MONGOLIA Implementation Progress of the TTFS 2020 Projects

Total Page:16

File Type:pdf, Size:1020Kb

MONGOLIA Implementation Progress of the TTFS 2020 Projects CAREC Corridor Implementation Progress and Priority Actions for 2020-2030 MONGOLIA Implementation Progress of the TTFS 2020 projects Planned Road Actual for Current Safety Project Target Completed (km) Completi Impleme Componen IP No. Corridor Sector Project Title Status Cost ($ Funding Source(s) Length on (km) ntation t (for Road million) (km) Cumulati Period projects)? ve up to 2019 2020 Yes/No 2018 Western Regional Road Development MON Government, 1995– (PRC Border at Complete 145 ADB & PRC 479.4 479.4 - - IP 1 4a Road 2018 Yarant–Khovd– Ulgii –Ulaanbaishint) ADB, MON Regional Road Government (31.5) Development ADB, MON Government (58.8) (Construction of 1995– Completed 126 Millenium 434 434 N/A N/A IP 2 4b Road 2014 Altanbulag- Challenge Ulaanbaatar- Corporation (65.8) Zamiin-Uud) ADB, MON Govenrment (24.1) Airport Construction of and New International 2008- IP 5 4b-c Completed 591 JICA/MON Gov N/A N/A N/A N/A N/A Civil Airport in 2018 AviationUlaanbaatar Implementation Progress of the TTFS 2020 projects Road Planned Safety Actual for Componen Completed (km) Completi Project Current Target t (for Road on (km) Project Title Cost ($ Funding Implement IP No. Corridor Sector Status Length projects)? million Source(s) ation (km) Yes/No Cumulati ) Period ve up to 2019 2020 2018 Access Road to the New China EXIM 2015- IP 10 4b Road International Airport in Completed 140 Bank soft 32 32 2018 Ulaanbaatar loan Western Regional Road Development Phase 2 2012- IP 11 4a Road MFF—Bayan Ulgii and Ongoing 120 ADB 189.7 103.9 60 25.8 2019 Khovd Aimags (provinces) Railway Rolling Stock 2020- IP 12 4b-c Railway Planned 59 TBD N/A N/A N/A N/A N/A Maintenance Depot 2022 Railway Centralized 2020- IP 13 4b-c Railway Planned 29 TBD N/A N/A N/A N/A N/A Traffic Control Center 2021 Ulaanbaatar City Railway 20\20- IP 14 4b-c Railway Planned 36 TBD N/A N/A N/A N/A N/A Passenger Station 2021 Concession Undurkhaan (AH32)– Based (120)/ Baruun-Urt–Bichigt– 2014– IP 101 4c Road Ongoing 268 MON 495 223 50 100 Huludao/ Chifeng– 2022 Government Jinzhou Road (12.6+36.9) Implementation Progress of the TTFS 2020 projects IP12, IP13, IP14 Ханх IP2 IP11 Railway Rolling Stock Сүхбаатар Баянтэс Maintenance Depot Дархан Мянгад Ховд Цахир Налайх Багануур Railway Centralized Traffic IP1 Багахангай Булган Control Center IP 10 Айраг IP101 Ulaanbaatar City Railway Passenger Station Гашуун Сухайт PLANNED IP2 Regional Road Development Ulaanbaishint (Construction of Altanbulag- Darkhan Цагааннуур IP11 Ulaanbaatar-Zamiin-Uud) Choibalsan 189.7 km paved road Olgiy Completed 4b Undurkhaan construction project 4c funded by GOM and Толбо Мянгад Baruun Urt ADB, completion rate is IP 10 72.5 % and will be Hovd Choir IP101 completed by 2020 Access Road to the 4aДарви New International Sainshand Airport in Ulaanbaatar. Baruun-Urt – Bichigt 272 Completion, completed km road is included to IP1 Булган the Concession list. Yarant IP 5 DBOT type. Present Western Regional Road moment, tendering Development (PRC Construction of New process is ongoing and Border