3095 Albion Road North Zoning By-Law Amendment

Total Page:16

File Type:pdf, Size:1020Kb

3095 Albion Road North Zoning By-Law Amendment 3095 Albion Road North Zoning By-law Amendment and Site Plan Control Applications PLANNING RATIONALE ADDENDUM Prepared for: Ahlul-Bayt Centre Ottawa (ABCO) 200 Baribeau Street Ottawa, ON K1L 7R6 Prepared by: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 January 2017 Novatech File: 113093 Ref: R-2017-003 Planning Rationale Addendum Ahlul-Bayt Centre Ottawa, 3095 Albion Road North Table of Contents 1.0 INTRODUCTION ............................................................................................................. 2 2.0 POLICY REGULATORY FRAMEWORK CHANGES – 2016 OPA ................................... 2 2.1 Policy 1 of Section 3.6.5 Urban Employment Area ....................................................... 3 3.0 COMPATIBILITY ASSESSMENT .................................................................................... 3 3.1 Purpose of the Compatibility Assessment .................................................................... 4 3.2 Land Use Context ........................................................................................................ 4 4.0 POTENTIAL ADVERSE IMPACTS .................................................................................. 7 4.1 Description of Class III Facility – Walkley O-Train Yard and CN Rail Lands ................. 7 4.2 Separation Distances within Infill Areas ....................................................................... 9 4.3 Potential Noise, Vibration and Air Impacts ..................................................................10 4.4 Health and Safety Considerations ..............................................................................13 4.4.1 Trespassing .....................................................................................................14 4.4.2 Areas of Potential Environmental Concern (APECs) ........................................14 4.4.3 Pedestrian Safety .............................................................................................15 4.5 Potential Traffic Impacts..............................................................................................16 4.5.1 Potential Traffic Increases ................................................................................16 4.5.2 Off-Street Parking Impact .................................................................................17 5.0 CONCLUSION ....................................................................................................................19 Novatech 1 Planning Rationale Addendum Ahlul-Bayt Centre Ottawa, 3095 Albion Road North 1.0 INTRODUCTION This Planning Rationale Addendum serves to complement the Planning Rationale (Novatech, 2016) that was prepared in relation to two concurrent planning applications, a Zoning By-law Amendment and a Site Plan Control application, for the proposed development of a mosque, school and community centre, to be known as the “Ahlul-Bayt Centre Ottawa” (ABCO) complex at 3095 Albion Road North. This Planning Rationale Addendum should be read in conjunction with the Planning Rationale and serves to address comments provided by the City (letter dated 28 April 2016) in regard to their review of the ZBA and Site Plan submission (deemed complete on 8 March 2016); as well as to address the recent proposed policy changes to the Urban Employment Lands designation of the City’s Official Plan that are directly relevant to this proposal. 2.0 POLICY REGULATORY FRAMEWORK CHANGES – 2016 OPA The Planning Rationale (2015) demonstrated conformity with the relevant policies of the Provincial Policy Statement and the City’s Official Plan; as well as provided an overview of the proposed Zoning By-law Amendment and a review of the Site Plan. Since that time, Council of the City of Ottawa adopted an Official Plan Amendment (Council Adopted 14 December 2016), known as 2016 OPA. The 2016 OPA is a comprehensive set of policy changes to the City’s Official Plan that incorporates findings of two major studies (Employment Land Review and the Land Evaluation and Area Review for Agriculture) and reflects a change of the OP’s planning horizon to the year 2036. The Amendment proposes a new policy within Section 3.6.5, Urban Employment Areas that will allow the consideration: “through a site specific amendment to the Zoning By-law permitting low density institutional uses such as community centres, daycares, places of worship only if the proposed use is compatible with existing and potential permitted uses as specified in the Zoning By-law; and, the ability for the remainder of the Urban Employment Area to achieve the requirements of Policy 1 above or as otherwise provided for in a Secondary Plan. The compatibility assessment will be guided by the Ministry of the Environment D-Series Guidelines, as amended. The identification of potential permitted uses may consider the impact that existing uses adjacent to and within the Urban Employment Area may already have on a non-existing use that is permitted in the Zoning By-law” (new proposed policy 3.6.5.2(f), OPA 2016, November 2016). Novatech 2 Planning Rationale Addendum Ahlul-Bayt Centre Ottawa, 3095 Albion Road North 2.1 Policy 1 of Section 3.6.5 Urban Employment Area Policy 1 of Section 3.6.5 (Draft OPA 2016) indicates that established Urban Employment Areas (UEA) have capacities to provide for 