291 Bus Time Schedule & Line Route

Total Page:16

File Type:pdf, Size:1020Kb

291 Bus Time Schedule & Line Route 291 bus time schedule & line map 291 Herongate View In Website Mode The 291 bus line (Herongate) has 2 routes. For regular weekdays, their operation hours are: (1) Herongate: 3:39 PM - 6:23 PM (2) Hurdman: 6:01 AM - 8:22 AM Use the Moovit App to ƒnd the closest 291 bus station near you and ƒnd out when is the next 291 bus arriving. Direction: Herongate 291 bus Time Schedule 38 stops Herongate Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 3:39 PM - 6:23 PM Hurdman E Tuesday 3:39 PM - 6:23 PM Lycée Claudel 1600 Riverside Dr, Ottawa Wednesday 3:39 PM - 6:23 PM Smyth 1a Thursday 3:39 PM - 6:23 PM 1879 Riverside Drive, Ottawa Friday 3:39 PM - 6:23 PM Riverside 1a Saturday Not Operational Pleasant Park 113 Pleasant Park Rd, Ottawa Billings Bridge 291 bus Info 1360 Bank Street, Ottawa Direction: Herongate Stops: 38 Heron 1a Trip Duration: 29 min 957 Heron Road, Ottawa Line Summary: Hurdman E, Lycée Claudel, Smyth 1a, Riverside 1a, Pleasant Park, Billings Bridge , Heron Walkley 1a 1a, Walkley 1a, Walkley 4c, Walkley / Bank, Walkley / Walkley Road, Ottawa Siblings, Walkley / Hampstead, Walkley / Jasper, Albion / Walkley, Heatherington / Albion, Walkley 4c Heatherington / Ad. 1455, Heatherington / Ad. 1485, 1150 Walkley Road, Ottawa Heatherington / Ad. 1535, Heatherington / Bannerhill, Heatherington / Fairlea, Heatherington / Walkley / Bank Fairlea, Walkley / Heatherington, Walkley / Ad. 1570, 1206 Walkley Road, Ottawa Baycrest / Walkley, Baycrest / Cedarwood, Baycrest / Heron, Heron / Baycrest, Heron / Sandalwood, Walkley / Siblings Jefferson / Heron, Jefferson / Featherston, 1280 Walkley Road, Ottawa Featherston / Virginia, Featherston / Connecticut, Featherston / Ryder, Walkley / Ryder, Walkley / Walkley / Hampstead Heron, Walkley / Holly, Walkley / Heron, Walkley / Ad. 1324 Walkley Road, Ottawa 1680 Walkley / Jasper 2018 Jasper Avenue, Ottawa Albion / Walkley 101 Lilibet Cres, Ottawa Heatherington / Albion 2975 Albion Road North, Ottawa Heatherington / Ad. 1455 1462 Heatherington Road, Ottawa Heatherington / Ad. 1485 1481 Heatherington Road, Ottawa Heatherington / Ad. 1535 1495 Heatherington Road, Ottawa Heatherington / Bannerhill 1620 Heatherington Road, Ottawa Heatherington / Fairlea 1675 Heatherington Road, Ottawa Heatherington / Fairlea 1770 Heatherington Road, Ottawa Walkley / Heatherington 1581 Walkley Road, Ottawa Walkley / Ad. 1570 144 Reardon Private, Ottawa Baycrest / Walkley 2898 Baycrest Drive, Ottawa Baycrest / Cedarwood Baycrest Drive, Ottawa Baycrest / Heron 1530 Heron Road, Ottawa Heron / Baycrest 1530 Heron Road, Ottawa Heron / Sandalwood 1670 Heron Road, Ottawa Jefferson / Heron 2389 Jefferson St, Ottawa Jefferson / Featherston 2331 Jefferson Street, Ottawa Featherston / Virginia 1848 Featherston Drive, Ottawa Featherston / Connecticut 1930 Connecticut Avenue, Ottawa Featherston / Ryder 1992 Featherston Drive, Ottawa Walkley / Ryder 