Lower Fitzroy River Infrastructure Project Draft Environmental Impact

Total Page:16

File Type:pdf, Size:1020Kb

Lower Fitzroy River Infrastructure Project Draft Environmental Impact 25. References Table of contents 25. References ............................................................................................................. i 25.1 Introduction.................................................................................................. 25-1 25.2 Project description ........................................................................................ 25-1 25.3 Legislation and project approvals .................................................................... 25-1 25.4 Climate, natural hazards and climate change .................................................... 25-2 25.5 Land ........................................................................................................... 25-4 25.5.1 Scenic amenity and lighting ........................................................................ 25-4 25.5.2 Topography, geology and soils ................................................................... 25-4 25.5.3 Contaminated land.................................................................................... 25-5 25.5.4 Land use and tenure ................................................................................. 25-6 25.6 Flora ........................................................................................................... 25-6 25.7 Aquatic ecology ............................................................................................ 25-7 25.8 Terrestrial fauna ..........................................................................................25-11 25.9 Surface water resources ...............................................................................25-13 25.10 Groundwater resources ................................................................................25-15 25.11 Water quality...............................................................................................25-15 25.12 Air quality ...................................................................................................25-18 25.13 Greenhouse gas emissions ...........................................................................25-18 25.14 Noise and vibration ......................................................................................25-19 25.15 Waste ........................................................................................................25-19 25.16 Transport....................................................................................................25-20 25.17 Cultural heritage ..........................................................................................25-20 25.17.1 Indigenous cultural heritage ......................................................................25-20 25.17.2 Non-Indigenous cultural heritage................................................................25-20 25.18 Social ........................................................................................................25-21 25.19 Economic ...................................................................................................25-22 25.20 Hazard and risk ...........................................................................................25-23 25.21 Cumulative impacts......................................................................................25-23 25.22 Offsets .......................................................................................................25-24 25.23 Environmental management plan ...................................................................25-25 25.24 Conclusions and recommendations ................................................................25-25 41/20736/444894 Draft environmental impact statement June 2015 i Volume 1 Chapter 26 References 25.1 Introduction Department of Natural Resources and Water (DNRW) 2006, ‘Central Queensland Regional Water Supply Strategy’, Rockhampton, Queensland Government. Gladstone Area Water Board (GAWB) 2013, ‘Strategic Water Plan 2013’ Gladstone. Gladstone Area Water Board (GAWB) 2009, ‘Water Resource (Boyne River Basin) Plan 2000’ Gladstone. Rockhampton Regional Council (RRC) 2013, ‘Rockhampton to Yeppoon Pipeline’, retrieved May 22, 2- 15, from http://www.rockhamptonregion.qld.gov.au/Council_Services/Fitzroy_River_ Water/Water_and_Sewerage_Infrastructure/Rockhampton_to_Yeppoon_Pipeline. Fitzroy River Water (Business Unit of RRC), ND, ‘Rockhampton to Yeppoon: Water Supply Pipeline Project’, from http://www.environment.gov.au/system/files/pages/144e8a38-f97b-4532-87f8- b633f9869a63/files/pipeline-report.pdf 25.2 Project description Australian National Committee on Large Dams (ANCOLD) 1991, ‘Guidelines on Concrete-Faced Rockfill Dams’ ANCOLD International Erosion Control Association (IECA) 2008, ‘Best Practice Erosion and Sediment Control Guideline’ Brisbane, Catchments & Creeks Pty Ltd. Sunwater, 2008a, ‘Rookwood Weir Hydraulic Model Study Report, report prepared for Department of Infrastructure by Sunwater’, Ref: P-AEXP-0803-BF-01-02, File: 07-008799, December, 2008. SunWater,2008b, ‘Proposal for Queensland Regional Water Infrastructure Program: Fitzroy Options Proposal’, Commercial in confidence. State of Queensland (Department of Natural Resources and Water) 2011, ‘Resource Operations Plan January 2004 Amended October 2011 (revision 3’), Brisbane, Queensland Government. 