Police & Jacksons Roads Noble Park

Total Page:16

File Type:pdf, Size:1020Kb

Police & Jacksons Roads Noble Park OFFICIAL: Sensitive# PERMISSION OF THE CHIEF COMMISSIONER OF POLICE TO CONDUCT A HIGHWAY COLLECTION UNDER THE PROVISIONS OF REGULATION 32 OF THE ROAD SAFETY (TRAFFIC MANAGEMENT) REGULATIONS 2019 I, Mark MORRIS, Senior Sergeant of Police, (State Event Planning Unit), duly delegated by the Chief Commissioner of Police, under the provisions of Section 19 of the Victoria Police Act 2013 to act on his behalf with respect to matters concerning Regulation 32 of the Road Safety (Traffic Management) Regulations 2019, do hereby permit the conduct of the following collection. PERMIT NUMBER: 21/0001- State-Wide GFA PERMIT ISSUED ON: 18/03/2021 PERMIT ISSUED TO: Anna Wilson HWT Tower Southbank 3006 NAME OF CHARITY / ORGANISATION: Royal Childrens Hospital Good Friday Appeal DATES/TIMES OF COLLECTION: AS PER ATTACHED LIST LOCATION OF COLLECTION POINTS: AS PER ATTACHED LIST RESTRICTION: NOT PERMITTED AT ANY INTERSECTION WHERE THE SPEED LIMIT, ON ANY OF THE ROADS, IS ABOVE 70KPH. NOTE: A COPY OF THIS PERMIT AND ATTACHED CONDITIONS MUST BE KEPT BY EACH COLLECTION SUPERVISOR AT EACH SITE, AND PRODUCED TO A MEMBER OF THE POLICE FORCE OR A LOCAL BY-LAWS OFFICER UPON DEMAND. HIGHWAY COLLECTION PERMIT CONDITIONS: 1 Applicants MUST liaise with local government and ensure that any conditions imposed by them are also complied with. 2 Highway collections are only to take place at the intersections nominated in the permit which are controlled by traffic control signals. 3 No highway collection shall take place between sunset and sunrise. 4 No highway collection shall take place at an intersection located in a speed zone greater than 70 kilometres per hour. 5 No highway collection shall commence or continue during inclement weather or abnormal atmospheric conditions. Inclement weather and abnormal atmospheric conditions includes but is not restricted to rain periods, thunderstorms, sleet and hail, fog and periods of low visibility that would affect the safety of the person/s collecting. 6 Whilst a collection is in progress signs shall be conspicuously displayed so as to face all traffic approaching the intersection. The sign shall be placed between 50 to 100 metres prior to the intersection and shall be: (i) not less than 100 centimetres wide and not less than 50 centimetres in height; and (ii) placed so that the bottom edge of the sign is at least 100 centimetres above the ground; and (iii) inscribed with the words “CAUTION HIGHWAY COLLECTORS AHEAD”in red letters on a white background; and (iv) the word “CAUTION” shall be in letters not less than 20 centimetres high and of proportionate width; and (v) the words “HIGHWAY COLLECTORS AHEAD” shall be in letters not less than 10 centimetres high and of proportionate width. #OFFICIAL: Sensitive OFFICIAL: Sensitive# 7 Collectors shall only enter upon the carriageway: (i) when a red traffic control signal is displayed facing vehicles from which they wish to solicit for contributions; and (ii) shall immediately leave the carriageway and remain on the reservation or footpath when that traffic control signal changes from red 8 Where the carriageway is divided into more than 4 lanes (including turn lanes), collectors shall not proceed onto the carriageway further than 2 lanes from the boundaries of the carriageway. 9 All vehicles associated with the highway collectors shall be parked in accordance with the Road Safety Road Rules 2017. 10 All collectors shall be dressed in highly visible clothing. 11 The person named as the “applicant” in the highway collection permit shall nominate the “collection supervisors” who shall be present at the collection site at all times during the collection. 