BOOK 3 TERMINALS DESCRIPTION

TIMETABLING YEAR 2016/2017

CID BOOK 3 Version 3

VERSION AUTHOR DATE CHANGES 0 PMO 10/11/2013 TT 2013/2014 and TT 2014/2015 publication 1 PMO 13/01/2014 TT 2014/2015 publication 2 PMO 28/02/2014 Added Torino Orbassano AFA Terminal in Italy 3 PMO 12/01/2015 TT 2015/2016 publication 4 PMO 12/01/2015 Added 4 terminals between Algericas - Madrid RFF/SNCF Réseau related updates in Book 3. 5 PMO 11/05/2015 Name of the company and the logo were changed 6 PMO 24/11/2015 Version 3 for TT 2016 Common Structure by RNE 7 PMO 24/11/2015 Extention to Croatia

2 CID BOOK 3 Version 3

Table of Contents

1. Introduction ...... 7 1.1 Purpose of the Terminal Description Book ...... 7 1.2 Definition of Terminal ...... 8 1.3 How to become a member of the Terminal Advisory Group? ...... 10 2. Terminal Overview ...... 13 2.1. A map of highlighted location of Terminals ...... 13 2.2. Summary of of the key features in ...... 14 2.3. Summary of of the key features in France ...... 22 2.4. Summary of of the key features in Italy ...... 24 2.5. Summary of of the key features in Slovenia ...... 26 2.6. Summary of of the key features in Croatia ...... 27 2.7. Summary of of the key features in Hungary ...... 28 3. Terminal Details ...... 29 3.1. Terminal details of Spain ...... 30 Algeciras-TERMINAL ...... 31 Can Tunis ...... 34 Barcelona Morrot ...... 37 ...... 39 Celsa ...... 42 Cordoba – El Higueron ...... 44 FORD - FACTORIA, (Silla - Valencia) ...... 47 Gonvauto ...... 54 Grisen ...... 55 La Llagosta ...... 57 Madrid Abrońigal ...... 59 ...... 61 Murcia Mercancias ...... 63 Port Bou ...... 65 Puerto de Algeciras ...... 67 Puerto de Alicante ...... 69 Puerto de Barcelona (8 different terminals) ...... 72 Puerto de Cartagena ...... 89 Puerto de Castellon ...... 91

3 CID BOOK 3 Version 3

Puerto de Tarragona (13 different terminals) ...... 93 Puerto de Valencia ...... 100 Puerto Seco Azuqueca de Henares (Azuqueca de Henares – Guadalajara) ...... 101 Puerto Seco Coslada (Coslada – Madrid) ...... 103 Repsol ...... 107 Sagunto ...... 109 San Roque – La Linea ...... 111 Silla ...... 114 Solvay...... 116 Tarragona Mercancias ...... 120 Terminal Intermodal de Monzón (Monzón de Rio Cinca – Huesca)...... 122 Terminal Marítima Zaragoza S.L. (Corbera Alta – Zaragoza) ...... 125 Valencia Fuente San Luis ...... 128 Vicalvaro Mercancías ...... 130 Vilamalla ...... 133 Zaragoza Plaza ...... 135 3.2. Terminal details of France ...... 137 Aiton ...... 138 Ambérieu ...... 140 Badan ...... 142 Chasse Sur Rhone ...... 144 Grenoble ...... 146 Le Boulou (Ambrogio SA)...... 148 Le Teil ...... 150 Marseille Maritime Arenc ...... 152 Modane ...... 153 Narbonne ...... 155 Perpignan ...... 156 Port Edouard Herriot ...... 158 Portes ...... 160 Portes Compagnie Nationale du Rhône ...... 162 Salaise Gie Osiris ...... 164 Salaise ITE CNR ...... 166 Sibelin ...... 168 St Avre la Chambre ...... 170

4 CID BOOK 3 Version 3

St Jean de Maurienne ...... 171 St Rambert d'Albon ...... 173 Valence - Plateforme militaire des Combeaux ...... 175 Vénissieux Naviland-Cargo ...... 177 Vénissieux Novatrans ...... 179 VIIA - Bourgneuf Aiton ...... 180 VIIA - Le Boulou ...... 183 3.3. Terminal details of Italy ...... 186 Brescia Terminal Intermodale RFI ...... 187 Cervignano Interporto Alpe Adria ...... 189 Milano Segrate RFI ...... 191 Milano Smistamento FS Logistica ...... 193 Novara Boschetto FS Logistica ...... 195 Novara Terminal CÍM...... 195 Padova Terminal intermodale FS logistica ...... 197 Padova Terminal intermodale Interporto ...... 197 Sito Interporto di Torino ...... 202 Torino Orbassano Terminal AFA ...... 204 Torino Orbassano Terminal Intermodale ...... 207 Trieste Campo Marzio - Raccordo autorità portuale ...... 209 Venezia Marghera-raccordi portuali ...... 212 Verona QE-raccordo ZAI ...... 216 3.4. Terminal details of Slovenia ...... 218 Celje tovorna ...... 219 Port of Koper ...... 221 Koper tovorna ...... 224 Ljubljanan Moste Kontejnerski terminal ...... 226 Ljubljana-Zalog- marshalling yard ...... 228 3.5. Terminal details of Croatia ...... 230 Bakar - Dry Bulk Cargo Terminal ...... 231 Port of Rijeka ...... 234 Rijeka - Brajdica Intermodal Terminal ...... 237 Zagreb - Jankomir Freight terminals...... 239 Zagreb - Zitnjak Freight terminals ...... 241 Zagreb - Vrapce Intermodal Terminal ...... 243

5 CID BOOK 3 Version 3

Zagreb Marshalling Yard ...... 245 3.6. Terminal details of Hungary ...... 247 Budapest Szabadkikötő Logisztikai Zrt./MAHART Container Center ...... 248 DELOG Debreceni Logisztikai Központ és Ipari Park Kft...... 249 DEPO Logisztikai Központ Kft...... 251 Győr / ÁTI Depo ...... 252 LOGISZTÁR Kft. / Székesfehérvár...... 253 Rail Cargo Terminal – BILK Zrt...... 254 Terminal GYSEV Sopron ...... 256 Szolnoki Ipari Park ...... 263 Zahony-Port Zrt...... 264

6 CID BOOK 3 Version 3

1. Introduction

1.1 Purpose of the Terminal Description Book

In any economy the terminals are one of the key parts of the transport chain together with railway infrastructure that is connecting the production plants with distribution centers and the storaging facilities. Easy and seamless flow of goods is a prerequisite to create an effective single European European transport logistic system. Logistic functions, intermodal integration and sustainable operation in order to establish competitive door-to-door or, at least, terminal- to-terminal transport chains, according to user needs are the elements of the system. The multimodal Trans-European Transport Network should enable a concentration of trans-national traffic and long-distance flows and, as a result of their integration, provide for a highly resource efficient infrastructure use. European transport infrastructure between the transport modes is fragmented at the moment. As regards making multi-modal connections, many of Europe's freight terminals, inland ports, maritime ports, airports and urban nodes are not up to the task. Since these nodes lack multimodal capacity, the potential of multi-modal transport and its ability to remove infrastructure bottlenecks and to bridge missing links is insufficiently exploited.

Terminals have very much different planning processes and timelines with their customers comparing to the IMs. Therefore, harmonisation is difficult to combine our services and many terminals on our routes without having the basic information of their operation procedure. Furthermore these facilities are of multimodal character, that can cause special business conditions.

Building up a European rail network for competitive freight is impossible without collecting a proper set of information from terminals and making available in the Corridor Information Document, especially in Book 3. An effective inclusion of terminals might also imply an involvement of their customers, the intermodal operators and/or shippers. Rail freight corridors could become more attractive to terminals if intermodal operators would allow RUs to provide terminals with access to real-time data of expected time of arrivals of the trains via an interoperable IT application.

In a supply chain applications for freight services, including information systems (real-time monitoring of freight trains), marshalling and allocation systems, reservation, payment and invoicing systems, management of connections with other modes of transport and production of electronic accompanying documents are equally the core functions.

In this regard the ultimate reason to develop and regularly update the Terminal Description Book is to keep the stakeholders informed about the basic information of various (almost one hundred) freight terminals along RFC 6, the Mediterrean Rail Freight Corridor.

7 CID BOOK 3 Version 3

1.2 Definition of Terminal

Freight terminals, inland ports, maritime ports and airports connect transport modes in order to allow multi-modal transport of goods. Where freight terminal means a structure equipped for transhipment between at least two transport modes and for temporary storage of freight such as seaports, inland ports, airports and (dry ports) rail-road terminals. Freight terminals for the transhipment of goods within the rail mode and between rail and other transport modes are one of the components of railway transport infrastructure. The technical equipment associated with railway lines includes electrification systems, equipment for the the loading and unloading of cargo in stations, logistic platforms and freight terminals. It includes any facility necessary to ensure the safe, secure and efficient operation of vehicles.

Operators of freight terminals are obliged to ensure that any freight terminal is open to all operators and this access has to be provided in a non-discriminatory way and apply transparent charges. Furthermore freight terminals are equipped with cranes, conveyors and other devices for moving freight between different transport modes and for the positioning and storage of freight.

Terminal requirements

Terminal requirements relate to the anticipated scale and nature of the freight and the operations involved in accessing sidings and handling the transfer of the cargo. This can split between the rail-side operations and the road/water/air-side operations.

On the rail side

 the train lengths  the frequency/timing of trains  the specific loading/unloading requirements  the use of crane  the availability of stackers for intermodal freight  the storage requirements  side loading by fork lift trucks into warehouses

are the key operational parameters.

On the road side for example

 the highway access  the junctions  the on site facilities  storage and maintenance facilities are important.

8 CID BOOK 3 Version 3

In general a terminal needs to be

 alongside an existing railway line  alongside a major highway route  just on the bank of sea bay or bank of an inland waterway  on flat terrain, level with the railway line  near to the origin/destination of freight  distant from residential areas  next to developable land for expansion

For intermodal terminals additional requirents are

 room to stroe containers  hard standing  space for crane/stacker movements  at least 3 running lines together with reception sidings  space for road vehicles’ movements

The railway lines, and where appropriate rail ferry lines of an RFC connects a terminal of relevance to rail freight traffic along the route to

 marshalling yards  major rail-connected freight terminals  rail-connected intermodal terminals in seaports and along inland waterways

The word ‘terminal’ means the installation provided along the freight corridor which has been specially arranged to allow either the loading and/or the unloading of goods onto/from freight trains, and the integration of rail freight services with road, maritime, river and air services, and either the forming or modification of the composition of freight trains (intermodal terminals, marshalling yards) and, where necessary, performing border procedures at borders (border station) with European third countries.

9 CID BOOK 3 Version 3

1.3 How to become a member of the Terminal Advisory Group?

Regulation 913/2010 should be considered not only as an obligation, but also as an opportunity to improve the European logistic supply chain performance, including how to enhance the future competiveness of the railway sector at least in medium term. As the rail freight business is one, but substantial chain of the logistic system, there is a need to join the complete transport sector’s efforts, to strenghten the cooperation of all operators concerned in order to achieve the best expected results.

A Terminal Advisory Group is a forum of consultation and coordination mechanisms ensuring optimal communication with the managers/owners of freight terminals. The Advisory Groups (including the Advisory Group of Terminals) of RFC 6 were established on 30th of November 2012 in Budapest. We have already had 7 Terminal/Railway Undertaking Advisory Group (TAG/RAG) meetings.

The representatives of the sector were appointed on the 6th Terminal Advisory Group meeting on 23rd of April in Madrid, who are internationally recognised professionals of Port Authorities of Barcelona and Valencia. For the first year (1st of May 2015 - 1st of May 2016) the TAG representative is Mr Manuel Guerra Vázquez (Valencia Port Authority) and the Deputy will be Mr Carles Rúa Costa (Barcelona Port Authority). For the second year Mr Carles Rúa Costa will be the representative and Mr Manuel Guerra Vázquez the Deputy.

The procedures for Advisory Groups Consultation were also adopted. The Implementation Plan describes the setting up of RFC 6 – Mediterranean Corridor Advisory Groups (Ch. 8.1).

The following procedures will be added to Ch. 8.1.1. of the Implementation Plan.

RFC 6 organizes two TAG-RAG meetings per year, which alternatively take place in the eastern or in the western part of the Corridor. Also, a Common RAG meeting will take place once a year according to the new procedures defined at Corridor Talk level among RFCs.

RFC 6 – Mediterranean Corridor applies the following time schedule for the organization of TAG-RAG meetings:

 Save the date – 2 months before the expected date;  Agenda of the meeting + invitation + registration form – 1 month before;  Within 15 calendar days before the date all participants are requested to fill and return the registration form.

TAG-RAG Representatives

Starting from the 6th RFC 6 – Mediterranean Corridor TAG-RAG meeting, the Management decided to introduce a new role within the context of the Advisory Groups: a representative for each Advisory Group in order to make the consultation process more effective and more useful for RUs and TMs. The representatives will encourage coordination within each Advisory Group and also towards other external institutions.

10 CID BOOK 3 Version 3

Duration of the assignment and appointment of the representatives

The TAG and RAG representatives are appointed for a period of two years, renewable once. At the moment a representative and a deputy are in charge; the two roles can rotate according to the necessities of the appointees or in agreement with the Management of the Corridor. The appointment of the representatives takes place in separate meetings, one for RAG and one for TAG. The Management of RFC 6 – Mediterranean Corridor collects the candidacies for the positions before and on the same day of the TAG-RAG. After the presentation of the candidates and discussion of the assembly, the representatives elected shall be considered in office.

Tasks of the TAG and RAG representatives

TAG representative and RAG representative contribute to the organization of the consultation process and to represent the interests of TMs and RUs as follows:

 Propose to the Management of RFC 6 new TMs and/or RUs to be included in the TAG- RAG contact list (before each meeting);  Cooperate with RFC 6 Management in the preparation of the agenda of the TAG-RAG. The representatives can address suggestions to RFC 6 PMO within 45 calendar days before the meeting;  Organize the preparatory meetings for TAG-RAG (same day of TAG-RAG) in order to independently collect needs, inputs, requests to be analyzed, prioritized and presented to RFC 6 Management during the TAG-RAG;  Represent the TMs and the RUs belonging to RFC 6 in the forthcoming common TAG- RAGs. The TAG and RAG representative shall collect the opinions of all TMs and RUs who are willing to express their opinions and the two assemblies shall agree on a common position of the TAG and RAG 15 calendar days before the scheduled date of the common meeting;  Represent the TMs and RUs interested in the use of RFC 6 in the institutional meetings with the EC (where necessary). The requirement to agree on a common position for TMs and RUs is the same as in the case of common TAG-RAG, the same procedures apply;  Provide the Management of the Corridor with urgent inputs (if necessary) during the period between the TAG-RAG meetings;  Ask extraordinary videoconference or physical meetings to the Management of the Corridor for specific reasons and with adequate notice;  Propose changes to the TAG-RAG procedures contained herein.

The structure and the operation of RFC 6 Terminal Advisory Group are open, flexible and easy to follow:

 membership is not fixed and participation to consultation is allowed at any time, as recommended by Regulation 913/2010 and by the Handbook (“New membership should always be possible and  the composition of an Advisory Group should be revised from time to time to allow an adjustment of the representation.” - Handbook, point 3.4.1)  participation to the Terminal Advisory Group is on a voluntary basis, members of this Advisory Group will not be reimbursed by the corridor organization for their expenses.

11 CID BOOK 3 Version 3

 on account of the different nationalities of the members, English is the sole official working language of the group. Bilaterly all the other languages of the European Union can be used.  one contact person for each country of the corridor is available for any information request.  terminals which can’t attend any of the meetings, but are interested in further activities of this Advisory Group can address at any time to contact persons.

In order to ensure efficiency to physical meetings, attendance may depend on the number of PaP requests (“Since any operator can claim to be interested in the use of the corridor, the number of possible participating in the Terminal Advisory Group could be too high.

Operators of different sizes and with different business models should be represented - Handbook, point 3.4.1).

According to a decision of the Executive Board of RFC 6, terminal owners/managers not giving the information requested by the Management Board will not be accepted into the Advisory Group and their terminals can be excluded from the corridor.

All Terminal owners/managers interested in the use of RFC 6 may be involved in the activities of the Advisory Group by means of public information on our corridor website and direct contact with national contact persons.

A list of the terminals designated to the corridor has been worked out, agreed upon and regularly updated. The designation is based on national assessment and evaluation (to be updated according to Transport Market Study and consultation with the Terminal Advisory Group). All nodes indicated in the Annex of Regulation 913/2010/EC are connected.

The list and characteristics of terminals, in particular information concerning the conditions and methods of accessing the terminals are available in the Corridor Information Document Book 3 titled Terminal Description. This includes:

 General information  Access condition  Terminal description  Capacity allocation  Services  Charging

The complete official document is always available on the corridor website, at https://www.railfreightcorridor6.eu/RFC6/web.nsf/OnePager/index.html

12 CID BOOK 3 Version 3

2. Terminal Overview

In this chapter a global overview of our Terminals is available with maps of locations of our Terminals together with short summary tables per country of the key features of each Terminal.

2.1. A map of highlighted location of Terminals

13 CID BOOK 3 Version 3

2.2. Summary of of the key features in Spain

Terminals Location Types of services Owner/Operator Contacts Algeciras Estación Antigua de Shunting in/outside ADIF E-mail: [email protected] Tel: Terminal FFCC - c/ Agustín facilities with/without +34 954.48.52.30 Balsamo s/n shunting vehicle and ALGECIRAS 11207 - Handling of intermodal CÁDIZ transport units Barcelona C/ Motors s/n. 08040 Shunting for delivery ADIF E-mail: [email protected] Tel: +34 Can Tunis - BARCELONA and/or receipt at other, 93 508 93 39 Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle Barcelona C/ Josep Carner s/n. Shunting for delivery ADIF E-mail: [email protected] Tel: +34 Morrot 08038 - BARCELONA and/or receipt at other, 93 508 93 39 Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle Castellbisbal Estación FFCC s/n. Shunting for delivery ADIF E-mail: [email protected] Tel: +34 CASTELLBISBAL. and/or receipt at other, 93 508 93 39 08755 - BARCELONA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle Apartadero Pol. Ind. Sant Unloading of scrap, COMPAÑÍA ESPAÑOLA E-mail: [email protected], Tel: +34 de CELSA Vicenç, 08755 loading of steel products DE LAMINACIÓN, S.L. 93 7730400 Castellbisbal 24h x 5, linked to (CELSA)/DEAL BARCELONA opening of Castellbisbal stations Córdoba - El Crta. Palma del Río, Shunting for delivery ADIF E-mail: [email protected] Tel: Higuerón Km. 3,500 CÓRDOBA and/or receipt at other, +34 954.48.52.30 14005 - CÓRDOBA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

14 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Ford C.P. 46440 Provided services Ford España S.L/Comsa Tel: +34 961 783 607 Factoría Almusafes/VALENCIA loading and unloading Rail Transport Polígono Code Station 64108 Industrial Juan Carlos 1º s/n GONVAUTO Polígon Industrial Loading and unloading Gonvarri Barcelona E-mail: [email protected] Tel: Sant Vicenç Carrer freight-car Handling +34 93 772 20 82 Ferralla, 32, 08755 steel coils of up to 35 Castellbisbal tons with gantry crane BARCELONA Grisen Paseo de la Estación Shunting for delivery ADIF E-mail: [email protected] Tel: +34 s/n. GRISÉN. 50297 and/or receipt at other, 93 508 93 39 – ZARAGOZA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

La Llagosta Camí de Can Shunting for delivery ADIF E-mail: [email protected] Tel: +34 Donadeu - Estacio and/or receipt at other, 93 508 93 39 de Mercaderies. LA Facilities LLAGOSTA. 08120 - Formation/Selection BARCELONA shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle Madrid C/ Méndez Álvaro nº Shunting for delivery ADIF E-mail: [email protected] Tel: +34 91 Abrońigal 84. 28053 – MADRID and/or receipt at other, 5066100 Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

Martorell Comercio, nº 2. Shunting for delivery ADIF E-mail: [email protected] Tel: +34 MARTORELL. 08760 and/or receipt at other, 93 508 93 39 - BARCELONA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

15 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Murcia Ctra. Alcantarilla Km. Shunting for delivery ADIF E-mail: [email protected] Tel: +34 Mercancías 6. NONDUERMAS. and/or receipt at other, 963.537.075 30166 – MURCIA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

Port Bou C/ Claudí Planas s/n. Shunting for delivery ADIF E-mail: [email protected] Tel: +34 PORTBOU. 17497 – and/or receipt at other, 93 508 93 39 GIRONA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle Puerto de Avenida de la Rai connections with Autoridad Portuaria de E-mail: [email protected] Tel: +34 Algeciras Hispanidad, 2. 11207 external facilities la Bahía de Algeciras 956.58.54.00 ALGECIRAS Shunting staff Container (APBA)/ADIF handling and storage Puerto de Muelle de Poniente, List of services on Autoridad Portuaria de E-mail: [email protected] Tel: Alicante 11 - 03001 Alicante demand Alicante (APA)/ADIF +34 965 13 01 35

Puerto de Sud warf 08039 Services provided by the Barcelona Port E-mail: [email protected] Tel.: +34 93 441 Barcelona Barcelona intermodal terminal and Authority/Terminal 00 66 Sud wharf the port terminal. Contenedores de rail terminal Consult the terminal Barcelona operator Puerto de Príncep d’Espanya Services provided by the Autoridad Portuaria de E-mail: [email protected] Barcelona wharf 08039 intermodal terminal and Barcelona/Autoterminal, Tel: +34 93 223 48 33 Príncep Barcelona the port terminal. S.A. Moll Dàrsena Sud d’Espanya Consult the terminal wharf rail operator terminal

Puerto de Prat wharf 08039 Services provided by the Autoridad Portuaria de E-mail: [email protected] Tel.: +34 93 508 Barcelona Barcelona intermodal terminal and Barcelona/Terminal 44 40 Prat wharf the port terminal. Catalunya, SA rail terminal Consult the terminal operator

Puerto de Energia wharf 08039 Services provided by the Autoridad Portuaria de E-mail: [email protected] Tel.: +34 93 289 Barcelona Barcelona intermodal terminal and Barcelona/Tepsa 55 40 Energia the port terminal. wharf rail Consult the terminal terminal operator

Puerto de Sud basin 08039 Services provided by the Autoridad Portuaria de E-mail: [email protected] Barcelona Barcelona intermodal terminal and Barcelona/Autoterminal, Tel: +34 93 223 48 33 Sud basin the port terminal. S.A. rail teminal Consult the terminal operator Puerto de Campa Z 08039 Services provided by the Autoridad Portuaria de E-mail: [email protected] Tel.: +34 93 Barcelona Barcelona intermodal terminal and Barcelona/SETRAM, SA 289 57 84 Campa Z rail the port terminal. terminal Consult the terminal operator

16 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Puerto de Costa wharf 08039 Services provided by the Autoridad Portuaria de Tel: +34 932 959 105 Barcelona Barcelona intermodal terminal and Barcelona/ACCIONA Costa wharf the port terminal. Trasmediterránea rail terminal Consult the terminal operator Puerto de Contradic wharf Services provided by the Autoridad Portuaria de E-mail: [email protected] Tel: Barcelona 08039 Barcelona intermodal terminal and Barcelona/TRAMER, SA +34 93 442 19 40 Contradic the port terminal. wharf rail Consult the terminal teminal operator Puerto de Plaza Héroes de List of provided services Autoridad Portuaria de E-mail: [email protected] Tel: +34 968 Escombreras Cavite, s/n - 30201 on demand Cartagena (APC)/ADIF 32 58 00 Cartagena

Puerto de Muelle Serrano List of provided services Autoridad Portuaria de E-mail: [email protected] Tel: +34 Castellón Lloberes, s/n - on demand Castellón (APC)/ADIF 964 28 06 90 12071 Castellón Port of Passeig de List of provided services: Autoritat Portuària de E-mail: [email protected] Tel: Tarragona l’Escullera, s/n, on demand. Contact the Tarragona +34 972427411 Euroenergo 43004 Tarragona APT and the operator. (APT)/Euroenergo Hydrocarbons Moreover, the shunting España SL Esplanade station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de Tarragona l’Escullera, s/n, on demand. Contact the Tarragona (APT) Intermodal 43004 Tarragona APT and the operator. Galicia Wharf Moreover, the shunting station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de E-mail: Tarragona l’Escullera, s/n, on demand. Contact the Tarragona [email protected] Catalunya 43004 Tarragona APT and the operator. (APT)/Euroports Ibérica Tel: +34 977222219 Catalunya Wharf Moreover, the shunting TPS SL station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de Ership SA: E-mail: [email protected] Tel: Tarragona l’Escullera, s/n, on demand. Contact the Tarragona (APT)/Ership +34 977556170 Bergé y Navarra 43004 Tarragona APT and the operator. SA, Bergé y CIA SA and CIA: E-mail: [email protected] Navarra Wharf Moreover, the shunting others Tel: +34977550500 station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de TERQUIMSA: E-mail: Tarragona l’Escullera, s/n, on demand. Contact the Tarragona [email protected] Tel: +34 Chemical 43004 Tarragona APT and the operator. (APT)/Terminales 977241454, TEPSA: E-mail: Chemical Wharf Moreover, the shunting Químicos SA VOPAK administració[email protected] Tel: Zone station Tarragona (TERQUIMSA) and +34977228262 Mercancías offers Terminales Portuarias services (see network SL (TEPSA) statement at: ww.adif.es)

17 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Port of Passeig de List of provided services: Autoritat Portuària de E-mail: [email protected] Tel: +34 Tarragona l’Escullera, s/n, on demand. Contact the Tarragona (APT)/Silos 977259500 Sitasa 43004 Tarragona APT and the operator. de Tarragona SA Castilla Castilla Wharf Moreover, the shunting station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de E-mail: [email protected] Tel: Tarragona l’Escullera, s/n, on demand. Contact the Tarragona (APT)/Bergé +34 977550500 Cantabria 1 43004 Tarragona APT and the operator. Marítma SL Cantabria Wharf Moreover, the shunting station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de E-mail: Tarragona l’Escullera, s/n, on demand. Contact the Tarragona [email protected] Cantabria 2 43004 Tarragona APT and the operator. (APT)/Euroports Ibérica Tel: +34 977222219 Cantabria Wharf Moreover, the shunting General Cargo Terminal station Tarragona SL Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de E-mail: [email protected] Tel: +34 Tarragona l’Escullera, s/n, on demand. Contact the Tarragona (APT)/Silos 977259500 Sitasa 43004 Tarragona APT and the operator. de Tarragona SA Aragon Aragon Wharf Moreover, the shunting station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de E-mail: [email protected] Tel: +34 Tarragona l’Escullera, s/n, on demand. Contact the Tarragona 977958000 Gonvarri 43004 Tarragona APT and the operator. (APT)/Gonvarri Aragon Wharf Moreover, the shunting Tarragona SL station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de E-mail: [email protected] Tarragona l’Escullera, s/n, on demand. Contact the Tarragona (APT)/Bergé Tel: +34 977554496 Bergé 43004 Tarragona APT and the operator. Automotive Logistics SL Automotive Cantrabria Wharf Moreover, the shunting Logistics Northern Zone station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Port of Passeig de List of provided services: Autoritat Portuària de E-mail: [email protected] Tel: Tarragona l’Escullera, s/n, on demand. Contact the Tarragona (APT)/Bergé +34 977550500 Aragon Bulk 43004 Tarragona APT and the operator. Marítima SL and others Aragon Wharf Moreover, the shunting station Tarragona Mercancías offers services (see network statement at: ww.adif.es)

18 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Port of Passeig de List of provided services: Autoritat Portuària de E-mail: [email protected] Tarragona l’Escullera, s/n, on demand. Contact the Tarragona Tel: +34 977249475 Algeposa 43004 Tarragona APT and the operator. (APT)/Algeposa Tarraco Aragon Wharf Moreover, the shunting SL station Tarragona Mercancías offers services (see network statement at: ww.adif.es) Puerto de Muelle Dique del Terminal ro ro traffic, Valencia Terminal E-mail: [email protected] Tel: +34 963 24 Valencia Este, s/n 46024 - Logistics distribution Europa 23 50 Valencia center car Auxiliary services of car pre- delivery Puerto Seco Autovía A-2 (Madrid Regular land services Puerto Seco Azuqueca E-mail: [email protected] Tel: Azuqueca de - Barcelona) Km 42,5 with technical assistance de Henares SA + 34 949 26 12 07 Henares 19200 - Azuqueca de to trains and loadings: Henares cargo consolidation and (Guadalajara) transport Storage services of full and empty containers in warehouses, including cleaning and reparation services Puerto Seco Av Europa, 28821 Load & unload PUERTO SECO DE E-mail: [email protected] Tel: +34 Coslada Coslada, Madrid containers & swap MADRID, 916 70 71 32 bodies for trains. Train S.A/CONTERAIL, S.A. manoeuvres & braking tests Repsol Repsol Química, Does not apply, terminal Repsol Química Tel: 34-977-759100 / 191 Química Ctra. El Morell- for Repsol Química Tarragona km 2,5 exclusive use 43140 La Pobla de Mafumet Sagunto Camí del Rolls s/n Shunting for delivery ADIF E-mail: [email protected] Tel: +34 (Polígono Industrial and/or receipt at other, 963.537.075 Sepes). SAGUNTO. Facilities 46500 - VALENCIA Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

San Roque – Crta. Almoraima s/n Shunting for delivery ADIF E-mail: [email protected] Tel: La Línea SAN ROQUE 11368 – and/or receipt at other, +34 954.48.52.30 CÁDIZ Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

19 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Silla Avda. de Picassent Shunting for delivery ADIF E-mail: [email protected] Tel: +34 Nº 5, SILLA. 46460 - and/or receipt at other, 963.537.075 VALENCIA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle SOLVAY APARTADERO Loading of LSC at the SOLVIN SPAIN, S.L./ E-mail: [email protected] Tel: FERROVIARIO factory, sending out 15 Ferrocarrils de la +34 937734900 SOLVAY-MARTORELL wagons trains with Generalitat de Avenida Marie Curie, Renfe Operadora in the Catalunya (FGC) 1-3-5 Martorell direction MARTORELL- (Barcelona) 08760 RELISA (Barcelona) for loads sending out and RELISA (Barcelona)- MARTORELL for the return of empty wagons. Unloading of industrial salt tubs between SURIA y MARTORELL, in the direction: train with approximately 40 loaded tubs from SURIA to MARTORELL, and return of empty tubs from MARTORELL to SURIA.

