Section Description Scale

Total Page:16

File Type:pdf, Size:1020Kb

Section Description Scale UTILITIES SYMBOLS ABBREVIATIONS Compressed Air SIGNS ROAD CROSSING WARNING DEVICES MISCELLANEOUS STRUCTURES Fiber Optic Cable Stop Ac. Acres Bldg. Building Crossbuck Sign Gas Pipeline Ave. Avenue Br. Bridge Flashing Light Warning Device Yard Limit Blvd. Boulevard CB Catch Basin Overhead Power Line Bldg. Building CPT Concrete Pile Trestle - Ballast Deck 1 Mile to Yard Limit BNSF BNSF Railway CIP Cast Iron Pipe Sanitary Sewer Flashing Light Warning Device C.Y. Cubic Yards CMP Corrugated Metal Pipe with Gate Whistle Post Conc. Concrete CMPA Corrugated Metal Pipe Arch Overhead Signal Line ° Degree (s) CSP Corrugated Steel Pipe Cantilever Flashing Steam Line Flanger Dia. Diameter Culv. Culvert Light Warning Device Dr. Drive DI Drop Inlet Storm Sewer Station Dwg. Drawing DPGBD Deck Plate Girder - Ballast Deck Cantilever Flashing Light Signal with Gate E East DPGOD Deck Plate Girder - Open Deck Telephone Reduce Speed Elev. Elevation EBW East Backwall Exist. Existing F.L. Flowline Underground Electric SIGNAL Resume Speed ' Foot, Feet or Minute (s) F.F. Finished Floor F.S. Finished Surface GIP Galvanized Iron Pipe Water Main General Purpose Horiz. Horizontal Hdwl Headwall Absolute Signal " Inch, Inches or Second (s) NBW North Backwall Underground Wire Inv. Invert PSCT Prestressed Concrete Trestle V. Signal Bridge Valve Lt. Left RCA Reinforced Concrete Arch M.H. L Length RCB Reinforced Concrete Box Manhole Cantilever Signal L.F. Lineal Feet RCP Reinforced Concrete Pipe C.B. Max. Maximum SBW South Backwall Catch Basin FENCES Min. Minimum SSP Smooth Steel Pipe F.H. ACS or CTC Signal N North SPTBD Steel Pile Trestle - Ballast Deck Fire Hydrant Barbed Wire NTS Not to Scale SPTOD Steel Pile Trestle - Open Deck Dwarf Signal Chain Link No. Number SPP Structural Plate Pipe TRACK OH Overhead TPGBD Through Plate Girder - Ballast Deck Begin CTC Snow / Sand Prop. Proposed TPGOD Through Plate Girder - Open Deck Existing Mainline RR Railroad TPTBD Timber Pile Trestle - Ballast Deck Rwy Railway TPTOD Timber Pile Trestle - Open Deck Existing Siding, Spur Microwave Tower R/W Right of Way TTBD Through Truss - Ballast Deck or UPRR Owned Industry Rt. Right TTOD Through Truss - Open Deck AEI AEI Proposed Mainline S South TWB Treated Wood Box S.F. Square Feet VCP Vitrified Clay Pipe Proposed Siding, Spur Sta. Station Viad. Viaduct STRUCTURES or UPRR Owned Industry Std. Standard WBW West Backwall ROADS St. Street WIP Wrought Iron Pipe Remove Mainline Culvert Twp. Township Paved Road Typ. Typical TRACK Shift Mainline UG Underground Culvert with Headwalls Unimproved Road UPRR Union Pacific Railroad ATR Above Top of Rail No RR Operations l b V Velocity Align. Alignment 80 t Existing Industry Owned Interstate Highway . Wt. Weight BBR Below Base of Rail Double Culvert R R W West Cntrs. Centers P Proposed Industry Owned 20 Federal Highway U X-ing Crossing CWR Continuous Welded Rail \ DSPD Double Switch Point Derail Railroad Bridge a l Remove Industry Owned 58 t State Highway b EOT End of Track a t . d HH