25.3 Legislation and project approvals Australian and New Zealand Environment and Conservation Council (ANZECC) and Agriculture and Resource Management Council of Australia and New Zealand (ARMCANZ) 2000, ‘Australian and New Zealand Guidelines for Fresh and Marine Water Quality’, National Water Quality Management Strategy, Canberra, Commonwealth of Australia. Commonwealth of Australia 2007. ‘Australian Code for the Transport of Dangerous Goods by Road and Rail (7th edition)’. Department of Agriculture and Fisheries 2012a,’ Forest Products – Defined Forest Areas as at 12/11/2012, Defined Forest Area Map SF 56-13’, Rockhampton. Prepared by the Department of Natural Resources and Mines. Department of Agriculture and Fisheries 2012b. ‘Forest Products – Defined Forest Areas as at 12/11/2012. Defined Forest Area Map SF 55-16’, Duaringa. Prepared by the Department of Natural Resources and Mines. Department of Energy and Water Supply (DEWS) 2013, ‘Guidelines on Acceptable Flood Capacity for Water Dams’, Brisbane, Queensland Government. 41/20736/444894 Draft environmental impact statement June 2015 25-1 Volume 1 Chapter 26 References Department of Environment and Resource Management (DERM) 2010, ‘Guidelines for Failure Impact Assessment of Water Dams’, Brisbane, Queensland Government. Department of Environment and Heritage Protection (DEHP) 2014, ‘Queensland Environmental Offsets Policy (Version 1.0)’, Brisbane, Queensland Government. Department of Environment and Resource Management (DERM) 2012, ‘The Queensland Stock Route Network’, retrieved January 8, 2013, from www.derm.qld.gov.au/land/stockroutes/index.html. Department of Natural Resources and Mines (DNRM) 2002, ‘Queensland Dam Safety Management Guidelines, Brisbane, Queensland Government. Department of Natural Resources and Water (DNRW) 2006, ‘Central Queensland Regional Water Supply Strategy’, Rockhampton, Queensland Government. Department of State Development, Infrastructure and Planning (DSDIP) 2012a, ‘State wide water program of works’, retrieved February 19, 2013, from www.dlg.qld.gov.au/infrastructure- delivery/statewide-water-program-of-works.html. Department of State Development, Infrastructure and Planning (DSDIP) 2012b, ‘Guide to the Sustainable Planning Act’, retrieved January 8, 2013, from www.dlg.qld.gov.au/guide-to-the-sustainable-planning-act. Department of State Development, Infrastructure and Planning (DSDIP) 2012c, ‘Central Queensland Regional Plan’, retrieved January 8, 2013, from www.dsdip.qld.gov.au/regional-planning/the-central- queensland-regional-plan.html. Department of State Development, Infrastructure and Planning (DSDIP) 2013, ‘State Planning Policy, draft for consultation April 2013’, February 19, 2013, from www.dsdip.qld.gov.au/resources/policy/state- planning/draft-spp.pdf. Department of Sustainability, Environment, Water, Population and Communities (DSEWPaC) 2010, ‘Introduction to the Aboriginal and Torres Strait Islander Heritage Protection Act’, retrieved February 14, 2013, from www.environment.gov.au/heritage/laws/pubs/introduction-atsihpa.doc. Fisheries Queensland, Department of Agriculture, Forestry and Fisheries 2013a. ‘Code for self- assessable development – Minor waterway barrier works Part 3: culvert crossings (code number WWBW01)’, April 2013. Fisheries Queensland, Department of Agriculture, Forestry and Fisheries 2013b. ‘Code for self- assessable development – Temporary waterway barrier works (code number WWBW02)’, April 2013. National Health and Medical Research Council (NHMRC) and National Resource Management Ministerial Council (NRMMC) 2011, ‘Australian Drinking Water Guidelines Paper 6 National Water Quality Management Strategy’, Canberra, Commonwealth of Australia. State of Queensland (Department of Natural Resources and Water) 2011, ‘Resource Operations Plan January 2004 Amended October 2011 (revision 3)’, Brisbane, Queensland Government. 25.4 Climate, natural hazards and climate change Aurecon Australia Pty Ltd 2012, ‘Rockhampton Regional Council Natural Hazards Risk Assessment (Final Report)’, Brisbane, Aurecon Australia Pty Ltd. 25-2 Draft environmental impact statement June 2015 41/20736/444894 Volume 1 Chapter 26 References Australian Academy of Technological Sciences and
Recommended publications
  • Water for Life
    SQWQ.001.002.0382 • se a er WATER FOR LIFE • Strategic Plan 2010-11 to 2014-15 Queensland Bulk Water Supply Authority (QBWSA) trading as Seqwater 1 SQWQ.001.002.0383 2010-11 to 2014-15 Strategic Plan Contents Foreword ........................................................................................................................................................... 3 Regional Water Grid ......................................................................................................................................... 4 . Seqwater's vision and mission ......................................................................................................................... 5 Our strategic planning framework ................................................................................................................... 5 Emerging strategic issues ................................................................................................................................ 7 Seqwater's goals and strategy for 2010-11 to 2014-15 ................................................................................... 8 • Budget outlook............................................................................................................................................... 10 Strategic performance management ................................................................................................................. 11 Key Performance Indicators ..........................................................................................................................