12 Each collection site shall have at least one “collection supervisor” who shall have a copy of the relevant permit in their possession. This copy must be produced on demand from a member of the police force or a by-laws officer. 13 “Collection supervisors” are to be over 18 years of age and shall be responsible for: (i) informing all collectors at the collection site of the conditions of the highway collection permit; and (ii) supervising all collectors at the collection site. 14 “Collection supervisors” shall not supervise more than 3 collectors less than 18 years of age. 15 No collector shall be under 16 years of age. 16 All highway collectors shall wear an “identification tag”. The “identification tag” shall be displayed on the collectors’ upper body. This tag shall clearly display: (i) the name of the organisation/charity to which contributions will be forwarded; (ii) the collector’s given name and family name; (iii) the highway collection permit number; and (iv) whether the collector is a PAID COLLECTOR or a VOLUNTEER. 17 All containers used for the collection of any donations must be sealed. Screw tops, buckets and similar containers are not permissible. 18 No highway collection shall be conducted in any manner which may jeopardise the safety of any road user. 19 A person taking part in a highway collection shall obey any reasonable instructions given by a member of the Police Force. 20 Any breach of these conditions may result in: (a) the collection being halted; (b) the offender being prosecuted; (c) the revocation of other existing permits issued to the applicant and/or the organisation; (d) refusal to grant further permits to the applicant and/or the organisation. 21 Applicants and Organisations MUST also ensure that the collectors comply with the current Victorian Chief Health Officer’s directions. Mark Morris Mark MORRIS Senior Sergeant 20992 State Event Planning Unit Date: 18/03/2021 #OFFICIAL: Sensitive OFFICIAL: Sensitive# ​‌For Official Use Only‌​ Highway Collection Permit - State-Wide Good Friday Appeal 2021 Collection Dates Time of Collection Suburb Intersection #1 Intersection #2 Intersection #3 Intersection #4 31/03 - 02/04/21 9am-5pm Albert Park Beaconsfield Parade & Kerferd Road 31/03 - 02/04/21 9am-5pm Alexandra Grant Street & Downey Street 31/03 - 02/04/21 9am-5pm Alfredton Gillies Street & Sturt Street 31/03 - 02/04/21 9am-5pm Ararat High Street & Vincent Street Vincent Street & Barkly Street 31/03 - 02/04/21 9am-5pm Ascot Vale Maribyrnong Road & Epsom Road, Scotia Street 31/03 - 02/04/21 9am-5pm Avoca Pyrenees Hwy & High Street 31/03 - 02/04/21 9am-5pm Bacchus Marsh Gisborne Road & Western Hwy Main Street & Grant Street 31/03 - 02/04/21 9am-5pm Bairnsdale Main Street & Service Street 31/03 - 02/04/21 9am-5pm Ballarat Victoria Street & Princes Street Sturt Street & Doverton Street 31/03 - 02/04/21 9am-5pm Balwyn Whitehorse Road & Balwyn Road 31/03 - 02/04/21 9am-5pm Bayswater Bayswater Road & Canterbury Road Mountian Hwy & Scoresby Road 31/03 - 02/04/21 9am-5pm Beaumaris Balcombe Road & Reserve Road 31/03 - 02/04/21 9am-5pm Belmont High Street & Barwon Heads Road Barwons Head Road & Settlement Road 31/03 - 02/04/21 9am-5pm Bendigo Barnard Street & Arnold Street Myers Street & Mitchell Street McRae Street & Nolan Street Condon Street & Edward Road 31/03 - 02/04/21 9am-5pm Bendigo Barnard Street & View Street View Street & Pall Mall, Mitchell Street Chapel Street & McRae Street Sternberg Street & McIvor Road 31/03 - 02/04/21 9am-5pm Bendigo Russell Street & Olinda Street Myrtle Street & High Street Carpenter Street & Miller Street 31/03 - 02/04/21 9am-5pm