Appendix a – Major Flood Control Projects
Total Page:16
File Type:pdf, Size:1020Kb
Appendix A – Major Flood Control Projects Table 1.1 Major Drainage Projects in Northern NT (Completed Projects) Project Title Construction Length Start Completion Brief Description Location of Significant Cost ($M) (km) Date Date Improvements and Benefits Rural Drainage 203 4.2 11/1998 12/2001 Construction of San Wai Barracks, Kwan Tei, Rehabilitation Scheme, drainage channels Wang Leng, Hung Leng, stage 1, phase 1A – and box culvert Leng Tsai, rehabilitation works at (about 170 m) Wang Shan Keuk San Tsuen, Ng Tung River Tai Tong Wu, Shan Tong, San Tong Po Rural drainage 156 4.9 04/1999 12/2001 Construction of Hang Tau Tai Po, Hang Tau, rehabilitation scheme, drainage channel Cheung Lek, Lin Tong Mei, stage 1, phase 1B – Tsiu Keng Lo Wai, rehabilitation works at Tsiu Keng Pang Uk, Sheung Yue River Tsiu Keng San Wai, Chan Uk Po Rural drainage 197# 1.7 05/2003 04/2006 Drainage rehabilitation Chow Tin Tsuen, rehabilitation scheme – works at Ta Kwu Ling Village, Drainage rehabilitation Ping Yuen River Kan Tau Wai, Fung Wong Wu, works at Ping Yuen River Lei Uk, Tong Fong, Shui Hau and Mo Fan Heung Stream (NNT Portion) Regulation of 390 4 12/2001 11/2006 Training of Lo Wu, Yuen Leng Chai, Shenzhen River, stage 3 Shenzhen River Nam Hang, Man Kam To, upstream of Lo Wu to Muk Wu, Muk Wu Nga Yiu, Lo Shue Leng Lo Shue Ling, Ta Kwu Ling River training works for 756 4.6 08/1999 03/2003 Training of Fu Tei Au, Sheung Shui Wa Shan, the drainage channel Ting Ping Shan Tsuen, Upper River Indus Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen Shek Wu Hui 891 1.7 09/1998 02/2002 River training in Tsung Yuen, Ho Sheung Heung, Development Package 4, Area 30 Ying Kong engineering works River training works for 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, Shek Ma, the drainage channel Ngam Pin, Pai Tau Lo, Lower River Indus and Ho Sheung Heung, Tong Kok, River Beas Shek Tsai Leng, Kwu Tung, Ying Kong # The total cost of the project. Appendix A – Major Flood Control Projects Table 1.2 Major Drainage Projects in Northern NT (Projects Under Construction) Project Title Construction Length Start Completion Brief Description Location of Significant Cost ($M) (km) Date Date Improvements and Benefits Drainage improvement 208 1.8 06/2005 End 2008 Construction of Ma Wat and for Ma Wat River at drainage channels in north of Hong Lok Yuen Kau Lung Hang Ma Wat and north of Hong Lok Yuen Drainage improvement 261 5.2 12/2006 End 2010 Construction of Ping Kong, Kau Lung Hang, works in Ping Kong, drainage channels and Yuen Leng, Nam Wa Po and Kau Lung Hang, box culverts in Ping Kong, Tai Hang areas Yuen Leng, Nam Wa Po Kau Lung Hang, Yuen Leng, and Tai Hang areas Nam Wa Po and Tai Hang areas Drainage improvement 120 3.5 06/2007 Mid 2010 Construction of Lung Yuek Tau, works in Lung Yuek Tau, drainage channels and Kwan Tei South and Leng Tsai Kwan Tei South and box culverts in Leng Tsai, Fanling Lung Yuek Tau, Kwan Tei South and Leng Tsai Drainage improvement 162 3.6 12/2007 End 2011 Construction of Tai Po Tin, Ping Che, works in Tai Po Tin and drainage channels and Man Uk Pin and Lin Ma Hang