Tarragona Pol. Ind. El Francolí, Shunting for delivery ADIF E-mail: [email protected] Tel: +34 Mercancías Parc. 22 s/n. 43006 - and/or receipt at other, 93 508 93 39 TARRAGONA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle Terminal Polígono Industrial Movements of Terminal Intermodal E-mail: [email protected] Intermodal La Armentera, 22400 containers (loading, Monzón Tel: +34 976 111 873 de Monzón, Monzón (Huesca) downloading from train (Monzón de or truck). Storage. Rio Cinca – Cleaning containers. Huesca) Movements of trains of other public and private terminals Terminal Ctra Cogullada, 65 Container warehousing Terminal Marítima E-mail: [email protected] Marítima Parcela 17, for empty and full Zaragoza Tel: +34 976 47 96 58 Zaragoza Mercazaragoza, containers. Cleaning and S.L., Zaragoza repairing services. (Corbera Transport from TMZ to Alta – delivery place and from Zaragoza) the factory/company to TMZ. Customs warehousing

20 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Valencia Camí Font de las Shunting for delivery ADIF E-mail: [email protected] Tel: +34 Fuente San Corts S/N. 46013 - and/or receipt at other, 963.537.075 Luis VALENCIA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle Vicalvaro Carretera de Shunting for delivery ADIF E-mail: [email protected] Tel: +34 91 Mercancías Vicálvaro a Coslada and/or receipt at other, 5066100 Km. 2,500. 28052 - Facilities MADRID Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

Terminal Polígono Industrial Storage, and beside of Generalitat de E-mail: [email protected] Tel: +34 93 Vilamalla Empordà the custom of fresh Catalunya 363 4960 Internacional Carrer product de la Duana s/n, 17469 Vilamalla Zaragoza Carretera Base Aérea Shunting for delivery ADIF E-mail: [email protected] Tel: +34 Plaza s/n. 50197 - and/or receipt at other, 93 508 93 39 ZARAGOZA Facilities Formation/Selection shunting with/without a shunting vehicle, Shunting at facilities with/without a shunting vehicle, Operations of access to Exterior facilities with/without a shunting vehicle

21 CID BOOK 3 Version 3

2.3. Summary of of the key features in France

Terminals Location Types of services Owner/Operator Contacts Aiton- Aiton-Autoroute Intermodal rail / road Aiton-Autoroute E-mail: [email protected] Autoroute Ferroviaire Alpine loading & unloading Ferroviaire Alpine Tel: +33 479 44 24 91 Ferroviaire Z.I. Arc Isère 73390 Alpine BOURGNEUF France Ambérieu en 104 Rue du Triage Relay SNCF Réseau E-mail: [email protected] Tel: + 33 Bugey 01500 Ambérieu-en- service/Marshalling yard (0)1 53 94 33 23 Marshalling Bugey, France yard

Badan 27 Rue Charles de Relay SNCF Réseau E-mail: [email protected] Tel: + 33 Marshalling Gaulle, 69520 service/Marshalling yard (0)1 53 94 33 23 yard Grigny, France Chasse sur 2-162 Avenue Léon Relay SNCF Réseau E-mail: [email protected] Tel: + 33 Rhone Blum 38670 Chasse- service/Marshalling yard (0)1 53 94 33 23 Marshalling sur-Rhône, France yard Grenoble 26-28 Rue Henri Intermodal rail/road SNCF Réseau E-mail: [email protected] Tel: + 33 Intermodal Tarze 38000 loading/unloading (0)1 53 94 33 23 Terminal Grenoble, France AMBROGIO Le camp de la Basse Storage of all kind of Amborgio SA E-mail: [email protected] Tel: SA B.P. 70212 F - 66161 UTI (20 30 40 45 ft) and +33 4 68 83 06 35 Le Boulou ADR Le Teil Le Dépot, 07400 Le Relay SNCF Réseau E-mail: [email protected] Tel: + 33 Marshalling Teil, France service/Marshalling yard (0)1 53 94 33 23 yard and Intermodal rail/road terminal loading/unloading Marseille http://www.marseille- Maritime port.fr/en/Accueil/ Arenc Modane 27 Rue du 11 Relay service SNCF Réseau E-mail: [email protected] Tel: + 33 terminal Novembre 73500 (0)1 53 94 33 23 Fourneaux, France Ateliers 6, rue des Corbières. Wagons maintenance Ateliers d’Occitanie E-mail: gregoire.devulliod@ateliers- d’Occitanie 11101 Narbonne, Tank cleaning Welding occitanie.fr Tel: +33 4 68 42 50 50 France Park Wagon Perpignan 2 320, avenue de Intermodal rail / road Perpignan Saint Charles E-mail: [email protected] Tel: +33 Saint Barcelone 66000 loading & unloading Conteneur Terminal 04.68.81.96.09 Charles Perpignan, France Conteneur Terminal Port de Lyon 2, rue André Bonin Intermodal ITE CNR E-mail: [email protected] Tel: +33 04 – Edouard 69316 Lyon Cedex rail/road/IWW loading & 72 00 69 69 Herriot 04, France unloading Portes 1Rue Fernand Forest Relay SNCF Réseau E-mail: [email protected] Tel: + 33 Valence 26000 Valence, service/Marshalling yard (0)1 53 94 33 23 France Intermodal rail/road loading/unloading Portes - La Motte, 26800 Intermodal rail / road ITE CNR/CNR E-mail: [email protected] Tel: +33 04 Compagnie Portes-lès-Valence, loading & unloading 72 00 69 69 Nationale du France Rhône Salaise Gie Rue Gaston Intermodal rail / road Plate-forme Chimique E-mail: plateformechimique.ror@gie- Osiris Monmousseau – CS loading & unloading des Roches- osiris.com Tel: +33 4.74.11.36.11 50032 Roussillon 38 Roussillon/GIE-OSIRIS 556 Saint Maurice SALAISE l'Exil Cedex, France SALAISE ITE 2, rue André Bonin Intermodal rail / road Compagnie Nationale du E-mail: [email protected] Tel: +33 04 CNR 69316 Lyon Cedex loading & unloading Rhone 72 00 69 69 04, France

22 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Sibelin 69360 Solaize, Relay SNCF Réseau E-mail: [email protected] Tel: + 33 Marshalling France service/Marshalling yard (0)1 53 94 33 23 yard St-Avre-la- 712-1124 Route de Relay SNCF Réseau E-mail: [email protected] Tel: + 33 Chambre Platrière 73130 service/Marshalling yard (0)1 53 94 33 23 Marsalling Saint-Avre, France yard

St-Jean-de- Avenue du 8 Mai Relay SNCF Réseau E-mail: [email protected] Tel: + 33 Maurienne 1945, 73300 Saint- service/Marshalling yard (0)1 53 94 33 23 Marsalling Jean-de-Maurienne, Intermodal rail/road yard France loading/unloading St-Rambert- Champ Peyraud Relay SNCF Réseau E-mail: [email protected] Tel: + 33 d’Albon 38150 Chanas, service/Marshalling yard (0)1 53 94 33 23 Marsalling France Intermodal rail/road yard loading/unloading Valence - 36 Rue Fernand Intermodal rail/road SNCF Réseau E-mail: [email protected] Tel: + 33 Plateforme Forest, 26000 loading/unloading (0)1 53 94 33 23 militaire des Valence, France Combeaux terminal Vénissieux chem Charbonnier, Relay SNCF Réseau/Naviland E-mail: laleyrangues@naviland- Naviland- 69200 VENISSIEUX, service/Marshalling yard Cargo cargo.com Tel: +33 (0) 4.72.21.51.00 Cargo France Intermodal rail/road loading/unloading Vénissieux Zone Industrielle - Intermodal rail/road SNCF Réseau/Novatrans E-mail: [email protected] Novatrans 63 Rue du Beaujolais loading/unloading Vénissieux Tel: +33 04 72 28 90 60 69800 SAINT- PRIEST, France VIIA PAE Arc Isère 662 Intermodal rail/road Lorry-Rail Zone E-mail: sebastiaan.klijnee@lorry- Connect rue Louis Armand loading/unloading Industrielle Schelleck II rail.com Tel: +35 2.24.87.68.1 Bourgneuf 73390 BOURGNEUF, Aiton France VIIA - Le Terminal d’Autoroute Intermodal rail/road Lorry-Rail Zone E-mail: sebastiaan.klijnee@lorry- Boulou Ferroviaire Lorry-Rail loading/unloading Industrielle Schelleck II rail.com Tel: +35 2.24.87.68.1 Distriport 66161 Le Boulou, France

23 CID BOOK 3 Version 3

2.4. Summary of of the key features in Italy

Terminals Location Types of services Owner/Operator Contacts Brescia Terminal Brescia Intermodal rail / road RFI/Terminali Italia srl E-mail: [email protected] Tel: Terminal Scalo La Piccola loading & unloading, +39 0263714320 Intermodale Velocità Via handling, storage and RFI Dalmazia, 50 - refuelling 25128 Brescia, Italy Interporto Viale Venezia, 22 Intermodal rail / road Friulia S.p.A./Interporto E-mail: Cervignano 33052 Cervignano loading & unloading, Cervignano del Friuli [email protected] Tel: del Friuli Del Friuli (UD), Italy handling, storage S.p.A. +39 0431 373334 S.p.A. Milano Viale Lazio Segrate Intermodal rail / road Terminali Italia srl E-mail: [email protected] Tel: Segrate RFI 20090 Segrate loading & unloading, +39 0263714320\ 0263716204 (MI)/Rubattino handling, storage, Tangenziale est maintenance and Milano, Italy refuelling Terminal via Via Rivoltana, Intermodal rail / road FS Logistica/Terminali E-mail: [email protected] Tel: Milano 50/A Scalo Merci FS loading & unloading, Italia srl +39 0263714320\ 0263716204 Smistamento Smistamento 20090 handling, storage, Segrate (MI), Italy maintenance and refuelling CIM SpA Via Carlo Panseri Intermodal rail / road CIM SpA/Eurogateway E-mail: [email protected] 118 28100 Novara, loading & unloading, Srl Tel: +39 0321 478090 Italy handling, storage, maintenance and handling of dangerous goods Padova Corso Spagna 14 Intermodal rail / road FS Logistica E-mail: [email protected] Tel: Terminal 35127 Padova, Italy loading & unloading, Spa/Interporto Padova +39 049 7621811 intermodale handling, storage Spa Interporto/P adova Terminal intermodale FS logistica

Sito Address: Tang. Sud Intermodal rail / road SITO SpA E-mail: [email protected] Tel: +39 Interporto di Km. 20.500 Prima loading & unloading, 011.397.59.75 Torino Strada 2-10043 handling, storage Orbassano Motorway Torino Sud, Exit: SITO, Italy

Torino Via Rovereto 14 loading/unloading Rete Ferroviaria Italiana E-mail: [email protected] Tel: +39 Orbassano 10136 Torino, Italy containers and swap S.p.A. (RFI)/FS Logistica 011 901 3117 Terminale bodies and manage Autostrada ROLA Ferroviaria Alpina (AFA)

Torino Strada del Portone Intermodal rail / road Rete Ferroviaria Italiana E-mail: [email protected] Tel: Orbassano 265 Scalo Merci FS loading & unloading, S.p.A./Terminali Italia +39 0263714320\ 0263716204 Terminal 10043 Orbassano handling, storage and srl Intermodale (TO), Italy refuelling

Trieste Via K.L. Von Bruck Intermodal rail, road, Autorità Portuale di E-mail: [email protected] Tel: Campo 3, 34144 Trieste, sea loading & unloading, Trieste +39 040–6731 Marzio - Italy handling, storage Raccordo autorità portuale Porto di Santa Marta, Intermodal rail, road, Venice Port Authority/28 E-mail: [email protected] Tel: +39 Venezia – Fabbricato 13 30123 sea loading & unloading, Terminal operators 041 5334111 Port of Venice, Italy handling, storage Venice

24 CID BOOK 3 Version 3

Terminals Location Types of services Owner/Operator Contacts Verona via Intermodal rail / road Rete Ferroviaria Italiana E-mail: [email protected] Quadrante Sommacampagna loading & unloading, S.p.A./Terminali Italia Tel: +39 0458624422, +39 348 Europa 61, 37137 Verona, handling, storage and srl 3622236 Italy refuelling

25 CID BOOK 3 Version 3

2.5. Summary of of the key features in Slovenia

Terminals Location Types of services Owner/Operator Contacts SŽ-Celje Kidričeva ulica 34, Intermodal rail / road Republika Slovenija/SŽ - E-mail: [email protected] tovorna 3000 Celje, Slovenia loading & unloading Infrastruktura, d.o.o. Tel: +386 03 293 33 42, +386 03 293 32 92 Port of Vojkovo nabrežje 38, Intermodal rail, road, Republika E-mail: [email protected], Tel: Koper SI - 6501 Koper, sea loading & unloading, Slovenija/Luka Koper, d. +386 5 6656 100 Slovenia handling, storage d. SŽ-Koper Vojkovo nabrežje 38, Intermodal rail, road, Republika Slovenija/SŽ - E-mail: edi.razman-knap@slo- tovorna 6501 Koper, Slovenia sea loading & unloading, Infrastruktura, d.o.o. zeleznice.si Tel: +386 05 296 41 43 handling, storage Container Letališka 14, 1000 Intermodal rail / road SLOVENSKE E-mail: [email protected], terminal Ljubljana, Slovenia loading & unloading, ŽELEZNICE-TOVORNI [email protected] Tel: Ljubljana storage, RO-LA PROMET d.o.o. +386 1 29 13 136

Ljubljana- Zaloška cesta 214b, Relay Republika Slovenija/SŽ - E-mail: bogdan.kovacic@slo- Zalog- Ljubljana, Slovenia service/Marshalling yard Infrastruktura, d.o.o. zeleznice.si Tel: +386 01 2913 835 marshalling yard

26 CID BOOK 3 Version 3

2.6. Summary of of the key features in Croatia

Terminals Location Types of services Owner/Operator Contacts Bakar - Dry Veberova ulica Intermodal rail/sea Republic of Croatia/Luka E-mail: [email protected] Tel: Bulk Cargo 51222 Bakar, Croatia terminal of bulk cargo Rijeka d.d. +385 051 496-530 Terminal (handling/ warehousing coal, iron ore, bauxite)

Port of Riva 1 HR - 51 000 Intermodal rail, road, Republic of Croatia/Luka E-mail: [email protected] Tel: Rijeka Rijeka, Croatia sea loading & unloading, Rijeka d.d. +385 051 496-530 handling, storage

Rijeka - Brajdica Šetalište Intermodal rail, road, Luka Rijeka d.d. AGCT E-mail: [email protected] Tel: +385 51 332 Brajdica Andrije Kačića sea loading & unloading, FILIPINES/JADRANSKA 806 Intermodal Miošića bb p.p.129 handling, storage VRATA d.d Terminal 51000 Rijeka, Croatia

Zagreb - Jankomir 25 - 10 Intermodal rail, road ZAGREBAČKI HOLDING E-mail: [email protected] Tel: Jankomir 090 Zagreb, Croatia loading & unloading, d.o.o./ +385 01 3871-153 Freight handling, storage ROBNITERMINALI terminals ZAGREB

Zagreb - Slavonska avenija 52 Intermodal rail, road ZAGREBAČKI HOLDING E-mail: [email protected] Tel: Zitnjak 10132 Zagreb, loading & unloading, d.o.o./ +385 01 2415-404 Freight Croatia handling, storage ROBNITERMINALI terminals ZAGREB

Zagreb - Kožinčev put 4 Intermodal rail, road HŽ Cargo d.o.o. /AGIT E-mail: [email protected] Tel: +385 01 Vrapce 10000 Zagreb, loading & unloading, d.o.o. 2350-800 Intermodal Croatia handling, storage Terminal

Zagreb 10000 Zagreb Shunting, weighing, Republic of Croatia/ HŽ E-mail: [email protected] Marshalling Jakuševac 2, Croatia refuelling Infrastruktura d.o.o. Tel: +385 1 453 35 36 Yard Pristup infrastrukturi (Infrastructure Access)

27 CID BOOK 3 Version 3

2.7. Summary of of the key features in Hungary

Terminals Location Types of services Owner/Operator Contacts Budapesti http://www.bszl.hu; Szabadkikötő http://www.containercenter.hu/ Logisztikai Zrt. / MAHART Container Center DELOG 4002 Debrecen, Intermodal rail, road DELOG Debrecen E-mail: [email protected] Tel: +36 Debreceni Petőfi tér 12., loading & unloading, Logistics Center and 52 510 120 Logisztikai Hungary handling, storage Industrial Park Ltd. Központ és Ipari Park Kft. DEPO www.depologisztika.hu Logisztikai Központ Kft.

ÁTI Depo http://atidepo.1- click.hu/?content=kezdolap&lang=en

LOGISZTÁR http://www.logisztar.hu Kft.

Rail Cargo 1239 Budapest, Intermodal rail, road Rail Cargo Hungaria Zrt. E-mail: [email protected] Tel: +36 1 Terminal – Európa u. 4., loading & unloading, 512 7777 BILK Zrt. Hungary handling, storage TERMINAL 9400 Sopron, Ipar Intermodal rail, road GYSEV Zrt./GYSEV E-amil: [email protected] GYSEV körút 21., Hungary loading & unloading, CARGO Zrt. Tel: +36 99 577 304 Sopron handling, storage

Szolnoki Ipari http://www.ipariparkszolnok.hu/ Park

ZÁHONY- 4625 Záhony Európa Intermodal rail, road MÁV Co. E-mail: [email protected] Tel: +36 PORT Zrt. place 12., Hungary loading & unloading, 1 513 3010 handling, storage, transhipment services

28 CID BOOK 3 Version 3

3. Terminal Details

The chapter includes the detailed characterisation of the Terminals, using the common template of all the Rail Freight Corridors in Europe developed by Rail Net Europe.

The Terminals of Member States are available in geographical order, starting on the West in Spain. And ends in Hungary on the East, through France-Italy-Slovenia-Croatia. In the countries involved the Terminals are included in alphabetical order.

The information on Terminals comprises:

 A map of the Corridor with the individual location of the Terminal  A general layout of the Terminal  A definition of the available services  Information on the applicable prices  Information on the opening times  Information on how to request the services  Owner contacts

29 CID BOOK 3 Version 3

3.1. Terminal details of Spain

30 CID BOOK 3 Version 3

Algeciras-Terminal

Information Related to RFC6

Number of Heading text Algeciras Terminal chapter

Table of contents

 Algeciras Terminal Estación Antigua de FFCC - c/ Agustín Balsamo s/n ALGECIRAS 11207 – CÁDIZ

 Part of RFC 4 and RFC 6

1 General information

ALGECIRAS MERCANCÍAS

PUERTO BAHÍA DE ALGECIRAS

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Email: [email protected] Tel: +34 954 48 52 30

2 Access conditions

 Logistical Installation 3 Terminal description

31 CID BOOK 3 Version 3

 Technical map

Nº Track Length (m) I 580 2A 120 2B 150 III 470 4 130

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/71901/ficha _instalacion_tecnica_0086.shtmll

4 Capacity allocation

 Formation/selection shunting, with or without shunting vehicle.  Reception shunting in other facilities.  Positioning shunting in the logistic facilities within the main facilities  Shunting in facilities with shunting vehicle  Shunting in facilities without shunting vehicle.  Shunting in facilities with shunting vehicle.  Handling of intermodal transport units 5 Services  Access shunting to outside facilities with shunting vehicle  Material operations associated to the access and expedition of trains.

Technical facility

Access and Train expedition : 7:00 – 22:00 h / M-F.

32 CID BOOK 3 Version 3

Timetable varies with service offered. For more information: http://www.adif.es/es_ES/infraestructuras/terminales/55020/fi cha_instalacion_logistica_0088.shtml

6 Charging

33 CID BOOK 3 Version 3

Barcelona Can Tunis

Information Related to RFC6

Number of Heading text Barcelona Can Tunis chapter

Table of contents

 Barcelona Can Tunis C/ Motors s/n. 08040 – BARCELONA  Part of RFC 6

1 General information  Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 93 508 93 39 Email: [email protected]

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Teléfono: 93 508 93 39 Email: [email protected]

 Terminal character (factory siding, intermodal rail/ road/water...) General Cargo

2 Access conditions

 Logistical Installation 3 Terminal description

34 CID BOOK 3 Version 3

 Technical map

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/71901/ficha _instalacion_tecnica_0086.shtmll

4 Capacity allocation

 List of provided services (storage, unloading, refuelling , 5 Services maintenance,...) Shunting for delivery and/or receipt at other Facilities

35 CID BOOK 3 Version 3

Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities with a shunting vehicle Operations of access to Exterior facilities without a shunting vehicle Operations on rolling stock associated with access or expedition of trains

 Operating times (opening times, terminal / particular services) Opening times Access and expedition of trains: 24h/ every day http://www.adif.es/es_ES/infraestructuras/terminales/719 01/ficha_instalacion_logistica_0079.shtml

6 Charging

36 CID BOOK 3 Version 3

Barcelona Morrot

Information Related to RFC6

Number of Heading text Barcelona Morrot chapter

Table of contents

 Barcelona Morrot C/Josep Carner s/n. 08038 - BARCELONA  Part of RFC 6

1 General information

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 93 508 93 39 Email: [email protected]

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 93 508 93 39 Email: [email protected]

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal Terminal

2 Access conditions

Logistical Installation

3 Terminal description

37 CID BOOK 3 Version 3

Technical map

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/71905/ficha _instalacion_tecnica_0084.shtml

4 Capacity allocation

 List of provided services (storage, unloading, refuelling ,maintenance,...) Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Handling intermodal transports units

Services Operations on rolling stock associated with access or 5 expedition of trains

 Operating times (opening times, terminal / particular services) Opening times Access and expedition of trains: 24h/ every day

http://www.adif.es/es_ES/infraestructuras/terminales/71905/ ficha_instalacion_logistica_0076.shtml

6 Charging

38 CID BOOK 3 Version 3

Castellbisbal

Information Related to RFC6

Number of Heading text Castellbisbal chapter

Table of contents

 Castellbisbal Terminal address: Estación FFCC s/n. CASTELLBISBAL. 08755 - BARCELONA

1 General information  Terminal owner (name, address, contact Adif (Railway Infrastructure Manager) Phone: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water...) General Cargo

2 Access conditions

3 Terminal description  Logistical Installation

39 CID BOOK 3 Version 3

 Technical map

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/72210/ficha _instalacion_tecnica_0076.shtml

4 Capacity allocation

40 CID BOOK 3 Version 3

 List of provided services (storage, unloading, refuelling , maintenance,...) Shunting for delivery and/or receipt at other Facilities Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities with a shunting vehicle 5 Services Operations of access to Exterior facilities without a shunting vehicle Operations on rolling stock associated with access or expedition of trains

 Operating times (opening times, terminal / particular services) Access and expedition of trains: 24h/ every day

http://www.adif.es/es_ES/infraestructuras/terminales/722 10/ficha_instalacion_logistica_0068.shtmll

6 Charging

41 CID BOOK 3 Version 3

Celsa

Information Related to RFC6

Number of Heading text CELSA chapter

Table of contents

 Apartadero de CELSA

 Teriman owner COMPAÑÍA ESPAÑOLA DE LAMINACIÓN, S.L. (CELSA), Pol. Ind. Sant Vicenç, 08755 Castellbisbal (Barcelona), Spain , Carlos Castán, Planning and Logistics Director, [email protected], +34 93 7730400 1 General information

 Terminal operator DEAL, Pol. Ind. Sant Vicenç, 08755 Castellbisbal (Barcelona), Spain, Antonio Llinás, [email protected]

 Terminal character Factory siding

 Open to all market operators yes

 Access condition 2 Access conditions Under contract

 Open wagons, type Ealos (XX in Spain), Roos (M5 in Spain); Rs (MM2

 Number and lenght of tracks 1386 m, three connexions with public track 3.000 m2

 Equipment capacity 2 mobile cranes, 3 forklifts (42, 33 and 16 T), 1 bridge 3 Terminal description crane 2 scrap wagons/hour; 1 platform wagon/h; 6 TEU wagon per hour

 Connection to main railway infrastructure Connexion with a industrial area public track, which is connected with Castellbisbal station

42 CID BOOK 3 Version 3

 Process description Slot allocation each 6 month by ADIF, the infrastructure regulator. Due to traffic reduction linked to economical crisis, allocation of free slots is faster (1 month) 4 Capacity allocation  Booking Written application is needed. Penalties for no utilization depend on contract, and are subject to commercial negotiation.

 Services provided 5 Services Unloading of scrap, loading of steel products 24h x 5, linked to opening of Castellbisbal stations

6 Charging Confidential information.

43 CID BOOK 3 Version 3

Cordoba – El Higueron

Information Related to RFC6

Number of Heading text Córdoba – El Higuerón chapter

Table of contents

 Córdoba – El Higuerón Crta. Palma del Río, Km. 3,500 CÓRDOBA 14005 – CÓRDOBA Email: [email protected] Tel: +34 954.48.52.30 Web : www.adif.es

1 General information

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Email: [email protected] Tel: +34 954.48.52.30 ADIF Intermodal terminal

2 Access conditions  Logistical Installation 3 Terminal description

44 CID BOOK 3 Version 3

 Technical map

Nº Track Length (m) Reception siding 1R 607 2R 609 3R 674 4R 616 5R 616 6R 608 Formation siding

14 Electrified tracks with length between 465 – 670 m

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/71901/ficha _instalacion_tecnica_0086.shtmll

4 Capacity allocation  Formation/selection shunting, with or without shunting vehicle.  Reception shunting in other facilities.  Positioning shunting in the logistic facilities within the main facilities  Shunting in facilities with shunting vehicle  Material operations associated to the access and expedition of trains.  Shunting in facilities without shunting vehicle. 5 Services  Shunting in facilities with shunting vehicle.  Handling of intermodal transport units  Access shunting to outside facilities with shunting vehicle  Technical facility:

 Access and Train expedition : 24 h/ 7  Services:

Timetable varies with service offered.

