Federal Register/Vol. 65, No. 148/Tuesday, August 1, 2000/Rules

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 65, No. 148/Tuesday, August 1, 2000/Rules 46870 Federal Register / Vol. 65, No. 148 / Tuesday, August 1, 2000 / Rules and Regulations significant economic impact on a Civil Justice Reform Dated: July 19, 2000. substantial number of small entities. G.N. Naccara, ``Small entities'' comprises small This rule meets applicable standards Rear Admiral, U.S. Coast Guard, Commander, businesses, not-for-profit organizations in sections 3(a) and 3(b)(2) of Executive First Coast Guard District. that are independently owned and Order 12988, Civil Justice Reform, to [FR Doc. 00±19396 Filed 7±31±00; 8:45 am] operated and are not dominant in their minimize litigation, eliminate BILLING CODE 4910±15±P fields, and governmental jurisdictions ambiguity, and reduce burden. with populations less than 50,000. Protection of Children The Coast Guard certifies under 5 DEPARTMENT OF TRANSPORTATION U.S.C. 605(b) that this rule will not have We have analyzed this rule under a significant economic impact on a Executive Order 13045, Protection of Coast Guard substantial number of small entities. Children from Environmental Health 33 CFR Part 117 This conclusion is based on the fact that Risks and Safety Risks. This rule is not three of the bridges presently open after an economically significant rule and a six-hour notice May 1 through does not concern an environmental risk [CGD01±99±069] September 30, which is greater than the to health or risk to safety that may proposed two-hour notice during those disproportionately affect children. RIN 2115±AE47 five months. The Coast Guard believes that the Environment Drawbridge Operation Regulations: two-hour advance notice October 1 Newtown Creek, Dutch Kills, English The Coast Guard considered the through April 30 is reasonable because Kills and their tributaries, New York the bridges will still open on signal environmental impact of this rule and provided the two-hour notice is given. concluded that under figure 2±1, AGENCY: Coast Guard, DOT. The commercial vessel transits on paragraph (32)(e) of Commandant ACTION: Final rule. Gowanus Canal are scheduled in Instruction M16475.1C, this rule is advance by the commercial operators. categorically excluded from further SUMMARY: The Coast Guard is changing Providing two-hours notice for bridge environmental documentation because the drawbridge operation regulations for openings for the additional seven promulgation of changes to drawbridge six New York City bridges: The Pulaski months of the year, October 1 through regulations have been found to not have Bridge, at mile 0.6, across Newtown April 30, when the bridge formerly a significant effect on the environment. Creek between Brooklyn and Queens; opened on signal, should not prevent A ``Categorical Exclusion the Greenpoint Avenue Bridge, at mile vessels from still transiting the Determination'' is available in the 1.3, across the Newtown Creek between waterway in a timely manner. docket for inspection or copying where Brooklyn and Queens; the Grand Street/ indicated under ADDRESSES. Avenue Bridge, at mile 3.1, across Collection of Information Newtown Creek (East Branch) between List of Subjects in 33 CFR Part 117 This rule calls for no new collection Brooklyn and Queens; the Metropolitan Avenue Bridge, at mile 3.4, across of information under the Paperwork Bridges. Reduction Act of 1995 (44 U.S.C. 3501± English Kills at Brooklyn; the Borden 3520). Regulations Avenue Bridge, at mile 1.2, across Dutch Kills at Queens; and the Hunters Point Federalism For the reasons set out in the Avenue Bridge, at mile 1.4, across Dutch We have analyzed this rule under preamble, the Coast Guard amends 33 Kills at Queens all in New York. Executive Order 13132 and have CFR part 117 as follows: The bridge owner asked the Coast determined that this rule does not have Guard to change the regulations to implications for federalism under that PART 117ÐDRAWBRIDGE require a two-hour advance notice for Order. OPERATION REGULATIONS openings. It is expected to relieve the bridge owner from the requirement to Unfunded Mandates Reform Act 1. The authority citation for part 117 crew the bridges at all times by using The Unfunded Mandates Reform Act continues to read as follows: multiple crews of drawtenders and still of 1995 (2 U.S.C. 1531±1538) governs Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 meet the reasonable needs of navigation. the issuance of Federal regulations that CFR 1.05±1(g); section 117.255 also issued DATES: This rule is effective August 31, require unfunded mandates. An under the authority of Pub. L. 102±587, 106 2000. unfunded mandate is a regulation that Stat. 5039. ADDRESSES: Comments and material requires a State, local, or tribal 2. Section 117.787 