Mongolia 2020 International Religious Freedom Report
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Report of the Portfolio Monitoring Mission in Mongolia
AFB/B.28/5 3 October 2016 Adaptation Fund Board Twenty-eighth Meeting Bonn, Germany, 6-7 October 2016 Agenda item 9 REPORT OF THE PORTFOLIO MONITORING MISSION IN MONGOLIA AFB/B.28/5 INTRODUCTION Context and scope of the mission 1. As part of the Knowledge Management (KM) Strategy and the secretariat’s work plan for FY16 which was approved by the Adaptation Fund Board (the Board) at its twenty-fifth meeting (Decision B.25/19), the Adaptation Fund Board secretariat (the secretariat) conducts missions to projects/programmes under implementation to collect and analyze lessons learned through its portfolio. So far, such missions have been conducted in Ecuador, Senegal, Honduras, Nicaragua, Jamaica, Argentina and Uruguay. This report covers the FY16 portfolio monitoring mission that took place in June 2016 in the project “Ecosystem Based Adaptation Approach to Maintaining Water Security in Critical Water Catchments in Mongolia” implemented by the United Nations Development Programme (UNDP). 2. The mission targeted this project for the following reasons: a) it enables to explore implications of the Ecosystem-Based Adaptation (EBA) approach, including its efficiency, effectiveness and sustainability; b) it may allow drawing lessons from the valuation of ecosystem services; c) it may allow taking stock of the arrangements for monitoring and evaluation, and the value of mid-term review in adjusting progress towards results. Methodology 3. The secretariat was represented by a senior climate change specialist and a junior professional associate. An Adaptation Fund Board alternate member was also part of the delegation. The mission was carried out from 12 to 18 June, and included field visits to project sites. -
CHAPTER 1 INTRODUCTION 1.1 Introduction
CHAPTER 1 INTRODUCTION 1.1 Introduction Transport plays a crucial role in the efficient functioning of the domestic economy as well as development of international trade due to dependence on both coal-based energy production and imports. However, the issues in the transport sector of Mongolia are mainly derived from the salient features of a landlocked country with a low population and a long distance between population centers. A major characteristics of transportation in Mongolia is the collection and distribution by road of both passenger traffic and cargo transport from the north-south transport axis centering on Ulaanbaatar. The main north-south axis comprises both rail and road. Within road transport, the density of arterial road network remains very low and unpaved earth roads or multiple shifting tracks occupy a large portion of arterial roads. More than 30% of population and a half of national car ownership are concentrated in Ulaanbaatar City, while very low level of mobility is found in rural area because non-motorized traffic such as horse and cart prevails. Recently, such gap of mobility level is increasing. Under such circumstances, in response to the request of the Government of Mongolia (hereinafter referred to as "GOM"), the Government of Japan decided to conduct the Feasibility Study on Construction of Eastern Arterial Road in Mongolia (hereinafter referred to as "the Study"), in accordance with the relevant laws and regulations in force in Japan. Japan International Cooperation Agency (hereinafter referred to as "JICA"), the official agency responsible for the implementation of the technical cooperation programs of the Government of Japan, dispatched the preparatory study team headed by Mr. -
2016/2017 Dzud Emergency Response, Mongolia Needs Assessment and Response Plan