1871 Walkley Road, Ottawa Walkley / Heron 1833 Walkley Road, Ottawa Walkley / Holly 1635 Walkley Road, Ottawa Walkley / Heron Walkley / Ad. 1680 Direction: Hurdman 291 bus Time Schedule 34 stops Hurdman Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:01 AM - 8:22 AM Walkley / Heron 1843 Walkley Rd, Ottawa Tuesday 6:01 AM - 8:22 AM Ryder / Walkley Wednesday 6:01 AM - 8:22 AM 2365 Ryder Street, Ottawa Thursday 6:01 AM - 8:22 AM Featherston / Ryder Friday 6:01 AM - 8:22 AM 1987 Featherston Dr, Ottawa Saturday Not Operational Featherston / Connecticut 1923 Featherston Drive, Ottawa Featherston / Virginia 2400 Virginia Drive, Ottawa 291 bus Info Direction: Hurdman Featherston / Jefferson Stops: 34 1820 Featherston Drive, Ottawa Trip Duration: 26 min Line Summary: Walkley / Heron, Ryder / Walkley, Jefferson / Arizona Featherston / Ryder, Featherston / Connecticut, Jefferson Street, Ottawa Featherston / Virginia, Featherston / Jefferson, Jefferson / Arizona, Heron / Jefferson, Heron / Heron / Jefferson Briarhill, Baycrest / Heron, Baycrest / Cedarwood, 1667 Heron Rd, Ottawa Walkley / Baycrest, Walkley / Heatherington, Heatherington / Fairlea, Heatherington / Angela, Heron / Briarhill Heatherington / Bannerhill, Heatherington / Ad. 1585 Heron Road, Ottawa 1560, Heatherington / Ad. 1476, Heatherington / Ad. 1455, Heatherington / Albion, Albion / Walkley, Baycrest / Heron Walkley / Jasper, Walkley / Hampstead, Walkley / 2810 Baycrest Dr, Ottawa Banff, Walkley / Bank, Walkley 4b, Walkley 2a, Heron 2a, Billings Bridge , Pleasant Park , Riverside 2a, Baycrest / Cedarwood Smyth 2a, Lycée Claudel, Hurdman B Baycrest Drive, Ottawa Walkley / Baycrest 144 Reardon Private, Ottawa Walkley / Heatherington 1620 Walkley Road, Ottawa Heatherington / Fairlea 1700 Heatherington Road, Ottawa Heatherington / Angela 114 Theresa Private, Ottawa Heatherington / Bannerhill 1620 Heatherington Road, Ottawa Heatherington / Ad. 1560 1530 Heatherington Road, Ottawa Heatherington / Ad. 1476 1492 Heatherington Road, Ottawa Heatherington / Ad. 1455 1462 Heatherington Road, Ottawa Heatherington / Albion 1430 Heatherington Road, Ottawa Albion / Walkley 2925 Albion Road North, Ottawa Walkley / Jasper 1265 Walkley Road, Ottawa Walkley / Hampstead 1286 Walkley Rd, Ottawa Walkley / Banff 1245 Walkley Road, Ottawa Walkley / Bank 1846 Bank Street, Ottawa Walkley 4b 1104 Walkley Road, Ottawa Walkley 2a 930 Brookƒeld Road, Ottawa Heron 2a 957 Heron Road, Ottawa Billings Bridge Transitway, Ottawa Pleasant Park 113 Pleasant Park Rd, Ottawa Riverside 2a Smyth 2a 1879 Riverside Drive, Ottawa Lycée Claudel 1600 Riverside Dr, Ottawa Hurdman B 1432 Riverside Dr, Ottawa 291 bus time schedules and route maps are available in an o«ine PDF at moovitapp.com. Use the Moovit App to see live bus times, train schedule or Check Live Arrival Times subway schedule, and step-by-step directions for all public transit in Ottawa. About Moovit MaaS Solutions Supported Countries Mooviter Community © 2021 Moovit - All Rights Reserved.