is revised to read received from the public, as well as government or the private sector to as follows: documents indicated in this preamble as incur direct costs without the Federal being available in the docket, are part of Government's having first provided the § 117.787 Gowanus Canal docket (CGD01±99±069) and are funds to pay those unfunded mandate The draws of the Ninth Street Bridge, available for inspection or copying at costs. This rule will not impose an the First Coast Guard District, Bridge unfunded mandate. mile 1.4, the Third Street Bridge, mile 1.8, the Carroll Street Bridge, mile 2.0, Branch Office, 408 Atlantic Avenue, Taking of Private Property and the Union Street Bridge, mile 2.1, Boston, Massachusetts, 02110, 7 a.m. to at Brooklyn, shall open on signal, if at 3 p.m., Monday through Friday, except This rule will not effect a taking of Federal holidays. private property or otherwise have least a two-hour advance notice is given taking implications under Executive to the New York City Department of FOR FURTHER INFORMATION CONTACT: John Order 12630, Governmental Actions and Transportation (NYCDOT), Radio W. McDonald, Project Officer, First Interference with Constitutionally Hotline, or the NYCDOT Bridge Coast Guard District, (617) 223±8364. Protected Property Rights. Operations Office. SUPPLEMENTARY INFORMATION: VerDate 11<MAY>2000 12:00 Jul 31, 2000 Jkt 190000 PO 00000 Frm 00012 Fmt 4700 Sfmt 4700 E:\FR\FM\01AUR1.SGM pfrm07 PsN: 01AUR1 Federal Register / Vol. 65, No. 148 / Tuesday, August 1, 2000 / Rules and Regulations 46871 Regulatory Information for the Grand Street/Avenue Bridge, Hunters Point Avenue Bridge On April 24, 2000, we published a listed at 33 CFR 117.801(e), require the bridge to open on signal unless the The Hunters Point Avenue Bridge, at notice of proposed rulemaking (NPRM) mile 1.4, over the Dutch Kills has entitled Drawbridge Operation drawtender is at the Borden Avenue, vertical clearances of 8 feet at mean high Regulations; Newtown Creek, Dutch Hunters Point Avenue or Roosevelt Kills, English Kills and their tributaries, Island Bridges. In this event a notice to water and 13 feet at mean low water. New York, in the Federal Register (65 the New York City Department of The existing regulations for the Hunters FR 21683). We received no comments in Transportation (NYCDOT) Radio Point Avenue Bridge in 33 CFR response to the notice of proposed Hotline, or NYCDOT Bridge Operations 117.801(d) require the draw to open on rulemaking. No public hearing was Office shall be given, resulting in up to signal if at least a one-hour advance requested and none was held. a one-hour delay. notice is given to the drawtender at the Metropolitan Avenue Bridge Grand Street/Avenue Bridge, the Background and Purpose NYCDOT Radio Hotline, or NYCDOT Pulaski Bridge The Metropolitan Avenue Bridge, at Bridge Operations Office. In the event mile 3.4, across the English Kills at The Pulaski Bridge, at mile 0.6, across the drawtender is at the Roosevelt Brooklyn has a vertical clearance of 10 Newtown Creek between Brooklyn and Island Bridge or the Borden Avenue feet above mean high water and 15 feet Queens has a vertical clearance of 39 Bridge, up to an additional half-hour above mean low water. The existing feet at mean high water and 43 feet at delay may occur. operating regulations require the draw mean low water. The existing to open on signal at all times. The bridge owner, the New York City regulations require the draw to open on Department of Transportation signal at all times. Borden Avenue Bridge (NYCDOT), submitted bridge opening Greenpoint Bridge The Borden Avenue Bridge, at mile log data to the Coast Guard for review. The Greenpoint Avenue Bridge, at 1.3, across the Dutch Kills has a vertical The bridge owner plans to operate these mile 1.3, across the Newtown Creek clearance of 4 feet at mean high water bridges with multiple crews of between Brooklyn and Queens has a and 9 feet at mean low water. The drawtenders. The two-hour advance vertical clearance of 26 feet at mean existing regulations in 33 CFR notice should allow sufficient time for high water and 31 feet at mean low 117.801(c) require the draw to open on the crews to operate these bridges due water. The existing regulations require signal if at least a one-hour advance to the close proximity of the bridges to the draw to open on signal at all times. notice is given to the drawtender at the each other. Recent yearly openings have Grand Street/Avenue Bridge, the New been relatively low which will allow the Grand Street/Avenue Bridge York City Department of Transportation bridge owner to utilize the roving crew The Grand Street/Avenue Bridge, at Radio Hotline or NYCDOT Bridge concept and still meet the needs of mile 3.1 across the Newtown Creek (East Operations Office. In the event the navigation.