at Yarant– International Airport in short listed Khovd– Ulgii – Ulaanbaatar. Ulaanbaishint) Construction works is Completed completed. Operation will start in 2019 Completed road construction projects On going road construction projects National Priority Actions for 2020 to 2030 • Roads Implementation Indicative Cost Project Title Period (in $ million) Regional Road Development and Maintenance Project Phase I and II (reconstruction and expanding work for Altanbulag-Ulaanbaatar-Zamyn Uud 2018-2021 120.0 road CAREC 4b) Regional Road Development and Maintenance Project phase III (reconstruction 2021-2024 120.0 and expanding work for Altanbulag-Ulaanbaatar-Zamyn Uud road CAREC 4b) Western Regional Road Corridor Investment Program, Tranche-2: (Khovd-Ulgii- 2015-2020 58 .0 Ulaanbaishint) /Ongoing/ Construction work of 272 km paved road Baruun-Urt-Bichigt (IP101) Part of corridor 4C (Ulaanbaatar- Undurkhaan– Baruun-Urt – Bichigt – 2019-2022 120.0 Huludao/Chifeng – Jinzhou) The advanced and smart technologies (control on vehicle movement, weight, dimension, emission, traffic intensity, and SOS emergency mobile network) to 2020 4.5 be installed on 997 kilometers of “Zamiin-Uud-Ulaanbaatar – Altanbulag” road. • Railways Implementation Indicative Cost Project Title Period (in $ million) Since 2020 Freight wagon manufacturing facility in Sainshand, Dorno Gobi province 61.0 New railway lines southern Mongolia Since 2020 5000.0 “State policy on railway transport” adopted on 2010 by the State Great Khural (Parliament of Mongolia) National Priority Actions for 2020 to 2030 • Nonlinear projects • Airports, logistics centers Implementation Indicative Cost Project Title Period (in $ million) Logistics centers in provinces of Bayan-Ulgii, Khovd, Darkhan – Uul in Mongolia 2020-2026 150.0 Upgrade Khovd airport of Khovd province to alternative airport in Western 2019-2022 150.0 Region Upgrade Tsagaandeglii airport of Uvs province to alternative airport in Western 2020-2025 20.0 Region • Policies, institutional reforms Implementation Indicative Cost Project Title Period (in $ million) Technical assistance for Integrated Transport System Capacity Development 2020 1.0 Technical assistance for International Green Card System Capacity Development 2021 1.0 • Capacity development Implementation Indicative Cost Project Title Period (in $ million) Technical assistance for project preparation Regional Road Development and 2019-2021 1.0 maintenance project Phase III (Altanbulag-Ulaanbaatar-Zamiin-Uud) Technical assistance for Capacity development of asset management and road 2019-2023 0.7 maintenance Technical assistance for Capacity development for improvement of national road 2020-2023 0.7 network Technical assistance for Capacity development for Safer road 2020-2021 0.5 Technical assistance for Capacity development for Harmonization of road sign, 2023-2025 1.0 signage and service standards in CAREC Countries Technical assistance for Capacity Development of Road Safety Audit 2020 1.0 Technical assistance for Feasibility study of Railway Centralized Traffic Control Since 2020 0.5 Center Feasibility study and detail drawing of “Bogdkhan railway” Since 2020 1.5 THANK YOU FOR ATTENTION.
