Poverty Alleviation and Agriculture Development Demonstration in Poor Areas Project Procurement Plan for Province Public Disclosure Authorized

I. General 1. Bank’s approval Date of the procurement Plan [Original: May 13, 2015: 1stRevision: May 11, 2018] 2. Date of General Procurement Notice: November 23, 2015 3. Period covered by this procurement plan: 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as Public Disclosure Authorized stated in Appendix 1 to the Guidelines for Procurement:

Procurement Method Prior Review Threshold Comments

US$

1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All Public Disclosure Authorized [Add other methods if necessary]

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes 5. Any Other Special Procurement Arrangements: no Public Disclosure Authorized 6. Summary of the Procurement Packages planned: [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7

Ref. No. Description Estimated Packages Domestic Review Comments Preference Cost by Bank (yes/no) US$ million (Prior / Post)

Summary of the ICB (Works)

Summary of the ICB (Goods) Summary of 0.230 1 No Post the NCB (Works)

Summary of the NCB (Goods) Summary of 4.005 119 No Post the Shopping (Works) Summary of 0.135 4 No Post the Shopping (Goods)

Summary of the ICB (Non- Consultant Services)

Summary of the NCB (Non- Consultant Services)

Summary of the Shopping (Non- Consultant Services)

III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments

1. Competitive Methods (Firms) Above US$ 1 million

2. Single Source (Firms) Above US$ 1 million

3. Individual Above US$ 300,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No 4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary of 0.074 3 post number of contracts that will be let under CQS Summary of number of contracts that will be let under IS PROCUREMENT : Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project PLAN General Information Country: China Banks Approval Date of the Original Procurement Plan: 2018-05-13 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-06-04 Project ID: P133326 GPN Date: Project Name: Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project Loan / Credit No: IBRD / 85090 Executing Agency(ies): Sichuan poverty

WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

SCZJGD07 / Zhaojue County Liuhe Township four kg five Public Infrastructure and Request for Single Stage - One Pending villages and other potato projects IBRD / 85090 Post Limited 118,052.00 0.00 2018-06-02 2018-06-26 2018-09-26 Services Quotations Envelope Implementation rectification Village Road (hardening) 1.5 km

SCZJGD08 / Zhaojue County four Kam Township, Yi Li Mu Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 18,016.00 0.00 2018-06-02 2018-06-26 2018-09-26 village potato production road 2 Services Quotations Envelope Implementation kilometers

SCZJGD14 / Zhaojue County, Liangshan County, the village of Public Infrastructure and Request for Single Stage - One Pending slash fire village, a semi fine wool IBRD / 85090 Post Limited 39,344.00 0.00 2018-06-02 2018-06-26 2018-09-26 Services Quotations Envelope Implementation sheep project, 1.2 kilometers of new village road.

SCZJGD12 / Zhaojue County four open Township good Valley Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 53,115.00 0.00 2018-06-02 2018-06-26 2018-09-26 Village potato project rectification Services Quotations Envelope Implementation

Village Road 1.08 kilometers

SCJYG001 / Jinyang Yongsheng konjac farmers' professional Public Infrastructure and Single Stage - One Pending cooperatives remediation village IBRD / 85090 Post Request for Bids Open - National 236,098.00 0.00 2018-05-20 2018-05-25 2018-06-25 2018-06-26 2018-07-06 2018-09-06 Services Envelope Implementation road hardening 3 km project contract

SCBTG01 / Construction of Integrated Value Chain Request for Single Stage - One Pending office building in Luocun co- IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation operatives in Bu Tuo County

SCBTG10 / Building of co- operative room of co-operatives in Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Japanese village in Bu Tuo Development Quotations Envelope Implementation

County

SCXYG140 / regulation Village Road Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 166,256.00 0.00 2018-05-26 2018-06-20 2018-08-20 (hardening) 2 km, New Village Services Quotations Envelope Implementation

Road 0.27 km

SCXYG143 / Xuyong County regulation Village Road Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 81,387.00 0.00 2018-05-26 2018-06-20 2018-08-20 (hardening) 0.73 km, New Village Services Quotations Envelope Implementation

Road 0.73 km

SCXYG145 / A new 1000 mu sweet orange garden drip Public Infrastructure and Single Stage - One Pending IBRD / 85090 Post Request for Bids Open - National 242,689.00 0.00 2018-07-02 2018-07-04 2018-08-04 2018-08-04 2018-08-12 2018-12-30 irrigation system in Xuyong Services Envelope Implementation

County

SCXYG49 / Xuyong county has built 60 cubic meters of water Public Infrastructure and Request for Single Stage - One Pending pool 3, 200 cubic meters of pool IBRD / 85090 Post Limited 80,817.00 0.00 2018-05-27 2018-06-20 2018-08-20 Services Quotations Envelope Implementation 2, PE 1.8 40 km 1.8 km, PE 90 90 km 4.2 km

