Poverty Alleviation and Agriculture Development Demonstration in Poor Areas Project Procurement Plan for Sichuan Province Public Disclosure Authorized I. General 1. Bank’s approval Date of the procurement Plan [Original: May 13, 2015: 1stRevision: May 11, 2018] 2. Date of General Procurement Notice: November 23, 2015 3. Period covered by this procurement plan: 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as Public Disclosure Authorized stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 10million All 2. NCB (Goods) Above US$ 2million All 3. ICB (Works) Above US$ 40 million All 4. NCB (Works) Above US$ 10 million All 5. (Non-Consultant Services) Above US$ 2million All Public Disclosure Authorized [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Yes, in procurement manual] 4. Reference to (if any) Project Operational/Procurement Manual: Yes 5. Any Other Special Procurement Arrangements: no Public Disclosure Authorized 6. Summary of the Procurement Packages planned: [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. No. Description Estimated Packages Domestic Review Comments Preference Cost by Bank (yes/no) US$ million (Prior / Post) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of 0.230 1 No Post the NCB (Works) Summary of the NCB (Goods) Summary of 4.005 119 No Post the Shopping (Works) Summary of 0.135 4 No Post the Shopping (Goods) Summary of the ICB (Non- Consultant Services) Summary of the NCB (Non- Consultant Services) Summary of the Shopping (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 1 million 2. Single Source (Firms) Above US$ 1 million 3. Individual Above US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ million (Prior / Post) Summary of number of contracts that will be let under QCBS Summary of 0.074 3 post number of contracts that will be let under CQS Summary of number of contracts that will be let under IS PROCUREMENT China : Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project PLAN General Information Country: China Banks Approval Date of the Original Procurement Plan: 2018-05-13 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-06-04 Project ID: P133326 GPN Date: Project Name: Poverty Alleviation and Agriculture-based Industry Pilot and Demonstration in Poor Areas Project Loan / Credit No: IBRD / 85090 Executing Agency(ies): Sichuan poverty WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCZJGD07 / Zhaojue County Liuhe Township four kg five Public Infrastructure and Request for Single Stage - One Pending villages and other potato projects IBRD / 85090 Post Limited 118,052.00 0.00 2018-06-02 2018-06-26 2018-09-26 Services Quotations Envelope Implementation rectification Village Road (hardening) 1.5 km SCZJGD08 / Zhaojue County four Kam Township, Yi Li Mu Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 18,016.00 0.00 2018-06-02 2018-06-26 2018-09-26 village potato production road 2 Services Quotations Envelope Implementation kilometers SCZJGD14 / Zhaojue County, Liangshan County, the village of Public Infrastructure and Request for Single Stage - One Pending slash fire village, a semi fine wool IBRD / 85090 Post Limited 39,344.00 0.00 2018-06-02 2018-06-26 2018-09-26 Services Quotations Envelope Implementation sheep project, 1.2 kilometers of new village road. SCZJGD12 / Zhaojue County four open Township good Valley Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 53,115.00 0.00 2018-06-02 2018-06-26 2018-09-26 Village potato project rectification Services Quotations Envelope Implementation Village Road 1.08 kilometers SCJYG001 / Jinyang Yongsheng konjac farmers' professional Public Infrastructure and Single Stage - One Pending cooperatives remediation village IBRD / 85090 Post Request for Bids Open - National 236,098.00 0.00 2018-05-20 2018-05-25 2018-06-25 2018-06-26 2018-07-06 2018-09-06 Services Envelope Implementation road hardening 3 km project contract SCBTG01 / Construction of Integrated Value Chain Request for Single Stage - One Pending office building in Luocun co- IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Development Quotations Envelope Implementation operatives in Bu Tuo County SCBTG10 / Building of co- operative room of co-operatives in Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Japanese village in Bu Tuo Development Quotations Envelope Implementation County SCXYG140 / Xuyong County regulation Village Road Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 166,256.00 0.00 2018-05-26 2018-06-20 2018-08-20 (hardening) 2 km, New Village Services Quotations Envelope Implementation Road 0.27 km SCXYG143 / Xuyong County regulation Village Road Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 81,387.00 0.00 2018-05-26 2018-06-20 2018-08-20 (hardening) 0.73 km, New Village Services Quotations Envelope Implementation Road 0.73 km SCXYG145 / A new 1000 mu sweet orange garden drip Public Infrastructure and Single Stage - One Pending IBRD / 85090 Post Request for Bids Open - National 242,689.00 0.00 2018-07-02 2018-07-04 2018-08-04 2018-08-04 2018-08-12 2018-12-30 irrigation system in Xuyong Services Envelope Implementation County SCXYG49 / Xuyong county has built 60 cubic meters of water Public Infrastructure and Request for Single Stage - One Pending pool 3, 200 cubic meters of pool IBRD / 85090 Post Limited 80,817.00 0.00 2018-05-27 2018-06-20 2018-08-20 Services Quotations Envelope Implementation 2, PE 1.8 40 km 1.8 km, PE 90 90 km 4.2 km SCZJGD09 / Zhaojue County four open Township good Valley Public Infrastructure and Request for Single Stage - One Pending Village potato project rectification IBRD / 85090 Post Limited 196,754.00 0.00 2018-06-02 2018-06-26 2018-09-26 Services Quotations Envelope Implementation Village Road (hardening) 2.5 kilometers SCZJGD10 / haojue County Liuhe Township, the village of Public Infrastructure and Request for Single Stage - One Pending potato in the village of Bo Luo IBRD / 85090 Post Limited 39,351.00 0.00 2018-06-02 2018-06-26 2018-09-26 Services Quotations Envelope Implementation regulation Village Road (hardening) 0.5 km SCZJGD11 / ZhaojueCounty, Damo Township, Dagu Village, Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 21,820.00 0.00 2018-06-02 2018-06-26 2018-09-26 Potato Project Production Road, Services Quotations Envelope Implementation 2.42 km SCZJGD13 / Zhaojue County, Bowling Township, United Township, Liangshan Semi- Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 78,702.00 0.00 2018-06-02 2018-06-26 2018-09-26 finishing Sheep Project, Services Quotations Envelope Implementation Renovation, Village Road (hardened), 1 km SCZJGD16 / Zhaojue County, Bowling Township, United Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 36,064.00 0.00 2018-06-02 2018-06-26 2018-09-26 Township, Liangshan Semi-fine Services Quotations Envelope Implementation Sheep Project 4km SCZJGD17 / Zhaojue County Shaolapo Township Bolige Public Infrastructure and Request for Single Stage - One Pending IBRD / 85090 Post Limited 27,049.00 0.00 2018-06-02 2018-06-26 2018-09-26 Village Liangshan Semi-fine Services Quotations Envelope Implementation Sheep Project 3km Page 1 SCBTG02 / Butuo County Integrated Value Chain Request for Single Stage - One Pending IBRD / 85090 Post Limited 24,590.00 0.00 2018-06-27 2018-07-25 2018-11-25 Villages Cooperatives Offices Development Quotations Envelope Implementation SCZJGD039 / Zhaojue County Liberation
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages11 Page
-
File Size-