DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0 TRAFFIC RESTRICTION BULLETIN (NOTE: SCHEDULES ARE SUBJECT TO WEATHER CONDITIONS) (All restrictions 24 hours/day, 7 days/week unless otherwise noted) PENNDOT ROADWAY MAINTENANCE HOTLINE 1-800-FIX- ROAD Log on to www.511pa.com or call 511 from any phone to check conditions on major highways.

DATE: 09-30-2016 LOCATION RESTRICTION DATE CONTRACTOR COST PHILADELPHIA Aramingo Ave. N & S Bridge Beam Installation: CLOSED & DETOURED 9/30/16 James J. Anderson $211.7 million between Delaware Ave. & I-95. 10 PM - 5 AM. DETOUR POSTED.

Betsy Ross Bridge ramp to I-95 Deck Repair: LEFT & CENTER LANE CLOSURE on 10/1/16 Maintenance South ramp. 6 AM - 2 PM.

*I-95 North ramp to Cottman Ave. Paving: RAMP CLOSED & DETOURED. 8 PM - 5 10/1/16-10/8/16 Walsh Construction $212.3 million (PA 73) AM. DETOUR POSTED. Company

Passyunk Ave. Bridge Rehabilitation: WESTBOUND RIGHT LANE 10/1/16-10/8/16 Buckley & Company, $33.5 million CLOSED on Hon. Robert C. Donatucci Memorial Inc. Bridge over . 9 AM - 3 PM.

Walnut St. Bridge Joint, Deck & Sidewalk Repairs: LANE 10/2/16-10/5/16 Neshaminy $2.5 million CLOSURES between N. 23rd St. & S. 32nd St. 8 PM - Constructors, Inc. 5 AM.

Whitaker Ave. Bridge Joint, Deck & Sidewalk Repairs: LANE 10/2/16-10/6/16 Neshaminy $2.5 million CLOSURES between E. Loudon St. & E. Ruscomb St. Constructors, Inc. 8 PM - 5 AM.

US 1 N & S (Roosevelt Extension) Bridge Cleaning: MOVING OPERATION between 10/2/16-10/7/16 DeAngelo Brothers, $1.2 million Henry Ave. & Broad St. (PA 611). 10 PM - 5 AM. LLC

9/30/2016 Page 1 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST *I-95 N & S Bridge Cleaning: MOVING OPERATION between 10/2/16-10/7/16 DeAngelo Brothers, $1.2 million Bucks County line & Delaware County line. 10 PM - 5 LLC AM.

*I-95 South Bridge Cleaning: MOVING OPERATION between PA 10/2/16-10/7/16 DeAngelo Brothers, $1.2 million 73 (Cottman Ave.) & Bridge St. 10 PM - 5 AM. LLC

Princeton Ave. ramp to I-95 North Roadwork: RAMP CLOSED & DETOURED. 8 PM - 5 10/2/16-10/8/16 Walsh Construction $212.3 million AM. DETOUR POSTED. Company

*I-95 N & S Fiber Installation: SHOULDER CLOSURE between 10/2/16-10/8/16 Walsh Construction $212.3 million Rhawn St. & Academy Rd. 9 AM - 3 PM. Company

*I-95 N & S Sign Structure Installation: SINGLE & DOUBLE LANE 10/2/16-10/8/16 Walsh Construction $212.3 million CLOSURES between Bridge St. & Academy Rd. 8 Company PM - 5 AM.

New State Rd. Roadwork: LANE CLOSURE between Longshore Ave. 10/2/16-10/8/16 Walsh Construction $212.3 million & Princeton Ave. 9 AM - 3 PM & 8 PM - 5 AM. Company

Bustleton Ave. Bridge Joint, Deck & Sidewalk Repairs: LANE 10/3/16-10/7/16 Neshaminy $2.5 million CLOSURES between Winchester Ave. & Benton St. 7 Constructors, Inc. AM - 3:30 PM.

*US 1 N & S (Roosevelt Blvd.) Milling & Paving: EXPRESS LANE CLOSURE 10/3/16-10/4/16 Buckley & Company, $15.5 million between Rhawn St. & Strahle St. 7 PM - 5 AM. Inc. DETOUR POSTED.

Passyunk Ave. Crack Sealing: LANE RESTRICTIONS between 10/3/16-10/4/16 James J. Anderson $7.2 million Schuylkill River & Broad St. (PA 611). 7 PM - 5 AM.

Robbins Ave. Prep: LANE RESTRICTIONS between Frankford Ave. 10/3/16-10/4/16 James J. Anderson $7.2 million & US 1 (Roosevelt Blvd.). 7 AM - 4 PM.

Baltimore Ave. Crack Sealing: LANE RESTRICTIONS between 10/3/16-10/4/16 James J. Anderson $7.2 million University Ave. & 61st St. 7 PM - 5 AM.

9/30/2016 Page 2 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Levick St. Prep: LANE RESTRICTIONS between Frankford Ave. 10/3/16-10/5/16 James J. Anderson $7.2 million & US 1 (Roosevelt Blvd.). 7 AM - 4 PM.

*I-676 E & W Overhead Bridge Construction: CLOSED & 10/3/16-10/6/16 Buckley & Company, $211.7 million DETOURED between I-76 & Broad St. (PA 611). 11 Inc. PM - 5 AM. DETOUR POSTED.

*US 1 N & S (Roosevelt Blvd.) Drain Cleaning/Debris Removal: LANE 10/3/16-10/6/16 Maintenance RESTRICTIONS between I-76 & 9th St. 9:30 AM - 2 PM. *I-676 E & W Drain Cleaning/Debris Removal: LANE 10/3/16-10/6/16 Maintenance RESTRICTIONS between I-76 & I-95. 9:30 AM - 2 PM.

*I-95 N & S Drain Cleaning/Debris Removal: LANE 10/3/16-10/6/16 Maintenance RESTRICTIONS between Phila. Int. Airport & PA 63 (Woodhaven Rd.). 9:30 AM - 2 PM.

*I-76 E & W Drain Cleaning/Debris Removal: LANE 10/3/16-10/6/16 Maintenance RESTRICTIONS between US 1 (City Ave.) & 26th St. 9:30 AM - 2 PM.

Frankford Ave. Paving: LANE RESTRICTIONS between Rhawn St. & 10/3/16-10/7/16 James J. Anderson $7.2 million Robbins Ave. 7 PM - 5 AM.

Snyder Ave. Curb Ramp Reconstruction: LANE RESTRICTIONS 10/3/16-10/7/16 James J. Anderson $13.4 million between Front St. & 29th St. 7 AM - 4 PM.

Broad St. (PA 611) Paving: LANE RESTRICTIONS between Indiana Ave. 10/3/16-10/7/16 James J. Anderson $7.2 million & Spring Garden St. 7 PM - 5 AM.

Baltimore Ave. Curb Ramp Reconstruction: LANE RESTRICTIONS 10/3/16-10/7/16 James J. Anderson $13.4 million between 61st St. & 39th St. 7 AM - 4 PM.

Pennsylvania Ave. Median & Curb Ramp Reconstruction: LANE 10/3/16-10/7/16 Tony DePaul & Son $1.3 million RESTRICTIONS between 22nd St. & N. Judson St. 9 AM - 3 PM.

9/30/2016 Page 3 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Benjamin Franklin Parkway Sidewalk & Curb Ramp Reconstruction: LANE 10/3/16-10/7/16 Tony DePaul & Son $3.3 million CLOSURE between 18th St. & 16th St. 6:30 AM - 3 PM.

