those matters particular to this tender process and should also be read in conjunction with the Instructions to Tenderer set out in Section 3 of Part I of the Tender Documents. Julau 33/11kV Substation Distribution Project Execution (Contract Ref. No. PLS-188006-E) Volume 1 - Part I, Section 2 – Tender Particulars TENDER PARTICULARS No. Clause Reference Description Details 1. Sub-Clause 1.1.4 Closing Date and 3:00 p.m. on 8 May 2019 (Wednesday). and Sub-Clause Time 5.1 [Closing Date and Time] 2. Sub-Clause 1.1.12 Eligibility Tenderers must be registered Contractor with the and Sub-Clause Requirements following: 2.4 [Eligibility to a) Unit Pendaftaran Kontraktor (UPK) Electrical Tender] Works Class II or above, Head VIIB under the following subheads:- - Subhead 4a (Switchgear & Substation No Limit) or - Subhead 4b (Switchgear & Substation up to 33kV) b) CIDB Grade 4 or above Category ME, E04 (Low Voltage Installation) & E05 (High Voltage Installation) The tenderers must also provide details in the tender submission (Volume 2 – Unpriced Commercial, Schedule 8) of successfully completing at least one a) Substation Projects for 33kV or higher voltage switchgears, transformers and ancillaries contract of similar magnitude and complexity; or b) Transformer Uprating up to 33kV or higher voltage; or c) Switchgear Extension up to 33kV or higher voltage 3.
    [Show full text]
  • SARAWAK GOVERNMENT GAZETTE PART II Published by Authority
    For Reference Only T H E SARAWAK GOVERNMENT GAZETTE PART II Published by Authority Vol. LXXI 25th July, 2016 No. 50 Swk. L. N. 204 THE ADMINISTRATIVE AREAS ORDINANCE THE ADMINISTRATIVE AREAS ORDER, 2016 (Made under section 3) In exercise of the powers conferred upon the Majlis Mesyuarat Kerajaan Negeri by section 3 of the Administrative Areas Ordinance [Cap. 34], the following Order has been made: Citation and commencement 1. This Order may be cited as the Administrative Areas Order, 2016, and shall be deemed to have come into force on the 1st day of August, 2015. Administrative Areas 2. Sarawak is divided into the divisions, districts and sub-districts specified and described in the Schedule. Revocation 3. The Administrative Areas Order, 2015 [Swk. L.N. 366/2015] is hereby revokedSarawak. Lawnet For Reference Only 26 SCHEDULE ADMINISTRATIVE AREAS KUCHING DIVISION (1) Kuching Division Area (Area=4,195 km² approximately) Commencing from a point on the coast approximately midway between Sungai Tambir Hulu and Sungai Tambir Haji Untong; thence bearing approximately 260º 00′ distance approximately 5.45 kilometres; thence bearing approximately 180º 00′ distance approximately 1.1 kilometres to the junction of Sungai Tanju and Loba Tanju; thence in southeasterly direction along Loba Tanju to its estuary with Batang Samarahan; thence upstream along mid Batang Samarahan for a distance approximately 5.0 kilometres; thence bearing approximately 180º 00′ distance approximately 1.8 kilometres to the midstream of Loba Batu Belat; thence in westerly direction along midstream of Loba Batu Belat to the mouth of Loba Gong; thence in southwesterly direction along the midstream of Loba Gong to a point on its confluence with Sungai Bayor; thence along the midstream of Sungai Bayor going downstream to a point at its confluence with Sungai Kuap; thence upstream along mid Sungai Kuap to a point at its confluence with Sungai Semengoh; thence upstream following the mid Sungai Semengoh to a point at the midstream of Sungai Semengoh and between the middle of survey peg nos.
