State Projects Scheduled for Advertising
Total Page:16
File Type:pdf, Size:1020Kb
Connecticut Department of Transportation Updated: 9/9/21 State Projects Scheduled for Advertising September 2021 through August 2022 Project Location Route Description Improvement Scope Code Advertising Date: 9/1/21 0036-0184 DERBY CT 34 Reconstruction from Bridge St. to Ausonio Dr. RECONSTRUCTION NO ADD CAP K 0172-0506 DISTRICT 2 Various Install High Friction Surface Treatment at HIGH FRICTION E Various Locations Advertising Date: 9/8/21 0171-0469 DISTRICT 1 Various Install High Friction Surface Treatment at HIGH FRICTION E Various Locations Advertising Date: 9/15/21 0011-0156 BLOOMFIELD CT 178 Replace Br 01489 over Beaman Brook BRIDGE REPLACEMNT NO ADD CAP F 0128-0153 SIMSBURY CT 10 NHS - Replace Br 00653 o/ Hop Brook BRIDGE REPLACEMNT NO ADD CAP F 0132-0139 SOUTH WINDSOR I-291 & King St NHS - Rehab Br 05944 o/ Podunk River BRIDGE RESTORATION NO ADD CAP F 0170-3597 STATEWIDE Various Install Centerline Rumble Strips on Town SPOT SAFETY IMPROVEMENT D Roads 0172-0485 DISTRICT 2 Various Traffic Signal Safety Improvements (Proj. #2) TRAFFIC SIGNAL INSTALLATION F Advertising Date: 9/22/21 0015-0382 BRIDGEPORT I-95 NB Widen Br 03532 to Increase Exiting Capacity REVISE INTERCHANGE RAMPS H at Exit 27A to CT 8 NB 0028-0206 COLCHESTER Various Rehab/Replace Bridges (culverts) 06696, BRIDGE REPLACEMNT NO ADD CAP E 06781 & 06820 0063-0723 HARTFORD I-84 Replace Retaining Wall at South End of Br CONCRETE BARRIER RAIL D 01765 0079-0245 MERIDEN I-91/I-691/RT 15 Interchange Improvs - EB to NB (B/O from REVISE INTERCHANGE RAMPS L 79-240) - RFQ (Design-Build) 0102-0296 New CT 15 Resurfacing, Bridge & Safety Improvements, RECONSTRUCTION NO ADD CAP M Canaan/Norwalk CT 124 to Main Avenue Advertising Date: 9/29/21 0034-0351 DANBURY CT 39 Int. Imprvs. at Beckerle St. & East Gate Rd. MINOR INTERSECTION IMPROV E 0082-0321 MIDDLETOWN CT 154 Replace Br 02100 o/ Bible Rock Brook BRIDGE REPLACEMNT NO ADD CAP E 0086-0092 MORRIS CT 109 Replace Br 05417 (culvert) o/ Brook BRIDGE REPLACEMNT NO ADD CAP E 0095-0255 NEW MILFORD Construct New (Replacement) Maintenance FACILITY CONSTRUCTION H Facility 0106-0130 ORANGE CT 15 Interchange 57/58 Improvements at CT 34 INTESECTION REALIGNMENT F 0120-0095 SALEM CT 11 Rehab Br 06780 (culvert) o/ Brook BRIDGE REPLACEMNT NO ADD CAP D 0148-0212 WALLINGFORD CT 150 Rehab Br 03225 o/ Brook BRIDGE SUBSTUCTURE REPAIRS F 0162-0155 WINCHESTER SR 800 Replace Br 00617 o/ Mad River BRIDGE REPLACEMNT NO ADD CAP F Advertising Date: 11/3/21 0040-0141 EAST HADDAM CT 82 Rehab Br 01138 o/ CT River BRIDGE RESTORATION NO ADD CAP M 0173-0507 DISTRICT 3 Various Midblock Crosswalk Upgrades BICYCLE/PEDESTRIAN FACILITY C Advertising Date: 11/17/21 0320-0016 WINDSOR LOCKS RAIL Hartford Line - Windsor Locks Station FACILITY CONSTRUCTION M Scope Codes: From To From To From To A - LESS THAN $100,000 I - $10,000,000 $14,999,999 Q - $160,000,000 $199,999,999 B - $100,000 $199,999 J - $15,000,000 $19,999,999 R - $200,000,000 $249,999,999 C - $200,000 $499,999 K - $20,000,000 $29,999,999 S - $250,000,000 $299,999,999 D - $500,000 $999,999 L - $30,000,000 $39,999,999 T - $300,000,000 $399,999,999 E - $1,000,000 $2,499,999 