Head Hardened Shift Industry Owned e \ C3 County Highway l s Jtd. Jointed Rail Highway Overpass b d a r n SIGNAL LH Left Hand Future Industry Track t a g n d d ML Main Line . e ABS Automatic Block Signal n Prop. Leased Ind. Track v P MM Mile Marker Highway Underpass a OTHER _ e ATC Automatic Train Control t i r MP Mile Post S 8 CTC Centralized Traffic Control b Exist. Leased Ind. Track \ V NSC Not Sufficient Clearance b e _ DED Dragging Equipment Detector Wetlands A c R OTM Other Track Material Tunnel a R DTC Direct Traffic Control Other Industry Track n p P PCC Point of Compound Curve o s ELTO Electric Lock Turnout U i k PC Point of Curve \ t In Buildings or River or Lake r HBD Hot Box Detector n c o PCS Point of Curve to Spiral Under Structures Building e u HTTO Hand Throw Turnout W P r POC Point on Curve \ \ t HWD High Wide Dectector y s Turnout s PF 1/2" Point of Frog e e POTO Power Operated Turnout Embankment n l l PI Point of Intersection t o b TWC Track Warrant Control n C Bumping Post a PITO Point of Intersection of Turnout e \ t WILD Wheel Impact Load Dectector s B \ PS Point of Spiral LIGHTING \ e Flow Line s l Earthen Bumper i g d PSC Point of Spiral to Curve i F r f a POS Point on Spiral Light Pole n Derail n d o g PT Point of Tangent n i Milepost C a s _ POT Point on Tangent t Switch Point Derail Light Tower e D S Perpendicular to Centerline of Track D Pt. Sw. Point of Switch A or Double Switch Point Derail \ \ C e s PVC Point of Vertical Curve \ Milemarker c } t m Section Number i a PVI Point of Vertical Intersection PROPERTY r b p i a s PVT Point of Vertical Tangent h p k Section Line CONSTRUCTION i x r RH Right Hand 15 E \ Control Point o Section Sheet No. d SH Second Hand W Note a e Center Section Line l \ c SSPD Single Switch Point Derail Note (Work by Contractor) p y g e m TC Track Centers n l Parcel or Easement Line 1 Revision Number a e t S T.F. Track Feet \ n Note \ e m Trk. Track Note (Work by Others) s Right of Way B o Section Number t \ c UXO Universal Cross-Over c . Revision Cloud g Section Description r e i X-Over Cross-Over Former Right of Way Cut Lines j r f o p n r u Scale o . Right of Way to be Acquired P Fill Lines C d _ Section From a . y D FES #: DOCUMENT TYPE: p r Foreign Right of Way A Sheet No. r xxx Development Concept t C o s \ c u DRAWN BY: m REV. # BY DATE DESCRIPTION p d r Ex. UPRR Track Shift Ind. Track Hand Throw Turnout For use in Agreement with: u n a I \ p Industry Name \ Prop. UPRR Track Future Ind. Track Power Turnout \ i CHECKED BY: s : \ e Remove UPRR Track Prop. Leased Ind. Trk Power Derail LOCATION & DESCRIPTION: e 3 c l 7 RAILROAD ENGINEERS, INC. r b Shift UPRR Track Ex. Leased Ind. Trk Hand Throw Derail 5 1 OMAHA, NEBRASKA DATE: City, State - Sub MP u a 2 5 t t o 0 Ex. Ind. Track No RR Operations q Point of Curve l Trackage to Serve: Industry Name s 2 h u r e / RE m Prop. Ind. Track Other Ind. Track a Bridge SHEET NUMBER 1 o R SHEET TITLE: l o f 2 \ o e \ : Remove Ind. Track Right of Way Signal / of xxx Plan View C \ S D 5 S:\Resources\Industry Projects\Sample Exhibits\Design Files\Construction Abbrev.dgn.