45 CID BOOK 3 Version 3

For more information:

http://www.adif.es/es_ES/infraestructuras/terminales/50512/f icha_instalacion_logistica_0075.shtml

6 Charging

46 CID BOOK 3 Version 3

FORD - FACTORIA, (Silla - Valencia)

Information Related to RFC6

Number of Heading text FORD - FACTORIA chapter

Table of contents

 Ford Factoría // Polígono Industrial Juan Carlos 1º s/n // C.P. 46440 Almussafes // VALENCIA // Code Station 64108

 Terminal owner Ford España S.L. // Polígono Industrial Juan Carlos 1º s/n // C.P. 46440 Almussafes // VALENCIA // NIP General B46066361 1 information  Terminal Operator Comsa Rail Transport , Tfn +34 961 783 607 (Central: Edificio Numancia 1, Viriato, 47, 08014, Barcelona, España)

 Terminal character factory siding and intermodal rail/road  Open access for all market body partly

Ford own regulation 2 Access conditions .-20'- 40'-45' ISO Containers, swaps bodies and Trailers .- Max Length of trains = 1050 m .- Max Weight = 40 Tn .- Max Shipments = 5 trains per day

 Information In "Technical Parameters"

 Equipment capacity 20 units per hour Terminal 3 description  Main railway connections connecting railway station see "Station 64108"

 TeInformation In: "Layouts"  Process description Information In: Sheet "Process XXX" 4 Capacity allocation  Booking Ford own regulation

47 CID BOOK 3 Version 3

 Provided services loading and unloading 5 Services  "Monday to Thursday - from 00:00 to 24:00 hours  Friday - from 00:00 to 22:00 hours  Sunday - from 22:00 to 24:00 hours" 6 Charging Not for public disclosure

Technical Parameters Tracks & Lengths Tracks length of Electrified Interlocking tracks (m) Track 1 679 YES Remotely Controlled Track 2 613 YES Remotely Controlled Track 3 577 YES Remotely Controlled Track 4 510 YES Remotely Controlled Track 5 452 YES Remotely Controlled Track 6 571 YES Remotely Controlled Track 7 499 YES Remotely Controlled Track 8 460 YES Remotely Controlled Track 9 537 YES Remotely Controlled Track 10 520 YES Remotely Controlled Track 11 503 YES Remotely Controlled Track 12 468 YES Remotely Controlled Track 13 474 YES Remotely Controlled Track 14 421 YES Remotely Controlled Track 15 420 YES Remotely Controlled Track 16 (Playa de Tracks) 354 NO Remotely Controlled Track 17 (Playa de Tracks) 204 NO Remotely Controlled Branch 8 (PMA) 222 NO Remotely Controlled Branch 9 (PMA) 177 NO Manual Branch 11 (PMA) 142 NO Manual

Services and Timetables Shunting by manpower Monday to Thursday - from 00:00 to 24:00 hours Load / unload wagons Friday - from 00:00 to 22:00 hours Sunday - from 22:00 to 24:00 hours Reception / expedition of trains

Storing capacity m2 Rail Yard 15000

Motor Equipment Power (hp) Locomotive Nº 1 315 hp Locomotive Nº 2 276 hp Locomotive Nº 3 310 hp

Ramps Loading/ Unloading Vehicle Length (m) Branch 8 (PMA) 222 Branch 9 (PMA) 177 Branch 11 (PMA) 142

48 CID BOOK 3 Version 3

Load Capacity Stackers (kg) HYSTER H800HD 36000 kg HYSTER H800HD 36000 kg HISTER ReachStacker RS 46-33 IH 46000 kg LAYOUTS

49 CID BOOK 3 Version 3

50 CID BOOK 3 Version 3

TRAIN OPERATION PROCESS

51 CID BOOK 3 Version 3

TRUCK OPERATION PROCESS

52 CID BOOK 3 Version 3

STACKER OPERATION PROCESS

53 CID BOOK 3 Version 3

Gonvauto

Information Related to RFC6

Number of Heading text GONVAUTO chapter

Table of contents

General 1 GONVAUTO information 2 Access conditions  Direct connection with Castellbisbal station through the main private-sidings line shared only with CELSA and Gonvauto. Terminal 3  Train sets of 12 cars maximum. description  Three branch lines 200 metres each, one located inside sheltered warehouses. 4 Capacity allocation  We carry out freight-car loading and unloading.  We handle steel coils of up to 35 tons with gantry crane.  It is not possible to handle containers. 5 Services  Light-rail motor tractor available for internal shunting  Operating 24 hours from Monday to Friday.  Possibility of storing coils of steel sheets (capacity is subject to how busy our warehouses are). 6 Charging

54 CID BOOK 3 Version 3

Grisen

Information Related to RFC6

Number of Heading text Grisen chapter

Table of contents

 Grisen Terminal address: Paseo de la Estación s/n. GRISÉN. 50297 – ZARAGOZA

 Terminal 1 General information owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/water...) General Cargo Terminal

2 Access conditions  Logistical Installation

3 Terminal description

 Technical map

55 CID BOOK 3 Version 3

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/70706/ficha _instalacion_tecnica_0098.shtml

4 Capacity allocation  List of provided services (storage, unloading, refuelling , maintenance,...) Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities without a shunting vehicle Operations on rolling stock associated with access or expeditions of trains 5 Services

 Operating times (opening times, terminal / particular services)

Opening times Access and expedition of trains: 24h/ every day http://www.adif.es/es_ES/infraestructuras/terminales/707 06/ficha_instalacion_logistica_0092.shtml

6 Charging

56 CID BOOK 3 Version 3

La Llagosta

Information Related to RFC6

Number of Heading text La Llagosta chapter

Table of contents

 La Llagosta Terminal address: Camí de Can Donadeu - Estacio de Mercaderies. LA LLAGOSTA. 08120 - BARCELONA

1 General information

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water...) General Cargo 2 Access conditions  Logistical Installation

3 Terminal description

 Technical map

57 CID BOOK 3 Version 3

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/790 11/ficha_instalacion_tecnica_0027.shtml 4 Capacity allocation  Phone: 935089339, Email: [email protected]

5 Services  Operating times (opening times, terminal / particular services) Tel: 935089339, Email: [email protected] 6 Charging

58 CID BOOK 3 Version 3

Madrid Abrońigal

Information Related to RFC6

Number of Heading text Madrid Abrońigal chapter

Table of contents

 Name of terminal, address, how to find the terminal Madrid Abroñigal Terminal address: C/ Méndez Álvaro nº 84. 28053 – MADRID

1 General information

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 91 5066100 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 91 5066100 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal Terminal 2 Access conditions  Logistical Installation

3 Terminal description

59 CID BOOK 3 Version 3

 Technical map

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/95104/ficha _instalacion_tecnica_0018.shtml 4 Capacity allocation  List of provided services (storage, unloading, refuelling , maintenance,...) Shunting for delivery and/or receipt at other Facilities Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities with a shunting 5 Services vehicle Operations of access to Exterior facilities without a shunting vehicle Handling intermodal transports units

 Operating times (opening times, terminal / particular services) Access and expedition of trains: 24h/ every day http://www.adif.es/es_ES/infraestructuras/terminales/951 04/ficha_instalacion_logistica_0005.shtmll 6 Charging

60 CID BOOK 3 Version 3

Martorell

Information Related to RFC6

Number of Heading text Martorell chapter

Table of contents

 Martorell Terminal address: Comercio, nº 2. MARTORELL. 08760 - BARCELONA

1 General information  Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Teléfono: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water...) General cargo 2 Access conditions Technical map

3 Terminal description

61 CID BOOK 3 Version 3

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/722 09/ficha_instalacion_tecnica_0078.shtml 4 Capacity allocation  List of provided services (storage, unloading, refuelling , maintenance,...) Tel: 935089339, Email: [email protected]

5 Services  Operating times (opening times, terminal / particular services) Tel: 935089339, Email: [email protected]

 Access and expedition of trains 24h/ every day 6 Charging

62 CID BOOK 3 Version 3

Murcia Mercancias

Information Related to RFC6

Number of Heading text Murcia Mercancías chapter

Table of contents

 Murcia Mercancías Terminal address: Ctra. Alcantarilla Km. 6. NONDUERMAS. 30166 – MURCIA

1 General information  Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 963.537.075 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Teléfono: 963.537.075 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/water...) Intermodal Terminal 2 Access conditions  Logistical Installation 3 Terminal description

63 CID BOOK 3 Version 3

 Technical map

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/61101/ficha _instalacion_tecnica_0102.shtml

4 Capacity allocation  List of provided services (storage, unloading, refuelling, maintenance,...) Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Handling intermodal transports units Operations of access to Exterior facilities without a 5 Services shunting vehicle Operations on rolling stock associated with access or expedition of trains

 Operating times (opening times, terminal / particular services)

Access and expedition of trains: 24h/ Every day http://www.adif.es/es_ES/infraestructuras/terminales/611 01/ficha_instalacion_logistica_0096.shtml 6 Charging

64 CID BOOK 3 Version 3

Port Bou

Information Related to RFC6

Number of Heading text Port Bou chapter

Table of contents

 Portbou Terminal address: C/ Claudí Planas s/n. PORTBOU. 17497 – GIRONA

 Terminal 1 General information Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Teléfono: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal Terminal 2 Access conditions  Logistical Installation

3 Terminal description

 Technical map

65 CID BOOK 3 Version 3

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/79315/ficha _instalacion_tecnica_0024.shtml 4 Capacity allocation  List of provided services (storage, unloading, refuelling maintenance,...)

Shunting for delivery and/or receipt at other Facilities Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities with a shunting 5 Services vehicle Operations of access to Exterior facilities without a shunting vehicle Operations on rolling stock associated with access or expedition of trains Handling intermodal transports units

 Operating times (opening times, terminal / particular services) Access and expedition of trains: 24h/ every day http://www.adif.es/es_ES/infraestructuras/terminales/793 15/ficha_instalacion_logistica_0011.shtmll 6 Charging

66 CID BOOK 3 Version 3

Puerto de Algeciras

Information Related to RFC6

Number of Heading text PUERTO DE ALGECIRAS chapter

Table of contents

 Puerto Bahía de Algeciras/Terminal Ferroportuaria 1 de Isla Verde Exterior y Terminal Ferroportuaria 2 de Isla Verde Interior. Address: Avenida de la Hispanidad, 2. 11207 ALGECIRAS Contacts: Rafael Olivares Email:[email protected] Tel: +34 956.58.54.00 Juan José Aguilar Email:[email protected] Tel: +34 956.58.54.29 Web : www.apba.es

1 General information

 Terminal owner: Autoridad Portuaria de la Bahía de Algeciras (APBA). According to the spanish law, the port authority is the rail infrastructure manager within the port.  Terminal operator: ADIF/ APBA  Terminal character: Intermodal (rail-road /maritime  Open access for all market operators (RU, forwarder,logistic provider...): Yes 2 Access conditions  Legal requirements to access: no particular requirements  Technical conditions: only diesel traction 3 Terminal description  Type of cargo: all (containers mainly)

67 CID BOOK 3 Version 3

 Equipment (container): reach stacker: Other cargoes: no specific equipment  Connection to main railway infrastructure: Connecting railway station: San Roque (ADIF) y Algeciras Mercancías (ADIF)

 Process description: regulated through ADIF-APBA formal agreement. Paths are organized between San Roque 4 Capacity allocation (ADIF) and Puerto de Algeciras.  Booking: on a daily basis  Connections with externalfacilities  Shunting staff  Commercial billing and administrative support 5 Services  Containershandling and storage  Pick-up and delivery operations  Other services under request  Price list: to be published (consult the APBA in the 6 Charging meanwhile)  Payment conditions: no particular conditions

68 CID BOOK 3 Version 3

Puerto de Alicante

Information Related to RFC6

Number of Heading text Puerto de ALICANTE chapter

Table of contents

 Puerto de Alicante (see remarks). Address: Muelle de Poniente, 11 - 03001 Alicante (SPAIN).

 Terminal owner Autoridad Portuaria de Alicante (APA). According to the spanish law, the port authority is the rail infrastructure 1 General information manager within the port.

 Terminal operator ADIF/ APA

 Terminal character Intermodal (rail-road /maritime)  Open access for all market operators (RU, forwarder, logistic provider...) Yes

2 Access conditions  Legal requirements to access no particular requirements

 Technical conditions only diesel traction  Number and length of tracks from 1 to 3, and up to 450 m depending on the qua

 Type of cargo all 3 Terminal description  Equipment no specific equipment

 Connection to main railway infrastructure Connecting railway station: Alicante (ADIF)  Process description regulated through ADIF-APA formal agreement. Paths are organized between Alicante (ADIF) and Puerto de 4 Capacity allocation Alicante.

 Booking: on a daily basis.

69 CID BOOK 3 Version 3

 List of provided services on demand 5 Services  Operating times on demand  Price list in elaboration (consult the APA in the meanwhile) 6 Charging  Payment conditions no particular conditions

Remarks: The PA is working on more detailed information, including technical maps and separated information about specific terminals within the port network, when possible. Attached rail network map of the Port of Alicante

Contact information: Juan Ferrer Marsal // +34 965 13 01 35// [email protected]

70 CID BOOK 3 Version 3

71 CID BOOK 3 Version 3

Puerto de Barcelona (8 different terminals)

Information Related to RFC6

Number of Heading text chapter

Table of contents

 Sud wharf rail terminal (TCB) Address: Sud warf 08039 Barcelona (SPAIN) Latitude: 41,356701 Longitude: 2,165318

 Terminal owner Barcelona Port Authority – Port de Barcelona World Trade Center, edifici Est Moll de Barcelona , s/n 08039 1 General information Barcelona (SPAIN) E-mail: [email protected] Tel: +34 93 306 88 00 Web: www.portdebarcelona.cat

 Terminal operator Terminal Contenedores de Barcelona, SL. (TCB, SL) Sud wharf 08039 Barcelona (SPAIN) Tel.: +34 93 441 00 66 Fax: +34 93 441 04 18 E-mail: [email protected] Web: www.tcbcn.com

 Terminal character Port terminal Intermodal rail/road/sea Preferential use by containers (mainly maritime)  Open access for all markets Yes

2 Access conditions  The legal and technical requirements for access to the terminal are the same that ADIF establishes to access to the national rail network and public intermodal terminals.  Number and length of tracks: 6 tracks of 750 m. Mixed gauge (Iberian +UIC) 3 Terminal description  Handling capacity ( TEU/year) 288,000 TEU

72 CID BOOK 3 Version 3

 Characteristics and equipment of the railway terminal: Rail terminal area: 5 ha Rail mounted gantry cranes (RMG): 1 (currently), 3 (foreseen) Reach Stackers : 2

 Storing capacity (m2), equipment and equipment capacity of the port terminal where the railway terminal is located: Port terminal area: 57.58 ha ECH (Empty Containers Handlers): 9 Maritime customs and BIO integrated in the terminal Refrigeration connections. 486 Container freight station: 13,800 m2 Covered warehouses: 3,600 m2

 Connection to the railway infrastructure: Direct access to Can Tunis ( ADIF terminal of reception/expedition of trains) though “Tramo III” Port access

 Technical map of the terminal. Rail scheme:

4 Capacity allocation Consult the terminal operator Services provided by the intermodal terminal and the port 5 Services terminal. Consult the terminal operator 1. Shunting costs at the internal port rail network: 1.1. Access to the internal rail network (change of locomotive and circulation 1.2. Train operations (adding or cutting units…..) 1.3. Support staff

Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC gauge)

6 Charging http://www.adif.es/es_ES/conoceradif/doc/CA_DRed_Completo.pd f http://www.portdebarcelona.cat/en/home_apb

2. Cost of horizontal transport service from the railway to any point in the terminal, or vice versa, and/or transfer from rail to lorry or vice versa.

Maximum rates established by the Port Authority of Barcelona http://www.portdebarcelona.cat/en/web/port-dels-negocis/102

73 CID BOOK 3 Version 3

Information Related to RFC6

Number of Heading text chapter

Table of contents

 Príncep d’Espanya wharf rail terminal (former TERCAT) Address: Príncep d’Espanya wharf 08039 Barcelona (SPAIN) Latitude:41,337226 Longitude: 2,143194

 Terminal owner Autoridad Portuaria de Barcelona – Port de Barcelona World Trade Center, edifici Est 08039 Barcelona (SPAIN) E-mail: [email protected] Tel:+34 93 306 88 00 1 General information Web: www.portdebarcelona.cat

 Terminal operator: Autoterminal, S.A. Moll Dàrsena Sud 08039 Barcelona (SPAIN) E-mail: [email protected] Tel: +34 93 223 48 33 Fax: +34 93 223 42 68 Web: www.autoterminal.es

SETRAM, SA Sud basin 08039 Barcelona (SPAIN) Tel.: 93 289 57 84 Fax: 93 223 45 59 E-mail: [email protected] Web: www.setram.es

 Terminal character Port terminal Intermodal rail/road/sea Preferential use by cars  Open access for all markets Yes

2 Access conditions  Legal requirements The legal and technical requirements for access to the terminal are the same that ADIF establishes to access to the national rail network and public intermodal terminals. 3 Terminal description  Number and length of tracks

74 CID BOOK 3 Version 3

3 tracks from 532 to 607 m. Mixed gauge (Iberian +UIC+ Metric)

 Handling capacity( cars/year) 105,600 Cars

 Storing capacity, equipment and equipment capacity of the port terminal where the railway terminal is located: Area : 48 ha Covered storage: 14,225 m2 Container Freight Station: 3,607 m2 Connection to the railway infrastructure: Direct access to Can Tunis (ADIF terminal of reception/expedition of trains) though “Bucle” Port access and “Calle 4” Port access.

 Technical map of the terminal. Rail scheme:

4 Capacity allocation Consult the terminal operator  Services provided by the intermodal terminal and the port 5 Services terminal. Consult the terminal operator 1. Shunting costs at the internal port rail network: 1.1. Access to the internal rail network (change of locomotive and circulation) 1.2. Train operations (adding or cutting units…) 1.3. Support staff

Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC gauge). 6 Charging http://www.adif.es/es_ES/conoceradif/doc/CA_DRed_Completo.pd f http://www.portdebarcelona.cat/en/home_apb

2. Cost of horizontal transport service from the railway to any point in the terminal, or vice versa, and/or transfer from rail to lorry or vice versa.

Maximum rates established by the Port Authority of Barcelona http://www.portdebarcelona.cat/en/web/port-dels-negocis/102

75 CID BOOK 3 Version 3

Information Related to RFC6

Number of Heading text chapter

Table of contents

 Prat wharf rail terminal (BEST) Address: Prat wharf 08039 Barcelona (SPAIN) Latitude: 41,315942 Longitude: 2,145815

 Terminal owner Autoridad Portuaria de Barcelona – Port de Barcelona 1 General information World Trade Center, edifici Est 08039 Barcelona (SPAIN) E-mail: [email protected] Tel:+34 93 306 88 00 Web: www.portdebarcelona.cat

 Terminal operator Terminal Catalunya, SA (TerCat) Moll Prat - BEST (Barcelona Europe South Terminal) Tel.: +34 93 508 44 40 Fax: +34 93 508 44 41 E-mail: [email protected] Web: www.tercat.es

 Terminal character Port terminal Intermodal rail/road/sea Preferential use by containers (mainly maritime)  Open access for all markets Yes

2 Access conditions  Legal requirements The legal and technical requirements for access to the terminal are the same that ADIF establishes to access to the national rail network and public intermodal terminals.  Number and length of tracks: 8 tracks of 750 m. Mixed gauge (Iberian + UIC)  Handling capacity ( TEU/year) 806,400 TEU 3 Terminal description

 Railway terminal equipment Rail mounted gantry cranes (RMG): 2 (currently), 3 (foreseen)

76 CID BOOK 3 Version 3

Reach Stackers

 Area and capacity of the port terminal where the railway terminal is located: 100 ha, Capacity: 2.65 M TEU ( 2017)

 Connection to the railway infrastructure Direct access to Can Tunis (ADIF terminal of reception/expedition of trains) though “Calle 4 ” Port access (North) and new Port rail access (South)

 Technical map of the railway terminal. Rail scheme:

4 Capacity allocation Consult the terminal operator Services provided by the intermodal terminal and the port 5 Services terminal. Consult the terminal operator. 1. Shunting costs at the internal port rail network: 1.1. Access to the internal rail network (change of locomotive and circulation) 1.2. Train operations (adding or cutting units…) 1.3. Support staff

Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC gauge). Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC 6 Charging gauge). http://www.adif.es/es_ES/conoceradif/doc/CA_DRed_Completo.pd f http://www.portdebarcelona.cat/en/home_apb

2. Cost of horizontal transport service from the railway to any point in the terminal, or vice versa, and/or transfer from rail to lorry or vice versa.

Maximum rates established by the Port Authority of Barcelona http://www.portdebarcelona.cat/en/web/port-dels-negocis/102

77 CID BOOK 3 Version 3

Information Related to RFC6

Number of Heading text chapter

Table of contents

 Energia wharf rail terminal (former Inflamables wharf) Address: Energia wharf 08039 Barcelona (SPAIN) Latitude: 41,329146; Longitude: 2,154139

 Terminal owner Autoridad Portuaria de Barcelona – Port de Barcelona World Trade Center, edifici Est 08039 Barcelona (SPAIN) E-mail: [email protected] Tel:+34 93 306 88 00 Web: www.portdebarcelona.cat

 Terminal operator 1 General information Tepsa Tel.: +34 93 289 55 40 E-mail: [email protected] Web: www.tepsa.es

Relisa Tel.: +34 93 223 40 02 E-mail: [email protected] Web: www.relisa.com

Autoterminal, S.A. Moll Dàrsena Sud 08039 Barcelona (SPAIN) E-mail: [email protected] Tel: +34 93 223 48 33 Fax: +34 93 223 42 68 Web: www.autoterminal.es

SETRAM, SA Sud basin 08039 Barcelona (SPAIN) Te.: 93 289 57 84 Fax: 93 223 45 59 E-mail: [email protected] Web: www.setram.es

 Terminal character:

78 CID BOOK 3 Version 3

Port terminal Intermodal rail/road/sea Preferential use by oily liquids (sodium hypochlorite, bleach) and cars  Open access for all markets Yes  2 Access conditions  Legal requirements The legal and technical requirements for access to the terminal are the same that ADIF establishes to access to the national rail network and public intermodal terminals  Number and length of tracks 3 tracks from 650 to 685. Mixed gauge (Iberian +UIC) 2 tracks of 90 m

 Handling capacity ( cars/years, tons/year) 105,600 cars 625,000 tons (liquid bulk

 Railway terminal equipment Equipment is provided by the operator

 Connection to the railway infrastructure Direct access to Can Tunis (ADIF terminal of reception/expedition of trains) though “Calle 4” Port 3 Terminal description access

 Technical map of the railway terminal Rail scheme:

4 Capacity allocation Consult the terminal operator  Services provided by the intermodal terminal and the port 5 Services terminal Consult the terminal operator 1. Shunting costs at the internal port rail network: 1.1. Access to the internal rail network (change of locomotive and circulation) 1.2. Train operations (adding or cutting units…) 1.3. Support staff

Established by ADIF (Iberian gauge) or by the Agreement of the 6 Charging Management Board of the Port Authority of Barcelona (UIC gauge). Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC gauge). http://www.adif.es/es_ES/conoceradif/doc/CA_DRed_Completo.pd f http://www.portdebarcelona.cat/en/home_apb

79 CID BOOK 3 Version 3

2. Cost of horizontal transport service from the railway to any point in the terminal, or vice versa, and/or transfer from rail to lorry or vice versa. Maximum rates established by the Port Authority of Barcelona http://www.portdebarcelona.cat/en/web/port-dels-negocis/102

80 CID BOOK 3 Version 3

Information Related to RFC6

Number of Heading text chapter

Table of contents

 Sud basin rail teminal (Dàrsena Sud) Address: Sud basin 08039 Barcelona (SPAIN) Latitude: 41,327878; Longitude: 2,143472

 Terminal owner Autoridad Portuaria de Barcelona – Port de Barcelona World Trade Center, edifici Est 08039 Barcelona (SPAIN) E-mail: [email protected] Tel:+34 93 306 88 00 1 General information Web: www.portdebarcelona.cat

 Terminal operator: Autoterminal, S.A. Moll Dàrsena Sud 08039 Barcelona (SPAIN) E-mail: [email protected] Tel: +34 93 223 48 33 Fax: +34 93 223 42 68 Web: www.autoterminal.es

SETRAM, SA Sud basin 08039 Barcelona (SPAIN) Tel.: 93 289 57 84 Fax: 93 223 45 59 E-mail: [email protected] Web: www.setram.es

 Terminal character Port terminal Intermodal rail/road/sea Preferential use by cars  Open access for all markets Yes

2 Access conditions  Legal requirements The legal and technical requirements for access to the terminal are the same that ADIF establishes to access to the national rail network and public intermodal terminals  Number and length of tracks: 3 Terminal description 4 tracks of 270 m. Iberian gauge

81 CID BOOK 3 Version 3

 Handling capacity ( cars/years) 172,800 cars

 Railway terminal equipment/Storing capacity, equipment and equipment capacity of the port terminal where the railway terminal is located Area: 895,000m2. Total 478,000 covered Maximum capacity: 50,000 cars 5 vertical parking facilities Vehicle personalisation centre and protection removal tunnel

 Connection to the railway infrastructure Direct access to Can Tunis (ADIF terminal of reception/expedition of trains) though “Calle 4 ” Port access

 Technical map of the railway terminal. Rail scheme:

4 Capacity allocation Consult the terminal operator Services provided by the intermodal terminal and the port 5 Services terminal Consult the terminal operator 1. Shunting costs at the internal port rail network: 1.1. Access to the internal rail network (change of locomotive and circulation) 1.2. Train operations (adding or cutting units…) 1.3. Support staff

Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC gauge). Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC 6 Charging gauge). http://www.adif.es/es_ES/conoceradif/doc/CA_DRed_Completo.pd f http://www.portdebarcelona.cat/en/home_apb

2. Cost of horizontal transport service from the railway to any point in the terminal, or vice versa, and/or transfer from rail to lorry or vice versa. Maximum rates established by the Port Authority of Barcelona http://www.portdebarcelona.cat/en/web/port-dels-negocis/102

82 CID BOOK 3 Version 3

Information Related to RFC6

Number of Heading text chapter

Table of contents

 Campa Z rail terminal Address: Campa Z 08039 Barcelona (SPAIN) Latitude: 41,328363; Longitude: 2,142056

 Terminal owner Autoridad Portuaria de Barcelona – Port de Barcelona World Trade Center, edifici Est 08039 Barcelona (SPAIN) E-mail: [email protected] Tel:+34 93 306 88 00 1 General information Web: www.portdebarcelona.cat

 Terminal operator: SETRAM, SA Sud basin 08039 Barcelona (SPAIN) Tel.: 93 289 57 84 Fax: 93 223 45 59 E-mail: [email protected] Web: www.setram.es

Autoterminal, S.A. Moll Dàrsena Sud 08039 Barcelona (SPAIN) E-mail: [email protected] Tel: +34 93 223 48 33 Fax: +34 93 223 42 68 Web: www.autoterminal.es

 Terminal character Port terminal Intermodal rail/road/sea Preferential use by cars  Open access for all markets yes

2 Access conditions  Legal requirements The legal and technical requirements for access to the terminal are the same that ADIF establishes to access to the national rail network and public intermodal terminals 3 Terminal description  Number and length of tracks

83 CID BOOK 3 Version 3

2 tracks of 280 m. Mixed gauge (Iberian + UIC)

 Handling capacity ( cars/years) 105,600 cars

 Storing capacity, equipment and equipment capacity of the port terminal where the railway terminal is located: Area: 250,000 m2. Total 150,000 m2 covered Maximum capacity: 13,300 cars 1 vertical parking facility with an area of 88,700 m2

 Connection to the railway infrastructure Direct access to Can Tunis (ADIF terminal of reception/expedition of trains) though “Calle 4 ” Port access

 Technical map of the railway terminal. Rail scheme

4 Capacity allocation Consult the terminal operator  Services provided by the intermodal terminal and the port 5 Services terminal Consult the terminal operator 1. Shunting costs at the internal port rail network: 1.1. Access to the internal rail network (change of locomotive and circulation) 1.2. Train operations (adding or cutting units…) 1.3. Support staff

Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC gauge). Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC 6 Charging gauge). http://www.adif.es/es_ES/conoceradif/doc/CA_DRed_Completo.pd f http://www.portdebarcelona.cat/en/home_apb

2. Cost of horizontal transport service from the railway to any point in the terminal, or vice versa, and/or transfer from rail to lorry or vice versa. Maximum rates established by the Port Authority of Barcelona http://www.portdebarcelona.cat/en/web/port-dels-negocis/102

84 CID BOOK 3 Version 3

Information Related to RFC6

Number of Heading text chapter

Table of contents

 Costa wharf rail terminal Address: Costa wharf 08039 Barcelona (SPAIN) Latitude: 41,362169; Longitude: 2,171041

 Terminal owner 1 General information Autoridad Portuaria de Barcelona – Port de Barcelona World Trade Center, edifici Est 08039 Barcelona (SPAIN) E-mail: [email protected] Tel:+34 93 306 88 00 Web: www.portdebarcelona.cat

 Terminal operator ACCIONA Trasmediterránea Est. Marítima, Moll Sant Bertran 08039 BARCELONA Tel. +34 932 959 105 Fax. + 34 932 959 159 /94

 Terminal character Port terminal Intermodal rail/road/sea Preferential use by cars  Open access for all markets Yes

2 Access conditions  Legal requirements The legal and technical requirements for access to the terminal are the same that ADIF establishes to access to the national rail network and public intermodal terminals  Number and length of tracks 1 track 550 m. Mixed gauge (Iberian + metric)

 Handling capacity ( cars/years) 105,600 cars 3 Terminal description  Connection to the railway infrastructure Direct access to Can Tunis (ADIF terminal of reception/expedition of trains)

 Technical map of the railway terminal

85 CID BOOK 3 Version 3

Rail scheme

4 Capacity allocation Consult the terminal operator  Services provided by the intermodal terminal and the port 5 Services terminal Consult the terminal operator 1. Shunting costs at the internal port rail network: 1.1. Access to the internal rail network (change of locomotive and circulation) 1.2. Train operations (adding or cutting units…) 1.3. Support staff

Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC gauge). http://www.adif.es/es_ES/conoceradif/doc/CA_DRed_Completo.pd 6 Charging f http://www.portdebarcelona.cat/en/home_apb

2. Cost of horizontal transport service from the railway to any point in the terminal, or vice versa, and/or transfer from rail to lorry or vice versa. Maximum rates established by the Port Authority of Barcelona

http://www.portdebarcelona.cat/en/web/port-dels-negocis/102

86 CID BOOK 3 Version 3

Information Related to RFC6

Number of Heading text chapter

Table of contents

 Contradic wharf rail teminal Address: Contradic wharf 08039 Barcelona (SPAIN) Latitude: 41,361697; Longitude: 2,170509

 Terminal owner 1 General information Autoridad Portuaria de Barcelona – Port de Barcelona World Trade Center, edifici Est 08039 Barcelona (SPAIN) Mail: [email protected] Tel:+34 93 306 88 00 Web: www.portdebarcelona.cat

 Terminal operator TRAMER, SA Tel +34 93 442 19 40 Fax: 93 443 20 73 Web: www.iberpotash.com

 Terminal character: Port terminal Intermodal rail/road/sea Preferential use by dry bulk ( potash  Open access for all markets Yes

2 Access conditions  Legal requirements The legal and technical requirements for access to the terminal are the same that ADIF establishes to access to the national rail network and public intermodal terminals  Number and length of tracks 2 tracks 350 Metric gauge 2 tracks 340 Iberian gauge  Handling capacity ( cars/years) 3 Terminal description 584,000 tons (metric gauge) 257,000 tons (Iberian gauge

 Storing capacity, equipment and equipment capacity of the port terminal where the railway terminal is located:

87 CID BOOK 3 Version 3

 Maximum storage capacity 80,000 t Equipment trench and hopper

 Connection to the railway infrastructure: Direct access to Can Tunis (ADIF terminal of reception/expedition of trains) though “Bucle” Port access.