Ping Che of Ta Kwu Ling, box culverts in Tai Po Tin, and Man Uk Pin and Ping Che, Man Uk Pin and Lin Ma Hang of Lin Ma Hang Sha Tau Kok Drainage improvement 222 3.1 08/2008 End 2010 Construction of Ki Lun Tsuen, Ma Tso Lung, works in Ki Lun Tsuen, drainage channels and Ying Pun, Shek Tsai Leng and Ma Tso Lung, Ying Pun, stormwater drains in Sha Ling Shek Tsai Leng and Ki Lun Tsuen, Ma Tso Lung, Sha Ling in New Ying Pun, Shek Tsai Leng Territories and Sha Ling Table 1.3 Major Drainage Projects in Northern NT (Projects Under Design/Planning ) Project Title Construction Length Start Completion Brief Description Location of Significant Cost ($M) (km) Date Date Improvements and Benefits Drainage Improvement 136 8 Early 2010 End 2012 Construction of Lin Ma Hang, Ping Che, works in Northern drainage channels in Tai Po Tin, New Territories – Lung Yeuk Tau, Man Uk Sheung Shan Kai Wat, Package C (NNT portion) Pin, Ta Kwu Ling, Man Uk Pin, Loi Tung, Ping Che and Ng Uk Tsuen, Lin Ma Hang Tan Chuk Hang Lo Wai, Tan Chuk Hang, San Tong Po, Tai Wo, Ma Wat Wai, Ma Liu Shui San Tsuen, Leng Tsai Appendix A – Major Flood Control Projects Table 2.1: Major Drainage Projects in Northwestern NT (Completed Projects) Project Title Construction Length Start Completion Brief Description Location of Significant Cost ($M) (km) Date Date Improvements and Benefits Yuen Long, Kam Tin, Ngau 139 3.2 06/2004 06/2007 Construction of secondary Cheung Kong, Tai Kong Po, Tam Mei and Tin Shui Wai drainage channels in Kam Tsat Sing Kong, Ha Che, drainage improvements, stage Tin and Ngau Tam Mei SanWai Tsuen 1, phase 2A – Kam Tina nd Ngau Tam Mei Main drainage channel for 125 1.5 09/2003 03/2006 Construction of drainage Lung Tin Tsuen, Yuen Long and Kam Tin – channel in Lung Tin Tsuen Lam Hau Tsuen Shan Ha Tsuen to Lam Hau Tsuen section Main drainage channels for 100 1.7 03/2000 12/2002 Construction of drainage Yau Tam Mei Tsuen, Ngau Tam Mei, phase 2 – channel from Ngau Tam Yau Tam Mei San Tsuen, Ngau Tam Mei to Yau Mei Mei to Yau Mei San Tsue Wai Tsai San Tsuen section Village flood protection for 109 0.9 12/2001 12/2004 Construction of floodwater Wang Chau, Pok Wai Yuen Long, Kam Tin and pumping station in Wang Ngau Tam Mei, North West Chau; and construction of New Territories, stage 1 - Pok Wai drainage channel remainder Yuen Long bypass floodway 432 3.8 01/2003 03/2006 Construction of drainage Yuen Long town, channels in Tung Shing Lei, Au Tau, Yuen Long South Small Traders New Village, Yeung Uk Tsuen, Chuk San Tsuen, Kong Tau San Tsuen, Shung Ching San Tsuen, Sham Chung Tsuen San Tin Eastern Main 354 2.4 10/2002 04/2006 Construction of the Eastern Lok Ma chau Drainage Channel Main drainage channels in San Tin Main drainage channels for 220 3.4 05/2001 07/2003 Construction of drainage Tsz Tong Tsuen, Ng Ka Tsuen, Yuen Long and Kam Tin, channels near Ng Ka Kam Tsin Wai, Nam Hing Lei, stage 2 – remainder Tsuen and Shek Tau Wai Chung Sum Tsuen, Pak Pin Tsuen, Uk Tau Tsuen, To Uk Tsuen, Shek Tau Wai, Tsz Tong Tsuen Main drainage channels for 280 3.1 08/1999 03/2004 Construction of drainage Kam Tin San Tsuen, Yuen Long and Kam Tin channel from Kam Tin San Wing Lung Wai, Kiu Tau Tsuen, stage 