M - $40,000,000 $59,999,999 U - $400,000,000 $499,999,999 F - $2,500,000 $4,999,999 N - $60,000,000 $89,999,999 V - $500,000,000 $599,999,999 G - $5,000,000 $7,499,999 O - $90,000,000 $119,999,999 W - $600,000,000 AND OVER H - $7,500,000 $9,999,999 P - $120,000,000 $159,999,999 Page 1 of 4 Connecticut Department of Transportation Updated: 9/9/21 State Projects Scheduled for Advertising September 2021 through August 2022 Project Location Route Description Improvement Scope Code Advertising Date: 11/24/21 0320-0023 SUFFIELD Rail CSO Breakout of P/N 320-16 (Hartford Line - FACILITY CONSTRUCTION I Windsor Locks Station) Advertising Date: 12/1/21 0031-0132 CORNWALL Replace Various Tanks FACILITY REHABILITATION F 0170-3320 WATERBURY Rehab 3 RR Bridges on Pan America Railways BRIDGE RESTORATION NO ADD CAP H Line 0320-0022 HARTFORD Rail Union Station Platform Roof FACILITY REHABILITATION F Advertising Date: 12/8/21 0301-0195 DARIEN Darien Railroad Station Improvements FACILITY REHABILITATION K Advertising Date: 12/15/21 0040-0146 EAST HADDAM CT 82 Replace Br 02510 over Strongs Brook BRIDGE REPLACEMNT NO ADD CAP E 0058-0337 GROTON Replace Wastewater Tank FACILITY REHABILITATION C 0154-0125 WESTBROOK Willard Avenue Rehab Br 00230 o/ I-95 BRIDGE DECK REPLACEMENT F Advertising Date: 12/22/21 0011-0158 BLOOMFIELD CT 185 Replace Br 05576 (Culvert) o/ Tumbledown BRIDGE RESTORATION NO ADD CAP E Brook Channel Advertising Date: 12/29/21 0108-0189 Plainfield/Sterling Trail Moosup Valley State Park Trail (CN) PEDESTRIAN WALKWAY F 0173-0511 DISTRICT 3 Various Replace Highway Illumination Systems at ILLUMINATION H Various Locations Advertising Date: 1/5/22 0110-0136 PLYMOUTH US 6 Operational revisions, No. Main/Agney INTESECTION REALIGNMENT F Advertising Date: 1/26/22 0076-0222 MANCHESTER I-384 Rehab Br 06650 (culvert) o/ Folly Brook BRIDGE REPLACEMNT NO ADD CAP F 0174-0424 DISTRICT 4 Various Replace Traffic Signals at Various Locations TRAFFIC SIGNAL INSTALLATION F Advertising Date: 2/2/22 0051-0274 FARMINGTON I-84/US 6/SR 531 Realign I-84 EB On-Ramp and US 6 REALIGNMENT NO ADD CAP F Advertising Date: 2/9/22 0171-0475 DISTRICT 1 Various Pavement Preservation - Ultra-Thin Bonded THIN RESURFACE TREATMENT E Overlay Advertising Date: 2/16/22 0172-0511 DISTRICT 2 Various Pavement Preservation - Chip Seal THIN RESURFACE TREATMENT E Advertising Date: 2/23/22 0172-0512 DISTRICT 2 Various Pavement Preservation - Ultra-Thin Bonded THIN RESURFACE TREATMENT G Overlay 0174-0438 DISTRICT 4 Various Midblock Crosswalk Upgrades BICYCLE/PEDESTRIAN FACILITY D Scope Codes: From To From To From To A - LESS THAN $100,000 I - $10,000,000 $14,999,999 Q - $160,000,000 $199,999,999 B - $100,000 $199,999 J - $15,000,000 $19,999,999 R - $200,000,000 $249,999,999 C - $200,000 $499,999 K - $20,000,000 $29,999,999 S - $250,000,000 $299,999,999 D - $500,000 $999,999 L - $30,000,000 $39,999,999 T - $300,000,000 $399,999,999 E - $1,000,000 $2,499,999 M - $40,000,000 $59,999,999 U - $400,000,000 $499,999,999 F - $2,500,000 $4,999,999 N - $60,000,000 $89,999,999 V - $500,000,000 $599,999,999 G - $5,000,000 $7,499,999 O - $90,000,000 $119,999,999 W - $600,000,000 AND OVER H - $7,500,000 $9,999,999 P - $120,000,000 $159,999,999 