 Technical map of the railway terminal. Rail scheme:

4 Capacity allocation Consult the terminal operator  Services provided by the intermodal terminal and the port 5 Services terminal Consult the terminal operator 1. Shunting costs at the internal port rail network: 1.1. Access to the internal rail network (change of locomotive and circulation) 1.2. Train operations (adding or cutting units…) 1.3. Support staff

Established by ADIF (Iberian gauge) or by the Agreement of the Management Board of the Port Authority of Barcelona (UIC gauge). http://www.adif.es/es_ES/conoceradif/doc/CA_DRed_Completo.pd 6 Charging f http://www.portdebarcelona.cat/en/home_apb

2. Cost of horizontal transport service from the railway to any point in the terminal, or vice versa, and/or transfer from rail to lorry or vice versa. Maximum rates established by the Port Authority of Barcelona

http://www.portdebarcelona.cat/en/web/port-dels-negocis/102

88 CID BOOK 3 Version 3

Puerto de Cartagena

Information Related to RFC6

Number of Heading text Puerto de Escombreras chapter

Table of contents

 Puerto de Escombreras (see remarks). Address: Plaza Héroes de Cavite, s/n - 30201 Cartagena (SPAIN).

 Terminal owner Autoridad Portuaria de Cartagena (APC). According to the spanish law, the port authority is the rail 1 General information infrastructure manager within the port.

 Terminal operator ADIF/ APC

 Terminal character Intermodal (rail-road /maritime)  Open access for all market operators (RU, forwarder, logistic provider...) Yes

2 Access conditions  Legal requirements to access no particular requirements

 Technical conditions only diesel traction  Number and length of tracks 1 single track and 100 m restriction

 Type of cargo all 3 Terminal description  Equipment no specific equipment

 Connection to main railway infrastructure Connecting railway station: Escombreras (ADIF)  Process description regulated through ADIF-APC formal agreement to be signed. Paths are organized between Escombreras and 4 Capacity allocation Puerto de Escombreras

 Booking on a daily basis.

89 CID BOOK 3 Version 3

 List of provided services on demand 5 Services  Operating times on demand  Price list in elaboration (consult the APC in the meanwhile) 6 Charging  Payment conditions no particular conditions

Remarks: The PA is working on more detailed information, including technical maps and separated information about specific terminals within the port network, when possible.

Contact information: Fermín Rol Rol // +34 968 32 58 00 // [email protected]

90 CID BOOK 3 Version 3

Puerto de Castellon

Information Related to RFC6

Number of Heading text Puerto de Castellón chapter

Table of contents

 Puerto de Castellón (see remarks). Address: Muelle Serrano Lloberes, s/n - 12071 Castellón(SPAIN).

 Terminal owner Autoridad Portuaria de Castellón (APC). According to the spanish law, the port authority is the rail infrastructure 1 General information manager within the port.

 Terminal operator ADIF/ APC

 Terminal character Intermodal (rail-road /maritime)  Open access for all market operators (RU, forwarder, logistic provider...) Yes

2 Access conditions  Legal requirements to access no particular requirements

 Technical conditions only diesel traction  Number and length of tracks from 1 to 2, and up to 750 m depending on the quay

 Type of cargo all 3 Terminal description  Equipment no specific equipment

 Connection to main railway infrastructure Connecting railway station: Las Palmas (ADIF)  Process description regulated through ADIF-APC formal agreement. Paths are organized between Las Palmas (ADIF) and Puerto de 4 Capacity allocation Castellón.

 Booking on a daily basis.

91 CID BOOK 3 Version 3

 List of provided services on demand 5 Services  Operating times on demand  Price list to be published (consult the APC in the meanwhile) 6 Charging

 Payment conditions no particular conditions

Remarks: The PA is working on more detailed information, including technical maps and separated information about specific terminals within the port network, when possible. Contact information: Roberto J. Arzo Cubero (Director General) // +34 964 28 06 90 // [email protected]

92 CID BOOK 3 Version 3

Puerto de Tarragona (13 different terminals)

Information related to RFC6

Number Heading text of chapter PORT OF TARRAGONA

Table of contents

Port of Tarragona has 13 existing rail terminals

 The owner of all terminals is the Autoritat Portuària de Tarragona (APT) Passeig de l’Escullera, s/n, 43004 Tarragona +34 977 259 400

According to the spanish law, the port authority is the rail infrastructure manager (ADIF) within the port

 Terminal operators, names, location and other information related to each terminal please find below the map of terminals

1 General information

 Terminals:

93 CID BOOK 3 Version 3

1. Name of rail terminal: Euroenergo Location in the port: Hydrocarbons Esplanade

Operator: Euroenergo España SL

Type of cargo: Liquid bulk (chemical)

Number and length of tracks: 2 x 150 m

Gauge: Iberian

Equipment: Loading stations

Operator contact details: +34 972427411; [email protected]

2. Name rail terminal: Intermodal Location in the port: Galicia Wharf

Operator: Tender in progress

Type of cargo: Intermodal (containers, swap bodies and semi-trailers)

Number and length of tracks: 4 x 800 m

Gauge: Mixed (Iberian + UIC)

Equipment: Reach stacker, Gantry cranes foreseen

Operator contact details: Tender in progress, to be closed by February 2015

3. Name rail terminal: Catalunya Location in the port: Catalunya Wharf

Operator: Euroports Ibérica TPS SL

Type of cargo: Solid bulk (coal)

Number and length of tracks: 2 x 450 m

Gauge: Iberian

Equipment: Diggers

Operator contact details: +34 977222219; europortsiberica@eurroportsiberic a.com

4. Name rail terminal: Navarra Location in the port Navarra Wharf

94 CID BOOK 3 Version 3

Operator: Ership SA, Bergé y CIA SA and others

Type of cargo: Solid bulk

Number and length of tracks: 2 x 400 m

Gauge: Iberian

Equipment: Diggers

Operator contact details: Ership SA: +34 977556170; [email protected],

Bergé y CIA: +34977550500; [email protected]

5. Name rail terminal: Chemical Location in the port: Chemical Wharf Zone

Operator: Terminales Químicos SA VOPAK (TERQUIMSA) and Terminales Portuarias SL (TEPSA)

Type of cargo: Liquid bulk (chemical and petrochemical)

Number and length of tracks: 3 x 200 m (1 track with chargers)

Gauge: Iberian

Equipment: Loading stations

Operator contact details: TERQUIMSA: +34 977241454; [email protected],

TEPSA: +34977228262; administració[email protected]

6. Name rail terminal: Sitasa Castilla Location in the port: Castilla Wharf

Operator: Silos de Tarragona SA

Type of cargo: Solid bulk (grain)

Number and length of tracks: 1 x 430 m

Gauge: Iberian

Equipment: 1 train charger

Operator contact details: +34 977259500; [email protected]

95 CID BOOK 3 Version 3

7. Name rail terminal: Cantabria 1 Location in the port: Cantabria Wharf

Operator: Bergé Marítma SL

Type of cargo: Ro-ro (cars)

Number and length of tracks: 2 x 700 m and 1 x 550 m

Gauge: Iberian

Equipment: Ramps

Operator contact details: +34 977550500; [email protected]

8. Name rail terminal: Cantabria 2 Location in the port: Cantabria Wharf

Operator: Euroports Ibérica General Cargo Terminal SL

Type of cargo: Pulp paper, general cargo

Number and length of tracks: 1 x 450 m

Gauge: Mixed (Iberian + UIC)

Equipment: Forklift

Operator contact details: +34 977222219; [email protected]

9. Name rail terminal: Sitasa Aragon Location in the port: Aragon Wharf

Operator: Silos de Tarragona SA

Type of cargo: Solid bulk (grain)

Number and length of tracks: 2 x 100 m

Gauge: Iberian

Equipment: 1 train charger

Operator contact details: +34 977259500; [email protected]

10. Name rail terminal: Gonvarri Location in the port: Aragon Wharf

Operator: Gonvarri Tarragona SL

96 CID BOOK 3 Version 3

Type of cargo: Steel products

Number and length of tracks: 2 x 250 m

Gauge: Iberian

Equipment: Gantry cranes

Operator contact details: +34 977958000; [email protected]

11. Name rail terminal: Bergé Automotive Logistics Location in the port: Cantrabria Wharf Northern Zone

Operator: Bergé Automotive Logistics SL

Type of cargo: Ro-ro (cars)

Number and length of tracks: 2 x 600 m

Gauge: Iberian

Equipment: Ramps

Operator contact details: +34 977554496; [email protected]

12. Name rail terminal: Aragon Bulk Location in the port: Aragon Wharf

Operator: Bergé Marítima SL and others.

Type of cargo: Solid bulk (manganese, phospat, others)

Number and length of tracks: 2 x 700 m

Gauge: Iberian

Equipment: Diggers

Operator contact details: +34 977550500; [email protected]

13. Name rail terminal: Algeposa Location in the port: Aragon Wharf

Operator: Algeposa Tarraco SL

Type of cargo: Steel products

Number and length of tracks: 1 x 150 m

Gauge: Iberian

97 CID BOOK 3 Version 3

Equipment: Gantry cranes

Operator contact details: +34 977249475; [email protected]

2 Access condition  Open access for all market (RU, forwarder, logistic provider...) Yes

 Legal requirements The legal and technical requirements for access the terminals are the same that ADIF establishes to access the national rail network and public intermodal terminals

 Tecnhical conditions. Only diesel traction at the moment. From October 2015 electrified traction will be possible to access the Intermodal Terminal and ZAL (expected)

3 Terminal description  Number and length of tracks See at part 1

 Type of cargo See at part 1

 Equipment See at part 1

 Connection to main railway infrastructure. There are two access to the port, one in the north and another in the south, and one planned directly connected to the shunting station Tarragona Mercancías (see map of terminals)

All terminals are connected to the shunting station Tarragona Mercancías by means of train manoeuvres. In general all the trains pass through ADIF Mercancías to access the general railway line. Nevertheless, it’s possible to access directly the general railway line

4 Capacity allocation  Process description: regulated through ADIF-Port Authority formal agreement. Paths are organized between Tarragona Mercancías and the Port of Tarragona. Contact the APT for more information  Booking: on a daily basis

98 CID BOOK 3 Version 3

5 Services  List of provided services: on demand. Contact tha APT and the operator. Moreover, the shunting station Tarragona Mercancías offers services (see network statement at: ww.adif.es)

 Opening times: the port is open 365 days a year and 24 hours a day. For timetables of terminals contact the operator

6 Charging  Price list To be published. Contact the APT

 Payment conditions: no particular conditions Contact informaction:

Víctor Castillo Tido // +34 977 259 400 // [email protected]

99 CID BOOK 3 Version 3

Puerto de Valencia

Information Related to RFC6

Number of Heading text Valencia Terminal Europa chapter

Table of contents

 Valencia Terminal Europa (belongs to Grimaldi Group) Muelle Dique del Este, s/n General 46024 - Valencia (Spain) 1 Information Pho: +34 963 24 23 50 Fax: +34 963 24 23 51 Mail: [email protected]

 Open access for all market body Yes 2 Access conditions  Legal requirements Contact terminal management Surface: 220.000 m2 2 berthing lines: 1.000 m + 350 m Draught: 18 m 4 Ro Ro ramps Terminal 24 lighting towers 3 description TV circuit and closed paved area Continuous monitoring 24 hours Operation: 360 days / year Equipment Ro Ro: ro ro tugmasters and forlifts Direct link to the rail network. 3 intermodal tracks Capacity 4 Contact terminal management allocation

Terminal ro ro traffic, vehicles and rolling stock Logistics distribution center car 5 Services Auxiliary services of car predelivery (PDI - Predelivery Inspections). Stock maintenance services.

6 Charging Contact terminal management

100 CID BOOK 3 Version 3

Puerto Seco Azuqueca de Henares (Azuqueca de Henares – Guadalajara)

Information Related to RFC6

Number of Heading text Puerto Seco Azuqueca de Henares chapter

Table of contents

 Puerto Seco Azuqueca de Henares – Railway 2 General Intermodal Terminal is a 60.000m private railway 1 Information terminal with a perfect strategic location, in the area of influence of Madrid, and connected with the principal seaports and highways of Spain.

The platform has excellent communications, being settled in an axis 2 Access conditions between the routes Madrid – Barcelona, Madrid – Valencia and Madrid – France, becoming a gate to access the European market.

Terminal 3 description

Capacity 4 allocation  Services provided: The main services offered to the different companies established in the platform are: Regular maritime services to different Spanish seaports: Barcelona, Bilbao, Valencia, Algeciras, Santander,.... Regular land services with technical assistance to 5 Services trains and loadings: cargo consolidation and transport Storage services of full and empty containers in warehouses, including cleaning and reparation services Customs Service Logistic warehouses Transport companies installed in the area 6 Charging Contact terminal management

101 CID BOOK 3 Version 3

Brief Summary

The construction of Puerto Seco of Azuqueca was initiated in 1995 and two years after, the Terminal was equipped with electrified railways and cargo railways. In 1998 the offices’ building was finished, offering complementary services in customs duty and distribution. Since Year 2000, Puerto Seco of Azuqueca has railway connection with two other Logistic Platforms, ZAL Azuqueca A-2, and the Intermodal Logistical Alovera Park. The Terminal extended its infrastructures with new railways, cranes, new container depot, and an industrial warehouse equipped with internal railway system.

The terminal has played a key role in the economic promotion of the area, attracting multinational firms such as Leroy Merlin, Primark, BMW, Volvo, or C&A. The development of the Puerto Seco of Azuqueca allows the transport of goods arrived from different seaports to Madrid and permits their storage for a future distribution, without using the congested passenger railway corridors of Madrid.

Gran Europa, who is the largest stokeholder (together to the ports of Barcelona, Bilbao and Santander) developes logistics and industrial parks close to the Puerto Seco Azuqueca. The area surrounding the Puerto Seco Azuqueca is the main logistics area in Spain, and whithin it, international logistics and distribution companies operate their warehouses, from which they give service to the Spanish and Portuguese markets.

PUERTO SECO AZUQUECA DE HENARES SA Autovía A-2 (Madrid - Barcelona) Km 42,5 19200 - Azuqueca de Henares (Guadalajara) SPAIN

Tel: ++ 34 949 26 12 07

Contact person: Oscar González – Director International & Railway [email protected]

102 CID BOOK 3 Version 3

Puerto Seco Coslada (Coslada – Madrid)

Information Related to RFC6

Number of Heading text Puerto Seco Coslada chapter

Table of contents

 MADRID DRY PORT COSLADA - MADRID. SPAIN. Av Europa, 28821 Coslada, Madrid Enlace: https://maps.google.es/maps?f=q&source=s_q&hl=es&g eocode=&q=Avenida+de+Europa,+Coslada&aq=&sll=4 0.495335,- 3.479309&sspn=0.384313,0.614548&vpsrc=0&t=h&ie= UTF8&hq=&hnear=Av+Europa,+Coslada&z=16 1 General information  Terminal owner (name, address, contact) PUERTO SECO DE MADRID, S.A www.puertoseco.com Manager. Jaime Seijas. [email protected]

 Terminal operator (name, address, contact) CONTERAIL, S.A. www.conterail.com Manager. Carlos Romero. Felipe Mendaña. [email protected] [email protected] Tel: +34 916 70 71 32  Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal rail/road  Open access for all market operators (RU, forwarder, logistic provider...) Yes / No / Partly (= under special conditions) All market operators

 Legal requirements to access (contract, certificates, insurance...) Customers contact the Terminal Operator 2 Access conditions  Technical conditions (type of handled intermodal units- ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...) Maritime Iso Containers Swap bodies 700 metres max length of trains

103 CID BOOK 3 Version 3

 Number and length of tracks 2 rail tracks for train reception/expedition (1 x 1775 m + 1 x 450 m) allowing management of 700 m length trains 1x 420 m Rail Tracks for maneouvres 4x 483 m Rail Tracks for train loading/unloading

 Storing capacity (m2) Loaded container storage capacity: 3,200 TEU´s 23.000 m2 Empty container dépot with a capacity of 2,200 TEU´s/ 4 heights.

 Theorical Maximum Througput Capacity 150,000 TEU´s (3,000 Trains / Year - 300 Trucks/ Day) Efficient Throughput Capacity: 113,000 TEU´s

 Equipment (cranes, ramps, stackers) 1 PACECO 2-8-3 Rail Mounted Gantry (R.M.G.) : (42 Ton. Elevation Capacity under spreader , 49 m. of clearance from leg to leg. 31m. Clearance from rail to rail.) 1 “ZEPHIR” LOCOTRACTOR 400 HP 1 “ZEPHIR” LOCOTRACTOR 250 HP 3 “LUNA” REACHSTACKERS:45 Ton. (4 heights) 2 “LUNA” EMPTY FRONT CRANE: 8 Ton. (5 heights) 2 “LINDE” FORK LIFT 3.500

 Equipment capacity e.g. XX units per hour 3 Terminal description train ( 100 TEUS capacity ), unloading 2.5 hours

 Connection to main railway infrastructure (name ofconnecting railway station, agreed timetabling for service trains if exists, ...) Connecting to Railway Line ( Algeciras/Valencia and Zaragoza/Barcelona )

 Technical map of terminal (position of tracks, siding areas...)

104 CID BOOK 3 Version 3

 Process description Customers contact the Terminal Operator

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... Customers contact the Terminal Operator  List of provided services (storage, unloading, refuelling ,maintenance,...) Rail Services: Load & Unload containers & swap bodies for outcoming or incoming trains. Train Manuvres & Braking Tests.

Road Transport Services: Load & Unload containers & swap bodies for outcoming or incoming trucks. Swap of containers in a Road to Road Service Auxiliary Services: Empty Container depot (2,200 TEU´s Capacity / 4 heights) Empty Container Cleaning & Repair. 5 Services 24 Reefer Connections & “Pre-Trip” services Customs clearance and additional services (fitosanitary inspection, stevedoring, unpalletising & repalletising). Warehousing (700 pallet spaces) and handling operations (palletise/unpalletise , batching ops., inventories, etc). Video Secure Parking Areas for C.T.P.A.T. Services (U.S.A. Import only)  Operating times (opening times, terminal / particular services) Terminal. 365 days. 24 hours.

 Particular Services. In accordance to each service demand and Public Services Schedule.  Price list 6 Charging

105 CID BOOK 3 Version 3

 CRANES MOVEMENTS  Full  22,99 € Containers  Empty  16,42 € Containers  Shift // Truck/Truck1 Container  45,98 €

Shift //Truck/Truck 2  68,98 € Container  Other services, Customers contact the Terminal Operator

 Payment conditions (billing arrangements) 30 days invoice

106 CID BOOK 3 Version 3

Repsol

Information Related to RFC6

Chapter Title Repsol Química number

1. Table of contents

 Repsol Química, Ctra. El Morell-Tarragona km 2,5 43140 La Pobla de Mafumet

 Terminal owner (name, address, contact) Repsol Química, C/ Méndez Álvaro, nº 44, 28045, Madrid 1 2. General Information  Terminal operator (name, address, contact) Repsol Química, Ctra. El Morell-Tarragona km 2,5 43140 La Pobla de Mafumet. Tel. 34-977-759100 / 191

 Terminal type (parking, intermodal…) Loading of chemical products in railway wagons.  Open to all the operators in the market (RU, forwarder, logistic provider...): Yes/No/Partially (= in which conditions) NO, exclusive use for Repsol Química

 Legal requirements for access (contracts, certifications, insurances…) Does not apply, terminal for Repsol Química exclusive 2 Access conditions use

 Technical conditions (type of manipulated intermodal unities: ISO containers/ continental containers/trailers/train length...) At the moment, only tank wagons, not intermodal even though it is technically possible depending on the position of the connections of the ISO container.  Number and tracks length 3 tracks: T1: 185 m, T2 y T3: 231 m, measured from the scale to the stop block.

 Storage capacity (m2) Maximum capacity 3 tracks * 10 (70m3-wagons) per track. Surface 25.000 m2 Terminal’s 3 description  Equipment (cranes, ramps, stackers…) Transvial machine

 Equipment capacity e.g. XX unities per hour At the moment, 2 compositions per week  Connection to the net (name of the connection station, agreed Schedule, if exists, for the service, ...)

107 CID BOOK 3 Version 3

line Reus-Roda towards Constanti-Reus’ Terminal

 Terminal map (track’s position, parking areas...)

superficie estacion de carga.pdf  Description of process Loading of chemical products in railway wagons.

4 Capacity’s allocation  Reservation Forms, reservation periods, cancellation conditions, special requisites... Does not apply, terminal for Repsol Química exclusive use  List of provided services (storage, unloading, fuel loading, maintenance...) Does not apply, terminal for Repsol Química exclusive 5 Services use

 Service Schedule (times, terminals, private services…) From 6 am to 10 pm on working days  Price List Does not apply, terminal for Repsol Química exclusive use 6 Rate-setting  Payment conditions (Invoicing agreements) Does not apply, terminal for Repsol Química exclusive use

108 CID BOOK 3 Version 3

Sagunto

Information Related to RFC6

Number of Heading text Sagunto chapter

Table of contents

 Sagunto Terminal address: Camí del Rolls s/n (Polígono Industrial Sepes). SAGUNTO. 46500 - VALENCIA

1 General information  Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 963.537.075 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager)

 Teléfono: 963.537.075 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road water...) General Cargo

2 Access conditions  Logistical Installation

3 Terminal description

109 CID BOOK 3 Version 3

 Technical map

 For further information: http://www.adif.es/es_ES/infraestructuras/terminales/652 12/ficha_instalacion_tecnica_0110.shtml

4 Capacity allocation  List of provided services (storage, unloading, refuelling, maintenance,...) Shunting for delivery and/or receipt at other Facilities Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities with a shunting 5 Services vehicle Operations of access to Exterior facilities without a shunting vehicle Operations on rolling stock associated with access or expedition of trains

 Operating times (opening times, terminal / particular services) Access and expedition of trains: 24h/ every day http://www.adif.es/es_ES/infraestructuras/terminales/652 12/ficha_instalacion_logistica_0104.shtml 6 Charging

110 CID BOOK 3 Version 3

San Roque – La Linea

Information Related to RFC6

Number of Heading text San Roque – La Línea chapter

Table of contents

 San Roque – La Línea Crta. Almoraima s/n SAN ROQUE 11368 – CÁDIZ Tel: +34 954.48.52.30 Email: [email protected] Web : www.adif.es

1 General information

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Email: [email protected] Tel: +34 954.48.52.30 ADIF Intermodal terminal

2 Access conditions  Logistical Installation 3 Terminal description

111 CID BOOK 3 Version 3

 Technical map

Nº Track Track length (m) 2 800 4 680 6 680 8 640 10 590

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/71901/f icha_instalacion_tecnica_0086.shtmll

4 Capacity allocation  Formation/selection shunting, with or without shunting vehicle.

 Reception shunting in other facilities.

 Positioning shunting in the logistic facilities within the main facilities

5 Services  Shunting in facilities with shunting vehicle

 Shunting in facilities without shunting vehicle.

 Shunting in facilities with shunting vehicle.

 Handling of intermodal transport units

 Access shunting to outside facilities with shunting vehicle

112 CID BOOK 3 Version 3

 Material operations associated to the access and expedition of trains.  Technical facility:

 Train Access and expedition : 06:00 – 22:00 h L-V  Services :

Timetable varies with service offered.

For more information:

http://www.adif.es/es_ES/infraestructuras/terminales/55026/f icha_instalacion_logistica_0089.shtml

6 Charging

113 CID BOOK 3 Version 3

Silla

Information Related to RFC6

Number of Heading text Silla chapter

Table of contents

 Silla Terminal address: Avda. de Picassent Nº 5, SILLA. 46460 - VALENCIA

1 General information

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 963.537.075 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 963.537.075 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal Terminal 2 Access conditions  Logistic Instalation

3 Terminal description

114 CID BOOK 3 Version 3

 Technical map

 For further information: http://www.adif.es/es_ES/infraestructuras/terminales/642 04/ficha_instalacion_tecnica_0107.shtml

4 Capacity allocation  List of provided services (storage, unloading, refuelling , maintenance,...) Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the MainFacilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Handling intermodal transports units Operations of access to Exterior facilities without a 5 Services shunting vehicle Operations on rolling stock associated with access or expedition of trains

 Operating times (opening times, terminal / particular services) Opening times Access and expedition of trains: 24h/ every day http://www.adif.es/es_ES/infraestructuras/terminales/642 04/ficha_instalacion_logistica_0101.shtml 6 Charging

115 CID BOOK 3 Version 3

Solvay

Information Related to RFC6

Number of Heading text Solvay - Martorell chapter

Table of contents

 APARTADERO FERROVIARIO SOLVAY-MARTORELL Avenida Marie Curie, 1-3-5 Martorell (Barcelona) 08760 Location: 41º 29’08.96 N 1º 55’ 50.66 E

 Terminal owner (name, address, contact) SOLVIN SPAIN, S.L. Avenida Marie Curie, 1-3-5 Martorell (Barcelona) CP 08760 Telephone 937734900 [email protected] 1 General information

 Terminal operator (name, address, contact) Ferrocarrils de la (FGC) Carrer del Cardenal , Barcelona CP 08017 Telephone 933663000

 Terminal character (factory siding, intermodal rail/ road/ water...) Loading, unloading and parking terminal. Rail exclusive use (not intermodal)  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions)

 Terminal type: Private use terminal.

 Legal requirements to access (contract, certificates, insurance...) Open to all market operators with written agreement or tacit conformity with terminal owner. 2 Access conditions  Technical conditions (type of handled intermodal units- ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...) Technically, it is possible to Access with rail vehicles of metric width (1000) and iberian width (1668). There is overhead power cable from the terminal access to half of it approximately in tracks 1,2,3 y 7 . The rest of the terminal is operated without overhead power cable but with traction power.

116 CID BOOK 3 Version 3

The types of unities handled at the moment are dangerous goods transport wagons (PRR type) for loading and transport of the following goods: 80, UN 1824, sodium hydroxide in solution, 8, II (LSC) and 239, UN 1086, stabilized vinyl chloride, 2.1. (VC). Also for the unloading and transport of industrial salt in tubs with metric width axles.  Number and length of tracks Terminal has 8 tracks: Track 1 - 1490 m Track 2 - 1490 m Track 3 - 1080 m Track 4 - 690 m Track 5 - 355 m Track 6 - 220 m Track 7 - 175 m Track 8 - 125 m  Storing capacity (m2)

 Equipment (cranes, ramps, stackers...)

 Equipment capacity e.g. XX units per hour 3 Terminal description

 As supplementary equipment, overead power cable is available. Also two railway scales with its legal updates, a salt dumper for industrial salt tubs unload and specific instalations for loading and unloading of LSC and VC.

 Connection to main railway infrastructure (name of connecting railway station, agreed timetabling for service trains if exists, ...)

 Connection to rail net through Adif’s Martorell station.

 Technical map of terminal (position of tracks, siding areas...)

117 CID BOOK 3 Version 3

 Process description Track 1 – Mobility and loading of VC wagons Track 2 – Mobility and loading of VC and LSC wagons Track 3 – Mobility and loading of VC and LSC wagons Track 4 – Mobility and loading of industrial salt tubs Track 5 – Mobility and loading of industrial salt tubs and 4 Capacity allocation LSC wagons Track 6 – Loading of empty LSC wagons. Track 7 – Loading of full LSC wagons

 Booking forms, time limits for booking, cancellation conditions, special requirements...  List of provided services (storage, unloading, refuelling , maintenance,...)  Loading of LSC at the factory, sending out 15 wagons 5 Services trains with Renfe Operadora in the direction MARTORELL- RELISA (Barcelona) for loads sending out and RELISA (Barcelona)-MARTORELL for the return of empty wagons.

118 CID BOOK 3 Version 3

Unloading of industrial salt tubs between SURIA y MARTORELL, in the direction: train with aproximately 40 loaded tubs from SURIA to MARTORELL, and return of empty tubs from MARTORELL to SURIA. The operator is FGC.

 Operating times (opening times, terminal / particular services) Timetable for manoeuvres at the moment is between 8 am and 8 pm with a two hour lunch stop between 1 pm and 3 pm.

6 Charging

119 CID BOOK 3 Version 3

Tarragona Mercancias

Information Related to RFC6

Number of Heading text Tarragona Mercancias chapter

Table of contents

 Tarragona Mercancías Terminal address: Pol. Ind. El Francolí, Parc. 22 s/n. 43006 - TARRAGONA

1 General information

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ ater...) Intermodal Terminal 2 Access conditions  Logistical Installation 3 Terminal description

120 CID BOOK 3 Version 3

 Technical map

For further

information: http://www.adif.es/es_ES/infraestructuras/terminales/71403/ficha _instalacion_tecnica_0088.shtml

4 Capacity allocation  List of provided services (storage, unloading, refuelling , maintenance,...) Shunting for delivery and/or receipt at other Facilities Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities with a shunting vehicle 5 Services Operations of access to Exterior facilities without a shunting vehicle Operations on rolling stock associated with access or expedition of trains

 Operating times (opening times, terminal / particular services) Opening times Access and expedition of trains: 24h/ every day http://www.adif.es/es_ES/infraestructuras/terminales/714 03/ficha_instalacion_logistica_0081.shtml 6 Charging

121 CID BOOK 3 Version 3

Terminal Intermodal de Monzón (Monzón de Rio Cinca – Huesca)

Information Related to RFC6

Number of Heading text Terminal Intermodal Monzón (T.I.M.) chapter

Table of contents

 Terminal Intermodal Monzón (T.I.M.). Address: Polígono Industrial La Armentera, 22400 Monzón (Huesca) TIM is located in the northeast of Spain, in Cinca Medio Area (Aragon). The location is between Monzón and Barbastro, in La Armentera Industrial Area and the connections and the communications by road is through A- 23 (Zaragoza and Barcelona are connected by this motorway). There are other links through N-240 or A-130.