SCZJGD09 / Zhaojue County four open Township good Valley Public Infrastructure and Request for Single Stage - One Pending Village potato project rectification IBRD / 85090 Post Limited 196,754.00 0.00 2018-06-02 2018-06-26 2018-09-26 Services Quotations Envelope Implementation Village Road (hardening) 2.5 kilometers

SCZJGD10 / haojue County Liuhe Township, the village of Public Infrastructure and Request for Single Stage - One Pending potato in the village of Bo Luo IBRD / 85090 Post Limited 39,351.00 0.00 2018-06-02 2018-06-26 2018-09-26 Services Quotations Envelope Implementation regulation Village Road (hardening) 0.5 km

SCZJGD11 / ZhaojueCounty, Damo Township, Dagu Village, Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 21,820.00 0.00 2018-06-02 2018-06-26 2018-09-26 Potato Project Production Road, Services Quotations Envelope Implementation

2.42 km

SCZJGD13 / Zhaojue County, Bowling Township, United Township, Liangshan Semi- Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 78,702.00 0.00 2018-06-02 2018-06-26 2018-09-26 finishing Sheep Project, Services Quotations Envelope Implementation

Renovation, Village Road (hardened), 1 km

SCZJGD16 / Zhaojue County, Bowling Township, United Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 36,064.00 0.00 2018-06-02 2018-06-26 2018-09-26 Township, Liangshan Semi-fine Services Quotations Envelope Implementation

Sheep Project 4km

SCZJGD17 / Zhaojue County Shaolapo Township Bolige Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 27,049.00 0.00 2018-06-02 2018-06-26 2018-09-26 Village Liangshan Semi-fine Services Quotations Envelope Implementation

Sheep Project 3km

Page 1 SCBTG02 / Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Villages Cooperatives Offices Development Quotations Envelope Implementation

SCZJGD039 / Zhaojue County Liberation Township Liangshan Public Infrastructure and Request for Single Stage - One Pending Semi-finishing Sheep Project IBRD / 85090 Post Limited 78,702.00 0.00 2018-06-04 2018-06-28 2018-09-28 Services Quotations Envelope Implementation Renovation Village Road (hardened) 1km

SCBTG05 / Butuo County Rijie Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Village Cooperative Office Development Quotations Envelope Implementation

SCBTG06 / Suzuo Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office House in IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation Butuo County

SCZJGD040 / Zhaojue County Sangang Township Liangshan Public Infrastructure and Request for Single Stage - One Pending semi-fine wool sheep rectification IBRD / 85090 Post Limited 39,344.00 0.00 2018-06-04 2018-06-28 2018-09-28 Services Quotations Envelope Implementation village inner road (hardened) 0.8 kilometers

SCBTG11 / Yahe Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Butuo IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCZJGD041 / Zhaojue County Shaolapo Township Liangshan Public Infrastructure and Request for Single Stage - One Pending Semi-fine Haired Sheep Project IBRD / 85090 Post Limited 49,180.00 0.00 2018-06-04 2018-06-28 2018-09-28 Services Quotations Envelope Implementation Renovation Village Road Highway (hardened) 1km

SCBTG14 / Buer Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Butuo IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCZJGD042 / Zhaojue County Liuhe Township potato project Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 49,180.00 0.00 2018-06-04 2018-06-28 2018-09-28 remedies village road (hardened) Services Quotations Envelope Implementation

1km

SCBTG17 / Zhuerku Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Butuo IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCZJGD043 / Zhaojue County Sangang Town Liangshan Semi- Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 39,344.00 0.00 2018-06-04 2018-06-28 2018-09-28 finishing Sheep Project 1.2km of Services Quotations Envelope Implementation

Newly Built Village Road

SCBTG18 / Labozuo Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Buto IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCZJGD044 / Zhaoju County Public Infrastructure and Request for Single Stage - One Pending Dimo Potato Project Newly built IBRD / 85090 Post Limited 32,787.00 0.00 2018-06-04 2018-06-28 2018-09-28 Services Quotations Envelope Implementation village road 1km

SCZJGD045 / Zhaojue County Public Infrastructure and Request for Single Stage - One Pending Sangang Township Liangshan IBRD / 85090 Post Limited 27,049.00 0.00 2018-06-04 2018-06-28 2018-09-28 Services Quotations Envelope Implementation Semi-fine Sheep Project 3km

SCZJGD046 / Zhaojue County Bowling Township Liangshan Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 18,033.00 0.00 2018-06-04 2018-06-28 2018-09-28 Semi-fine Sheep Production Services Quotations Envelope Implementation