Recommended publications
  • The Drawingboard
    The Drawingboard September 2006 Volume 6, Number 9 In This Issue President’s Message • President’s Message By Brian Flynn, P.E. President • Next Meeting – Sept 28th @ 6:30PM Welcome back, I hope everyone took some time to enjoy the sumer weather. It was a wonderful summer marred only by the • UPDATE – Dept. of Buildings Park's Department last minute cancellation of the PDC Picnic in News Brief August. Now that fall has arrived, we are back in full swing with • Useful Websites for Engineers our schedule of Chapter Meetings and events. This month's • Profile of an Engineer meeting promises to be very interesting with our sponsor Hilti discussing Firestopping techniques. As you all know Professional • 2006 Meeting Schedule Development Hours (PDH's) are available for free to our • Professional Directory and members at all of our meetings every month. In addition, the Sponsors PDC has a lecture series for additional PDH's every month as • PIE August Newsletter well. The next lecture on Tuesday, October 17 will most likely (attached) feature Tim Lynch, PE of the Building Department's Forensic Unit to discuss shoring and underpinning. I would like to announce the appointment of several individuals Board of Directors to head chapter committees. First is Sal Galletta, PE who will Brian Flynn, President head our Committee for Political Action to spear head actions to P.E. (718) 707-0416 promote licensed engineering, including the proposed resolution George L. to create a position of Deputy Mayor for Infrastructure, who is a 1ST Vice Pres. Tavoulareas, licensed engineer or registered architect.
    [Show full text]
  • Innovations & Accomplishments
    INNOVATIONS & ACCOMPLISHMENTS East River Bridges A $2.8 billion reconstruction program is underway to rehabilitate all four East River crossings. In 2002, these bridges carried some 467,080 vehicles per day. In 2002, working in coordination with the NYPD and other law enforcement agencies, the Division implemented enhanced security measures on these bridges. This work is ongoing. BROOKLYN BRIDGE The Brooklyn Bridge carried some 121,145 vehicles per day in 2002. The $467 million reconstruction commenced in 1980 with Contract #1, will continue with Contract #6, currently in the design phase and scheduled for completion in 2012, and will end with a seismic retrofit of the bridge, slated for completion in 2013. Work completed on the bridge to date includes reconditioning of the main cables, replacement of the suspenders and cable stays, rehabilitation of the stiffening trusses, and the replacement of the suspended spans deck. The next work scheduled for the bridge is a project to replace the existing travelers with a state of the art technology system. Construction is scheduled to begin in the spring of 2005 and conclude in the spring of 2007. Brooklyn Bridge in 1909 Pedestrian Vibration Study The major blackout of August 14, 2003 forced City officials to close the bridge to vehicular traffic and open the entire bridge to pedestrians. During this mass exodus, several pedestrians reported that the bridge was vibrating and thus causing them great anxiety. At the request of the Office of Emergency Management, an emergency inspection of the bridge was performed that evening as a result of these complaints of “swaying”; no structural problems were found.