Arch St. Sidewalk & Curb Ramp Reconstruction: LANE 10/3/16-10/7/16 Tony DePaul & Son $3.3 million CLOSURE between 15th St. & 17th St. 6:30 AM - 3 PM.

East Allegheny Ave. on-ramp to I-95 Core Boring: SHOULDER CLOSURE on ramp. 9 AM - 10/3/16-10/7/16 TRC Solutions South 3 PM.

Torresdale Ave. Bridge Cleaning: MOVING OPERATION between 10/3/16-10/7/16 DeAngelo Brothers, $1.2 million Rhawn St. & Enfield Ave. 9 AM - 3 PM. LLC

Torresdale Ave. Bridge Cleaning: MOVING OPERATION between 10/3/16-10/7/16 DeAngelo Brothers, $1.2 million Tolbut St. & Linden Ave. 9 AM - 3 PM. LLC

Torresdale Ave. Bridge Cleaning: MOVING OPERATION between 10/3/16-10/7/16 DeAngelo Brothers, $1.2 million Rhawn St. & Ashburner St. 9 AM - 3 PM. LLC

State Rd. Bridge Cleaning: MOVING OPERATIONLANE 10/3/16-10/7/16 DeAngelo Brothers, $1.2 million CLOSURES between Grant Ave. & Mill Rd. 9 AM - 3 LLC PM.

Adademy Rd. Bridge Cleaning: MOVING OPERATION between 10/3/16-10/7/16 DeAngelo Brothers, $1.2 million Chalfont Drive & Comly Rd. 9 AM - 3 PM. LLC

Knights Rd. Bridge Cleaning: MOVING OPERATION between 10/3/`16-10/7/16 DeAngelo Brothers, $1.2 million Fairdale Rd. & Franklin Mills Blvd. 9 AM - 3 PM. LLC

Knights Rd. Bridge Cleaning: MOVING OPERATION between 10/3/16-10/7/16 DeAngelo Brothers, $1.2 million Academy Rd. & Dunksferry Rd. 9 AM - 3 PM. LLC

9/30/2016 Page 4 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Holme Ave. Bridge Cleaning: MOVING OPERATION between 10/3/16-10/7/16 DeAngelo Brothers, $1.2 million Pennypack St. & Willits Rd. 9 AM - 3 PM. LLC

Linden Ave. Bridge Cleaning: MOVING OPERATION between 10/3/16-10/7/16 DeAngelo Brothers, $1.2 million Torresdale Ave. & State Rd. 9 AM - 3 PM. LLC

US 1 (City Ave.) Trench Restoration: LANE CLOSURES between 10/3/16-10/8/16 Armour & Son $2.9 million Wynnewood Ave. & 63rd St. 9 AM - 3 PM.

US 1 (City Ave.) Trench Restoration: LANE CLOSURES between 10/3/16-10/8/16 Armour & Sons $2.9 million Cardinal Ave. & Lapsley Ave. 9 AM - 3 PM.

Olney Ave. Curb Ramp Construction/Traffic Signal Foundations: 10/3/16-10/8/16 Armour & Sons $4.7 million CLOSED & DETOURED between 3rd St. & Mascher St. 7 AM - 3 PM. DETOUR POSTED.

Olney Ave. Curb Ramp Construction/Traffic Signal Foundations: 10/3/16-10/8/16 Armour & Sons $4.7 million CLOSED & DETOURED between Fairhill st. & Lawrence St. 7 AM - 3 PM. DETOUR POSTED.

Kelly Drive Milling & Paving: LANE CLOSURE between 25th St. & 10/3/16-10/9/16 Tony DePaul & Son $1.8 million Hunting Park Ave. 9:30 AM - 3:30 PM & 6:30 PM - 6:30 AM.

PA 63 (Woodhaven Rd.) Install Foundation for EZ-Pass Tag Reader: 10/3/16-10/9/16 Miller Brothers $15.5 million SHOULDER CLOSURE between Thornton Rd. & US 1 (Roosevelt Blvd.). 9 AM - 3 PM.

Broad St. (PA 611) Install Foundation for EZ-Pass Tag Reader: LANE 10/3/16-10/9/16 Miller Brothers $15.5 million CLOSURES between Pattison Ave. & 11th St. 9 AM - 3 PM.

9/30/2016 Page 5 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST *I-95 South Install DMS Foundation: SHOULDER CLOSURE 10/3/16-10/9/16 Miller Brothers $15.5 million between Betsy Ross Bridge & Allegheny Ave. 12 AM - 5 AM.

Chestnut St. Core Boring: PARKING LANE RESTRICTIONS 10/3/16-10/21/16 TRC Solutions between 23rd St. & 31st St. Weekdays. 9 AM - 3 PM.

Richmond St. N & S Core Boring: LANE RESTRICTIONS between E. Ann 10/3/16-10/21/16 TRC Solutions St. & Allegheny Ave. 9 AM - 3 PM.

Levick St. Paving: LANE RESTRICTIONS between Frankford 10/5/16-10/7/16 James J. Anderson $7.2 million Ave. & US 1 (Roosevelt Blvd.). 7 PM - 5 AM.

*I-95 North (Girard Point Bridge) Guide Rail Repair: RIGHT LANE CLOSED between 10/6/16 Long Fence Inc. $2.2 million Enterprise Rd. & Broad St. (PA 611). 10 PM - 11 PM.

PA 63 (Woodhaven Rd.) Guide Rail Repair: LEFT LANE CLOSED between 10/6/16-10/7/16 Long Fence Inc. $2.2 million Knights Rd. & I-95 Interchange. 11:30 PM - 12:30 AM.

Aramingo Ave. N & S Bridge Beam Installation: CLOSED & DETOURED 10/7/16 James J. Anderson $211 million between Delaware Ave. & Girard Ave. 10 PM - 5 AM. DETOUR POSTED.

*I-76 West Guide Rail Repair: LEFT LANE CLOSED at US 1 10/7/16 Long Fence Inc. $2.2 million (Roosevelt Blvd.). 1 AM - 2 AM.

*US 1 North (Roosevelt Blvd.) Guide Rail Repair: LEFT LANE CLOSED between 10/7/16 Long Fence Inc. $2.2 million & Wissahickon Ave. 2:15 AM - 4 AM.

Princeton Ave. ramp to I-95 North Roadwork: RAMP CLOSED & DETOURED. 8 PM - 5 10/7/16-10/10/16 Walsh Construction $212.3 million AM. DETOUR POSTED. Company

9/30/2016 Page 6 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Delaware Ave. Milling: LANE RESTRICTIONS between Allegheny 9/26/16-9/30/16 James J. Anderson $7.2 million Ave. & Castor Ave. 7 PM - 6 AM.

*PA 291 ramp to I-95 South Crack Sealing: LANE RESTRICTIONS on ramp. 7 9/26/16-9/30/16 James J. Anderson $7.2 million PM - 5 AM.

Bartram Ave. ramp to I-95 North Crack Sealing: LANE RESTRICTIONS on ramp. 7 9/26/16-9/30/16 James J. Anderson $7.2 million PM - 5 AM.

Race St. ramp to I-95 North Crack Sealing: LANE RESTRICTIONS on ramp. 7 9/26/16-9/30/16 James J. Anderson $7.2 million PM - 5 AM.