Recommended publications
  • Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-96
    Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-96 Amtrak (ATK) Northbrook, IL December 25, 2008 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2008-96 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. Amtrak [ATK ] ATK 110589 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident No. N/A N/A N/A 3.Name of Railroad Operating Train #3 3a. Alphabetic Code 3b. Railroad Accident/Incident No. N/A N/A N/A 4.Name of Railroad Responsible for Track Maintenance: 4a. Alphabetic Code 4b. Railroad Accident/Incident No. Northeast IL Regional Commuter Rail Corp. [NIRC] NIRC USB041 5. U.S. DOT_AAR Grade Crossing Identification Number 6. Date of Accident/Incident 7. Time of Accident/Incident 388037N Month 12 Day 25 Year 2008 07:05:00 AM PM 8. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other Code (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 07 9.
    [Show full text]
  • WESTRACE First-Line Maintenance Manual 11.0
    WESTRACE First-Line Maintenance Manual for WESTRACE MkI WRTOFLMM Issue 11.0 CONTACTING INVENSYS RAIL W http://www.invensysrail.com Asia Pacific ABN 78 000 102 483 179–185 Normanby Rd (Locked Bag 66) South Melbourne Victoria 3205 Australia T +61 1300 724 518 F +61 3 9233 8777 E [email protected] India No. 112–114 Raheja Chambers 12 Museum Road Bangalore 560 001 Karnataka India T +91 80 3058 8763/64 F +91 80 3058 8765 North America 2400 Nelson Miller Parkway Louisville Kentucky 40223 USA T +1 502 618 8800 F +1 502 618 8810 E [email protected] Spain, Portugal and Latin America Avda. de Castilla Apartado de Correos 6 Parque Empresarial (Edif Grecia) 28830 San Fernando de Henares Madrid Spain T +34 9 1675 4212 F +34 9 1656 9840 E [email protected] UK and Northern Europe PO Box 79 Pew Hill Chippenham Wiltshire SN15 1JD UK T +44 1249 44 1441 F +44 1249 65 2322 E [email protected] WESTRACE First-Line Maintenance Manual for WESTRACE MkI Document CI: WRTOFLMM Issue: 11.0 Date of Issue: 03 Dec 2010 Change History: Issue Date Comment Changed Checked Approved 1.0 7/9/94 WRTFGEN. initial issue 2.0 4/4/96 WRTFGEN, CR273 3.0 30/10/96 WRTFGEN, CR319 1.0 16/11/94 WETFWAYE, initial release 2.0 17/12/96 WETFWAYE, CR1385, CR1728, WR348, WR349, WR350 4.0 1/9/00 WRTOFLMM, initial issue. Compiled PGB from WRTFGEN 3.0 and WETFWAYE 2.0 CR333, 334, 379, 394, 395, 402, 404, 405, 406, 407, 440, 454, 502, 515 5.0 3/8/01 Rebuilt to correct faulty 4.0 build PGB 6.0 20/2/03 CR 783, 789, 790 PGB 7.0 11/10/04 CR831 ML DJ WMcD 8.0 12/9/05 CR325, 340, 345, 372, 378 ML SR WMcD 9.0 29/1/07 CR423, 428, 433 ML SR WMcD 10.0 10/2/09 Updated branding ML ML WMcD 11.0 03/12/10 Updated branding MH WMcD WMcD Copyright This document is protected by Copyright and all information contained therein is confidential.
    [Show full text]
  • Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-94
    Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-94 Canadian Pacific (CP) River JCT, MN December 17, 2008 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2008-94 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. SOO Line RR Co. [SOO ] SOO 209549 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident No. SOO Line RR Co. [SOO ] SOO 209549 3.Name of Railroad Operating Train #3 3a. Alphabetic Code 3b. Railroad Accident/Incident No. N/A N/A N/A 4.Name of Railroad Responsible for Track Maintenance: 4a. Alphabetic Code 4b. Railroad Accident/Incident No. SOO Line RR Co. [SOO ] SOO 209549 5. U.S. DOT_AAR Grade Crossing Identification Number 6. Date of Accident/Incident 7. Time of Accident/Incident Month 12 Day 17 Year 2008 04:48:00 AM PM 8. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other Code (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 04 9.