Page 2 of 4 Connecticut Department of Transportation Updated: 9/9/21 State Projects Scheduled for Advertising September 2021 through August 2022 Project Location Route Description Improvement Scope Code Advertising Date: 3/2/22 0092-0686 NEW HAVEN CT 15 Install MASH Metal Beam Rail METAL BEAM RAIL E 0164-0243 WINDSOR CT 75 Rehab Culvert @ Holcomb Hill Rd CONSTRUCT CULVERT C 0173-0523 DISTRICT 3 Various Pavement Preservation - Ultra-Thin Bonded THIN RESURFACE TREATMENT F Overlay Advertising Date: 3/9/22 0174-0454 DISTRICT 4 Various Pavement Preservation - Chip Seal THIN RESURFACE TREATMENT F Advertising Date: 3/16/22 0174-0455 DISTRICT 4 Various Pavement Preservation - Ultra-Thin Bonded THIN RESURFACE TREATMENT F Overlay Advertising Date: 3/30/22 0301-0192 STAMFORD Replace Catenary for Stamford Yard Lead FACILITY REHABILITATION M Tracks & Car Wash Facility Advertising Date: 4/5/22 0042-0324 EAST HARTFORD New Maintenance/Signs & Markings Facility FACILITY CONSTRUCTION J Advertising Date: 4/20/22 0017-0187 BRISTOL CT 72 Intersection Impr at CT 69 and Divinity St MAJOR INTERSECTION G 0172-0495 DISTRICT 2 Various Midblock Crosswalk Upgrades BICYCLE/PEDESTRIAN FACILITY D Advertising Date: 4/27/22 0015-0381 Bridgeport- CT 8 Replace Highway Signs & Supports SIGNING G Winchester Advertising Date: 5/4/22 0130-0173 SOUTHBURY I-84 I-84 Improvements at Exit 14 INTESECTION REALIGNMENT F 0170-3490 WALLINGFORD Various Replace Traf. Ctrl Sigls w/ RR Pre-Empt TRAFFIC SIGNAL INSTALLATION E Advertising Date: 5/25/22 0156-0181 WEST HAVEN I-95 NHS - Replace Br 00162 over MN RR & BRIDGE REPLACEMNT NO ADD CAP M Widen to Extend Decel. Lane - RFQ (Design- Build) 0173-0512 DISTRICT 3 Various Replace Traffic Signal LED Lamps in Various TRAFFIC SIGNAL REVISION E Locations Advertising Date: 6/8/22 0082-0322 MIDDLETOWN Portland St Upgrade Portland St. RR Xing & Close Access MINOR IMPRVMNT OF GRADE CROSSING E b/t CT 9 & Miller St., B/O of 82-318 0301-0509 STAMFORD Stamford MOE Facility Improvements FACILITY REHABILITATION K Advertising Date: 6/15/22 0044-0156 EAST LYME I-95 Improve I-95 Interchange 74 at CT 161 REVISE INTERCHANGE RAMPS O (80/20) 0056-0305 GREENWICH US 1 Replace Br 01872 o/ Greenwich Creek BRIDGE REPLACEMNT NO ADD CAP G Scope Codes: From To From To From To A - LESS THAN $100,000 I - $10,000,000 $14,999,999 Q - $160,000,000 $199,999,999 B - $100,000 $199,999 J - $15,000,000 $19,999,999 R - $200,000,000 $249,999,999 C - $200,000 $499,999 K - $20,000,000 $29,999,999 S - $250,000,000 $299,999,999 D - $500,000 $999,999 L - $30,000,000 $39,999,999 T - $300,000,000 $399,999,999 E - $1,000,000 $2,499,999 M - $40,000,000 $59,999,999 U - $400,000,000 $499,999,999 F - $2,500,000 $4,999,999 N - $60,000,000 $89,999,999 V - $500,000,000 $599,999,999 G - $5,000,000 $7,499,999 O - $90,000,000 $119,999,999 W - $600,000,000 AND OVER H - $7,500,000 $9,999,999 P - $120,000,000 $159,999,999 Page 3 of 4 Connecticut Department of Transportation Updated: 9/9/21 State Projects Scheduled for Advertising September 2021 through August 2022 Project Location Route Description Improvement Scope Code Advertising Date: 6/29/22 0043-0132 EAST HAVEN CT 337 Rehab Br 02166 o/ Morris Creek BRIDGE SUBSTUCTURE REPAIRS