Project 2 km

SCZJGD047 / Zhaojue County Public Infrastructure and Request for Single Stage - One Pending Sikai Town Potato Project IBRD / 85090 Post Limited 18,033.00 0.00 2018-06-04 2018-06-28 2018-09-28 Services Quotations Envelope Implementation Production Road 2 km

SCBTG22 / Poli Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Buto IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCBTG23 / Moci Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Butuo IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCBTG26 / Ashengrida Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Butuo IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCBTG27 / Laojiugui Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Butuo IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCZJGD048 / Zhaoju County Public Infrastructure and Request for Single Stage - One Pending Dimo Potato Production Project IBRD / 85090 Post Limited 18,033.00 0.00 2018-06-04 2018-06-28 2018-09-28 Services Quotations Envelope Implementation 2 km

SCZJGD049 / Zhaojue County Public Infrastructure and Request for Single Stage - One Pending Sarawipo Township Liangshan IBRD / 85090 Post Limited 9,016.00 0.00 2018-06-04 2018-06-28 2018-09-28 Services Quotations Envelope Implementation Semi-fine Sheep Project 1km

SCBTG28 / Shouzi Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Butuo IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCBTG29 / Dianzi Village Integrated Value Chain Request for Single Stage - One Pending Cooperative Office in Butuo IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation County

SCBTG31 / The village of Butuo Public Infrastructure and Request for Single Stage - One Pending County rectifies the village road IBRD / 85090 Post Limited 73,771.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation (hardened) 1.5 kilometers

Page 2 SCBTG34 / Zuluo Village, Butuo Public Infrastructure and Request for Single Stage - One Pending County, remedies the village road IBRD / 85090 Post Limited 73,771.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation (hardened) 1.5 kilometers

SCBTG35 / Old Tuofeng Village, Public Infrastructure and Request for Single Stage - One Pending Butuo County, remedies village IBRD / 85090 Post Limited 73,771.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation roads (hardened) 1.5 kilometers

SCBTG37 / Road Renovation Public Infrastructure and Request for Single Stage - One Pending (hardening) 1.5km in Niche IBRD / 85090 Post Limited 73,771.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation Village, Butuo County

SCBTG38 / Road in the village of Rida Village, Abu Province, Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 7,377.00 0.00 2018-06-16 2018-07-12 2018-10-12 Butuo County (hardening) 0.15 Services Quotations Envelope Implementation km

SCBTG39 / Butuo County Shou Public Infrastructure and Request for Single Stage - One Pending zi Village Reclamation IBRD / 85090 Post Limited 39,344.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation (hardening) 0.8 km

SCBTG40 / Zhuercun Village Public Infrastructure and Request for Single Stage - One Pending Road Regulation (hardening) 0.8 IBRD / 85090 Post Limited 39,344.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation km in Butuo County

SCBTG41 / Dianzi Village Road Public Infrastructure and Request for Single Stage - One Pending Regulation (hardening) 0.8 km in IBRD / 85090 Post Limited 39,344.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation Butuo County

SCBTG36 / Moci Village Road Public Infrastructure and Request for Single Stage - One Pending Regulation (hardening) 0.8 km in IBRD / 85090 Post Limited 98,360.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation Butuo County

SCBTG42 / Yahe Village Road Public Infrastructure and Request for Single Stage - One Pending Regulation (hardening) 0.8 km in IBRD / 85090 Post Limited 98,360.00 0.00 2018-06-16 2018-07-12 2018-10-12 Services Quotations Envelope Implementation Butuo County

SCJYG002 / Jinyang Yongsheng konjac farmers cooperatives set Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 20,262.00 0.00 2018-06-08 2018-07-02 2018-08-20 up 60 cubic meters of irrigation Services Quotations Envelope Implementation reservoirs 5 contracts

SCJYG003 / Shida village white konjac Public Infrastructure and Request for Single Stage - One Pending Planting Farmers' professional IBRD / 85090 Post Limited 98,360.00 0.00 2018-06-10 2018-07-04 2018-08-23 Services Quotations Envelope Implementation cooperatives new village road 3 km project contract

SCJYG004 / Jinyang County, Shida village, white konjac Planting Farmers' professional Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 20,262.00 0.00 2018-06-08 2018-07-02 2018-08-20 cooperatives to build irrigation Services Quotations Envelope Implementation reservoirs 60 cubic meters and 5 engineering contracts

SCJYG005 / Jinyang County, the village of jiguru white konjac Public Infrastructure and Request for Single Stage - One Pending farmers cooperatives professional IBRD / 85090 Post Limited 20,262.00 0.00 2018-06-08 2018-07-02 2018-08-20 Services Quotations Envelope Implementation irrigation pool 60 cubic meters 5 engineering contracts

