Environmental Review Document Part 6 (PDF, 355.54

Total Page:16

File Type:pdf, Size:1020Kb

Environmental Review Document Part 6 (PDF, 355.54 Significance Criteria Comment Result in an invasive species The Proposed Action is unlikely to result in the establishment of harmful that is harmful to the migratory invasive species. species becoming established Horse Swamp comprises Melaleuca rhaphiophylla over introduced in an area of important habitat pasture herbs and grasses. The wetland is already considered degraded. for the migratory species The Proposed Action will not result in further degradation of this wetland. Seriously disrupt the lifecycle (breeding, feeding, migration or resting behaviour) of an The Proposed Action is unlikely to disrupt the lifecycle of the Glossy Ibis. ecologically significant The Proposed Action is not within Glossy Ibis breeding habitat. proportion of the population of a migratory species. Conclusion The Proposed Action is considered unlikely to have a significant impact on the Glossy Ibis. Potential impacts to MNES The potential impacts on MNES are described in Table 99. Table 99: Potential impacts on MNES Proposed Impact Activities Potential Impacts Action Stage Type Construction Direct Clearing of native vegetation. Permanent loss of: · 10.05 ha of Banksia Woodland of the Swan Coastal Plain TEC. · 81.4 ha of Carnaby’s Black Cockatoo foraging habitat including 54.1 ha quality habitat. · 68.1 ha of Forest Red-tailed Black Cockatoo foraging habitat including 38.0 ha of quality habitat. · 81.4 ha of Baudin’s Black Cockatoo foraging habitat including 42.8 ha of quality habitat. · Removal of 423 Black Cockatoo potential breeding trees including 33 trees with hollows, none of which were assessed as suitable for Black Cockatoo nesting. · Injury/mortality of Black Cockatoos from vehicle strike. · Inadvertent removal of trees with nesting occurring. 473 Proposed Impact Activities Potential Impacts Action Stage Type Indirect · Accidental clearing of native · Introduction and spread of declared vegetation. pests and other weed species. · Cut and fill works. · Introduction and spread of Phytophthora dieback. · Soil compaction. · Decline in Banksia Woodland TEC as · Construction of permanent a result of groundwater drawdown. and temporary infrastructure including but not limited to · Degradation of Carter’s Freshwater rail, roads, car parks, Mussel/potential Black-stripe Minnow buildings, hard stand and habitat from contamination of surface laydown areas. water, increased sediment loads, altered surface hydrology and Temporary groundwater · dewatering. abstraction for construction water supply and temporary · Disruption or disturbance to fauna as dewatering for construction a result of noise, vibration, light and purposes. dust. · Disturbance to Bennett Brook riverbed leading to increase sediment loads migrating downstream. Operation Indirect · Operation and maintenance · Introduction and spread of declared of the railway line pests and other weed species. · Operation of plant and · Introduction and spread of dieback. machinery and service vehicles. · Injury/mortality of Black Cockatoos from train strike. · Operation and maintenance of the electrified railway line. Public Transport Authority Malaga to Ellenbrook Rail Works 474 Mitigation of impacts to MNES Table 100 demonstrates how the PTA has applied the mitigation hierarchy of avoid, minimise and rehabilitate during design of the Proposed Action to address key potential impact to MNES. Table 100: Summary of environmental impacts and mitigation hierarchy for Matters of National Environmental Significance Potential impacts Assessment of impacts Preliminary Mitigation Hierarchy Direct Impacts Removal of up to Targeted surveys of habitat identified as