Bentleigh East Warrigal Road & Centre Road 31/03 - 02/04/21 9am-5pm Berwick Princes Highway & Clyde Road 31/03 - 02/04/21 9am-5pm Birchip Campbell Road & Cumming Road, Wycheproof Road 31/03 - 02/04/21 9am-5pm Blackburn North Surrey Road & Springfield Road 02/04/2021 10am-5pm Bonbeach Nepean Highway & Bondi Road Station Street & Bondi Road 31/03 - 02/04/21 9am-5pm Boronia Boronia Road & Dorset Road Boronia Road & Floriston Road Boronia Road & Scoresby Road 31/03 - 02/04/21 9am-5pm Box Hill South Middleborough Road & Canterbury Road 31/03 - 02/04/21 9am-5pm Braybrook Ballarat Road & Churchill Avenue Ballarat Road & Ashley Street 31/03 - 02/04/21 9am-5pm Briar Hill Sherbourne Road & Mountainview Road 31/03 - 02/04/21 9am-5pm Bright Mafeking Square & Ireland Street Anderson Street & Barnard Street Ireland Street & Burke Street 31/03 - 02/04/21 9am-5pm Brighton South Road & Hampton Street Bay Street & New Street 31/03 - 02/04/21 9am-5pm Brighton East Bluff Road, Cummins Road & South Road 31/03 - 02/04/21 9am-5pm Brunswick Sydney Road & Dawson Street Sydney Road & Park Street Sydney Road & Brunswick Road 01 - 02/04/21 9am-5pm Bulleen Manningham Rd & Bulleen Road Manningham Rd & Thompsons Road 31/03 - 02/04/21 9am-5pm Bundoora Grimshaw Street & Plenty Road Settlement Road & Plenty Road 31/03 - 02/04/21 9am-5pm Burwood Burwood Hwy, Toorak Road & Warrigal Road 31/03 - 02/04/21 9am-5pm Cairnlea Cairnlea Ave & Station Road 31/03 - 02/04/21 9am-5pm Camberwell Toorak Road & Burke Road Barkers Road & Burke Road Burke Road & Mont Albert Road Canterbury Road & Burke Road 31/03 - 02/04/21 9am-5pm Caroline Springs Lake Street & Caroline Springs Boulevard Hume Drive & Gourlay Road 02/04/2021 10am-5pm Carrum Station Street & McLeod Road 31/03 - 02/04/21 Sunrise to Sunset Castlemaine Barker Street & Forest Street 31/03 - 02/04/21 9am-5pm Cavendish Henty Highway & Scott Street 01 - 02/04/21 10am-5pm Cheltenham Centre Dandenong Road & Warrigal Road 31/03 - 02/04/21 9am-5pm Clunes Service Street & Bailey Street West Street & Ballarat Maryborough Road 31/03 - 02/04/21 9am-5pm Cobden Victoria Street & Neylon Street Curdie Street & Victoria Street 31/03 - 02/04/21 9am-5pm Cobram Mookarii Street & Barooga Bridge 31/03 - 02/04/21 9am-5pm Coburg Bell Street & Elizabeth Street
Recommended publications
  • Road Safety Camera Locations in Victoria
    ROAD SAFETY CAMERA LOCATIONS IN VICTORIA Approved Sites — April 2006 — Road Safety Camera Locations in Victoria – Location of Road Safety Cameras – Red light only wet film cameras (84 sites) • Armadale, Kooyong Road and Malvern Road • Ascot Vale, Maribyrnong Road and Mt Alexander Road • Balwyn, Balwyn Road and Whitehorse Road • Bayswater, Bayswater Road and Mountain Highway • Bendigo, High Street and Don Street • Bendigo, Myrtle Street and High Street • Box Hill, Canterbury Road and Station Street • Box Hill, Station Street and Thames Street • Brighton, Bay Street and St Kilda Street • Brunswick, Melville Road and Albion Street • Brunswick, Nicholson Street and Glenlyon Road • Bulleen, Manningham Road and Thompsons Road • Bundoora, Grimshaw Street and Marcorna Street • Bundoora, Plenty Road and Settlement Road • Burwood, Highbury Road and Huntingdale Road • Burwood, Warrigal Road and Highbury Road • Camberwell, Prospect Hill Road and Burke Road • Camberwell, Toorak Road and Burke Road • Carlton, Elgin Street and Nicholson Street • Caulfield, Balaclava Road and Kooyong Road • Caulfield, Glen Eira Road and Kooyong Road • Chadstone, Warrigal Road and Batesford Road • Chadstone, Warrigal Road and Batesford Road • Cheltenham, Warrigal Road and Centre Dandenong Road • Clayton, Dandenong Road and Clayton Road • Clayton, North Road and Clayton Road • Coburg, Harding Street and Sydney Road • Collingwood, Johnston Street and Hoddle Street • Corio, Princes Highway and Purnell Road • Corio, Princes Highway and Sparks Road • Dandenong, McCrae Street
