OPERATIONAL GUIDELINES
FOR
COIR VIKAS YOJANA (CVY)
The following components:-
1. COIR INDUSTRY TECHNOLOGY UPGRADATION SCHEME (CITUS) 2. SCIENCE AND TECHNOLOGY (S&T) 3. SKILL UPGRADATION AND MAHILA COIR YOJANA 4. EXPORT MARKET PROMOTION (EMP) 5. DOMESTIC MARKET PROMOTION (DMP) 6. TRADE AND INDUSTRY RELATED FUNCTIONAL SUPPORT SERVICES( TIRFSS) 7. WELFARE MEASURES
GOVERNMENT OF INDIA
MINISTRY OF MICRO, SMALL AND MEDIUM ENTERPRISES
Coir Board Head Office, M G Road, Kochi — 682016. Phone : 0484 2351900 Fax : 2370034 e-mail: [email protected], [email protected] Website : coirboard.gov.in
F.No.5(9)/2017-Coir OPERATIONAL GUIDELINES FOR COIR INDUSTRY TECHNOLOGY UPGRADATION SCHEME (CITUS)
1. Short Title: The component may be called Coir Industry Technology Upgradation Scheme (CITUS) 2. Objective:
The objectives of this component are,
• To provide modern infrastructure facilities to the production units resulting in improvement of productivity and quality. • To support the establishment of new 'State of the Art' Coir Processing Units. • To spread of the industry to potential areas. • To promote the enhanced utilization of available raw material. • To create more employment opportunities, especially for women in rural areas. • To attract new generation entrepreneurs to the industry. • To modernise the existing coir units. • To promote the development and installation cof information technology including enterprise resource planning (ERP). • To support the production of high value customer oriented products. • To make the Coir Industry integrated and competitive with modern technologies. • To facilitate the adoption of eco-friendly production techniques. • To achieve the target of a pollution free coir industry with technological advancements.
3. Nodal Agency:
3.1 Coir Board, Kochi will be the Nodal Agency. The component will be implemented through the Regional/ Sub-regional offices of the Coir Board. Technical interventions, wherever necessary, will be provided by Central Coir Research Institute (CCRI), Kalavoor and Central Institute of Coir Technology (CICT), Bangalore and other institutes engaged in the development and promotion of coir industry. The component will be periodically monitored by the Coir Board and the Ministry of Micro, Small and Medium Enterprises (MSME), Government of India. 3.2 The applications for assistance under the component will be invited by Coir Board, at periodic intervals by releasing All-India advertisement with particular emphasis in coconut producing regions. Publicity through all other sorts like web based electronic & IT tools etc. publicity shall also be undertaken. The component will be popularized through state/UT Govts, Industrial associations etc..
Wage
F.No.5(9)/20 1 7-Coir 3.3 The applicant/beneficiary unit seeking assistance under this component shall file applications online with all relevant details /documents prescribed. 3.4 The Regional/ Sub Regional Officers of the Board will conduct on the spot inspection of the units, verify the documents and recommend the quantum of incentive as per the guidelines and forward their due recommendations for obtaining sanction of the competent authority for release of financial assistance. Applications for financial assistance will be duly examined by the above offices to ascertain whether the requirements have been duly complied with and the acceptance/ rejection of the application will be communicated to the applicant within 15 days from the date of receipt of the application. In the case of rejection, clearcut reason/s there of shall be communicated to the applicant.
4. Interventions under the component
4.1 Assistance under the component will be available to entrepreneurs in the categories of individuals/partnership firms, SHGs, Associations, enterprises from small scale / medium / co- operative/ private sector / public sector, interested for production of value added coir /coir blended items, where coir is the dominant fibre, by setting up new unit or adding to the existing capacity subject to investment only in new plant and machinery. No applications from those units exceeding the investment limits prescribed for medium scale enterprises in the MSME Act from time to time shall be considered for the grant of assistance under this component. 4.2 All eligible Coir units under the component will be entitled to get financial assistance for procurement of eligible Plant and Machinery for modernisation, upgradation and / or establishing a new unit on making an application in the prescribed format for the purpose. The financial assistance shall be 25% of the cost of admissible items of Plant and Machinery procured by the Coir units. The upper ceiling of the financial assistance will be Rs.2.50 crores per coir unit/ project. 4.3 The financial assistance will be payable only in Rupees in India through Direct Benefit Transfer (DBT) mode and Public Finance Management System (PFMS) as reimbursement of the amount invested. The amount will be released after the Coir Unit installs the eligible machinery and commences its operation. The applicant unit will be at liberty to procure the Plant and machinery from out of the loan of any financial institution/ bank/ leasing company or from own resources.
5 Eligibility:
All coir production/processing units newly established will be eligible to apply for assistance. All coir production/ processing units registered with Coir Board under Coir Industry (Registration) Rules, 2008 and having Udyog Aadhar are eligible to apply for financial assistance for modernisation under this scheme. A new unit which has applied for/availed of assistance under this component. scheme will have to complete 5 years of successful operation before applying for assistance under modernisation.
