Port River Expressway - Hanson Road Off-Ramp Closure and Detour – Day and Night Works

Port River Expressway - Hanson Road Off-Ramp Closure and Detour – Day and Night Works

Notification • April 2020 Road North-South Corridor Northern Connector Project Port River Expressway - Hanson Road off-ramp closure and detour – day and night works As part of the Northern Connector Project, the Department of Planning, Transport and Infrastructure advises that day and night works will be undertaken on the Port River Expressway, westbound off ramp to Hanson Road. Location: The Hanson Road off-ramp from the Port River Expressway, westbound only, will be closed. Date: From 11pm on Tuesday 7 April, until 5pm Thursday 9 April, weather permitting. Activities: Undertaking pavement and asphalt works, installation of guard rail and new line marking. Traffic management: The Hanson Road off-ramp from the Port River Expressway will be closed. Access to Hanson Road will be maintained via 2 detour options: 1. Via the South Road Superway; or 2. Via the Port River Expressway to Eastern Parade (refer to map). Speed and lane restrictions will apply in the vicinity of the works. Signage and traffic management will be in place to advise motorists of changed conditions. More information: To sign up for traffic updates, please contact the Project Information Line on 1300 916 221 or email your contact details to [email protected]. For real time roadwork information visit www.addinsight.com.au/app and download the app, available for both Apple and Android, or visit the Traffic SA website at www.traffic.sa.gov.au. Thank you for your patience while these important works are undertaken. #15321040 For further information: Call: 1300 916 221 Email: [email protected] Visit: dpti.sa.gov.au/northernconnector Call: 1300 916 221 Email: [email protected] V For further information isit: dpti.sa.go Northern Connector detour map • Hanson Road off ramp from Port River Expressway - April 2020 Road LEGEND DETOUR 2: Northern v .au/northernconnector Connector Northern Connector Continue along the Port River OPEN Main Roads Expressway Detour 1 AY PORT RIVER EXPRESSW Detour 2 SALISBURY HIGHWAY SWAY ER EXPRES ROAD CLOSED RIV RT PO DETOUR 1: Hanson Rd Turn left onto HANSON RD off ramp South Road CLOSED WILKINS RD Superway SOUTH TCE SOUTH ROAD SUPERWAY KAP ARA CORMACK RD RD Exit the WINGFIELD RD Port River PL BOWYER RD Expressway via YMOUTH RD Eastern Parade BEDFORD ST ramp EASTERN P FRANCIS RD ARADE TCE Y MA Turn right onto GRAND JUNCTION ROAD Grand Junction Road and continue Turn left on to Hanson Road or Grand Junction Eastern Parade Road and continue to Hanson Road ADDISON RD For further information Call: 1300 916 221 Email: [email protected] Visit: dpti.sa.gov.au/northernconnector.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us