    [Show full text]
  • Motorway Design Volume Guide December 2017
    Motorway Design Volume Guide Design volumes for increased safety, reliability and productivity on motorways December 2017 Page 1 of 78 Commercial in Confidence Motorway Design Volume Guide 1.0.docx Published by: VicRoads Investment and Design Services 60 Denmark Street Kew VIC 3101 Authors: Hendrik Zurlinden John Gaffney Matthew Hall Review: Rod Troutbeck Richard Fanning Motorway Design Volume Guide Table of Contents Foreword 7 Acknowledgements 8 1. A new approach to assessing motorway section operation 9 1.1. Scope 9 1.2. Customer expectations and road operator’s targets 9 1.3. Traffic flow and operational performance 10 1.4. Data and observations 11 1.5. Maximum Sustainable Flow Rate 13 1.6. Factors affecting Maximum Sustainable Flow Rates 13 1.7. Detailed description of Key Performance Indicators and their relationship 14 1.8. Concluding remarks 16 1.9. LOS density bands and factors influencing traffic flow 16 2. Application of Maximum Sustainable Flow Rates 19 2.1. Scope 19 2.2. Why are Maximum Sustainable Flow Rates needed? 19 2.3. Maximum Sustainable Flow Rates for managed motorways 19 2.4. Maximum Sustainable Flow Rates for unmanaged motorways 25 2.5. Typical speed-flow relationship curves 28 2.6. Auxiliary lanes 30 2.7. Tight curves 30 2.8. Initial application of Maximum Sustainable Flow Rates 31 3. Definitions, Methodologies and Analysis 35 3.1. Need for the Guide 35 3.2. Scope of the Guide 37 3.3. Measurement methodology 40 3.4. Data and Site Observations 49 3.5. Measurement results 50 3.6. Comparison with International Design Values 67 3.7.
    [Show full text]
  • Height Clearance Under Structures for Permit Vehicles
    SEPTEMBER 2007 Height Clearance Under Structures for Permit Vehicles INFORMATION BULLETIN Height Clearance A vehicle must not travel or attempt to travel: Under Structures for (a) beneath a bridge or overhead Permit Vehicles structure that carries a sign with the words “LOW CLEARANCE” or This information bulletin shows the “CLEARANCE” if the height of the clearance between the road surface and vehicle, including its load, is equal to overhead structures and is intended to or greater than the height shown on assist truck operators and drivers to plan the sign; or their routes. (b) beneath any other overhead It lists the roads with overhead structures structures, cables, wires or trees in alphabetical order for ready reference. unless there is at least 200 millimetres Map references are from Melway Greater clearance to the highest point of the Melbourne Street Directory Edition 34 (2007) vehicle. and Edition 6 of the RACV VicRoads Country Every effort has been made to ensure that Street Directory of Victoria. the information in this bulletin is correct at This bulletin lists the locations and height the time of publication. The height clearance clearance of structures over local roads figures listed in this bulletin, measured in and arterial roads (freeways, highways, and metres, are a result of field measurements or main roads) in metropolitan Melbourne sign posted clearances. Re-sealing of road and arterial roads outside Melbourne. While pavements or other works may reduce the some structures over local roads in rural available clearance under some structures. areas are listed, the relevant municipality Some works including structures over local should be consulted for details of overhead roads are not under the control of VicRoads structures.