1 General information

E-mail: [email protected] Tel: +34 976 111 873

It is position is strategic because is in a central situation respect to other logistics interlocutors: ports (Barcelona and Bilbao), terminals (TMZ, Plaza, Industrial Areas (PLHUS, Platea, etc.). TIM belongs to Samca Group and it is participated in 10% by Logirail (Renfe). TIM’s workers together with Logirail manage the terminal: entrances and departures of trains and movements of containers at the terminal (loading and downloading).

122 CID BOOK 3 Version 3

 Process description The access conditions are opened for all market body. The terminal offers a public vocation and everybody can operate at the terminal under special conditions. We require to set a contract and some insurances depending on the activity of the interlocutor. Currently we have a contract with RENFE and we consider all points (rights and responsabilities).

2 Access conditions  Technical conditions up to now we use or move continental containers, mainly 20’ and 40’ standard BOX Container, but we also move 30’, HC 40’, etc…. In the short term (Q4 2013 Q1 2014), we hope to use ISO- containers for the transport of liquids. The terminal gets an area ready for this kind of transport units. The length of trains is around 530 meters. Its composition is 21 platforms 60’. Every platform allows a maximum weight of 60 MT.  Number and length of tracks Number of main tracks: 2 TIM has a third auxiliary truck (used for particular movements, cuts of platforms, separating broken platforms, etc.). The length of this tracks is around 300 meters. Length of main tracks: 540 meters.

 Storing capacity 32.000 m2.

 Connection to main railway infrastructure. Currently TIM receive trains from Barcelona port and Bilbao port. Since its beginnings (two years ago), the direct connection has been through Barcelona Port but during this year we have opened other route from Bilbao Port. Though Barcelona, we have five trains per week (one unit per day), but in some periods during the year, the volume 3 Terminal description has increased till seven-nine trains per week. Though Bilbao, the current movement is two-three trains per month. We think this way will be more important in the future. At the moment, we work with two operators (they manage and contract the trains): 1.- BEST terminal or TERCAT terminal (Barcelona) to TIM. They operate with three trains weekly. MSC only moves their own containers Besides, they move the trains from Bilbao. 2.- terminal in Barcelona Port to TIM. This logistic figure moves containers of several shipping lines ( Maersk, CMA, Hapag Lloyd, Hamburg Sud, etc.). We receive two trains per week from this operator. Barcelona timetable: Tuesday – Thursday - Friday: MSC Monday – Wednesday: TCB Railway

123 CID BOOK 3 Version 3

The trains always arrive to TIM at 5:30 pm and leave at 7:30 pm (two hours later).

 Technical map of terminal

 Process description Every operator sends us the information previously to the arrival of train by email. We receive a report where we can see the composition of the trains and how many containers go in every platform, 4 Capacity allocation the number of containers, the name of containers, their dimensions (20’ or 40’). Furthermore, if there is a special import, for example a container with dangerous material, we know exactly their location inside the train.  Services provided TIM offers differemt sercives Movements of containers (loading, downloading from train or truck). 5 Services Storage Cleaning containers Movements of trains: our people have some authorizations, and they can move trains of other public and private terminals.  Price List: 28,8 € / movement. 42 € / cleaning containers. 6 Charging Storage: depends on the volume and the period. Works in other terminals: depends on the particular activity.

124 CID BOOK 3 Version 3

Terminal Marítima Zaragoza S.L. (Corbera Alta – Zaragoza)

Information Related to RFC6

Number of Heading text Terminal Marítima Zaragoza chapter

Table of contents

 Terminal Marítima de Zaragoza S.L, Ctra Cogullada, 65 Parcela 17, Mercazaragoza, Zaragoza, Spain. TmZ is located in Mercazaragoza´s logistics area, it is just 2 km away from the A2 highway which connects Madrid with Barcelona throughout Zaragoza. Also connected with Valencia through A23, and the highway which connects us with Bilbao AP7. In addition to this tmZ has its own railway connection to the General railway track Madrid-Barcelona TmZ and the Zaragoza´s railway hub are a key point on the RFC 6 Corridor. Both to capture loads from the Ebro Valley to the Mediterranean ports but also to develop the Mediterranean axis throughout Zaragoza and Madrid. Terminal marítima de Zaragoza S.L is a public-private entity. The main stockholders are the following: (56%) Mercazaragoza S.A. Carretera de Cogullada nª 65, 50014 Zaragoza, España.Tlfn+34976464180 (21%) Autoridad Portuaria de Barcelona. WTC Barcelona, edifici 1 General information Est. Moll de Barcelona, s/n. 08039 Barcelona. España. Tfn +34 93.306.64.45 20%) Diputación General de Aragón. Edificio Pignatelli. P° María Agustín, 36. 50071.Tfn+ 976 714 000 And privately, a local bank and two local private corporations The following Company under concession and in charge of the internal and operative process is: Depot tmZ. Services.S.L. Ctra Cogullada, 65 Parcela 17, Mercazaragoza, Zaragoza, España. Tlfn: +34 976 464438. Attending to its inner general functions tmZ might be considered as an intermodal terminal (track/railway/ vessel) According to the Company’s statutes, providing logistic services and containers handling are the main goals of this company. Any interested customer is welcome to join work in tmZ facilities. E-mail: [email protected] Tel: +34 976 47 96 58  The use of the terminal is clearly open to all interested players as (forwarders, Shipping companies, Railway Operators, etc) 2 Access conditions  The terms and conditions about work within the terminal must be taken by both parts, but is tmZ. Services which can decline or not the choice of working at the Company.

125 CID BOOK 3 Version 3

 Legal requirements: must be taken by both parts.

 Technical conditions There is just one technical restriction. We only operate with ISO Containers. 20´´, 40´´, 40´´ high, dry, open top, tank container The maximum train length is 750 meters The maximum weight is 25 Tons by container

 Number and length of railway trucks Track 0, 570 meter; Track 1,680 meter; Track 2, 600 meter; Track 3, 750 meter; Track 4,590 meter; Track 5,750 meter. Track 7, 300meter

 Storage Capacity The tmZ storage capacity is about 2800 Teus. The container yard has more than 15.000m2 TmZ is equipped with 3 Reach Stacker-style mobile cranes Reach Stacker, Linde Model 45 Tons. With the 3 Reach Stacker cranes, the maximum operative capacity, the terminal is able to reach up to 120 Mvt/hour. One of the tmZ´s most important operative advantages is the double railway access via Barcelona by the south and via Lerida by north.

3 Terminal description  Operating times The terminal is operative open from 7:00 am to 20:00 pm on weekly days. Saturday and Sunday under special conditions The following diagram shows the most representative railway facilities in tmZ:

Red marks: Electrified rail truck Yellow marks: Non electrified rail trucks.  Process description a typical Electronic Data Interchange (EDI) system is used in tmZ for the operational process. We have also developed a customized IT software, mainly for internal processes and for some external communication with costumers and providers.

4 Capacity allocation  Booking The booking orders are usually introduced in our IT software. Such orders should include the load and unload order with all specified conditions.

The container identification number, shipping company and road transport must be previously notified.

126 CID BOOK 3 Version 3

The booking list is received by tmZ from the originating terminal with the essential information (arrival and expedition railway, weekly timing, container features (weight and dimensions). This container list is automatically sent to the crane operators. With all these previous steps the container is ready to be loaded or unloaded. The most common booking way is by Electronic data interchange. The booking deadline depends from the private contractual conditions. There are common standards but there is no possibility to cancel past two hours before the expected time.  Services provided Container Logistics Container warehousing for empty and full containers. Storage and handling services. Direct connection with operators and carriers. It offers business solutions. Cargo Logistics. Consolidation and deconsolidation but also complementary services such as classifying and palletizing. Add value services. Cleaning and repairing services. Transport Services Facilitates transport from tmZ to 5 Services delivery place and from the factory/company to tmZ. We have a unique knowledge about the transport situation in our influence area; tmZ transport agency can provide customized transport services to our customers. Customs Warehousing Allowing our customers for money- saving but also and perhaps the most important to reduce the administrative task which means saving time. Nowadays we are CW (Customs warehouse), TDW (Temporary Depot Warehousing) and currently in process to get the AEO certification.  Prices list: Handling rates according to the ADIF Spanish rates. 22€/movement.

6 Charging  Might be modifications with reduction of the economic rates depending on the container quantity

 Charging conditions would be determined by both parts.

127 CID BOOK 3 Version 3

Valencia Fuente San Luis

Information Related to RFC6

Number of Heading text Valencia Fuente San Luis chapter

Table of contents

 Valencia Fuente San Luis Terminal address: Camí Font de las Corts S/N. 46013 - VALENCIA

1 General information  Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 963.537.075 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 963.537.075 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water... General Cargo 2 Access conditions Logistical Installation

3 Terminal description

128 CID BOOK 3 Version 3

Technical map

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/650 13/ficha_instalacion_tecnica_0109.shtml 4 Capacity allocation  List of provided services (storage, unloading, refuelling , maintenance,...) Shunting for delivery and/or receipt at other Facilities Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities without a 5 Services shunting vehicle Operations on rolling stock associated with access or expedition of trains Operating times (opening times, terminal / particular services)

 Opening times Access and expedition of trains: 24h/ Every day  http://www.adif.es/es_ES/infraestructuras/terminales/650 13/ficha_instalacion_logistica_0103.shtml 6

129 CID BOOK 3 Version 3

Vicalvaro Mercancías

Information Related to RFC6

Number of Heading text Vicalvaro Mercancías chapter

Table of contents

 Vicalvaro Mercancías Terminal address: Carretera de Vicálvaro a Coslada Km. 2,500. 28052 - MADRID

1 General information  Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 91 5066100 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Phone: 91 5066100 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water...) General Cargo Terminal 2 Access conditions  Logistical Installation 3 Terminal description

130 CID BOOK 3 Version 3

 Technical map

 For further information: http://www.adif.es/es_ES/infraestructuras/terminales/982 01/ficha_instalacion_tecnica_0017.shtml

4 Capacity allocation  List of provided services (storage, unloading, refuelling , 5 Services maintenance,...)

131 CID BOOK 3 Version 3

Shunting for delivery and/or receipt at other Facilities Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities with a shunting vehicle Operations of access to Exterior facilities without a shunting vehicle Operations on rolling stock associated with access or expeditions of trains

 Operating times (opening times, terminal / particular services) Opening times Access and expedition of trains: 24h/ every day http://www.adif.es/es_ES/infraestructuras/terminales/982 01/ficha_instalacion_logistica_0004.shtml

6 Charging

132 CID BOOK 3 Version 3

Vilamalla

Information Related to RFC6

Number of Heading text Terminal Vilamalla chapter

Table of contents

 TERMINAL VILAMALLA Polígono Industrial Empordà Internacional Carrer de la Duana s/n, 17469 Vilamalla. SPAIN E(X): 498256.6 m N(Y): 4675427.8 m UTM31N / ETRS89 E(X): 498349.9 m N(Y): 4675632.5 m UTM31N / ED50

 Terminal owner Generalitat de Catalunya 1 General information Address: Còrsega 273, 08008 BARCELONA, SPAIN Contact: Isidre Gavín E-mail: [email protected] Tel: +34 93 363 4960

 Terminal operator: Nobody

 Terminal character: intermodal rail/ road  Open access for all market operators Yes

 Technical conditions The terminal have Iberian gauge. Anyone will operate in 2 Access conditions UIC and Iberian gauge in 2014/2015. We don´t have load/unload equipment, but the terminal can storage freeze containers, ISO containers, continental containers, swap bodies, cars Allowed RID classes.  load/unload tracks both with a length of 478 m 1 shuntig track with a length of 550 m. (it will have 750 m in 2014/2015)

 Storing capacity 31. 470 m2 3 Terminal description

 Equipment None

 Connection to main railway infrastructure Direct in UIC and Iberian gauge

133 CID BOOK 3 Version 3

 Technical map of terminal

4 Capacity allocation  List of provided services storage, and beside of the custom of fresh product, and, in 2014/2015 security cameras 5 Services

 Operating time No one is operating 6 Charging

134 CID BOOK 3 Version 3

Zaragoza Plaza

Information Related to RFC6

Number of Heading text Zaragoza Plaza chapter

Table of contents

 Zaragoza Plaza Terminal address: Carretera Base Aérea s/n. 50197 - ZARAGOZA

1 General information

 Terminal owner (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal operator (name, address, contact) Adif (Railway Infrastructure Manager) Tel: 93 508 93 39 Email: [email protected] Web: http://www.adif.es

 Terminal character (factory siding, intermodal rail/ road/ water...) General Cargo Terminal 2 Access conditions  Logistical Installation

3 Terminal description

 Technical map

135 CID BOOK 3 Version 3

For further information: http://www.adif.es/es_ES/infraestructuras/terminales/708 05/ficha_instalacion_tecnica_0096.shtml

4 Capacity allocation  List of provided services (storage, unloading, refuelling , maintenance,...) Shunting for delivery and/or receipt at other Facilities Formation/Selection shunting with a shunting vehicle. Formation/Selection shunting without a shunting vehicle. Shunting operations on logistics facilities at the Main Facilities Shunting at facilities with a shunting vehicle. Shunting at facilities without a shunting vehicle. Operations of access to Exterior facilities with a shunting vehicle Operations of access to Exterior facilities without a 5 Services shunting vehicle Handling intermodal transports units Operations on rolling stock associated with access or expedition of trains

 Operating times (opening times, terminal / particular services) Access and expedition of trains: 24h/ every day

http://www.adif.es/es_ES/infraestructuras/terminales/7080 5/ficha_instalacion_logistica_0090.shtml 6 Charging

136 CID BOOK 3 Version 3

3.2. Terminal details of France

[To be updated]

137 CID BOOK 3 Version 3

Aiton

Information Related to RFC6

Number of Heading text Aiton chapter

Table of contents

 Aiton Autoroute Ferroviaire Alpine Z.I. Arc Isère 73390 BOURGNEUF France

 Terminal owner (name, address, contact) Autoroute Ferroviaire Alpine

 Terminal operator (name, address, contact) 1 General information Autoroute Ferroviaire Alpine http://www.transalpine.com/autoroute-ferroviaire E-mail: [email protected] Tel: +33 479 44 24 91

 Terminal character (factory siding, intermodal rail/ road/ water...) Modalohr Load / Unload  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) http://www.transalpine.com/autoroute-ferroviaire

 Number and length of tracks 1 track from 500 m

 Surface 3 Terminal description 20 000 m²

 Equipment Modalohr

 Process description

 Booking forms, time limits for booking, cancellation 4 Capacity allocation

 conditions, special requirements...

 Intermodal rail / Road 5 Services

138 CID BOOK 3 Version 3

 Load /Unload

6 Charging

139 CID BOOK 3 Version 3

Ambérieu

Information Related to RFC6

Number of Heading text Ambérieu chapter

Table of contents

 Ambérieu en Bugey Marshalling yard, 104 Rue du Triage 01500 Ambérieu-en-Bugey, France  Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification/Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 Tel: + 33 (0)1 53 94 33 23, +33 08 99 86 87 22 1 General information E-mail: [email protected]

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Relay Station , Marshalling yard  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau 24h/24, 7j/7  Number and length of tracks Big number of tracks of 700m that can be used by several Railway Undertakings

3 Terminal description

4 Capacity allocation  Process description

140 CID BOOK 3 Version 3

It’s necessary to have a contract with RFF

 Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served  List of provided services (storage, unloading, refuelling , maintenance,...) 5 Services Relay service / Marshalling yard It’s necessary the presence of thrue RU staff  Price list Defined by the contract with SNCF Réseau 6 Charging

 Payment conditions (billing arrangements)

141 CID BOOK 3 Version 3

Badan

Information Related to RFC6

Number of Heading text Badan chapter

Table of contents

 Badan Marshalling yard, 27 Rue Charles de Gaulle, 69520 Grigny, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 1 General information Tel: + 33 (0)1 53 94 33 23 E-mail: [email protected]

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Relay station/marshalling yard  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau

 24h/24, 7j/7  Number and length of tracks 3 Terminal description tracks from 460 to 650m for the relay station tracks of 500 and 540m for marshalling yard  Process description It’s necessary to have a contract with RFF

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served

142 CID BOOK 3 Version 3

 List of provided services (storage, unloading, refuelling , maintenance,...) Relay service / Marshalling yard It’s necessary the presence of thr RU staff 5 Services

 Operating times (opening times, terminal / particular services) 24h/24, 7j/7  Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

143 CID BOOK 3 Version 3

Chasse Sur Rhone

Information Related to RFC6

Number of Heading text Chasse Sur Rhone chapter

Table of contents

 Chasse sur Rhone Marshalling yard, 2-162 Avenue Léon Blum 38670 Chasse-sur-Rhône, France Km 530,816 line section Paris – Marseille Km 532,086 line section Paris – Marseille

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 1 General information + 33 (0)1 53 94 33 23 [email protected] Fret SNCF 24 rue Villeneuve 92583 Clichy-la-Garenne Cedex

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Relay Station , Load/unload  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau 24h/24, 7j/7  Number and length of tracks 4 tracks from 500 to 640m for the relay station 1 tracks of 600m for Load / Unload yard 3 Terminal description

 Storing capacity (m2) 20 000 m  Process description It’s necessary to have a contract with SNCF Résau  Booking forms, time limits for booking, cancellation 4 Capacity allocation

 conditions, special requirements... First arrived-first served

144 CID BOOK 3 Version 3

 List of provided services (storage, unloading, refuelling ,  maintenance,...) 5 Services Relay service / Marshalling yard / Load-Unload It’s necessary the presence of thr RU staff  Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

145 CID BOOK 3 Version 3

Grenoble

Information Related to RFC6

Number of Heading text Grenoble chapter

Table of contents

 Grenoble Marshalling yard, 26-28 Rue Henri Tarze 38000 Grenoble, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 1 General information Tel: + 33 (0)1 53 94 33 23 E-mail: [email protected]

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal rail/road, load/unload  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau 24h/24, 7j/7  Number and length of tracks tracks of 280m for Load / Unload yard 3 Terminal description  Storing capacity (m2) 10 000 m  Process description It’s necessary to have a contract with SNCF Réseau

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served  List of provided services (storage, unloading, refuelling , maintenance,...) 5 Services Load-Unload It’s necessary the presence of the RU staff

146 CID BOOK 3 Version 3

 Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

147 CID BOOK 3 Version 3

Le Boulou (Ambrogio SA)

AMBROGIO SA Number of Heading text AMBROGIO SA chapter

Table of contents

 AMBROGIO SA Le camp de la Basse B.P. 70212 F - 66161 Le Boulou Phone +33 4 68 83 06 35 Fax +33 4 68 83 01 09 E-mail: [email protected] www.ambrogio.it

 How to find the terminal LE BOULOU- FRANCE close to the Motorway exit 1 General information

 Terminal Owner Amborgio SA

 Terminal operator Amborgio SA

 Terminal character Intermodal rail/road  Accepted operators RAILWAY OPERATORS - INTERMODAL TRANSPORTERS

 Legal requirements must be qualified and certified to operate as such

 Technical conditions U.T.I., drivers and vehicles with documentation in orde 2 Access conditions

 Units maximum weight 44 tons

 Lenght of trains up to 850 m

 RID Classes allowed: 3.4.5.6.8.9  Number and length of tracks 8 tracks for a total lenght of 2.977 m Storing capacity (m2) terminal has an operating area of 90.000m2

3 Terminal description  Equipment 2 40ton reachstackers - 1 50 ton straddlecarrier

 Equipment capacity up to 50 ton xx units per hour: 60

148 CID BOOK 3 Version 3

 Connection to main railway infrastructure YES - terminal is located in Le Boulou and is part of the intermodal hub Le Boulou is relied directly to Perpignan where it connects with the main railway line.

 Technical map of terminal for general information visit www.ambrogio.it locate on google-Earth 42º 31´ 28.15" N 002º 48` 53.78" E

 Booking forms by phone, fax or via internet Times limits for booking : up to 1 hour before departure from terminal  Process description Personalized for each customer

 Cancellation conditions 4 Capacity allocation Depends on the contract

 Special requirements Depends on the contract  Storage Storage of all kind of UTI (20 30 40 45 ft) and ADR

 Loading/Unloading No

 Refuelling 5 Services By arrangement

 Maintenance No, except minor issues Others electrical connections for reefers

 Operating times 7-19 Mon-Fri 8-12 Sat  Price List On request 6 Charging  Payment conditions On request

149 CID BOOK 3 Version 3

Le Teil

Information Related to RFC6

Number of Heading text Le Teil chapter

Table of contents

 Le Teil Marshalling yard and terminal, Le Dépot, 07400 Le Teil, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 Tel : + 33 (0)1 53 94 33 23 1 General information E-mail: [email protected] SNCF 2 place aux Etoiles, 93200 Saint Denis

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Relay Station , Load/unload  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes  Legal requirements to access (contract, certificates, insurance...) 2 Access conditions Contract with SNCF Réseau

 Technical conditions (type of handled intermodal units-  ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...)  Number and length of tracks 4 tracks of 750m for the relay station 1 tracks of 400m for Load / Unload yard 3 Terminal description  Storing capacity (m2) 1 000 m² No equipment

150 CID BOOK 3 Version 3

 Process description It’s necessary to have a contract with SNCF Réseau

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served  List of provided services (storage, unloading, refuelling ,maintenance,...) 5 Services  Relay service / Marshalling yard / Load-Unload It’s necessary the presence of the RU staff  Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

151 CID BOOK 3 Version 3

Marseille Maritime Arenc

Information Related to RFC6

Number of Heading text Marseille Maritime Arenc chapter

Table of contents

http://www.marseille-port.fr/fr/pages/module.aspx?PAGEID=- 1 General information

10010104&DOCUMENTID=13733&VERSIONID=2

2 Access conditions

3 Terminal description 4 Capacity allocation 5 Services 6 Charging

152 CID BOOK 3 Version 3

Modane

Information Related to RFC6

Number of Heading text Modane chapter

Table of contents

 Modane terminal, 27 Rue du 11 Novembre 73500 Fourneaux, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 1 General information Tel: + 33 (0)1 53 94 33 23 E-mail: [email protected]

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/water...) Relay Station  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau 24h/24, 7j/7  Number and length of tracks 3 Terminal description 9 tracks of 400m for export 4 tracks of 420-580 m for import  Process description It’s necessary to have a contract with RFF

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served  List of provided services (storage, unloading, refuelling, maintenance,...) 5 Services  Relay service It’s necessary the presence of thr RU staff

153 CID BOOK 3 Version 3

 Price list Defined by the contract with SNCF Réseau 6 Charging

 Payment conditions (billing arrangements)

154 CID BOOK 3 Version 3

Narbonne

Information Related to RFC6

Number of Heading text Narbonne chapter

Table of contents

 Ateliers d’Occitanie Address : 6, rue des Corbières. 11101 Narbonne, France Activities : Workshop, Freight wagon maintenance and manufacture //http:/www.ateliers-occitanie.fr

1 General information  Operator Ateliers d’Occitanie Tel:+33 4 68 42 50 50 E-mail: [email protected]

 Character No siding, rail and road connected

2 Access conditions

connected to Narbonne railway station covered workshop : 8 075m2 internal railways : 5.2 km 12 cranes for wagons locomotives 3 Terminal description All maintenance equipements Important welding equipments Special coating and painting équipements Dangerous goods : Inside tank cleaning plan

4 Capacity allocation  On demand  Services provided Wagons maintenance Tank cleaning Welding ISO 9001 / EN 15085 certifications 5 Services VPI / SNCF / ECM agrements Park Wagon

 Operating time 7h30-11h45 // 13h30-16h15

6 Charging On demand

155 CID BOOK 3 Version 3

Perpignan

Information Related to RFC6

Number of Heading text Perpignan chapter

Table of contents

 PERPIGNAN SAINT CHARLES CONTENEUR TERMINAL Address: 2 320, avenue de Barcelone 66000 Perpignan, France Tel: +33 04.68.81.96.09 Fax: +33 04.68.39.35.68 E-mail: [email protected]  Owner/Operator: Perpignan Saint Charles Conteneur Terminal

 Terminal character: A combinated rail/road Terminal and an extension project of the combinated rail/road Terminal is foreseeable

1 General information

2 Access conditions  870 Hectares  560 Companies  8700 Employees  4 billions € of Turnover / year  5 millions tons of goods / year  A railway station dedicated to goods 3 Terminal description  A handling area of : 75 000 m²

 Capacity: 110 000 TEU/year

 Number and length of tracks

156 CID BOOK 3 Version 3

4 rail tracks of 750 meter lenght 2 rail tracks of 370 meter lenght 2 marshalling tracks of 750 m

 Storing capacity (m2) 2 lanes dedicated to lorries 3 specifics storage lanes for TEU (6 750 m²) 2 lanes dedicated to lorries 2 specifics storage lanes for TEU (4 500 m²) 2 lanes dedicated to lorries 3 specifics storage lanes for TEU (3 330 m²) 4 000 m² of storage area for containers Repair and maintenance facilities for containers reach-stackers

 Equipment (cranes, ramps, stackers...) 4 gantry cranes with a handling capacity of 40 tons 2 reach-stackers with a handling capacity of 40 tons

 Connection to main railway infrastructure: French Railway Network High Speed Line of Barcelone-Perpignan 4 Capacity allocation 5 Services 6 Charging

157

Port Edouard Herriot

Information Related to RFC6

Number of Heading text Port Edouard Herriot chapter

Table of contents

 Port de Lyon – Edouard Herriot

1 General information  Terminal owner (name, address, contact) ITE CNR 2, rue André Bonin 69316 Lyon Cedex 04 Tél: +33 04 72 00 69 69 Fax: +33 04 72 10 66 66 E-mail: [email protected]

 Terminal operator (name, address, contact) ITE CNR 2, rue André Bonin 69316 Lyon Cedex 04 Tél: +33 04 72 00 69 69 Fax: +33 04 72 10 66 66 E-mail: [email protected]

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal road / river transport  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) 2 Access conditions Yes

158

 Legal requirements to access (contract, certificates, insurance...) http://www.portdelyon.fr/les-services-portuaires/les-services- ferroviaires.aspx

 Number and length of tracks http://www.portdelyon.fr/les-services-portuaires/les-services- ferroviaires.aspx

3 Terminal description  Connections http://www.portdelyon.fr/les-services-portuaires/les- terminaux-a-conteneurs/liaisons-multimodales-de-lyon- terminal.aspx

 Process description Contact the company

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements...

 http://www.portdelyon.fr/les-services-portuaires/les-services- ferroviaires.aspx 5 Services  http://www.portdelyon.fr/les-services-portuaires/les- terminaux-a-conteneurs/services-de-lyon-terminal.aspx  Price list Contact the company 6 Charging

 Payment conditions (billing arrangements)

159

Portes

Information Related to RFC6

Number of Heading text Portes chapter

Table of contents

 Portes, 1 Rue Fernand Forest 26000 Valence, France  Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 + 33 (0)1 53 94 33 23 E-mail: [email protected] 1 General information Fret SNCF 24 rue Villeneuve 92583 Clichy-la-Garenne Cedex

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Relay Station , Load/unload, marshalling yard  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

 Legal requirements to access (contract, certificates, insurance...) 2 Access conditions Contract with SNCF Réseau

 Technical conditions (type of handled intermodal units- ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...)  Number and length of tracks 4 tracks of 750m for the relay station tracks of 170m for Load / Unload yard 3 Terminal description  Storing capacity (m2) 9 000 m² No equipment

160

 Process description It’s necessary to have a contract with SNCF Réseau 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served  List of provided services (storage, unloading, refuelling , maintenance,...)

5 Services  Relay service / Marshalling yard / Load-Unload It’s necessary the presence of the RU staff

 Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

161

Portes Compagnie Nationale du Rhône

Information Related to RFC6

Number of Heading text PORTES Compagnie Nationale du Rhône chapter

Table of contents

 Portes - Compagnie Nationale du Rhône (CNR) Address: La Motte, 26800 Portes-lès-Valence, France Tel: +33 4 75 57 45 60

 Terminal owner (name, address, contact) 1 General information ITE CNR 2, rue André Bonin 69316 Lyon Cedex 04 Tél: +33 04 72 00 69 69 E-mail: [email protected]

162

 Terminal operator (name, address, contact) CNR 2, rue André Bonin 69316 Lyon Cedex 04 Tél: +33 04 72 00 69 69 Fax: +33 04 72 10 66 66

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal road- river port  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

 Legal requirements to access (contract, certificates, insurance...) Contract To be defined with the CNR 2 Access conditions

 Technical conditions (type of handled intermodal units- ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...) Containers

 Number and length of tracks 1 track of 250m

3 Terminal description  Storing capacity (m2) 20 000 m² Stackers, crane  Process description It’s necessary to have a contract with CNR 4 Capacity allocation

 List of provided services (storage, unloading, refuelling , maintenance,...) 5 Services Load-Unload It’s necessary the presence of the RU staff

6 Charging

163

Salaise Gie Osiris

Information Related to RFC6

Number of Heading text Salaise Gie Osiris chapter

Table of contents

 GIE-OSIRIS SALAISE Location of the Chemical Platform Groupement d’Intérêt Economique (Economic Interest Group) 38150 Roussillon GPS coordinates: Latitude : 45.360475960041064 Longitude : 4.796798229217529 E-mail: [email protected] Tel: +33 4.74.11.36.11

 Terminal owner (name, address, contact) 1 General information Plate-forme Chimique des Roches-Roussillon Rue Gaston Monmousseau – CS 50032 Roussillon 38 556 Saint Maurice l'Exil Cedex Tel.: + 33 (0)4 74 11 36 11 Fax: + 33 (0)4 74 11 36 36 E-mail: [email protected]

 Terminal operator (name, address, contact) GIE-OSIRIS SALAISE E-mail: [email protected] Tel: +33 4.74.11.36.11

164

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal Rail/Road  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Members of the grouping

2 Access conditions  Technical conditions (type of handled intermodal units- ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...) Chemical containers  Number and length of tracks tracks of 650m for Load / Unload yard

 Equipment (cranes, ramps, stackers...) Stackers, cranes

3 Terminal description  Connection to main railway infrastructure (name of connecting railway station, agreed timetabling for service trains if exists, ...)