2 – Kam Tin San Tsuen Tsuen to Wan Toi Shan Pang Ka Tsuen, to Wang Toi Shan section Shek Kong San Tsuen, Wang Toi Shan Main drainage channels for 210 3.5 07/1999 03/2002 Construction of drainage Kat Hing Wai, Tai Hong Tsuen, Yuen Long and Kam Tin channel from Kam Tin Shek Wu Tong, Tin Sam Tsuen, stage 2 –Kam Tin Road to Tai Road to Tai Kek Tai Kek Kek section Project Title Construction Length Start Completion Brief Description Location of Significant Cost ($M) (km) Date Date Improvements and Benefits Main drainage channels for 359 2.3 11/1999 03/2005 Construction of drainage Yau Mei San Tsuen, Ngau Tam Mei phase 1 – Yau channels from Yau Mei Chuk Yuen Tsuen, Mei San Tsuen to Tai Sang San Tsuen to Tai Sang Wai Man YuenChuen Wai section Village flood protection for 122 11/2000 03/2003 Construction of floodwater Chuk Yuen Tsuen, Ha San Wai Chuk Yuen Tsuen and Ha San pumping station in Chuk Wai, North West New Yuen Tsuen and Territories Ha San Wai Village flood protection for 146 12/2001 08/2005 Construction of floodwater Mai Po Lo Wai, Mai Po Lo Wai, Mai Po San pumping stations in Mai Mai Po San Tsuen, Tsuen, Ma Tin Tsuen and Po Lo Wai, Ma Tin Tsuen Ma Tin Tsuen, Shui Pin Wai Shui Pin Wai, North West and Shui Pin Wai New Territories Appendix A – Major Flood Control Projects Table 2:2 Major Drainage Projects in Northwestern NT (Projects under Construction) Project Title Construction Length Start Completion Brief Description Location of Significant Cost ($M) (km) Date Date Improvements and Benefits Yuen Long, Kam Tin, 156 2.1 03/2007 End 2009 Construction of Cheung Chun San Tsuen and Ngau Tam Mei and Tin drainage channels in Kam Tsin Wai Shui Wai drainage Cheung Chun San improvements, stage 1, Tsuen and phase 2B – Cheung Chun Kam Tsin Wai San Tsuen and Kam Tsin Wai Yuen Long, Kam Tin, 202 2.3 12/2007 Early 2011 Construction of Yuen Kong San Tsuen, Ngau Tam Mei and Tin secondary drainage Cheung Po, Ma On Kong Shui Wai drainage channels in Kam Tin improvement, stage 1, phase 2B – remaining works Table 2:3 Major Drainage Projects in Northwestern NT (Projects under Design/Planning) Project Title Construction Length Start Completion Brief Description Location of Significant Cost ($M) (km) Date Date Improvements and Benefits Drainage improvement in 168 2.1 End 2012 End 2018 Construction of the Western San Tin Northern New Territories – western main drainage package A channel in San Tin Appendix A – Major Flood Control Projects Table 3.1 Major Drainage Projects in West Kowloon (Completed Projects) Project Title Construction Length Start Completion Brief Description Location of Significant Cost ($M) (km) Date Date Improvements and Benefits West Kowloon drainage 686 23 12/1999 12/2004* Improvement of 23km of Tsim Sha Tsui, Mong Kok, improvement, stages 2 stormwater drains Tai Kok Tsui, Lai Chi Kok, phase 1 works Cheung Sha Wan, Sham Shui Po West Kowloon drainage 1,200 11 01/2001 08/2007 Construction of Tai Hang Yau Ma Tei, Mong Kok, improvement, stage 2 Tung flood stage scheme and Tai Kok Tsui, Sham Shui Po phase 2 and stage 3 phase Kai Tak stormwater transfer 1 works tunnel and improvement of 11km of storwmater drains * Substantial completion date: Overall