    [Show full text]
  • Copy of RMC List Statewide FINAL 20201207 to Be Published .Xlsx
    Department of Transport Road Maintenance Category - Road List Version : 1 ROAD NAME ROAD NUMBER CATEGORY RMC START RMC END ACHERON WAY 4811 4 ROAD START - WARBURTON-WOODS POINT ROAD (5957), WARBURTON ROAD END - MARYSVILLE ROAD (4008), NARBETHONG AERODROME ROAD 5616 4 ROAD START - PRINCES HIGHWAY EAST (6510), SALE ROAD END - HEART AVENUE, EAST SALE AIRPORT ROAD 5579 4 ROAD START - MURRAY VALLEY HIGHWAY (6570), KERANG ROAD END - KERANG-KOONDROOK ROAD (5578), KERANG AIRPORT CONNECTION ROAD 1280 2 ROAD START - AIRPORT-WESTERN RING IN RAMP, TULLAMARINE ROAD END - SHARPS ROAD (5053), TULLAMARINE ALBERT ROAD 5128 2 ROAD START - PRINCES HIGHWAY EAST (6510), SOUTH MELBOURNE ROAD END - FERRARS STREET (5130), ALBERT PARK ALBION ROAD BRIDGE 5867 3 ROAD START - 50M WEST OF LAWSON STREET, ESSENDON ROAD END - 15M EAST OF HOPETOUN AVENUE, BRUNSWICK WEST ALEXANDRA AVENUE 5019 3 ROAD START - HODDLE HIGHWAY (6080), SOUTH YARRA ROAD BREAK - WILLIAMS ROAD (5998), SOUTH YARRA ALEXANDRA AVENUE 5019 3 ROAD BREAK - WILLIAMS ROAD (5998), SOUTH YARRA ROAD END - GRANGE ROAD (5021), TOORAK ANAKIE ROAD 5893 4 ROAD START - FYANSFORD-CORIO ROAD (5881), LOVELY BANKS ROAD END - ASHER ROAD, LOVELY BANKS ANDERSON ROAD 5571 3 ROAD START - FOOTSCRAY-SUNSHINE ROAD (5877), SUNSHINE ROAD END - MCINTYRE ROAD (5517), SUNSHINE NORTH ANDERSON LINK ROAD 6680 3 BASS HIGHWAY (6710), BASS ROAD END - PHILLIP ISLAND ROAD (4971), ANDERSON ANDERSONS CREEK ROAD 5947 3 ROAD START - BLACKBURN ROAD (5307), DONCASTER EAST ROAD END - HEIDELBERG-WARRANDYTE ROAD (5809), DONCASTER EAST ANGLESEA
    [Show full text]
  • Traffic and Transport 8.1 OVERVIEW
    8 Traffic and transport 8.1 OVERVIEW ........................................................................................................................................ 8-1 8.2 EES OBJECTIVES AND REQUIREMENTS ............................................................................................. 8-2 8.3 LEGISLATION AND POLICY ................................................................................................................ 8-3 8.4 METHODOLOGY ................................................................................................................................ 8-4 8.5 STUDY AREA ...................................................................................................................................... 8-5 8.6 EXISTING CONDITIONS ..................................................................................................................... 8-7 8.6.1 LAND USE ................................................................................................................................................. 8-7 8.6.2 ROAD NETWORK ...................................................................................................................................... 8-7 8.6.3 ROAD NETWORK PERFORMANCE ............................................................................................................ 8-9 8.6.4 PUBLIC TRANSPORT ............................................................................................................................... 8-14 8.6.5 ACTIVE TRANSPORT ..............................................................................................................................