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • Ward 16 Master THEME EN
    Draft Budget 2020 – Ward 16 – River Councillor Riley Brockington Ward investments in 2020 Infrastructure • $31.2 million on infrastructure, including: o $5.5 million to rehabilitate Mooney’s Bay trunk sewer o $6.8 million for integrated road, sewer, and water work along Claymor and Senio avenues o $5.9 million for integrated road, sewer and water work along Larkin Street, Larose Avenue and Lepage Avenue o $8.8 million on structure renewal, including culverts along the Airport Parkway at Walkley Road, and O-Train overpasses at Heron Road, Riverside Drive and Walkley Road o $3.95 million to resurface Riverside Drive between Hunt Club and Walkley roads Transportation • $817 million to fund Stage 2 of Ottawa’s light-rail transit system, extending service to Limebank Station with a link to the Ottawa Macdonald–Cartier International Airport, adding 12 kilometres and eight stations along the Trillium Line, south of Greenboro Station • $125,000 to reconstruct sidewalks and curbs to improve road safety along McCarthy Road between Plante Drive and the rail crossing • $30,000 to apply high-friction asphalt on Prince of Wales Drive at Kochar Drive • $20,000 to repair streetlight cables at Kenzie Street and Leaside Avenue • $6,000 to replace streetlight poles on Riverside Drive at Malhotra Court Parks and facilities • $500,000 on renewal projects, including: o $85,000 for building improvements to the Water Services facility on Clyde Avenue o $80,000 for upgrades to the Deborah Anne Kirwan Pool o $270,000 for concrete walkways and retaining walls at
    [Show full text]
  • 2197 Riverside Drive
    For Sublease 2197 Riverside Drive Impressive Common Area Upgrades Available space Highlights Suite 101 1,087 sf • Move-in ready space • Lots of natural light Net Rent • Three sound-proofed offices Contact Listing Agent • New Conference facility in the building • New lobby and elevators • Onsite parking Additional Rent • Public transit and food service amenities at your door $15.43 psf (2020 estimate) step • Bike paths, walking trails, and outdoor green space Lease Expiry • Key fob and security camera system May 31, 2025 Location Possession Ottawa South, Billings Bridge, with a short 10 minute Immediate commute to Downtown Ottawa. Avison Young Matthew Schultz Commercial Real Estate (Ontario) Inc. Brokerage Sales Representative, Principal 45 O’Connor Street, Suite 800 D 613 567 3478 Ottawa, ON K1P 1A4 [email protected] M 613 567 2680 E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young. Pictures 2197 Riverside Drive, Ottawa Matthew Schultz Sales Representative, Principal avisonyoung.ca D 613 567 3478 [email protected] E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young. Pictures 2197 Riverside Drive, Ottawa Map Patty’s Pub Transitway Brewer Park Bronson Avenue Bank Street Riverside Drive Vincent Massey Park Heron Road (Approximately, not to scale) Matthew Schultz Sales Representative, Principal avisonyoung.ca D 613 567 3478 [email protected] E. & O.E.: The information contained herein was obtained from sources which we deem reliable and, while thought to be correct, is not guaranteed by Avison Young..
    [Show full text]
  • Project Synopsis
    Final Draft Road Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 1 1.3 Report Structure .................................................................................................. 3 2. Background Information ...................................................................... 4 2.1 The TRANS Screenline System ......................................................................... 4 2.2 The TRANS Forecasting Model ......................................................................... 4 2.3 The 2008 Transportation Master Plan ............................................................... 7 2.4 Progress Since 2008 ........................................................................................... 9 Community Design Plans and Other Studies ................................................................. 9 Environmental Assessments ........................................................................................ 10 Approvals and Construction .......................................................................................... 10 3. Needs and Opportunities ..................................................................
    [Show full text]
  • Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa
    Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa Updated March 8, 2021 Do you know the history behind a street name not on the list? Please contact us at [email protected] with the details. • - The Gloucester Historical Society wishes to thank others for sharing their research on street names including: o Société franco-ontarienne du patrimoine et de l’histoire d’Orléans for Orléans street names https://www.sfopho.com o The Hunt Club Community Association for Hunt Club street names https://hunt-club.ca/ and particularly John Sankey http://johnsankey.ca/name.html o Vanier Museoparc and Léo Paquette for Vanier street names https://museoparc.ca/en/ Neighbourhood Street Name Themes Neighbourhood Theme Details Examples Alta Vista American States The portion of Connecticut, Michigan, Urbandale Acres Illinois, Virginia, others closest to Heron Road Blackburn Hamlet Streets named with Eastpark, Southpark, ‘Park’ Glen Park, many others Blossom Park National Research Queensdale Village Maass, Parkin, Council scientists (Queensdale and Stedman Albion) on former Metcalfe Road Field Station site (Radar research) Eastway Gardens Alphabeted streets Avenue K, L, N to U Hunt Club Castles The Chateaus of Hunt Buckingham, Club near Riverside Chatsworth, Drive Cheltenham, Chambord, Cardiff, Versailles Hunt Club Entertainers West part of Hunt Club Paul Anka, Rich Little, Dean Martin, Boone Hunt Club Finnish Municipalities The first section of Tapiola, Tammela, Greenboro built near Rastila, Somero, Johnston Road.
