Directions to Silvercup Main from BROOKLYN

Total Page:16

File Type:pdf, Size:1020Kb

Directions to Silvercup Main from BROOKLYN Directions to Silvercup Main FROM BROOKLYN: Take the Brooklyn Queens Expressway north to the McGuiness-Humbolt exit. Make a left at the bottom of the ramp onto McGuiness Avenue going over the Pulaski Bridge and then straight across Jackson Avenue. Go straight onto 11th Street. Make a right when you reach Queens Plaza South. Go three blocks to 22nd Street and turn right. Silvercup is on the right and the parking lot is on the left. FROM LONG ISLAND Via Long Island Expressway: Take the LIE west and get off at the Van Dam Street exit (the last exit before the tolls for the Midtown Tunnel). Make a right onto Van Dam Street and proceed three lights to Thomson Avenue. Make a left onto Thomson Avenue bearing to the left as you go over the Thompson Avenue Bridge (if you bear right, you'll turn onto the ramp for the Queensboro Bridge into Manhattan). Make a right onto 44th Drive and continue straight across Jackson Avenue past the Citicorp tower until you reach 21st Street. Make a right at 21st Street and turn right when you reach Queens Plaza South (just before the Queensboro/59th Street Bridge). Make a right onto 22nd Street/Harry Suna Place. Silvercup is on the right and the parking lot is on the left. Via Grand Central Parkway: Take the Grand Central west and take Exit 45 for 31st Street (the last exit before the Triboro Bridge). Make a left onto 31st Street and then a right onto Astoria Boulevard. Proceed to 21st street and make a left. Take 21st Street about a mile until you reach Queens Plaza South (the first street after you go under the Queensboro/59th Street Bridge) and make a left on Queens Plaza South. Make first right onto 22nd Street. Silvercup is on the right and the parking lot is on the left. FROM MANHATTAN: Queensboro/59th Street Bridge: UPPER ROADWAY (preferred): Enter the upper roadway of the bridge via 57th Street or 58th Street. Follow signs to "21st Street" (bearing right at fork) and proceed to traffic light at bottom of the ramp. Make a right onto 21st Street. Go one block and make a right at Queens Plaza South. Go one block and make a right at 22nd Street. The entrance to Silvercup is on the right and the parking lot is on the left. LOWER ROADWAY: Stay in the right lane when exiting off the bridge and make the first possible right which is 27th Street. Go two blocks and make a right onto 43rd Avenue. Go four blocks and make a right onto 21st Street. Go one block and make a right at Queens Plaza South. Go one block and make a right on 22nd Street/Harry Suna Place. Silvercup Studios is on the right and the parking lot is to the left. Via Queens-Midtown Tunnel: Stay in the right lanes through the toll booths. Exit at the ramp to the right which says 21st Street, Van Alst Avenue, Long Island City, Astoria. This will feed directly onto 21st Street. Continue north on 21st Street for approximately ½ mile. Make a right on Queens Plaza South and a right on 22nd Street. Silvercup Studios is on the right and the parking lot is on the left. Via Triboro Bridge: Get off at the first exit in Queens making a right onto 31st Street. Go one block and make a right onto Astoria Blvd. Proceed to 21st Street and make a left. Go about a mile on 21st Street to Queens Plaza South (the first street after you go under the Queensboro/59th Street Bridge) and make a left on Queens Plaza South. Make the first right onto 22nd Street. Silvercup is on the right and the parking lot is on the left. FROM NEW JERSEY Via George Washington Bridge: Take the Harlem River Drive South to the FDR Drive South and follow directions above for the Queensboro Bridge. Via Lincoln Tunnel: Go cross-town in Manhattan heading east on 34th Street and follow directions above for the Queens Midtown Tunnel. FROM WESTCHESTER: Take the Major Deegan (Route I87) south to the Triboro Bridge and follow the directions above from the Triboro Bridge -or- get onto the FDR Drive south and follow the directions above for the Queensboro Bridge. SUBWAY Directions N, Q & 7 Train: Queensboro Plaza station. Exit to Queens Bridge Plaza South, via the pedestrian walkway over the street. Walk 3 blocks west toward Manhattan (parallel to the Queensboro Bridge). Go left onto 22nd Street. The entrance to Silvercup Studios is on the right. E & M Train: Go to Court Square/23rd Street station. Exit rear of train to 21st Street. Go right (north) on 21st Street toward the Queensboro Bridge for 4 blocks. Turn right onto 43rd Avenue and left onto 22nd Street. Silvercup Studios is on the left. R Train: Exit Queens Plaza Station. Follow Bridge Plaza South. Walk 7 blocks toward Manhattan parallel to the Queensboro Bridge. Go left on 22nd Street. Silvercup Studios is on the right. G Train: Exit Court Square Station. Exit near intersection of 44th Drive and Hunter Street. Walk west on 44th Drive toward 23rd Street. Turn right onto 23rd Street. Turn left onto 43rd Avenue. Turn right onto 22nd Street. Silvercup Studios will be on the left. F Train: Go to 21st Street Queensbridge Station. Walk south on 21st Street three blocks. You will go under bridge. Turn left on Bridge Plaza South. Walk one block. Turn right onto 22nd Street/Harry Suna Place. Silvercup is on the right. .