Recommended publications
  • Report of the Portfolio Monitoring Mission in Mongolia
    AFB/B.28/5 3 October 2016 Adaptation Fund Board Twenty-eighth Meeting Bonn, Germany, 6-7 October 2016 Agenda item 9 REPORT OF THE PORTFOLIO MONITORING MISSION IN MONGOLIA AFB/B.28/5 INTRODUCTION Context and scope of the mission 1. As part of the Knowledge Management (KM) Strategy and the secretariat’s work plan for FY16 which was approved by the Adaptation Fund Board (the Board) at its twenty-fifth meeting (Decision B.25/19), the Adaptation Fund Board secretariat (the secretariat) conducts missions to projects/programmes under implementation to collect and analyze lessons learned through its portfolio. So far, such missions have been conducted in Ecuador, Senegal, Honduras, Nicaragua, Jamaica, Argentina and Uruguay. This report covers the FY16 portfolio monitoring mission that took place in June 2016 in the project “Ecosystem Based Adaptation Approach to Maintaining Water Security in Critical Water Catchments in Mongolia” implemented by the United Nations Development Programme (UNDP). 2. The mission targeted this project for the following reasons: a) it enables to explore implications of the Ecosystem-Based Adaptation (EBA) approach, including its efficiency, effectiveness and sustainability; b) it may allow drawing lessons from the valuation of ecosystem services; c) it may allow taking stock of the arrangements for monitoring and evaluation, and the value of mid-term review in adjusting progress towards results. Methodology 3. The secretariat was represented by a senior climate change specialist and a junior professional associate. An Adaptation Fund Board alternate member was also part of the delegation. The mission was carried out from 12 to 18 June, and included field visits to project sites.
    [Show full text]
  • Infrastructure Strategy Review Making Choices in Provision of Infrastructure Services
    MONGOLIA Infrastructure Strategy Review Making Choices in Provision of Infrastructure Services S. Rivera East Asia & Pacific The World Bank Government of Mongolia: Working Group Technical Donors Meeting October, 2006. 1 Mongolia: Infrastructure Strategy The Process and Outputs Factors Shaping Infrastructure Strategy Demand Key Choices to discuss this morning 2 Process and Outcome The Process – An interactive process, bringing together international practices: Meeting in Washington, March 2005. Field work in the late 2005. Preparation of about 12 background notes in sector and themes, discussed in Washington on June 2006. Submission of final draft report in November, 2006 Launching of Infrastructure Strategy report in a two day meeting in early 2007. Outcome A live document that can shape and form policy discussions on PIP, National Development Plan, and Regional Development Strategy….it has been difficult for the team to assess choices as well. 3 Factors Shaping the IS • Urban led Size and Growth of Ulaanbaatar and Selected Aimag (Pillar) Centers Size of the Circle=Total Population ('000) Infrastructure 6% 5% 869.9 Investments ) l 4% ua nn 3% a Ulaanbaatar (%, 2% h t Darkhan w Erdenet o 1% r G n 0% o i -10 0 10 20 30 40 50 60 70 80 at l -1% Choibalsan Kharkhorin opu Ondorkhaan P -2% Khovd Uliastai -3% Zuunmod -4% Share of Total Urban Population (%) 4 Factors Shaping the IS: Connectivity, with the World and in Mongolia Khankh Khandgait Ulaanbaishint Ereentsav Khatgal Altanbulag ULAANGOM Nogoonnuur UVS KHUVSGUL Tsagaannuur ÒýñTes
    [Show full text]
  • MONGOLIA CONSTRAINTS ANALYSIS a Diagnostic Study of the Most Binding Constraints to Economic Growth in Mongolia
    The production of this constraints analysis was led by the partner governments, and was used in the development of a Millennium Challenge Compact or threshold program. Although the preparation of the constraints analysis is a collaborative process, posting of the constraints analysis on this website does not constitute an endorsement by MCC of the content presented therein. 2014-001-1569-02 MONGOLIA CONSTRAINTS ANALYSIS A diagnostic study of the most binding constraints to economic growth in Mongolia August 18, 2016 Produced by National Secretariat for the Second Compact Agreement between the Government of Mongolia and the Millennium Challenge Corporation of the USA With technical assistance from the Millennium Challenge Corporation i Table of Contents Contents Table of Contents ............................................................................................................................................... i List of Figures ............................................................................................................................................... iv List of Tables ................................................................................................................................................ vi Glossary of Terms .......................................................................................................................................... viii 1. Executive Summary .................................................................................................................................