    [Show full text]
  • A Look at Bridges: a Study of Types, Histories, and the Marriage of Engineering and Architecture Cody Chase Connecticut College
    Connecticut College Digital Commons @ Connecticut College Architectural Studies Integrative Projects Art History and Architectural Studies 2015 A Look at Bridges: A Study of Types, Histories, and the Marriage of Engineering and Architecture Cody Chase Connecticut College Follow this and additional works at: http://digitalcommons.conncoll.edu/archstudintproj Recommended Citation Chase, Cody, "A Look at Bridges: A Study of Types, Histories, and the Marriage of Engineering and Architecture" (2015). Architectural Studies Integrative Projects. Paper 73. http://digitalcommons.conncoll.edu/archstudintproj/73 This Article is brought to you for free and open access by the Art History and Architectural Studies at Digital Commons @ Connecticut College. It has been accepted for inclusion in Architectural Studies Integrative Projects by an authorized administrator of Digital Commons @ Connecticut College. For more information, please contact [email protected]. The views expressed in this paper are solely those of the author. CODY CHASE SENIOR INTEGRATIVE PROJECT: INDEPENDENT STUDY ARCHITECTURAL STUDIES CONNECTICUT COLLEGE 2015 A"LOOK"INTO"BRIDGES" A"Study"of"Types,"Histories,"and"the"Marriage"of" Engineering"and"Architecture" " Cody"Chase"‘15" Architectural"Studies"Major,"Art"History"Minor" Senior"IntegraHve"Project" " Why Bridges? Where to begin? TYPES OTHER • Arch • Glossary • Beam/Girder/Stringer • Materials • Truss • History of Failures • Suspension • Models • Cable-Stayed • Moveable Span What makes a bridge stand up? FORCES ***Compression:
    [Show full text]
  • Court Sq-23 St E
    Neighborhood Map ¯ 25-16 27-17 Riverwalk 9-19 Commons 38 Avenue 39-01 21-18 38-99 22-01 37-99 t 27-12 e 10 Street 28-17 38-01 37-31 e 38-99 r 29 Street t Roosevelt Island Q102 10-11 11 Street S n Promenade Queens Q103 i 22-18 38-99 40 Avenue Q100 39-01 Old Ridge Road a East River Q102 12 Street 23-01 28-18 LTD 38-01 M 37-49 38-99 39 Avenue Greenway 13 Street Q100 40-01 Q103 11-11 Q66 LTD Q69 38-99 23-14 24-19 39-01 29-18 Vernon Boulevard Queensbridge 38-01 38-99 Q66 North 21 StreetQ69 Roosevelt 12-15 Houses 24-20 38-99 39-01 25-19 38-99 22 Street Island 40-01 13-13 38-99 40-99 40 Avenue 25-20 Firefighters 39-01 27-19 39-99 39 Avenue Field 23 Street Queensbridge 8-25 21-19 27-20 38-99 39-01 28-11 Fisher Landau Park 41-01 24 Street Center for Art 40-01 21-22 39-99 Roosevelt 8-26 22-01 38-99 1 40-99 28-10 Island 39-01 29-19 Q102 Q103 10-25 Queensbridge North Queensbridge 22-14 39-99 40-01 Houses 23-13 Crescent Street 38-99 4 29-08 Q102 41 Avenue Library 39-01 d 41-01 Q103 40 Avenue a 39 Av o 27 Street R 39-99 t 23-02 s Queensbridge 40-01 24-11 a 39-01 E 2 South 10-26 40-99 Houses 28 StreetGrowing Up 39-99 10-25 24-16 Green Q32 40-01 25-17 Charter School Q60 Q103 21 St Q101 3 41-01 Queensbridge 29 Street Queensboro Q103 10-26 25-20 39-99 Bridge 40-01 27-15 10 Street 40-99 40 Avenue St.
    [Show full text]
  • 1 NYC Bridge and Screenline Traffic Volumes Dashboard Metadata
    NYC Bridge and Screenline Traffic Volumes Dashboard Metadata Data Methodology Vehicular traffic volumes are collected annually for a two week period either during the fall months of September, October, and November or during the spring months of March, April, May, and June. Most of these traffic volumes are collected using Automated Traffic Recorders (ATRs), which record each vehicle as it passes over a pneumatic tube. A small percentage are collected using cameras. Average hourly volumes and an average daily volume are calculated from valid midweek days (Tuesday through Thursday). Dashboard Visuals The line graph on the “Average Daily Traffic Volumes per Facility per Year” page (page 1 of 2) represents a bidirectional (where applicable) average daily volume per location dating back to 1981 for most locations. The line graph on the “Average Hourly Traffic Volumes per Facility” page (page 2 of 2) represents the average bidirectional (where applicable) hourly volumes per location. This graph displays the end of the hour for each traffic volume on the x axis. For example, in the year of 2019 for Brooklyn Bridge, the traffic volume of 7,931 occurs during the 11:00 PM to 12:00 AM time period. Similarly, the traffic volume of 5,333 occurs during the 12:00 AM to 1:00 PM time period, and so on. The "Group" and the "Facility" filters will apply to both graphs. The "Year" filter will only alter the "Average Hourly Traffic Volumes per Facility" line graph. Each graph can display a maximum of only 60 facilities (lines) due to a limitation with Power BI.