21Page ij F.No.5(9)/2017-Coir The details are as follows:
i) Financial assistance under this component will be extended to entire coir sector of the country. The units applying for the assistance shall be within the investment limits prescribed for Small and Medium Enterprises under the MSME Act from time to time. ii) The application with all relevant documents shall be filed online. The Regional Officer/ Sub Regional Officer/ In-charge of the Coir Board will conduct on the spot inspection of the unit and will verify all the documents and assess the quantum of financial assistance and recommend those cases complete in all respect to Coir Board Head Quarters online for obtaining the sanction from the Competent Authority. iii) The equipment and motors eligible for assistance under the scheme shall not be below the standards prescribed from time to time by BIS. iv) There will be an overall ceiling of Rs. 2.5 crores for computing financial assistance. v) The ceiling of prices of different items of machinery will be fixed and reviewed periodically by a four member Technical Committee (TC) three senior officers & two representatives from the trade, constituted by Chairman Coir Board from time to time, after making a fair assessment of probable cost of all components used in the production of machinery items. As the cost of machinery and equipment tend to change and additional developments/innovations in machinery/technology are possible, this list will be updated periodically by the TC. vi) The machinery/equipments procured should be as per the standards prescribed by the BIS and can be sourced from at the option/choice of entrepreneurs with valid receipts/invoice with GST number from the open market. Machinery can also be imported for setting up high-tech coir processing units for which the unit shall substantiate the reason for import of machinery. vii) The machinery suppliers will have to give a performance guarantee for a period of at least two years to the beneficiaries and the copy to be provided while availing the incentive under the scheme. In the case of imported machinery, the units shall produce the invoice, shipping bill etc. certified by Customs Authorities/DGFT/Banks with performance certificate from the supplier. viii) In respect of projects for modernization, the cost of new machinery/equipments/ power generators/material handling equipments/conveyors etc. installed/ procured will only be taken for arriving at the project cost for calculation of the amount of financial assistance ix) The financial assistance under this component will be available to entrepreneurs who have not availed any Central Government subsidy under PMEGP, CUY, DPI, TUF etc. for the same purpose. An undertaking to the effect that the applicant has neither applied for nor availed of assistance under these programmes/ components will have to be furnished while applying for assistance. x) In the case of original documents pledged with banks, the copies duly attested by the Manager of the bank have to be submitted with the application for the assistance.
3IPage F.No.5(9)/2017-Coir xi) The cases of applications seeking financial assistance recommended by the Regional / Sub Regional Officers of the Board shall be placed before a steering Committee constituted at the Board Head Quarters by the Chairman, Coir Board. The Committee shall have representatives from the CCRI and CICT of the Board, subject experts and representatives from the industry. The steering committee shall meet at least once in two months. xii) Even though the scrutiny of the application will be made on first come first served basis subject to the receipt of proper documents, the criteria adopted for selection of beneficiary shall be purely on merits and the rankings given by the "Project Steering Committee."
6 Conditions for grant of financial Subsidy:
i) The Coir production/processing unit desirous of availing the assistance under this component shall install in its declared premises the eligible plant and machinery for setting up of new unit/ expansion of existing units, upgradation and modernisation either from own resources or by availing of institutional credit. ii) Such acquisition and installation shall be preceded by intimation to Coir Board online about the intention for such expansion, upgradation, modernisation or setting up of new units along with the scheme & submission of Detail Project Report (DPR). The Coir Board through the CCRI, CICT or any other institution as may be deemed fit by it apprise technically the proposed project/ DPR/ unit and will inform the applicant for its approval or otherwise of the eligibility of the application for financial assistance. The Coir Board will issue an in principle approval (IPA) to the applicant after examination and appraisal of the proposal. All cases will be discussed and decided in the steering committee at Board's HQ. iii) The applicant will be required to submit claims within one year (to be extended up to 18 months under special circumstances) from the date of commencement of production , both in the cases of own source of finance or Institutional Credit. iv) However, the Chairman, Coir Board will be competent to condone the delay in submitting the applications, on a case to case basis on merits, on the basis of written appeals submitted to him explaining the reasons behind the delay upto two years & beyond that upto 3 years by the "Coir Board".
7 Procurement/Cost of Machinery under the Scheme:
7.1 All plant and machinery and equipments required for setting up the coir processing unit shall be of BIS/ Coir Board standards specifications prescribed from time to time and shall be of reputed make and in the case of import of machinery for setting up of high value coir products using high-tech machinery, all relevant documents regarding the import of machinery from the Customs Authorities/ DGFT/Bank along with Performance Guarantee of the machinery should be produced and a certificate stating
4 1Page F.No.5(9)/20 1 7-Co ir that these machinery will be used only for coir/value added diversified products/Coir blended items. The estimated cost will be revised by the Technical Committee from time to time, based on the field situations and increase in the cost of inputs for fabrication of the machinery. 7.2 In the case of installation of power generator sets/ diesel engines/any non-conventional energy generating equipments separate electrical power line from the rural feeder, incentive will be considered along with the project cost for existing and new units. 7.3 Any addition/ modification to the range of machinery for each type of units due to technological advancements, innovation, new processing technologies, product diversification will be added to the list by the Coir Board as per the recommendations of the Technical Committee from time to time.
8 General Instructions:
a. The financial assistance as admissible under this component will be disbursed to the applicant only after the unit goes into production as reimbursement of investments in Plant & Machinery. In the case of units set up/modernised availing of institutional credit, the assistance shall be released to the Bank account through which the loan/ credit has been availed of. b. The beneficiary availing of the financial assistance under this component shall not mortgage the assets except to the financial institution/bank from where he had availed loan for the establishment of the unit. c. The coir unit will not be allowed to dispose of the items for which incentive has been disbursed within a period of 7 years from the date of receipt of assistance under the scheme. d. To identify machines bought under this component, embossing / engraving Identification Code (IC).On each plant / machine for which the incentive has been provided will be made. e. The entrepreneur availing incentive under this component will give an undertaking that the unit has not applied for or availed of subsidy/assistance under any other scheme like PMEGP, CUY, DPI,TUF etc. of the Central Government for the same purpose. f. The assistance received from the Board under this component shall be recoverable from the entrepreneur through legal means. i. Where the assistance under the scheme has been obtained by misrepresentation of facts or by furnishing of false information; or where the machinery and premises of the unit are used for other purposes than the assistance availed for during the currency period of the assistance. i.e. for 7 years ii. Where the unit goes out of production within 7 years from the date of commencement of production, except in case where the unit remains out of production for short periods extending to 6 months due to reasons beyond its control, such as shortage of raw material, power, natural calamities etc. g. In case of any disputes with regard to grant of incentive under the scheme, the decision of Chairman, Coir Board shall be final. 5IPage F.No.5(9)/20 1 7-Co ir
9 Maintenance of list of Applicants:
List of applicants should be maintained at Regional Office/ Sub Regional Office and Head Quarters of Coir Board and also on the Coir Board Website. A data bank should be created in the Coir Board.