    [Show full text]
  • Language Use and Attitudes As Indicators of Subjective Vitality: the Iban of Sarawak, Malaysia
    Vol. 15 (2021), pp. 190–218 http://nflrc.hawaii.edu/ldc http://hdl.handle.net/10125/24973 Revised Version Received: 1 Dec 2020 Language use and attitudes as indicators of subjective vitality: The Iban of Sarawak, Malaysia Su-Hie Ting Universiti Malaysia Sarawak Andyson Tinggang Universiti Malaysia Sarawak Lilly Metom Universiti Teknologi of MARA The study examined the subjective ethnolinguistic vitality of an Iban community in Sarawak, Malaysia based on their language use and attitudes. A survey of 200 respondents in the Song district was conducted. To determine the objective eth- nolinguistic vitality, a structural analysis was performed on their sociolinguistic backgrounds. The results show the Iban language dominates in family, friend- ship, transactions, religious, employment, and education domains. The language use patterns show functional differentiation into the Iban language as the “low language” and Malay as the “high language”. The respondents have positive at- titudes towards the Iban language. The dimensions of language attitudes that are strongly positive are use of the Iban language, Iban identity, and intergenera- tional transmission of the Iban language. The marginally positive dimensions are instrumental use of the Iban language, social status of Iban speakers, and prestige value of the Iban language. Inferential statistical tests show that language atti- tudes are influenced by education level. However, language attitudes and useof the Iban language are not significantly correlated. By viewing language use and attitudes from the perspective of ethnolinguistic vitality, this study has revealed that a numerically dominant group assumed to be safe from language shift has only medium vitality, based on both objective and subjective evaluation.
    [Show full text]
  • A-306 Peat and Organic Soils Challenges in Road
    15TH INTERNATIONAL PEAT CONGRESS 2016 Abstract No: A-306 PEAT AND ORGANIC SOILS CHALLENGES IN ROAD CONSTRUCTION IN SARAWAK: JKR SARAWAK EXPERIENCE Vincent Tang Chok Khing Public Works Department Sarawak *Corresponding author: [email protected] SUMMARY Road construction on peat/organic soils has always posed challenges to Engineers, Contractors and policy-makers, be it a technical, contractual obligation, or cost implication. The success of road construction on soft soils relies on various important factors such as proper planning, analysis, design, construction, control and supervision. For Engineers, the primary boundary conditions are the stability and allowable settlement in terms of serviceability limits both as a function of time. Our current observation reveals that many of the road embankments and culvert foundation failures are associated with geotechnical factors. Majority of these failures are still repeating and quite identical / similar in nature that they are caused by failure to comply with one or a combination of the above factors. This paper presents some of the case histories of the road embankment construction closely related to the geotechnical factors investigated by the Author. Lastly, some simple guidelines on Method of Treatment, Cost and Design Principle to prevent future embankment failures related to geotechnical factors on soft ground are presented. INTRODUCTION Sarawak has approximately 1.7 million ha of tropical peat that covers 13% of the total land area (12.4 million ha.). It is the largest area of peatland in Malaysia. It constitutes nearly 63% of the total peatland of the country. More than 80% of the peats are more than 2.5 m depth.
    [Show full text]
  • Malaysian Communications and Multimedia Commission