*I-95 South ramp to Broad St. Crack Sealing: LANE RESTRICTIONS on ramp. 7 9/26/16-9/30/16 James J. Anderson $7.2 million PM - 5 AM.

PA 611 (Broad St.) Install Foundation for EX-Pass Tag Reader: 9/26/16-10/2/16 Miller Brothers $15.5 million SHOULDER CLOSURE between Pattison Ave. & 11th St. 9 AM - 3 PM.

*I-95 South off-ramp to Aramingo Ramp Reconstruction: RAMP CLOSED & 9/21/16-6/2017 Driscoll Construction $160.2 million Ave. DETOURED. 24-HOUR DETOUR. DETOUR Company, POSTED. Inc./Richard E. Pierson Construction Company, Inc.

*I-95 N & S Overpass Bridge Demolition: INTERMITTENT LANE 9/12/16-9/30/16 Driscoll Construction $160.2 million CLOSURES between Allegheny Ave. & Bridge St. 8 Company, PM - 5 AM. Inc./Richard E. Pierson Construction Company, Inc.

Walnut Lane Road Reconstruction: CLOSED & DETOURED at 8/27/16-10/21/16 Buckley & Company, $14.7 million Park Line Drive. 24-HOUR DETOUR. DETOUR Inc. POSTED.

9/30/2016 Page 7 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Berks St. Bridge Construction: CLOSED & DETOURED 7/25/16-4/1/17 James J. Anderson $211.7 million between East Wildey St. & Delaware Ave. 24-HOUR DETOUR. DETOUR POSTED.

Adams Ave. Bridge Reconstruction: CLOSED & DETOURED 5/9/16-11/16/16 Loftus Construction, $2.8 million between Newtown Ave. & Crescentville Rd. 24-HOUR Inc. DETOUR. DETOUR POSTED.

Olney Ave. Roadwork: LANE RESTRICTIONS between Broad St. 12/2/15-11/2017 Armour and Sons $4.7 million (PA 611) & Rising Sun Ave. 9 AM - 3 PM. Electric

Sergeant St. Bridge Work: CLOSED & DETOUR between Salmon 12/28/15-12/2018 James J. Anderson $211 million St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED.

Huntingdon St. Bridge Work: CLOSED & DETOUR between Salmon 12/28/15-12/2018 James J. Anderson $211 million St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED.

Somerset St. Bridge Work: CLOSED & DETOUR between Salmon 12/28/15-12/2018 James J. Anderson $211 million St. & Richmond St. 24-HOUR DETOUR. DETOUR POSTED.

*Aramingo Ave. ramp to I-95 South Ramp Reconstruction: CLOSED & DETOURED at 12/21/15-11/30/16 Driscoll Construction $160.2 million Betsy Ross Bridge Interchange. 24-HOUR Company, CLOSURE. DETOUR POSTED. Inc./Richard E. Pierson Construction Company, Inc.

Girard Ave. ramp to I-95 North Highway and Ramp Reconstruction: RAMP CLOSED 12/16/15-6/2017 James J. Anderson $211 million & DETOURED. 24-HOUR CLOSURE. DETOUR POSTED. Richmond St. South Intersection Reconstruction: CLOSED & DETOURED 12/16/15-6/2017 James J. Anderson $211 million between Lehigh Ave. & Delaware Ave. 24-HOUR CLOSURE. DETOUR POSTED.

9/30/2016 Page 8 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Benjamin Franklin Parkway Bridge Construction: INNER LANE REDUCED FROM 10/23/15-6/2017 Buckley & Company, $64.8 million THREE LANES TO TWO between 21st St. & 20th St. Inc.

Winter St. Roadwork: LANE RESTRICTIONS between 20th St. & 10/6/15-4/2/2017 Buckley & Company, $64.8 million 21st St. 24-HOUR RESTRICTIONS. Inc.

Benjamin Franklin Parkway East Road Construction: OUTER LANES CLOSED at 21st 10/6/15-6/2017 Buckley & Company, $64.8 million St. DETOUR POSTED. Inc.

19th Street Bridge Construction: CLOSED & DETOURED 10/1/15-5/2017 Buckley & Company, $64.8 million between Vine St. & Logan Circle. 24-HOUR Inc. DETOUR. DETOUR POSTED.

Delaware Ave. Reconstruction: NEW TRAFFIC PATTERN between 4/1/15-10/2018 James J. Anderson $211.7 million Columbia Ave. & Aramingo Ave. 24-HOUR RESTRICTIONS.

BUCKS COUNTY *I-95 N & S, Various Municipalities Bridge Cleaning: MOVING OPERATION between PA 10/2/16-10/7/16 DeAngelo Brothers, $1.2 million 63 (Woodhaven Rd.) & US 1 (Lincoln Hwy.) . 10 PM - LLC 5 AM. *US 202 South, Doylestown Twp., Line Painting: RIGHT LANE CLOSED between Green 10/3/16-10/7/16 Rohm and Haas Doylestown Bor. St. & Swamp Rd. 9 AM - 3 PM. Chemicals, LLC

PA 611 South, Doylestown Twp., Line Painting: RIGHT LANE CLOSED between N. 10/3/16-10/7/16 Rohm and Haas Doylestown Bor. Broad St. & W. State St. 9 AM - 3 PM. Chemicals, LLC

Taylorsville Rd., Lower Makefield Core Boring: SHOULDER CLOSURE between 10/3/16-10/7/16 Delaware River Joint Twp. Woodside Rd. & Highland Drive. 9 AM - 3 PM. Toll Bridge Commission *I-95 N & S, Morrisville Bor. Core Boring: LANE CLOSURE between Taylorsville 10/3/16-10/7/16 Delaware River Joint Rd. & PA 32 (River Rd.). 9 AM - 3 PM. Toll Bridge Commission

9/30/2016 Page 9 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST PA 611 (Easton Rd.), Warrington Curb Ramp Installation: LANE CLOSURES at 10/3/16-10/7/16 James D. Morrissey $4.3 million Twp. Steeplechase Drive; Turk Rd.; Almshouse Rd.; Edison Furlong Rd.; New Britain Rd./Sauerman Rd.; Bristol Rd.; Kelly Rd.; Freedoms Way/Oxford Drive; Doylestown Plaza. 9 AM - 3 PM.

Falls, Middletown, Lower Makefield Line Painting: SLOW MOVING OPERATION to paint 10/3/16-10/7/16 PennDOT twps., Doylestown Bor. traffic lines. MOTORISTS ARE ADVISED TO REMAIN AN AMPLE DISTANCE BEHIND THE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 3 PM.

*I-95 North, Lower Makefield Twp. Bird Netting Installation: RIGHT LANE CLOSED 10/3/16-10/19/16 Delaware River Joint between Taylorsville Rd. & New Jersey state line. 10 Toll Bridge AM - 8 PM. Commission

PA 309 North, Richland Twp. Road Widening & Curb Installation: LANE 10/3/16-10/28/16 Quakertown CVS RESTRICTIONS at Tollgate Rd. Weekdays. 9 AM - 3 PM.

Tollgate Rd., Richland Twp. Road Widening & Curb Installation: LANE 10/3/16-10/28/16 Quakertown CVS RESTRICTIONS between PA 309 & Old Bethlehem Pike. Weekdays. 9 AM - 3 PM.