    [Show full text]
  • Queensland Water Directorate
    supporting ellearning splportunities Queensland Water Directorate Demonstrated progress report Funding - up to AUD$l00,000 Submitted September 2008 to the Industry Integration of E-learning business activity of the national training system's e-learning strategy, the Australian Flexible Learning Framework @ Commonwealth of Australia 2008 For more information about E-learning for Industry: Phone: (02) 6207 3262 Email: [email protected] Website: htt~://industrv.flexiblelearninq.net.au Mail: Canberra Institute of Technology Strategic and National Projects GPO Box 826 Canberra ACT 2601 DET RTI Application 340/5/1797 - File A - Document No. 566 of 991 TAFE Queensland - - * Queensland Government Industry integration of e-learning September 08 Progress Report qldwaterand TAFE Queensland 1. Business - provider partnerships numbers and growth In the past business - provider partnerships for trainiug in the water sector have been adhocand there has been little national coordination. Moreover, at the start of this project there were or~lytwo examples of a business - provider partnership for e-learning in the water industry in Australia. These were: a relationship between Wide Bay Water and Sunwater for water worker training and a preliminary arrangement between Wide Bay TAFE and Wide Bay Water to provide on-line training services to other Councils. The collaborative model of industry sector long-term funding has already (in the first three months) resulted in an increase in the number of relationships through two mechanisms. These are: new partnerships as a direct result of the project, and negotiation of partnerships with other RTOs through leverage provided by the project. Two new partnerships have arisen as a result of the industry funding.
    [Show full text]
  • Annual Report 2011-12
    AnnuAl RepoRt 2011-12 6 September 2012 this Annual Report provides information about the financial and non-financial performance of the Queensland Bulk Water Supply the Hon Mark McArdle Mp Authority (trading as Seqwater) for 2011-12. Minister for energy and Water Supply PO Box 15216 It has been prepared in accordance with the Financial City east QlD 4002 Accountability Act 2009, the Financial and performance Management Standard 2009 and the Annual Report Guidelines the Hon tim nicholls Mp for Queensland government agencies. treasurer and Minister for trade level 9, executive Building the report records the significant achievements against the 100 George St strategies and activities detailed in the organisation’s Strategic Brisbane Qld 4000 and operational plans. this report has been prepared for the Minister for energy and Dear Ministers Water Supply, to submit to parliament. It has also been prepared 2011-12 Seqwater Annual Report to meet the needs of Seqwater’s customers and stakeholders, which include the Commonwealth and local governments, I am pleased to present the Annual Report 2011-12 and industry and business associations and the community. financial statements for the Queensland Bulk Water Supply Authority (QBWSA), trading as Seqwater. this report is publicly available and can be viewed and downloaded from Seqwater’s website at I certify that this Annual Report complies with: www.seqwater.com.au/public/news-publications/annual-reports. • the prescribed requirements of the Financial Accountability Act 2009 and the Financial and performance Management Standard 2009, and • the detailed requirements set out in the Annual Report requirements for Queensland government agencies.
    [Show full text]
  • WATER SECURITY STATUS REPORT December 2020
    WATER SECURITY STATUS REPORT December 2020 SEQ Water Grid capacity Average daily residential consumption Grid operations and overall water security position (L/Person) Despite receiving rainfall in parts of the northern and southern areas The Southern Regional Water Pipeline is still operating in a northerly 100% 250 2019 December average of South East Queensland (SEQ), the region continues to be in Drought direction. The Northern Pipeline Interconnectors (NPI 1 and 2) have been 90% 200 Response conditions with combined Water Grid storages at 57.8%. operating in a bidirectional mode, with NPI 1 flowing north while NPI 80% 150 2 flows south. The grid flow operations help to distribute water in SEQ Wivenhoe Dam remains below 50% capacity for the seventh 70% 100 where it is needed most. SEQ Drought Readiness 50 consecutive month. There was minimal rainfall in the catchment 60% average Drought Response 0 surrounding Lake Wivenhoe, our largest drinking water storage. The average residential water usage remains high at 172 litres per 50% person, per day (LPD). While this is less than the same period last year 40% 172 184 165 196 177 164 Although the December rain provided welcome relief for many of the (195 LPD), it is still 22 litres above the recommended 150 LPD average % region’s off-grid communities, Boonah-Kalbar and Dayboro are still under 57.8 30% *Data range is 03/12/2020 to 30/12/2020 and 05/12/2019 to 01/01/2020 according to the SEQ Drought Response Plan. drought response monitoring (see below for additional details). 20% See map below and legend at the bottom of the page for water service provider information The Bureau of Meteorology (BOM) outlook for January to March is likely 10% The Gold Coast Desalination Plant (GCDP) had been maximising to be wetter than average for much of Australia, particularly in the east.