SCJYG006 / Jinyang County Desheng white konjac green Public Infrastructure and Request for Single Stage - One Pending pepper pepper farmers' IBRD / 85090 Post Limited 49,180.00 0.00 2018-06-10 2018-07-04 2018-08-23 Services Quotations Envelope Implementation professional cooperative new 1.5 km village road project contract

SCJYG007 / Jinyang County Desheng white konjac green pepper pepper farmers Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 40,524.00 0.00 2018-06-08 2018-07-02 2018-08-20 cooperatives irrigation pool 60 Services Quotations Envelope Implementation cubic meters 10 engineering contracts

SCJYG008 / Jinyang County Desheng white konjac green pepper pepper farmers Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 11,426.00 0.00 2018-06-10 2018-07-04 2018-08-23 professional cooperatives Services Quotations Envelope Implementation irrigation pipe irrigation 4 km project contract

SCJYG009 / Jinyang County Hongli white konjac Planting Public Infrastructure and Request for Single Stage - One Pending Farmers Cooperatives irrigation IBRD / 85090 Post Limited 12,164.00 0.00 2018-06-08 2018-07-02 2018-08-20 Services Quotations Envelope Implementation pool 60 cubic meters 3 engineering contracts

SCJYG010 / Jinyang County Hongli white konjac Planting Public Infrastructure and Request for Single Stage - One Pending Farmers' professional IBRD / 85090 Post Limited 93,803.00 0.00 2018-06-10 2018-07-04 2018-08-23 Services Quotations Envelope Implementation cooperatives to install irrigation pipe 16 km project contract

SCJYG011 / 3 km project Public Infrastructure and Request for Single Stage - One Pending contract of New Village Road in IBRD / 85090 Post Limited 98,361.00 0.00 2018-06-01 2018-06-27 2018-09-27 Services Quotations Envelope Implementation Mu Ni Guer village, Jinyang

SCJYG012 / Jinyang County Fu Tai semi wool sheep professional Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 49,180.00 0.00 2018-06-01 2018-06-27 2018-09-27 cooperative new village road 1.5 Services Quotations Envelope Implementation km project

SCJYG013 / Jinyang County, Fujian Province, semi fine wool Public Infrastructure and Request for Single Stage - One Pending sheep professional cooperative IBRD / 85090 Post Limited 18,032.00 0.00 2018-06-01 2018-06-27 2018-09-27 Services Quotations Envelope Implementation production of 2 km bypass engineering contract

Page 3 SCJYG014 / Jinyang County, Fujian Province, semi fine wool Public Infrastructure and Request for Single Stage - One Pending breeding professional IBRD / 85090 Post Limited 14,279.00 0.00 2018-07-09 2018-08-04 2018-09-30 Services Quotations Envelope Implementation cooperatives irrigation pipe 5 KM project contract

SCJYG017 / Jinyang County Desheng white konjac, green Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-10 2018-07-06 2018-09-06 pepper, farmers' professional Development Quotations Envelope Implementation cooperative office space 100.

SCJYG018 / Jinyang County Ben Kang konjac planting Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-10 2018-07-06 2018-09-06 professional cooperative office Development Quotations Envelope Implementation space construction contract

SCJYG019 / Construction Integrated Value Chain Request for Single Stage - One Pending contract for building office IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-08 2018-07-02 2018-09-02 Development Quotations Envelope Implementation building of Jinyang County

SCJYG020 / Jinyang County TengXiang white konjac Planting Integrated Value Chain Request for Single Stage - One Pending Farmers Professional IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-08 2018-07-02 2018-09-02 Development Quotations Envelope Implementation Cooperatives office space 100 contract project

SCJYG021 / Jinyang County Jia Fu white konjac Planting Integrated Value Chain Request for Single Stage - One Pending Farmers' professional IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-08 2018-07-02 2018-09-02 Development Quotations Envelope Implementation cooperatives office space 100 contract project

SCJYG022 / Jinyang County Lan Po semi fine wool sheep Integrated Value Chain Request for Single Stage - One Pending breeding farmers cooperatives IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-08 2018-07-02 2018-09-02 Development Quotations Envelope Implementation professional office 100 square project contract

SCJYG023 / Jinyang County NYDA IDA semi fine wool sheep Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-08 2018-07-02 2018-09-02 farmers professional cooperative Development Quotations Envelope Implementation office space 100 contract project

SCJYG024 / Jinyang County Jifu metropolitan semi fine wool Integrated Value Chain Request for Single Stage - One Pending sheep farmers professional IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-08 2018-07-02 2018-09-02 Development Quotations Envelope Implementation cooperatives new office space project contract