 Technical map of terminal (position of tracks, siding areas...)  List of provided services (storage, unloading, refuelling , 5 Services maintenance,...) Loading/Unloading 6 Charging

165

Salaise ITE CNR

Information Related to RFC6

Number of Heading text SALAISE ITE CNR chapter

Table of contents

 Compagnie Nationale du Rhone Salaise

 Terminal owner (name, address, contact) Compagnie Nationale du Rhone Salaise 2, rue André Bonin 69316 Lyon Cedex 04 Tel: +33 04 72 00 69 69 E-mail: [email protected]

1 General information  Terminal operator (name, address, contact) Compagnie Nationale du Rhone 2, rue André Bonin 69316 Lyon Cedex 04 Tel : +33 04 72 00 69 69 E-mail: [email protected]

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal Road / River Transport  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Members of the grouping

2 Access conditions  Technical conditions (type of handled intermodal units- ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...) Chemical containers  Number and length of tracks 1 track of 400m for Load / Unload yard

 Surface 3 Terminal description 15 000 m²

 Equipment (cranes, ramps, stackers...) Stackers, cranes

166

 List of provided services (storage, unloading, refuelling , maintenance,...) Loading/Unloading 5 Services

 Operating times (opening times, terminal / particular services) 6 Charging

167

Sibelin

Information Related to RFC6

Number of Heading text Sibelin chapter

Table of contents

 Sibelin Marshalling yard, Address: 69360 Solaize, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 Tel: + 33 (0)1 53 94 33 23 1 General information E-mail: [email protected]

 Terminal operator (name, address, contact) Fret SNCF 24 rue Villeneuve 92583 Clichy-la-Garenne Cedex

 Terminal character (factory siding, intermodal rail/ road/ water...) Marshalling yard  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau 24h/24, 7j/7  Number and length of tracks 8 tracks of 750m for the relay station 3 Terminal description Big number of tracks of 750m that can be used by several Railway Undertakings Marshalling by gravity  Process description It’s necessary to have a contract with SNCF Réseau 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served

168

 List of provided services (storage, unloading, refuelling , maintenance,...) 5 Services Relay service / Marshalling yard It’s necessary the presence of thr RU staff 24h/24, 7j/7  Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

169

St Avre la Chambre

Information Related to RFC6

Number of Heading text St Avre la Chambre chapter

Table of contents

 St-Avre-la-Chambre Marsalling yard, Address: 712-1124 Route de Platrière 73130 Saint-Avre, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 1 General information Tel: + 33 (0)1 53 94 33 23 E-mail: [email protected]

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Relay Station  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with RFF 24h/24, 7j/7  Number and length of tracks 3 Terminal description 8 tracks from 690m for the relay station  Process description It’s necessary to have a contract with SNCF Réseau

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served  List of provided services (storage, unloading, refuelling, maintenance,...) 5 Services Relay service It’s necessary the presence of the RU staff  Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

170

St Jean de Maurienne

Information Related to RFC6

Number of Heading text St Jean de Maurienne chapter

Table of contents

 St-Jean-de-Maurienne Marsalling yard Address: km 207,174 to km 209,745 line Culoz-Modane. Saint Jean de Maurienne station km 206,086 Avenue du 8 Mai 1945, 73300 Saint-Jean-de-Maurienne, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 Tel: + 33 (0)1 53 94 33 23 1 General information E-mail: [email protected]

Fret SNCF 24 rue Villeneuve 92583 Clichy-la-Garenne Cedex

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Relay Station , Load/unload, Marshalling yard  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau 24h/24, 7j/7  Number and length of tracks 8 tracks from 520 to 760m for the relay station tracks of 200m for Load / Unload yard 3 Terminal description

 Storing capacity (m2) 5 000 m

171

 Process description

 It’s necessary to have a contract with SNCF Réseau 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served  List of provided services (storage, unloading, refuelling , maintenance,...) 5 Services Relay service / Marshalling yard / Load-Unload It’s necessary the presence of thr RU staff  Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

172

St Rambert d'Albon

Information Related to RFC6

Number of Heading text St-Rambert-d’Albon chapter

Table of contents

 St-Rambert-d’Albon Marsalling yard, Champ Peyraud 38150 Chanas, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 1 General information Tel: + 33 (0)1 53 94 33 23 E-mail: [email protected]

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Relay Station , Load/unload  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes 2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau 24h/24, 7j/7  Number and length of tracks tracks of 750 m for the relay station tracks of 700m for Load / Unload yard 3 Terminal description  Storing capacity (m2) 10 000 m² No equipment  Process description It’s necessary to have a contract with SNCF Réseau 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served

173

 List of provided services (storage, unloading, refuelling , maintenance,...) 5 Services Relay service / Marshalling yard / Load-Unload It’s necessary the presence of thr RU staff

 Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

174

Valence - Plateforme militaire des Combeaux

Information Related to RFC6

Number Valence - Plateforme militaire des Combeaux of Heading text

chapter

Table of contents

 Valence - Plateforme militaire des Combeaux terminal, Address: 36 Rue Fernand Forest, 26000 Valence, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 1 General information 92 avenue de France – 75648 PARIS CEDEX 13 Tel: + 33 (0)1 53 94 33 23 E-mail: [email protected]

 Terminal operator (name, address, contact) No operator

 Terminal character (factory siding, intermodal rail/ road/ water...) Load/unload  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Under special conditions

2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract with SNCF Réseau  24h/24, 7j/7  Number and length of tracks 4 tracks from 400 to 700 m for Load / Unload yard 3 Terminal description  Storing capacity (m2) 0 m²  Process description It’s necessary to have a contract with SNCF Réseau 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served  List of provided services (storage, unloading, refuelling , maintenance,...) 5 Services Load-Unload  It’s necessary the presence of the RU staff

175

 Price list 6 Charging Defined by the contract with SNCF Réseau  Payment conditions (billing arrangements)

176

Vénissieux Naviland-Cargo

Information Related to RFC6

Number of Heading text Vénissieux Naviland-Cargo chapter

Table of contents

 Vénissieux Naviland-Cargo, Address: chem Charbonnier, 69200 VENISSIEUX, France

 Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 Tel: + 33 (0)1 53 94 33 23 1 General information E-mail: [email protected]

 Terminal operator (name, address, contact) Naviland Cargo Chemin du charbonnier 69200 VENISSIEUX Adresse postale BP 587 69969 CORBAS Cédex Tel:+33 (0) 4.72.21.51.00 E-mail:[email protected]  Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal rail/road  Open access for all market operators (RU, forwarder, logistic provider...): Yes  Legal requirements to access (contract, certificates, 2 Access conditions insurance...) 24h/24, 7j/7 Every freight accepted except animals MD class 1 and 7 (MD 1.4S accepted)  Number and length of tracks 20 tracks from 200-400m 4 tracks with crane tracks with gantry 3 Terminal description  Surface 70 000 m²  Connections http://www.naviland-cargo.com/implantations/lyon- venissieux  Process description It’s necessary to have a contract with SNCF Réseau 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... First arrived-first served

5 Services http://www.naviland-cargo.com/implantations/lyon-venissieux

177

 Price list 6 Charging Contact the company  Payment conditions (billing arrangements)

178

Vénissieux Novatrans

Information Related to RFC6

Number of Heading text Vénissieux Novatrans chapter

Table of contents

 Vénissieux Novatrans, Address: Zone Industrielle - 63 Rue du Beaujolais 69800 SAINT-PRIEST, France  Terminal owner (name, address, contact) SNCF Réseau Pôle commercialisation et planification Direction commerciale Guichet Unique 92 avenue de France – 75648 PARIS CEDEX 13 Tel: +33 (0)1 53 94 33 23 E-mail: [email protected] 1 General information  Terminal operator (name, address, contact) Novatrans Vénissieux Address: Zone Industrielle - 63 Rue du Beaujolais 69800 SAINT-PRIEST, France http://www.novatrans.fr/ Tel: +33 04 72 28 90 60 E-mail: [email protected]

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal rail/road  Open access for all market operators (RU, forwarder, logistic provider...): Yes 2 Access conditions  Legal requirements to access (contract, certificates, insurance...) http://www.novatrans.fr/  Number and length of tracks 7 tracks from 150-470 m  Surface 3 Terminal description 20 000 m²  Equipment Stackers and cranes  Process description http://www.novatrans.fr/ 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... http://www.novatrans.fr/  Intermodal rail / Road 5 Services Load /Unload  Price list 6 Charging Contact the company  Payment conditions (billing arrangements)

179

VIIA - Bourgneuf Aiton

Information Related to RFC6

Number of Heading text VIIA - Bourgneuf Aiton chapter

Table of contents

 VIIA Connect Bourgneuf Aiton PAE Arc Isère 662 rue Louis Armand 73390 BOURGNEUF, France Tel: +33 04 79 44 24 90

1 General information

 Terminal owner Lorry-Rail Zone Industrielle Schelleck II L-3225 Bettembourg Tel: +35 2.24.87.68.1 E-mail: [email protected]  Terminal operator Lorry-Rail Zone Industrielle Schelleck II L-3225 Bettembourg Tel: +35 2.24.87.68.1 E-mail: [email protected]  Terminal character Platform using the Lohr Industry technology, loading of lowered wagons with rotating shells.  Open access for all market operators: Yes

 Technical conditions Allowed types of trailers are Tankers Lorries 2 Access conditions Containers Powdery Tank Semi-trailer Hazardous goods except explosives (class 1) and radioactive products (class 7) The capacity of a train is 14 full trucks (accompanied mode) or 22 trailers. 2 services are possible : Accompanied service for truck (truck and trailers and driver)

180

Unaccompanied service: the trailer is loaded by a jockey service to check the gauge and loading / unloading. There are constraints regarding mass (1 200 t max.) and gauge (3.97 m, GB1). Maximum authorized weight per trailer is 38 tons. The length of each train (11 Lohr Industries wagons) is 391 m, the total length of the train including the drivers’ wagon and the 2 locomotives is 431 m.  Number and length of tracks The platform is privately connected and is equipped with a loading track (500 m) electrified and 3 tracks + 2 slide tracks.

 Storing capacity 172 271 m² The terminal is equipped with a walkway with a climbing protection, harness, a 60m3 reserve for fire-fighting operations and a 60m3 water holding zone.

 Equipment the platform is equipped with 22 Lohr Industries units allowing to unload/load trailers from the Lohr Industries wagons.

 Equipment capacity The loading/unloading operations are operated by a jockey service equipped with 2 yard tractors. The platform allows to load / unload 12 trailers/hour 3 Terminal description  Technical map of terminal:

 Process description Platform abides by SNCF loading rules. Commercial matters 4 Capacity allocation are run by the AFA sales representatives.  Timesheet examples are follows:

181

 List of provided services: The site has a 200 trailers storage capacity. It is in charge of loading/unloading trailers, securing trailers on trains (strappings to avoid open tarpaulins). Parking limit is 48 hours due to hazardous goods 5 Services restrictions.

 Operating times: The platform is open from Monday 4.30 am to Saturday to 5.am.  Price list and payment conditions Prices and conditions are decided by the AFA sales services. 6 Charging It is fixed according to the number of trailers/year, the type of goods (hazardous goods), the time of the train, and operations (gauge, loading, unloading).

182

VIIA - Le Boulou

Information Related to RFC6

Number of Heading text VIIA - Le Boulou chapter

Table of contents

 VIIA - Le Boulou Address: Terminal d’Autoroute Ferroviaire Lorry-Rail Distriport 66161 Le Boulou, France Tel: +33.4.68.81.56.74

1 General information

 Terminal owner Lorry-Rail Zone Industrielle Schelleck II L-3225 Bettembourg Tel: +35 2.24.87.68.1 E-mail: [email protected]  Terminal operator Lorry-Rail Zone Industrielle Schelleck II L-3225 Bettembourg Tel: +35 2.24.87.68.1 E-mail: [email protected]  Terminal character loading of lowered wagons with rotating shells. Platform connected to the combined platform of Ambrogio  Open access for all market operators Yes 2 Access conditions

 Technical conditions

183

Limited access to GB1 trailers. Maximum authorized weight is 38 tons. Hazardous goods are authorized except : Class 1 Class 2 Class 5.2 Class 7 Class 4.1 with an ONU number between 3231 & 3240 Class 8 ONU 1829

 Maximum authorized length is 850m for rail motorway trains.  Number and length of tracks Platform with a 330 m loading track.

 Storing capacity 30 000m²

 Equipment The platform is equipped with 20 Lohr Industries units allowing to unload / load trailers from the Lohr Industries wagons. The platform is equipped with 4 yard tractors for operations.

 Equipment capacity The platform can load / unload about 12 trailers / hour.

 Connection to main railway infrastructure The platform is connected to Le Boulou station. Trains arrive and leave from Le Boulou:

From Luxemburg to Le Boulou Departure from Bettembourg Arrival on Le Boulou 05h25 19h59 3 Terminal description 11h14 02h29 (D+1) 16h54 07h58 (D+1) 23h06 13h44 (D+1)

From Le Boulou to Luxemburg Departure from Le Boulou Arrival on Bettembourg 01h34 18h59 09h21 23h59 15h00 06h11 (D+1) 20h54 12h00 (D+1)

184

 Technical map of terminal:

 Process description 4 Capacity allocation Lorry-Rail is authorized candidate to RFF for slots and uses the standard national document.  List of provided services The site has a 200 trailers storage capacity. It is in charge of loading/unloading trailers, securing trailers on trains 5 Services (strappings to avoid open tarpaulins).

 Operating times The terminal is open 27 /7 and 365 days a year.  Price list 6 Charging Float rate depending on the volume, the number of trains and of trailers.

185

3.3. Terminal details of Italy

186

Brescia Terminal Intermodale RFI

Information Related to FC6

Number Heading text of Brescia Terminal Intermodale RFI chapter

Table of contents

 Terminal Brescia Scalo La Piccola Velocità Via Dalmazia, 50 - 25128 Brescia

 Terminal Owner Rete Ferroviaria Italiana S.p.A. (RFI) Address: Piazza della Croce Rossa, 1 - 00161 Roma, Italy 1 General information  Terminal Operator Terminali Italia srl – Mr Aldo Lo Curcio Responsible contact person: Nevio Olimpi E-mail:[email protected] Tel: +39 0263714320  Terminal character Intermodal, rail and road  Open access for all market operators Yes Terminali Italia is a Public Terminal, open for all Market Body;

 Legal requirements 2 Access conditions Contract;

 Technical conditions Swaps Bodies, Trailers, Continental cntr and Maritime, Tanks and Bulk; weight max 40.000 Tons/Unit; max langth of train is 500 mt; NO RID Tracks inside the Terminal

 Number and length of tracks 4 tracks on Brescia Station

 Storing capacity (m2) 25.000 mq

3 Terminal description  Equipment (cranes, ramps, stackers...) 2 Reach Steake

 Equipment capacity e.g. XX units per hour units/hour

 Connection to main railway infrastructure (name ofconnecting railway station, agreed timetabling for service trains if exists, ...) Brescia Scalo Station Capacity allocation  Process description

187

4 All process are to be defined with every customer

 Booking forms, time limits for booking, cancellation conditions, special requirements... Terminal is very flexible  List of provided services (storage, unloading, refuelling , maintenance,...) Handling, storage and refuelling

Services 5  Operating times (opening times, terminal / particular services) Mo÷ Fri 07:30 – 19:00 Sa 07:30 – 12:00

 Price list Official pricelist available on Terminali Italia website

6 Charging  Payment conditions (billing arrangements) Official conditions available on Terminali Italia website

188

Cervignano Interporto Alpe Adria

Information Related to RFC6

Number of Heading text Cervignano Interporto Alpe Adria chapter

Table of contents

 Interporto Cervignano del Friuli S.p.A. Viale Venezia, 22 – Cervignano del Friuli (UD) – Italy The terminal is located at 9 km from the A4 Motorway – Palmanova Exit and it is directly linked to the national rail lines

 Terminal owner (name, address, contact) Main stakeholder (82%): Friulia S.p.A. Via Locchi, 19 – 34143 Trieste, Italy Tel: + 39 040 31971 1 General information  Terminal operator (name, address, contact) Interporto Cervignano del Friuli S.p.A. Viale Venezia, 22 33052 Cervignano Del Friuli (UD), Italy E-mail: [email protected] E-mail: [email protected] Tel: +39 0431 373334 Tel: +39 0431 371050  Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal terminal, with rail and road connections  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes

 Legal requirements to access (contract, certificates, insurance...) All rail companies can access the terminal as long as they 2 Access conditions comply with national rail regulations requirements

 Technical conditions (type of handled intermodal units-ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...) ITUs, containers, bulk; max weight: D4 category

189

 Number and length of tracks No. 6 tracks , max length: 750 m; No. 2 tracks, max length 500 m  Storing capacity (m2) 160,000 m2

 Equipment (cranes, ramps, stackers...) No. 2 stackers, 6 forklifts, 2 overhead travelling cranes

 Equipment capacity e.g. XX units per hour 3 Terminal description 24 ITUs per hour

 Connection to main railway infrastructure (name of connecting railway station, agreed timetabling for service trains if exists, ...) The terminal is linked to the national railway line from the neighbouring Cervignano Scalo station (500 m)

 Technical map of terminal (position of tracks, siding Please see attachment)

 Process description The train is loaded/unloaded on the basis of an operation list determined by the terminal operator or by the client 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... Booking forms are mainly provided by the rail companies

 List of provided services (storage, unloading, refuelling , maintenance,...) storage, loading and unloading

5 Services  Operating times (opening times, terminal / particular services) It is usually from Monday to Thursday from 8.00 am to 5 pm and on Friday from 8.00 am to 4.00 p.m. Additional opening times are possible on the request basis.  Price list No official price list is present, the usual rate is 22€ for loading/unloading of empty containers and 32€ for loading/unloading of full containers. 6 Charging

 Payment conditions (billing arrangements) Payment at 30 days after the operations, at the end of the month

190

Milano Segrate RFI

Information Related to RFC6

Number of Heading text Milano Segrate RFI chapter

Table of contents

 Terminal Segrate (MI) Address: Viale Lazio Segrate 20090 Segrate (MI)/Rubattino Tangenziale est Milano, Italy

 Terminal owner (name, address, contact) Terminali Italia srl Gruppo Ferrovie dello Stato Italiane Piazza della Croce Rossa 1 00161 Roma

1 General information  Terminal operator (name, address, contact) Terminali Italia srl - Mr. Aldo Lo Curcio Responsible contact person: Nevio Olimpi E-mail: [email protected] Tel: +39 0263714320\ 0263716204

 Terminal character (factory siding, intermodal rail/ road/ water...) Intermodal, rail and road.  Open access for all market operators (RU, forwarder, logistic provider...): Yes / No / Partly (= under special conditions) Yes, Terminali Italia is a Public Terminal, open for all market bodies.

 Legal requirements to access (contract, certificates, insurance...) 2 Access conditions Contract

 Technical conditions (type of handled intermodal units-ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...) Swaps bodies, Trailers, continental cntr and maritime, Tanks and bulk; weight max 40.000/unit; max langth of train is 600 mt; RID all class, exclusided Radioactive 7.  Number and length of tracks 8 tracks inside of the treminal and the langth is 500 mt; 9 tracks outside the Terminal langth 650 mt;10 tracks on Station Milano Smistamento.

3 Terminal description  Storing capacity (m2) 160,000 m2  Equipment (cranes, ramps, stackers...) 7 reach Steackers cran

191

 Equipment capacity e.g. XX units per hour every RS 10 units per hours

 Connection to main railway infrastructure (name of connecting railway station, agreed timetabling for service trains if exists, ...) Milano Smistamento  Process description All processes are to be definined with every customer;

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements. All processes are to be definined with every customer; Terminal must be vey flexible  List of provided services (storage, unloading, refuelling , maintenance,...) Intermodal loading/unloading, maintenance, storage, 5 Services refuelling, handling.

 Operating times (opening times, terminal / particular services) Mo ÷ Fri 07:00 ÷ 19:30; Sa 07:00 ÷ 11:30  Price list Official pricelist available on Terminali Italia website 6 Charging  Payment conditions (billing arrangements) Official pricelist available on Terminali Italia website

192

Milano Smistamento FS Logistica

Information Related to RFC6

Number of Heading text Milano Smistamento FS Logistica chapter

Table of contents

 Terminal Milano Smistamento Address: Via Rivoltana, 50/A Scalo Merci FS Smistamento 20090 Segrate (MI), Italy A51 ring road East exit Linate

 Terminal Owner FS Logistica Spa Address: Via Valtellina, 7, Milano, Italy E-mail: 1 General information Tel: +39 02 608 0086

 Terminal Operator Terminali Italia srl – Mr Aldo Lo Curcio Responsible contact person: Nevio Olimpi E-mail: [email protected] Tel: +39 0263714320\ 0263716204  Terminal character Intermodal, rail and road  Open access for all market operators (RU, forwarder, logistic provider...): Terminali Italia is a Public Terminal, open for all Market Body;

 Legal requirements to access (contract, certificates, 2 Access conditions insurance...) Contract;

 Technical Requirements Swaps Bodies, Trailers, Continental cntr and Maritime, Tanks and Bulk; weight max 40.000 Tons/Unit; max langth of train is 560/450 mt; RID all class, exclusided Radioactive class 7  Number and length of tracks: 4 tracks inside the Terminal 14 tracks on Station Milano Smistamento

 Storing capacity (m2) Area is 46.000 mq

3 Terminal description  Equipment (cranes, ramps, stackers...) 4 Reach Steaker

 Equipment capacity e.g. XX units per hour 10 units/hour

 Connection to main railway infrastructure (name of connecting railway station, agreed timetabling for service

193

trains if exists, ...) Milano Smistamento Station  Process description All process are to be defined with every customer

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements. Terminal is very flexible  List of provided services (storage, unloading, refuelling , maintenance,...) Handling, storage and refuelling

5 Services  Operating times (opening times, terminal / particular services) Mo ÷ Fri 06:15 - 19:40 - Sa 06:15 - 11:30  Price list Official pricelist available on Terminali Italia website

6 Charging  Payment conditions (billing arrangements) Official conditions available on Terminali Italia website

194

Novara Boschetto FS Logistica Novara Terminal CÍM

Information Related to RFC6

Number Novara Boschetto FS Logistica of Heading text chapter

Table of contents

 CIM SpA Address: Via Carlo Panseri 118 28100 Novara, Italy Motorway A4 Turin-Milan–Exit: Novara Est For more information please visit www.cimspa.it

 Terminal Owner CIM SpA Address: Via Carlo Panseri 118 28100 Novara, Italy

1 General information  Terminal operator Eurogateway Srl Address: Via Carlo Panseri 132 28100 Novara, Italy E-mail: [email protected] Tel: +39 0321 478090 Tel: +39 0321 697290 For more information please visit www.eurogateway.it

 Terminal Character Intermodal rail/road terminal  Open access for all market operators: YES (operators are usually companies operating cargo trains)

 Legal requirements to access: 2 Access conditions contract

 Type of handled intermodal units Containers 20” – 45”,swap bodies, trailers, tanks Allowed RID classes: 1,2,3, 4.1, 4.2, 4.3, 5.1, 5.2, 6.1, 6.2, 8,9  Number and length of tracks 7 x 600÷650 m

 Storing capacity Approx. 1300-1500 UTI/day (2327-2685 TEU/day)

3a Terminal description  Equipment 7 reach stackers

 Equipment capacity 7x 45 t /12 handlings per hour

195

 Connection to main railway infrastructure Novara Boschetto (RFI)

 Technical map of terminal See attachment and please visit www.eurogateway.it

 Process description Booking + pick up or delivery

 Time limits for booking 4 Capacity allocation Booking not before 48 h from time of pick up or deliver

 Booking forms, cancellation conditions, special requirements All information on www.eurogateway.it , online services upon registration  List of provided services Unloading, loading, handling of dangerous goods, storage, control of reefers, IT System for the handling of traffic inside the terminal (W.O.L.T.), repair and maintenance services for rail wagons and UTI. 5 Services

 Operating times CIM Terminal: Mo to Fr H24, Sat 00.00 - 13.00, Sun 7.00- 12.30 trains only Boschetto Terminal: Mo to Fr 5.00-22.00, Sat 7.00 - 12.30, Sun closed  Price list please contact Eurogateway Srl for the price list 6 Charging  Payment conditions (billing arrangements) please contact Eurogateway Srl

196

Padova Terminal intermodale FS logistica Padova Terminal intermodale Interporto

Information Related to RFC6

Number Padova Terminal intermodale FS logistica of Heading text Padova Terminal intermodale Interporto chapter

Table of contents

Interporto Padova is an intermodal platform that integrates two transport modes: road and rail. The intermodal area includes about 350,000 square meters of Railway Infrastructure and Terminal. It provides to the logistics and transport operators all the services necessary to the exercise of any combined road – rail traffics, operating 24 hours a day.

In these structures, containers, swap bodies and semi-trailers are shifted from trucks to wagons and vice versa. The operations of loading and unloading are carried out with 15 reach stackers (8 for full and 7 for empty units) able to lift containers up to 40 tons.

A software efficiently and quickly executed all the handling operations. In addition to the areas of loading and unloading, the terminals have large storage yards for full and empty containers whose depot management will be integrated soon in the management IT system.

Interporto Padova Spa manages both the existing Terminals: the “Nuovo Grande Terminal” owned by the company itself and the “Terminal FS Logistica”, thanks to a 1 General information lease agreement signed with Gruppo Ferrovie dello Stato Italiane (Italian Railways Group).

 Nuovo Grande Terminal Address: Corso Spagna 14 35127 Padova, Italy  Terminal FS Logistica Address: Corso Spagna 14 35127 Padova, Italy

The terminal area is situated in the south side of the Padova (Padua) Industrial Zone. Very close links to the motorways through the Padova East toll gate on the A4 motorway (Turin – Milan – Venice – Trieste) and the Padova Z.I. – Interporto toll gate on the A13 motorway (Padua – Bologna)

 Terminal Owner Nuovo Grande Terminal: Interporto Padova Spa Address: Galleria Spagna, 35 35127 Padova Contact: Mr Francesco Bacarini– Sales executive

197

Terminal FS Logistica: FS Logistica Spa Address: Piazza della Croce Rossa, 1 Roma

 Terminal operator Interporto Padova Spa Address: Galleria Spagna, 35 35127 Padova Contacts: Mr Giuseppe Lavoradori – Operations E-mail: [email protected] Tel: +39 049 7621811 Mr Alberto Novello – Commercial area E-mail: [email protected] Tel: +39 049 8286111  Terminal Character Intermodal rail/road terminal  Open access for all market operators: YES

 Legal requirements to access: contract, certificates, 2 Access conditions insurance, and all other documents provided by law

 Technical conditions: handling of ISO containers/ continental containers/ trailers/swap-bodies/ tanks; max. weight/ length of trains:1600 tons/680 mt shipments: domestic and international; allowed RID classes: all excepted 1.7.6.2 classes  Number and length of tracks 16 tracks from 400 to 700 mt long;

 Storing capacity 1) 200.000 mq; 2) 70.000 mq

 Equipment 8 stackers for load containers and 7 stackers for empty units;

 Equipment capacity 3 Terminal description 10 nits full cnt/hour; 13 units empty cnt/hour;

 Connection to main railway infrastructure The site is linked to the railway along a 4 km electrified line that links the Container Terminal and goods station in Padova Interporto with Padova Central Station, which is then linked to the main national and international networks

 Timetabling for service trains: see Annex 1

 Technical map of terminal : see Annex 2  Process description 1) pre-booking of CNTR entry/exit (on web for customers connected to our IT platform named “Gestione Deposito” (GD) 4 Capacity allocation enabling the depot management; 2) gate IN/gate OUT; 3) interchange forms issuing; 4) rail/road ;

198

1) pre-booking If CNTR entry by truck, the pre- insertion of the information in GD of identification it must be made, depending on the case : • directly by the user, when connected in GD ; By the staff of the gate of Interporto Padova, in the case of users connected to the GD .

2) Gate IN The information to be inserted before the arrival of the CNTR are: Information identifying CNTR (number, size , ...); CNTR destination and the seal number ( if load) ; CNTR owner ; identification data carrier (plate, driver , ...).

CNTR entry via train If CNTR is arriving by train, the Multimodal operator must inform the staff of the railway office of Interporto Padova of the train departs by sending in their own format , a "Manifest of arrival" containing the combination wagons / containers and information regarding : Information identifying CNTR (code / number , size , ...); CNTR owner ; identification data carrier ( wagon , ...); any billing information .

3) CNTR check If the check is positive , “ Interchange” form is printed and signed by Gate personnel and consigned to the driver who has to countersigned it. At this point, the truck is allowed to ' entry . In case of CNTR via train , is carried a visual inspection of correspondence between the data of the CNTR / wagons transported compared to the “Manifest of arrival” form. In general, for all the CNTR entry a control should be made for good condition and in case of CNTR loaded, it should be checked the integrity and the correct number of the seal.