    [Show full text]
  • Somerset Dam
    ENGINEERS AUSTRALIA ENGINEERING HERITAGE AUSTRALIA HERITAGE RECOGNITION PROGRAM Nomination Document for THE SOMERSET DAM BCC Image BCC-C54-16 Somerset Region South-east Queensland January 2010 Table of Contents Nomination Form .................................................................................................................................. 1 Introduction........................................................................................................................................... 2 Letter of support: ................................................................................................................................... 3 Location Maps ........................................................................................................................................ 4 Heritage Assessment 1. BASIC DATA ..................................................................................................................................... 5 2. ASSESSMENT OF SIGNIFICANCE Statement of Significance:.............................................................................................................. 6 Proposed wording for interpretation panel .......................................................................................... 9 Appendix A: Paper by Geoffrey Cossins............................................................................................... 10 References .................................................................................................................................
    [Show full text]
  • Enrich Quality of Life. 1
    2010 -11 ANNUAL REPORT Enrich quality of life. 1. 3 MILLION PEOPLE RESIDE WITHIN OUR SERVICE TERRITORY Queensland Urban Utilities Annual Report 2010-11 iii ISSN: 1838-5575 © Queensland Urban Utilities 2011 ABOUT THIS REPORT INTERPRETER SERVICE STATEMENT The Queensland Urban Utilities Annual Report is Queensland Urban Utilities is committed to providing a summary of our corporate performance during the accessible services to our customers and stakeholders from 2010-11 financial year. It outlines our operational, culturally and linguistically diverse backgrounds. environmental, social, and financial performance against If you have difficulty in understanding the annual report, key business objectives and targets as set out in the please contact us on 13 14 50 and we will arrange an Corporate Plan, as well as the challenges ahead. The five interpreter to communicate the report to you effectively. key corporate objectives addressed in this report are: • service valued and trusted by customer and community • business efficiency and sustainability • appropriate financial performance • sustainable growth • safe, capable, and dedicated people. ENQUIRIES READERSHIP 8:30am – 4:30pm This report aims to provide information to meet the needs Level 6, Brisbane Transit Centre of individuals and groups who are affected by, or have an West Tower, 171 Roma Street interest in, our activities, including, but not limited to: Brisbane QLD 4000 • our residential and non-residential customers • our employees T: 13 26 57 (7am – 7pm weekdays) • Participating Councils F: +61 7 3403 3208 • government departments E: [email protected] • the community For more information on any of the initiatives, projects • the media. and services mentioned in this report, visit the Queensland We are committed to open and accountable governance, Urban Utilities website at www.urbanutilities.com.au.
    [Show full text]
  • Defence of the First Defendant
    Form 7A (version 5) UCPR 14.3 DEFENCE OF THE FIRST DEFENDANT (To Further Amended Statement of Claim) COURT DETAILS Court Supreme Court of New South Wales Division Common Law Registry Sydney Case number 2014 / 200854 TITLE OF PROCEEDINGS Plaintiff Rodriguez & Sons Pty Limited (ACN 108 770 681) First Defendant Queensland Bulk Water Supply Authority, trading as Seqwater Number of defendants 3 FILING DETAILS Filed for Queensland Bulk Water Supply Authority, trading as Seqwater, First Defendant Legal representative Justin McDonnell, King & Wood Mallesons Legal representative reference JAM/NC 0455057758 Contact name and telephone Justin McDonnell; (07) 3244 8099 Contact email [email protected] 20982018_10 2 Index The First Defendant adopts the headings set out in the