    [Show full text]
  • Vicroads Purpose, Aims and Organisational Values
    VICROADS PURPOSE, AIMS AND ORGANISATIONAL VALUES PURPOSE To serve the community by managing the Victorian road network and its use as an integral part of the overall transport system. VicRoads, in partnership with other State and Federal Government agencies, local government and the private sector, contributes to the social and economic development of Victoria and Australia through its role in management of the transport system. AIMS > To assist economic and regional development by improving the effectiveness and efficiency of the transport system. > To assist the efficient movement of people and freight, and improve access to services for all transport system users. > To achieve a substantial reduction in the number and severity of road crashes and the resultant cost of road trauma. > To be sensitive to the environment through responsible management of the transport network. > To provide efficient and effective, nationally consistent, customer-oriented driver licensing, vehicle registration, revenue collection, and driver and vehicle information services. ORGANISATIONAL VALUES > We put our customers’ and stakeholders’ needs first. > We develop as individuals and contribute as members of a team. > We are open, honest and fair. > We take pride in our success and continuous improvement. > We take responsibility for our actions. > We take a commercial approach to our service delivery. 3 LETTER TO THE MINISTER THE HONORABLE PETER BATCHELOR MP MINISTER FOR TRANSPORT LEVEL 26, NAURU HOUSE 80 COLLINS STREET MELBOURNE VICTORIA 3000 Dear Minister VicRoads 2001–02 Annual Report I have much pleasure in submitting to you, for presentation to Parliament, the Annual Report of the Roads Corporation (VicRoads) for the period 1 July 2001 to 30 June 2002.
    [Show full text]
  • Smart Traffic Lights
    GetVictoriaMoving.com.au GET VICTORIA MOVING Traffic light removal project INTRODUCTION Bottlenecks on our arterial roads are choking Melbourne and Geelong. That’s why I’ve developed a new plan to ease the squeeze on our most congested arterial roads. Everyone agrees the removal of level crossings will help to free up Melbourne’s traffic congestion, but it’s only part of the solution. Another key part is to remove Melbourne’s most congested and frustrating traffic intersections, using grade–separations. Preference for grade–separations will be an underpass construction with consultation with the community, local government and engineering experts, determining the final design. The grade-separation configurations will be a closed diamond model of intersection removal. These will not MATTHEW GUY MP be freeway style, clover interchanges. Leader of the Opposition As part of this project, traffic signal systems will be modernised to ensure traffic flow is optimised on corridors where intersections are removed. That’s why I’m committing between $4.1 billion to $5.3 billion to remove traffic lights from 55 of Melbourne’s busiest, most congested intersections. Recently released census data shows that 74% of Melburnians take a car to work every day. Despite the level crossing removal program’s benefits to traffic along Melbourne’s train lines, over one million people continue to sit in gridlocked traffic on other parts of the road network. That means tradies, couriers and salespeople are losing money while sitting in gridlock. It means mums and dads spending more time on their commute and less time at home with their families.
    [Show full text]
  • Community Update
    COMMUNITY MONASH FREEWAY UPGRADE STAGE 2 UPDATE FEBRUARY 2019 We’re upgrading and extending O’Shea Road These upgrades will improve What we’ll do • upgrade traffic lights at: local traffic flow and make • add new lanes to O’Shea Road – Skyline Way it easier, safer and quicker between Clyde Road and – Bridgewater Boulevard Soldiers Road to get to the freeway. – Soldiers Road • extend O’Shea Road so it joins – the future North-South Link Road, the Beaconsfield interchange About the upgrade near Minta Farm • upgrade the Beaconsfield Interchange – Clyde Road. As part of the Monash Freeway Upgrade and add an inbound freeway off-ramp Stage 2, we’re adding new lanes to and an outbound freeway on-ramp Our upgrades to O’Shea Road and the O’Shea Road between Clyde Road Beaconsfield Interchange will: and Soldiers Road. We’ll also extend • build a new pedestrian crossing on the new lanes to the Beaconsfield the new section of O’Shea Road build • improve traffic flow and travel times Interchange to create a new connection a walking and cycling path from • give you better access on and off to the Princes Freeway. Clyde Road in Berwick to the the freeway Beaconsfield Interchange • improve the flow of public transport • make it easier for you to walk or cycle along O’Shea Road. SIGN UP FOR PROJECT UPDATES roadprojects.vic.gov.au Authorised and published by the Victorian Government, 1 Treasury Place, Melbourne More lanes on the Monash These works will improve traffic flow and Princes freeways and travel times, give you better access on and off the Freeway and to major Our upgrades to O’Shea Road are destinations across Melbourne whilst part of the Monash Freeway Upgrade also improving links for freight.