    [Show full text]
  • 40 Bus Time Schedule & Line Route
    40 bus time schedule & line map 40 Greenboro View In Website Mode The 40 bus line (Greenboro) has 2 routes. For regular weekdays, their operation hours are: (1) Greenboro: 4:38 AM - 11:53 PM (2) St-Laurent: 12:25 AM - 11:55 PM Use the Moovit App to ƒnd the closest 40 bus station near you and ƒnd out when is the next 40 bus arriving. Direction: Greenboro 40 bus Time Schedule 54 stops Greenboro Route Timetable: VIEW LINE SCHEDULE Sunday 12:28 AM - 11:40 PM Monday 12:10 AM - 11:53 PM St-Laurent A 1248 St-laurent, Boulevard Tuesday 4:38 AM - 11:53 PM St Laurent / Tremblay Wednesday 4:38 AM - 11:53 PM 1325 St-Laurent Boulevard, Ottawa Thursday 4:38 AM - 11:53 PM St Laurent / Oc Transpo Friday 4:38 AM - 11:53 PM 1500 St-Laurent Boulevard, Ottawa Saturday 5:25 AM - 11:58 PM St Laurent / Belfast 1534 St-Laurent Boulevard, Ottawa St Laurent / Industrial 1740 St-Laurent Boulevard, Ottawa 40 bus Info Direction: Greenboro St Laurent / Bourassa Stops: 54 1802 St-Laurent Boulevard, Ottawa Trip Duration: 20 min Line Summary: St-Laurent A, St Laurent / Tremblay, Elmvale Mall Stop St Laurent / Oc Transpo, St Laurent / Belfast, St 1910 St-Laurent Boulevard, Ottawa Laurent / Industrial, St Laurent / Bourassa, Elmvale Mall Stop, St Laurent / Tawney, St Laurent / Connery, St Laurent / Tawney St Laurent / Joliffe, St Laurent / Foley, St Laurent / 2013 St-Laurent Boulevard, Ottawa Ad. 2250, St Laurent / Ad. 2300, St Laurent / Thurston, St Laurent / Ad. 2385, St Laurent / Conroy, St Laurent / Connery Conroy / St Laurent, Conroy / Thurston, Conroy / 2086 St-Laurent Boulevard, Ottawa Railway, Johnston / Conroy, Johnston / Ewing, Johnston / Ad.
    [Show full text]
  • Heron Road Bridge Rehabilitation Ottawa, Ontario
    Canadian Consulting Engineering Awards 2013 Heron Road Bridge Rehabilitation Ottawa, Ontario Association of Consulting Engineering Companies Heron Road Bridge Rehabilitation 2013 Awards Ottawa, Ontario TABLE OF CONTENTS Confirmation Receipt Entry Consent Form PROJECT HIGHLIGHTS .................................................................................................. 1 PROJECT DESCRIPTION ................................................................................................ 2 TOC iii Association of Consulting Engineering Companies Heron Road Bridge Rehabilitation 2013 Awards Ottawa, Ontario PROJECT HIGHLIGHTS The Heron Road Bridge located in the nation’s capital, is a vital link within the City of Ottawa’s transportation network being one of several bridges crossing the Rideau River that divides the east and west parts of the City and one of three major east-west cross town routes. Constructed in 1966/1967, it consists of long twin structures carrying Heron Road over the Rideau Canal (National Historic Site of Canada and UNESCO World Heritage site), the National Capital Commission (NCC) pedestrian pathway, Colonel By Drive, the Rideau River, and the Vincent Massey Park access road. Part of the bridge collapsed during original construction and this tragedy remains one of Ontario’s worst construction accidents in history. Each structure consists of seven spans carrying three lanes of traffic. The north structure is about 267m long and the south structure is 276m long. The superstructure consists of cast-in-place post-tensioned voided concrete deck cantilevered to support three suspended spans. The suspended spans consist of nine simply supported prestressed girders, with reinforced concrete deck. The precast girders are supported by corbels at the ends of the cantilevered post-tensioned deck. The substructure consists of six intermediate piers and abutments at each ends. The piers in the vicinity of the Rideau River are supported on spread footing on bedrock whereas the remaining piers and abutments are supported by piles driven to bedrock.