SCJYG025 / Jinyang County Joint farmers' professional Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-08 2018-07-02 2018-09-02 cooperatives union office 100 Development Quotations Envelope Implementation square project contract

SCJYG034 / Jinyang County, Fujian Province, semi fine wool sheep farmers specialized Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 20,262.00 0.00 2018-06-08 2018-07-02 2018-08-20 cooperatives irrigation reservoir Services Quotations Envelope Implementation

60 cubic meters 5 engineering contracts

SCJYG032 / Contract for Public Infrastructure and Single Stage - One Pending construction of animal husbandry IBRD / 85090 Post Request for Bids Open - National 230,180.00 0.00 2018-06-08 2018-06-10 2018-07-10 2018-07-11 2018-07-23 2018-10-31 Services Envelope Implementation trading market in Jinyang County

SCMGG05 / Jiwei village Integrated Value Chain Request for Single Stage - One Pending professional cooperative building IBRD / 85090 Post Limited 24,590.00 0.00 2018-08-01 2018-08-25 2018-10-25 Development Quotations Envelope Implementation in Ba Pu town, Mei Gu County

SCMGG11 / Mei Gu County, Xixiang, La Luo village, the Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 18,032.00 0.00 2018-06-01 2018-07-02 2018-09-02 construction of 2 kilometers of Services Quotations Envelope Implementation convenient road

SCMGG18 / Mei Gu County, nine villages in the village of Wu Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 157,410.00 0.00 2018-06-01 2018-07-02 2018-09-02 village regulation (hardening) 2 Services Quotations Envelope Implementation km

SCMGG19 / Nine villages in Mei Public Infrastructure and Request for Single Stage - One Pending Gu County, New Village Road IBRD / 85090 Post Limited 30,164.00 0.00 2018-06-01 2018-07-02 2018-09-02 Services Quotations Envelope Implementation 0.92 km

SCMGG20 / 2 kilometers of New Public Infrastructure and Request for Single Stage - One Pending Village Road in Longmen IBRD / 85090 Post Limited 65,574.00 0.00 2018-06-01 2018-07-05 2018-09-05 Services Quotations Envelope Implementation Township, Mei Gu County

SCMGG21 / Mei Gu County, Rama Ai Village, new village Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 73,771.00 0.00 2018-07-01 2018-07-25 2018-09-25 regulation Village Road Services Quotations Envelope Implementation

(hardening) 1.5 km

SCMGG22 / Mei Gu County, La Ma Jiao Township rad village Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 49,180.00 0.00 2018-07-01 2018-07-25 2018-09-25 regulation Village Road Services Quotations Envelope Implementation

(hardening) 1 km

SCMGG23 / Mei Gu County, Public Infrastructure and Request for Single Stage - One Pending nine villages, nine villages, new IBRD / 85090 Post Limited 22,541.00 0.00 2018-06-01 2018-07-02 2018-09-02 Services Quotations Envelope Implementation production of 2.5 kilometers

SCMGG24 / The new rural area of Luo Yi Yi village in Mei Gu Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 22,541.00 0.00 2018-06-01 2018-07-05 2018-09-05 county has 2.5 kilometers of new Services Quotations Envelope Implementation production.

Page 4 SCMGG25 / Mei Gu County, Luo Wo Yi village EBOHR Wo Public Infrastructure and Request for Single Stage - One Pending Village 60 cubic meters of new IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-05 2018-09-02 Services Quotations Envelope Implementation reservoir 1 Install PE 40 pipe 3 km

SCMGG26 / Mei Gu County, Luo Yi Yi village, a new 60 cubic Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-05 2018-09-02 meter reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG27 / Mei Gu County agricultural township Yi Cun new Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-05 2018-09-02 60 cubic meters reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG28 / Mei Gu County, farming village, WA Yi village, a Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,606.00 0.00 2018-06-01 2018-07-05 2018-09-02 new 60 cubic meter reservoir 1. Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG29 / Mei Gu County rural farming village of new 60 Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-05 2018-09-02 cubic meters reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG30 / Mei Gu County, nine villages, new village of 60 Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-02 2018-09-02 cubic meters, 1 reservoirs Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG31 / Mei Gu County, nine villages, new village of 60 Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-02 2018-09-02 cubic meters of water storage 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG32 / Mei Gu County, nine villages, Bo Wo bitter New Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-02 2018-09-02 60 cubic meters reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG33 / A new 60 cubic meter cistern of 1 PE in the Public Infrastructure and Request for Single Stage - One Pending Longmen village of Mei Gu IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-05 2018-09-02 Services Quotations Envelope Implementation County, 3 km in diameter, is installed in the village.