Recommended publications
  • Strategic Policy Statement 2014 Melinda Katz
    THE OFFICE OF THE QUEENS BOROUGH PRESIDENT Strategic Policy Statement 2014 Melinda Katz Queens Borough President The Borough of Queens is home to more than 2.3 million residents, representing more than 120 countries and speaking more than 135 languages1. The seamless knit that ties these distinct cultures and transforms them into shared communities is what defines the character of Queens. The Borough’s diverse population continues to steadily grow. Foreign-born residents now represent 48% of the Borough’s population2. Traditional immigrant gateways like Sunnyside, Woodside, Jackson Heights, Elmhurst, Corona, and Flushing are now communities with the highest foreign-born population in the entire city3. Immigrant and Intercultural Services The immigrant population remains largely underserved. This is primarily due to linguistic and cultural barriers. Residents with limited English proficiency now represent 28% of the Borough4, indicating a need for a wide range of social service support and language access to City services. All services should be available in multiple languages, and outreach should be improved so that culturally sensitive programming can be made available. The Borough President is actively working with the Queens General Assembly, a working group organized by the Office of the Queens Borough President, to address many of these issues. Cultural Queens is amidst a cultural transformation. The Borough is home to some of the most iconic buildings and structures in the world, including the globally recognized Unisphere and New York State Pavilion. Areas like Astoria and Long Island City are establishing themselves as major cultural hubs. In early 2014, the New York City Council designated the area surrounding Kaufman Astoria Studios as the city’s first arts district through a City Council Proclamation The areas unique mix of adaptively reused residential, commercial, and manufacturing buildings serve as a catalyst for growth in culture and the arts.
    [Show full text]
  • Innovations & Accomplishments
    INNOVATIONS & ACCOMPLISHMENTS East River Bridges A $2.8 billion reconstruction program is underway to rehabilitate all four East River crossings. In 2002, these bridges carried some 467,080 vehicles per day. In 2002, working in coordination with the NYPD and other law enforcement agencies, the Division implemented enhanced security measures on these bridges. This work is ongoing. BROOKLYN BRIDGE The Brooklyn Bridge carried some 121,145 vehicles per day in 2002. The $467 million reconstruction commenced in 1980 with Contract #1, will continue with Contract #6, currently in the design phase and scheduled for completion in 2012, and will end with a seismic retrofit of the bridge, slated for completion in 2013. Work completed on the bridge to date includes reconditioning of the main cables, replacement of the suspenders and cable stays, rehabilitation of the stiffening trusses, and the replacement of the suspended spans deck. The next work scheduled for the bridge is a project to replace the existing travelers with a state of the art technology system. Construction is scheduled to begin in the spring of 2005 and conclude in the spring of 2007. Brooklyn Bridge in 1909 Pedestrian Vibration Study The major blackout of August 14, 2003 forced City officials to close the bridge to vehicular traffic and open the entire bridge to pedestrians. During this mass exodus, several pedestrians reported that the bridge was vibrating and thus causing them great anxiety. At the request of the Office of Emergency Management, an emergency inspection of the bridge was performed that evening as a result of these complaints of “swaying”; no structural problems were found.