    [Show full text]
  • Brooklyn-Queens Greenway Guide
    TABLE OF CONTENTS The Brooklyn-Queens Greenway Guide INTRODUCTION . .2 1 CONEY ISLAND . .3 2 OCEAN PARKWAY . .11 3 PROSPECT PARK . .16 4 EASTERN PARKWAY . .22 5 HIGHLAND PARK/RIDGEWOOD RESERVOIR . .29 6 FOREST PARK . .36 7 FLUSHING MEADOWS CORONA PARK . .42 8 KISSENA-CUNNINGHAM CORRIDOR . .54 9 ALLEY POND PARK TO FORT TOTTEN . .61 CONCLUSION . .70 GREENWAY SIGNAGE . .71 BIKE SHOPS . .73 2 The Brooklyn-Queens Greenway System ntroduction New York City Department of Parks & Recreation (Parks) works closely with The Brooklyn-Queens the Departments of Transportation Greenway (BQG) is a 40- and City Planning on the planning mile, continuous pedestrian and implementation of the City’s and cyclist route from Greenway Network. Parks has juris- Coney Island in Brooklyn to diction and maintains over 100 miles Fort Totten, on the Long of greenways for commuting and Island Sound, in Queens. recreational use, and continues to I plan, design, and construct additional The Brooklyn-Queens Greenway pro- greenway segments in each borough, vides an active and engaging way of utilizing City capital funds and a exploring these two lively and diverse number of federal transportation boroughs. The BQG presents the grants. cyclist or pedestrian with a wide range of amenities, cultural offerings, In 1987, the Neighborhood Open and urban experiences—linking 13 Space Coalition spearheaded the parks, two botanical gardens, the New concept of the Brooklyn-Queens York Aquarium, the Brooklyn Greenway, building on the work of Museum, the New York Hall of Frederick Law Olmsted, Calvert Vaux, Science, two environmental education and Robert Moses in their creations of centers, four lakes, and numerous the great parkways and parks of ethnic and historic neighborhoods.
    [Show full text]
  • Division Overview
    DIVISION OVERVIEW As an integral part of New York City's Department of Transportation, the Division of Bridges has a two-fold mission: to maintain an optimal transportation network by ensuring smooth mobility on the city's bridges, and to ensure the safety of the public. The New York City Department of Transportation’s Division of Bridges is comprised of five major bureaus. The Chief Bridge Officer is responsible for formulating policy and providing executive direction. He oversees all aspects of the design, construction, rehabilitation and reconstruction, maintenance, operation and administration of the 787 bridges (including 5 tunnels), and 61 culverts presently under the jurisdiction of the New York City Department of Transportation (NYCDOT). In addition to broad supervision, the Chief Bridge Officer also provides overall executive and administrative direction for the Division of Bridges, and ensures that all contractors are promptly paid. Reporting to the Chief Bridge Officer, the Community Affairs Unit maintains liaison with elected officials, community boards, community groups, and civic/neighborhood associations. The Unit takes a pro-active approach in addressing design issues, roadway closures, and detours by reaching out to communities prior to the onset of construction. This enables the Division to proceed with its rehabilitation program with community input, and allows the Agency and its contractors to co-exist in a more harmonious manner with the community surrounding the project. Issues and problems of concern to the communities
    [Show full text]
  • Pulaski Bridge Pedestrian and Bicycle Improvements Month Year