    [Show full text]
  • Canada Gouvernementaux Canada
    Public Works and Government Services Travaux publics et Services 1 1 Canada gouvernementaux Canada RETURN BIDS TO: Title - Sujet RETOURNER LES SOUMISSIONS À: COURIER AND FREIGHT SERVICES Bid Receiving - PWGSC / Réception des soumissions - Solicitation No. - N° de l'invitation Date TPSGC E60LM-120020/B 2013-03-05 11 Laurier St. / 11, rue Laurier Client Reference No. - N° de référence du client Amendment No. - N° modif. Place du Portage , Phase III E60LM-120020 006 Core 0A1 / Noyau 0A1 Gatineau, Québec K1A 0S5 File No. - N° de dossier CCC No./N° CCC - FMS No./N° VME Bid Fax: (819) 997-9776 lm001.E60LM-120020 GETS Reference No. - N° de référence de SEAG PW-$$LM-001-62053 Date of Original Request for Standing Offer 2013-01-25 Revision to a Request for a Standing Offer Date de la demande de l'offre à commandes originale Révision à une demande d'offre à commandes Solicitation Closes - L'invitation prend fin Time Zone Fuseau horaire National Master Standing Offer (NMSO) at - à 02:00 PM on - le 2013-03-11 Eastern Standard Offre à commandes principale et nationale (OCPN) Time EST Address Enquiries to: - Adresser toutes questions à: Buyer Id - Id de l'acheteur Jiang, Kevin lm001 The referenced document is hereby revised; unless otherwise indicated, all other terms and conditions of Telephone No. - N° de téléphone FAX No. - N° de FAX the Offer remain the same. (819) 956-3857 ( ) ( ) - Delivery Required - Livraison exigée Ce document est par la présente révisé; sauf indication contraire, les modalités de l'offre demeurent les mêmes. Destination - of Goods, Services, and Construction: Destination - des biens, services et construction: Comments - Commentaires Vendor/Firm Name and Address Security - Sécurité Raison sociale et adresse du This revision does not change the security requirements of the Offer.
    [Show full text]
  • Report Template
    1 Report to/Rapport au : Transportation Committee Comité des transports November 27, 2012 27 novembre 2012 Submitted by/Soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Bob Streicher, Acting Manager/Gestionnaire par intérim, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) 580-2424 x 22723, [email protected] CITY WIDE / À L’ÉCHELLE DE LA VILLE Ref N°: ACS2012-PAI-PGM-0260 SUBJECT: JOINT STUDY TO ASSESS CUMULATIVE EFFECTS OF TRANSPORTATION INFRASTRUCTURES ON THE NATIONAL CAPITAL GREENBELT – STUDY REPORT OBJET : ÉTUDE CONJOINTE VISANT À ÉVALUER LES EFFETS CUMULATIFS DES INFRASTRUCTURES DE TRANSPORT SUR LA CEINTURE DE VERDURE DE LA CAPITALE NATIONALE – RAPPORT D’ÉTUDE REPORT RECOMMENDATIONS That the Transportation Committee receive this report for information. RECOMMANDATIONS DU RAPPORT Que le Comité des Transports prenne connaissance de ce rapport. BACKGROUND The purpose of this study undertaken in partnership with the National Capital Commission (NCC) was to identify projects within the Transportation Master Plan (TMP) and other transportation projects that have emerged since the completion of the TMP that could have an impact on the environmental integrity of the federal Greenbelt lands. By examining the cumulative effects of the construction of this infrastructure on the Greenbelt lands, a framework now has been established to ensure that the associated Environmental Assessments (EAs) that require federal approval will move forward more expediently. 2 One of the NCC’s mandates is to protect the Greenbelt. Current practice has been that the NCC only comments or provides input on projects that are identified in its Greenbelt Master Plan (GBMP).