*I-95 North, Bristol, Bensalem twps. Temporary Barrier Shift: LANE RESTRICTIONS 10/5/16-10/6/16 Pennsylvania between PA 413 (Veterans Highway) & US 1 (Lincoln Turnpike Commission Highway). 9 AM - 3 PM. Blooming Glen Rd., Hilltown Twp. Base Repair: CLOSED & DETOURED between PA 9/27/16-10/4/16 Maintenance 113 & Branch Rd. 7 AM - 5 PM. DETOUR POSTED.

Allentown Rd., Trumbauersville Bor. Pole Replacement & Install New Wire: LANE 9/29/16-12/30/16 PP&L Utilities CLOSURE between Creamery Rd. & Oak Drive. Monday thru Saturday. 9 AM - 3 PM. Allentown Rd., Trumbauersville Bor. Pole Replacement & Install New Wire: LANE 9/29/16-12/30/16 PP&L Utilities CLOSURE between Creamery Rd. & Milford Square Pike. Monday thru Saturday. 9 AM - 3 PM.

9/30/2016 Page 10 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST *I-95 North, Lower Makefield Twp. Tree Clearing: SHOULDER CLOSURE between PA 9/19/16-1/6/17 Delaware River Joint 332 (Yardley Newtown Rd.) & Taylorsville Rd. 9 AM - Toll Bridge 3 PM. Commission

Bristol Rd., Warminster Twp. Roadway Reconstruction: CLOSED & DETOURED 9/20/16-11/4/16 J.D. Eckman, Inc. $31.6 million between PA 263 (York Rd.) & Brennan Drive. 24- HOUR DETOUR. DETOUR POSTED.

Brown Ave., Bensalem Twp. Utility Installation: LANE RESTRICTIONS between 9/12/16-11/30/16 PECO Energy Dunks Ferry Rd. & Hulmeville Rd. Weekdays. 9 AM - 3 PM. Durham Rd., Bristol Twp. Roadwork: LANE RESTRICTIONS between PA 413 & 8/22/16-10/2/16 Pennsylvania $142 million New Falls Rd. 7 AM - 3 PM. Turnpike Commission

Durham Rd., Bristol Twp. Roadwork: CLOSED & DETOURED between PA 413 8/22/16-10/2/16 Pennsylvania $142 million & New Falls Rd. 8 PM - 5 AM. DETOUR POSTED. Turnpike Commission

New Rodgers Rd., Bristol Twp. Bridge Rehabilitation: LANE RESTRICTIONS & 15- 8/22/16-10/2/16 Pennsylvania $142 million MINUTE STOPPAGES between Plumbridge Drive & Turnpike Commission Bath Rd./Durham Rd. 7 AM - 3 PM.

PA 263 (York Rd.), Warminster, Roadwork: LANE RESTRICTIONS between Ivyland 4/26/16-10/17/17 J.D. Eckman, Inc. $31.6 million Warwick twps. Rd. & Meetinghouse Rd. 24-HOUR RESTRICTIONS.

County Line Rd., Warrington, Utility Installation: LANE RESTRICTIONS between 3/7/16-9/2018 James D. Morrissey, $14.8 million Horsham, Montgomery twps. East Kulp Rd. & Stump Rd. 7 AM - 3 PM. Inc.

PA 32 (River Rd.), Solebury Twp. Retaining Wall Replacement: CLOSED & 2/29/16-10/3/16 H&K Group, Inc. $3.9 million DETOURED between Cuttalossa Rd. & Laurel Rd. 7 AM - 5 PM. DETOUR POSTED. US 13 (Bristol Pike), Bristol Twp., Reconstruction: LANE RESTRICTION at Levittown 7/27/15-10/7/16 James D. Morrissey, $36.5 million Tullytown Bor. Parkway. 7 AM - 3 PM. Inc.

Oxford Valley Rd. South, Falls Twp. Bridge Damage: SOUTHBOUND LEFT TURN LANE 6/29/15-Indef. PennDOT RESTRICTED at US 1 Interchange. 24-HOUR RESTRICTIONS.

9/30/2016 Page 11 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST *US 202 North, Buckingham Twp., Road Construction: LANE RESTRICTIONS between 4/13/15-11/9/18 James D. Morrissey $11 million Doylestown Bor. PA 313 (Swamp Rd.) & Mechanicsville Rd. 9 AM - 3 PM. US 13, Bristol Twp. Roadwork: LANE RESTRICTIONS between Green 10/20/14-10/2016 James D. Morrissey $36.5 million Lane & Levittown Parkway. 9 AM - 3 PM.

*PA 263 (York Rd.), Warwick Twp. Road Reconstruction: LANE CLOSURES between 3/17/14-6/2017 J.D. Eckman, Inc. $31.6 million Meyer Way & Sugar Bottom Rd. 24-HOUR RESTRICTIONS. US 13 (Bristol Pike), Bristol Twp., Road Reconstruction: LANE RESTRICTIONS 1/21/13-10/2016 James D. Morrissey $36.5 million Bristol, Tullytown bors. between PA 413 & . 9 AM - 3 PM.

Headquarters Rd., Tinicum Twp. Bridge Damage: CLOSED & DETOURED between 3/2/11-Indef. Red Hill Rd. & Tankhannen Rd. DETOUR POSTED.

CHESTER COUNTY *US 30 E & W, West Whiteland Twp. Roadwork: LANE CLOSURES between Quarry Rd. & 9/30/16 Road-Con, Inc. $2.9 million PA 100 Interchanges. 7 PM - 5 AM.

*US 202 South, East Whiteland Twp. Fiber Optic Cable Installation: LANE CLOSURE 9/30/16 Allan A. Myers $63.3 million between PA 401 & US 30. 8 PM - 10 AM.

*US 422 East, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES 9/30/16-10/29/16 J.D. Eckman, Inc. $73.3 million between PA 724 (Schuylkill Rd.) & Sanatoga Interchanges. 9 AM - 2 PM & 5 PM - 5 AM.

*US 422 West, North Coventry Twp. Road & Bridge Construction: LANE CLOSURES 9/30/16-10/29/16 J.D. Eckman, Inc. $73.3 million between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 7 PM - 1 PM.

9/30/2016 Page 12 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST East Nottingham, New London, Line Painting: SLOW MOVING OPERATION to paint 10/1/16-10/7/16 PennDOT Franklin, Upper Oxford, Londonderry traffic lines. MOTORISTS ARE ADVISED TO twps. REMAIN AN AMPLE DISTANCE BEHIND THE PAINTING TRUCK & STAY OFF TRAFFIC LINES. 9 AM - 2:30 PM.

Newark Rd., New Garden Twp. Milling: LANE RESTRICTIONS between Broad Run 10/3/16 Maintenance Rd. & Hillstream Rd. 8 AM - 3 PM.

Conestoga Rd., East Nantmeal, Base Repair: LANE RESTRICTIONS between PA 82 10/3/16-10/6/16 Maintenance West Nantmeal twps. (Manor Rd.) & Bulltown Rd. 6 AM - 4 PM.

US 30 (Lincoln Highway), Valley, Curb Ramp Construction: LANE RESTRICTIONS 10/3/16-10/7/16 Allan Myers $5.5 million Caln twps., City of Coatesville between Airport Rd. & Veterans Drive. Weekdays. 9 AM - 3 PM.

Boot Rd., West Whiteland Twp. Paving: LANE RESTRICTIONS between Quarry Rd. & 10/3/16-10/7/16 J.D. Eckman, Inc. $4.7 million Copeland School Rd. 9 AM - 3 PM.