    [Show full text]
  • Federal Register/Vol. 65, No. 148/Tuesday, August 1, 2000/Rules
    46870 Federal Register / Vol. 65, No. 148 / Tuesday, August 1, 2000 / Rules and Regulations significant economic impact on a Civil Justice Reform Dated: July 19, 2000. substantial number of small entities. G.N. Naccara, ``Small entities'' comprises small This rule meets applicable standards Rear Admiral, U.S. Coast Guard, Commander, businesses, not-for-profit organizations in sections 3(a) and 3(b)(2) of Executive First Coast Guard District. that are independently owned and Order 12988, Civil Justice Reform, to [FR Doc. 00±19396 Filed 7±31±00; 8:45 am] operated and are not dominant in their minimize litigation, eliminate BILLING CODE 4910±15±P fields, and governmental jurisdictions ambiguity, and reduce burden. with populations less than 50,000. Protection of Children The Coast Guard certifies under 5 DEPARTMENT OF TRANSPORTATION U.S.C. 605(b) that this rule will not have We have analyzed this rule under a significant economic impact on a Executive Order 13045, Protection of Coast Guard substantial number of small entities. Children from Environmental Health 33 CFR Part 117 This conclusion is based on the fact that Risks and Safety Risks. This rule is not three of the bridges presently open after an economically significant rule and a six-hour notice May 1 through does not concern an environmental risk [CGD01±99±069] September 30, which is greater than the to health or risk to safety that may proposed two-hour notice during those disproportionately affect children. RIN 2115±AE47 five months. The Coast Guard believes that the Environment Drawbridge Operation Regulations: two-hour advance notice October 1 Newtown Creek, Dutch Kills, English The Coast Guard considered the through April 30 is reasonable because Kills and their tributaries, New York the bridges will still open on signal environmental impact of this rule and provided the two-hour notice is given.
    [Show full text]
  • The 21St Hamptons International Film Festival Announces Southampton
    THE 21ST HAMPTONS INTERNATIONAL FILM FESTIVAL ANNOUNCES SOUTHAMPTON OPENING, SATURDAY’S CENTERPIECE FILM AUGUST: OSAGE COUNTY, SPOTLIGHT AND WORLD CINEMA FILMS INCLUDING LABOR DAY, HER, THE PAST AND MANDELA: LONG WALK TO FREEDOM WILL FORTE TO JOIN BRUCE DERN IN “A CONVERSATION WITH…” MODERATED BY NEW YORK FILM CRITICS CIRCLE CHAIRMAN JOSHUA ROTHKOPF Among those expected to attend the Festival are: Anna Paquin, Bruce Dern, Ralph Fiennes, Renee Zellweger, Dakota Fanning, David Duchovny, Helena Bonham Carter, Edgar Wright, Kevin Connolly, Will Forte, Timothy Hutton, Amy Ryan, Richard Curtis, Adepero Oduye, Brie Larson, Dane DeHaan, David Oyelowo, Jonathan Franzen, Paul Dano, Ralph Macchio, Richard Curtis, Scott Haze, Spike Jonze and Joe Wright. East Hampton, NY (September 24, 2013) -The Hamptons International Film Festival (HIFF) is thrilled to announce that Director Richard Curtis' ABOUT TIME will be the Southampton opener on Friday, October 11th and that Saturday's Centerpiece Film is AUGUST: OSAGE COUNTY directed by John Wells. As previously announced, KILL YOUR DARLINGS will open the Festival on October 10th; 12 YEARS A SLAVE will close the Festival; and NEBRASKA is the Sunday Centerpiece. The Spotlight films include: BREATHE IN, FREE RIDE, HER, LABOR DAY, LOUDER THAN WORDS, MANDELA: LONG WALK TO FREEDOM, THE PAST and CAPITAL.This year the festival will pay special tribute to Oscar Award winning director Costa-Gavras before the screening of his latest film CAPITAL. The Festival is proud to have the World Premiere of AMERICAN MASTERS – MARVIN HAMLISCH: WHAT HE DID FOR LOVE as well as the U.S Premiere of Oscar Winner Alex Gibney’s latest doc THE ARMSTRONG LIE about Lance Armstrong.
    [Show full text]
  • Urban Design and Visual Resources
    18.0 Urban Design and Visual Resources A. INTRODUCTION This chapter evaluates the effects of the Proposed Action on the urban form and visual resources of the Project Site and surrounding Study Area. Provided in this chapter is a description and analysis of the existing urban design and visual resources of the Project Site and Study Area, and descriptions of Future conditions with and without the Proposed Action in 2009. No significant adverse impacts to urban design or visual resources would result from the Proposed Action; the variations, all of which would be constructed according to the same site plan and building envelope as the Preferred Development Program, would likewise result in no significant adverse impacts to urban design or visual resources. The Proposed Action would result in development that differs substantially in height, bulk, form, scale, and arrangement compared to the uses currently found on the Project Site. These changes are identified in the CEQR Technical Manual as conditions suggesting that analyses of urban design and visual resources are appropriate. Based on guidance in the CEQR Technical Manual, the urban design analysis considers the potential impact of the Proposed Action related to building bulk, use, type, and arrangement, block form, street pattern and hierarchy, streetscape elements, and natural features. Also, based on guidance provided in the CEQR Technical Manual, the visual resources analysis considers the potential impact of the Proposed Action on important views of visual resources, such as the East River waterfront and the historic Queensboro Bridge and New York Architectural Terra Cotta Company building, from publicly accessible locations.