    Pulaski Bridge Pedestrian and Bicycle Improvements Month Year Commissioner Janette Sadik-Khan, New York City Department of Transportation Presented December 17th, 2013 Background • Critical bike network link: • Connects Brooklyn to Ed Koch Queensboro Bridge • Connects rapidly redeveloping Queens and Brooklyn waterfronts • Important connection to the 7 train for pedestrians and bicyclists • Community concerns about bicycle-pedestrian path in 2009 • Enhancements installed to improve safety and organize traffic flow Pulaski Bridge Weekday Bicycle/Pedestrian Counts 7-11am & 2-7pm Mode April 2009 April 2013 % change Bicyclists 487 1,004 +106% Pedestrians 1,077 1,586 +47% Background • Path width makes passing difficult, especially as volume increases • Community request for bicycle and pedestrian enhancements • Support from AM Joseph Lentol, CM Stephen Levin, CM Jimmy Van Bramer, Transportation Alternatives and Queens CB2 • April 2013: DOT consultant begins design of a new bicycle path • August 2013: Transportation Enhancement Program (TEP) grant application submitted Project Map Proposed Project Limits Bicycle Lane Shared Lane Pulaski Bridge Subway Station Ferry Terminal Existing Conditions: Shared Path • 8.5 ft-wide two-way shared bicycle/pedestrian path • Path narrows at obstacles • Average two-way weekday volumes, 7am-7pm, April 2013: • 1,845 pedestrians • 1,194 bicyclists Existing Conditions: Roadway • 3 Queens-bound (northbound) and 3 Brooklyn-bound (southbound) travel lanes • All travel lanes are 11 ft wide • Peak hour traffic volumes: • 1,559 vehicles (Brooklyn- bound, 4:30-5:30pm) • 1,556 vehicles (Queens- bound, 8-9am) • 2 receiving lanes on McGuiness Blvd, Brooklyn • Complex multi-nodal intersection at Queens landing Project Challenges • Bridge approaches have slip lanes • Electrical lines in existing barrier • Moveable bridge: opens for maritime traffic • Newtown Creek is an active waterway, approx.
    [Show full text]
  • Newtown Creek SAMPLES Water Quality Results from Community-Led Research, 2017
    Newtown Creek SAMPLES Water Quality Results from Community-Led Research, 2017 Newtown Creek SAMPLES Water Quality Results from Community-Led Research, 2017 In 2017 the Newtown Creek Alliance, Table of Contents in partnership with LaGuardia Community College and the North Introduction 4 Brooklyn Boat Club, ran an extensive Combined Sewer Overflow 5 water quality program, collecting over Sampling Locations 7 2,000 points of data from seven Rainfall 9 different locations on Newtown Creek. Dissolved Oxygen 11 This report provides details on the Enterococcus 15 parameters that we tested for, trends Phosphorus 17 that were observed as well as specific Algal Blooms 18 issues we targeted through our Marine Debris 21 research. Bird Survey 22 Next Steps 23 Additional Resources 24 Funding for this report was provided by the Hudson River Foundation. 1 In 2017 the Newtown Creek Alliance, Table of Contents in partnership with LaGuardia Community College and the North Introduction 4 Brooklyn Boat Club, ran an extensive Combined Sewer Overflow 5 water quality program, collecting over Sampling Locations 7 2,000 points of data from seven Rainfall 9 different locations on Newtown Creek. Dissolved Oxygen 11 This report provides details on the Enterococcus 15 parameters that we tested for, trends Phosphorus 17 that were observed as well as specific Algal Blooms 18 issues we targeted through our Marine Debris 21 research. Bird Survey 22 Next Steps 23 Additional Resources 24 Funding for this report was provided by the Hudson River Foundation. 2 3 Introduction Newtown Creek is a 3.8 miles waterway forming the western border between the boroughs of Brooklyn and Queens in New York City.