2016/2017 Dzud Emergency Response, Mongolia Needs Assessment and Response Plan Photo: Regis Defurnaux, 2016 People in Need January 2017 LIST OF FIGURES 2 LIST OF ACRONYMS 2 GLOSSARY 2 INTRODUCTION 3 CONTEXT 3 ASSESSMENT METHODOLOGY 5 CURRENT SITUATION 7 DORNOD PROVINCE 11 KHENTII PROVINCE 14 SUKHBAATAR PROVINCE 15 PIN RESPONSE PLAN 16 VULNERABILITY CRITERIA AND BENEFICIARY SELECTION PROCESS 16 1 ESTIMATES OF AFFECTED AND TARGET HOUSEHOLDS IN DORNOD, KHENTII AND SUKHBAATAR PROVINCES 17 AGRICULTURE 18 EARLY RECOVERY 21 COORDINATION & FUNDRAISING 22 UN CERF 22 UN HUMANITARIAN COUNTRY TEAM - AGRICULTURAL CLUSTER 22 ANNEXES 24 Annex 1. Data collection sheet 24 Annex 2: Beneficiary selection process 24 Annex 3: Photos 24 SOURCES 24 2016/2017 Dzud Emergency Response: Needs Assessment and Response Plan People in Need, January 2017 List of Figures FIGURE 1: DZUD CONTRIBUTIONS AND THEIR IMPACT ........................................................................................... 4 FIGURE 2: DATA COLLECTED DURING THE NEEDS ASSESSMENT ........................................................................... 6 FIGURE 3: INDICATORS SIGNALLING THE SEVERITY OF 2016/2017 DZUD COMPARED TO LAST YEAR .................. 7 FIGURE 4: SOUMS EVALUATED AS WITH DZUD IN DORNOD, KHENTII AND SUKHBAATAR PROVINCES .................. 9 FIGURE 5: COMPARISON OF DZUD SITUATION IN MONGOLIA IN DECEMBER 2016 AND JANUARY 2017 ............ 10 FIGURE 6: SOUMS IN DORNOD PROVINCE ........................................................................................................... -
SIS) – 2017 Version
Information Sheet on EAA Flyway Network Sites Information Sheet on EAA Flyway Network Sites (SIS) – 2017 version Available for download from http://www.eaaflyway.net/about/the-flyway/flyway-site-network/ Categories approved by Second Meeting of the Partners of the East Asian-Australasian Flyway Partnership in Beijing, China 13-14 November 2007 - Report (Minutes) Agenda Item 3.13 Notes for compilers: 1. The management body intending to nominate a site for inclusion in the East Asian - Australasian Flyway Site Network is requested to complete a Site Information Sheet. The Site Information Sheet will provide the basic information of the site and detail how the site meets the criteria for inclusion in the Flyway Site Network. When there is a new nomination or an SIS update, the following sections with an asterisk (*), from Questions 1-14 and Question 30, must be filled or updated at least so that it can justify the international importance of the habitat for migratory waterbirds. 2. The Site Information Sheet is based on the Ramsar Information Sheet. If the site proposed for the Flyway Site Network is an existing Ramsar site then the documentation process can be simplified. 3. Once completed, the Site Information Sheet (and accompanying map(s)) should be submitted to the Flyway Partnership Secretariat. Compilers should provide an electronic (MS Word) copy of the Information Sheet and, where possible, digital versions (e.g. shapefile) of all maps. ----------------------------------------------------------------------------------------------------------------------------- - 1. Name and contact details of the compiler of this form *: Full name: Gombobaatar Sundev and Tsendgombo EAAF SITE CODE FOR OFFICE USE ONLY: Institution/agency: Mongolian Ornithological Society and Onon and Bali PA Address: Astra Building -1148, Sukhbaatar District, E A A F 0 7 4 Ulaanbaatar, Mongolia Telephone: 976-99180148; 976-77460148 Fax numbers: 1 Information Sheet on EAA Flyway Network Sites Email address: [email protected]; [email protected]; [email protected]; 2. -
(Additional Financing): Project Administration Manual
Additional Financing for the Southeast Gobi Urban and Border Town Development Project (RRP MON 42184-027) Project Administration Manual Project Number: 42184-027 Loan Number: 3388-MON September 2018 Mongolia: Additional Financing for Southeast Gobi Urban and Border Town Development Project ABBREVIATIONS ADB – Asian Development Bank ADF – Asian Development Fund DMF – design and monitoring framework EIA – environmental impact assessment EMP – environmental management plan IEE – initial environmental examination MCUD – Ministry of Construction and Urban Development MOF – Ministry of Finance NCB – national competitive bidding PAM – project administration manual PMU – project management unit PPMS – project performance management system PUSO – public utility service organization QCBS – quality- and cost-based selection RRP – report and recommendation of the President SGAP – social and gender action plan SOE – statement of expenditure TOR – terms of reference TSA – Treasury single account WSRC – Water Services Regulatory Commission WWTP – wastewater treatment