PA 340 E & W (Kings Hwy.), East Shoulder Work: LANE RESTRICTIONS between PA 10/3/16-10/7/16 Maintenance Whiteland Twp. 10 (Compass Rd.) & PA 82 (Manor Rd.). 9 AM - 3 PM.

PA 100 (Pottstown Pike), East ADA Curb Replacement: LANE RESTRICTIONS at 10/3/16-10/8/16 Allan A. Myers $5.5 million Whiteland, West Whiteland twps. WaterlooRd./Swedesford Rd. & Town Center Mall Entrance/Exton Square Mall Entrance. 9 AM - 3 PM.

PA 100 (Pottstown Pike), North ADA Curb Replacement: LANE RESTRICTIONS at 10/3/16-10/8/16 Allan A. Myers $5.5 million Coventry Twp. Cedarville Rd. 9 AM - 3 PM.

Bridge St., Phoenixville Bor. ADA Curb Replacement: LANE RESTRICTIONS at 10/3/16-10/8/16 Allan A. Myers $5.5 million Ringold Ave./Pennsylvania Ave.; Columbia Ave. & Chester Ave. 9 AM - 3 PM.

9/30/2016 Page 13 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST PA 724 (Schuylkill Rd.), East Traffic Signal Improvements/Road Widening: LANE 10/3/16-12/15/16 East Coventry Coventry Twp. CLOSURES between Wells Rd. & Reitnour Rd. Township Weekdays. 9 AM - 3 PM.

Main St., Parkesburg Bor. Utility Installation: CLOSED & DETOURED between 10/3/16-4/30/17 Pennsylvania Culvert St. & Bridge St. Weekdays. 8 AM - 4:30 PM. American Water DETOUR POSTED.

PA 352 (Sproul Rd.), East Whiteland Milling & Resurface: LANE RESTRICTIONS between 10/5/16 Maintenance Twp. King Rd. & Bus. 30 (Lincoln Hwy.). 9 AM - 3 PM.

Newark Rd., New Garden Twp. Paving: LANE RESTRICTIONS between Broad Run 10/5/16-10/6/16 Maintenance Rd. & Hillstream Rd. 8 AM - 3 PM.

Raintree Rd., Pennsbury Twp. Utility Installation: LANE CLOSURE at Paddock Lane. 10/5/16-10/12/16 PECO Energy Weekdays. 9 AM - 3 PM.

Bridge St., Phoenixville Bor. Utility Installation: LANE CLOSURE between 10/5/16-10/12/16 PECO Energy Columbia Ave. & Roberts Ave. Weekdays. 9 AM - 3 PM.

Ross Lane, West Caln Twp. Utility Installation: LANE CLOSURE between Ross 9/26/16-10/3/16 PECO Energy Lane & Wagontown Rd. 9 AM - 3 PM.

Upper Gulph Rd., Tredyffrin Twp. Utility Installation: LANE CLOSURE between Old 9/27/16-10/3/16 PECO Energy Eagle School Rd. & West Valley Rd. 9 AM - 3 PM.

Boot Rd., West Whiteland Twp. Utility Installation: LANE CLOSURE between Burke 9/28/16-10/5/16 PECO Energy Rd. & Whiteland Drive. 9 AM - 3 PM.

Ship Rd., West Whiteland Twp. Pipeline Maintenance: LANE CLOSURES between 9/28/16-11/23/16 Sunoco Logistics Boot Rd. & Constitution Drive. Monday thru Thursday. 9 AM - 3 PM.

9/30/2016 Page 14 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Boot Rd., West Goshen Twp. Pipeline Maintenance: LANE CLOSURES between US 9/28/16-11/23/16 Sunoco Logistics 202 & Phoenixville Pike. 9 AM - 3 PM.

Grove Rd., West Whiteland Twp. Utility Installation: LANE CLOSURE between Southern 9/29/16-10/6/16 PECO Energy Drive & Stewart Drive. 9 AM - 3 PM.

E. Market St., West Chester Bor. Utility Installation: LANE RESTRICTIONS at Franklin 9/19/16-10/7/16 Aqua Pennsylvania St. 9 AM - 3 PM.

PA 10, Highland Twp. Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore between Gumtree Rd. & Freeman Rd. Monday thru Natural Gas Saturday. 9 AM - 3 PM.

PA 41 (Gap Newport Pike), Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore Londonderry Twp. between Keller Rd. & Bernard Ave. Monday thru Natural Gas Saturday. 9 AM - 3 PM.

PA 926 (Street Rd.), Londonderry Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore Twp. between Daleville Rd. & Baker Rd. Monday thru Natural Gas Saturday. 9 AM - 3 PM.

Gum Tree, Highland Twp. Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore between Limestone Rd. & Fernwood Rd. Monday thru Natural Gas Saturday. 9 AM - 3 PM.

PA 41 (Gap Newport Pike), Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore Londonderry Twp. between Bernard Ave. & Keller Rd. Monday thru Natural Gas Saturday. 9 AM - 3 PM.

Daleville Rd., Londonderry Twp. Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore between Fernwood Rd. & Birchwood Rd. Monday thru Natural Gas Saturday. 9 AM - 3 PM.

PA 926 (Street Rd.), Londonderry Pipeline Construction: LANE RESTRICTIONS 9/6/16-12/30/16 Eastern Shore Twp. between Daleville Rd. & Baker Rd. 9 AM - 3 PM. Natural Gas Monday thru Saturday. 9 AM - 3 PM.

9/30/2016 Page 15 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST US 30 E & W (Lincoln Hwy.), Roadwork: LANE RESTRICTIONS between Octorara 9/7/16-10/29/16 Marino Corporation $741,000.00 Sadsbury Twp. Rd. & Old Wilmington Rd. Weekdays. 7:30 AM - 3:30 PM.

PA 472 (East Lancaster Ave.), Roadwork: CLOSED & DETOURED between Vernon 8/1/16-11/1/16 Presbyterian Homes, Oxford Bor. St. & Pine St. 24-HOUR DETOUR. DETOUR Inc. POSTED.

S. First Ave., City of Coatesville Utility Installation: LANE RESTRICTIONS between 6/13/16-10/28/16 Pennsylvania Oak St. & Modena Rd. Weekdays. 9 AM - 3 PM. American Water

Green Valley Rd., Newlin Twp. Bridge Damage: CLOSED & DETOURED between 5/11/16-Indef. PennDOT Powell Rd. & Brandywine Creek Rd. 24-HOUR DETOUR. DETOUR POSTED.

PA 401 (Conestoga Rd.), West Bridge Damage: REDUCED TO ONE LANE at St. 4/21/16-Indef. PennDOT Vincent Twp. Matthews Rd. 24-HOUR RESTRICTIONS

Evergreen St./Prospect Ave., West Storm Drainage, Curb, Sidewalk, Traffic Signal: LANE 4/11/16-10/21/16 Marino Corporation $1.3 milliom Grove Bor. CLOSURES between Chatham Rd.& Summit Ave. 7:30 AM - 3:30 PM.

Frog Hollow Rd., East Fallowfield, Covered Bridge Rehabilitation: CLOSED & 12/14/15-10/21/16 Eastern Highway $3.2 million West Marlborough twps. DETOURED between Concord Bridge Rd. & Specialists, Inc. Strasburg Rd. 24-HOUR CLOSURE. DETOUR POSTED.

Ross Fording Rd., West Fallowfield Bridge Damage: CLOSED & DETOURED between 7/2/15-Indef. PennDOT Twp. Creek Rd. & Bryson Rd. 24-HOUR DETOUR. DETOUR POSTED.