    [Show full text]
  • Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-48
    Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2008-48 Canadian National-North America (CN) Crystal Springs, MS May 27, 2008 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2008-48 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. Amtrak [ATK ] ATK 108129 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident No. N/A N/A N/A 3.Name of Railroad Operating Train #3 3a. Alphabetic Code 3b. Railroad Accident/Incident No. N/A N/A N/A 4.Name of Railroad Responsible for Track Maintenance: 4a. Alphabetic Code 4b. Railroad Accident/Incident No. Canadian National - North America [CN ] CN 596181 5. U.S. DOT_AAR Grade Crossing Identification Number 6. Date of Accident/Incident 7. Time of Accident/Incident 299824D Month 05 Day 27 Year 2008 01:00: AM PM 8. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other Code (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 07 9.
    [Show full text]
  • NTSB Hearing Jeff Young Asst
    NTSB Hearing Jeff Young Asst. Vice President – Transportation Systems March 4, 2009 1 Topics to Address • Current Train Control Systems • Concerns with Existing Systems • How does PTC Address Concerns with Existing Systems • UP PTC Pilot Locations • PTC Challenges • PTC Implementation Plan • PTC Project Timeline 2 Dark Territory Track Warrant Control Track Warrant Authority Limits AMTK • Main Track Not Signaled • Movement Authority Conveyed By Track Warrant or Direct Traffic Control permit •2. [X] Proceed From (Station or Location) To (Station or Location) On Main Track Spokane Subdivision •8. [X] Hold Main Track At Last Named Point • Train separation provided by train dispatcher and train crew 3 Automatic Block System (ABS) Track Warrant Control Track Warrant Authority Limits AMTK • Main Track Signaled for Movement in Both Directions • Movement Authority Conveyed By Track Warrant or Direct Traffic Control permit •2. [X] Proceed From ( Station or Location) To ( Station or Location ) On Main Track Spokane Subdivision •8. [X] Hold Main Track At Last Named Point • Train separation provided by train dispatcher, train crew and signal system 4 Automatic Block Signal (ABS) Current Of Traffic Field Signal Indication • Two Main tracks with an assigned direction of movement • Movement authority is conveyed by signal system • The tracks are only signaled for movement in the assigned direction • Train separation provided by train crew and signal system 5 Centralized Traffic Control (CTC) Field Signal Indication • One or More Main Tracks Signaled
    [Show full text]
  • View / Open TM Database Composite.Pdf
    • • • • TRANSPORTATION-MARKINGS • DATABASE • COMPOSITE CATEGORIES • CLASSIFICATION & INDEX • • • -­ • III III • 1 TRANSPORTATION-MARKINGS: A STUDY IN CO.MMUNICATION MONOGRAPH SERIES Alternate Series Title: An Inter-modal Study of Safety Aids Transportatiol1-Markings Database Alternate T-M Titles: Transport [ation] Mark [ing]s / Transport Marks / Waymarks T-MFoundations, 4th edition, 2005 (Part A, Volume I, First Studies in T-M) (3rd edition, 1999; 2nd edition, 1991) Composite Categories A First Study in T-M: The US, 2nd edition, 1993 (Part B, Vol I) Classification & Index International Marine Aids to Navigation, 2nd edition, 1988 (parts C & D, Vol I) [Unified First Edition ofParts A-D, University Press ofAmerica, 1981] International Traffic Control Devices, 2nd edition, 2004 (Part E, Volume II, Further Studies in T-M) (lst edition, 1984) Part Iv Volume III, Additional Studies, International Railway Signals, 1991 (Part F, Vol II) International Aero Navigation Aids, 1994 (Part G, Vol II) Transportation-Markil1gs: A Study il1 T-M General Classification with Index, 2nd edition, 2004 (Part H, Vol II) (1st edition, 1994) Commllnication Monograph Series Transportation-Markings Database: Marine Aids to Navigation, 1st edition, 1997 (I'art Ii, Volume III, Additional Studies in T-M) TCDs, 1st edition, 1998 (Part Iii, Vol III) Railway Signals. 1st edition, 2000 (part Iiii, Vol III) Aero Nav Aids, 1st edition, 2001 (Part Iiv, Vol III) Composite Categories Classification & Index, 1st edition, 2006 (part Iv, Vol III) (2nd edition ofDatabase, Parts Ii-v,