10. Monitoring and Evaluation:
The monitoring of the units will be undertaken by the Regional/ Sub Regional Offices of Coir Board and by the Secretary/CEOIChairman, Coir Board at regular intervals. The Mid-term appraisal of implementation of the scheme will be got done by the Board through reputed external agencies. Scheme will also be regularly monitored by the Secretary, Ministry of MSME.
FORM NO 1 COIR BOARD (Ministry of Micro, Small & Medium Enterprises, Government of India) P.B.No.1752, M.G.ROAD, ERNAKULAM, KOCHI-682016
APPLICATION FOR AVAILING INCENTIVE UNDER THIS COMPONENT ACQUISITION OF PLANTS AND MACHINERY FOR COIR INDUSTRY
Part —A
1. Name of Applicant
2. Other Details
(i) Date of Birth :
(ii) Community: SC/ST/OBC/Minority/Others:
3. Address for Communication
Addressl:
Address2:
Post Office:
Taluk:
Village:
State: 6 1Page F.No.5(9)/2017-Coir District:
PIN Code:
Tele Phone No:
4. Aadhanr No of the Applicant:-
% 71Page F.No.5(9)/2017-Coir
Part -B
1. (a) Type of Organization
Proprietor / Partnership / SHG /NGO / Pvt. Ltd. Co./ Public Ltd. Co./ Co-operative Society / Others *
* Specify:-
(b) Type of Unit (c) Date of Establishment DD MM YY
(d) Coir Board Registration under Registration Rules 2008
No. Date
(e) Udyog Aadhar No:
No. Date (f) Date of commencement of production DD MM YY
If Partnership concern, please attach the registered partnership deed attested by notary
If Company, attach copies of the Registration Certificate from Registrar of Companies along with Memorandum of Association & Articles of Association
If Co-operative Society, the registration issued by competent authority may be attached.
2. If NGO/ SHG, the Registration Certificate issued by competent authority may be attached.
3. Whether SC/ ST/ OBC/ Women/ Minority/ Others:
8 1Page F.No.5(9)/2017-Coir
4. No of persons employed. (a) Directly: (in Nos) (b)Indirectly: 5. Details of Upgradation and/ or Modernization proposed to undertaken:
(a) Machinery/ equipment
Name of Machine Capacity Year of mfr. Name of the mfr. Value
Attested copies of bills, cash receipts, copy of the performance certificate of the machinery manufacturer, documents from electricity authority to be attached.
6. Source of funding Bank Own Other source
7. If the source of funding is other than own sources provide the following information.
i. Name and address of the Bank/Financial or other institution:
ii. Amount of fund sanctioned: Rs.
iii. Sanction letter details (Copy of the sanction letter and techno financial appraisal of the bank /financial institution to be attached):
iv. Details of payment to the supplier of machineries: Amount Rs.
Cheque/DD No& Date:
9IPage F.No.5(9)/2017-Coir
8. If the source of funding is from own resources. Please provide the following information: i. Details of IPA received from Coir Board (Copy to be enclosed): ii. Details of payment to the supplier of machineries: Amount Rs. Cheque/DD No& Date 9. Details of Bank account a) Bank Name & Branch:- b) Account no. :- (Copy of the Bank Pass Book to be enclosed)
I/We hereby declare that I/we have not availed of any other assistance under any of the other schemes of Govt. of India for the same plant / machinery for which incentive has been claimed hereinabove.
I/We hereby undertake to submit any further documents/ information as maybe required by the appropriate authorities.
I/We hereby undertake not to dispose of the machinery/equipments for which subsidy has been claimed within a period of 7 years from the date of receipt of incentive except with the prior approval of Coir Board.
I/We hereby agree that in case it is found that the incentive has been availed of on the basis of any false information, we shall forthwith refund the incentive availed of to Coir Board along with interest to be charged as per scheme from the date of disbursal to the date of refund & will be liable for legal action by Coir Board.
I/We hereby further agree that I/we shall forth with repay the amount disbursed to me/us under the scheme, if the amount of incentive is found to have been disbursed in excess of the amount actually admissible for whatsoever reason and shall be liable to pay interest at such rate as may be prescribed on such amount and such other charges/expenses which may be payable by us.
Name and Signature of the applicant (Seal) Place: Date:
10IPage \\y F.No.5(9)/2017-Coir
Certificate to be issued by Chartered Accountant (Annexure to form No I)
I/we hereby certify from the examination of the accounts and other relevant records of the applicant M/s that I/We found the statements made and particular furnished by the applicant in form no-I annexed here to be correct according to the books and records maintained by the applicant in the ordinary course of business subject to the following remarks.
Remarks if any:
Signature of the Chartered Accountant: Name of the Firm Registration Number Place Date
(Seal of the Chartered Accountant)
11 IP agc F.No.5(9)/2017-Coir
Certificate to be given by Coir Unit (Annexure to form No I) Scheduled for fixed assets (machinery) created as on by M/s address Break up of costs included in the value of assets Si Description Qua Date Name of Date of Bill Paid up Bill No. of the plant ntity of machinery creation/ No. value of value of /machinery order mfr. With erection & the assets the (item wise) address Date created/ assets erected Rs. created Rs.