Further Amended Statement of Claim. A The Plaintiff 6 B The Defendants 6 C January 2011 Queensland Flood 6 D Group Members and Common Questions 7 E Somerset Dam 9 F Wivenhoe Dam 16 G Flood Mitigation 26 Policy and regulatory framework 26 Safety and Reliability 40 The Interim Program 41 H Seqwater’s Ownership and Control of Somerset Dam and Wivenhoe Dam 47 I SunWater’s Control of Somerset Dam and Wivenhoe Dam 50 J The Flood Mitigation Manual 52 Status, Purpose and Objectives of the Flood Mitigation Manual 52 Flood Operations Personnel and Responsibilities 54 Definition of “Flood Event” 57 Wivenhoe Dam Flood Operations Strategies 58 Somerset Dam Flood Operations Strategies 66 K The Real Time Flood Model 72 L Duties of Care 79 Risk of Harm 79 Seqwater’s Duty of Care as Owner
    [Show full text]
  • Watery 66 P1
    Newsletter No 66 November 2011 Another new DG Terry Wall, having completed his stint as DG has As previously reported, the former Director- resumed his former duties as Associate Director- General of DERM, John Bradley, was appointed DG General, Operations and Environmental Regulation. of the Department of Premier and Cabinet on 6 June. Perhaps Jim Reeves is having second thoughts about Terry Wall acted in the position of DG (DERM) until the wisdom of taking on the position. Almost as soon a new appointment could be made. This has now as he had sat down for the first time, Cougar Energy been done. announced that it would sue the Government and John Jim Reeves took up duties as the Director-General Bradley, Terry Wall and Jim Reeves, seeking damages of the Department of Environment and Resource because of the forced closure of their CSG operations Management on 29 August 2011. Prior to that Jim near Kingaroy. Members will probably be aware of the was the General Manager of the Institute of Sustain- case where carcinogenic chemicals were reported to able Resources at QUT, and previous to that he was have been discharged from their operations. Randall the Divisional Manager of Brisbane Water. Cox was not named in the case, but no doubt, in his Mr Reeves has also served on the boards of the role of managing CSG for the Queensland Water Com- Water Services Association of Australia and the Ur- mission, he will find himself in court. ban Land Development Authority. Another of our colleagues, Peter Allan, has been He has significant leadership and public sector ex- caught up in legal proceedings with the Commission of perience, particularly in the fields of greenhouse gas Inquiry into last wet season’s floods.
    [Show full text]
  • Dams and Weirs Capital Works Program Dams and 27 May2014 Weirs Capital 42627348/01/01
    a Report Dams and Weirs Capital Works Program Dams and 27 May2014 Weirs Capital 42627348/01/01 Works Prepared for: Program Seqwater Prepared by URS Australia Pty Ltd AUSTRALIA DOCUMENT PRODUCTION / APPROVAL RECORD Issue No. Name Signature Date Position Title Prepared by Mike Phillips 27 May 2014 Senior Associate 27 May 2014 Checked by Christopher Dann Senior Principal 27 May 2014 Approved by Christopher Dann Senior Principal Report Name: DOCUMENT REVISION RECORD Dams and Weirs Capital Works Program Issue No. Date Details of Revisions Report No. 42627348/01/01 Status: Final Client Contact Details: Seqwater Issued by: URS Australia Pty Ltd Level 17, 240 Queen Street Brisbane, QLD 4000 GPO Box 302, QLD 4001 Australia T: +61 7 3243 2111 F: +61 7 3243 2199 © Document copyright of URS Australia Pty Limited. No use of the contents, concepts, designs, drawings, specifications, plans etc. included in this report is permitted unless and until they are the subject of a written contract between URS Australia and the addressee of this report. URS Australia accepts no liability of any kind for any unauthorised use of the contents of this report and URS Australia reserves the right to seek compensation for any such unauthorised use. Document Delivery. URS Australia provides this document in either printed format, electronic format or both. URS Australia considers the printed version to be binding. The electronic format is provided for the client’s convenience and URS Australia requests that the client ensures the integrity of this electronic information is maintained. Storage of this electronic information should at a minimum comply with the requirements of the Electronic Transactions Act 2000 (Cth).