Avoid 12.3 ha of inferred potentially critical to the survival of · A significant portion (6.95 ha) of suitable Caladenia Caladenia huegelii over two consecutive Caladenia huegelii habitat Area A, huegelii habitat. years have not encountered any represented by vegetation in Excellent individuals or populations of the species. condition, has been incorporated into Two areas of Suitable Habitat have been a NVRA. identified within the Development Envelope, which are synonymous with the · Permanent access paths where the Banksia Woodlands TEC. An assessment rail alignment crosses the junction against critical habitat criteria has between Drumpellier Drive and determined that neither Area A nor Area D Gnangara Road have been relocated can be considered critical to the survival of to avoid impact on Caladenia huegelii the species. habitat Area D. The Proposed Action is therefore not Minimise considered to have a significant impact on · The potential habitat coincides with Caladenia huegelii habitat. TEC Patch 1 and TEC Patch 5 of the Banksia Woodlands TEC. Measures aimed at minimising impacts to Caladenia huegelii are consistent with those implemented for minimising impacts on this TEC. These are outlined in Section 5.7 and will be implemented in accordance with the TECMP. · The embankment and proposed alignment have been modified to minimise impacts to Caladenia huegelii habitat Area D. · The location of the dive structure under the southbound carriageway of Tonkin Highway was modified to allow the rail to cross Caladenia huegelii habitat Area A through the lowest condition vegetation practicable. Rehabilitate · Not Applicable. Removal of quality Field surveys identified 51.4 ha of Avoid Black Cockatoo Carnaby’s quality foraging habitat (habitat · The Development Envelope has been foraging habitat classed as medium or high quality) within aligned to avoid areas of quality the Proposed Action’s Footprint and within foraging habitat wherever practicable. this area 38 ha Forest Red-tailed Black Cockatoo and 42.8 ha Baudin’s quality · NVRAs have been established that foraging habitat. specifically incorporate potential Black Cockatoo habitat. 475 Potential impacts Assessment of impacts Preliminary Mitigation Hierarchy Minimise · Where unavoidable, the alignment has been designed to minimise impacts on Black Cockatoo habitat. Rehabilitate · Not Applicable Removal of 423 Of the 423 potential nesting trees (trees Avoid potential breeding with DBH > 500mm), 33 were noted to · The Development Envelope has been trees for Carnaby’s contain hollows. An inspection of hollows aligned to avoid potential breeding and Forest Red- determined that none are considered trees wherever practicable. tailed Black suitable for nesting purposes. No actual · NVRAs have been established that Cockatoos. nesting or sign of nesting has been specifically incorporate Black observed. Cockatoo breeding trees. Field surveys identified 30.8 ha of potential Minimise suitable roosting habitat within the · Where unavoidable, the alignment Development Envelope, however no has been designed to minimise roosting was observed. There are no impacts on Black Cockatoo breeding historical records of roosting occurring trees. within the Development Envelope Rehabilitate · Not Applicable Injury/mortality of Injury of Black Cockatoos may occur as a Avoid Black Cockatoos result of vehicle movement during · Not Applicable. from vehicle and/or construction activities or train passage train strike during operation. Minimise Black cockatoos are known to drop to the · The Proposed Action includes high ground when they alight from a foraging fencing to deter Black Cockatoos from location, and this increases the risk of entering the rail corridor. vehicle strike when alighting from roosts · No Black Cockatoo foraging species adjacent to transport corridors. will be planted near the train corridor Habitat that attracts black cockatoos to for landscaping to deter use of these forage adjacent to transport corridors areas by Black Cockatoos. increases the risk of vehicle impact resulting in mortality and injury. Rehabilitate · Not Applicable. Removal of up to Two TEC patches will be impacted by the Avoid 10.05 ha of Banksia Proposed Action. The Proposed Action will · The Proposed Action has been Woodlands of the result in the clearing of 8.54 ha of designed to avoid three patches of Swan Coastal Plain vegetation from Patch 2 Malaga TEC, TEC that were mapped within the listed as a TEC comprising 7.26 ha in Very Good condition survey area. under EPBC Act and 0.84 ha in Good condition. The and Priority 3 by Proposed Action will result in the clearing · A significant portion (6.22 ha) of DBCA. of up to 1.51 ha of vegetation from Patch 5 vegetation in Excellent condition Gnangara Road all of which is in within Patch 1 has been incorporated Good – Very Good condition. The into a NVRA. alignment dissects Patch 1, resulting in Minimise increased edge effects and creating two smaller patches. · Permanent access paths where the rail alignment crosses the junction An assessment against the significant between Drumpellier Drive and impact guidelines indicates that the Gnangara Road have been relocated impacts of the Proposed Action on Banksia to minimise the impact on TEC Woodland TEC are likely to be considered Patch 5. significant. Public Transport Authority Malaga to Ellenbrook Rail Works 476 Potential impacts Assessment of impacts Preliminary Mitigation Hierarchy · The embankment and proposed alignment have been modified to minimise impacts to TEC Patch 5. · The location of the dive structure under the southbound carriageway of Tonkin Highway was modified to allow the rail to cross Patch 1 through the lowest condition vegetation practicable. Rehabilitate · Not Applicable. Indirect Impacts – Construction Phase Edge effects Vegetation condition has the potential to Avoid decline adjacent to the alignment where it · Not
Recommended publications
  • Benefits to Western Australian Motorists from Taxes, Fees And
    REPORT TO RAC WA MARCH 2020 BENEFITS TO WESTERN AUSTRALIAN MOTORISTS FROM TAXES, FEES AND CHARGES ACIL ALLEN CONSULTING PTY LTD ABN 68 102 652 148 LEVEL NINE 60 COLLINS STREET MELBOURNE VIC 3000 AUSTRALIA T+61 3 8650 6000 F+61 3 9654 6363 LEVEL ONE 50 PITT STREET SYDNEY NSW 2000 AUSTRALIA T+61 2 8272 5100 F+61 2 9247 2455 LEVEL FIFTEEN 127 CREEK STREET BRISBANE QLD 4000 AUSTRALIA T+61 7 3009 8700 F+61 7 3009 8799 LEVEL SIX 54 MARCUS CLARKE STREET CANBERRA ACT 2601 AUSTRALIA T+61 2 6103 8200 F+61 2 6103 8233 LEVEL TWELVE, BGC CENTRE 28 THE ESPLANADE PERTH WA 6000 AUSTRALIA T+61 8 9449 9600 F+61 8 9322 3955 167 FLINDERS STREET ADELAIDE SA 5000 AUSTRALIA T +61 8 8122 4965 ACILALLEN.COM.AU REPORT AUTHORS JOHN NICOLAOU, EXECUTIVE DIRECTOR MARSHALL ROBERTS, ANALYST E: [email protected] E: [email protected] D: (08) 9449 9616 D: (08) 9449 9620 RELIANCE AND DISCLAIMER THE PROFESSIONAL ANALYSIS AND ADVICE IN THIS REPORT HAS BEEN PREPARED BY ACIL ALLEN CONSULTING FOR THE EXCLUSIVE USE OF THE PARTY OR PARTIES TO WHOM IT IS ADDRESSED (THE ADDRESSEE) AND FOR THE PURPOSES SPECIFIED IN IT. THIS REPORT IS SUPPLIED IN GOOD FAITH AND REFLECTS THE KNOWLEDGE, EXPERTISE AND EXPERIENCE OF THE CONSULTANTS INVOLVED. THE REPORT MUST NOT BE PUBLISHED, QUOTED OR DISSEMINATED TO ANY OTHER PARTY WITHOUT ACIL ALLEN CONSULTING’S PRIOR WRITTEN CONSENT. ACIL ALLEN CONSULTING ACCEPTS NO RESPONSIBILITY WHATSOEVER FOR ANY LOSS OCCASIONED BY ANY PERSON ACTING OR REFRAINING FROM ACTION AS A RESULT OF RELIANCE ON THE REPORT, OTHER THAN THE ADDRESSEE.