2,000 to 20,000+ jobs, which would be distributed over a particular Urban Employment Area at a range of densities. As outlined in the Planning Rationale (Novatech, 2016), the Urban Employment Area in which the subject property is located has an area of approximately 685 ha (including only those employment lands south of Walkley Road, not the larger Employment Area designation that captures the rail corridor north and east to the 417). The subject property is 1.55 ha in size, which represents 0.2% of the lands within the Urban Employment Area. When applying the minimum and maximum job capacities to the South of Walkley Road Urban Employment Area (i.e. 2,000 jobs (minimum) to 20,000 jobs (maximum) over 685 ha), a 1.55 ha parcel would have job targets ranging from 4.5 jobs (minimum) to 45 (maximum) jobs. The proposed institutional building at 3095 Albion Road North would employ 20 full-time people and 43 part-time people, for a total of 63 jobs. Sixty-three jobs will provide an adequate number of jobs on the site to enable the UEA to reach the higher magnitude job capacity of 20,000+ jobs. 3.0 COMPATIBILITY ASSESSMENT The overall purpose of carrying out a compatibility assessment is to prevent land use conflicts. In keeping with policy 3.6.5.2(f), introduced through OPA 2016, and the City of Ottawa’s Review Comments, this compatibility assessment is being guided by the MOE D-Series Guidelines. Appendix A of D-6, Compatibility between Industrial Facilities, classifies the adjacent Walkley Rail Yard and CN lands located to the south of the subject property as a Class III Industrial Facility. Appendix 3 (D-6-3 Separation Distances) indicates that the following parameters should be considered as part of a compatibility assessment for a Class III Industrial Facility: - a 1000 metre potential influence area and - a 300 metre recommended minimum setback in which incompatible development should not normally take place. Novatech 3 Planning Rationale Addendum Ahlul-Bayt Centre Ottawa, 3095 Albion Road North 3.1 Purpose of the Compatibility Assessment The specific outcome of this assessment is to establish the parameters and/or mitigation measures which are required to reduce the potential conflicts and adverse impacts of locating the proposed institutional uses (mosque/school/community centre) within the minimum 300 metre recommended separation distance limit between uses that may be considered incompatible. In addition to MOE’s D-Series, the Guidelines for New Development in Proximity to Railway Operations (Federation of Canadian Municipalities/Railway Association of Canada Proximity Initiative, 2013) apply in this context and this assessment includes their consideration. The Proximity Initiative Guidelines recommend a 300 metre setback for new residential development in proximity to a “freight rail yard” and a 30 metre setback from a main rail line (Section 3.3 Building Setbacks for New Developments). The Walkley O-Train Yard, which is directly adjacent to the subject property, is not a typical “freight yard” since the trains that are serviced and maintained within this Yard are passenger trains (diesel-powered O-Trains), whereas the CN rail lands further south are more typical of a freight rail yard. 3.2 Land Use Context Adjacent to and abutting the subject property to the south, is the Walkley O-Train Maintenance and Storage Yard. The Walkley Yard forms part of the O-Train Trillium Line (component of the City’s Rapid Transit Network) and is zoned Light Industrial (IL), as is the front portion of the subject property (see Figure 1). Permitted uses within the Light Industrial Zone include “heavy equipment and vehicles sales, rental and servicing” and uses that are similar to the proposed institutional uses (i.e. day care, place of assembly, recreational and athletic facility, and training centre) (see pages 17 and 18 of the Planning Rationale for further discussion). It is assumed that since the City’s Zoning By-law for Light Industrial zones allows for the listed range of uses, it de facto has established that such uses (institutional and heavy equipment and vehicle sales, rental and servicing) may be compatible with each other given appropriate handling in regard
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • Project Synopsis
    Final Draft Road Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 1 1.3 Report Structure .................................................................................................. 3 2. Background Information ...................................................................... 4 2.1 The TRANS Screenline System ......................................................................... 4 2.2 The TRANS Forecasting Model ......................................................................... 4 2.3 The 2008 Transportation Master Plan ............................................................... 7 2.4 Progress Since 2008 ........................................................................................... 9 Community Design Plans and Other Studies ................................................................. 9 Environmental Assessments ........................................................................................ 10 Approvals and Construction .......................................................................................... 10 3. Needs and Opportunities ..................................................................
