Port River Expressway - Hanson Road Off-Ramp Closure and Detour – Day and Night Works

Total Page:16

File Type:pdf, Size:1020Kb

Port River Expressway - Hanson Road Off-Ramp Closure and Detour – Day and Night Works Notification • April 2020 Road North-South Corridor Northern Connector Project Port River Expressway - Hanson Road off-ramp closure and detour – day and night works As part of the Northern Connector Project, the Department of Planning, Transport and Infrastructure advises that day and night works will be undertaken on the Port River Expressway, westbound off ramp to Hanson Road. Location: The Hanson Road off-ramp from the Port River Expressway, westbound only, will be closed. Date: From 11pm on Tuesday 7 April, until 5pm Thursday 9 April, weather permitting. Activities: Undertaking pavement and asphalt works, installation of guard rail and new line marking. Traffic management: The Hanson Road off-ramp from the Port River Expressway will be closed. Access to Hanson Road will be maintained via 2 detour options: 1. Via the South Road Superway; or 2. Via the Port River Expressway to Eastern Parade (refer to map). Speed and lane restrictions will apply in the vicinity of the works. Signage and traffic management will be in place to advise motorists of changed conditions. More information: To sign up for traffic updates, please contact the Project Information Line on 1300 916 221 or email your contact details to [email protected]. For real time roadwork information visit www.addinsight.com.au/app and download the app, available for both Apple and Android, or visit the Traffic SA website at www.traffic.sa.gov.au. Thank you for your patience while these important works are undertaken. #15321040 For further information: Call: 1300 916 221 Email: [email protected] Visit: dpti.sa.gov.au/northernconnector Call: 1300 916 221 Email: [email protected] V For further information isit: dpti.sa.go Northern Connector detour map • Hanson Road off ramp from Port River Expressway - April 2020 Road LEGEND DETOUR 2: Northern v .au/northernconnector Connector Northern Connector Continue along the Port River OPEN Main Roads Expressway Detour 1 AY PORT RIVER EXPRESSW Detour 2 SALISBURY HIGHWAY SWAY ER EXPRES ROAD CLOSED RIV RT PO DETOUR 1: Hanson Rd Turn left onto HANSON RD off ramp South Road CLOSED WILKINS RD Superway SOUTH TCE SOUTH ROAD SUPERWAY KAP ARA CORMACK RD RD Exit the WINGFIELD RD Port River PL BOWYER RD Expressway via YMOUTH RD Eastern Parade BEDFORD ST ramp EASTERN P FRANCIS RD ARADE TCE Y MA Turn right onto GRAND JUNCTION ROAD Grand Junction Road and continue Turn left on to Hanson Road or Grand Junction Eastern Parade Road and continue to Hanson Road ADDISON RD For further information Call: 1300 916 221 Email: [email protected] Visit: dpti.sa.gov.au/northernconnector.
Recommended publications
  • Falls Prevention Service Directory
    Falls Prevention Service Directory Central Adelaide Local Health Network June 2012 Welcome to the fifth edition for the Central Adelaide Local Health Network. The Falls Prevention Service Directory has become a must-have resource for health professionals working with older adults who are at risk of falls. Linking individuals to the right services is easier with maps, common referral forms, clear criteria for referral, a decision making tool and alphabetic listings. Central Adelaide Local Health Network primary health services The Central Adelaide Local Health Network (CALHN) provides care for around 420,000 people living in the central metropolitan area of Adelaide as well as providing a number of state-wide services, and services to those in regional areas. More than 3,000 skilled staff provide high quality client care, education, research and health promoting services. The Central Adelaide Local Health Network (CALHN) provides a range of acute and sub acute health services for people of all ages and covers 19 Statistical Local Areas and 10 Local Government Areas and includes the following: > Royal Adelaide Hospital > The Queen Elizabeth Hospital > Hampstead Rehabilitation Centre > St Margaret’s Rehabilitation Hospital > Ambulatory and Primary Health Care (including Super Clinics) > Sub-Acute > Mental Health Services (under the governance of the Adelaide Metro Mental Health Directorate) We are working hard to build a healthy future for South Australia by striving towards our three strategic goals of better health, better care and better services. What is ‘falls prevention’? Falls represent a common and significant problem, especially in our elderly population. Approximately 30% of community-dwelling older persons fall in Australia each year, resulting in significant mortality and morbidity, as well as increased fear of falling and restriction in physical activity.