plant CONTENTS Page I. PROJECT DESCRIPTION 1 A. Rationale 1 B. Impact and Outcome 4 C. Outputs 5 II. IMPLEMENTATION PLANS 6 A. Project Readiness Activities 6 B. Overall Project Implementation Plan 6 III. PROJECT MANAGEMENT ARRANGEMENTS 7 A. Project Implementation Organizations: Roles and Responsibilities 8 B. Key Persons Involved in Implementation 10 C. Project Organization Structure 11 IV. COSTS AND FINANCING 12 A. Cost Estimates 12 B. Key Assumptions 12 C. Revised Project and Financing Plan 13 D. Detailed Cost Estimates by Expenditure Category 15 E. Allocation and Withdrawal of Loan Proceeds 16 F. Detailed Cost Estimates by Financier ($ million) 17 G. Detailed Cost Estimates by Output ($ million) 18 H. Detailed Cost Estimates by Year ($ million) 19 I. Contract and Disbursement S-Curve 20 J. -
MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized
MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Acknowledgements This Mongolia Strategic Country Diagnostic was led by Samuel Freije-Rodríguez (lead economist, GPV02) and Tuyen Nguyen (resident representative, IFC Mongolia). The following World Bank Group experts participated in different stages of the production of this diagnostics by providing data, analytical briefs, revisions to several versions of the document, as well as participating in several internal and external seminars: Rabia Ali (senior economist, GED02), Anar Aliyev (corporate governance officer, CESEA), Indra Baatarkhuu (communications associate, EAPEC), Erdene Badarch (operations officer, GSU02), Julie M. Bayking (investment officer, CASPE), Davaadalai Batsuuri (economist, GMTP1), Batmunkh Batbold (senior financial sector specialist, GFCP1), Eileen Burke (senior water resources management specialist, GWA02), Burmaa Chadraaval (investment officer, CM4P4), Yang Chen (urban transport specialist, GTD10), Tungalag Chuluun (senior social protection specialist, GSP02), Badamchimeg Dondog (public sector specialist, GGOEA), Jigjidmaa Dugeree (senior private sector specialist, GMTIP), Bolormaa Enkhbat (WBG analyst, GCCSO), Nicolaus von der Goltz (senior country officer, EACCF), Peter Johansen (senior energy specialist, GEE09), Julian Latimer (senior economist, GMTP1), Ulle Lohmus (senior financial sector specialist, GFCPN), Sitaramachandra Machiraju (senior agribusiness specialist, -
Overview of Civil Aviation Sector in Mongolia
A38-WP/324 International Civil Aviation Organization EC/37, TE/142 12/9/13 (Information paper) WORKING PAPER English only ASSEMBLY — 38TH SESSION ECONOMIC COMMISSION TECHNICAL COMMISSION Agenda Item 38: Other issues to be considered by the Technical Commission Agenda Item 43: Aviation Data — Monitoring and Analysis OVERVIEW OF CIVIL AVIATION SECTOR IN MONGOLIA (Presented by Mongolia) EXECUTIVE SUMMARY This information paper outlines the aviation sector activity of Mongolia by presenting the major developments and accomplishments in the sector and related actions taken by the Civil Aviation Authority (CAA) of Mongolia in addressing the challenges during the past triennium. Strategic This working paper relates to the Safety, and Environmental Protection and Sustainable Objectives: Development of Air Transport Strategic Objectives. Financial Not applicable. implications: References: 1. INTRODUCTION 1.1 This information paper outlines the aviation sector activity of Mongolia by presenting the major developments and accomplishments in the sector and related actions taken by the Civil Aviation Authority (CAA) of Mongolia in addressing the challenges during the past triennium. 1.2 The adoption of the State Policy on Civil Aviation in Mongolia up to the year 2020 for the first time was a major milestone for the civil aviation sector of Mongolia. The State Policy has outlined major objectives for the development of Mongolia civil aviation. 1.3 Mongolia remains committed to the strategic objectives of ICAO with respect to its goal of enhancing the global aviation safety and security, improving efficiency of aviation operations, minimizing adverse environmental impacts from air transport and strengthening the laws governing civil aviation. A38-WP/324 - 2 - EC/37, TE/142 2. -
Desertification Information Extraction Based on Feature Space
