<<

STATE OF

List of Projects for Dedication to nation and e-foundation stone laying on 25.08.2020 (Tuesday) at 11:30 AM

Sl. Name of Project Length in Cost in No. km Rs. crore

E-Foundation NH Projects 1. Construction of 4 lane ROB at km 14+800 (Jerai) on Katin - ROB 77.26 Beena section of NH-934 on EPC Mode under setuBharatam 2. Construction of 2 -lane ROB at Km 36+800 (Jarua) on Sagar -Khuraj-Bina section of NH-934 on EPC Mode under ROB 66.49 SetuBharatam 3. Construction of Major Bridge at Betwa River (436 mtr) at Bridge 24.66 km. 81/2 on NH-539 on EPC mode 4. Construction of High level Bridge across Kshipra River at Bridge 9.36 Km 20/2 on Indore Betul section of NH-47 on EPC Mode 5. Reconstruction of 6 nos. submersible / narrow / distressed bridgeson -Dinori section of NH-45 Ext. on EPC Bridge 26.02 Mode. 6. Strengthening work in km. 1/550 to 23 of Indore - Betul 22.6 14.03 Road on NH-47 7. Strengthening work in km. 32 to 35 of Ambua to Dahod on 4 2.58 NH-56 8. Strengthening work in km. 41 to 55 of Gulganj-Amanganj- 15 6.58 Pawai-Katni Road on NH-43 Ext 9. Strengthening work in km. 82=1, 101 to 103=3, 106=1, 112=1, 120 to 122=3, 124 to 134=11, 135 to 145= 11, 163 to 40.4 16.73 164=2, 167= 1, 182 to 183=2, 188= 1, & 220 to 222.400= 3.400 ( Tikamgarh- Prathvipur - Road) on NH-539 10. Strengthening work in km. 1, 2, 5 to 10, 13,14,18,20,26 to 33, 77 to 85, 96 to 98, 162 to 195 of Dinara- Pichhor Road 68 33.27 on NH-346 11. Strengthening work in km.115, 122, 127, 128, 136 to 148, 159, 182, 183, 188, 201 of SawaiMadhopur-Sheopur-Goras- 22 11.02 Shyampur Road on NH-552 Extn. 12. 4L of Nanasa to Pidgaon from Km 95.000 to 142.445 of 47.445 866.64 Indore – Harda Section of NH-47 13. 4L of Harda to Temgaon from Km 0.000 to 30.000 of 30 555 Harda-Betul Section of NH-47 14 4L of Chicholi to Belul from km 81.00 to km 121.248 of 40.25 620.36 Harda-Betul section of NH-47 15 4-laning of Katni Bypass section of NH-30 20 194.4 Sl. Name of Project Length in Cost in No. km Rs. crore

Dedication to Nation NH Project 16 2L+PS from Km 81 to 175 of Sanchi-Sagarsection of NH- 94.64 287.34 146 on EPC mode 17 2L+PS from Km 0.00 to 36.71 of -Sirmoursection of 36.71 162.56 NH-135B on EPC mode 18 Construction of HL Bridges at Km. 188/4 onChattarpur-UP Bridge 8.58 Borader section of NH-34 on EPC mode 19 Const. of High level Bridge overDhasan river at Km. 146/8- Bridge 16.68 10 of Bhopal-Sanchi-Sagar section of NH-146 on EPC Mode. 20 Reconstruction of 29 nos. Culverts and Minor bridges between Km. 3/8 to 87 Sagar- Chattarpur –MP/UP Border Bridge 39.73 section of NH-34 21 2L+PS from Km 131 to 189/4 of Sagar- Chattarpursection 57.42 178.23 of NH-34 on EPC mode. 22 2L+ PS from Km 5.500 to Km 22.910 (KhilchipurJirapur 25.18 101.61 section of newly declared NH-752 B on EPC mode 23 Strengthening work in km. 0 to 3200 BiaoraMaksudangarh 3.2 1.64 Road on New NH 752 B 24 Strengthening work in km. 34.560 to 36 of Anjad - Thikari 1.44 0.91 Road on NH-347B 25 Strengthening work in km.20 to 22 of (Jabalpur-Kundum- Shahpura-Dindori Road) & Km. 194, 195, 219, 220 of 7.6 3.31 SagarTola - Kabirchabutra stretch on NH- 45 Extn. 26 4L of Rewa to Maihar section of NH-30 (Package-I) 69.19 622 27 4L of Maihar to Katni and Katni to Sleemnabad section of 69.07 622 NH-30 (Package-II) 28 4L of Sleemnabad to Jabalpur section of NH-30 (Package- 68.26 810.22 IV) 29 4L of Jabalpur - Lakhnadon section of NH-30 & NH-34 80.82 928.83 30 4L of Biaora – Pachore- Sarangpur- Shajapur- Makshi- Dewas 141.26 1583.79 Section of NH-52 31 4L of Lalghati to Mubarakpur (Pkg-I) of Bhopal-Biaora 8.275 221.88 Section of NH-46 32 Balance work of 2 L+PS of Bhopal-SanchiSection of NH-146 53.775 167.2 33 4L of Nayagaon to Satanwardaof Gwalior-Shivpuri Section 97 1055 of NH-46 34 4L of existing road from km 169/6 to km 173/ 6 (Mohana Town Portion) of Gwalior- Shivpuri Section of NH-46 on EPC 3.2 18.39 mode (Under One Time Investment ) 35 4L of existing road from SimariyaTekri to HaripuraTiraha road from Km. 41/8 to Km. 50/10 of NH-44 at Dabra Town 10.3 49.75 and JaurasiMandir approach Road from Km. 22/4 to Km. 23/6 of NH-44 on EPC mode Total 1137.035 9404.05