    [Show full text]
  • The Magic of the Mongolian West
    Magie de l'ouest Mongol Jours: 14 Prix: 1550 EUR Vol international non inclus Confort: Difficulté: Aventure, exploration et expédition Hors des sentiers battus Randonnée Minorité ethnique Aux confins de l'Asie Centrale, des peuplades Kazakhs vivent en harmonie avec leurs coutumes ancestrales. Sommets enneigés, glaciers, lacs cristallins et vallées luxuriantes, l'Altai Mongol est une des régions les plus reculées du Monde. Un circuit alternant découverte en jeep et journées de randonnée, pour les personnes souhaitant découvrir l'ouest du pays à un rythme modéré. Jour 1. Oulan-Bator, arrivée et visite de la ville Accueil par notre chauffeur à votre sortie de l'aéroport. Transfert à votre hôtel, installation et repos. Rendez-vous à midi à votre hôtel avec votre guide, qui vous amènera déjeuner dans le restaurant de votre choix. Plongeons au coeur de l'histoire mongole, au superbe musée d'histoire nationale. Trois étages d'un passé riche et glorieux, violent et noble, depuis la préhistoire jusqu'à la période soviétique, en passant bien sûr par la création du grand empire mongol par Gengis Khan. Oulan Bator Balade dans le centre ville d'Oulan-Bator. Découverte de la place centrale Gengis Khan, et du Parlement. À 18h00, spectacle traditionnel mongol au Tumen Ekh : danses folkloriques, contorsion et bien sûr khoomi, le chant diphonique. Hébergement Hôtel Nine Jour 2. Vol pour le far west mongol Oulan Bator - Khovd Nous quittons la trépidante capitale mongole pour embarquer sur un vol domestique à destination de Khovd. Khovd fut un centre commercial important situé au nord de la route de la soie, qui avait tissé des liens avec la Russie et la Chine.
    [Show full text]
  • Wildlife Protection in Mongolia by R
    196 Oryx Wildlife Protection in Mongolia By R. A. Hibbert CMG Although the Mongolian People's Republic, last refuge of the Przewalski wild horse, is one of the most thinly populated countries in the world, the wildlife decreased considerably in the 30's and 40's. There has been some improvement in recent years, and the Game Law now gives protection to nearly all mammals—the few exceptions include the wolf, understandably in a country with vast herds of domestic animals. Mr. Hibbert, who was British Charge d'Affaires at Ulan Bator from 1964 to 1966, and has since spent a year at Leeds University working on Mongolian materials, assesses the status of the major species of mammals, birds and fish, and describes the game laws. HE Mongolian People's Republic is a huge country with a very T small population. Its area is just over H million square kilometres, its population just over 1,100,000. This gives an average population density of 0-7 per square kilometre or allowing for the concentration of nearly a quarter of the population in the capital at Ulan Bator, a density in rural areas of 0-5 per square kilometre. This seems to be a record low density for a sovereign state. The density of domestic animals—sheep, goats, cows and yaks, horses, camels—is much higher. There are some 24 million domestic animals in the herds, which gives an average density of 15 per square kilometre. Even so, the figures suggest that there is still plenty of room for wild life.