    [Show full text]
  • Traffic Impact Assessment
    APPENDIX Q9 Traffic impact assessment See attached Traffic Impact Assessment Report prepared by Arup. Olympic Dam Expansion Draft Environmental Impact Statement 2009 Appendix Q 165 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment October 2008 Arup This report takes into account the Arup Pty Ltd ABN 18 000 966 165 particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no Arup responsibility is undertaken to any third Level 17 1 Nicholson Street, party Melbourne VIC 3000 Tel +61 3 9668 5500 Fax +61 3 9663 1546 www.arup.com Job number 085200/01 BHP Billiton Olympic Dam Expansion Environmental Impact Statement Traffic Impact Assessment Contents Page Executive Summary i 1 Introduction 1 2 Existing Conditions 5 2.1 Road Network 5 2.2 Road Classification, Responsibilities and Policies 5 2.3 Road Environment 7 2.4 Traffic Data 13 2.5 Baseline Traffic Flows 19 2.6 Future Road Network Improvements 21 2.7 Rail Network 23 2.8 Rail Operations 25 2.9 Crash Analysis 26 3 Proposed Olympic Dam Expansion 32 3.1 Overview 32 3.2 Olympic Dam Site Expansion Heavy Vehicles AADT 33 3.3 Ancillary Traffic AADT 39 3.4 Total AADT 43 3.5 Traffic Movements Between Townships and Olympic Dam 54 3.6 Road Link Level of Service - Impact 60 3.7 Key Intersections, Peak Hour Traffic and Impacts 64 3.8 Over-Dimensional Load Movements and Impacts 66 3.9 Road Safety 81
    [Show full text]
  • Justification and Benefits of the Northern Expressway and Port Wakefield Road Upgrade
    northernexpressway environmental report B Part B. Need for the Proposal and Consideration of Alternatives 4. Justifi cation and benefi ts of the Northern Expressway and Port Wakefi eld Road Upgrade 4-1 5. Alternative routes considered and the selected route 5-1 6. Economic and fi nancial assessment 6-1 Northern Expressway Environmental Report 4 Justification and benefits of the Northern Expressway and Port Wakefield Road Upgrade 4.1 Introduction The proposed Northern Expressway and Port Wakefield Road Upgrade will provide significant State and regional benefits, in particular by improving access to Adelaide for freight transport via the Sturt Highway, including freight for export from key areas such as the Barossa Valley wine producing area and the Riverland wine and citrus producing area. Together with the Port River Expressway, it will provide a high standard link between the Sturt Highway at Gawler and the Port of Adelaide, South Australia’s main shipping port. It will remove much heavy freight traffic from Main North Road, Angle Vale Road and Heaslip Road, lessening congestion and improving safety for urban traffic in the northern suburbs. 4.1.1 Background Part A outlined the various studies undertaken that justify the need for the Northern Expressway. For example, the Strategic Planning Study by SKM in 1998 concluded that there was a need to provide additional capacity for traffic movement from the outer northern suburbs, and that it is significantly more cost effective to develop a new route on the fringe of the northern urban area than to upgrade the existing Main North Road through northern metropolitan Adelaide.
    [Show full text]
  • SA Speed Survey Results 2008 Road Type Speed Limit Street Suburb
    SA Speed Survey Results 2008 Percentage Number of all of Percentage vehicles Vehicles Average of all exceeding Passing Speed of vehicles the speed during the all exceeding limit by Speed week of vehicles the speed more than Road Type Limit Street Suburb/Town sampling (km/h) limit 10km/h Adelaide local 50 Gilbertson Road Seacliff Park 3227 51.9 62.8 17.5 Adelaide local 50 Coorara Avenue Payneham South 18229 51.2 58.3 10.7 Adelaide local 50 Bermudez Crescent Paralowie 8342 49.8 50.5 10.1 Adelaide local 50 Hambledon Road Campbelltown 13400 49.8 49.4 8.9 Adelaide local 50 Main Street Beverley 6332 48.1 44.1 10.3 Adelaide local 50 Vincent Road Smithfield Plains 1541 46.1 36.1 9.3 Adelaide local 50 Northcote Street Kilburn 7988 45.1 29.0 5.1 Adelaide local 50 Charles Road Beverley 5462 41.8 20.9 4.3 Adelaide local 50 Adelaide Street Maylands 2873 42.1 20.8 2.2 Adelaide local 50 London Drive Salisbury East 7469 37.6 20.0 3.7 Adelaide local 50 Commercial Street Marleston 5349 38.6 19.1 3.2 Adelaide local 50 Archer Street North Adelaide 15525 43.2 18.6 1.5 Adelaide local 50 North Esplanade Glenelg North 11603 40.7 14.7 1.8 Adelaide local 50 Olive Avenue Broadview 2604 39.5 9.2 1.1 Adelaide local 50 Bowyer Street Rosewater 3375 37.4 5.6 0.7 Adelaide local 50 Andrew Avenue Salisbury East 1541 36.9 2.3 0.1 Adelaide local 50 Farrell Street Glenelg South 2231 33.5 2.2 0.2 Adelaide local 50 George Street Adelaide 6372 28.4 0.6 0.0 Adelaide collector 50 Scenic Way Hackham 7665 53.7 68.5 23.6 Adelaide collector 50 Perry Barr Road Hallett Cove 13996 51.3