    [Show full text]
  • Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa
    Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa Updated March 8, 2021 Do you know the history behind a street name not on the list? Please contact us at [email protected] with the details. • - The Gloucester Historical Society wishes to thank others for sharing their research on street names including: o Société franco-ontarienne du patrimoine et de l’histoire d’Orléans for Orléans street names https://www.sfopho.com o The Hunt Club Community Association for Hunt Club street names https://hunt-club.ca/ and particularly John Sankey http://johnsankey.ca/name.html o Vanier Museoparc and Léo Paquette for Vanier street names https://museoparc.ca/en/ Neighbourhood Street Name Themes Neighbourhood Theme Details Examples Alta Vista American States The portion of Connecticut, Michigan, Urbandale Acres Illinois, Virginia, others closest to Heron Road Blackburn Hamlet Streets named with Eastpark, Southpark, ‘Park’ Glen Park, many others Blossom Park National Research Queensdale Village Maass, Parkin, Council scientists (Queensdale and Stedman Albion) on former Metcalfe Road Field Station site (Radar research) Eastway Gardens Alphabeted streets Avenue K, L, N to U Hunt Club Castles The Chateaus of Hunt Buckingham, Club near Riverside Chatsworth, Drive Cheltenham, Chambord, Cardiff, Versailles Hunt Club Entertainers West part of Hunt Club Paul Anka, Rich Little, Dean Martin, Boone Hunt Club Finnish Municipalities The first section of Tapiola, Tammela, Greenboro built near Rastila, Somero, Johnston Road.
    [Show full text]
  • Appendix I Detailed Evaluation of Alternatives
    APPENDIX I DETAILED EVALUATION OF ALTERNATIVES Alternatives Analysis – Gladstone Station Trillium Line Extension EA Study Performance Measures – “The preferred Factor Areas / Criteria Option 1: North of Gladstone Option 2: Centred on Gladstone Option 3: South of Gladstone alternative…” Transportation System Network connectivity Provides the best connections to existing and GOOD VERY GOOD POOR planned local and rapid transit routes Provides a direct connection to the planned Provides a direct connection to the planned Does not provide a direct connection to the transit plaza. transit plaza. planned transit plaza Passengers transferring to/from eastbound Provides a direct connection to both sides of Passengers transferring to/from westbound bus route 14 must cross Gladstone Avenue. Gladstone Avenue, so that passengers bus route 14 must cross Gladstone Avenue. transferring to/from bus route 14 need not cross the street. Provides the best connections to existing and GOOD VERY GOOD POOR planned pedestrian, cycling and road networks Provides direct connection to pedestrian Provides direct connection to pedestrian Provides direct connection to pedestrian networks accessible from transit plaza. networks accessible from transit plaza and networks accessible from south side of Provides direct connection to N-S MUP and E- south side of Gladstone. Gladstone, but not those accessible from W Gladstone Avenue cycling route. Provides direct connection to N-S MUP and E- transit plaza. W Gladstone Avenue cycling route. Provides direct connection to N-S MUP and E- W Gladstone Avenue cycling route. Ridership Generates the highest ridership VERY GOOD Combined total of 180 boardings and alightings anticipated during the 2048 morning peak hour.
    [Show full text]
  • Line 1 Preparations Continue
    Transpo Express FALL 2017_Layout 1 2017-Oct-20 10:42 AM Page 1 TRANSPO express WINTERFall 2017 2019 Line 1 preparations continue 2. Derek Stevens 3. Tony Spinello GARAGE ATTENDANT 1. Tim Wielinga PARA TRANSPO 1. 7150 Brian Ferguson 2. 7313 Hussein Suleiman reparations have been underway for some requirements that come with the transition to that have been created and how they will con- time for the highly anticipated launch a multi-modal transit system, made up of bus, tribute to the success of our new light rail line. PCONVENTIONALof O-Train Line 1. Many positions have diesel rail and light rail. Continue reading on been created and filled to meet the changing page 4 for an in-depth look at some of the roles 1. 2883 Manjit Nagra 2. 5833 Kulwinder Sidhu he 2017 Roadeo competition and weather competition this year. Manjit will compete in the In this issue was HOT! Competitors, spectators, staff and 2018 International Roadeo in Tampa, Florida. He 3. 