SCMGG34 / A new 60 cubic meter reservoir in Longmen Public Infrastructure and Request for Single Stage - One Pending village, Mei Gu County, has 1 IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-05 2018-09-02 Services Quotations Envelope Implementation cubic meters installed PE 3 40 kilometers.

SCMGG35 / Mei Gu County, Longmen Township, new village Public Infrastructure and Request for Single Stage - One Pending 60 cubic meters of cistern IBRD / 85090 Post Limited 12,607.00 0.00 2018-07-01 2018-07-28 2018-09-20 Services Quotations Envelope Implementation reservoir 1, install PE 3 40 km pipeline

SCMGG36 / Mei Gu County, Longmen Township tree Buyi Luo Public Infrastructure and Request for Single Stage - One Pending village, a new 60 cubic meters IBRD / 85090 Post Limited 12,607.00 0.00 2018-07-01 2018-07-28 2018-09-20 Services Quotations Envelope Implementation reservoir 1, install PE 3 40 km pipeline

SCMGG37 / Mei Gu County, the village of new town of 60 cubic Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-04 2018-07-02 2018-09-05 meters of cistern reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 1.5 km

SCMGG38 / Mei Gu County, the town of Bago Town, new village Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-04 2018-07-02 2018-09-05 60 cubic meters reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG39 / 60 new cubic meters of 1 reservoirs in sprinler Public Infrastructure and Request for Single Stage - One Pending village, BAP Town, Mei Gu IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-04 2018-07-02 2018-09-05 Services Quotations Envelope Implementation County Install PE 40 pipe 3 km

SCMGG40 / Ha Gu village, Longmen Township, Mei Gu Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 19,443.00 0.00 2018-07-01 2018-07-28 2018-09-20 County, has built 200 cubic Services Quotations Envelope Implementation meters of reservoir 1.

SCMGG41 / 1.92 kilometers of New Village Road in Longmen Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 62,951.00 0.00 2018-07-01 2018-07-28 2018-09-20 village, Ma Ma Village, Mei Gu Services Quotations Envelope Implementation

County

SCMGG42 / Mei Gu County, Public Infrastructure and Request for Single Stage - One Pending Xixiang, 1 wells in the New IBRD / 85090 Post Limited 32,787.00 0.00 2018-06-02 2018-06-30 2018-08-30 Services Quotations Envelope Implementation Village Road

SCMGG43 / Village Road in Public Infrastructure and Request for Single Stage - One Pending Longmen village of Mei Gu IBRD / 85090 Post Limited 73,771.00 0.00 2018-07-01 2018-07-28 2018-09-20 Services Quotations Envelope Implementation County, 1.5 km

SCMGG44 / Mei Gu County, WA Xixiang, West Village Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 49,180.00 0.00 2018-06-01 2018-07-02 2018-09-02 regulation Village Road Services Quotations Envelope Implementation

(hardening) 1 km

SCMGG45 / A new production road 5 kilometers in the village of Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 45,082.00 0.00 2018-08-01 2018-08-29 2018-11-15 Er Ma Village, Longmen Services Quotations Envelope Implementation

Township, Mei Gu County

Page 5 SCMGG46 / Mei Gu County, farming village, new village 60 Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-01 2018-07-05 2018-09-02 cubic meters, 1 reservoirs Services Quotations Envelope Implementation

Install PE 40 pipe 1.5 km

SCMGG47 / Mei Gu County agricultural township Yi Cun new Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-01 2018-07-05 2018-09-02 60 cubic meters reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 1.5 km

SCMGG48 / Mei Gu County farm farming village new 60 cubic Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-01 2018-07-05 2018-09-02 meters reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG49 / Mei Gu County, WA Xixiang, West Village Public Infrastructure and Request for Single Stage - One Pending installed PE 40 1.5 km pipeline, IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-01 2018-07-02 2018-09-02 Services Quotations Envelope Implementation 60 cubic meters of new reservoir 1.

SCMGG50 / Mei Gu County, Public Infrastructure and Request for Single Stage - One Pending Xixiang, La Luo village, PE 1.5 40 IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-01 2018-07-02 2018-09-02 Services Quotations Envelope Implementation km pipeline

SCMGG51 / Mei Gu County, Xixiang, Dalla am village, PE 40 Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-01 2018-07-02 2018-09-02 1.5 km pipeline, 1 cubic meters Services Quotations Envelope Implementation of new 60 cubic meters.

SCMGG52 / Mei Gu County, Xixiang, Nei Mu village installed Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-01 2018-07-02 2018-09-02 PE 1.5 40 km pipeline, 60 cubic Services Quotations Envelope Implementation meters of new reservoir 1.