PA 724 ramp to US 422 East, E. Ramp/Bridge Construction: RAMP CLOSED & 5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million Coventry Twp. DETOURED. DETOUR POSTED.

9/30/2016 Page 16 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST *US 422 E & W, West Pottsgrove, Bridge Construction: REDUCED TO ONE LANE 11/27/14-9/2018 J.D. Eckman, Inc. $36 million North Coventry twps. between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION.

Burnt Mill Rd., Kennett Twp. Bridge Damage: CLOSED & DETOURED between 4/25/14-12/2016 PennDOT Norway Rd. & Spring Mill Rd. 24 HOUR DETOUR. DETOUR POSTED.

*US 422 E & W, North Coventry Road Construction: TRAFFIC PATTERN SHIFT 2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million Twp. between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 24-HOUR PATTERN.

DELAWARE COUNTY Hook Rd., Darby Twp. Utility Installation: LANE RESTRICTIONS at Industrial 10/2/16-10/6/16 Aqua Pennsylvania Drive. 9 PM - 5 AM.

*US 1 N & S (West Baltimore Pike), Utility Installation: LANE RESTRICTIONS between PA 10/2/16-10/7/12 Aqua Pennsylvania Middletown Twp. 452 (Pennell Rd.) & Oriole Ave. 9 PM - 5 AM.

*I-476 South, Various Municipalities Bridge Cleaning: MOVING OPERATION between US 10/2/16-10/7/16 DeAngelo Brothers, $1.2 million 30 & Baltimore Pike. 10 PM - 5 AM. LLC

*I-95 North ramp to I-476 North, Surface Treatment Installation: LANE CLOSURES on 10/3/1610/4/16 Tony DePaul & Son $2 million Ridley Twp. ramp. 9 AM - 3 PM.

PA 3 (West Chester Pike), Curb Ramp Reconstruction: LANE CLOSURE at Brief 10/3/16-10/7/16 L.C. Costa $5.9 million Haverford, Upper Darby twps. Ave., Carol Blvd.; State Rd.; Copley Rd.; Terminal Contractors, Inc. Square & Pennock Ave. 9 AM - 3 PM.

PA 3 (Market St.), Millbourne Bor. Curb Ramp Reconstruction: LANE CLOSURE at 10/3/16-10/7/16 L.C. Costa $5.9 million Chatham Rd.; Forge Rd.; Copley Rd.; Terminal Contractors, Inc. Square & Millbourne Ave. 9 AM - 3 PM.

9/30/2016 Page 17 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Springfield Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURE at 10/3/16-10/7/16 L.C. Costa $4.1 million Diamond St.; Madison St.; Woodlawn Ave.; Clifton Contractors, Inc. Ave. & Broadway Ave. 9 AM - 3 PM. Baltimore Ave., Clifton Heights Bor. Curb Ramp Reconstruction: LANE CLOSURES at 10/3/16-10/7/16 L.C. Costa $4.1 million Church St.; Marple Ave.; Jackson Ave.; Springfield Contractors, Inc. Ave.; Bishop Ave. & Glenwood Ave. 9 AM - 3 PM.

Baltimore Ave., Clifton Heights, Road Widening: LANE RESTRICTIONS at Springfield 10/3/16-10/7/16 Lenni Electric $4.1 million Upper Darby bors. Rd.; Church Lane; Delmar Drive; Diamond St. & Home Depot Drive. 9 AM - 3 PM.

Baltimore Ave., Lansdowne Bor. Traffic Signal Upgrade: LANE RESTRICTIONS at 10/3/16-10/7/16 Lenni Electric $4.1 million Lansdowne Ave.; Wycombe Ave.; Union Ave.; Martin Drive, Walsh Rd. & Mansfield Ave. 9 AM - 3 PM.

Baltimore Ave., Upper Darby Twp., Traffic Signal Upgrade: LANE RESTRICTIONS 10/3/16-10/7/16 Lenni Electric $4.1 million Lansdowne Bor. between Lansdowne Ave.; Penn Blvd./4th St.; Wycombe Ave.; Burmont Rd.; Scottdale Rd. & Church Lane. 9 AM - 3 PM.

Paxon Hollow Rd., Marple Twp. Ramp Constructon: LANE RESTRICTIONS between 10/3/16-10/7/16 Allan Myers $3.8 million Maclaire Lane & PA 320 (Sproul Rd.). 9 AM - 3 PM.

Cedar Grove Rd., Marple Twp. Ramp Construction: LANE RESTRICTIONS between 10/3/16-10/7/16 Allan Myers $3.8 million Kingswood Rd. & PA 320 (Sproul Rd.). 9 AM - 3 PM.

*I-95 North, Tinicum Twp. Install DMS Foundation: SHOULDER CLOSURE 10/3/16-10/9/16 Miller Brothers $15.5 million between PA 420 (Wannamaker Ave.) & PA 291 (Gov. Printz Blvd.). 12 AM - 5 AM.

*I-476 N & S, Various Municipalities Fiber Optic Cable Installation: SHOULDER CLOSURE 10/3/16-10/9/16 Miller Brothers $15.5 million between I-76 & I-95. 9 AM - 3 PM.

US 13 (10th St.), Marcus Hook Bor. Pipe Installation: CLOSED & DETOURED between 10/4/16 Sunoco Inc. Green St. & Hewes Ave. 10 PM - 1 AM. DETOUR POSTED.

9/30/2016 Page 18 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Valley Rd., Edgemont Twp. Pipe Replacement: CLOSED & DETOURED at 10/4/16-10/5/16 Maintenance Gradyville Rd. 9 AM - 3 PM. DETOUR POSTED.

PA 452 N & S (Pennell Rd.), Bridge Steel Girder Repairs: LANE RESTRICTIONS 10/5/16-10/7/16 J.D. Eckman, Inc. $6,573,713.00 Middletown Twp. between Parkmount Rd. & Glendale Blvd. 9 AM - 3 PM.

4th Ave., Tinicum Twp. Utility Installation: CLOSED & DETOURED between 10/17/16-11/25/16 Aqua Pennsylvania 2nd St. & S. PA 291 (Govenor Printz Blvd.). 9 AM - 3 PM. DETOUR POSTED. US 13 (10th St.), Marcus Hook Bor. Pipe Installation: LANE RESTRICTIONS between 9/25/16-10/13/16 Sunoco Inc. Green St. & Hewes Ave. Weekdays. 7 PM - 5 AM.

Springfield Rd, Springfield, Upper Utility Installation: CLOSED & DETOURED between 9/19/16-4/8/17 Aqua Pennsylvania Darby twps., Clifton Heights Bor. Saxer Ave. & Oak Ave. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

Orange St., Upper Providence Twp., Trench Restoration: CLOSED & DETOURED between 9/12/16-10/14/16 Aqua Pennsylvania Media Bor. Baltimore Pike & Ridley Creek Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

Blueball Ave., Upper Chichester Utility Installation: CLOSED & DETOURED between 9/12/16-11/18/16 Chester Water Twp. Scott Ave. & Columbia Ave. 24-HOUR DETOUR. Authority DETOUR POSTED.

Bishop Hollow Rd., Newtown Twp. Utility Installation: CLOSED & DETOURED between 9/14/16-11/25/16 Aqua Pennsylvania Smedly Lane & Ellis Ave. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

Chester Pike, Sharon Hill Bor. Utility Installation: LANE RESTRICTIONS between 9/15/16-12/16/16 PECO Energy Folcroft Ave. & Cherry St. Weekdays. 9 AM - 3 PM.