2643 Terry Claesson Tvolunteers came out on a beautiful will be joined by William Castillo, Derek Stevens September Sunday for this year’s annual Roadeo. and Tony Spinello, who will compete in the Mechanical competition. Another successful OperatorPriority Manjit Seating Nagra, who Cards was runner-up in6 past years, won first place in the Conventional Transit Food Drive! 2 2017 ROADEO cont’d P. 4-5 Transecure stories 7 InThe charter this experience issue 2 Accessible entrances NewTraining Nova - onebuses track at at andNew parking Employee at OC Passes Transpo 7 4 OC Celebrates Ottawa cominga
    [Show full text]
  • TRANSIT SERVICES Document 1 PURCHASE ORDERS ≥$10,000 AWARDED UNDER DELEGATION of AUTHORITY for the PERIOD JULY 1, 2012 to DECEMBER 31, 2012
    TRANSIT SERVICES Document 1 PURCHASE ORDERS ≥$10,000 AWARDED UNDER DELEGATION OF AUTHORITY FOR THE PERIOD JULY 1, 2012 TO DECEMBER 31, 2012 Professional / Vendor Name Item PO Branch Description Consulting Contract Type Amount Non-Competitive Rationale Location Services 1 45064135 BOS Printing and delivery of "Take-One" pamphlets as distributed aboard OC Transpo A $20,352.00 LOWE MARTIN COMPANY INC buses for 2012. OTTAWA ON 2 45067917 BOS Provision of web site hosting services for www.octranspo.com for 2012. E $10,349.00 STORM INTERNET SERVICES Section 22(1)(c) OTTAWA ON Only one source of supply acceptable and cost effective 3 45072521 BOS Transit map printing services for OC Transpo. E $13,028.66 MPH GRAPHICS INC MARKHAM ON 4 45072550 BOS Supply and delivery of fifteen hundred and fifty (1,550) Transit Shelter maps for $17,334.21 LOWE MARTIN COMPANY INC OC Transpo. OTTAWA ON 5 45072971 BOS Professional project management services to undertake and support the re- PO $23,201.28 CORPORATE RESEARCH GROUP scoping of the Presto card rollout and launch in 2013 for the Transit Services NEPEAN ON department. 6 45073040 BOS Professional services (voice artist) for Next Stop Announcement System voice PE $15,265.02 THE MENSOUR AGENCY LTD Section 22(1)(c) prompts on as and when required basis for an estimated one (1) year period. OTTAWA ON Only one source of supply acceptable and cost effective 7 45073208 BOS Professional services to undertake database and design revisions to the OC PO $13,432.32 BV02 INC Transpo Events web page.
    [Show full text]
  • 2004-1101-Ottawa-Central-ETT-4.Pdf
    OUR MISSION To be our customers’ preferred supplier of transportation logistics services to help them meet the needs of their own customers. BASIS OF OUR MISSION To make a significant contribution to our customers’ commercial success by providing safe, efficient and cost- effective transportation logistics services. OTTAWA CENTRAL RAILWAY TIME TABLE NO. 4 Effective Monday November 1st, 2004 REFER TO PAGE 2 FOR EFFECTIVE TIME AND FOR OTHER TIME AND DATE CHANGES THAT WILL OCCUR JAMES ALLEN GENERAL MANAGER OTTAWA ONT LUC LAROSE TRANSPORTATION SUPERVISOR OTTAWA ONT. TIME TABLE NO 4 OTTAWA CENTRAL RAILWAY Page 2 November 1st 2004 MAJOR CHANGES TO TIME TABLE NO 4 Information previously contained in the monthly- re-issue of bulletins has been placed in the subdivisions to which it applies. System Special Instructions containing Rule changes and Special Instructions have been revised. General Operating Instructions have been revised Rule 105(a) is applicable on all non-main tracks except tracks at Smurfit Stone. Beachburg Sub RTC Standby Channel has Changed. Main track ends at mile 85.0 Speeds on the North and South Freight shed leads and the Sheffeild Industrial have changed Renfrew Sub RTC Standby Channel has Changed Vankleek Sub RTC Standby Channel, tones and DTMF Codes have Changed L'Orignal Sub RTC Standby Channel, tones and DTMF Codes have Changed TIME TABLE NO 4 OTTAWA CENTRAL RAILWAY Page 3 November 1st 2004 EFFECTIVE 0001 Monday November 1st, 2004 on Beachburg, Renfrew ,Vankleek and L'Orignal Subdivisions Governed by: Eastern Standard Time Commencing at 0100 Sunday, October 31st, 2004 Eastern Daylight Saving Time Commencing at 0300 Sunday April 3rd, 2005 Eastern Standard Time Commencing at 0100 Sunday, October 30th, 2005 THIS TIME TABLE IS FOR THE INFORMATION AND GUIDANCE OF OCR EMPLOYEES AND OTHERS WHO HAVE BEEN AUTHORIZED TO USE IT.