    [Show full text]
  • 36 Air Quality
    Northern Expressway Environmental Report 36 Air quality 36.1 Introduction This section describes the existing air quality conditions, examines the potential effects of the Port Wakefield Road Upgrade on these conditions and recommends adoption of the management measures identified in Part D, Section 21. An air quality assessment was undertaken to determine the effects of Port Wakefield Road Upgrade on the existing air quality of the study area and to determine if any air quality criteria and guidelines would be exceeded in the future at any sensitive receptors. Refer to Part D, Section 21 for information on the legislative and policy requirements, existing environment air quality criteria, modelling methodology, and construction effects and mitigation measures. 36.2 Effects of the project on the existing environment 36.2.1 Sensitive receptors Inspection of the alignment of the proposed Port Wakefield Road Upgrade was made to identify sensitive receptors close to the roadway. The results are provided for the four major sections of the proposed upgrade: • Section 1: Salisbury Highway to Ryans Road • Section 2: Ryans Road to Bolivar Road • Section 3: Bolivar Road to Burton Road • Section 4: Burton Road to Northern Expressway connection. Section 1: Salisbury Highway to Ryans Road There are no sensitive receptors close to the roadway between Port Wakefield Road and Globe Derby Park. The land to the west of the road is wetlands or salt crystallisation pans. The land to the east of the road is mostly wetlands apart from the new residential estate of Mawson Lakes. No existing houses in Mawson Lakes are within 200 m of the road and future houses will be at least 100 m from the roadway.
    [Show full text]
  • 224F Bus Time Schedule & Line Route
    224F bus time schedule & line map 224F City View In Website Mode The 224F bus line (City) has 2 routes. For regular weekdays, their operation hours are: (1) City: 6:41 AM - 9:02 AM (2) Elizabeth: 2:47 PM - 5:27 PM Use the Moovit App to ƒnd the closest 224F bus station near you and ƒnd out when is the next 224F bus arriving. Direction: City 224F bus Time Schedule 86 stops City Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:41 AM - 9:02 AM Zone C Elizabeth Interchange Bus Access, Elizabeth Tuesday 6:41 AM - 9:02 AM Zone D Elizabeth City Centre - North West side Wednesday 6:41 AM - 9:02 AM Oxenham Drive, Elizabeth Thursday 6:41 AM - 9:02 AM Stop 63 Philip Hwy - East side Friday 6:41 AM - 9:02 AM 7 Philip Highway, Elizabeth Saturday Not Operational Stop 62 Philip Hwy - South East side 29 Philip Highway, Elizabeth Stop 61 Philip Hwy - South East side 224F bus Info Stop 60 Philip Hwy - South East side Direction: City 1 Deverill Street, Elizabeth Stops: 86 Trip Duration: 92 min Stop 59 Philip Hwy - South East side Line Summary: Zone C Elizabeth Interchange, Zone Phillip Highway, Elizabeth D Elizabeth City Centre - North West side, Stop 63 Philip Hwy - East side, Stop 62 Philip Hwy - South Stop 58 Philip Hwy - South East side East side, Stop 61 Philip Hwy - South East side, Stop 149 Philip Highway, Elizabeth 60 Philip Hwy - South East side, Stop 59 Philip Hwy - South East side, Stop 58 Philip Hwy - South East side, Stop 57 Hogarth Rd - North side Stop 57 Hogarth Rd - North side, Stop 56A Hogarth 109 Hogarth Road, Elizabeth
    [Show full text]
  • South Road Superway North-South Corridor • Regency Road to Port River Expressway
    DELIVERING OUR TRANSPORT FUTURE NOW South Road Superway north-south corridor • Regency Road to Port River Expressway Project Impact Report • Executive Summary Environment • Social • Economic South Road Superway Executive Summary The South Australian The proposed South Road Superway will The Superway will extend over the major deliver a non-stop corridor approximately intersections of South Terrace, Wingfield Government has a 4.8 kilometres in length largely consisting rail line, Cormack Road, Grand Junction strategic vision to of an elevated roadway, with multiple Road and Days Road and bypass traffic deliver to the Adelaide lanes in each direction above the existing signals. The Superway will minimise the alignment, between Regency Road and need for property and businesses to be metropolitan area a Port River Expressway. acquired and will enable regional and non-stop north–south local east–west links across South Road The project has been developed as to be maintained and enhanced. corridor for freight and part of the solution to address a lack passenger