
CAREC Corridor Implementation Progress and Priority Actions for 2020-2030 MONGOLIA Implementation Progress of the TTFS 2020 projects Planned Road Actual for Current Safety Project Target Completed (km) Completi Impleme Componen IP No. Corridor Sector Project Title Status Cost ($ Funding Source(s) Length on (km) ntation t (for Road million) (km) Cumulati Period projects)? ve up to 2019 2020 Yes/No 2018 Western Regional Road Development MON Government, 1995– (PRC Border at Complete 145 ADB & PRC 479.4 479.4 - - IP 1 4a Road 2018 Yarant–Khovd– Ulgii –Ulaanbaishint) ADB, MON Regional Road Government (31.5) Development ADB, MON Government (58.8) (Construction of 1995– Completed 126 Millenium 434 434 N/A N/A IP 2 4b Road 2014 Altanbulag- Challenge Ulaanbaatar- Corporation (65.8) Zamiin-Uud) ADB, MON Govenrment (24.1) Airport Construction of and New International 2008- IP 5 4b-c Completed 591 JICA/MON Gov N/A N/A N/A N/A N/A Civil Airport in 2018 AviationUlaanbaatar Implementation Progress of the TTFS 2020 projects Road Planned Safety Actual for Componen Completed (km) Completi Project Current Target t (for Road on (km) Project Title Cost ($ Funding Implement IP No. Corridor Sector Status Length projects)? million Source(s) ation (km) Yes/No Cumulati ) Period ve up to 2019 2020 2018 Access Road to the New China EXIM 2015- IP 10 4b Road International Airport in Completed 140 Bank soft 32 32 2018 Ulaanbaatar loan Western Regional Road Development Phase 2 2012- IP 11 4a Road MFF—Bayan Ulgii and Ongoing 120 ADB 189.7 103.9 60 25.8 2019 Khovd Aimags (provinces) Railway Rolling Stock 2020- IP 12 4b-c Railway Planned 59 TBD N/A N/A N/A N/A N/A Maintenance Depot 2022 Railway Centralized 2020- IP 13 4b-c Railway Planned 29 TBD N/A N/A N/A N/A N/A Traffic Control Center 2021 Ulaanbaatar City Railway 20\20- IP 14 4b-c Railway Planned 36 TBD N/A N/A N/A N/A N/A Passenger Station 2021 Concession Undurkhaan (AH32)– Based (120)/ Baruun-Urt–Bichigt– 2014– IP 101 4c Road Ongoing 268 MON 495 223 50 100 Huludao/ Chifeng– 2022 Government Jinzhou Road (12.6+36.9) Implementation Progress of the TTFS 2020 projects IP12, IP13, IP14 Ханх IP2 IP11 Railway Rolling Stock Сүхбаатар Баянтэс Maintenance Depot Дархан Мянгад Ховд Цахир Налайх Багануур Railway Centralized Traffic IP1 Багахангай Булган Control Center IP 10 Айраг IP101 Ulaanbaatar City Railway Passenger Station Гашуун Сухайт PLANNED IP2 Regional Road Development Ulaanbaishint (Construction of Altanbulag- Darkhan Цагааннуур IP11 Ulaanbaatar-Zamiin-Uud) Choibalsan 189.7 km paved road Olgiy Completed 4b Undurkhaan construction project 4c funded by GOM and Толбо Мянгад Baruun Urt ADB, completion rate is IP 10 72.5 % and will be Hovd Choir IP101 completed by 2020 Access Road to the 4aДарви New International Sainshand Airport in Ulaanbaatar. Baruun-Urt – Bichigt 272 Completion, completed km road is included to IP1 Булган the Concession list. Yarant IP 5 DBOT type. Present Western Regional Road moment, tendering Development (PRC Construction of New process is ongoing and Border at Yarant– International Airport in short listed Khovd– Ulgii – Ulaanbaatar. Ulaanbaishint) Construction works is Completed completed. Operation will start in 2019 Completed road construction projects On going road construction projects National Priority Actions for 2020 to 2030 • Roads Implementation Indicative Cost Project Title Period (in $ million) Regional Road Development and Maintenance Project Phase I and II (reconstruction and expanding work for Altanbulag-Ulaanbaatar-Zamyn Uud 2018-2021 120.0 road CAREC 4b) Regional Road Development and Maintenance Project phase III (reconstruction 2021-2024 120.0 and expanding work for Altanbulag-Ulaanbaatar-Zamyn Uud road CAREC 4b) Western Regional Road Corridor Investment Program, Tranche-2: (Khovd-Ulgii- 2015-2020 58 .0 Ulaanbaishint) /Ongoing/ Construction work of 272 km paved road Baruun-Urt-Bichigt (IP101) Part of corridor 4C (Ulaanbaatar- Undurkhaan– Baruun-Urt – Bichigt – 2019-2022 120.0 Huludao/Chifeng – Jinzhou) The advanced and smart technologies (control on vehicle movement, weight, dimension, emission, traffic intensity, and SOS emergency mobile network) to 2020 4.5 be installed on 997 kilometers of “Zamiin-Uud-Ulaanbaatar – Altanbulag” road. • Railways Implementation Indicative Cost Project Title Period (in $ million) Since 2020 Freight wagon manufacturing facility in Sainshand, Dorno Gobi province 61.0 New railway lines southern Mongolia Since 2020 5000.0 “State policy on railway transport” adopted on 2010 by the State Great Khural (Parliament of Mongolia) National Priority Actions for 2020 to 2030 • Nonlinear projects • Airports, logistics centers Implementation Indicative Cost Project Title Period (in $ million) Logistics centers in provinces of Bayan-Ulgii, Khovd, Darkhan – Uul in Mongolia 2020-2026 150.0 Upgrade Khovd airport of Khovd province to alternative airport in Western 2019-2022 150.0 Region Upgrade Tsagaandeglii airport of Uvs province to alternative airport in Western 2020-2025 20.0 Region • Policies, institutional reforms Implementation Indicative Cost Project Title Period (in $ million) Technical assistance for Integrated Transport System Capacity Development 2020 1.0 Technical assistance for International Green Card System Capacity Development 2021 1.0 • Capacity development Implementation Indicative Cost Project Title Period (in $ million) Technical assistance for project preparation Regional Road Development and 2019-2021 1.0 maintenance project Phase III (Altanbulag-Ulaanbaatar-Zamiin-Uud) Technical assistance for Capacity development of asset management and road 2019-2023 0.7 maintenance Technical assistance for Capacity development for improvement of national road 2020-2023 0.7 network Technical assistance for Capacity development for Safer road 2020-2021 0.5 Technical assistance for Capacity development for Harmonization of road sign, 2023-2025 1.0 signage and service standards in CAREC Countries Technical assistance for Capacity Development of Road Safety Audit 2020 1.0 Technical assistance for Feasibility study of Railway Centralized Traffic Control Since 2020 0.5 Center Feasibility study and detail drawing of “Bogdkhan railway” Since 2020 1.5 THANK YOU FOR ATTENTION.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages7 Page
-
File Size-