Basic Customs/ Freight, Sales Tax Erection Others, if Total (CIF/F0B) Excise Insurance cost any value Duty and (specify) Handling charges (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
Certified that the assets enlisted in the schedule of fixed assets (machinery) are created in position at site as on and put into operation on Signature (with Seal) of Managing Director/ Director/ Secretary of the company a. We hereby certify that we have checked the above statement of fixed assets( machinery) with the books of accounts, the invoices and other records maintained by M/s as produced ,and the information and explanation given, and found the same to be true and in accordance therewith. b. We also certify that M/s. have acquired and installed the above mentioned assets (machinery during the period from to c. We further certify that the aforesaid items of fixed assets (machinery) have been taken, to the extend paid for, up to from to and exhibited in the relevant books of the company. Signature of the Chartered Accountant Date: Place: Name of the Firm: Registration No: (Seal of the Chartered Accountant)
12IPage F.No.5(9)/2017-Coir
OPERATIONAL GUIDELINES FOR SCIENCE AND TECHNOLOGY COMPONENT
Introduction
Innovative R&D activities on coir are carried out under the Board by the two research institutes; the Central Coir Research Institute, Kalavoor and Central Institute of Coir Technology, Bangalore. The Central Coir Research Institute, Alleppey was established in 1959 and the Central Institute of Coir Technology, Bengaluru in 1980. Whereas CCRI, Kalavoor concentrates on research concerning development of ecofriendly technologies for quality improvement of coir fibre, utilization of coir pith, effluent treatment, development of new machinery etc. CICT, Bengaluru concentrates mainly on technology development on coir composites. Identification of new user areas for utilization of coir and coir waste (coir pith), modernization of production infrastructure for elimination of drudgery in manual operation thereby attaining higher productivity and improvement in quality are integral parts of the research efforts of both the Institutes and research investigations have led to development of several new technologies for the coir industry.
Extensions of the results of the technologies developed/research at the laboratory level are scaled up for application at the field level together with extension of testing and service facilities to the coir entrepreneurs & exporters, carrying out of research activities with the funding support from reputed institutions are also envisaged under the programme.
Collaborative research with research organizations, institutes, industries, universities in India and abroad, having proven records on varied applications of coir, development of new products, new machinery, product diversification, development of environment friendly technologies, technology transfer, incubation, testing and service facilities are the areas which are given priority consideration. Commercialization of new products/technologies and machine developed by the R&D institutes and registering for Patent Right of these research outcomes and proper documentation etc., are also to be done. As part of the Government of India decision to rationalize all the Schemes, the stand alone scheme of Plan S&T has brought under the umbrella Scheme of Coir Vikas Yojana.
The programmes under the S&T activities for the period 2017-18 to 2019-20 are implemented under the following components.
• Modernization of Production Processes. • Development of machinery and equipments. • Product Development and Diversification. • Development of Environment Friendly technologies. • Technology transfer, Incubation, Testing and Service Facilities.
13 IPage F.No.5(9)/2017-Coir
The Director RDTE, who is heading the Research Institutes CCRI & CICT of the Board, will be the nodal officer all of the S&T programmes, fund utilization and settlement and furnishing reports to HO.
(I). Modernization of Production Processes
Objectives
• Modernization of extraction process of coir fibre leading to enhancement of productivity, upgradation of quality and elimination of drudgery. • Development of appropriate technologies for improving the productivity and quality in spinning. • Development of innovative technologies in weaving of coir products by improvisation of the production processes of fibre and equipments. • Development of modern technologies for finishing operations of coir products. • Modernization of the production and extraction process through application of bio- technology. • Development of technologies for wet processing of coir using natural dyes.
• Extraction of good quality fiber using Mobile Fibre Extraction Machine which will be modified to produce fibre of uniform length and reduce impurity.
• Development of technologies for quality improvement of coir fibre using Bio-chem treatment and enzyme treatment.
• Development of diversified products using a superior quality fibre such as Janata Mattress, superior quality coir floor coverings.
• Productivity and quality of products need to be modernized
• Research will result in increased production of new range of coir products which will be accepted both by internal and external markets
Most of the conventional technologies used in the coir industry are of medium level. Consequently, the amount of drudgery is more and the working atmosphere is not user friendly enough for retention of a dedicated work force. The productivity and the quality of the products are not up to the mark either. Continued research activities will result increasing the acceptance of the new technologies for processing of coir & development of new coir products both by internal and external markets.
(II). Development of Machinery and Equipments
Objectives
• Elimination of drudgery in operations • Improvement in productivity and quality
14 !Page F.No.5(9)/2017-Coir
• Bringing about cost effectiveness The programme aims at Development of Plant Machinery and Control Systems to Spin Fine Quality Coir Yarn of Uniform Thickness and Reduced Hairiness for Weaving Superior Quality Coir Floor Furnishing Products, development of machinery for spinning coir yarn, extraction of fibre, weaving coir products etc. Most of the existing machineries are obsolete with low productivity and involve drudgery in operation. Low productivity, low technology application, reluctance to accept rapid mechanization, economic disability to modernize the sector etc. are some of the limitations for growth in the coir industry. Modernization essentially involves mechanization and application of modern processes, which necessitates developing appropriate machinery for processing of coir fibre into yarn and products with enhanced productivity.
(III). Product Development and Diversification
Objectives
• To develop innovative products from coir fibre or blending with other natural fibers. • To develop new areas of application for coir products like coir geo-textiles • To develop new technologies for utilization of coir pith • To develop technology for use of coir in the automobile industry for seat cushions and upholstery • To develop innovative designs suitable for mats, matting and carpets • To construct rural roads under PMGSY using coir geo-textiles for inclusion in the manuals of PWD etc. • To establish Design Clinics in the major coir clusters & in CCIR/CICT.