    [Show full text]
  • Introduction on Dry Ports in Mongolia
    Introduction on Dry Ports in Mongolia 2017.11.14 Dry Ports Significance for Introduction Land‐Locked Countries Mongolia is an ideal environment for the development of Dry Ports. With fast growing local industries and volumes of cargo exchanged with our world, with no access to a sea but with a relatively good connection to neighboring ports of Russia and China calls for an erection and development of respective hubs, even with reflection of the vast territory of the country and a minor‐but‐growing intensity of settlement. Dry Ports Significance for Dry Ports Significance for Land‐Locked Land‐Locked Countries Countries as Mongolia • Mongolia ratified the Intergovernmental Agreement on Dry Ports on 23 April 2016. • The Agreement identifies a number of existing and potential dry port locations that are to be the basis of a coordinated effort to creates modes along an international integrated intermodal transport and logistics system. Dry Ports Significance for Dry Ports in Mongolia Land‐Locked Countries o Altanbulag (border with Russian Federation) o Ulaanbaatar o Sainshand o Zamyn-Uud (border with People`s republic of China) o Choibalsan (potential dry port) Dry Ports Significance for Dry Ports in Mongolia Land‐Locked Countries Dry Ports Significance for Dry Ports in Mongolia – Access to the Sea Land‐Locked Countries Dry Ports Significance for Dry Ports in PRC&RF - Significance for Mongolia Land‐Locked Countries CHINA • Erenhot South International Logistics Center, Erenhot • Manzhouli New International Freight Yard, Manzhouli • (altogether 17 ports, the above 2 have a direct connection with Mongolia). Dry Ports Significance for Dry Ports Significance for Land‐Locked Land‐Locked Countries Countries Nominated as Dry Ports /inland ports/ in Mongolia ALTANBULAG and ZAMYN-UUD are respectfully key parts of a wider Altanbulag and Zamyn-Uud Special Economic Zones.
    [Show full text]
  • Mongolia: Severe Winter
    Emergency Plan of Action (EPoA) Mongolia: Severe Winter Emergency Appeal n° MDRMN006 Glide n° CW-2017-000001 Date of issue: 10 February 2017 Operation manager: Point of contact: Gwendolyn Pang Bolormaa Nordov, Head of IFRC Country Cluster Support Team in Beijing Secretary General of Mongolian Red Cross Society Operation start date: 2 January 2017 Expected timeframe: 10 months (to 2 November 2017) Operation budget: CHF 655,512 DREF allocation: CHF 177,349 Total number of people affected: Number of people to be assisted: 157,0001 people 11,264 people (2,740 families) Host National Society presence (n° of volunteers, staff, branches): Mongolian Red Cross Society (MRCS) has 33 mid-level and 703 primary level branches working in all provinces of Mongolia, it has 7,000 volunteers and 128,827 members including 75,000 junior and youth members. MRCS has six established regional disaster preparedness centres with 240 emergency response team members. Red Cross Red Crescent Movement partners actively involved in the operation: The National Society works with International Federation of Red Cross and Red Crescent Societies (IFRC) in this operation as well as current Partner National Societies: Australian Red Cross, British Red Cross, Japanese Red Cross Society, Finnish Red Cross, and the Republic of Korea National Red Cross. Other partner organizations actively involved in the operation: Mongolia National Emergency Management Agency (NEMA), local governments, USAID, UN and its agencies, World Vision International, Save the Children, Caritas Czech, People in Need, G-Mobile, World Animal Protection Organization. A. Situation analysis Description of the disaster Dzud (Mongolian term for a severe winter), which is a slow onset winter condition has now been affecting some 157,000 people (37,000 herder households) across 17 out of 21 provinces in Mongolia.