    MALAYSIAN COMMUNICATIONS AND MULTIMEDIA COMMISSION INVITATION TO REGISTER INTEREST AND SUBMIT A DRAFT UNIVERSAL SERVICE PLAN AS A UNIVERSAL SERVICE PROVIDER UNDER THE COMMUNICATIONS AND MULTIMEDIA (UNIVERSAL SERVICE PROVISION) REGULATIONS 2002 FOR THE INSTALLATION OF NETWORK FACILITIES AND DEPLOYMENT OF NETWORK SERVICE FOR THE PROVISIONING OF PUBLIC CELLULAR SERVICES AT THE UNIVERSAL SERVICE TARGETS UNDER THE JALINAN DIGITAL NEGARA (JENDELA) PHASE 1 INITIATIVE Ref: MCMC/USPD/PDUD(01)/JENDELA_P1/TC/11/2020(05) Date: 20 November 2020 Invitation to Register Interest as a Universal Service Provider MCMC/USPD/PDUD(01)/JENDELA_P1/TC/11/2020(05) Page 1 of 142 TABLE OF CONTENTS ABBREVIATIONS ............................................................................................................................. 4 INTERPRETATION ........................................................................................................................... 5 SECTION I – INTRODUCTION ........................................................................................................ 8 1. BACKGROUND ......................................................................................................................... 8 SECTION II – DESCRIPTION OF SCOPE OF WORK .............................................................. 10 2. GENERAL DESCRIPTION OF THE FACILITIES AND SERVICES TO BE PROVIDED ....................................................................................................................................... 10 3. SCOPE OF
    [Show full text]
  • Palace Tours − Luxury Tours Collection Into the Heart of Borneo Into the Heart of Borneo
    Palace Tours − Luxury Tours Collection Into the Heart of Borneo Into the Heart of Borneo Join Palace Tours on an unforgettable 9−day cruise journey on the Rajang River into the lush rainforests of Borneo, the third largest island in the world. Though the name is familiar to many from Redmon O’Hanlon’s classic Into the Heart of Borneo, there is very little tourism here due to the river’s remoteness and lack of facilities. There is much to do and see upriver, whether just gazing at the amazing scenery or visiting traditional and modern Iban long houses. In these river towns, you can explore the architectural vestiges of the Brooke Raj, and experience jungle treks and longboat trips as your journey continues to the Pelagus Rapids. Wildlife is in abundance and crocodiles, monitor lizards and the hornbill (national bird of Sarawak) are common sights. Downriver, the prosperous Chinese city of Sibu with its old shop houses, markets and friendly inhabitants, is a calm reflection of old China. At Sareiki, enjoy visits to pepper farms and exotic fruit plantations, and experience textile production at the sea port of Thanjung Manis. ITINERARY • Day 1 − Arrive in Sibu and board your cruise ship You are met upon arrival at the airport in Sibu, a bustling Malaysian port city set close to local markets and temples. Transfer to the cruise ship and settle in to your comfortable cabin. The afternoon is yours at leisure to explore the town on foot with its attractive streets of old Chinese shop houses, redolent of Malacca or Penang but without the tourists.
    [Show full text]
  • Senarai Cawangan Jabatan Dan Agensi Persekutuan Di Sarawak
    SENARAI KETUA CAWANGAN JABATAN DAN AGENSI PERSEKUTUAN DI SARAWAK 1 JABATAN PENILAIAN DAN PERKHIDMATAN HARTA SARAWAK BIL CAWANGAN ALAMAT NAMA KETUA CAWANGAN JAWATAN/GRED EMEL NO TEL NO FAKS JABATAN PENILAIAN DAN PERKHIDMATAN HARTA KUCHING, TKT.2, WISMA HONG, 082-255859/ 1 KUCHING ROSLIMA BINTI TAHA PENILAI DAERAH KUCHING/W44 [email protected] 082-256117 WISMA HONG, BATU 2 ¾, JALAN ROCK, 93200 KUCHING 082-235144 JABATAN PENILAIAN DAN PERKHIDMATAN HARTA SIBU, LOT 903, BLOK 7, SIBU TOWN 084-327407/ 2 SIBU LISA LOW SEOW WEI PENILAI DAERAH SIBU/W44 [email protected] 084-327064 DISTRICT, NO.60, JALAN TIONG HUA, 96000 SIBU 084-327132 JABATAN PENILAIAN DAN PERKHIDMATAN HARTA MIRI, TKT. 10, YU LAN PLAZA, JALAN 085-427226/ 3 MIRI SONG MUI KIE PENILAI DAERAH MIRI/W44 [email protected] 085-415226 BROOKE, 98000 MIRI 085-425226 2 KEMENTERIAN PERDAGANGAN DALAM NEGERI DAN HAL EHWAL PENGGUNA NEGERI SARAWAK BIL CAWANGAN ALAMAT NAMA KETUA CAWANGAN JAWATAN/GRED EMEL NO TEL NO FAKS PEJABAT KEMENTERIAN PERDAGANGAN DALAM NEGERI DAN HAL EHWAL PENGGUNA PENOLONG PEGAWAI 1 SERIAN SUB-CAWANGAN SERIAN, PUSAT REKREASI SABERKAS CAWANGAN KEDUP SERIAN, D/A YUSOF BIN SMAIL [email protected] - - PENGUATKUASA/KP29 JALAN D.O. AREA, 94700 SERIAN, SARAWAK PEJABAT KEMENTERIAN PERDAGANGAN DALAM NEGERI DAN HAL EHWAL PENGGUNA 2 SRI AMAN CAWANGAN SRI AMAN, BANGUNAN PERSEKUTUAN GUNASAMA, BLOK II & III, JALAN PELANI ANAK KEMITI PEGAWAI PENGUATKUASA/KP41 [email protected] 083-323836 083-323150 KEJATAU, P.O BOX 425, 95000 SRI AMAN, SARAWAK PEJABAT KEMENTERIAN PERDAGANGAN