Future of coir industry depends on product development and diversification, especially into non-traditional areas. Development of substitutes for wood, synthetic products, geo-synthetics, combination products through blending with other natural fibres etc. would open up new vistas for the coir industry. Development of new application areas and new products are of vital importance for the full utilization of the potential of the industry. The future of the industry depends on innovative eco friendly consumer acceptable products and coir wood shall bring immediate changes to the life of people especially in the building and furnishing sector. The demand for coir wood shall increase from the sunrise building sector which ultimately preserve the tropical forests from depletion and reduces the serious concern of the impact on world climatic conditions.
(IV). Development of Environment Friendly Technologies
Objectives
• To develop appropriate technologies for abatement of pollution in the production processes.
15 'Page F.No.5(9)/2017-Coir
• To develop a cost effective eco-friendly effluent treatment technology for treating the effluents arising out of wet processing in coir industry. • To develop technology for disposal of sludge in the ETPs. • To develop new products like wood substitutes out of coir alone or by blending with other natural fibres. • To standardize the coir composite products for different applications. • To undertake studies in estimation of carbon credit by using coir products like composites, geo-textiles etc. • To develop new technology for production of coir toys.
The world is becoming more environment conscious and the need for protection of water, air and other natural resources for the posterity is being realized widely. Even though coir and its products are nature friendly in the sense that they are hundred percent degradable, research efforts have to be carried out to minimize the environmental hazards caused by retting and wet processing.
(V) Technology Transfer, Incubation, Testing and Service Facilities
Objectives
• To transfer the technologies developed by the research institutes to the trade against specific requests and under agreement of technology transfer by realising appropriate fees. • To establish technology incubation centers in one or many places for training the entrepreneurs in the new technologies developed and transferred. • To create a tool room for maintenance of and repair of the looms and equipments established in different coir production centers. • To establish a laboratory for testing coir composite materials and to extend service facilities to the trade. • To demonstrate the user friendly technologies and machineries developed by CCRI/CICT in the major coir yarn production centers for the benefit of the workers/entrepreneurs. • To extend technical assistance for interventions in clusters identified by the Board in different coir producing States. • To undertake testing of coir and coir products, dyed samples, coir pith etc. at the laboratories of CCRI, CICT and Regional Officers and issue test certificates. • To extend service facilities to the trade in dyeing of coir yarn/fibre at the dye house established at the CCRI. • To undertake civil/electrical infrastructure support required for the research institutes of CCRI/CICT etc.
The result of the research activities need to be disseminated to the industry and trade and diversified uses of coir and coir products have to be popularized through demonstration
16 IP a ge \V/ F.No.5(9)/2017-Coir
in the field for increasing the demand of coir. There is a need of services like testing and certification facilities required by the industry.
Phasing of expenditure during the period 2017-18, 2018-19 and 2019-20 for each S&T Schemes are detailed below:
(Rs. in lakhs)
SI. Programme Intervention 2017- 2018-19 2019-20 Total No 18
1 Modernization of Modernization of 75.70 180 200 455.70 Production Processes production process
2 Development of Development of new 62.72 280 300 642.72 machinery and machines equipments
3 Product Development Product development & 128.71 180 200 508.71 and Diversification diversification
4 Development of Development of 244.96 280 300 824.96 Environment friendly environment friendly technologies technologies
5 Technology Transfer, i) Field demonstration of 187.91 180 200 567.91 Incubation, Testing technology. and Service Facilities ii) Transfer of eco- friendly technologies iii) Transfer of technology to machine manufacturers. iv) New clusters to be provided with technological support v) Field demonstration of technologies. vi) Extension of testing and services facility Total Total 700.00 1,100.00 1,200.00 3,000.00
17 I P , 613.-- F.No.5(9)/2017-Coir
The funds will be released to the Research Institutes from HO of Coir Board on a quarterly basis on certification of utilization of 70% funds released earlier. The funds will be utilized by the Research Institutes for R&D activities and creation of infrastructure & civil construction/repairs etc. relating to R&D activities only as specified in the Action Plan under different Programme Heads of the Scheme. Industry/Research institutes will prepare proposals for various R&D activities including projects, creation of infrastructural facilities, civil constructions, repairs and maintenance etc. with the approval of competent authority. Board will prioritize the fund requirement and submit to the Ministry on quarterly and lumpsum basis. • The Research Institutes of the Board will undertake collaborative research projects with other recognized institutions/industries who are interested to have research projects related with coir and its allied products. • Research efforts will be perused through public private partnership basis after giving due transparency. • Advertisement will be released for inviting the collaborators online as well as. • Advertisement will be released for inviting interested entrepreneurs, industrialists, research organizations etc. for utilizing the facilities available at Board's research institutes for a consideration fixed by mutual discussion. • If necessary, the collaborators of the projects will be invited for making presentation on the project before the Board. • Preference will be given to the collaborators having experience of research works pertaining to coir or any other natural fibre. • The outcome of the project must be for the benefit of the coir industry • The collaborating institute should provide counterpart contribution in terms of kind or cash for the project. • An Advisory Committee will be constituted consisting of Chairman, Coir Board, CEO(CB)/ Secretary, Coir Board, Joint Director (Plg.), Director, NCRMI, Chairman, FICEA, Chairman, TN Dist. Coir manufactures Association, Officer in-charge of coir industries from Govt. of Kerala, Tamil Nadu, Karnataka and Oddisha, etc. experts from National R&D institutes having expertise in the relevant field will validate the project proposals before approval of S&T committee. Board etc. The Director, RDTE will be the member and convener of the Committee. • A Project Review Committee consisting of Director (RDTE), Joint Director (Res.), Joint Director (Tech.), Deputy Director (S&T), the Nodal Officer of the project concerned, the nominee of Finance & Accounts Section, Coir Board will review the progress of the projects periodically (at least once in three months) and recommend for the release of Board's share for continuing the project. • The Chairman, Coir Board shall be the appellate authority and his decision on all matters connected with the project shall be final and binding on both the parties.