    [Show full text]
  • Northlink WA Stage 1 - Southern Section Perth, WA, Australia
    CASE STUDY ––––––––––––––––––––––––– Northlink WA Stage 1 - Southern Section Perth, WA, Australia Reinforced Earth® TerraTilt® Abutment & Retaining walls Owner: Main Roads WA Consultants: Aurecon Contractor: John Holland Pty Ltd Construction: Nov 2016 - Jan 2018 Background Challenges The $1.02 billion NorthLink WA - Re-design an in-situ counterfort Project, jointly funded by the retaining wall to a Reinforced Federal and State Government, Earth® wall that can takes traffic off local roads and accommodate large horizontal onto the Tonkin Highway. This traffic barrier loads. means local roads will be used for - Large horizontal bridge loads local traffic and those who live and - Architectural finish, circle pattern work locally will experience a safer, - Curved abutment panels with more peaceful environment. It also architectural finish, circle pattern provides an efficient alternative freight route, taking about 80 per Solutions cent of trucks away from the Great RECO was able to develop a modified Northern Highway. traffic barrier and Reinforced Earth® wall interaction that restrained any The southern section of Northlink horizontal loads from the traffic WA provides a freeway-standard, barriers being transferred to the wall free-flowing link from Collier Road itself. through to Reid Highway via Tonkin Highway. The system incorporates a column and capping beam that the traffic Works included: barrier is cast on top of. The capping - Grade separations at Benara beam has soil reinforcement Road, Morley Drive and Collier connected to it and it is this, along Road with the columns, that restrain the - 4m wide shared path along horizontal loading. Tonkin Highway from Guildford Road to Reid Highway Due to traffic barrier loads not being transferred to the wall, we were able The Reinforced Earth Company to use our standard TerraTilt® panel (RECO) was awarded the design design with optimised thickness and and supply of the abutment walls at reinforcement.
    [Show full text]
  • Malaga to Ellenbrook Rail Works
    Malaga to Ellenbrook Rail Works Referral Supplementary Document December 2019 For more information contact Public Transport Authority Public Transport Centre, West Parade, Perth WA 6000 PO Box 8125, Perth Business Centre, Perth WA 6849 Telephone: (08) 9326 2000 Email: [email protected] www.pta.wa.gov.au Document Information Document Name Prepared by C Baxter Reviewed by M Ludlow Prepared for Environmental Protection Authority Version / Revision 1A Date 24/12/2019 Distribution List Name Position Organisation Anthony Sutton Executive Director EPA Services Hans Jacob Manager Infrastructure Assessment EPA Services Dehlia Goundrey Manager Strategic Assessment EPA Services Contents Contents ........................................................................................................................................ 3 Executive Summary ...................................................................................................................... 9 Proposal Title: Malaga to Ellenbrook Rail Works ........................................................................ 9 1. Introduction .......................................................................................................................... 20 1.1. Purpose and scope ......................................................................................................... 20 1.2. Proponent ....................................................................................................................... 20 1.3. Environmental Impact Assessment Process ..................................................................
    [Show full text]
  • Main Roads Tonkin Highway Guildford Road to Hepburn Avenue
    Main Roads Tonkin Highway Guildford Road to Hepburn Avenue Environmental Protection Act Referral Supporting Document Don Aitken Centre Waterloo Crescent, East Perth, 6004 31 July 2019 56957/R001 (Rev 1) JBS&G Australia Pty Ltd T/A Strategen-JBS&G Main Roads Tonkin Highway Guildford Road to Hepburn Avenue Environmental Protection Act Referral Supporting Document Don Aitken Centre Waterloo Crescent, East Perth, 6004 31 July 2019 56957/R001 (Rev 1) JBS&G Australia Pty Ltd T/A Strategen-JBS&G Table of Contents 1. Summary ........................................................................................................................ 1 1.1 Project Information ............................................................................................. 1 1.2 Impacts to key environmental aspects ................................................................ 2 1.3 Key Environmental Management Actions ........................................................... 2 1.4 Summary of Regulatory Approvals ...................................................................... 3 2. INTRODUCTION .............................................................................................................. 4 2.1 Purpose of this document ................................................................................... 4 3. PROJECT DESCRIPTION .................................................................................................. 5 3.1 Proposal Location ...............................................................................................