    [Show full text]
  • $223,355,000 Triborough Bridge and TUNNEL Authority Lehman
    NEW ISSUE BOOK-ENTRY-ONLY $223,355,000 TRIBOROUGH BRIDGE AND TUNNEL AutHORITY (MTA Bridges and Tunnels) General Revenue Bonds, Series 2007A DATED: Date of Delivery DUE: November 15, as shown on the inside cover The Series 2007A Bonds are being issued to finance bridge and tunnel projects. The Series 2007A Bonds – • are general obligations of MTA Bridges and Tunnels, payable generally from the net revenues collected on the bridges and tunnels operated by MTA Bridges and Tunnels as described herein, and • are not a debt of the State or The City of New York or any other local government unit. MTA Bridges and Tunnels has no taxing power. In the opinion of Hawkins Delafield & Wood LLP, Bond Counsel to MTA Bridges and Tunnels, under existing law and relying on certain representations by MTA Bridges and Tunnels and assuming the compliance by MTA Bridges and Tunnels with certain covenants, interest on the Series 2007A Bonds is • excluded from a bondholder’s federal gross income under the Internal Revenue Code of 1986, • not a preference item for a bondholder under the federal alternative minimum tax, and • included in the adjusted current earnings of a corporation under the federal corporate alternative minimum tax. Also in Bond Counsel’s opinion, under existing law, interest on the Series 2007A Bonds is exempt from personal income taxes of New York State or any political subdivisions of the State, including The City of New York. The Series 2007A Bonds are subject to redemption prior to maturity as described herein. The Series 2007A Bonds are offered when, as, and if issued, subject to certain conditions, and are expected to be delivered through the facilities of The Depository Trust Company, on or about June 20, 2007.
    [Show full text]
  • The Queens Ribbon
    The Queens Ribbon The proposed “Queens Ribbon” a bicycle-pedestrian bridge connecting Queens to Manhattan (rendering by T.Y. Lin International). A plan for three new car-free bridges to Manhattan’s Business District from Queens, Brooklyn, and New Jersey June 24, 2020 Table of Contents 1. Introduction 2. Background 3. The Need for Bicycle-Pedestrian Bridges 4. Three New Bridges – Alignment Options 5. Queens-Roosevelt Island-Midtown Manhattan Ribbon Bridge Case Study 6. Conclusion Appendices A. Worldwide Bicycle-Pedestrian Bridges B. Bicycling Growth in New York City C. Level of Service on East River Bridges D. Our Team 2 1. Introduction At the start of the Covid-19 crisis a group of transportation engineers began working together, on a pro bono basis, to develop a transportation system that would provide an almost risk-free method of travel to Manhattan’s Central Business District (CBD – Manhattan south of Central Park). The impetus for this grouping was the realization that the city may face similar epidemics, a severe flu season, or other man-made or natural disasters in the future. Experience told the group that the two forms of transportation that are most risk-free from both infections and crashes are walking and bicycling. These “active transportation” options are also healthy modes that burn calories, and build muscle, bone, heart, and lung strength while improving mental and emotional health. From this discussion, the idea of a bicycle-pedestrian bridge was born. Importantly, these facilities would be equitable. Costs to use them would be a pair of shoes or a bicycle. The group included teams from the Institute of Design & Each bridge could handle Construction (IDC) Innovation Hub of the NYU Tandon School approximately 20,000 people of Engineering, T.Y.