vehicles of efficiency of the South Road transport This project has been carefully designed between the Port River corridor and increasing urban to minimise adverse social and congestion. This congestion, if allowed environmental effects on the business Expressway and the to worsen, would result in more traffic and broader community. It will support Southern Expressway. delays, higher crash rates, reduced the strategically important northwest South Road is the only amenity as well as reduced business industrial precincts of Outer Harbor, and community access. Port Adelaide, Wingfield and Regency continuous transport link Park as well as the rapidly expanding between these areas An elevated roadway, is considered the industrial and employment hubs within optimum design solution, and when and is crucial for the metropolitan Adelaide and across constructed will be the first in South South Australia.
    [Show full text]
  • 5 Alternative Routes Considered and the Selected Route
    Northern Expressway Environmental Report 5 Alternative routes considered and the selected route 5.1 Northern Expressway 5.1.1 The ‘No Northern Expressway’ option (maintaining the status quo) Without the Northern Expressway, Main North Road would require substantial upgrading and widening to six lanes between Mawson Lakes and Gawler to cater for the future traffic volumes. It is not feasible to upgrade Main North Road to expressway standard considering the number of existing controlled and uncontrolled intersections already along this section and the level of development, both commercial and residential, that exists on both sides of the road. To upgrade to expressway standard would be a prohibitive cost (probably in the range of $1.5 billion to $2.5 billion), and involve extensive local roadworks, cause significant social and environmental effects relating to land acquisition, and seriously reduce community accessibility and increase noise. Realistically, any upgrade will only achieve arterial road standard. A Main North Road upgrade could not provide the same level of service as an expressway and would not meet AusLink objectives. For similar reasons, Angle Vale Road and Heaslip Road could not be upgraded to expressway standard. A number of other arterial roads in the study area would also need upgrading to improve safety and access including Womma Road between Heaslip Road and the Adelaide–Gawler/Barossa rail line, Waterloo Corner Road from Port Wakefield Road to Heaslip Road, and the access roads from the Gawler Bypass into Gawler. In addition, Heaslip–Angle Vale Road would also require upgrading and widening (including duplication) to improve safety and cater for the expected traffic volumes.
    [Show full text]
  • OLSH College Transport Brochure (PDF)
    OLSH OUR LADY OF THE SACRED HEART COLLEGE Transport Information Location Our Lady of the Sacred Heart College is located near the corner of Regency Road and Main North Road, only 7.5 kms from the Adelaide CBD. We are easily and safely accessible by public transport for students from the north, east and west as well as from immediate surrounding suburbs. The College is located near a major community and shopping precinct that services the inner northern suburbs. Public transport bus timetables are available from your local Post Office, Newsagent and most shopping centres. For up-to-date information please contact Passenger Transport Information on 1300 311 108 or visit their website to download a timetable or map www.adelaidemetro.com.au Our Lady of the Sacred Heart College Bus Stop 17A Regency Road Main North Road Regency Bus Plaza Stop 17 Shopping Centre North Park Shopping Centre Sefton Plaza Shopping Centre Bus Routes T-Bus (Route 483) 300 Suburban Connector Arndale Shopping Centre www.adelaidemetro.com.au/routes/483 www.adelaidemetro.com.au/routes/300 Special OLSH College Service Departs Corralyn Terrace 3.30pm (Tuesdays 3.00 pm). Corralyn Terrace, Arndale Shopping Centre to Arndale Shopping Centre (clockwise and anti- Markham Avenue, Regency Road, Port Wakefield Road, Salisbury Highway, clockwise) via Woodville Road, Regency Road, Muller Road, OG Road etc. Philip Highway to Elizabeth Station. OLSH Stop 17A Regency Road Route 224 Route 222 www.adelaidemetro.com.au/routes/224 www.adelaidemetro.com.au/routes/222 Mawson Lakes Interchange to City Mawson Lakes Interchange Elizabeth Interchange to City via Mawson Lakes Elizabeth Interchange Elizabeth Interchange to City via Mawson Lakes Interchange and return via Mawson Lakes Interchange to City via Main North Road, Pooraka, Blair Philip Highway, Salisbury Highway, Mawson Lakes, Main North Road and Athol, Enfield and return.