    [Show full text]
  • Annual Report
    2019 ANNUAL REPORT CONNECTING PEOPLE AND PLACES Main Roads Annual Report 2019 2 Contents Welcome ....................................................................................................................................................................4 Overview ....................................................................................................................................................................6 Our Stories ........................................................................................................................................................................ 7 Our Finances ...................................................................................................................................................................11 Our Performance ..........................................................................................................................................................13 Our Outcomes ................................................................................................................................................................14 Commissioner’s Foreword ...........................................................................................................................................17 Managing Director’s Review .........................................................................................................................................18 About Us ..................................................................................................................................................................20
    [Show full text]
  • Offsets Paper: On-Ground Management Offset at Whiteman Park Malaga to Ellenbrook Rail Works Proposal September 2020
    Offsets Paper: On-ground management offset at Whiteman Park Malaga to Ellenbrook Rail Works Proposal September 2020 Document Information Version Prepared Description/Changes Reviewed Authorised Provided Version by made by for release to Date by A B. Lockley First Draft J. Morrell J. Morrell DWER Sept 2020 For more information contact Public Transport Authority Public Transport Centre, West Parade, Perth WA 6000 PO Box 8125, Perth Business Centre, Perth WA 6849 Telephone: (08) 9326 2000 Email: [email protected] www.pta.wa.gov.au Contents 1. Introduction ............................................................................................................................ 4 1.1. Malaga to Ellenbrook Rail Works Proposal ....................................................................... 4 1.2. Regulatory context ............................................................................................................ 4 1.3. Regulator assessment of the Proposal ............................................................................. 4 1.4. Objective .......................................................................................................................... 5 1.5. Stakeholder Consultation .................................................................................................. 5 1.6. Assumptions and limitations ............................................................................................. 5 2. Significant Residual Environmental Impacts ......................................................................
    [Show full text]
  • Northlink WA Traffic Update
    MAIN ROADS WESTERN AUSTRALIA AUGUST 2019 NorthLink WA Traffic Update Changed driving conditions at the Gnangara Road and The Promenade Interchanges. What’s happening at Tonkin Highway near Ellenbrook? The final stages within the Gnangara Road / Tonkin Highway interchange will open to traffic in the afternoon on 17 August. This means that all movements north, south, east and west will be possible between Gnangara Road and Tonkin Highway. Additionally, the first four ramps within The Promenade / Tonkin Highway interchange will open to allow direct access into Ellenbrook. The remaining ramps are expected to open in late 2019. A closer view of the new ramps to open within the interchange: • Motorists who travel north or south on Tonkin Highway will use the new bridge over Gnangara Road or the interchange ramps to continue their journey. • Motorists who travel into or out of Ellenbrook via Tonkin Highway can use the upgraded Drumpellier Drive roundabout and The Promenade interchange. • Access to Neaves Road and beyond to Muchea will be available when NorthLink WA northern section opens, expected in late 2019. Thanks for your patience The $1.02 billion NorthLink WA If you travel through roadworks along NorthLink WA, initiative is jointly funded by the slow down and enjoy the ride – the benefits will be Australian ($821m) and Western worth it. Please take care and drive safely through the new road configuration. Australian ($204m) governments. Will there be access for cyclists and pedestrians? A 16 km section of the 4 metre-wide principal shared path along Tonkin Highway will open from Benara Road to Mitre Bend in Ellenbrook.