SCMGG54 / Mei Gu County, BAP town ridge village new 60 Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-04 2018-07-02 2018-09-05 cubic meters reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG55 / 60 new cubic meters of 1 new reservoirs in Public Infrastructure and Request for Single Stage - One Pending Sanhe Village, BAP Town, Mei IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-04 2018-07-02 2018-09-05 Services Quotations Envelope Implementation Gu County Install PE 40 pipe 1.5 km

SCMGG56 / Mei Gu County, Longmen village, new village 60 Public Infrastructure and Request for Single Stage - One Pending cubic meters of water storage IBRD / 85090 Post Limited 12,607.00 0.00 2018-08-01 2018-08-29 2018-10-15 Services Quotations Envelope Implementation tank 1, install PE 3 40 km pipeline

SCMGG57 / Mei Gu County, Longmen Township, hung Bi Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 9,754.00 0.00 2018-08-01 2018-08-29 2018-10-15 Village, a new 60 cubic meter Services Quotations Envelope Implementation reservoir 1, PE 2 40 km pipeline

SCMGG58 / Mei Gu County, according to Guo Gu township, ancient village 60 cubic meters of Public Infrastructure and Request for Single Stage - One Pending new reservoir 1 IBRD / 85090 Post Limited 126,380.00 0.00 2018-06-04 2018-07-02 2018-09-05 Services Quotations Envelope Implementation Installation of PE 1.5 40 km pipeline, regulation of Village Road (hardening) 1.5 km

SCMGG59 / Mei Gu County, Yi Guo Jue Township, according to Public Infrastructure and Request for Single Stage - One Pending the village of new 60 cubic IBRD / 85090 Post Limited 8,334.00 0.00 2018-06-04 2018-07-02 2018-09-05 Services Quotations Envelope Implementation meters of the reservoir 1 Install PE 40 pipe 1.5 km

SCMGG60 / Mei Gu County, according to Guo Er Township, Public Infrastructure and Request for Single Stage - One Pending Erma village, a new 60 cubic IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-04 2018-07-02 2018-09-05 Services Quotations Envelope Implementation meter reservoir 1. Install PE 40 pipe 1.5 km

SCMGG61 / Mei Gu County, Longmen Township, the village Public Infrastructure and Request for Single Stage - One Pending has 200 cubic meters of new IBRD / 85090 Post Limited 57,016.00 0.00 2018-08-01 2018-08-29 2018-10-15 Services Quotations Envelope Implementation reservoir 1, PE 7 40, 7 kilometers, PE 3, 3 kilometers.

SCMGG67 / Mei Gu County Jue Public Infrastructure and Request for Single Stage - One Pending Luo Russian village regulation IBRD / 85090 Post Limited 102,312.00 0.00 2018-06-05 2018-06-30 2018-08-30 Services Quotations Envelope Implementation Village Road (hardening) 1.3 km

SCMGG72 / Mei Gu County jilo Township jilo village new 60 cubic Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-06-05 2018-06-30 2018-08-30 meters reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG73 / Mei Gu County, Jue Luo Township, Pago village, Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-07-01 2018-07-25 2018-09-25 a new 60 cubic meter reservoir 1. Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG80 / Mei Gu County, Xixiang, west of the village of PE Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 50,148.00 0.00 2018-06-02 2018-06-30 2018-08-30 PE 40 2 km / 60 cubic meters Services Quotations Envelope Implementation reservoir 1, 90 km 4 km

SCMGG81 / Mei Gu County, West Ye Xi Township, the core Public Infrastructure and Request for Single Stage - One Pending village of PE, 40 km, 2 km, 60 IBRD / 85090 Post Limited 21,492.00 0.00 2018-06-02 2018-06-30 2018-08-30 Services Quotations Envelope Implementation cubic meters, 1 reservoirs, PE 2, 63 km, 2 km.

Page 6 SCMGG82 / Mei Gu County well ye te Xixiang thousand village PE Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 15,656.00 0.00 2018-06-02 2018-06-30 2018-08-30 40 2 km, 60 cubic meters, 1 Services Quotations Envelope Implementation reservoirs / PE 1 63 km 1 km

SCMGG83 / Mei Gu County, Xixiang fine leaf bamboo picking Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-02 2018-06-30 2018-08-30 village PE 40 1.5 km / 60 cubic Services Quotations Envelope Implementation meters reservoir 1.

SCMGG84 / Mei Gu County, Xixiang, Tate Ye Village, PE Public Infrastructure and Request for Single Stage - One Pending village, installed with a diameter IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-02 2018-06-30 2018-08-30 Services Quotations Envelope Implementation of 40 km, 1.5 km / 60 cubic meters, 1 reservoirs.

SCMGG85 / Mei Gu County well ye te Xixiang West Village Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 8,335.00 0.00 2018-06-02 2018-06-30 2018-08-30 installed PE, 40, 1.5 km, 60 Services Quotations Envelope Implementation cubic meters, 1 reservoirs.