    [Show full text]
  • UPRR - General Code of Operating Rules
    Union Pacific Rules UPRR - General Code of Operating Rules Seventh Edition Effective April 1, 2020 Includes Updates as of September 28, 2021 PB-20280 1.0: GENERAL RESPONSIBILITIES 2.0: RAILROAD RADIO AND COMMUNICATION RULES 3.0: Section Reserved 4.0: TIMETABLES 5.0: SIGNALS AND THEIR USE 6.0: MOVEMENT OF TRAINS AND ENGINES 7.0: SWITCHING 8.0: SWITCHES 9.0: BLOCK SYSTEM RULES 10.0: RULES APPLICABLE ONLY IN CENTRALIZED TRAFFIC CONTROL (CTC) 11.0: RULES APPLICABLE IN ACS, ATC AND ATS TERRITORIES 12.0: RULES APPLICABLE ONLY IN AUTOMATIC TRAIN STOP SYSTEM (ATS) TERRITORY 13.0: RULES APPLICABLE ONLY IN AUTOMATIC CAB SIGNAL SYSTEM (ACS) TERRITORY 14.0: RULES APPLICABLE ONLY WITHIN TRACK WARRANT CONTROL (TWC) LIMITS 15.0: TRACK BULLETIN RULES 16.0: RULES APPLICABLE ONLY IN DIRECT TRAFFIC CONTROL (DTC) LIMITS 17.0: RULES APPLICABLE ONLY IN AUTOMATIC TRAIN CONTROL (ATC) TERRITORY 18.0: RULES APPLICABLE ONLY IN POSITIVE TRAIN CONTROL (PTC) TERRITORY GLOSSARY: Glossary For business purposes only. Unauthorized access, use, distribution, or modification of Union Pacific computer systems or their content is prohibited by law. Union Pacific Rules UPRR - General Code of Operating Rules 1.0: GENERAL RESPONSIBILITIES 1.1: Safety 1.1.1: Maintaining a Safe Course 1.1.2: Alert and Attentive 1.1.3: Accidents, Injuries, and Defects 1.1.4: Condition of Equipment and Tools 1.2: Personal Injuries and Accidents 1.2.1: Care for Injured 1.2.2: Witnesses 1.2.3: Equipment Inspection 1.2.4: Mechanical Inspection 1.2.5: Reporting 1.2.6: Statements 1.2.7: Furnishing Information
    [Show full text]
  • Ortungsanforderungen Und Ortungsmöglichkeiten Bei Sekundärbahnen
    Fakultät Verkehrswissenschaften „Friedrich List“ Professur für Verkehrssicherungstechnik Diplomarbeit Ortungsanforderungen und Ortungsmöglichkeiten bei Sekundärbahnen eingereicht von Fabian Kirschbauer geb. am 21.01.1991 in Straubing Prüfer: Prof. Dr.-Ing. Jochen Trinckauf Dr.-Ing. Ulrich Maschek Betreuer: Dr.-Ing. Michael Kunze (CERSS) Dipl.-Ing. Martin Sommer (CERSS) Dresden, den 15. Juli 2016 .......................................... Unterschrift des Studenten Autorenreferat Autorenreferat Die Sicherung von Zugfahrten erfolgt bei Eisenbahnen durch verschiedene Systeme der Sicherungstechnik. Die Ausrüstungsstandards, und damit auch die Ortungslösungen, orientieren sich an den Bedürfnissen des Kernnetzes und sind auf Bahnen untergeordne- ter Bedeutung, sog. Sekundärbahnen, hauptsächlich aus wirtschaftlichen Gründen nicht tragfähig. Steigende Anforderungen an die Sicherheit und der weiter zunehmende Kos- tendruck werden für diese Bahnen eine Ablösung der bisherigen Betriebsweise mit Hil- fe neuer technischer Möglichkeiten erfordern. Die vorliegende Arbeit soll Anforderun- gen an Ortungslösungen für Sekundärbahnen auf Grundlage bereits bestehender Umset- zungen identifizieren. Die Ergebnisse sollen die Basis für eine bedarfsgerechte Weiter- entwicklung bisheriger Techniken zur Sicherung von Zugfahrten auf Sekundärbahnen bilden. Bibliografischer Nachweis Fabian Kirschbauer Ortungsanforderungen und Ortungsmöglichkeiten bei Sekundärbahnen Technische Universität Dresden, Fakultät Verkehrswissenschaften „Friedrich List“, Professur für Verkehrssicherungstechnik