    [Show full text]
  • Afghan Carpet Exporters' Guild*
    PART ONE NATIONAL ORGANIZATIONS AFGHANISTAN AFGHANISTAN CHAMBER OF COMMERCE AND AFGHANISTAN INTERNATIONAL CHAMBER OF INDUSTRY (ACCI) COMMERCE (AICC) Office/postal address: Office/postal address: Shahr-e-Naw House No. 91 Ministry of Interior Road Street 2, Shash Darak Opposite Indian Embassy Kabul Kabul Phone: (93 70) 296281 Phone: (93 7) 52002669, 9810184, 9326479 E-mail: [email protected], E-mail: [email protected], [email protected] [email protected] URL: www.acci.org.af URL: www.aicc-online.org.af Year established: 1939 Year established: 2004 Principal functions: Principal functions: • To provide credit information about Afghan and foreign • To advance and promote the economic environment for companies; business; • To liaise between the private sector and government • To encourage investment; agencies; • To advocate responsive Government, quality education, and • To promote exports by marketing Afghan goods; transparent business dealings while preserving Afghanistan’s • To act as a mediation body in disputes between local unique culture and values. businesses and foreign companies; • To encourage Afghan and foreign companies to invest in Services/activities: Afghanistan; • To assist with construction and rehabilitation of holy sites. • Serves as a voice for Afghanistan’s business community and assists in the creation of a business association network. Services/activities: Publication issued: • Acts as an intermediary in establishing business contracts between Afghan businesspeople and their counterparts • AICC Position Paper of Agriculture (2005, English and Dari). abroad; • AICC's Review of Custom Reforms (2005). • Facilitates and promotes Afghan businesses in their efforts • Guidelines for Private Sector Input into the Legislative to increase exports; Process (2005).
    [Show full text]
  • Usp Register
    SURUHANJAYA KOMUNIKASI DAN MULTIMEDIA MALAYSIA (MALAYSIAN COMMUNICATIONS AND MULTIMEDIA COMMISSION) USP REGISTER July 2011 NON-CONFIDENTIAL SUMMARIES OF THE APPROVED UNIVERSAL SERVICE PLANS List of Designated Universal Service Providers and Universal Service Targets No. Project Description Remark Detail 1 Telephony To provide collective and individual Total 89 Refer telecommunications access and districts Appendix 1; basic Internet services based on page 5 fixed technology for purpose of widening communications access in rural areas. 2 Community The Community Broadband Centre 251 CBCs Refer Broadband (CBC) programme or “Pusat Jalur operating Appendix 2; Centre (CBC) Lebar Komuniti (PJK)” is an nationwide page 7 initiative to develop and to implement collaborative program that have positive social and economic impact to the communities. CBC serves as a platform for human capital development and capacity building through dissemination of knowledge via means of access to communications services. It also serves the platform for awareness, promotional, marketing and point- of-sales for individual broadband access service. 3 Community Providing Broadband Internet 99 CBLs Refer Broadband access facilities at selected operating Appendix 3; Library (CBL) libraries to support National nationwide page 17 Broadband Plan & human capital development based on Information and Communications Technology (ICT). Page 2 of 98 No. Project Description Remark Detail 4 Mini Community The ultimate goal of Mini CBC is to 121 Mini Refer Broadband ensure that the communities living CBCs Appendix 4; Centre within the Information operating page 21 (Mini CBC) Departments’ surroundings are nationwide connected to the mainstream ICT development that would facilitate the birth of a society knowledgeable in the field of communications, particularly information technology in line with plans and targets identified under the National Broadband Initiatives (NBI).