SCMGG88 / Mei Gu County, Jilao Township, the village of e 60 Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-08-01 2018-08-25 2018-10-25 cubic meters of new reservoir 1. Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

SCMGG89 / Mei Gu County jilo Township Code Arni village 60 Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 12,607.00 0.00 2018-08-01 2018-08-25 2018-10-25 cubic meters of new reservoir 1 Services Quotations Envelope Implementation

Install PE 40 pipe 3 km

GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

SCMGH01 / 10 cooperative Integrated Value Chain Request for Single Stage - One Under office equipment purchase in Mei IBRD / 85090 Post Limited 38,525.00 0.00 2018-05-28 2018-05-27 2018-06-22 2018-07-20 Development Quotations Envelope Implementation Gu County

SCJYH046 / Jinyang county poverty alleviation project Public Infrastructure and Request for Single Stage - One Pending management center, product IBRD / 85090 Post Limited 16,967.00 0.00 2018-06-13 2018-07-07 2018-08-06 Services Quotations Envelope Implementation market information release platform.

SCBTH03 / The product market Public Infrastructure and Request for Single Stage - One Pending information platform of the project IBRD / 85090 Post Limited 16,967.00 0.00 2018-06-22 2018-07-15 2018-07-30 Services Quotations Envelope Implementation office of Bu Tuo County

SCBTH02 / 11 cooperative office Integrated Value Chain Request for Single Stage - One Pending equipment purchase in Bu Tuo IBRD / 85090 Post Limited 42,377.00 0.00 2018-07-11 2018-08-06 2018-08-21 Development Quotations Envelope Implementation County

SCJYH044 / Jinyang County 7.5 fine wool sheep project area Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 26,967.00 0.00 2018-06-13 2018-07-09 2018-08-05 cooperative 7 sets of office Development Quotations Envelope Implementation equipment procurement contract

SCJYH045 / Jinyang County 7.5 fine wool sheep project area Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 48,311.00 0.00 2018-06-13 2018-07-09 2018-08-05 cooperative 7 sets of office Development Quotations Envelope Implementation furniture procurement contract

NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

SCMGFZ02 / Walnut trademark Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 8,196.00 0.00 2018-08-28 2018-09-22 2018-12-20 registration in Mei Gu County Services Quotations Envelope Implementation

SCMGFZ03 / Certification of Public Infrastructure and Request for Single Stage - One Pending walnut green agricultural IBRD / 85090 Post Limited 22,459.00 0.00 2018-08-28 2018-09-22 2019-10-01 Services Quotations Envelope Implementation products in Mei Gu County

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

SCMGZ12 / The design of the Consultant Public Infrastructure and Pending walnut trademark in meigu IBRD / 85090 Post Qualification Open - National 8,197.00 0.00 2018-08-20 2018-08-28 2018-09-13 2018-09-20 2018-09-23 2018-10-20 Services Implementation county. Selection

Consultant SCMGZ13 / Packaging design of Public Infrastructure and Pending IBRD / 85090 Post Qualification Open - National 14,754.00 0.00 2018-08-20 2018-08-28 2018-09-13 2018-09-15 2018-09-24 2018-10-24 Walnut in Mei Gu County Services Implementation Selection

SCXYZ19 / Investigation and Consultant design of drip irrigation system Public Infrastructure and Pending IBRD / 85090 Post Qualification Open - National 13,118.00 0.00 2018-05-22 2018-05-27 2018-06-27 2018-06-30 2018-07-09 2018-07-29 for 1000 mu sweet orange garden Services Implementation Selection in Xuyong County

SCXYZ18 / Sichuan World Bank six phase poverty alleviation Consultant Research, Training and Pending project "industrial poverty IBRD / 85090 Post Qualification Open - National 24,590.00 0.00 2018-07-16 2018-08-06 2018-09-19 2018-10-19 2018-11-23 2019-05-22 Extension Implementation alleviation risk prevention" project Selection research

Page 7 SCGLZ011 / Research on the "poverty alleviation model of Consultant Research, Training and Pending industry" in the six phase of IBRD / 85090 Post Qualification Open - National 24,590.00 0.00 2018-07-16 2018-08-06 2018-09-19 2018-10-19 2018-11-23 2019-05-22 Extension Implementation poverty alleviation project of Selection Sichuan World Bank

SCXYZ17 / Research on Consultant cooperative operation mechanism Research, Training and Pending IBRD / 85090 Post Qualification Open - National 24,590.00 0.00 2018-07-16 2018-08-06 2018-09-19 2018-10-19 2018-11-23 2019-05-22 of Sichuan World Bank's six Extension Implementation Selection phase poverty alleviation project

INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Page 8