State Projects Scheduled for Advertising

State Projects Scheduled for Advertising

Connecticut Department of Transportation Updated: 9/9/21 State Projects Scheduled for Advertising September 2021 through August 2022 Project Location Route Description Improvement Scope Code Advertising Date: 9/1/21 0036-0184 DERBY CT 34 Reconstruction from Bridge St. to Ausonio Dr. RECONSTRUCTION NO ADD CAP K 0172-0506 DISTRICT 2 Various Install High Friction Surface Treatment at HIGH FRICTION E Various Locations Advertising Date: 9/8/21 0171-0469 DISTRICT 1 Various Install High Friction Surface Treatment at HIGH FRICTION E Various Locations Advertising Date: 9/15/21 0011-0156 BLOOMFIELD CT 178 Replace Br 01489 over Beaman Brook BRIDGE REPLACEMNT NO ADD CAP F 0128-0153 SIMSBURY CT 10 NHS - Replace Br 00653 o/ Hop Brook BRIDGE REPLACEMNT NO ADD CAP F 0132-0139 SOUTH WINDSOR I-291 & King St NHS - Rehab Br 05944 o/ Podunk River BRIDGE RESTORATION NO ADD CAP F 0170-3597 STATEWIDE Various Install Centerline Rumble Strips on Town SPOT SAFETY IMPROVEMENT D Roads 0172-0485 DISTRICT 2 Various Traffic Signal Safety Improvements (Proj. #2) TRAFFIC SIGNAL INSTALLATION F Advertising Date: 9/22/21 0015-0382 BRIDGEPORT I-95 NB Widen Br 03532 to Increase Exiting Capacity REVISE INTERCHANGE RAMPS H at Exit 27A to CT 8 NB 0028-0206 COLCHESTER Various Rehab/Replace Bridges (culverts) 06696, BRIDGE REPLACEMNT NO ADD CAP E 06781 & 06820 0063-0723 HARTFORD I-84 Replace Retaining Wall at South End of Br CONCRETE BARRIER RAIL D 01765 0079-0245 MERIDEN I-91/I-691/RT 15 Interchange Improvs - EB to NB (B/O from REVISE INTERCHANGE RAMPS L 79-240) - RFQ (Design-Build) 0102-0296 New CT 15 Resurfacing, Bridge & Safety Improvements, RECONSTRUCTION NO ADD CAP M Canaan/Norwalk CT 124 to Main Avenue Advertising Date: 9/29/21 0034-0351 DANBURY CT 39 Int. Imprvs. at Beckerle St. & East Gate Rd. MINOR INTERSECTION IMPROV E 0082-0321 MIDDLETOWN CT 154 Replace Br 02100 o/ Bible Rock Brook BRIDGE REPLACEMNT NO ADD CAP E 0086-0092 MORRIS CT 109 Replace Br 05417 (culvert) o/ Brook BRIDGE REPLACEMNT NO ADD CAP E 0095-0255 NEW MILFORD Construct New (Replacement) Maintenance FACILITY CONSTRUCTION H Facility 0106-0130 ORANGE CT 15 Interchange 57/58 Improvements at CT 34 INTESECTION REALIGNMENT F 0120-0095 SALEM CT 11 Rehab Br 06780 (culvert) o/ Brook BRIDGE REPLACEMNT NO ADD CAP D 0148-0212 WALLINGFORD CT 150 Rehab Br 03225 o/ Brook BRIDGE SUBSTUCTURE REPAIRS F 0162-0155 WINCHESTER SR 800 Replace Br 00617 o/ Mad River BRIDGE REPLACEMNT NO ADD CAP F Advertising Date: 11/3/21 0040-0141 EAST HADDAM CT 82 Rehab Br 01138 o/ CT River BRIDGE RESTORATION NO ADD CAP M 0173-0507 DISTRICT 3 Various Midblock Crosswalk Upgrades BICYCLE/PEDESTRIAN FACILITY C Advertising Date: 11/17/21 0320-0016 WINDSOR LOCKS RAIL Hartford Line - Windsor Locks Station FACILITY CONSTRUCTION M Scope Codes: From To From To From To A - LESS THAN $100,000 I - $10,000,000 $14,999,999 Q - $160,000,000 $199,999,999 B - $100,000 $199,999 J - $15,000,000 $19,999,999 R - $200,000,000 $249,999,999 C - $200,000 $499,999 K - $20,000,000 $29,999,999 S - $250,000,000 $299,999,999 D - $500,000 $999,999 L - $30,000,000 $39,999,999 T - $300,000,000 $399,999,999 E - $1,000,000 $2,499,999 M - $40,000,000 $59,999,999 U - $400,000,000 $499,999,999 F - $2,500,000 $4,999,999 N - $60,000,000 $89,999,999 V - $500,000,000 $599,999,999 G - $5,000,000 $7,499,999 O - $90,000,000 $119,999,999 W - $600,000,000 AND OVER H - $7,500,000 $9,999,999 P - $120,000,000 $159,999,999 Page 1 of 4 Connecticut Department of Transportation Updated: 9/9/21 State Projects Scheduled for Advertising September 2021 through August 2022 Project Location Route Description Improvement Scope Code Advertising Date: 11/24/21 0320-0023 SUFFIELD Rail CSO Breakout of P/N 320-16 (Hartford Line - FACILITY CONSTRUCTION I Windsor Locks Station) Advertising Date: 12/1/21 0031-0132 CORNWALL Replace Various Tanks FACILITY REHABILITATION F 0170-3320 WATERBURY Rehab 3 RR Bridges on Pan America Railways BRIDGE RESTORATION NO ADD CAP H Line 0320-0022 HARTFORD Rail Union Station Platform Roof FACILITY REHABILITATION F Advertising Date: 12/8/21 0301-0195 DARIEN Darien Railroad Station Improvements FACILITY REHABILITATION K Advertising Date: 12/15/21 0040-0146 EAST HADDAM CT 82 Replace Br 02510 over Strongs Brook BRIDGE REPLACEMNT NO ADD CAP E 0058-0337 GROTON Replace Wastewater Tank FACILITY REHABILITATION C 0154-0125 WESTBROOK Willard Avenue Rehab Br 00230 o/ I-95 BRIDGE DECK REPLACEMENT F Advertising Date: 12/22/21 0011-0158 BLOOMFIELD CT 185 Replace Br 05576 (Culvert) o/ Tumbledown BRIDGE RESTORATION NO ADD CAP E Brook Channel Advertising Date: 12/29/21 0108-0189 Plainfield/Sterling Trail Moosup Valley State Park Trail (CN) PEDESTRIAN WALKWAY F 0173-0511 DISTRICT 3 Various Replace Highway Illumination Systems at ILLUMINATION H Various Locations Advertising Date: 1/5/22 0110-0136 PLYMOUTH US 6 Operational revisions, No. Main/Agney INTESECTION REALIGNMENT F Advertising Date: 1/26/22 0076-0222 MANCHESTER I-384 Rehab Br 06650 (culvert) o/ Folly Brook BRIDGE REPLACEMNT NO ADD CAP F 0174-0424 DISTRICT 4 Various Replace Traffic Signals at Various Locations TRAFFIC SIGNAL INSTALLATION F Advertising Date: 2/2/22 0051-0274 FARMINGTON I-84/US 6/SR 531 Realign I-84 EB On-Ramp and US 6 REALIGNMENT NO ADD CAP F Advertising Date: 2/9/22 0171-0475 DISTRICT 1 Various Pavement Preservation - Ultra-Thin Bonded THIN RESURFACE TREATMENT E Overlay Advertising Date: 2/16/22 0172-0511 DISTRICT 2 Various Pavement Preservation - Chip Seal THIN RESURFACE TREATMENT E Advertising Date: 2/23/22 0172-0512 DISTRICT 2 Various Pavement Preservation - Ultra-Thin Bonded THIN RESURFACE TREATMENT G Overlay 0174-0438 DISTRICT 4 Various Midblock Crosswalk Upgrades BICYCLE/PEDESTRIAN FACILITY D Scope Codes: From To From To From To A - LESS THAN $100,000 I - $10,000,000 $14,999,999 Q - $160,000,000 $199,999,999 B - $100,000 $199,999 J - $15,000,000 $19,999,999 R - $200,000,000 $249,999,999 C - $200,000 $499,999 K - $20,000,000 $29,999,999 S - $250,000,000 $299,999,999 D - $500,000 $999,999 L - $30,000,000 $39,999,999 T - $300,000,000 $399,999,999 E - $1,000,000 $2,499,999 M - $40,000,000 $59,999,999 U - $400,000,000 $499,999,999 F - $2,500,000 $4,999,999 N - $60,000,000 $89,999,999 V - $500,000,000 $599,999,999 G - $5,000,000 $7,499,999 O - $90,000,000 $119,999,999 W - $600,000,000 AND OVER H - $7,500,000 $9,999,999 P - $120,000,000 $159,999,999 Page 2 of 4 Connecticut Department