18 IPage F.No.5(9)/2017-Coir
• In the case of collaborative projects tenure will be specific and a MoU will be signed between the Board and the collaborator. • There will be nodal officers for all the collaborative projects who will function under the Director, RDTE. The collaborative projects should be monitored by the nodal officers effectively and the progress report of each of the collaborative projects should be submitted by the Director, RDTE before the S&T Committee/ Board Meeting with due recommendation of the review and advisory committee in time. • Data base may be prepared and upgraded on available technologies as well as RDTE experts available in the country and outstanding consultants may be identified. • Building two-way linkages with RDTE experts and field level units. • Constantly improving the quality of coir products and facilitating the compliance with pertinent standards. • Identify a few products on which major thrust would be given in a well coordinated manner for the increase in their market penetration.
Development "outcomes" and "outputs" of the scheme/project The Scheme being a Research & Development Activity, the outcome of the Scheme may not be measured in financial terms but the expected outcome of the Scheme are as detailed below:
• Continued implementation of the Scheme will result in development of new technologies for reducing drudgery and improving the quality and productivity of the coir products. Continued research activities will result in increasing the acceptance of the coir products both by internal and external markets. • The development of more sophisticated machinery with the features of automation will result in enhanced productivity and income. Elimination of physical strain and better income would attract younger generation to engage themselves into coir activities. • The use of coir products for environment friendly activities will result in environment protection. • Development of new value added products and identification of new areas for application of coir will result in the generation of more national income from a waste material.
19 I P a g e
F.No.5(9)/2017-Coir
OPERATIONAL GUIDELINES FOR SKILL UPGRADATION AND MAHILA COIR YOJANA COMPONENT
1. Introduction
1.1 The Coir Industry is a labour intensive and export oriented industry employing more than seven lakh workers predominantly women. The decentralized operations in the coir industry without adequate training of spinners, weavers and artisans engaged in value added product manufacturing have been posing problems particularly for ensuring the desired level of quality in the ultimate products. Inferior quality may ultimately turnout to be detrimental to the concerted efforts towards overall development of the industry and also its survival, particularly it being a traditional product, in the present context of unprecedented competition on account of cheap synthetic substitutes, globalization and liberalization. Skill development is, therefore, the most essential pre-requisite for the overall development of the industry and to accelerate the spread of the industry into non-traditional areas.
1.2 Development of skilled manpower in coir industry through appropriate training programmes is one of the major activities of the Coir Board. Continuous improvement in the quality of certain products is essential to sustain the demand for coir products and also for improvement in prospects of coir products in a world, which is becoming more and more quality conscious. In order to achieve the above objectives, the Board has been organizing, quality improvement camps and entrepreneurship development programmes.
1.3 80% of the workers employed in coir industry are women, particularly in the pre-product sectors. Mahila Coir Yojana (MCY) is the first woman oriented self-employment scheme implemented by the Coir Board since 1994. The scheme envisages provision for training to women artisans.
1.4 Training and quality improvement programmes including MCY are part of ongoing central sector scheme and for its continuation from 2017-18 to 2019-20, it has been got evaluated through independent agency. Based on the recommendations in the Evaluation Report and keeping in view the growing demand of skilled manpower, some parameters of the existing scheme have been modified. Details of the plan scheme 'Skill Upgradation & Mahila Coir Yojana Scheme' to be implemented during 2017-18 to 2019-20 are given in subsequent paras.
2. Interventions
2.1 The programme, "Skill Upgradation & Mahila Coir Yojana" consists of two distinct components. Viz. (a) Skill Upgradation, (b) Mahila Coir Yojana The Objectives of the scheme are to:- • Train personnel in the cadres of Supervisors/ Instructors/ Artisans and to meet the requirement of skilled man power for the development of coir industry.
20 IPage ENo.5(9)/2017-Coir
• Help in transfer of technology to non-traditional areas through development of skill of coir workers. • Assisting the trained women artisans for procuring spinning equipments/coir processing machineries from the PMEGP. • Provide self employment to rural woman artisans in regions producing coir fibre and enabling them to get better returns through improvement of productivity and quality. Providing them with a better work environment and elimination of drudgery involved in the traditional methods of spinning and product manufacturing. Encourage new entrepreneurs both in traditional and non-traditional areas under Entrepreneurship Development Programmes to venture into coir industry and trade and thereby accelerate the development of the industry in the existing and new areas. • Aim at inculcating quality consciousness among the workers at grass root level and to educate them on proper methods of producing standard quality fibre, yarn and products. • Create awareness among the coconut growers, entrepreneurs etc. to set up coir based units and to modernize the existing units for better productivity, quality and also enhance earnings. • Contribute to generate employment in rural areas of the coconut producing States.
3. Nodal Agency
3.1 Coir Board, Kochi is the Nodal Agency. The scheme will be implemented through the Regional/ Sub-regional offices/ training centres of the Board. The scheme will be monitored by Coir Board and the feedback (Monthly/ Quarterly/ Half yearly and Annually Report) will be regularly furnished to the Ministry of Micro, Small and Medium Enterprises by the Head Office of the Board. Technical intervention, wherever necessary, will be provided by Central Coir Research Institute and Central Institute of Coir Technology and other institutes engaged in the development and promotion of coir industry.