    [Show full text]
  • Appendix D.3 Scoping Report
    PUBLIC COMMENTS PC00001 LGA Comments <[email protected]> LaGuardia Airport Access Improvement Project Denise Crockett <[email protected]> Thu, May 9, 2019 at 10:44 PM To: "[email protected]" <[email protected]> Dear Mr Andrew Brooks: Thank you for the opportunity to comment on the LaGuardia Airport Access Improvement Project. As a long term resident of Jamaica, NY, residing along the Grand Central Parkway, I do believe that there is a great need for these proposed improvements. Connecting the LaGuardia Airport to the LIRR and NYCT No. 7 Line is a great idea, but it does not go far enough! Both of these proposed connections are Manhattan centric, that is supporting more ridership between the Airport and the City. This does absolutely nothing to relieve or ease local traffic congestion we experience in Queens on the Long Island Expressway and the Grand Central Parkway with inbound and outbound Long Island traffic. It also does not reduce heavy traffic congestion on the Van Wyck Expressway between JKF and LaGuardia. It would be helpful if the proposed plan included plans to extend the Airtrain light rail service Train which ends at the Jamaica LIRR Station to LaGuardia Airport with a stop at the NYCT No 7 Line. Having lived here for over 40 years and having travelled extensively on business out of both airports, I believe that extending the Airtrain from the Jamaica Station to LaGuardia Airport would be a tremendous improvement and provide many more benefits for the greater NYC area. People traveling from Long Island
    [Show full text]
  • • the Activation of OMNY Readers at the Queensboro Plaza Station in Queens Marks the Completion of the Line and the Halfway Po
    The activation of OMNY readers at the Queensboro Plaza station in Queens marks the completion of the line and the halfway point in the MTA's effort to activate OMNY at all 472 subway stations in the system. OMNY installation remains set to be completed by the end of the year at all subway stations and on all MTA-operated buses. A list of all subway stations and bus routes where OMNY is currently in use is at this link: https://omny.info/system-rollout In March, the MTA announced OMNY had surpassed 10 million taps. In 2021, the MTA will introduce an OMNY card at retail locations throughout the New York region. Also in 2021, the MTA will begin to install new vending machines at locations throughout the system. OMNY readers accept contactless cards from companies such as Visa, Mastercard, American Express, and Discover, as well as digital wallets such as Apple Pay, Google Pay, Samsung Pay, and Fitbit Pay. Following the completion of OMNY installation at all subway turnstiles and on buses, the MTA will introduce all remaining fare options, including unlimited ride passes, reduced fares, student fares, and more. Only after OMNY is fully available everywhere MetroCard is today, expected in 2023, will the MTA say goodbye to the MetroCard. The MetroCard was first tested in the system in 1993, debuting to the larger public in January 1994. All turnstiles were MetroCard-enabled by May 1997 and all buses began accepting it by the end of 1995. Tokens were sold until April 2003 and acceptance was discontinued that May in subway stations and that December on buses.
    [Show full text]
  • Brooklyn-Queens Greenway Guide
    TABLE OF CONTENTS The Brooklyn-Queens Greenway Guide INTRODUCTION . .2 1 CONEY ISLAND . .3 2 OCEAN PARKWAY . .11 3 PROSPECT PARK . .16 4 EASTERN PARKWAY . .22 5 HIGHLAND PARK/RIDGEWOOD RESERVOIR . .29 6 FOREST PARK . .36 7 FLUSHING MEADOWS CORONA PARK . .42 8 KISSENA-CUNNINGHAM CORRIDOR . .54 9 ALLEY POND PARK TO FORT TOTTEN . .61 CONCLUSION . .70 GREENWAY SIGNAGE . .71 BIKE SHOPS . .73 2 The Brooklyn-Queens Greenway System ntroduction New York City Department of Parks & Recreation (Parks) works closely with The Brooklyn-Queens the Departments of Transportation Greenway (BQG) is a 40- and City Planning on the planning mile, continuous pedestrian and implementation of the City’s and cyclist route from Greenway Network. Parks has juris- Coney Island in Brooklyn to diction and maintains over 100 miles Fort Totten, on the Long of greenways for commuting and Island Sound, in Queens. recreational use, and continues to I plan, design, and construct additional The Brooklyn-Queens Greenway pro- greenway segments in each borough, vides an active and engaging way of utilizing City capital funds and a exploring these two lively and diverse number of federal transportation boroughs. The BQG presents the grants. cyclist or pedestrian with a wide range of amenities, cultural offerings, In 1987, the Neighborhood Open and urban experiences—linking 13 Space Coalition spearheaded the parks, two botanical gardens, the New concept of the Brooklyn-Queens York Aquarium, the Brooklyn Greenway, building on the work of Museum, the New York Hall of Frederick Law Olmsted, Calvert Vaux, Science, two environmental education and Robert Moses in their creations of centers, four lakes, and numerous the great parkways and parks of ethnic and historic neighborhoods.