    [Show full text]
  • MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized
    MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Acknowledgements This Mongolia Strategic Country Diagnostic was led by Samuel Freije-Rodríguez (lead economist, GPV02) and Tuyen Nguyen (resident representative, IFC Mongolia). The following World Bank Group experts participated in different stages of the production of this diagnostics by providing data, analytical briefs, revisions to several versions of the document, as well as participating in several internal and external seminars: Rabia Ali (senior economist, GED02), Anar Aliyev (corporate governance officer, CESEA), Indra Baatarkhuu (communications associate, EAPEC), Erdene Badarch (operations officer, GSU02), Julie M. Bayking (investment officer, CASPE), Davaadalai Batsuuri (economist, GMTP1), Batmunkh Batbold (senior financial sector specialist, GFCP1), Eileen Burke (senior water resources management specialist, GWA02), Burmaa Chadraaval (investment officer, CM4P4), Yang Chen (urban transport specialist, GTD10), Tungalag Chuluun (senior social protection specialist, GSP02), Badamchimeg Dondog (public sector specialist, GGOEA), Jigjidmaa Dugeree (senior private sector specialist, GMTIP), Bolormaa Enkhbat (WBG analyst, GCCSO), Nicolaus von der Goltz (senior country officer, EACCF), Peter Johansen (senior energy specialist, GEE09), Julian Latimer (senior economist, GMTP1), Ulle Lohmus (senior financial sector specialist, GFCPN), Sitaramachandra Machiraju (senior agribusiness specialist,
    [Show full text]
  • Land Acquisition and Resettlement Plan Progress Report MON
    Land Acquisition and Resettlement Plan Progress Report Annual Report December 2020 MON: Southeast Gobi Urban and Border Town Development Project–Additional Financing Prepared by Project Management Unit for the Ministry of Construction and Urban Development of Mongolia and the Asian Development Bank. This land acquisition and resettlement plan progress report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. L3388-MON: Southeast Gobi Urban and Border Town Development Project-Additional Financing Land Acquisition and Resettlement Plan Progress Report Project Management Unit December 2020 TABLE OF CONTENTS I. INTRODUCTION AND PROJECT BACKGROUND II. SCOPE OF THIS REPORT . III. PROJECT DESCRIPTION . 1. A1.1 Arkhangai WWTP and ancillary services 2. A1.4 Uvurkhangai WWTP and ancillary services 3. A1.1 Umnugovi WWTP and ancillary services 4. A1.1 Dornogovi WWTP and ancillary services 5. A1.1 Khujirt soum, Uvurkhangai WWTP and ancillary services IV. GRIEVANCE REDRESSAL MECHANISM V. CONCLUSION Attachment: Photos ABBREVIATIONS ADB Asian Development Bank AP Affected Person / People PMU Project Management Unit LAR Land Acquisition and Resettlement LARP Land Acquisition and Resettlement Plan LACUDD Land Affairs, Construction and Urban Development Division PUSO Public Utilities Service Organization WWTP Wastewater Treatment Plant GRM Grievance Redressal Mechanism I.
    [Show full text]
  • Overview of Civil Aviation Sector in Mongolia
    A38-WP/324 International Civil Aviation Organization EC/37, TE/142 12/9/13 (Information paper) WORKING PAPER English only ASSEMBLY — 38TH SESSION ECONOMIC COMMISSION TECHNICAL COMMISSION Agenda Item 38: Other issues to be considered by the Technical Commission Agenda Item 43: Aviation Data — Monitoring and Analysis OVERVIEW OF CIVIL AVIATION SECTOR IN MONGOLIA (Presented by Mongolia) EXECUTIVE SUMMARY This information paper outlines the aviation sector activity of Mongolia by presenting the major developments and accomplishments in the sector and related actions taken by the Civil Aviation Authority (CAA) of Mongolia in addressing the challenges during the past triennium. Strategic This working paper relates to the Safety, and Environmental Protection and Sustainable Objectives: Development of Air Transport Strategic Objectives. Financial Not applicable. implications: References: 1. INTRODUCTION 1.1 This information paper outlines the aviation sector activity of Mongolia by presenting the major developments and accomplishments in the sector and related actions taken by the Civil Aviation Authority (CAA) of Mongolia in addressing the challenges during the past triennium. 1.2 The adoption of the State Policy on Civil Aviation in Mongolia up to the year 2020 for the first time was a major milestone for the civil aviation sector of Mongolia. The State Policy has outlined major objectives for the development of Mongolia civil aviation. 1.3 Mongolia remains committed to the strategic objectives of ICAO with respect to its goal of enhancing the global aviation safety and security, improving efficiency of aviation operations, minimizing adverse environmental impacts from air transport and strengthening the laws governing civil aviation. A38-WP/324 - 2 - EC/37, TE/142 2.
