STATE of MADHYA PRADESH List of Projects for Dedication to Nation

STATE of MADHYA PRADESH List of Projects for Dedication to Nation

STATE OF MADHYA PRADESH List of Projects for Dedication to nation and e-foundation stone laying on 25.08.2020 (Tuesday) at 11:30 AM Sl. Name of Project Length in Cost in No. km Rs. crore E-Foundation NH Projects 1. Construction of 4 lane ROB at km 14+800 (Jerai) on Katin - ROB 77.26 Beena section of NH-934 on EPC Mode under setuBharatam 2. Construction of 2 -lane ROB at Km 36+800 (Jarua) on Sagar -Khuraj-Bina section of NH-934 on EPC Mode under ROB 66.49 SetuBharatam 3. Construction of Major Bridge at Betwa River (436 mtr) at Bridge 24.66 km. 81/2 on NH-539 on EPC mode 4. Construction of High level Bridge across Kshipra River at Bridge 9.36 Km 20/2 on Indore Betul section of NH-47 on EPC Mode 5. Reconstruction of 6 nos. submersible / narrow / distressed bridgeson Jabalpur-Dinori section of NH-45 Ext. on EPC Bridge 26.02 Mode. 6. Strengthening work in km. 1/550 to 23 of Indore - Betul 22.6 14.03 Road on NH-47 7. Strengthening work in km. 32 to 35 of Ambua to Dahod on 4 2.58 NH-56 8. Strengthening work in km. 41 to 55 of Gulganj-Amanganj- 15 6.58 Pawai-Katni Road on NH-43 Ext 9. Strengthening work in km. 82=1, 101 to 103=3, 106=1, 112=1, 120 to 122=3, 124 to 134=11, 135 to 145= 11, 163 to 40.4 16.73 164=2, 167= 1, 182 to 183=2, 188= 1, & 220 to 222.400= 3.400 ( Tikamgarh- Prathvipur - Orchha Road) on NH-539 10. Strengthening work in km. 1, 2, 5 to 10, 13,14,18,20,26 to 33, 77 to 85, 96 to 98, 162 to 195 of Dinara- Pichhor Road 68 33.27 on NH-346 11. Strengthening work in km.115, 122, 127, 128, 136 to 148, 159, 182, 183, 188, 201 of SawaiMadhopur-Sheopur-Goras- 22 11.02 Shyampur Road on NH-552 Extn. 12. 4L of Nanasa to Pidgaon from Km 95.000 to 142.445 of 47.445 866.64 Indore – Harda Section of NH-47 13. 4L of Harda to Temgaon from Km 0.000 to 30.000 of 30 555 Harda-Betul Section of NH-47 14 4L of Chicholi to Belul from km 81.00 to km 121.248 of 40.25 620.36 Harda-Betul section of NH-47 15 4-laning of Katni Bypass section of NH-30 20 194.4 Sl. Name of Project Length in Cost in No. km Rs. crore Dedication to Nation NH Project 16 2L+PS from Km 81 to 175 of Sanchi-Sagarsection of NH- 94.64 287.34 146 on EPC mode 17 2L+PS from Km 0.00 to 36.71 of Rewa-Sirmoursection of 36.71 162.56 NH-135B on EPC mode 18 Construction of HL Bridges at Km. 188/4 onChattarpur-UP Bridge 8.58 Borader section of NH-34 on EPC mode 19 Const. of High level Bridge overDhasan river at Km. 146/8- Bridge 16.68 10 of Bhopal-Sanchi-Sagar section of NH-146 on EPC Mode. 20 Reconstruction of 29 nos. Culverts and Minor bridges between Km. 3/8 to 87 Sagar- Chattarpur –MP/UP Border Bridge 39.73 section of NH-34 21 2L+PS from Km 131 to 189/4 of Sagar- Chattarpursection 57.42 178.23 of NH-34 on EPC mode. 22 2L+ PS from Km 5.500 to Km 22.910 (KhilchipurJirapur 25.18 101.61 section of newly declared NH-752 B on EPC mode 23 Strengthening work in km. 0 to 3200 BiaoraMaksudangarh 3.2 1.64 Road on New NH 752 B 24 Strengthening work in km. 34.560 to 36 of Anjad - Thikari 1.44 0.91 Road on NH-347B 25 Strengthening work in km.20 to 22 of (Jabalpur-Kundum- Shahpura-Dindori Road) & Km. 194, 195, 219, 220 of 7.6 3.31 SagarTola - Kabirchabutra stretch on NH- 45 Extn. 26 4L of Rewa to Maihar section of NH-30 (Package-I) 69.19 622 27 4L of Maihar to Katni and Katni to Sleemnabad section of 69.07 622 NH-30 (Package-II) 28 4L of Sleemnabad to Jabalpur section of NH-30 (Package- 68.26 810.22 IV) 29 4L of Jabalpur - Lakhnadon section of NH-30 & NH-34 80.82 928.83 30 4L of Biaora – Pachore- Sarangpur- Shajapur- Makshi- Dewas 141.26 1583.79 Section of NH-52 31 4L of Lalghati to Mubarakpur (Pkg-I) of Bhopal-Biaora 8.275 221.88 Section of NH-46 32 Balance work of 2 L+PS of Bhopal-SanchiSection of NH-146 53.775 167.2 33 4L of Nayagaon to Satanwardaof Gwalior-Shivpuri Section 97 1055 of NH-46 34 4L of existing road from km 169/6 to km 173/ 6 (Mohana Town Portion) of Gwalior- Shivpuri Section of NH-46 on EPC 3.2 18.39 mode (Under One Time Investment ) 35 4L of existing road from SimariyaTekri to HaripuraTiraha road from Km. 41/8 to Km. 50/10 of NH-44 at Dabra Town 10.3 49.75 and JaurasiMandir approach Road from Km. 22/4 to Km. 23/6 of NH-44 on EPC mode Total 1137.035 9404.05 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us