    [Show full text]
  • New York City Department of Transportation (NYCDOT) Decreased to 793
    Appendix A BRIDGE CAPITAL PROGRAM East River Bridge Rehabilitation Plans A-1 Bridges Under Construction A-2 Component Rehabilitation A-3 Bridges Under Design A-4 216 2017 BRIDGES AND TUNNELS ANNUAL CONDITION REPORT APPENDIX A-1 MANHATTAN BRIDGE REHABILITATION ITEMS TOTAL ESTIMATED COST Est. Cost ($ in millions) Repair floor beams. (1982) 0.70* Replace inspection platforms, subway stringers on approach spans. (1985) 6.30* Install truss supports on suspended spans. (1985) 0.50* Partial rehabilitation of walkway. (1989) 3.00* Rehabilitate truss hangers on east side of bridge. (1989) 0.70* Install anti-torsional fix (side spans) and rehabilitate upper roadway decks on approach spans on east side; replace drainage system on approach spans, install new lighting on entire upper roadways east side, including purchase of fabricated material for west side of bridge. (1989) 40.30* Eyebar rehabilitation - Manhattan anchorage Chamber “C.” (1988) 12.20* Replacement of maintenance platform in the suspended span. (1982) 4.27* Reconstruct maintenance inspection platforms, including new rail and hanger systems and new electrical and mechanical systems; over 2,000 interim repairs to structural steel support system of lower roadway for future functioning of roadway as a detour during later construction contracts. (1992) 23.50* Install anti-torsional fix on west side (main and side spans); west upper roadway decks, replace drainage systems on west suspended and approach spans; walkway rehabilitation (install fencing, new lighting on west upper roadways
    [Show full text]
  • New York City Department of Transportation
    INNOVATIONS & ACCOMPLISHMENTS East River Bridges A $3.14 billion reconstruction program is underway to rehabilitate all four East River crossings. In 2005, these bridges carried some 498,213 vehicles per day. In 2002, working in coordination with the NYPD and other law enforcement agencies, the Division implemented enhanced security measures on these bridges. This work is ongoing. BROOKLYN BRIDGE The Brooklyn Bridge carried some 132,210 vehicles per day in 2005. The $547 million reconstruction commenced in 1980 with Contract #1, and will continue with Contract #6, currently in the design phase and scheduled for completion in 2013. This contract will include the rehabilitation of both approaches and ramps, the painting of the entire suspension bridge, as well as the seismic retrofitting of the structural elements that are within the Contract #6 project limits. Engineering Landmark Plaque. (Credit: Russell Holcomb) 1899 Plaque Near the Franklin Truss of the Bridge, Marking the Site of George Washington’s First Presidential Mansion, Franklin House. (Credit: Hany Soliman) Historic Landmark, 1954 Reconstruction, and Two Cities Plaques. (1954 & Cities Credit: Michele N. Vulcan) 44 2006 BRIDGES AND TUNNELS ANNUAL CONDITION REPORT INNOVATIONS & ACCOMPLISHMENTS The fitting of the remaining bridge elements requiring seismic retrofitting will be carried out under a separate contract by the end of 2013. Work completed on the bridge to date includes reconditioning of the main cables, replacement of the suspenders and cable stays, rehabilitation of the stiffening trusses, and the replacement of the suspended spans deck. The next work scheduled for the bridge is a project to replace the existing travelers with a state of the art technology system.
    [Show full text]
  • 1911-03-00 Index
    HEtITY RCVJI OFFICIAL JOURNAI OF THE CITY OF NEW YORK There shall be published daily, Sundays and legal holidays excepted, under a contract to be made as hereinafter provided, a paper to be known as the CITY REwxa. And said CrrY Rzco , and the newspapers now by law designated as corporation newspapers in the present City of Brooklyn, shall be the only papers to be included within the term corporation newspapers, as the same is used anywhere in this act; .... There shall be inserted in said CITY REcoan nothing aside from such official matters as are expressly authorized All advertising required to be done for the City, except as in this act otherwise specially provided, and all notices required by law or ordi- nance to be published in corporation papers, shall be inserted at the public expense only in the CrrY REcow, and the publication therein shall be a sufficient compliance with any law or ordinance requiring publication of such matters or notices The Comptroller shall cause a continuous series of the CITY REconn to be bound as completed, quarterly, and to be deposited with his certificate thereon in the office of the Register of Deeds of the County of New York, in the County Clerk's office of said county, and in- the office of the City Clerk, and copies of the contents of any of the same, certified by such Register, County Clerk or City Clerk, shall be received in judicial pro- ceedings as prima facie evidence of the truth of the contents thereof.—§1526, Greater New York Charter.
    [Show full text]