remote sensing Article Desertification Information Extraction Based on Feature Space Combinations on the Mongolian Plateau Haishuo Wei 1,2 , Juanle Wang 1,3,4,* , Kai Cheng 1,5, Ge Li 1,2, Altansukh Ochir 6 , Davaadorj Davaasuren 7 and Sonomdagva Chonokhuu 6 1 State Key Laboratory of Resources and Environmental Information System, Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China; [email protected] (H.W.); [email protected] (K.C.); [email protected] (G.L.) 2 School of Civil and Architectural Engineering, Shandong University of Technology, Zibo 255049, China 3 Jiangsu Center for Collaborative Innovation in Geographical Information Resource Development and Application, Nanjing 210023, China 4 Visiting professor at the School of Engineering and Applied Sciences, National University of Mongolia, Ulaanbaatar City 14201, Mongolia 5 University of Chinese Academy of Sciences, Beijing 100049, China 6 Department of Environment and Forest Engineering, National University of Mongolia, Ulaanbaatar City 210646, Mongolia; [email protected] (A.O.); [email protected] (S.C.) 7 Department of Geography, National University of Mongolia, Ulaanbaatar City 14201, Mongolia; [email protected] * Correspondence: [email protected]; Tel.: +86-139-1107-1839 Received: 22 August 2018; Accepted: 9 October 2018; Published: 11 October 2018 Abstract: The Mongolian plateau is a hotspot of global desertification because it is heavily affected by climate change, and has a large diversity of vegetation cover across various regions and seasons. Within this arid region, it is difficult to distinguish desertified land from other land cover types using low-quality vegetation information. -
Sep 2010, 43-101 Updated Technical Report On
UPDATED TECHNICAL REPORT ON THE COAL RESOURCES OF THE CHANDGANA KHAVTGAI COAL RESOURCE AREA, KHENTII AIMAG, MONGOLIA Prepared for: Prophecy Resource Corporation Vancouver, British Columbia Canada Prepared by: Christopher M. Kravits CPG, LPG Kravits Geological Services, LLC Salina, Utah USA September 28, 2010 Updated Technical Report on the Coal Resources of the Chandgana Khavtgai Coal Resource Area 1 TABLE OF CONTENTS 1 TABLE OF CONTENTS............................................................................................ii 1.1 LIST OF FIGURES............................................................................................................... V 1.2 LIST OF TABLES ................................................................................................................ V 1.3 LIST OF MAPS.................................................................................................................. V 2 SUMMARY...........................................................................................................1 3 INTRODUCTION ...................................................................................................3 3.1 PURPOSE, INFORMATION SOURCES, AND SITE INSPECTION......................................................3 3.2 COMPLETE INFORMATION..................................................................................................4 4 RELIANCE ON OTHER EXPERTS .............................................................................5 5 PROPERTY DESCRIPTION AND LOCATION.............................................................7 -
Skvortsovia: 2(1): 8 – 27 (2015) Skvortsovia ISSN 2309-6497 (Print) Copyright: © 2015 Russian Academy of Sciences ISSN 2309-6500 (Online)
Skvortsovia: 2(1): 8 – 27 (2015) Skvortsovia ISSN 2309-6497 (Print) Copyright: © 2015 Russian Academy of Sciences http://skvortsovia.uran.ru/ ISSN 2309-6500 (Online) Article New records for the flora of Selenge Province (Mongolia) Vladimir Doronkin1, Dmitry Shaulo2, Irina Han1, Natalya Vlasova1, Victoria Ivleva1, Luvsanbaldan Enkhtuya3, Tovuudorj Munkh-Erdene4, Nanjidsuren Ochgerel3 and Battseren Munkhjargal5 1 Plant Systematics Laboratory, Institution of Russian Academy of Sciences, Central Siberian Botanical Garden, Siberian Branch, Russian Academy of Sciences, Zolotodolinskaya St. 101, Novosibirsk 630090, Russian Federation. Email: [email protected] 2 Herbarium Laboratory, Institution of Russian Academy of Sciences, Central Siberian Botanical Garden, Siberian Branch, Russian Academy of Sciences, Zolotodolinskaya St. 101, Novosibirsk 630090, Russian Federation. Email: [email protected] 3 Botanical Garden, Institute of Botany of Mongolian Academy of Sciences, Jukov St. 77, Ulaanbaatar 210351, Mongolia. Email: [email protected] 4 Department of Flora and Systematics, Institute of Botany of Mongolian Academy of Sciences, Jukov St. 77, Ulaanbaatar 210351, Mongolia. 