    [Show full text]
  • FAST FACTS the Future Is Brabham
    Exciting new community The future is Brabham in an established area with existing schools, shops and restaurants on your We’re creating a connected community that will feel vibrant and fresh while doorstep. retaining the soul and character of the natural and cultural heritage of the area. Neighbourhoods that will encourage people to venture outside 1.5km to Swan Valley through intelligent street design and a network of connected walkways & 20km to Perth CBD. that facilitate the buzz of daily interaction. We are reimagining the notion of what a home can be for everyone. Drawing the best from the past and present to create a better future. Awarded a 6 star ‘Green Star’ Brabham is your chance to be part of a diverse, inclusive and forward- certification by the Green Building thinking community where you’ll always be close to everything you need. 6 FAST FACTS Council of Australia. SIZE AND LOCATION PARKS AND RESERVES SCHOOLS 220ha master-planned community Brabham will provide a range of public Two future primary schools and a Located 20km north-east of Perth CBD in open spaces and natural assets such highschool the City of Swan as St Leonard’s creek, with all parks Brabham Primary School opening in 2021, Within 1.5km of the Swan Valley wine region designed to be within a 400m walking just 250m from the estate Upon completion, Brabham will boast distance for all residents Hop and a skip to local schools approximately 3,300 dwellings delivering Brabham is also adjacent to Whiteman – 3km to Riverlands Montessori School an affordable and integrated
    [Show full text]
  • Perth–Darwin National Highway (Swan Valley Section)
    Final Public Environment Report Perth–Darwin National Highway (Swan Valley Section) FEBRUARY 2016 | PART A: DRAFT PUBLIC ENVIRONMENT REPORT Public Environmental Review Perth-Darwin National Highway (Swan Valley Section) SEPTEMBER 2015 | VOLUME I: MAIN TEXT This document is a Public Environmental Review under the Environmental Protection Act 1986 (WA) and a draft Public Environment Report under the Environment Protection and Biodiversity Conservation Act 1999 (Cth). EXECUTIVE SUMMARY Introduction Main Roads Western Australia (MRWA) proposes to construct a new section of the Perth–Darwin National Highway (hereafter referred to as ‘the proposal’) between Malaga and Muchea, Western Australia. The proposal is 38 km of new dual carriageway highway to the west of the Swan Valley and will connect the intersection of Tonkin Highway and Reid Highway in the south with Great Northern Highway and Brand Highway in the north. The proposal is the culmination of decades of planning for the southern terminus of the Perth–Darwin National Highway (PDNH), a key 4,000 km road transport route linking Perth with northern Western Australia and the Northern Territory. This document is a Public Environmental Review (PER) required under Western Australian environmental legislation and a Public Environment Report required under Commonwealth environmental legislation. It will be used by Western Australian and Commonwealth agencies as the basis for environmental assessment of the proposal. Background and Context The current PDNH alignment follows Great Northern Highway through the Swan Valley between Roe Highway and Muchea. However, urban growth and increased tourism between Midland and Bindoon has generated additional traffic on roads in and around the Swan Valley, including on Great Northern Highway.