    [Show full text]
  • Download Brochure
    4301LIC.COM 4301LIC.COM The View Looks Good From Here In the heart of Long Island City is 43-01 22nd Street, stop to Manhattan. And, tenants' needs are a six-story building with stunning views and workspaces understood by an ownership team comprised tailored to small and medium-size companies. of two family run organizations, GFP Real Estate and Olmstead Properties. We look forward to Modern interiors paired with new oversized windows meeting you. allow for tons of natural light, making this building a place to thrive. Access is swift, being one subway Building entrance on 22nd Street, facing west. 4301LIC.COM Renovated, expanded lobby and building entrance with a new, modernized elevator. 4301LIC.COM Small workspaces boasting polished concrete floors, new oversized windows, and stunning views. 4301LIC.COM All spaces feature 12’ 6” slab-to-slab ceiling heights and industrial fluted columns. 4301LIC.COM Medium spaces featuring abundant natural light, amazing views, and an overall inspiring work environment. 4301LIC.COM Upper 40t Ave 4301LIC.COM East St 10t 40t Ave Side F F ACCESS St 21t QUEENSBRIDGE PARK N W Queensboro 98 E 59t St Bridge 7 WALK SCORE 10t St 10t Long 5 STOPS Island 100 TO PORT AUTHORITY City TRANSIT SCORE E 1 STOP M TO MANHATTAN E 52t St 7 Midtown East 6 STOPS G TO PENN STATION 11t St 4 MIN Vrnon B WALK TO COURT SQUARE E 48t St G E M 7 G 47t R 7 2 MIN E 45t St gantry plaza state park drive 7 MIN 3 STOPS TO THE LIRR WALK TO GRAND CENTRAL 7 TO QUEENSBORO PLAZA 4 STOPS TO WILLIAMSBURG N W 7 3 MIN Firt Ave 1 STOP DRIVE TO GREENPOINT TO THE EAST 5 CITIBIKE RIVER FERRY EaST STOPS river LESS THAN 5 MINUTES AWAY E 33r St 4301LIC.COM LIC on the move Long Island City offers something special.
    [Show full text]
  • Jackson Avenue Future Home of Your Business 2 Highlights
    PRIME COURT SQUARE RETAIL 2320 JACKSON AVENUE FUTURE HOME OF YOUR BUSINESS 2 HIGHLIGHTS Location • Incredible corner exposure and frontage at the center of LIC’s business district – COURT SQUARE • Corner of Jackson Ave and Pearson St Size • 10,000 sf floor plate (as is) • Can build up to 60,000+ sf Rent Upon request Neighboring Tenants Comments Citibank, Burger Garage, LIC Market, • Directly in front of 1 Court Square – 1,500,000 sf of office space (Citibank) Dutch Kills, Silvercup Studios, CUNY • Over 22,500 new residential units planned for LIC School of Law, Queens Court House, Starbucks, Subway, Astoria Bank • Direct access to the Court Square subway entrance across Jackson Avenue (Coming soon) • Court Square subway with a daily ridership of 27,000 is located steps away • The Jackson Square retail opportunity is 30,000 SQ FT between three levels; outdoor space available • The Court Square is centrally located on the corner of Jackson Avenue, with maximal exposure across from the Citibank building PRIME COURT SQUARE RETAIL 3 RESIDENTIAL MAP DEVELOPMENTS CONSTRUCTION/ QUEENSBORO BRIDGE 22nd St 99 QUEENS PLAZA SOUTH 98 23rd St PLANNING 20 24th St 41st Ave NO. ADDRESS STATUS UNITS 13th St Queens Plaza North 3 12th St Crescent St 56 23-10 Queens Plaza South 2015 391 Silvercup 97 4 Studios 101 30 27th St 59 42-14 Crescent Street 2015 48 100 60 42-60 Crescent Street 2015 40 7 Jetblue Metlife 102 91 61 25-19 43rd Avenue 2015 86 56 M N 28th St 21ST ST 11 65 43-25 Hunter Street 2016 974 Q Queensboro Bridge Greenway 29th St 42nd Rd 103 10 70 Tisman Speyer Phase 1 2017 2000 22nd St 1 Northern Blvd 59 Clock- 71 Tisman Speyer Phase 2 2018 TBD 72 tower To Bridge 88 72 25-10 Queens Plaza South 2017 150 23rd St 85 29 96 Dutch Kills (42-02 27th St) 7 Green 44th Ave 43rd Ave 104 74 Dept.
    [Show full text]