4. Implementation
4.1 Skill Upgradation
4.1.1 The Coir Board will continue to impart training in processing of coir to artisans and workers engaged in the coir industry through its training centres, i.e., National Coir Training and Design Centre (NCT&DC), Kalavoor, Alleppey and Research-cum-Extension Centre, Thanjavur, and Field Training Centres of Regional Officers/ Sub Regional Officers of the Board located at various parts of the country. The Board will conduct training activities at a number of Field Training Centres as per the convenience of coir workers. The Field Training Centres will be run with the help of Co-operative Societies/Associations and SFURTI Clusters etc. engaged in coir activities and NGO's registered in Daman Portal of NITI Ayog. The RO/SRO should ensure that the NGOs are registered in the portal.
21 'Page
F.No.5(9)/2017-Coir
4.1.2 The in-house training programmes organized by Coir Board at its training centers exclusively for orientation training on the basis of the request from trade and industry and Govt. sponsored agencies are not provided with stipend. All other field level training programmes are stipendiary. The Coir Board from time to time will also design different training programmes according to the need of the industry. The duration of these training programmes will be decided based on the requirements of the skill to be imparted. These training programmes shall be as per NSQF norms.
4.1.3 The stipend per trainee for the skill development programmes will be limited to Rs.3,000/- per month and in the case of training programmes of less than one month duration, stipend will be disbursed on prorata basis. The honorarium for the trainer will be limited to Rs. 15.000/- per month. An amount of Rs.400/- per head per month will be provided as financial assistance to the training sponsoring agency to meet the operational cost of the training for raw material, power charges, other incidentals etc. on submission of a self certification of Expenditure from the Sponsoring Agency which will be verified and passed by the Regional/Sub Regional Officer for effecting the payment. In the field level training centres organized by Coir Board through sponsoring agencies, the Regional/ Sub Regional Officers shall verify the attendance registers and the stipend will be calculated on pro-rata basis of their attendance certified by the trainer and the sponsoring agency. The amount of stipend will be disbursed by the Regional/Sub Regional Officer on verification of all relevant records. They shall also receive acquaintance certified by the Sponsoring agency and the trainer and counter certified by the Regional Officer for settlement of stipend account. The amount of stipend will be directly transferred to the Aadhar linked account of the trainee through e-payments/DBT mode. The payments towards honorarium to the trainers will be paid to the Aadhar account of the trainer through e-payment/DBT mode and reimbursement of operational expenses shall be made through e-payments/DBT or crossed cheques to the training agency. The payment for training programme shall be as per NSQF norms.
4.1.4 The selection of trainees for in-house training at NCT&DC will be made by inviting applications through advertisements in print and electronic media and through recommendation from the authorities of the coir producing States Coir Producers, Exporters. An official Committee of Coir Board will be constituted for the selection of the trainees. The selection of trainees for regular courses will be after conducting written tests. In the case of Orientation Training Programmes, candidates shall be sponsored by coir units registered under Coir Industry Registration Rules, 2008 of Coir Board or by State Govts./ NGOs/ Educational Institutions/ Research Organizations etc. Selection of trainees for training programmes conducted at Regional Extension Centre will be made by the officer-in-charge of the centre through sponsoring of candidates by Trade Associations, Unit owners, Industries Department, NGOs, SFURTI Cluster SPVS, Co-operatives etc. and from open forum with suitable paper advertisements.
4.1.5 In the case of field level training programmes, selection of the training sponsoring agency will be vested with Regional/ Sub-regional Officers of Coir Board. Before appointing the agency an undertaking will be obtained from the sponsoring agency in the prescribed format
\,y 22 I P age F.No.5(9)/20 1 7-Coi r (Annexure I). After proper scrutiny of the application, an agreement will be entered into between the sponsoring agency and Regional/ Sub-regional Officer for organizing the training programme as per the guidelines. The sponsoring agency shall submit the name with full address and details of Aadhar linked bank accounts bank account of the candidates along with recent passport size photographs (two copies) and with ID proof (Election ID Card / Ration Card / Aadhar Card / PAN Card / Certificate of identification from any authorized Government agency/SC/ST/PWD). The Election ID / Aadhar Card shall be insisted upon in all cases and other proof of ID may also be accepted. One photograph will be affixed on the certificate issued on successful completion of the training and other will be kept at the office for reference. The certificate will be issued by the Regional/Sub-regional Officer after conducting a test as per the norms prescribed by the Coir Board-follow up with those obtain training for setting up enterprises should be done.
4.1.6 The in-house training programme will be conducted by the technical persons of the Coir Board and its Research Institutes. In certain cases, outsourcing can also be made according to the requirement. Theory and practical tests will be conducted and evaluated by the faculty of the National Coir Training and Design Centre and results will be published on approval of the Director, RDTE under his/her signature on behalf of Secretary, Coir Board.
4.1.7 The Officer-in-Charge of the Training Institute can outsource faculty for undertaking specialized studies on payment of honorarium with the approval of the Competent Authority. Training programmes conducted at National Coir Training & Design Centre, Kalavoor, Alappuzha will be under the direct supervision of Director, RDTE and the training programmes conducted by the Regional Offices/ Sub Regional Offices and Regional Extension Centers will be under the direct supervision of the respective Regional Officers. In the case of Trainers Training Programme and Mahila Coir Yojana, the practical test will be conducted by the technical staff of these Centers and the certificate will be issued with the concurrence of the respective Regional Officers/SROs under the signature on behalf of Secretary, Coir Board.
4.1.8 Specialized training programmes will be organized by the respective Regional Officer and Director, RDTE with the concurrence of the Chairman, Coir Board. The syllabus for the specialized training programmes will be prepared in consultation with Director, RDTE and approved by the Chairman, Coir Board. The trainers will be selected by the Regional/ Sub- Regional Officers from the list of trainers who have successfully completed the Trainers Training Programme.
4.1.9 Infrastructure for Training: To achieve the objectives of skill upgradation in the coir sector, creation of proper infrastructure for training like strengthening/setting up of demonstration-cum-training institutes/centres will be undertaken by the Coir Board independently or in collaboration with the State Universities/State Governments etc. This also includes purchase of machinery and equipments for training, preparation of soaking tank, etc. The expenditure on this component will be limited to the annual budgetary allocations for the component.