    [Show full text]
  • The Collection
    the collection THIRTY-FOUR OUTSTANDING DEVELOPMENT SITE OPPORTUNITIES IN MELBOURNE, AUSTRALIA – SPRING 2015 #2 Welcome to the Spring Edition of The Collection, Victoria’s leading and most followed development site publication. The strong start we witnessed early on in the year has followed through to Q3 2015; supported by strong market credentials, continued historically low interest rates and increased overseas investment influenced by the falling Australian Dollar. So far this year we have seen large volumes of stock transact to both local and offshore developers, supported by continued confidence and demand in the residential sector. As Victoria’s population continues to grow, the merits of apartment living are becoming more attractive to Australian home owners and investors –whether it be for the empty nesters, the downsizers or first home owners etc. Developers have recognised this growing trend, backed by confidence and depth in the residential market and reflected in the volume of transactions moving into the 2015/2016 financial year. CBRE Victorian Development Sites team recognise the ever-changing market needs and continue to service this sector with dedicated and highly specialised sales experts to handle all buying and selling queries. We welcome you to the Spring Edition of The Collection of 2015. This edition showcases a wide range of development sites that are currently available for your purchasing consideration. Some of the sites have approved permits and some without. We also welcome you to visit the dedicated team website www.cbremelbourne.com.au which hosts all current listings and sold properties. On behalf of our team, I would like to take this opportunity to thank you all for your business in 2015 and we look forward to being of great service to you in the future.
    [Show full text]
  • The M1 Freeway Managed Motorway in Melbourne, Australia
    The M1 Freeway DATE TO GO HERE Managed Motorway in Melbourne, Australia Robert Freemantle Executive Director, Policy & Programs VicRoads, Australia MCW Upgrade Project | Slide Title to go here 1 Melbourne,Melbourne capital of the state of Victoria Internationallyoverview voted “World’s Most Livable City” – 4 times in the past decadeDATE TO GO HERE MCWMelbourne Upgrade Convention Project | Slide Bureau Title to go here 2 Victoria – General Information . 227,600 sq km or 3% of the area DATE TO GO HERE of Australia . Most densely populated state – 5.5m people, 24% of Australia . 4.1m people (>70%) in Melbourne . 4.4 million motor vehicles, 33% of Australian total . 3.5 million licensed drivers . 154,750 km of public roads . 51% of arterial road travel is in Melbourne . 25% of Australian road freight task MCW inUpgrade Victoria Project | Slide Title to go here 3 Melbourne Metropolitan Daily Traffic Volumes DATE TO GO HERE Key City Route Traffic Volume (veh/day) Westgate Fwy 180,000 Monash Fwy 180,000 Eastern Fwy 132,000 Hoddle Street 81,000 Kingsway 98,000 Nepean Hwy 88,000 Dandenong Road 73,000 MCW Upgrade Project | Slide Title to go here 4 Problems on Melbourne’s freeways DATE TO GO HERE . Daily volumes on Melbourne’s freeways are growing around 5% pa . Peak-hour traffic throughput is in decline - some sections have declined as much as 25% in the past 5 years. Regular flow breakdown and congestion during peak periods leading to: – Under-utilisation of the freeway – Reduced level of service – Longer and less reliable travel times – Greater risk of incidents and reduced safety 5 5 The importance of the M1 route in Melbourne DATE TO GO HERE .