of Transportation Updated: 9/9/21 State Projects Scheduled for Advertising September 2021 through August 2022 Project Location Route Description Improvement Scope Code Advertising Date: 3/2/22 0092-0686 NEW HAVEN CT 15 Install MASH Metal Beam Rail METAL BEAM RAIL E 0164-0243 WINDSOR CT 75 Rehab Culvert @ Holcomb Hill Rd CONSTRUCT CULVERT C 0173-0523 DISTRICT 3 Various Pavement Preservation - Ultra-Thin Bonded THIN RESURFACE TREATMENT F Overlay Advertising Date: 3/9/22 0174-0454 DISTRICT 4 Various Pavement Preservation - Chip Seal THIN RESURFACE TREATMENT F Advertising Date: 3/16/22 0174-0455 DISTRICT 4 Various Pavement Preservation - Ultra-Thin Bonded THIN RESURFACE TREATMENT F Overlay Advertising Date: 3/30/22 0301-0192 STAMFORD Replace Catenary for Stamford Yard Lead FACILITY REHABILITATION M Tracks & Car Wash Facility Advertising Date: 4/5/22 0042-0324 EAST HARTFORD New Maintenance/Signs & Markings Facility FACILITY CONSTRUCTION J Advertising Date: 4/20/22 0017-0187 BRISTOL CT 72 Intersection Impr at CT 69 and Divinity St MAJOR INTERSECTION G 0172-0495 DISTRICT 2 Various Midblock Crosswalk Upgrades BICYCLE/PEDESTRIAN FACILITY D Advertising Date: 4/27/22 0015-0381 Bridgeport- CT 8 Replace Highway Signs & Supports SIGNING G Winchester Advertising Date: 5/4/22 0130-0173 SOUTHBURY I-84 I-84 Improvements at Exit 14 INTESECTION REALIGNMENT F 0170-3490 WALLINGFORD Various Replace Traf. Ctrl Sigls w/ RR Pre-Empt TRAFFIC SIGNAL INSTALLATION E Advertising Date: 5/25/22 0156-0181 WEST HAVEN I-95 NHS - Replace Br 00162 over MN RR & BRIDGE REPLACEMNT NO ADD CAP M Widen to Extend Decel. Lane - RFQ (Design- Build) 0173-0512 DISTRICT 3 Various Replace Traffic Signal LED Lamps in Various TRAFFIC SIGNAL REVISION E Locations Advertising Date: 6/8/22 0082-0322 MIDDLETOWN Portland St Upgrade Portland St. RR Xing & Close Access MINOR IMPRVMNT OF GRADE CROSSING E b/t CT 9 & Miller St., B/O of 82-318 0301-0509 STAMFORD Stamford MOE Facility Improvements FACILITY REHABILITATION K Advertising Date: 6/15/22 0044-0156 EAST LYME I-95 Improve I-95 Interchange 74 at CT 161 REVISE INTERCHANGE RAMPS O (80/20) 0056-0305 GREENWICH US 1 Replace Br 01872 o/ Greenwich Creek BRIDGE REPLACEMNT NO ADD CAP G Scope Codes: From To From To From To A - LESS THAN $100,000 I - $10,000,000 $14,999,999 Q - $160,000,000 $199,999,999 B - $100,000 $199,999 J - $15,000,000 $19,999,999 R - $200,000,000 $249,999,999 C - $200,000 $499,999 K - $20,000,000 $29,999,999 S - $250,000,000 $299,999,999 D - $500,000 $999,999 L - $30,000,000 $39,999,999 T - $300,000,000 $399,999,999 E - $1,000,000 $2,499,999 M - $40,000,000 $59,999,999 U - $400,000,000 $499,999,999 F - $2,500,000 $4,999,999 N - $60,000,000 $89,999,999 V - $500,000,000 $599,999,999 G - $5,000,000 $7,499,999 O - $90,000,000 $119,999,999 W - $600,000,000 AND OVER H - $7,500,000 $9,999,999 P - $120,000,000 $159,999,999 Page 3 of 4 Connecticut Department of Transportation Updated: 9/9/21 State Projects Scheduled for Advertising September 2021 through August 2022 Project Location Route Description Improvement Scope Code Advertising Date: 6/29/22 0043-0132 EAST HAVEN CT 337 Rehab Br 02166 o/ Morris Creek BRIDGE SUBSTUCTURE REPAIRS

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us