    [Show full text]
  • Finished Vehicle Logistics by Rail in Europe
    Finished Vehicle Logistics by Rail in Europe Version 3 December 2017 This publication was prepared by Oleh Shchuryk, Research & Projects Manager, ECG – the Association of European Vehicle Logistics. Foreword The project to produce this book on ‘Finished Vehicle Logistics by Rail in Europe’ was initiated during the ECG Land Transport Working Group meeting in January 2014, Frankfurt am Main. Initially, it was suggested by the members of the group that Oleh Shchuryk prepares a short briefing paper about the current status quo of rail transport and FVLs by rail in Europe. It was to be a concise document explaining the complex nature of rail, its difficulties and challenges, main players, and their roles and responsibilities to be used by ECG’s members. However, it rapidly grew way beyond these simple objectives as you will see. The first draft of the project was presented at the following Land Transport WG meeting which took place in May 2014, Frankfurt am Main. It received further support from the group and in order to gain more knowledge on specific rail technical issues it was decided that ECG should organise site visits with rail technical experts of ECG member companies at their railway operations sites. These were held with DB Schenker Rail Automotive in Frankfurt am Main, BLG Automotive in Bremerhaven, ARS Altmann in Wolnzach, and STVA in Valenton and Paris. As a result of these collaborations, and continuous research on various rail issues, the document was extensively enlarged. The document consists of several parts, namely a historical section that covers railway development in Europe and specific EU countries; a technical section that discusses the different technical issues of the railway (gauges, electrification, controlling and signalling systems, etc.); a section on the liberalisation process in Europe; a section on the key rail players, and a section on logistics services provided by rail.
    [Show full text]
  • Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2005-104
    Federal Railroad Administration Office of Safety Headquarters Assigned Accident Investigation Report HQ-2005-104 Northeastern Illinois Regional Commuter Railroad (NIRC) Elmwood Park, Illinois November 23, 2005 Note that 49 U.S.C. §20903 provides that no part of an accident or incident report made by the Secretary of Transportation/Federal Railroad Administration under 49 U.S.C. §20902 may be used in a civil action for damages resulting from a matter mentioned in the report. DEPARTMENT OF TRANSPORTATION FRA FACTUAL RAILROAD ACCIDENT REPORT FRA File # HQ-2005-104 FEDERAL RAILROAD ADMINISTRATION 1.Name of Railroad Operating Train #1 1a. Alphabetic Code 1b. Railroad Accident/Incident No. Northeast IL Regional Commuter Rail Corp. [NIRC] NIRC NC016Y 2.Name of Railroad Operating Train #2 2a. Alphabetic Code 2b. Railroad Accident/Incident N/A N/A N/A 3.Name of Railroad Responsible for Track Maintenance: 3a. Alphabetic Code 3b. Railroad Accident/Incident No. Northeast IL Regional Commuter Rail Corp. [NIRC] NIRC NC016Y 4. U.S. DOT_AAR Grade Crossing Identification Number 5. Date of Accident/Incident 6. Time of Accident/Incident Month Day Year 372131E 11 23 2005 04:43:00 AM PM 7. Type of Accident/Indicent 1. Derailment 4. Side collision 7. Hwy-rail crossing 10. Explosion-detonation 13. Other (single entry in code box) 2. Head on collision 5. Raking collision 8. RR grade crossing 11. Fire/violent rupture (describe in narrative) 3. Rear end collision 6. Broken Train collision 9. Obstruction 12. Other impacts 07 8. Cars Carrying 9. HAZMAT Cars 10. Cars Releasing 11. People 12. Division HAZMAT Damaged/Derailed HAZMAT Evacuated 0 0 0 0 CHICAGO UNION STATIO 13.