4) Communication to operators for the load Once confirmed the entry of the CNT, the software automatically sends to the terminal of the crane a message containing : activities to be performed (loading, unloading); Information identifying CNTR ; destination information or useful to the positioning . Unloading and positioning CNTR The unloading of CNTR must be made by the crane operators in relation to the indications given in the message described above, the positioning of CNTR in the yard must be made according to the characteristics of the container: - full or empty; - import or export; - size and type; - destination; - any discharge lists for withdrawal in a fixed order ; - any other information (ADR, to be fumigated, set aside. Once positioned the CNTR , the crane operator should confirm the operation carried out successfully, also in the software by

199 inserting the coordinates of the position , at which point the software automatically updates the board CNTR that from this moment will be present in the yard

2) Gate OUT a) By road If the CNTR exit is performed by truck the data for incoming trucks for the withdrawal of CNTR must be pre- booking in GD through pre booking via web for connected user and pre booking at gate Interporto for others. Upon arrival of the truck, the staff at the Gate must provide the following controls: corresponding data of truck identification; CNTR data identification( empty and full ) corresponding to Bill of loading of the carrier; presence of CNT in the yard.

In case of withdrawal of CNTR empty , the data for the pre CNTR input may be related to a type of CNTR ( size, type, height ) with no indication of the specific number , the staff of the Gate has only to check the correspondence of the data of the owner of the CNTR to be withdrawal, already inserted into the GD in the form of reservation. Once the checks listed above have been successfully performed, the Gate staff informs the crane operator, inserting the data in the GD system , about the plate number of the truck that will carry out the withdrawal . Then, the crane operator who receives the information of the operation to carry out, confirms it on the GD in order to allow the subsequent controls in exit. In case of withdrawal of a specific CNTR , the crane operator must only confirm the operation, in case of withdrawal of a specific type of CNTR , the crane operator must also indicate the CNTR’s identification number. When the truck arrives at the gate, the staff must check that: the procedure performed by the crane operator has been completed; The data of the CNTR owner’s and CNTR unit coincide with the ones added to GD. If the control is positive, the staff of Gate prints and signs the form " Interchange " which is given to be countersigned to the driver. At this point, the truck is allowed to exit. b) By rail The exit of CNTR via train must firstly be advanced by the "Manifest of departure", which is transmitted to the Multimodal Operator Padua with the ' indication of containers to be loaded. Upon arrival of the wagons to be loaded , the staff of the Railway check the congruency between type and number of wagons and CNTR to load. The crane operator load the CNTR on the wagons following the copy of the Manifest of Departure received from the staff of the Railway office. Upon completion of the loading of the CNT on the train, the railway office staff must:

200

physically check the correspondence of the matching wagons / CNTR to the ones listed in the manifest of departure; check that the CNTR have been loaded properly according to the safety standards (e.g exact positioning of the corner blocks on the respective twist and proper closing of the doors of the loaded CNTR ) ; confirm, by sending copy of the Manifest of departure both to the Multimodal Operator and to the local office of Italian Railways ( RFI ) that the loading of the train has been completed; register the exit of the CNTRs by entering the operation in the software Gestione Deposito, noting the identification code of the train and the number of the respective wagon .

 Booking forms, cancellation conditions, special requirements all these conditions depend on MTO’s indications referred to its trains.  List of provided services: Management of rail intermodal terminals which are linked every day to the main Italian and foreign ports. Storage and handling of containers and intermodal loading units. Handling, loading and unloading of standard goods wagons. 5 Services Construction of modified and special containers. PTI, washing and management of refeer containers. Repairs, sells and hires new and used containers.

 Operating times: Trains services: 24h/day Gate: Mon-Fri 07.00/20.30 Sat 07.00 12.00  Price list: The price list is confidential, not available for publication.

6 Charging  Payment conditions (billing arrangements): Payment conditions are confidential, not available for publication.

201

Sito Interporto di Torino

Information Related to RFC6

Number of Heading text Sito Interporto di Torino chapter

Table of contents

 Sito Interporto di Torino Address: Tang. Sud Km. 20.500 Prima Strada 2-10043 Orbassano Motorway Torino Sud, Exit: SITO, Italy

For more information please visit www.sitospa.it

 Terminal Owner 1 General information SITO SpA E-mail: [email protected] Tel: +39 011.397.59.75  Terminal operator SITO SpA E-mail: [email protected] Tel: +39 011.397.59.75  lntermodal rail/road terminal  Open access for all market operators YES (operators are usually companies operating cargo trains)

 Legal requirements to access 2 Access conditions Contract

 Type of handled intermodal units containers 20" - 45", swap bodies, trailer. Allowed RID classes: to be defined  Number and length of tracks 2 x 600 -i- 650 m

 Storing capacity (m2) approx. 1300 - 1500 UTI a day (TEU 2327-2685)

 Equipment 3 reach stackers

 Equipment capacity 3 Terminal description 3 x 45 till 2 handlings per hour

 Connection to main railway infrastructure Torino -Orbassano (RFI). (See below)

 Number and length of tracks 4 x 400 -;- 600 m

 Storing capacity (m2) approx. 700 UTI/day (TEU 1.253)

202

 Equipment 3 reach stackers

 Equipment capacity 3 x 45 till 2 handlings per hour

 Connection to main railway infrastructure Torino -Orbassano (RFl) See below  Process description booking + pick lip or delivery

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements all information on www.sitosl2a.il  List of provided services unloading, loading, handling of goods, storage, control of reefers, IT System for the handling of traffic inside the terminal (WOLT), repair and maintenance services for rail 5 Services wagons and UTI

 Operating times: SITO's Terminal Mo to Fr 7.00 am - 7.00 pm  Price list please contact SITO SpA 6 Charging  Payment conditions (billing arrangements) Please contact SITO SpA

203

Torino Orbassano Terminal AFA

Information Related to RFC6

Number of Torino Orbassano Terminal AFA Heading text chapter

Table of contents

 Torino Orbassano Terminale Autostrada Ferroviaria Alpina (AFA) Address: Via Rovereto 14 10136 Torino, Italy E-mail: [email protected] Tel: +39 011 352530 www.ferralpina.com  Terminal Owner Rete Ferroviaria Italiana S.p.A. (RFI) Address: Piazza della Croce Rossa, 1 - 00161 Roma, Italy

 Terminal Operator FS Logistica – Mr Fabrizio Di Lernia Address: 265, Strada Del Portone, Orbassano, Torino 10043, Italy E-mail: [email protected] Tel: +39 011 901 3117  Terminal Character Intermodal, rail and road

1 General information

 Close to the AFA terminal, there is a multimodal terminal Torino Orbassano Terminal Intermodale operated by Terminali Italia (FS group), where containers and swap bodies are loaded / unloaded. AFA (Autostrada Ferroviaria Alpina) is a subsidiary, equally owned by Trenitalia and SNCF- Participations. Its main aim is to market the rolling road service (both accompanied and not accompanied) from the intermodal terminal in Torino Orbassano to the one in Bourgneuf-Aiton in France, and vice versa.

204

 Open access for all market operators: Yes, Terminale AFA is a Public Terminal, open for all Market Body;

 Legal requirements to access: Contract;

 Technical conditions:

Allowed types of trailers:

 Tankers;

 Lorries;

 Containers;

 Powdery Tank Semi-trailer; 2 Access conditions  Hazardous goods except explosives (class 1) and radioactive products (class 7)

2 types of services are avaiable:

 Accompanied service for truck (truck and trailers and driver);

 Unaccompanied service: the trailer is loaded by a jockey service to check the gauge and loading / unloading.

There are constraints regarding mass (1 200 t max) and gauge (3.97 m, GB1). Maximum authorized weight per trailer is 38 tons.

The lenght of each train (11 Lohr Industries wagons) is 391 m, the total length of the train including the drivers wagon and the 2 locomotives is 431 m.

 Number and length of tracks 1 track Parking space along the track plus additional parking space for trailers

 Storing capacity

3 Terminal description  Equipment No crane, 28 Lohr Industry ramps (only 22 are currently used) used to unload / load trailers & semi-trailers with the Lohr technology

 Equipment Capacity It is equipped in order to manage rail motorway trains (AFA),

205

about 20 to 205 units / hour (semi trailers & trailers)

 Connection to main railway infrastructure Torino Orbassano Station

 Terminal Map

 Process Description Platform abides by SNCF loading rules

4 Capacity allocation  Booking forms, cancellation conditions, special requirements Commercial matters are run by the AFA sales representatives  List of service

5 Services  Operating Hours from 3:30 am on Monday to 6:00 am on Saturday  Price List Prices and conditions are decided by the AFA sales services. It is fixed according to the number of trailers / year, the type 6 Charging of goods (hazardous goods), the time of the train, and operations (gauge, loading, unloading).

 Payments Conditions (Billing Agreements)

206

Torino Orbassano Terminal Intermodale

Information Related to RFC6

Number of Torino Orbassano Terminal Intermodale Heading text chapter

Table of contents

 Torino Orbassano Terminal Intermodale Address: Strada del Portone 265 Scalo Merci FS 10043 Orbassano (TO), Italy

 Terminal Owner Rete Ferroviaria Italiana S.p.A. (RFI) 1 General information Address: Piazza della Croce Rossa, 1 - 00161 Roma, Italy  Terminal Operator Terminali Italia srl – Mr Salvatore D’Onofrio E-mail: [email protected] Tel: +39 0263714320  Terminal Character Intermodal, rail and road  Open access for all market operators: Yes, Terminali Italia is a Public Terminal, open for all Market Body;

 Legal requirements to access: Contract; 2 Access conditions  Technical conditions: Swaps Bodies, Trailers, Continental cntr and Maritime, Tanks and Bulk; weight max 40.000 Tons/Unit; max langth of train is 550 mt; RID all class, exclusided Radioactive class 7  Number and length of tracks 4 tracks inside the Terminal 10 tracks on Torino Orbassano Station

 Storing capacity Area is 50.000 mq

3 Terminal description  Equipment Reach Steaker

 Equipment Capacity 10 units/hour

 Connection to main railway infrastructure Torino Orbassano Station  Process Description

4 Capacity allocation all process are to be defined with every customer

207

 Booking forms, cancellation conditions, special requirements Terminal must be very flexible  List of service Handling, storage and refuelling 5 Services  Operating Hours Mo ÷ Fri 07:00 - 13:00 / 13:30 – 19:30  Price List Official pricelist available on Terminali Italia website 6 Charging  Payments Conditions (Billing Agreements) Official conditions available on Terminali Italia website

208

Trieste Campo Marzio - Raccordo autorità portuale

Information Related to RFC6

Number of Heading text Trieste Campo Marzio - Raccordo Autorità Portuale di Trieste chapter

Table of contents

 Trieste Campo Marzio – Raccordo autorità portuale Address: Via K.L. Von Bruck 3, 34144 Trieste, Italy E-mail: [email protected] Tel: +39 040–6731

 Terminal Owner Rete Ferroviaria Italiana S.p.A. (RFI) and Trieste Port Authority

Rete Ferroviaria Italiana S.p.A. (RFI) Address: Piazza della Croce Rossa, 1 - 00161 Roma, Italy

Autorità Portuale di Trieste (Trieste Port Authority) Via L. Von Bruck, 3 34144, Trieste, Italy www.porto.trieste.it

Freight Terminals and private operators in the Port of Trieste:

1. Terminal Miscellaneous goods Adria Terminal: 1 General information C. Steinweg - G.M.T. S.r.l. (http://www.genoametalterminal.com http://www.steinweg.com) Saipem S.p.A. (http://www.saipem.com)

2. Terminal Ro-Ro, Riva Traiana: Samer Seaports & Terminals S.r.l. (http://www.samer.com)

3. Terminal Fruit, Molo V: Terminal Frutta Trieste S.p.A. (http://www.tft.it)

4. Terminal Miscellaneous goods, magazzini 58-66: Romani & C. S.p.A. Tergestea S.r.l. (http://www.tergestea.net)

5. Terminal Multipurpose General Cargo, Molo VI: Europa Multipurpose Terminals (EMT) S.r.l. (http://www.emterminals.com)

6. Terminal Cereals, radice Molo VI: Grandi Molini Italiani S.p.A. (http://www.grandimolini.it)

209

7. Terminal Polo Caffè, radice Molo VII: Pacorini Silocaf S.r.l. (http://www.pacorini.it)

8. Terminal Ro-Ro, Mooring 47-48: Trieste Intermodal Maritime Terminal (T.I.M.T.) S.r.l.

9. Terminal Containers Molo VII Trieste Marine Terminal (T.M.T.) S.r.l. (http://www.trieste- marine-terminal.com)

10. Terminal Multipurpose timber terminal: - General Cargo Terminal S.p.A. (http://www.gcterminal.com)

11. Terminal Steelworks Ferriera: Siderurgica Triestina Srl

12. Terminal Oil: S.I.O.T S.p.A. (http://www.tal-oil.com)

13. Terminal Oil Products: Depositi Costieri S.p.A.

14. Terminal waterway (cements, industrial products, chemicals, frozen): Italcementi S.p.A. (http://www.italcementi.it) Alder S.p.A. (http://www.alder.it) Frigomar S.r.l. (http://www.frigomartrieste.com) Cimsa Adriatico S.r.l. (http://www.cimsa.com.tr/en- US/default.aspx) Ortolan Mare S.r.l. (http://www.ortolancostruzioni.it)

15. Terminal Oil Products, Aquilinia: Shell Italia S.p.A. (http://www.shell.it)

 Terminal Character All freight terminals operate ship-train-road traffic.

For its legal status the port of Trieste has two regimes: the traditional one and the free port one. Some advantages of the Free Port of Trieste are:  non-discriminatory right of entry of ships and cargo;  prohibition on customs intervention entering and leaving at the free-zone crossing points;  no customs formalities to be completed and no customs duties to pay or to guarantee as long as the goods stay in 2 Access conditions the Free Zones;  lower port dues than other Italian ports;  simplified transit for commercial vehicles directed abroad that are in transit to/from the Port of Trieste. The port allows open access for all market operators (RU, forwarder, logistic provider...) All typologies of trains are managed: Container block trains, bulk, RO-RO, special cargos, swap bodies, tanks, etc for all types of traffic: containerized cargo, fruit and vegetables, coffee, grains, metals,

210

engines, steel and chemical products, timber, dry and liquid bulk, crude oil and derivative products, etc

Campo Marzio rail terminal is the main terminal in Trieste port, where all operations for freight trains concentrate.

All freight terminals are connected by the port rail network to Campo Marzio; total port network length is 70 km.

Adriafer Srl, which is the sole operator permitted by Trieste Port Authority to move rail wagons and trains within the Port of Trieste, manages the wagons and the shunting in Campo Marzio organising its operations with the rail freight carriers and all the terminal operators within the Port.

 Number and length of tracks Total number of tracks is 29 3 Terminal description

 Storing capacity The rail terminal has no storing capacity.

 Connection to main railway infrastructure Campo Marzio is connected to Venice and Udine-Wien railway lines (via the double track line "Linea di cintura"), to Trieste Aquilinia, to Villa Opicina. All tracks are electrified and the maximum length is more than 500m,

4 Capacity allocation

The service is provided 365 days a year. 5 Services

6 Charging

211

Venezia Marghera-raccordi portuali

Information Related to RFC6

Number of Heading text Venezia Marghera-raccordi portuali chapter

Table of contents

 Porto di Venezia – Port of Venice Address: Santa Marta, Fabbricato 13 30123 Venice, Italy E-mail: [email protected] Tel: +39 041 5334111 Web: http://www.port.venice.it

 Terminal owner Venice Port Authority Unique Rail Manager for Port Area: ERF - Esercizio Raccordi Ferroviari di Porto Marghera S.p.A. Via della Pila 119/5, 30175 Marghera Venezia, Italy E-mail: [email protected] Tel: +39 041 921950 Web: www.erf-spa.it

 Terminal operator (private) A.F.V. Beltrame Alcoa Trasformazioni S.r.l. Cereal docks marghera Decal S.p.A. E.N.I. Divisione R&M 1 General information Enel Produzione S.p.A. Grandi Molini Italiani Idromacchine S.r.l. Ilva S.p.A. Interporto di Venezia CIA Mecnafer Multiservice S.r.l. Consorzio Venezia nuova Petroven San Marco Petroli Simar Società Metalli Marghera Transped Terminal Intermodale Venezia S.p.A. Terminal Rinfuse Italia s.p.a. Vecon S.p.A. Jerich Italia - FIN PREO Demont s.r.l. Fincantieri S.p.A. Sirma S.p.A. Pilkington Intermodale Marghera srl Cereal Docks

212

Vgs Veneta gestione servizi

 Terminal character all the terminals manage rail/road/water mode of transport.  Process description: Terminals are open to all market operators both commercial and industrial terminals, are connected to the rail line by the “Marghera Scalo” station. The local railway company (ERF) manage the wagons in the Port of Venice Area: from and to the different terminals to /from the “Marghera Scalo” station. Here the train operation companies take the train in charge. 2 Access conditions Therefore the only entry point into the rail network is “Marghera Scalo” station, and train operation companies arrives just to that point. ERF local railway company acts as local unique railway manager. All typology of train are managed: Container block trains, bulk, RO-RO, special cargos, swap bodies, tanks, etc Max length is 750m, Max weight 22,5 t axis.  Number and length of tracks Main railways park has a total of 30 tracks of which 9 tracks 3 Terminal description are electrified and belongs to “Marghera Scalo” station. Total network length is about 30 km

213

214

4 Capacity allocation Station track allocation is managed by RFI 5 Services from Monday 6am to Saturday 9pm  Prices to move a wagon between Marghera Scalo and a terminal: 6 Charging from 30 to 45 € for load wagon

215

Verona QE-raccordo ZAI

Information Related to RFC6

Number Verona QE – Raccordo ZAI of chapter Heading text Table of contents  Verona Quadrante Europa Address: via Sommacampagna 61, 37137 Verona, Italy A22 motorway exit Verona North ring road direction South E-mail: [email protected] Tel: +39 045 862 2060

 Terminal Owner Rete Ferroviaria Italiana S.p.A. (RFI) / Terminal Gate

Address: Piazza della Croce Rossa, 1 - 00161 Roma, Italy

 Terminal Operator 1 General information Terminali Italia srl – Mrs Federica Ceccato Address: Via Sommacampagna Quadrante Europa 37, 37137 Verona, Italy E-mail: [email protected] Tel: +39 0458624422, +39 348 3622236

 Terminale Character Intermodal, rail and road  Open access for all market operators Yes, Terminali Italia is a Public Terminal, open for all Market Body

 Legal requirements to access Contract

2 Access conditions  Technical conditions Swaps Bodies, Trailers, Continental cntrand Maritime, Tanks and Bulk; weight max 40.000 Tons/Unit; max langth of train is 600/650 mt; RID all class, exclusided Radioactive class 7  Number and length of tracks 15 tracks inside the Terminal (10 tracks langth 550 mt + 5 langth 700 mt.) 24 tracks on Station Verona Quadrante Europa

 Storage Capacity Area is 230.000 mq

3 Terminal description  Equipment 7 Portal Crane, 5 Reach Steaker and 4 mafi

 Equipment capacity

216

50 units/hour

 Connection to main railway infrastructure Verona Quadrante Europa Station  Process Description all process are to be defined with every customer

4 Capacity allocation  Booking forms, cancellation conditions, special requirements Terminal must be very flexible  List of services Handling, storage and refuelling 5 Services  Operating hours Mo 00:15 ÷ Sa 11:30  Price List Official pricelist available on Terminali Italia website 6 Charging  Paymeny conditions Official conditions available on Terminali Italia website

217

3.4. Terminal details of Slovenia

218

Celje tovorna

Information Related to RFC6

Number of Heading text Celje tovorna chapter

Table of contents

 SŽ-Celje tovorna Address: Kidričeva ulica 34, 3000 Celje, Slovenia E-mail: [email protected] Tel: +386 03 293 33 42, +386 03 293 32 92

 Terminal owner (name, address, contact) Republika Slovenija 1 General information  Terminal operator (name, address, contact) SŽ - Infrastruktura, d.o.o. Address: Kolodvorska 11, Ljubljana, Slovenia

 Terminal character (factory siding, intermodal rail/ road/ water...) freight rails  Open access for all market operators (RU, forwarder, logistic provider...): Yes

 Legal requirements to access (contract, certificates, insurance...) Railway Network Programme of Slovenia 2 Access conditions

 Technical conditions (type of handled intermodal units- ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. weight/ length of trains/ shipments, allowed RID classes...) Described in Railway Network Programme and Station management order on public railway infrastructure.  Number and length of tracks Described in Station management order, Technological working process and Proceedings.

 Storing capacity (m2) Described in Station management order, Technological working process and Proceedings. 3 Terminal description  Equipment (cranes, ramps, stackers...) Described in Station management order, Technological working process and Proceedings.

 Equipment capacity e.g. XX units per hour Completion 2 trains per hour.

219

 Connection to main railway infrastructure All three terminals are connected to railway station Celje

 Technical map of terminal (position of tracks, siding areas...) Yes  Process description Described in documents of Infrastructure manager and Railway Undertakings (Station management order, Technological working process and Proceedings). 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... bilateral harmonized plan between Railway Undertakings and Terminal manager.  List of provided services (storage, unloading, refuelling , maintenance,...) Completion of trains 5 Services  Operating times (opening times, terminal / particular services) non stop  Price list at contract basis 6 Charging  Payment conditions (billing arrangements) at contract basis

220

Port of Koper

Information Related to RFC6

Number of Heading text Port of Koper chapter

Table of contents

 Luka Koper, d. d. Address: Vojkovo nabrežje 38, SI - 6501 Koper, Slovenia Tel: +386 5 6656 100 E-mail: [email protected] Website: www.luka-kp.si GPS: 45°33' N and 13°44' E.

 Terminal owner (name, address, contact) Republika Slovenija

 Terminal operator Luka Koper, d. d. 1 General information Address: Vojkovo nabrežje 38, SI - 6501 Koper, Slovenia Tel: +386 5 6656 100 E-mail: [email protected] Website: www.luka-kp.si

 Terminal character The port in numbers 280 ha of port area, 12 specialized terminals, 3.4 km of operative quays, 26 berths 30 km of railway tracks serving and connecting all terminals, 17.9 million tons of maritime throughput (2012).

221

 Open access for all market operators (RU, forwarder, logistic provider...): Yes. 2 Access conditions  Legal requirements to access (contract, certificates, insurance...) Contract The Port of Koper is a multi-purpose port, equipped and prepared for handling and warehousing all types of goods. The basic port activity is carried out at specialised terminals, which are technically and organisationally suitable for handling and warehousing of specific cargo groups. More information:

http://www.luka-kp.si/eng/terminals-and-cargo

On this page you can find all technical data’s for each terminal.

Container and Ro-Ro Terminal "Experience our flexibility" At the terminal we handle all kinds of ordinary, frigo, LCL and other special containers.

Terminal in numbers:

Quayside: 596 m Max. allowed draft: 11.4 m Berths: 3 Railway tracks: 2 x 671 m, 1 x 647 m, 2 x 270 m 3 Terminal description Storage capacity at a time: 26,500 TEU Reefer electrical outlets: 340 Total terminal area: 270,000 m2 Stacking area: 180,000 m2 Est. total annual capacity (2012): 750,000 TEU

Equipment: Lift capacity (ton) 4 STS panamax cranes 40 (40 feet) / 45 (2 x 20 feet) under spreader 4 STS post-panamx cranes 51 (40 feet) / 65 (2x20 feet) under spreader 16 Rubber - Tyred G/C (storage area) 2 x 35; 14 x 40 2 Rubber - Tyred G/C (railway tracks) 1 x 35; 1x 40 11 Reach Stackers 42-45 6 ECH - empty container handler 7-9

Equipment No. Yard Trucks 46 Trailers 49 Ro-Ro Trucks 3 Ro-Ro Trailers 3

4 Capacity allocation

222

In addition to handling and warehousing, we also perform various additional services at the terminal:

 stripping and stuffing of containers (CFS)

 disinfection

 chemical cleaning and steam cleaning of containers

 PTI or pre-trip inspection of containers

Container repairs and other maintenance service for containers. We also organise a complete service for reefer containers :

 24-hour monitoring of reefer container condition, which includes temperature checks two times a day

 in addition to container repairs we also offer repair services for reefer containers' electronic devices

5 Services  assembly / disassembly of gen-sets

 maintenance & repair of gen-sets

 filling with gas and fuel

 PTI or pre-trip inspection of containers and gen-sets

 Spare part supply.

We are qualified for handling project cargo and heavy lifts; we also handle boats. Terminal connections: The terminal has regular weekly lines to the Far East and is connected via feeder services with important HUB ports in the Mediterranean (Gioia Tauro, Malta, Piraeus, Haifa, Taranto), which have regular connections with all continents in the world. Regular railway connections are established with the most important trade centres in Central and Eastern Europe.

For container terminal:

http://www.luka-kp.si/eng/terminals-and-cargo/container-and-ro-ro- terminal 6 Charging for other terminals:

http://www.luka-kp.si/eng/terminals-and-cargo

223

Koper tovorna

Information Related to RFC6

Number of Heading text Koper tovorna chapter

Table of contents

 SŽ-Koper tovorna - Koper, d.d. Address: Vojkovo nabrežje 38, 6501 Koper, Slovenia E-mail: [email protected] Tel: +386 05 296 41 43

 Terminal owner (name, address, contact) Republika Slovenija 1 General information

 Terminal operator SŽ - Infrastruktura, d.o.o. Kolodvorska 11, Ljubljana

 Terminal character freight rails  Open access for all market operators (RU, forwarder, logistic provider...): Yes.

 Legal requirements to access (contract, certificates, 2 Access conditions insurance...) Railway Network Programme of Slovenia

 Technical conditions Described in Railway Network Programme and Station management order on public railway infrastructure.  Number and length of tracks Described in Station management order, Technological working process and Proceedings.

 Storing capacity (m2) Described in Station management order, Technological working process and Proceedings.

 Equipment (cranes, ramps, stackers...) 3 Terminal description Described in Station management order, Technological working process and Proceedings.

 Equipment capacity e.g. XX units per hour Completion 5 trains per hour.

 Connection to main railway infrastructure Station Koper tovorna

 Technical map of terminal (position of tracks, siding areas...)

224

Yes  Process description Described in documents of Infrastructure manager and Railway Undertakings (Station management order, Technological working process and Proceedings). 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... bilateral harmonized plan between Railway Undertakings and Terminal manager.  List of provided services (storage, unloading, refuelling , maintenance,...) Completion of trains 5 Services

 Operating times non stop  Price list at contract basis 6 Charging  Payment conditions (billing arrangements) at contract basis

225

Ljubljanan Moste Kontejnerski terminal

Information Related to RFC6

Number of Heading text Ljubljanan Moste Kontejnerski terminal chapter

Table of contents

 Container terminal Ljubljana Address: Letališka 14, 1000 Ljubljana, Slovenia E-mail: [email protected], roman.bricelj@slo- zeleznice.si Tel: +386 1 29 13 136

 Terminal Owner SLOVENSKE ŽELEZNICE-TOVORNI PROMET d.o.o., 1 General information Address: Kolodvorska 11, 1000 Ljubljana, Slovenia

 Terminal Operator SLOVENSKE ŽELEZNICE-TOVORNI PROMET d.o.o., Address: Kolodvorska 11, 1000 Ljubljana, Slovenia

 Character of terminal Intermodal rail/ road  Open access for all market operators (RU, forwarder, logistic provider...) Yes 2 Access conditions

 Legal requirements to access Contract  Number and length of tracks 4 tracks (500m each)

 Storing capacity 30.000m2

 Equipment 3 Terminal description Gantry crane, 2 stackers, 2 forklifts

 Equipment capacity 45 tons

 Connection to main railway infrastructure Station Ljubljana Moste 4 Capacity allocation

226

 List of provided services Storage, unloading, door delivery, stuffing

5 Services  Operating times From Monday to Friday from 07:00 – 17:00 Saturday from 07.00 – 12:00  Price list On internet website of Slovene railway 6 Charging  Payment conditions Contract

227

Ljubljana-Zalog- marshalling yard

Information Related to RFC6

Number of Heading text Ljubljana-Zalog- marshalling yard chapter

Table of contents

 Ranžirna postaja Ljubljana Zalog Address: Zaloška cesta 214b, Ljubljana, Slovenia E-mail: [email protected] Tel: +386 01 2913 835

 Terminal owner (name, address, contact) Republika Slovenija 1 General information

 Terminal operator SŽ - Infrastruktura, d.o.o. Kolodvorska 11, Ljubljana

 Terminal character Rail freight  Open access for all market operators (RU, forwarder, logistic provider...): Yes

 Legal requirements to access (contract, certificates, 2 Access conditions insurance...) Railway Network Programme of Slovenia

 Technical conditions Described in Railway Network Programme and Station management order on public railway infrastructure.  Number and length of tracks Described in Station management order, Technological working process and Proceedings.

 Storing capacity (m2) Described in Station management order, Technological working process and Proceedings

 Equipment (cranes, ramps, stackers...) 3 Terminal description Described in Station management order, Technological working process and Proceedings.

 Equipment capacity e.g. XX units per hour Shunting process 300 wagons per hour.

 Connection to main railway infrastructure Station Zalog;

 Technical map of terminal (position of tracks, siding

228

areas...) Yes  Process description Described in documents of Infrastructure manager and Railway Undertakings (Station management order, Technological working process and Proceedings). 4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements... bilateral harmonized plan between Railway Undertakings and Terminal manager.  List of provided services Shunting 5 Services  Operating times non stop  Price list At contract basis 6 Charging  Payment conditions (billing arrangements) At contract basis

229

3.5. Terminal details of Croatia

*Effective 10 November 2016.