US 30 (Lancaster Ave.), Radnor Utility Installation: LANE CLOSURE between PA 320 8/25/16-12/1/16 Villanova University Twp. (Spring Mill Rd.) & Barley Cone Lane. Weekdays. 9 AM - 3 PM.

9/30/2016 Page 19 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Duttons Mill Rd., Middletown Twp. Utility Installation: CLOSED & DETOURED between 7/12/16-10/1/16 Middletown Township New Middletown Rd. & Creek Rd. Weekdays. 8 AM - Sewer Authority 4 PM. DETOUR POSTED.

U.S. 13 (10th St./Post Road), Marcus Streetscape & Traffic Signal Improvements/Curb, 3/21/16-11/30/16 Marino Corporation $1,661,612.00 Hook Bor. Sidewalk, ADA Ramp Installation: LANE RESTRICTIONS between Blueball Ave. & Penn Ave./Walnut St. Weekdays. 9 AM - 3 PM.

MONTGOMERY COUNTY *US 422 East, Lower Pottsgrove Road & Bridge Construction: LANE CLOSURES 9/30/16-10/29/16 J.D. Eckman, Inc. $73.3 million Twp. between PA 724 (Schuylkill Rd.) & Sanatoga interchanges. 5 PM - 5 AM. *US 422 West, Lower Pottsgrove Road & Bridge Construction: WEEKEND LANE 9/30/16-10/29/16 J.D. Eckman, Inc. $73.3 million Twp. CLOSURES between Sanatoga & PA 724 (Schuylkill Rd.) interchanges. 7 PM - 1 PM.

Germantown Pike, Plymouth, Milling: LANE RESTRICTIONS between Joshua Rd. & 10/2/16-10/3/16 Maintenance Whitemarsh twps. Plymouth Rd. 7 PM - 4 AM.

*I-476 N & S, Various Municipalities Bridge Cleaning: MOVING OPERATION between 10/2/16-10/7/16 DeAngelo Brothers, $2.1 million Germantown Pike & I-76. 10 PM - 5 AM. LLC

PA 100 N & S (Pottstown Pike), Bridge Cleaning: MOVING OPERATION between US 10/2/16-10/7/16 DeAngelo Brothers, $2.1 million Various Municipalities 422 & High St. 10 PM - 5 AM. LLC

PA 100 N & S (Pottstown Pike), Bridge Cleaning: MOVING OPERATION between 10/2/16-10/7/16 DeAngelo Brothers, $2.1 million Pottstown Bor. Manatawny St. & Maugers Mill Rd. 10 PM - 5 AM. LLC

Edge Hill Rd., Upper Moreland Twp. Milling: CLOSED & DETOURED between Moreland 10/3/16-10/4/16 Maintenance Rd. & Terwood Rd. 7 PM - 4 AM. DETOUR POSTED.

9/30/2016 Page 20 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST *US 422 West ramp to Armand Intersection Reconstruction: LANE CLOSURES on 10/3/16-10/4/16 J.D. Eckman, Inc. $73.3 million Hammer Blvd., Lower Pottsgrove ramp. 9 AM - 2 PM & 6 PM - 6 AM. Twp.

Germantown Pike, Lower Milling & Paving: LANE RESTRICTIONS between 10/3/16-10/5/16 Montgomery County Providence, Worcester twps. North Grange Ave. & East Mount Kirk Ave. 7 AM - 6 PM.

*I-76 E & W, Upper Merion, Lower Sweeping & Debris Removal: INTERMITTENT LANE 10/3/16-10/6/16 Maintenance Merion twps., W. Conshohocken CLOSURES between US 1 (City Ave.) & PA Turnpike. Bor. 9 AM - 3 PM.

PA 309 (Bethlehem Pike) N & S, Sweeping & Debris Removal: LANE RESTRICTIONS 10/3/16-10/6/16 Maintenance Cheltenham, Springfield, Upper between Cheltenham Ave. & PA 63 (Welsh Rd.). 9 Dublin, Lower Gwynedd twps. AM - 3 PM.

*US 422 East exit ramp to PA 23, Bridge Bean Delivery: INTERMITTENT RAMP 10/3/16-10/7/16 J.D. Eckman, Inc. $97.4 million Upper Merion Twp. CLOSURES . USE FIRST AVE. EXIT RAMP DURING PA 23 RAMP CLOSURE. 10 AM - 2:30 PM. DETOUR POSTED.

*US 422 West, Upper Merion, West Bridge Beam Setting: RIGHT LANE CLOSURE 10/3/16-10/7/16 J.D. Eckman, Inc. $97.4 million Norriton twps. between PA 23 & PA 363. 9 AM- 2:30 PM.

Meyers Rd., Perkiomen Twp. Fiber Optic Relocation: LANE RESTRICTIONS 10/3/16-10/7/16 H&K Group, Inc. $11 million between Seitz Rd. & Miller Rd. 9 AM - 3 PM.

PA 73 (Skippack Pike) East, Shoulder Work: LANE RESTRICTIONS between 10/3/16-10/7/16 H&K Group, Inc. $11 million Skippack Twp. Squirrel Hill Rd. & Perkiomen Creek Rd. 9 AM - 3 PM.

Norristown Rd., Lower Gwynedd ITS Installation: LANE CLOSURES between 10/3/16-10/7/16 Carr & Duff, Inc. $3.6 million Twp. Bethlehem Pike & Tennis Ave. 9 AM - 3 PM.

Germantown Pike, East Norriton, ITS Installation: LANE CLOSURES between I-476 & 10/3/16-10/7/16 Carr & Duff, Inc. $3.6 million Plymouth twps. Swede Rd. 9 AM - 3 PM.

9/30/2016 Page 21 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST PA 63 (Sumneytown Pike), Lower ITS Installation: LANE CLOSURES between 10/3/16-10/7/16 Carr & Duff, Inc. $3.6 million Salford, Towamencin, Upper Harleysville Pike & Bethlehem Pike. 9 AM - 3 PM. Gwynedd, Lower Gwynedd, Montgomery twps.; North Wales Bor.

Bethlehem Pike, Montgomery, ITS Installation: LANE CLOSURES between 10/3/16-10/7/16 Carr & Duff, Inc. $3.6 million Hatfield twps. McLaughlin Rd. & Bergey Rd. 9 AM - 3 PM.

PA 63 (Red Lion Rd.), Lower Railroad Crossing Surface Replacement: CLOSED & 10/3/16-10/7/16 SEPTA Moreland Twp. DETOURED between Dale Rd. & Philmont Ave. Monday 9 AM thru Friday 7 PM. DETOUR POSTED.

*I-476 N & S, Various Municipalities Fiber Optic Cable Installation: SHOULDER CLOSURE 10/3/16-10/9/16 Miller Brothers $15.5 million between I-76 & I-95. 9 AM - 3 PM.

*US 202 North (DeKalb Pike), Upper Utility Installation: LANE RESTRICTIONS between 10/3/16-12/12/16 PECO Energy Merion Twp. Brandywine Lane & Town Center Rd. Monday thru Thursday. 7 PM - 5:30 AM.

Fox Chase Rd., Abington Twp. Paving: LANE RESTRICTIONS between PA 232 10/4/16-10/5/16 Maintenance (Huntingdon Pike) & Evans Rd. 7 PM - 4 AM.