    [Show full text]
  • Queensland's Direct Traffic Control
    Keeping the trains moving – Queensland’s Direct Traffic Control Alan Shaw n an anonymous and bland Brisbane office building not unlike the operates 0600 to 1600 Mondays to Fridays, controlling the line west of one I work in myself, up a short and shallow ramp and behind a Miles. This split of the Far West into a Far West and a Miles West came secure blue door marked ‘Control Room Regional Transit Manager’ about not because of the number of trains west of Miles (of which there is a group of mostly young men and women who keep the are now very few) but because of the need to keep the maintenance non-metropolitan trains of south-east Queensland safely on the move. crews safely operating during their working week. The work load for one Under their control are all trains from just west of Ipswich to Cunnamulla controller was simply getting too much and trains and maintenance crews Iand Quilpie in the west, Wallangarra and Thallon in the south west, and were being forced to wait too long for a response from the controller. from Tamaree (just north of Gympie North) to Parana, four kilometres I came into the control room (similar rooms are situated in Central and south of Gladstone, on the North Coast Line, as well as the numerous North Queensland) most interested to learn a little more about Direct maintenance crews who may be working on the tracks. Traffic Control. I’d heard of DTC several years ago, but knew next to The room, with its somewhat odd ambiance of blue walls and nothing about it.
    [Show full text]
  • FRA Guide for Preparing Accident/Incident Reports
    FRA Guide for Preparing Accident/Incident Reports U.S. Department of Transportation Federal Railroad Administration Office of Safety DOT/FRA/RRS-22 MAIL MONTHLY ACCIDENT/INCIDENT REPORTING SUBMISSIONS TO: Federal Railroad Administration FRA Project Office/CITI 4601 North Fairfax Drive, Suite 1100 Arlington, VA 22203-1547 Please refer to http://safetydata.fra.dot.gov/OfficeofSafety, and click on “Changes in Railroad Accident/Incident Recordkeeping and Reporting Info” for updated information. Preface The Federal Railroad Administration’s (FRA) regulations on reporting railroad accidents/incidents are found primarily in Title 49 of the Code of Federal Regulations (CFR), 1 Part 225. The purpose of the regulations in Part 225 is to provide FRA with accurate information concerning the hazards and risks that exist on the Nation’s railroads. See § 225.1. FRA needs this information to effectively carry out its regulatory and enforcement responsibilities under the Federal railroad safety statutes.2 FRA also uses this information for determining comparative trends of railroad safety and to develop hazard elimination and risk reduction programs that focus on preventing railroad injuries and accidents. Issuance of these regulations preempts States from prescribing accident/incident reporting requirements. Any State may, however, require railroads to submit to it copies of reports filed with FRA under Part 225 for accidents/incidents that occur in that State. 1 For brevity, further references in the Guide to sections in 49 CFR Part 225 will omit “49 CFR” and include only the section, e.g., § 225.9. 2 Title 49 United States Code Chapters 51, 201-213. iii iv Table of Contents Executive Summary .......................................................................................................................
    [Show full text]