    [Show full text]
  • Eminent Queensland Engineers
    EMI ENT QUEENSLAND ENGINEERS Volume II Editor Geoffrey Cossins Eminent Queensland Engineers Volume 11 Editor Geoffrey Cossins Cover picture: Doctor J.J.C. Bradfield Photograph by courtesy of Ipswich North state School. The picture was donated by Bradfield to The Institution of the school with the caption:.. UJ.J.C. Bradfield, C.M.G., D.Sc.Eng., D.E., M.E., Engineers, Australia M.Inst.C.E. M.lnst.E.A. Was taught his Alphabet and received the whole of his Queensland Division Prilu:try }l:dueation at the N'orth Ipswich state School 1872 - 1880." 1999 I EMINENT QUEENSLAND ENGINEERS 11 Institution of Engineers, Australia Queensland Division 447 Upper Edward st BRISBANE QLD 4000 Ph: 07 3832 3749 Fax: 07 3832 2101 E-Mail: [email protected] The Institution of Engineers, Australia is not responsible, as an organisation for the facts and opinions advanced in this pUblication. The copyright for each of the sections is retained by the respective authors. ISBN 085 825 717 3 National Library ofAustralia Catalogue No 620.0092 Printed by Monoset Printers Brendale QLD 4500 a1 1 EMINENT QUEENSLAND ENGINEERS 11 EMINENT QUEENSLAND ENGINEERS 11 TABLE OF CONTENTS PAGE INTRODUCTION 3 CONTRIBUTORS 6 BIOGRAPHIES 1. RBallard 10 2. Sir Charles Barton 12 3. GOBoultan 14 4. A Boyd 16 5. J J C Bradfield 18 6. H G Brameld 20 7. F H Brazier 22 8. F J Byerley 24 9. C M Calder 26 10. GFCardna 28 11. W J Doak 30 12. J W Dowrie 32 13. D Fison 34 14.
    [Show full text]
  • WATER SECURITY STATUS REPORT July 2021
    WATER SECURITY STATUS REPORT July 2021 Overall Water Security Position Wivenhoe and Somerset future levels should recent conditions repeat Average Daily Residential Consumption With the Water Grid levels now below 60%, Seqwater continues 100% 100% to advocate for water efficiency and has a campaign in market to 80% encourage residential demand reduction. The target of 150 litres per 90% person per day (LPD) is in place as per the South East Queensland 60% 80% adaptive drought response approach. 70% 40% Drought Readiness 60% 2020 July average 20% Drought Response 50% 0% % 40% Target 150 (LPD) 30% Jun-19 Jun-20 Jun-21 Jun-22 Sep-19 Sep-20 Sep-21 Dec-19 Dec-20 Dec-21 59.4 Mar-20 Mar-21 Mar-22 20% Combined Brisbane storage level (%) Somerset-Wivenhoe observed Somerset-Wivenhoe forecast based on average monthly changes 2016-2021 10% SEQ 0% Average Litres per Person Day 0.8% 1 month ago Water Grid storage 3.1% 1 year ago *as at 31 July 2021 Water Grid storage actual drawdown to July 2021, with projected drawdown to December 2021. Drought is continuing across the South East Queensland region, with 146 156 145 165 141 143 the Water Grid level now officially below the drought response trigger The Water Grid drawdown graph shows historical storage data and a projected five month drawdown if the rate observed during the dry calendar 1 *Data range is 1/07/2021 - 28/07/2021 and 2/07/2020 - 29/07/2020 at 59.4%. year of 2019 was repeated. The 2019 data is used because it was a particularly dry year.
    [Show full text]
  • Water Reuse and Recycling in Australia- History, Current Situation and Future Perspectives
    Water Cycle 1 (2020) 19–40 Contents lists available at ScienceDirect Water Cycle journal homepage: www.keaipublishing.com/en/journals/water-cycle/ Water reuse and recycling in Australia- history, current situation and future perspectives John C. Radcliffe *, Declan Page CSIRO, Locked Bag 2, Glen Osmond, South Australia, 5064, Australia ARTICLE INFO ABSTRACT Keywords: Most of Australia has low rainfall. The population is small (25 M) but growing at 1.5%/yr. Water limitations are Desalination being exacerbated by climate change. By 1990, restraints placed on wastewater treatment plant (WWTP) dis- Drought charges to receiving waters became an incentive for water recycling. The millennium drought (2000–2009) was a Managed aquifer recharge further driver for water recycling and desalination. Water reform policies, led to guidelines for recycled water, Stormwater including stormwater and augmentation of drinking water. Advanced purified recycled water plants for indirect Water recycling potable reuse were built in Brisbane. Dual pipes for drinking and recycled water were installed in new suburbs in Sydney, Melbourne and Adelaide. Agricultural, industrial and amenity recycled water use was expanded. Seawater desalination plants were installed in Gold Coast, Sydney, Melbourne, Adelaide and Perth. After the drought, economics further influenced the future use of recycled water. Since catchment water was cheaper than recycled or desalinated water, desalination plants were mothballed or maintained at low processing rates. and Brisbane’s advanced water treatment plants were shut. Water policy complacency followed. However, Western Australia, which had declining rainfall, demonstrated to an accepting community that recycled water could be used for groundwater replenishment in Perth’s water supply.
    [Show full text]