    [Show full text]
  • Desertification Information Extraction Based on Feature Space
    remote sensing Article Desertification Information Extraction Based on Feature Space Combinations on the Mongolian Plateau Haishuo Wei 1,2 , Juanle Wang 1,3,4,* , Kai Cheng 1,5, Ge Li 1,2, Altansukh Ochir 6 , Davaadorj Davaasuren 7 and Sonomdagva Chonokhuu 6 1 State Key Laboratory of Resources and Environmental Information System, Institute of Geographic Sciences and Natural Resources Research, Chinese Academy of Sciences, Beijing 100101, China; [email protected] (H.W.); [email protected] (K.C.); [email protected] (G.L.) 2 School of Civil and Architectural Engineering, Shandong University of Technology, Zibo 255049, China 3 Jiangsu Center for Collaborative Innovation in Geographical Information Resource Development and Application, Nanjing 210023, China 4 Visiting professor at the School of Engineering and Applied Sciences, National University of Mongolia, Ulaanbaatar City 14201, Mongolia 5 University of Chinese Academy of Sciences, Beijing 100049, China 6 Department of Environment and Forest Engineering, National University of Mongolia, Ulaanbaatar City 210646, Mongolia; [email protected] (A.O.); [email protected] (S.C.) 7 Department of Geography, National University of Mongolia, Ulaanbaatar City 14201, Mongolia; [email protected] * Correspondence: [email protected]; Tel.: +86-139-1107-1839 Received: 22 August 2018; Accepted: 9 October 2018; Published: 11 October 2018 Abstract: The Mongolian plateau is a hotspot of global desertification because it is heavily affected by climate change, and has a large diversity of vegetation cover across various regions and seasons. Within this arid region, it is difficult to distinguish desertified land from other land cover types using low-quality vegetation information.
    [Show full text]
  • Skvortsovia: 2(1): 8 – 27 (2015) Skvortsovia ISSN 2309-6497 (Print) Copyright: © 2015 Russian Academy of Sciences ISSN 2309-6500 (Online)
    Skvortsovia: 2(1): 8 – 27 (2015) Skvortsovia ISSN 2309-6497 (Print) Copyright: © 2015 Russian Academy of Sciences http://skvortsovia.uran.ru/ ISSN 2309-6500 (Online) Article New records for the flora of Selenge Province (Mongolia) Vladimir Doronkin1, Dmitry Shaulo2, Irina Han1, Natalya Vlasova1, Victoria Ivleva1, Luvsanbaldan Enkhtuya3, Tovuudorj Munkh-Erdene4, Nanjidsuren Ochgerel3 and Battseren Munkhjargal5 1 Plant Systematics Laboratory, Institution of Russian Academy of Sciences, Central Siberian Botanical Garden, Siberian Branch, Russian Academy of Sciences, Zolotodolinskaya St. 101, Novosibirsk 630090, Russian Federation. Email: [email protected] 2 Herbarium Laboratory, Institution of Russian Academy of Sciences, Central Siberian Botanical Garden, Siberian Branch, Russian Academy of Sciences, Zolotodolinskaya St. 101, Novosibirsk 630090, Russian Federation. Email: [email protected] 3 Botanical Garden, Institute of Botany of Mongolian Academy of Sciences, Jukov St. 77, Ulaanbaatar 210351, Mongolia. Email: [email protected] 4 Department of Flora and Systematics, Institute of Botany of Mongolian Academy of Sciences, Jukov St. 77, Ulaanbaatar 210351, Mongolia. 5 Department of Resources, Plant physiology and Biotechnology, Institute of Botany of Mongolian Academy of Sciences, Jukov St. 77, Ulaanbaatar 210351, Mongolia. Received: 4 August 2014 | Accepted by Irina V. Belyaeva: 29 March 2015 | Published on line: 31 March 2015 Abstract Eleven taxa from Selenge Province are listed as new for the Mongolian flora. Nineteen taxa are new for the botanical-geographical region. New locations for 5 species were found. Keywords: distribution, flora, Mongolia, new records, Selenge Province, vascular plants. Introduction In accordance with the international agreement on cooperation between the Central Siberian Botanical Garden SB RAS and the Institute of Botany, the Academy of Sciences of Mongolia, joint studies of the cross-boundary flora were conducted in 2012.
    [Show full text]