5 Department of Resources, Plant physiology and Biotechnology, Institute of Botany of Mongolian Academy of Sciences, Jukov St. 77, Ulaanbaatar 210351, Mongolia. Received: 4 August 2014 | Accepted by Irina V. Belyaeva: 29 March 2015 | Published on line: 31 March 2015 Abstract Eleven taxa from Selenge Province are listed as new for the Mongolian flora. Nineteen taxa are new for the botanical-geographical region. New locations for 5 species were found. Keywords: distribution, flora, Mongolia, new records, Selenge Province, vascular plants. Introduction In accordance with the international agreement on cooperation between the Central Siberian Botanical Garden SB RAS and the Institute of Botany, the Academy of Sciences of Mongolia, joint studies of the cross-boundary flora were conducted in 2012. -
Southeast Gobi Urban and Border Town Development Project
Report and Recommendation of the President to the Board of Directors Project Number: 42184-027 Loan Number: 3388-MON September 2018 Proposed Loan for Additional Financing Mongolia: Southeast Gobi Urban and Border Town Development Project Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval, ADB will disclose the document to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 23 August 2018) Currency unit – togrog (MNT) MNT1.00 = $0.000405 $1.00 = MNT2,467.00 ABBREVIATIONS ADB – Asian Development Bank IFAS – integrated fixed-film activated sludge m3 – cubic meter MCUD – Ministry of Construction and Urban Development PAM – project administration manual PMU – project management unit PUSO – public utility service organization SGAP – social and gender action plan TA – technical assistance WWTP – wastewater treatment plant GLOSSARY aimag – provincial administrative unit aimag center – aimag capital ger – traditional felt tent khural – citizens' representative committee soum – administrative subunit of aimag NOTE In this report, "$" refers to United States dollars. Vice-President Stephen Groff, Operations 2 Director General Amy S.P. Leung, East Asia Department (EARD) Director Sangay Penjor, Urban and Social Sectors Division, EARD Team leader Antonio Ressano Garcia, Principal Urban Development Specialist, EARD Deputy team leader Tuul Badarch, Senior Project Officer (Infrastructure), EARD Team members Baurzhan Konysbayev, Principal -
AH Istory of L and U Se in M Ongolia
A H istory of L and Use in Mongolia A H istory of L and Use in Mongolia The Thirteenth Century to the Present ELIZABETH ENDICOTT A HISTORY OF LAND USE IN MONGOLIA Copyright © Elizabeth Endicott, 2012. Softcover reprint of the hardcover 1st edition 2012 978-1-137-26965-2 All rights reserved. First published in 2012 by PALGRAVE MACMILLAN® in the United States— a division of St. Martin’s Press LLC, 175 Fifth Avenue, New York, NY 10010. Where this book is distributed in the UK, Europe and the rest of the world, this is by Palgrave Macmillan, a division of Macmillan Publishers Limited, registered in England, company number 785998, of Houndmills, Basingstoke, Hampshire RG21 6XS. Palgrave Macmillan is the global academic imprint of the above companies and has companies and representatives throughout the world. Palgrave® and Macmillan® are registered trademarks in the United States, the United Kingdom, Europe and other countries. I SBN 978-1-349-44403-8 ISBN 978-1-137-26966-9 (eBook) DOI 10.1057/9781137269669 Library of Congress Cataloging-in-Publication Data. Endicott, Elizabeth. A history of land use in Mongolia : the thirteenth century to the present / Elizabeth Endicott. p. cm. Includes bibliographical references and index. 1. Land use—Mongolia—History. 2. Land use, Rural—Mongolia— History. 3. Rangelands—Mongolia—History. 4. Herders—Mongolia— History. I. Title. HD920.8.E53 2012 333.73Ј1309517—dc23 2012016618 A catalogue record of the book is available from the British Library. Design by Newgen Imaging Systems (P) Ltd., Chennai, India. First