230

Rijeka Sea Port Bakar - Dry Bulk Cargo Terminal

Information Related to RFC6

Number of Heading text Rijeka Sea Port – Bakar Dry Bulk Cargo Terminal chapter

Table of contents

 Pier Podbok Dry Bulk Cargo Terminal – Bakar Address: Veberova ulica1628 51222 Bakar, Croatia E-mail: [email protected] Tel: +385 51 496 530 Latitude: 45º 19' 30' N Longitude: 14º 26' 54' E

 Terminal owner Republic of Croatia

1 General information  Terminal operator Luka Rijeka d.d. Address: Riva 1 51 000 Rijeka, Croatia E-mail: [email protected] Tel: +385 51 496 530

 Terminal character intermodal rail/sea terminal of bulk cargo (handling/ warehousing coal, iron ore, bauxite and other bulk cargo)

 Open access for all market body (RU, forwarder, logistic provider...) Yes  Legal requirements to access Access contract  Technical conditions Dry bulk cargo only 2 Access conditions More information at: http://www.lukarijeka.hr

http://www.lukarijeka.hr/_Data/Files/152_201411261563717 /Izvješće%20o%20mreži%20operatera%20uslužnog%20obj ekta.pdf

231

 Number and length of tracks Hinterland connection by railway at Bakar station 5 tracks for reception/dispatching of trains Max. length of trains: 315 m Connection with the industrial tracks in the port for bulk cargo (Port of Rijeka 13 km)

 Hosting Panamax and Capesize category ships 300 m long berth, 18.5 m depth, for vessels up to 150.000 DWT Annual capacity: 4.000.000 tons

 Storing capacity: Open: 21.130,00 m2 Warehouse capacity: 130.000 – 4.000.000 tons One-time storage capacity: . For fine iron ore 300,000 t, or . For iron ore pellets 250,000 t, or . For coal 120,000 t

 Equipment 2 Continuous Shore Ship Unloaders – iron ore, coal and other 3 Terminal description bulk cargo Nominal unloading capacity: iron ore – 3.000 t/h, coal - 2.100 t/h Conveyer transporters T8 – belt length 350 m Gantry type Stacker / Reclaimer Nominal stacking capacity: iron ore – 3.200 t/h, coal – 1.024 t/h Nominal reclaiming capacity: iron ore - 200 t/h, coal - 600 t/h 2 Ship Loaders – iron ore, coal and other bulk cargo Nominal loading capacity: 600 t/h

 Connection to main railway infrastructure Rijeka-Šepanje, Rijeka-Ogulin-Split/Zagreb Railway stations: Rijeka, Šoici, Bakar

 Booking at rail operators

Depending of type of services see: 4 Capacity allocation http://www.lukarijeka.hr http://www.hzcargo.hr

 List of provided services cargo handling, storage, unloading, 5 Services shunting and delivery of wagons at Bakar railway station

For more details see:

232

http://www.lukarijeka.hr/_Data/Files/152_201411261563717 /Izvje%C5%A1%C4%87e%20o%20mre%C5%BEi%20opera tera%20uslu%C5%BEnog%20objekta.pdf

 Operating times Loadin/unloading/storaging: Non-stop Rail related services: Every day between 7:20 – 18:40 and as required

 Shunting services: http://www.hzcargo.hr

 Price list  Payment conditions Depending of type of services go to: 6 Charging - http://www.lukarijeka.hr - http://www.hzcargo.hr

233

Rijeka Sea Port – Rijeka Terminals

Information Related to RFC6

Number of Heading text Rijeka Sea Port – Rijeka Terminals chapter

Table of contents

 Lučka uprava Rijeka Address: Riva 1 51 000 Rijeka, Croatia E-mail: [email protected] Tel: +385 51 351 177 Web: www.portauthority.hr

 Terminal owner Republic of Croatia

 Terminal operator Luka Rijeka d.d. Address: Riva 1 51 000 Rijeka, Croatia E-mail: [email protected] Tel: +385 51 496 530 1 General information Web: www.lukarijeka.hr

 Terminal character Maritime port – intermodal rail/ road/ sea terminals. It has special terminals for different types of cargos, equipped with high quality storage areas for different types of goods.

In Rijeka there are the following terminals:

- Ceraeal (Silos) Terminal - General Cargo Terminal - Timber Terminal - Frigo Terminal

 Open access for all market body (RU, forwarder, logistic provider...) Yes, open access for all market players

 Legal requirements to access 2 Access conditions Contract  Technical conditions ISO containers/ continental containers/ trailers/swap Bodies, tanks

 Number and length of tracks length of tracks 17,067 km 3 Terminal description

CEREAL TERMINAL

234

Terminal is located in the Western part of the Port of Rijeka, specially equipped to handle and store grain and oilseed crops. It meets all high standards of environmental protection. The silos can be used to dry grains, clean them with a separator, disinfect them and weigh them during all phases of operation.

Sea depth: 14 m Annual capacity: 1.000.000 t

 Storing capacity: Length: 86 m Width: 25 m Height: 53 m One-time storage capacity: 56.000 t

 Equipment Loading crane: 400 t/h The equipment enables the following loading / unloading operations: Ship–Silo and Silo –Ship Ship–Silo –Wagon (truck) Wagon (truck) –Silo –Ship

GENERAL CARGO TERMINAL

 Connection to main railway infrastructure Terminals are directly connected to the railway station Rijeka Rijeka-Šepanje, Rijeka-Ogulin-Split/Zagreb Railway stations: Rijeka, Rijeka Brajdica, Bakar

 Booking at rail operators Depending of type of services see: 4 Capacity allocation - http://www.lukarijeka.hr - http://www.hzcargo.hr

 List of provided services cargo handling, storage, unloading, refuelling, weighing of wagons, repairing, cleaning and washing of wagons and containers, fixing of containers, folding, binding and labeling in handling transshipment timber, 5 Services shunting and delivery of wagons to railway station For more details see: http://www.lukarijeka.hr/_Data/Files/152_201411261563717 /Izvje%C5%A1%C4%87e%20o%20mre%C5%BEi%20opera tera%20uslu%C5%BEnog%20objekta.pdf

 Operating times 24/7/365

 Price list 6 Charging  Payment conditions

235

Depending of type of services go to: - http://www.lukarijeka.hr - http://www.hzcargo.hr

236

Rijeka - Brajdica Intermodal Terminal

Information Related to RFC6

Number of Heading text Rijeka - Brajdica Intermodal Terminal chapter

Table of contents

 Kontejnerski terminal Rijeka Address: Brajdica Šetalište Andrije Kačića Miošića bb p.p.129 51000 Rijeka, Croatia E-mail: [email protected] Tel: +385 51 332 806

 Terminal owner Luka Rijeka d.d. AGCT FILIPINES 1 General information  Terminal operator JADRANSKA VRATA d.d. Address: Šetalište A.K. Miošića b.b., P.P. 129 51 000 Rijeka, Croatia E-mail: [email protected] Tel: +385 51 332 806  Terminal character intermodal rail/ road/ see terminal  Open access for all market body (RU, forwarder, logistic provider...) Yes, open access for all market players

2 Access conditions  Legal requirements to access Contract  Technical conditions Containers  Number and length of tracks 2, with a total length – 360 m

 Storing capacity: open: 400.000 TEUs /year connections for frigo containers -250 pcs indoor : 46-4.000 m² incompatible goods - 600 m²

3 Terminal description  Equipment coastal Marine container cranes - 4 pieces, capacity up to 61 mt for klifts - 3 pieces, capacity up to 15 mt bridge cranes - 6 pieces, capacity up to 41 mt bridge cranes for railways: 2 pieces, capacity up to 41 mt (in operation in mid-2015) container cranes - 6 pieces, capacity up to 40 mt terminal towing tractors - 9 pieces, capacity up to 55 mt

237

tractors, maneuvering (HZ Cargo)

 Connection to main railway infrastructure Rijeka-Šepanje, Rijeka-Ogulin-Split/Zagreb Railway stations: Rijeka Brajdica - shunting and delivery of wagons to railway station by HZ Cargo)

 Technical map of terminal https://maps.google.com/maps?sll=45.322846,14.450014&ss pn=0.0057935,0.0109864&cid=14278921256902281773&q= Adriatic+Gate+Container+Terminal+%28Jadranska+vrata+d .d.%29&output=classic&dg=ntvb

http://www.ictsi.hr/index.php/hr/detalji-o-terminal

http://www.ictsi.hr/images/resursi/brosure/AGCT_visitors.pdf

 Process description

 Booking forms, time limits for booking, cancellation 4 Capacity allocation conditions, special requirements.. Pre-arranged weekly dates of the service/user or in order of arrival  List of provided services cargo handling, storage of cargo, aditional services processing load, connections for frigo containers, washing containers, 5 Services minor repairs of containers, weighing, shunting of wagons and delivery to the railway station

 Operating times 365 days a year  Price list

 Payment conditions 6 Charging http://www.ictsi.hr/index.php/hr/kzk-download-zona

for shunting and delivery of wagons to railway station: http://www.hzcargo.hr

238

Zagreb - Jankomir Freight terminals

Information Related to RFC6

Number of Heading text Zagreb - Jankomir Freight terminals chapter

Table of contents

 ROBNITERMINALI ZAGREB - Jankomir Address: Jankomir 25 - 10 090 Zagreb, Croatia E-mail: [email protected] Tel: +385 01 3871-153 WEB: www.rtz.hr

 Terminal owner ZAGREBAČKI HOLDING d.o.o. Address: Jankomir 25 - 10090 Zagreb, Croatia E-mail: [email protected] 1 General information Tel: +385 1 3871-111

 Terminal operator ROBNITERMINALI ZAGREB Address: Jankomir 25 - 10 090 Zagreb, Croatia E-mail: [email protected] Tel: +385 01 3871-153 WEB: www.rtz.hr

 Terminal character intermodal rail/ road terminal  Open access for all market body (RU, forwarder, logistic provider...) Yes, open access for all market players

 Legal requirements to access 2 Access conditions Contract  Technical conditions bulk primary and secondary raw materials. various goods  Number and length of tracks each track 3.135m

 Storing capacity: open: 25.000m2 indoor: 77.000m2 3 Terminal description

 Equipment

 Connection to main railway infrastructure Zagreb Marshalling Yard Railway stations: Podsused TV

239

 Process description

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements.. Contract  List of provided services cargo handling. storage of cargo weighing, cleaning and washing of wagons 5 Services shunting and delivery of wagons to the station

 Operating times 365 days a year  Price list

 Payment conditions € 65 for the users of storage service, € 19.63 for tenants, € 35.43 for external users, 6 Charging € 9.69 setup of wagons according to price list of service provider

for shunting and delivery of wagons to railway station: http://www.hzcargo.hr

240

Zagreb - Zitnjak Freight terminals

Information Related to RFC6

Number of Heading text Zagreb - Zitnjak Freight terminals chapter

Table of contents

 ROBNITERMINALI ZAGREB Zitnjak Address: Slavonska avenija 52 10132 Zagreb, Croatia E-mail: [email protected] Tel: + 385 1 2404 865 Web: www.rtz.hr/hr/poslovne-jedinice/pj-zitnjak/skladiste- 53

 Terminal owner ZAGREBAČKI HOLDING d.o.o. Jankomir 25 1 General information Address: Jankomir 25 - 10090 Zagreb, Croatia E-mail: [email protected] Tel: +385 1 3871-111

 Terminal operator ROBNITERMINALI ZAGREB Jankomir Address: 25 10 090 Zagreb, Croatia E-mail: [email protected] Tel: +385 01 2415-404  Terminal character intermodal rail/ road terminal  Open access for all market body (RU, forwarder, logistic provider...) Yes, open access for all market players

 Legal requirements to access 2 Access conditions Contract  Technical conditions bulk primary and secondary raw materials. various goods

241

 Number and length of tracks each track 3.097m (1.237m useful length)

 Storing capacity: open: 3.000m2 indoor: 94.000m2

 Equipment 3 Terminal description cranes - no forklifts - 52 pieces up to 5 t ramps tractors, etc.

 Connection to main railway infrastructure Zagreb Marshalling Yard Railway stations: Zagreb Zitnjak

 Process description

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements.. Contract  List of provided services cargo handling. storage of cargo weighing, cleaning and washing of wagons 5 Services shunting and delivery of wagons to the station

 Operating times Monday - Friday 7:30-15:30  Price list

 Payment conditions € 65 for the users of storage service, € 19.63 for tenants, € 35.43 for external users, 6 Charging € 9.69 setup of wagons according to price list of service provider

for shunting and delivery of wagons to railway station: http://www.hzcargo.hr

242

Zagreb - Vrapce Intermodal Terminal

Information Related to RFC6

Number of Heading text Zagreb - Vrapce Intermodal Terminal chapter

Table of contents

 Kontejnerski terminal Vrapče Address: Kožinčev put 4 10000 Zagreb, Croatia E-mail: [email protected] Tel: +385 01 3887-917 Web: www.agit.hr

 Terminal owner HŽ Cargo d.o.o. Address: Heinzelova 51 10000 Zagreb, Croatia E-mail: [email protected] Tel: +385 01 453 45 27 1 General information Web: www.hzcargo.hr

 Terminal operator AGIT d.o.o. Address: Heinzelova 51 10000 Zagreb, Croatia E-mail: [email protected] Tel: +385 01 2350-800 Web: www.agit.hr

 Terminal character intermodal rail/ road terminal  Open access for all market body (RU, forwarder, logistic provider...) Yes, open access for all market players

2 Access conditions  Legal requirements to access General terms & conditions  Technical conditions ISO containers  Number and length of tracks Number of tracks – 3 Total lenght – 1.690m

 Storing capacity: Open: 20.000m2 Indoor: 500 m2 3 Terminal description  Equipment portal cranes - 2, capacity 40 t forklifts - 5, capacity 3 t, 5 t, 8 t, 12 t cranes - 2, capacity 40 t shunting locomotive

243

 Connection to main railway infrastructure Zagreb Marshalling Yard Railway stations: Zagreb Zitnjak  Process description

 Booking forms, time limits for booking, cancellation conditions, special requirements.. 4 Capacity allocation Depending of type of services: http://www.agit.hr

http://hzcargo.hr  List of provided services cargo handling storage of cargo additional services processing load storing wagons 5 Services shipping, extraction and shunting of wagons

 Operating times Monday - Friday 8:00 – 16:00 For more details see: http://www.agit.hr/include/pdf/izvjesce2016.pdf  Price list

 Payment conditions 6 Charging Depending of type of services: http://www.agit.hr

http://www.hzcargo.hr

244

Zagreb Marshalling Yard

Information Related to RFC6

Number of Heading text Zagreb Marshalling Yard chapter

Table of contents

 Zagreb Ranžirni kolodvor Address: 10000 Zagreb Jakuševac 2, Croatia E-mail: [email protected] Tel: +385 01 378 22 88

 Terminal owner Republic of Croatia

 Terminal operator 1 General information HŽ Infrastruktura d.o.o. Pristup infrastrukturi (Infrastructure Access) Address: 10000 Zagreb Mihanovićeva 12, Croatia E-mail: [email protected] Tel: +385 1 453 35 36 Web: http://www.hzinfra.hr/korisnicki-centar

 Terminal character Marsalling Yard  Open access for all market body (RU, forwarder, logistic provider...) Yes, open access for all market players

2 Access conditions  Legal requirements to access Access contract  Technical conditions Maximum length of trains: 667 m  Number and length of tracks Zagreb RK has the core function of freight train formation. Equipped with special facilities for splitting, joining trains. The station consists of: reception sidings set of sorting sidings train formation sidings a marshalling hump 3 Terminal description  Storing capacity:

 Equipment

 Connection to main railway infrastructure Zagreb Marshalling Yard Railway stations: Zagreb Marshalling Yard

245

 Process description http://www.hzinfra.hr/network-statement02 See Chapter 4. Capacity allocation

4 Capacity allocation  Booking forms, time limits for booking, cancellation conditions, special requirements.. http://www.hzinfra.hr/network-statement02 See Chapter 4. Capacity allocation  List of provided services shunting weighing refuelling http://www.hzinfra.hr/network-statement02 See Chapter 5. Services 5 Services  Operating times Every day, except Sunday – between 07:00 – 19:00 http://www.hzinfra.hr/network-statement02 See Chapter 5. Services

For refuelling see http://www.hzcargo.hr  Price list http://www.hzinfra.hr/network-statement02 Chapter 6. Charges 6 Charging  Payment conditions http://www.hzinfra.hr/network-statement02 Chapter 6. Charges

246

3.6. Terminal details of Hungary

247

Budapest Szabadkikötő Logisztikai Zrt./MAHART Container Center

Information Related to RFC6

Number Budapesti Szabadkikötő Logisztikai Zrt./ MAHART of Heading text Container Center chapter

Table of contents

1 General information http://www.bszl.hu; http://www.containercenter.hu/

2 Access conditions

3 Terminal description

4 Capacity allocation

5 Services

6 Charging

248

DELOG Debreceni Logisztikai Központ és Ipari Park Kft.

Information Related to RFCs

Number of Heading text DELOG Debreceni Logisztikai Központ és Ipari Park Kft. chapter

Table of contents  Container Terminal of Debrecen Address: 4002 Debrecen, Petőfi tér 12., Hungary

 Terminal owner DELOG Debrecen Logistics Center and Industrial Park Ltd. Address: 4030 Debrecen, Vámraktár u. 3., Hungary

 Terminal operator 1 General information DELOG Debrecen Logistics Center and Industrial Park Ltd. Address: 4030 Debrecen, Vámraktár u. 3., Hungary E-mail: [email protected], [email protected] Tel: +36 52 510 120 Web: www.trans-sped.hu, www.delog.hu

 Terminal character intermodal rail/ road  Open access for all market body (RU, forwarder, logistic provider...) Yes 2 Access conditions  Technical conditions type of handled intermodal units- ISO 20’ and 40’ containers, swap bodies  Number and length of tracks 308 meters long platforms

 Storing capacity 5000 sqm open air area, 4500 sqm covered storage area

3 Terminal description  Equipment Tthe capacity is 32 tons of BAK crane, 14 and 40 tons of KALMAR container lifts Debrecen 750 TEU

 Connection to main railway infrastructure Debrecen Railway Station 4 Capacity allocation There is not any specification  List of provided services: Loading and reloading railway containers, forwarding Cleaning and repairing of containers 5 Services Manual loading Keeping contact with the local railway company and organise the daily railway tasks

249

Fill in the bill of freight and keeping a record of arriving and starting Storing empty or full containers, swap bodies at the terminal area Customs clearance Goods transmission / forwarding, Road transport between terminal and other loading place

 Operating times (terminal / particular services) Monday to Friday 8.00 to 16.30 ( may be extended upon request if agreed) 6 Charging

250

DEPO Logisztikai Központ Kft.

Information Related to RFC6

Number DEPO Logisztikai Központ Kft. of Heading text

chapter Table of contents 1 General information www.depologisztika.hu 2 Access conditions 3 Terminal description 4 Capacity allocation 5 Services 6 Charging

251

Győr / ÁTI Depo

Information Related to RFC6

Number Győr / ÁTI Depo of Heading text

chapter Table of contents http://atidepo.1- 1 General information click.hu/?content=logisztika&page=Gy%C5%91r&lang=en 2 Access conditions 3 Terminal description 4 Capacity allocation 5 Services 6 Charging

252

LOGISZTÁR Kft. / Székesfehérvár

Information Related to RFC6

Number LOGISZTÁR Kft. / Székesfehérvár of Heading text

chapter Table of contents 1 General information http://www.logisztar.hu/ 2 Access conditions 3 Terminal description 4 Capacity allocation 5 Services 6 Charging

253

Rail Cargo Terminal – BILK Zrt.

Information Related to RFC6

Number of Heading text Rail Cargo Terminal – BILK Zrt. chapter

Table of contents

 Rail Cargo Terminal – BILK Zrt. Address: 1239 Budapest, Európa u. 4., Hungary E-mail: [email protected] Tel: +36 1 289 6000 Web: http://railcargobilk.hu/index.php?lang=en

 Terminal owner Rail Cargo Hungaria Zrt. Address: 1133 Budapest, Váci út 92., Hungary 1 General information E-mail: [email protected] Tel: +36 1 512 7777 Web: www.railcargo.hu

 Terminal operator Rail Cargo Hungaria Zrt. Address: 1133 Budapest, Váci út 92., Hungary

 Terminal character intermodal rail/ road/ terminal  Open access for all market body (RU, forwarder, logistic provider...) Open access for all market body

2 Access conditions  Technical conditions ISO containers/ continental containers/ trailers/swap bodies/RoLa/ tanks, max. length of trains: 700m, allowed RID classes: all)  Number and length of tracks 7x750m

 Storing capacity: ~7.000 TEU

 Equipment 3 Terminal description (2 cranes max 45t, 4 reachstackers: 3 max: 50t, 1 max 10t)

 Connection to main railway infrastructure (Nr 150, Budapest-Kelebia railline, name of

 connecting railway station Soroksár Terminal station 4 Capacity allocation  Booking at rail operators

254

 List of provided services storage, unloading, reefer.

5 Services  Operating times Rail: 0-24, 7 days a week, road: weekdays 6am-10pm, sat: 6am-12pm, sun: closed http://www.bilkkombi.hu/images/dijszabas/BILK_THC%20%202013. pdf 6 Charging  Payment conditions by cash or by special agreement

255

Terminal GYSEV Sopron

Information Related to RFC6

Number of Heading text TERMINAL GYSEV Sopron chapter

Table of contents

 TERMINAL SOPRON – GYSEV CARGO Zrt. Address: 9400 Sopron, Ipar körút 21., Hungary Tel: +36 55 07963-2, Sopron CT

 Terminal owner GYSEV Zrt. Address: 9400 Sopron, Mátyás király Str. 19., Hungary E-mail: [email protected] 1 General information Tel: +36 99 577 444

 Terminal operator GYSEV CARGO Zrt. Address: 9400 Sopron, Mátyás király Str. 19., Hungary E-amil: [email protected] Tel: +36 99 577 304

 Terminal character Rail/road terminal Certifications: quality-certificate BS EN ISO 9001:2008, BS EN ISO 14001:2004, BS OHSAS 18001:2007, AEO-Status

 Open access for all market body (RU, forwarder, logistic provider...) No special, extra insurance for terminal (the whole GYSEV group has forwarding third-party insurance): forwarding activity: Sublimit € 50.000 / case or € 400.000 / year.

 Technical conditions Handling of all intermodal units (20’-30’-40’-45’-45’ HC- 2 Access conditions Tankcontainers, Reefer-containers, OT-containers, swap bodies, trailers) up to 40 tons. Ro-La service (Sopron – Wels + v.v.) existed till 2004, railway gauges are available (max 650 m length) The terminal square is under extension. At the moment we are able to handle trains till max. length of 650 m (because of the conditions of the railway-infrastructure), but trains must be splitted in terminal (max. 330 m railway-track length RID-classes:: All classes are allowed, in exception of Class no. 7 (radioactive materials – only after previous arrangement)

256

 Storage Capacity Container management (lifting): 240 units daily w.m. 72.000 units / year Storage: 1.500 TEU at the same time (27.00 m2 space) TERMINAL IS UNDER EXTENSION (DEPOT-PLACE, IT-SYSTEM, RAIL-TRACK LENGTHENING)

 Equipment Number of platforms with cranes: 6 Number of storage platforms: 4 Lifting machines: Portal cranes: 2 x, 40 to (20-45’ container, swap bodies, trailer) Type: Künz (y. 1986, D960) + Ganz (y. 1999, individual) Mobile cranes: 2 x, 40 to (20-45’ container, swap bod.’s, trailer) Type: SMV (y. 1997, SC4127 + SMV 4123 CB5, y. 2013) 3 Terminal description  Connection to main railway infrastructure Sopron (55/07963-2), Hungary Rail Connection: Railway line HUN-8: to Győr – Budapest – SRB / ROM / UKR Railway line HUN-15: to Szombathely – AUT / SLO / CRO Railway line to Sopron-border (55-81/796) in direction to Austria: via Ebenfurth to Vienna – CZE / GER Road connection: HUN: Long distance road no. 84/85 (east direction to Győr, Budapest via M1 motorway / south direction to Szombathely, Austrian/Slovenian, Croatian borders) AUT: Motorway A3 (from/to Vienna/Graz, GER)

 Operating hours 24 hours daily (with the exception of Sunday 06 a.m. – 6 p.m.) (may be extended upon request if agreed)  Process description No special conditions: complete handling of one container train (600-650 m lentgh) approx. in 4 hours handling of single units (container: truck  vagon or opposite) transshipment of goods (truck  container/vagon or opposite 4 Capacity allocation direction) closing before train departure: -8 hrs (in some extra cases can be agreed individually – for example in agreement wirh an intermodal operateur)

 List of provided services handling of UTI’s agency, representation storage of loaded-, depot of unloaded units loading/unloading, load adjustment qualified repairs, technical revisions of multi-/intermodal 5 Services transport units washing of tank containers management of tempered multi-/intermodal transport devices, refuelling comprehensive warehouse logistics reception/creation (building) of block-trains

257

storage of hazardous substances accepting and executing complex terminal/logistics projects custom clearance, custom services trucking services (road) consultation

 Operating times (terminal / particular services) 6 Charging See the following pages

Price offers, terminal sales

+36 99517257 [email protected] Péter Kontor

Organisation +36 99517161 [email protected] Attila Csorba

+36 99517451 [email protected] Organisation, terminal activities +36 99517250 [email protected]

Péter Tóth +36 99517369 - direct line [email protected] terminal

258

259

260

Price-list (en):

LOGISTIC AND CT SERVICE RATES_2013

GYSEV CARGO Zrt. LOGISTIC CENTER H-9400 SOPRON, IPAR Krt. 21 Tel.: +36 99 517-385 Fax: +36 99 517-460 E-mail: [email protected]

I. CUSTOMS FORMALITIES In connection with transportorder or simple I/1. Import customs clearance 50 EUR/shipment Export customs clearance 50 EUR/shipment Dispatching A.TR / EUR 1. 15 EUR/document Dispatching TIR 15 EUR/document Recording TIR 11 EUR/document Issuing freightdocuments 15 EUR/document Setting completed documents to customs clearance 15 EUR/document Preliminary calculation 4 EUR/document Dutiable value declaration 4 EUR/document

I/2. TC31 Transit procedure including GYSEV CARGO guarantie In case trucking organized by GYSEV CARGO 64 EUR/document In case trucking organized by others 0 - 3.000.000,- HUF 105 EUR/document on secured duty 3.000.001 - 5.000.000,- HUF 1% projected on secured duty 5.000.001 - 10.000.000,- HUF 0,60% projected (Note: amounts show secured duties )

Guarantie commission 0 - 6.000.000,- HUF 40 EUR/guarantie 6.000.001 -10.000.000,- HUF 55 EUR/guarantie Above 10.000.000,- HUF 73 EUR/guarantie (Note: amounts show secured duties )

I/3. Others EORI No. Administration 15 EUR/document

II. WAREHOUSING Loading by forklift in the open 42 EUR/hour Storing in the open, in warehouse, and related by special agreement services

III. ROAD TRUCKING Normal and container trucking inland and abroad by special agreement

IV. TERMINALSERVICES Handling 36 EUR/container/hub Storage: for both empty and loaded containers

261

3 working days free incl. day of advice 5,5 EUR/20'/Tag From 4th day 10,5 EUR/30' - 45'/Tag

Issuing of freight documents Inland or CIM railway-bill 9 EUR/document SMGS railway-bill 36 EUR/document

by special Depot for empty containers agreement Railway-transportation (single wg. traffic or block by special train) agreement

Handling of reefercontainers Offered by Repair of boxcontainers, washing-cleaning of tankcontainers HCCR Kft. Inspection protocol

Above mentioned rates are net rates and are valid from 01.01.2013 until recalled.

Payment: basically within 15 days after issuing the invoice (date of invoice)

262

Szolnoki Ipari Park

Information Related to RFC6

Number Szolnoki Ipari Park of Heading text

chapter Table of contents 1 General information http://www.szolnokiipariparkkft.hu/image/terminalinforfc-en.pdf 2 Access conditions 3 Terminal description 4 Capacity allocation 5 Services 6 Charging

263

Zahony-Port Zrt.

Information Related to RFC6

Number of Heading text ZÁHONY-PORT Zrt. chapter

Table of contents

 ZÁHONY-PORT Co. Záhony-Logisztics and Load Handling Servicing Company Address: 4625 Záhony Európa place 12., Hungary E-mail: [email protected] Tel: +36 1 513 3010 Web: www.zahony-port.hu

 Terminal owner MÁV Co. Address: 1087 Budapest, Könyves Kálmán krt. 54-60., Hungary 1 General information  Terminal operator ZÁHONY-PORT Co. Záhony-Logisztics and Load Handling Servicing Company Address: 4625 Záhony Európa place 12., Hungary E-mail: [email protected] Tel: +36 1 513 3010 Web: www.zahony-port.hu

 Terminal character intermodal rail/ road

 Open access for all market body (RU, forwarder, logistic provider...): Yes

 Legal requirements to access Contract

2 Access conditions  Technical conditions Heating transloading of chemicals. 120 tons goods in one piece with one lift. Containers transshipment and storage. Transshipment of bulk goods and bulk grain. Customs administration and spedition service. RID 2, 3-9 classes

264

 Number and length of tracks 260 km length normal gauge track (210 kN) and 140 km wide gauge track (245 kN)

 Storing capacity 7500 m2 covered public customs warehouse and 90000 m2 open public customs storage

 Equipment gravity transhipment, 19 gantry cranes, special and 3 Terminal description secure technology is required at handling liquid state and gaseous commoditis, more then 10 forklifts (3 tonna), special front-end loaders and stockers

 Equipment capacity gantry cranes: 7000 tons/day, 300 TEU/day gravity transhipment 18000 tons/day liquid goods: 5000 tons/day

 Technical map of terminal (www.zahony-port.hu)

4 Capacity allocation  List of provided services storage, unloading, maintenance

5 Services  Operating times non-stop transhipment services

6 Charging specific request

265