    [Show full text]
  • Space For: Space For
    Space for: thegoing well-connected places CHIFLEY BUSINESS PARK 2 FEDERATION WAY, MOORABBIN AIRPORT, VIC OVERVIEW 2 Opportunity Chifley Business Park is an architecturally designed campus style estate, providing superior on-site amenities and facilities. Boasting convenient access to major roads and public transport routes, extensive landscaping, modern industrial and commercial spaces, and ample on-site parking, Chifley Business Park is a premium estate for customers looking to upgrade their corporate image. Now is the time to join high profile customers including Costco, Coca-Cola, Visy, Spectrum Brands, and Simplot in this 4,057 sqm facility. VIEW FROM ABOVE 3 Signalised intersections Signalised intersection Centre Dandenong Road Unit 2, 2 Federation Way Federation Way Costco Grange Road Chiey Business Park Signalised intersection Chiey Drive Moorabbin Airport Boundary Road Lower Dandenong Road LOCATION 4 Clever move Access Chifley Business Park is conveniently located close to major arterial roads including the Nepean Highway, Monash Freeway and Warrigal Road. The nearby Dingley Bypass provides excellent connectivity with the Bayside region, while the Dandenong Bypass provides connection to the established industrial precinct of Dandenong. The Mordialloc Freeway is a confirmed 9km freeway linking the Mornington Peninsula Freeway at Springvale Road to the Dingley Bypass. The Freeway will offer on/off ramps at both Lower Dandenong Road and Centre Dandenong Road providing direct connection to Moorabbin Airport. In addition to ample on-site car parking, buses service the park, operating between Hampton and Cheltenham train stations. CENTR ALLY CONNECTED 2.4KM 28KM to Monash to Port 5.6KM Freeway 21KM Melbourne 4 to Nepean to Melbourne Bus routes service Highway CBD the estate AMENITY 5 Abundance of retail and dining options Chifley Business Park offers convenient on-site amenities for employees to enjoy, including a café, gym, childcare centre and Costco.
    [Show full text]
  • 131123 Planning Report Draft V4 2008 6 2.Indd
    Burwood Village Neighbourhood Activity Centre Looking Towards the Future Study of planning opportunities east of Warrigal Road Adopted 19 May 2008 Burwood Village Neighbourhood Activity Centre Looking Towards the Future Study of planning opportunities east of Warrigal Road May 2008 contents contents 3 1.0 Introduction 1 2.1 Overview of the area around the Burwood Village Neighbourhood Activity Centre 2 2.2 Context of the study area 3 2.3 Existing land use and character in the centre 6 2.4 Population characteristics 10 2.5 Transport and Traffi c 11 3.0 Planning Policy Context 13 3.1 Melbourne 2030 13 3.2 Whitehorse Municipal Strategic Statement 13 3.3 City of Whitehorse Housing Study and residential development policies 13 3.4 Economic development and activity centres 13 3.5 Heritage 13 3.6 Urban Design Framework 13 3.7 Existing planning controls 14 4.0 Community consultation outcomes 15 5.0 Opportunities and constraints 16 6.0 Objectives and strategy 18 6.1 Enhancing Burwood Highway 18 6.2 Land use 18 6.3 Promoting quality development 18 6.4 Activity centre 18 6.5 Existing residential and industrial areas 18 6.6 Transport 18 7.0 Area action plan 21 7.1 Area 1 22 7.2 Area 2 23 7.3 Area 3 25 7.4 Area 4 26 7.5 Area 5 27 8.0 Summary of planning scheme recommendations 28 9.0 Attachment 1 – Methodology 29 9.1 Overall process for preparing the study 29 9.2 Inputs considered by the consultants 29 10.0 Attachment 2 – Minutes from Community Workshop 30 10.1 Welcome/ Introductions/ Purpose of the Workshop 30 10.2 Study Aims, Process and Role of each
    [Show full text]