    [Show full text]
  • Download the Welcome to Salisbury Booklet
    WelcomeuTO SALISBURY Welcome to Salisbury booklet Contents Emergency Numbers ................................................................4 About Salisbury .........................................................................6 Welcome to Salisbury ...............................................................7 Community Centres and Hub ..................................................10 Library Services ....................................................................... 14 Sport and Recreation ..............................................................20 Parks and Reserve ..................................................................23 Living in Salisbury ...................................................................26 Schools and Child Care ................................................................................26 Public Transport ...........................................................................................26 Youth Programs ...........................................................................................26 Salisbury Seniors .........................................................................................26 Health Services ............................................................................................26 Mental Health Support ................................................................................26 Employment and Training Services ............................................................27 The Polaris Centre .......................................................................................27
    [Show full text]
  • Analysis of Infringement Data from Fixed Red Light and Speed Cameras at Signalised Intersections in South Australia
    Analysis of infringement data from fixed red light and speed cameras at signalised intersections in South Australia Mackenzie JRR, Kloeden CN, Hutchinson TP CASR REPORT SERIES CASR071 June 2012 Report documentation REPORT NO. DATE PAGES ISBN ISSN CASR071 June 2012 20 978 1 921645 08 2 1449-2237 TITLE Analysis of infringement data from fixed red light and speed cameras at signalised intersections in South Australia AUTHORS Mackenzie JRR, Kloeden CN, Hutchinson TP PERFORMING ORGANISATION Centre for Automotive Safety Research The University of Adelaide South Australia 5005 AUSTRALIA SPONSORED BY Department of Planning, Transport and Infrastructure GPO Box 1533 Adelaide SA 5001 AUSTRALIA AVAILABLE FROM Centre for Automotive Safety Research http://casr.adelaide.edu.au/reports ABSTRACT Safety cameras are installed at some signalised intersections in South Australia. They photograph vehicles that enter the intersection after the signal has changed to red, or that exceed the speed limit by more than a selected amount. Infringement data at 21 safety camera sites in metropolitan Adelaide was used to track how disobey red light and speeding infringements changed during the first year of operation. It was found that both speeding and red light running decreased over time after the installation of a safety camera. Red light running decreased slowly over time, while speeding fell more rapidly. For the more serious levels of speeding, there was a more rapid fall in infringements during the first few weeks and a slower decline thereafter. Based on this, safety cameras appear to generate a worthwhile improvement in driver behaviour. The fact that continued reductions are seen during the first year of operation suggests that some learning on the part of drivers is occurring.
    [Show full text]
  • Expressway Northern
    northernintroducing the expressway expresswaynorthern info What is the Northern Expressway? and regional communities. People who commute between Gawler and the Port of Adelaide, and the western and southern The Northern Expressway will be a new road initially joining the suburbs of Adelaide will also benefi t. Sturt Highway to Port Wakefi eld Road – and then linking to the Port River Expressway. It will involve: The route will reduce truck movements along Main North Road and Salisbury Highway. The expressway will improve access the construction of a new, two-way expressway standard to Adelaide for freight transport travelling via the Sturt Highway. road between Gawler and Port Wakefi eld Road (approximately This includes freight coming from key areas such as the 23 kilometres), and Barossa Valley and the Riverland. Once linked with the an upgrade of Port Wakefi eld Road from north of Taylor Road Port River Expressway, there will be predicted travel time savings to the Salisbury Highway (10 kilometres) to cater for future of up to 20 minutes between the Sturt Highway at Gawler and traffi c volumes. the Port of Adelaide – South Australia’s main shipping port. The Northern Expressway project is a joint initiative by the The Northern Expressway contributes to AusLink’s key Australian and South Australian Governments under the AusLink objective of assisting national economic and social program. It will be the largest road construction project in the development aimed at improving the effi ciency, safety and state since the 1960s. reliability of the national transport network. This includes improving freight effi ciency and reducing travel time between Why do we need the expressway? Gawler and Outer Harbor.
    [Show full text]