    [Show full text]
  • Henley Brook Local Structure Plan
    HENLEY BROOK LOCAL STRUCTURE PLAN VARIOUS LOTS ON STARFLOWER ROAD, PARK STREET, HENLEY STREET, BROOKLANDS DRIVE, DIANE PLACE, ANDREA DRIVE, PETRANA PLACE, LOSINO BOULEVARD AND ASTURIAN DRIVE, HENLEY BROOK CITY OF SWAN NOVEMBER 2020 Prepared for: Progress Developments (on behalf of Little Property (WA) Pty Ltd) Prepared by: Burgess Design Group A: 101 Edward Street, Perth WA 6000 P: PO Box 8779, Perth Business Centre, WA 6849 T: (08) 9328 6411 E: [email protected] Project planner Mark Szabo Job code PRO BRO File reference 201111RLGA_Henley Brook LSP v3 (TRACKED CHANGES) Revision: Date: Description: Author: Reviewer: 0 28/12/19 First issue Mitch Bisby Mark Szabo/Jon Burgess 1 07/02/19 LWMS updates Mitch Bisby Mark Szabo 2 26/07/19 Pre-lodgement updates Mitch Bisby Mark Szabo 3 11/11/20 WAPC modifications Mitch Bisby Mark Szabo ENDORSEMENT OF THE HENLEY BROOK LOCAL STRUCTURE PLAN This structure plan is prepared under the provisions of the City of Swan Local Planning Scheme No. 17. IT 15 CERTIFIED THAT THIS STRUCTURE PLAN WAS APPROVED BY RESOLUTION OF THE WESTERN AUSTRALIAN PLANNING COMMISSION ON: 12 February 2021 Date Signed for and on behalfi,,' of4ptern Australian Planning Commission: srW ry=i-. An officer of the Commission duly authorised by the Commission pursuant to section '16 of the Planning and Development Act 2005 for that purpose, in the presence of: Witness 12 February 2021 Date 12 February 2031 Date of Expiry EXECUTIVE SUMMARY This Structure Plan applies to land generally bound by Starflower Road to the west, Gnangara Road to the north, Morgan Fields Estate and the planned Henley Brook Avenue to the east, and Park Street to the south, being the land located within the inner edge of the line denoting the structure plan boundary on the Structure Plan Map.
    [Show full text]
  • The Perth Freight Link Project 1/ Developing Transport Networks; Delivering Safer Roads
    4145 ~mainro d .!:.iiiIf~ WESTERN. AUSl~ RALlA S Australian Government BUILDING OUR FUTURE The Perth Freight Link Project 1/ Developing Transport Networks; Delivering Safer Roads Contents Foreword: Minister for Transport .............................................................................................................. 2 Executive summary ................................................................................................................................. 4 Perth Freight Link Project Scope ............................................................................................................. 6 Perth Freight Link Route Heavy Vehicle Charge .................................................................................. 8 Road Infrastructure Upgrades ........................................................................................................... 10 Why this project is needed ..................................................................................................................... 13 1. Transport Demand ....................................................................................................................... 13 The benefits of Roe 8 and the Fremantle Tunnel- meeting transport demand and reducing congestion ............................................................................................................. 14 2. Improved road safety as a result of less congestion ..................................................................... 18 The benefits of Roe 8 and the Fremantle
    [Show full text]
  • Northlink-Wa-Abbey-Street-Fact-Sheet
    MAIN ROADS WESTERN AUSTRALIA MAY 2016 NorthLink WA Fact Sheet ACCESS CHANGES TO ABBEY STREET The upgrade of Tonkin Highway as part of NorthLink WA requires Abbey Street to be made into a cul-de-sac at the intersection with Morley Drive. Planning since the 1980s indicates that this junction would be closed because of its close proximity to Tonkin Highway. When NorthLink WA is complete, the Tonkin Highway Interchange at Morley Drive will be a free-flowing roundabout at ground level, with a raised Tonkin Highway passing over the top. The new roundabout will be very close to Abbey parking area on the eastern side of Benefits Street and will have vehicles travelling Tonkin Highway within the road reserve Many road users are avoiding the at relatively high traffic speeds. If Abbey to access the school via the pedestrian currently congested Tonkin Highway Street was to stay open, it would result underpass. This car park will be by using local roads. Once complete, in: removed to construct the new highway NorthLink WA will discourage such and interchange with Morley Drive. • fewer gaps for existing traffic – no ‘rat running’ through local streets by traffic lights at the new interchange In addition to new parking in and attracting traffic onto a safe and efficient will mean more continuous traffic flow around the school grounds, the school highway that is purpose built to handle and leave fewer gaps for drivers to community requested that some high traffic volumes. Without NorthLink exit from Abbey Street; and parking be provided along Abbey Street. WA, local roads would become busier, less safe and more congested.
    [Show full text]