    [Show full text]
  • 40 Bus Time Schedule & Line Route
    40 bus time schedule & line map 40 Greenboro View In Website Mode The 40 bus line (Greenboro) has 2 routes. For regular weekdays, their operation hours are: (1) Greenboro: 4:38 AM - 11:53 PM (2) St-Laurent: 12:25 AM - 11:55 PM Use the Moovit App to ƒnd the closest 40 bus station near you and ƒnd out when is the next 40 bus arriving. Direction: Greenboro 40 bus Time Schedule 54 stops Greenboro Route Timetable: VIEW LINE SCHEDULE Sunday 12:28 AM - 11:40 PM Monday 12:10 AM - 11:53 PM St-Laurent A 1248 St-laurent, Boulevard Tuesday 4:38 AM - 11:53 PM St Laurent / Tremblay Wednesday 4:38 AM - 11:53 PM 1325 St-Laurent Boulevard, Ottawa Thursday 4:38 AM - 11:53 PM St Laurent / Oc Transpo Friday 4:38 AM - 11:53 PM 1500 St-Laurent Boulevard, Ottawa Saturday 5:25 AM - 11:58 PM St Laurent / Belfast 1534 St-Laurent Boulevard, Ottawa St Laurent / Industrial 1740 St-Laurent Boulevard, Ottawa 40 bus Info Direction: Greenboro St Laurent / Bourassa Stops: 54 1802 St-Laurent Boulevard, Ottawa Trip Duration: 20 min Line Summary: St-Laurent A, St Laurent / Tremblay, Elmvale Mall Stop St Laurent / Oc Transpo, St Laurent / Belfast, St 1910 St-Laurent Boulevard, Ottawa Laurent / Industrial, St Laurent / Bourassa, Elmvale Mall Stop, St Laurent / Tawney, St Laurent / Connery, St Laurent / Tawney St Laurent / Joliffe, St Laurent / Foley, St Laurent / 2013 St-Laurent Boulevard, Ottawa Ad. 2250, St Laurent / Ad. 2300, St Laurent / Thurston, St Laurent / Ad. 2385, St Laurent / Conroy, St Laurent / Connery Conroy / St Laurent, Conroy / Thurston, Conroy / 2086 St-Laurent Boulevard, Ottawa Railway, Johnston / Conroy, Johnston / Ewing, Johnston / Ad.
    [Show full text]
  • Report Template
    1 Report to/Rapport au : Transportation Committee Comité des transports November 27, 2012 27 novembre 2012 Submitted by/Soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Bob Streicher, Acting Manager/Gestionnaire par intérim, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) 580-2424 x 22723, [email protected] CITY WIDE / À L’ÉCHELLE DE LA VILLE Ref N°: ACS2012-PAI-PGM-0260 SUBJECT: JOINT STUDY TO ASSESS CUMULATIVE EFFECTS OF TRANSPORTATION INFRASTRUCTURES ON THE NATIONAL CAPITAL GREENBELT – STUDY REPORT OBJET : ÉTUDE CONJOINTE VISANT À ÉVALUER LES EFFETS CUMULATIFS DES INFRASTRUCTURES DE TRANSPORT SUR LA CEINTURE DE VERDURE DE LA CAPITALE NATIONALE – RAPPORT D’ÉTUDE REPORT RECOMMENDATIONS That the Transportation Committee receive this report for information. RECOMMANDATIONS DU RAPPORT Que le Comité des Transports prenne connaissance de ce rapport. BACKGROUND The purpose of this study undertaken in partnership with the National Capital Commission (NCC) was to identify projects within the Transportation Master Plan (TMP) and other transportation projects that have emerged since the completion of the TMP that could have an impact on the environmental integrity of the federal Greenbelt lands. By examining the cumulative effects of the construction of this infrastructure on the Greenbelt lands, a framework now has been established to ensure that the associated Environmental Assessments (EAs) that require federal approval will move forward more expediently. 2 One of the NCC’s mandates is to protect the Greenbelt. Current practice has been that the NCC only comments or provides input on projects that are identified in its Greenbelt Master Plan (GBMP).