    [Show full text]
  • 3025 Albion Road North I C H a E L
    Engineering Land / Site Development Municipal Infrastructure 3025 Albion Road Environmental / Water Resources Traffic / Ahlul-Bayt Center Ottawa Transportation Structural Transportation Impact Study Recreational Planning Land / Site Development Planning Application Management Municipal Planning Documents & Studies Expert Witness (OMB) Wireless Industry Landscape Architecture Urban Design & Streetscapes Open Space, Parks & Recreation Planning Community & Residential Developments Commercial & Institutional Sites Environmental Restoration 3025 Albion Road Ahlul-Bayt Center Ottawa Transportation Impact Study Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 April 2018 Novatech File: 113093 Ref: R-2015-176 Documentation and Reporting Checklist Report Context (Section 1.0) Description of the development (include all of the following that are known at the time of the application): Municipal address; Location relative to major elements of the existing transportation system (e.g., the site is located in the southwest quadrant of the intersection of Main Street/ First Street, 600 metres from the Maple Street Rapid Transit Station); Existing land uses or permitted use provisions in the Official Plan, Zoning By-law, etc.; Proposed land uses and relevant planning regulations to be used in the analysis; Proposed development size (building size, number of residential units, etc.) and location on site; Estimated date of occupancy; Planned phasing of development; Proposed number of parking spaces (not relevant for Draft Plans of Subdivision); and Proposed access points and type of access (full turns, right-in/ right-out, turning restrictions, etc. Study area; Time periods and phasing; and Horizon years (include reference to phased development). The TIS must include a key plan that shows the general location of the development in relation to the surrounding area.
    [Show full text]
  • Airport Parkway Widening & Lester Road Widening Environmental Assessment Study
    Airport Parkway Widening & (Brookfield Avenue to Ottawa Macdonald-Cartier International Airport) Lester Road Widening (Airport Parkway to Bank Street) Environmental Assessment Study Project overview The City of Ottawa initiated the study to develop a Recommended Plan for the widening of the Airport Parkway between Brookfield Avenue to the Ottawa Macdonald-Cartier International Airport and the widening of Lester Road from the Airport Parkway to Bank Street. Study Area Some aspects of the study will require examination of a broader area in order to address environmental effects; to co-ordinate with relevant ongoing studies and projects, and to study and identify tie-ins to the roadway network. Rationale for widening the Airport Parkway and Lester Road The Airport Parkway is a major north-south arterial road in the city. Along the corridor it connects with the neighbourhoods of Confederation Heights, Riverside Park, Ellwood, South Keys, Hunt Club, Gloucester, Uplands and Blossom Park at the Brookfield, Walkley, Hunt Club and Lester interchanges. Rapid growth in the communities south of Hunt Club Road, including Leitrim, Riverside South and Greely has increased traffic volumes on the Airport Parkway, leading to congestion during the peak commuting periods. Future development of the airport lands, with a planned airport expansion as well as commercial development will also put increased pressure on these corridors. The establishment of the Ernst & Young Centre trade show facility at the northwest corner of the Airport Parkway and Uplands Road has further increased traffic in the area of the Lester/Albion Road corridor. This Environmental Assessment (EA) study will take urban and rural growth, the development of the Ernst & Young Centre, as well as the Rideau Carleton Raceway operations as a source of demand effect on the Airport Parkway into consideration.
    [Show full text]
  • Carleton Heights and Area Residents Association AGM
    COUNCILLOR/CONSEILLE R RILEY BROCKINGTON Carleton Heights and Area Residents Association AGM June 25, 2019 Baseline Road Bus Rapid Corridor Update Preliminary design is ongoing and is expected to be completed this summer for the Baseline Road Bus Rapid Corridor. A plan for public consultation on the preliminary design is being considered but has not been finalized. The detailed design is anticipated to be complete by late winter or early spring 2020. There is currently no timetable for the construction of this project as no funds have been allocated at this time. Permanent Installation of Reflections of Greece Sign Blades On June 12, I brought forward a motion to have the ‘Reflections of Greece’ sign blades on Prince of Wales Drive (between Hogs Back Road and Baseline Road) made a permanent fixture on the street. The previous term of council authorized a pilot project which saw the signs installed annually in 2016, 2017, and 2018 for the Greek Festival. Since then, the Hellenic community has asked for the signs to become permanent. The maintenance and installation costs are the responsibility of the Hellenic Community of Ottawa, and not taxpayers. This motion is to be debated at the city council meeting this Wednesday, June 26. If you have any thoughts or feedback on this topic, I welcome your comments at [email protected]. Hog’s Back Construction Update On Monday, May 13, I hosted a public information session with the National Capital Commission and Parks Canada to share information on the upcoming construction and replacement of both bridges that span Hog’s Back Road; the swing bridge and fixed bridge.
    [Show full text]