231Page (V/<--- F.No.5(9)/20 1 7-Coir
4.1.10 Training programmes can also be organized by the Institutes of State/ M/o MSME etc so as to have made Outreach & Impact.
4.2 Entrepreneur Development Programmes (EDPs) , Exposure Tours, Awareness Programmes, Workshop & National Seminar
4.2.1 Entrepreneur Development Programmes (EDPs)
The details for conducting EDPs are given below:- (i) The EDPs will be organised by the Regional/Sub-regional Offices according to the targeted programmes. The Regional/ Sub-regional Officer of Coir Board will select a professional agency, which has sufficient expertise for conducting the EDP. The Regional/ Sub-regional Officer will enter into an agreement with the agency for organizing the EDPs. (ii) The agency shall invite prospective entrepreneurs through regional level press advertisement. The agency will prepare all the necessary study materials in consultation with the Regional/ Sub-regional Officers. The agency will outsource faculty for conducting technical sessions as per the norms prescribed by Coir Board. (iii) A field visit to a nearby coir processing centre will be organized at the end of EDP. The expenditure will be registered as per the conditions mentioned in clause 4.2.2 and rest to be organized by the agency from the participants or other sources. (iv) Expenditure for conducting each EDP will be limited to Rs.100,000/-. The terms of references for organizing EDP are appended as Annexure — II. (v) Those who have undergone EDP will be supplied with applications for availing assistance under CUY (merged with PMEGP), CITUS etc. and the agency should ensure that at least 40% of the participants become entrepreneurs.
4.2.2 Exposure Tours and Awareness Programmes:- Exposure Tours will be organized for the benefit of prospective entrepreneurs and artisans of coir processing centres to visit other coir producing centres engaged in the production of value added products and the functioning of the unit engaged in coir industry. In the case of entrepreneurs, 50% of the actual travel cost subject to A.G. Two- tier Class train fare and in the case of artisans engaged in the coir processing activities under cooperative society/SHG and sponsored by the State Government 90% of the actual travel cost / subject to A.C. Two- tier class fare will be reimbursed by the Board. The duration of the Exposure Tour will be five working days excluding travel time. The expenditure for conducting an Exposure Tour including to and fro bus/train fare, GST. permit for entering neighbouring States, toll tax etc. will be limited to Rs.1,00,000/-. In the case of A & N Islands and NER, the expenditure will be the actual cost incurred for to and fro bus/train/ship fare, plus GST, permit for entering neighbouring states, toll fare etc.
24IPage F.No.5(9)/2017-Coir Awareness Programme will be organised for the general public for their introduction to the Plan Schemes of the Coir Board. The expenditure for conducting an awareness programme will be limited to Rs. 30,000/-.
4.2.3 Workshop :- The expenditure for conducting a Workshop will be limited to Rs. 65,000/,
4.2.4 National Regional & State Seminar :- The expenditure for conducting a National Regional & State Seminar will be limited to Rs. 5 Lakh, Rs. 3 Lakh, Rs. 2 Lakh.
4.3 MAHILA COIR YOJANA
4.3.1 This programme is intended to provide self employment opportunities to rural women artisans in regions processing coconut husk. Over the last two decades, production of coir fibre has substantially increased in India. Conversion of coir fibre into yarn on motorized rats in rural households provides scope for large scale employment, improvement in productivity and quality of coir fibre, better working conditions and higher income, which ultimately leads to the improvement of standard of living of rural woman artisans. The programme envisages providing of training only to women artisans.
• To provide training on sophisticated machinery/advanced technology in order to scale up the skill of the Mahila Coir Workers. • To integrate MCY training along with LBI in order to make the MCY trainees more entrepreneurial. • To encourage the trained women to avail of assistance under CUY (merged with PMEGP), to set up unit/start self employment. Year-wise target for coir sector will be provided under the PMEGP. Necessary handholding support will be provided by the Coir Board through its field officer to the women artisans to avail of assistance under PMEGP.
4.3.2 Regular monitoring of the scheme will be undertaken by Joint Director (Planning)/Senior Accounts Officer of Coir Board and reported to the Ministry of MSME.
5.The financial assistance for procurement of machines/equipments may be obtained under PMEGP scheme for setting up of new coir units for which the maximum project cost is upto Rs.25 lakhs.
25IPage F.No.5(9)/20 1 7-Coir
An nexure- I Skill Development Training Programme Under taking by the Training sponsoring agency
I S/o. Sri residing at (Complete address) on behalf of M/s...... (Name of the sponsoring agency) on..... (Date) is furnishing the undertaking with details as shown below to Coir Board.
I. Name of the Sponsor 2. Address with phone/fax/email Principal Co-ordinator of the Name: group of trainees/SHG/NGO* Address: 3. No. of candidates 4. Period & Type of training 5. Source of Raw material for training : locally available / to be purchased from out side 6. Details of power connection 7. Availability of machineries for training: 8. Whether the trained candidates will be provided employment in the unit of the sponsors or facilitate employment in other unit. If starting own units, the type of unit proposed 9. Credit support, if any envisaged, for starting Units 10.Whether the trainees have any infrastructural facility.(furnish details) 11. If not, the mode of acquiring the basic Infrastructure : Nature of marketing support that could be Provided. 12.Whether the details of the Adhar liked accounts of the trainees have been furnished. The agency undertakes the full responsibility of ensuring the raw material, credit flow and market support with gainful employment or staring own units by linking the trainees with Boards scheme like Mahila Coir Yojana, Rejuvenation, Modernization & Technology upgradation of coir Industry, Financial Assistance, PMEGP etc with Banks.