    [Show full text]
  • 3025 Albion Road North I C H a E L
    Engineering Land / Site Development Municipal Infrastructure 3025 Albion Road Environmental / Water Resources Traffic / Ahlul-Bayt Center Ottawa Transportation Structural Transportation Impact Study Recreational Planning Land / Site Development Planning Application Management Municipal Planning Documents & Studies Expert Witness (OMB) Wireless Industry Landscape Architecture Urban Design & Streetscapes Open Space, Parks & Recreation Planning Community & Residential Developments Commercial & Institutional Sites Environmental Restoration 3025 Albion Road Ahlul-Bayt Center Ottawa Transportation Impact Study Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 April 2018 Novatech File: 113093 Ref: R-2015-176 Documentation and Reporting Checklist Report Context (Section 1.0) Description of the development (include all of the following that are known at the time of the application): Municipal address; Location relative to major elements of the existing transportation system (e.g., the site is located in the southwest quadrant of the intersection of Main Street/ First Street, 600 metres from the Maple Street Rapid Transit Station); Existing land uses or permitted use provisions in the Official Plan, Zoning By-law, etc.; Proposed land uses and relevant planning regulations to be used in the analysis; Proposed development size (building size, number of residential units, etc.) and location on site; Estimated date of occupancy; Planned phasing of development; Proposed number of parking spaces (not relevant for Draft Plans of Subdivision); and Proposed access points and type of access (full turns, right-in/ right-out, turning restrictions, etc. Study area; Time periods and phasing; and Horizon years (include reference to phased development). The TIS must include a key plan that shows the general location of the development in relation to the surrounding area.
    [Show full text]
  • Appendix a Consultation Record
    APPENDIX A CONSULTATION RECORD MEETING REPORT Date: July 14, 2014 Project: O-Train Extension EA Date of meeting: June 26, 2014 Project Number: 3414015-000 Location: Honeywell Room, Author: E. Sangster Ottawa City Hall Purpose: Transit Design and Operations Workshop Attendees: Initial E-Mail Steven Boyle, City of Ottawa SB [email protected] Alex Carr, City of Ottawa AC [email protected] Vivi Chi, City of Ottawa VC [email protected] Dennis Gratton, City of Ottawa DG [email protected] Frank McKinney, City of Ottawa FM [email protected] Kornel Mucsi, City of Ottawa KM [email protected] Pat Scrimgeour, City of Ottawa PSC [email protected] Colin Simpson, City of Ottawa CS [email protected] Derek Washnuk, City of Ottawa DW [email protected] Yvon Larochelle, OMCIAA YL [email protected] Alex Stecky-Efantis, OMCIAA AS [email protected] Paul Croft, Parsons Corporation PC [email protected] David Hopper, Parsons Corporation DH [email protected] Scott Bowers, MMM Group SB [email protected] Tim Dickinson, MMM Group TD [email protected] Paul Nimigon, MMM Group PN [email protected] Emily Sangster, MMM Group ES [email protected] Peter Steacy, MMM Group PST [email protected] DISTRIBUTION: All Attendees Item Details Action By 1. Introductions CS and PST provided an introduction to the study team, objectives, process and rationale. 2. Operational Considerations DH provided an overview of the existing OC Transpo network, which the O-Train extension will support. Transit network planning principles to be considered as part of this study include coverage, capacity, reliability, and legibility.
    [Show full text]
  • Local Railway Items from Area Papers
    Local Railway Items from Area Papers - Beachburg subdivision 19/01/1894 Renfrew Mercury Beachburg From an item in the District News this week, it will be seen that it is now proposed to bring a railway from Pembroke to Renfrew by way of Beachburg and Foresters' Falls: in order to connect with the several railways already centering here. The scheme is being gone into with some vim, evidently, and between the natural desire of Pembroke to get a line competing with the C.P.R., and the very probably willingness of the O.A. & P.S. to have all possible feeders for their traffic, - it is quite possible that the new project will get beyond the charter stage. It must be remembered, too, that a road following the route suggested would pass through just that section og Ross or Horton where the proposed line from Pontiac county would srike after crossing the Ottawa river; and if a combination of forces could be effected, one track would do for both roads for some miles before entering Renfrew, with consequent saving of construction expenses. Some such scheme as this may yet evolve; and if Renfrewites see a chance to put in a helping word or hand at any time it would be good policy to say the word or do the deed. With the best of wishes for the prosperity of every town arouns - still, let all roads lead to Renfrew. 23/08/1906 The Equity, Shawville Beachburg The engineers of the C.N. railway are now engaged in preliminary survey work on the proposed line along the front of this county-- the staff was at Bristol Corners last week.
    [Show full text]