    [Show full text]
  • Sarawak Map Sarikei Sarikei Sarikei Division Map
    STB/2019/DivBrochure/Sarikei/V1/P1 Foodstalls Market Foodstalls Chop Hock Mee Hiong Mee Hock Chop Julau Kedai Kopi Gembira Kopi Kedai Sarikei Dabai (Black Olives) (Black Dabai Sarikei Foodstall Market Foodstall Paris Cafe Paris Pakan Iban Cafe Coffee Shop Coffee Cafe Iban Yusuf Islamic Restaurant Islamic Yusuf Bintangor Muslim Foodcourt Muslim Bintangor Hotspot Cafe & Catering & Cafe Hotspot Tel : 084-734228 Fax : 084-734449 : Fax 084-734228 : Tel Popular Foodcourt Popular Meradong Julau Pepper Julau Julau District Office Office District Julau Kindo Cafe Kindo Bintangor Tel : 011-18444211 Fax : 011-18444200 : Fax 011-18444211 : Tel MDMJ FoodStalls, Jalan Mahkamah Mahkamah Jalan FoodStalls, MDMJ Pakan District Office District Pakan MDMJ Foodstalls Market Foodstalls MDMJ Taman Selera Baji Jaya Baji Selera Taman Tel : 084-693245 Fax : 084-692578 : Fax 084-693245 : Tel Kopi Rempah Kopi Meradong District Office Office District Meradong Yusuf Islamic Cafe Cafe Islamic Yusuf Pakan Durian Pakan Sukahati Steamboat Restaurant Sarikei Restaurant Steamboat Sukahati Tel : 084-651299 Fax : 084-651012 : Fax 084-651299 : Tel Sarikei District Office Office District Sarikei Seagood Restaurant Seagood Sarikei Glory Cafe Glory Fax : 084-653204/ 654396 084-653204/ : Fax 21 Cafe Cafe 21 Youth & Sports Sarawak Sports & Youth Tel : 084-651104 : Tel Ministry of Tourism, Arts, Culture, Arts, Tourism, of Ministry Everwin Kopitiam Everwin Resident Office Sarikei Division Division Sarikei Office Resident Popular Foodcourt Popular Sarikei Administrative Division Administrative
    [Show full text]
  • 01 January 02 February 03 March 04 April 05 May 07 JULY 06 JUNE
    nd rd th th MAKAN TAHUN PERDANA th th 2 -3 25 -27 Bekenu & Lambir, Miri 18 -27 KUCHING ULTRA MARATHON BORNEO CULTURAL ASEAN INTERNATIONAL “Makan Tahun” is a celebration for a Kedayan tribe in Subis District. This celebration Kuching, Sarawak FILMS FESTIVAL AND is held annually as a thanksgiving to God for a good harvest. The aim of this celebration FESTIVAL & SIBU STREET ART FESTIVAL Dataran Tun Tuanku Bujang Fasa 1 & 2 The third edition of the Road Ultra Marathon. This AWARDS (AIFFA) is to promote unity, sense of ownership and to promote the culture of the Kedayan tribe. running event consists of 30KM, 50KM, 70KM, and Subis District Office Richness of culture heritage in our motherland comprising multiracial beliefs and habits 100KM category respectively. Get ready for a meowderful Pullman Hotel, Kuching 085-719018 085-719527 is texturing the uniqueness of Sarawak. The main objective of this event is to promote adventure in Cat City capital of Sarawak. “beauty in ethnic diversity” within Borneo Island to the world. Grit Event Management The gathering of film makers and movie stars from the ASEAN region add more charm Sibu Municipal Council CALENDAR OF TOURISM EVENTS 016-878 2809 084-333411 084-320240 to the rustic city. Sanctioned by ASEAN secretariat as one of the ASEAN joint activities, st rd the festival is held in every two years. 1 -3 th st th th th th World Communication Network Resources (M) Sdn Bhd IRAU 19 -21 2019 7 -9 5 -7 082-414661 082-240661 ALTA MODA SARAWAK (AMS) BALEH-KAPIT RAFT SAFARI ACO LUN BORNEO JAZZ Kapit Town FESTIVAL For further information, contact: Old DUN Building, Kuching BAWANG MINISTRY OF TOURISM, ARTS, CULTURE, An annual rafting competition held along the Rejang River.
    [Show full text]