Montgomery Ave., Upper Moreland Utility Installation: LANE RESTRICTIONS between PA 10/4/16-10/5/16 Gorden H. Baver Twp. 332 (Jacksonville Ave.) & Penn St. 9 AM - 3 PM.

Cowpath Rd., Hatfield Twp. Utility Installation: LANE RESTRICTIONS between 10/4/16-10/5/16 Fortuna Station Broad St. & Walnut St. 9 AM - 3 PM. Development LP

South Broad St., Upper Gwynedd Milling & Paving: LANE RESTRICTIONS between 10/4/16-10/7/16 Montgomery County Twp. Sumneytown Pike & Park Ave. 7 AM - 6 PM.

9/30/2016 Page 22 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Edge Hill Rd., Upper Moreland Twp. Paving: CLOSED & DETOURED between Moreland 10/5/16-10/6/16 Maintenance Rd. & Terwood Rd. 7 PM - 4 AM. DETOUR POSTED.

PA 63 (Welsh Rd.), Montgomery Milling & Paving: LANE RESTRICTIONS between US 10/5/16-10/7/16 309 Development Twp. 202 & PA 309. 9 AM - 3 PM. Company

Norristown Rd., Lower Gwynedd Paving: CLOSED & DETOURED between Bethlehem 10/6/16-10/7/16 Maintenance Twp. Pike & Tennis Ave. 7 PM - 4 AM. DETOUR POSTED.

Morris Rd., Upper Dublin Twp. Utility Installation: LANE RESTRICTIONS between 10/6/16-10/7/16 PECO Energy Willow Rd. & Fir Rd. 9 AM - 3 PM.

PA 332 (Montgomery Ave.), Hatboro Paving Railroad Approaches: CLOSED & DETOURED 10/8/16 SEPTA Bor. between PA 332 (Jacksonville St.) & Penn St. Saturday 8 AM - 8 PM. DETOUR POSTED.

*US 422 West ramp to Armand Intersection Reconstruction: LANE CLOSURES on 10/10/16-10/11/16 J.D. Eckman, Inc. $73.3 million Hammer Blvd., Lower Pottsgrove ramp. 6 PM - 6 AM. Twp.

*US 422 West ramp to Armand Intersection Reconstruction: LANE CLOSURES on 10/10/16-10/11/16 J.D. Eckman, Inc. $73.3 million Hammer Blvd., Lower Pottsgrove ramp. 9 AM - 2 PM. Twp.

Byberry Rd., Hatboro Bor. Railroad Crossing Surface Replacement: CLOSED & 10/10/16-10/14/16 SEPTA DETOURED between New St. & Penn St. Monday 9 AM thru Friday 7 PM. DETOUR POSTED.

PA 63 (Moreland Rd.), Upper Railroad Crossing Surface Replacement: CLOSED & 10/14/16-10/15/16 SEPTA Moreland, Abington twps. DETOURED between Cherry St. & Davisville Rd. 8 PM Friday thru 8 AM Saturday. DETOUR POSTED.

9/30/2016 Page 23 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Markley St., Norristown Bor. Utility Installation: LANE RESTRICTIONS between 9/26/16-11/11/16 Pennsylvania Marshall St. & Elm St. Weekdays. 7 PM - 5 AM. American Water

Lederach Cross Rd., Lower Salford, Milling & Paving: LANE RESTRICTIONS between 9/27/16-10/14/16 North Penn Water Skippack twps. Spencer Drive & Tyson Rd. Weekdays. 9 AM - 3 PM. Authority

Washington Lane, Lower Moreland Milling: CLOSED & DETOURED between Herbert Rd. 9/29/16-9/30/16 Maintenance Twp. & Terwood Rd. 7 PM - 4 AM.

N. Gulph Rd., Upper Merion Twp. Utility Installation: CLOSED & DETOURED between 9/19/16-10/21/16 Aqua Pennsylvania Freedom Drive & Guthrie Rd. Weekdays. 8 PM - 6 AM. DETOUR POSTED.

Matsonford Rd., West ADA Ramp Reconstruction/Signal Adjustments/Barrier 9/12/16-10/31/16 Suncap Property Conshohocken Bor. Adjustments: LANE RESTRICTIONS at Front St. Group LLC Weekdays. 9 AM - 3 PM & 9 PM - 6 AM.

PA 29 (South Collegeville Rd.), ADA Ramp Reconstruction: LANE RESTRICTIONS 9/12/16-12/9/16 Glaxo Smith Kline Upper Providence Twp. between Black Rock Rd. & US 422. Weekdays. 9 AM - 3 PM.

Black Rock Rd., Upper Providence Install Right Turn Lane: LANE RESTRICTIONS 9/12/16-12/9/16 Glaxo Smith Kline Twp. between Troutman Rd. & PA 29 (South Collegeville Rd.). Weekdays. 9 AM - 3 PM.

Joshua Rd., Whitemarsh Twp. Utility Installation: LANE RESTRICTIONS between 8/26/16-11/30/16 Whitemarsh Emerson Drive & Flourtown Rd. Weekdays. 9 AM - 3 Township Authority PM.

*US 202 N & S, Upper Merion Twp. Utility Improvements: LANE CLOSURES at Mall Blvd. 8/14/16-10/21/16 Aqua Pennsylvania Sundays thru Thursdays. 8 PM - 6 AM.

9/30/2016 Page 24 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST Trewigtown Rd., Hatfield Twp. Bridge Rehabilitation: CLOSED & DETOURED 7/18/16-10/28/16 J.D. Eckman, Inc. $2.6 million between Anthony Drive & Line Lexington Rd. 24- HOUR CLOSURE. DETOUR POSTED.

Old Welsh Rd., Abington Twp. Utility Installation: CLOSED & DETOURED between 7/20/16-11/30/16 Aqua Pennsylvania Fitzwatertown Rd. & Lukens Ave. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

New Second St., Cheltenham Twp. Utility Installation: CLOSED & DETOURED between 7/21/16-11/30/16 Aqua Pennsylvania Tookany Creek Parkway & Church Rd. Weekdays. 9 AM - 3 PM. DETOUR POSTED.

Remington Rd., Lower Merion Twp. Bridge Replacement: CLOSED & DETOURED 7/11/16-10/21/16 J.D. Eckman, Inc. $2.6 million between Minden Way & Roslyn Lane. Monday thru Thursday. 7 AM - 5 PM. DETOUR POSTED.

PA 29 (Gravel Pike), Lower Bridge Rehabilitation: LANE RESTRICTIONS between 5/2/16-12/22/16 J.D. Eckman, Inc. $2 million Frederick Twp. Meng Rd. & Zieglerville Rd. 7 AM - 5 PM.

PA 73 (Skippack Pike), Skippack, Bridge Rehabilitation: CLOSED & DETOURED 4/25/16-12/2016 Loftus Construction, $7.5 million Perkiomen twps; Schwenksville Bor. between Main St. & Haldeman Rd. 24-HOUR Inc. DETOUR. DETOUR POSTED.

PA 252 (Valley Forge Rd.), Upper Utility Installation: CLOSED & DETOURED between 4/1/16-9/31/16 Tredyffrin Township Merion, Tredyffrin twps. Yellow Springs Rd. & PA 23. 24-HOUR DETOUR. Authority DETOUR POSTED. County Line Rd., Warrington, Utility Installation: LANE RESTRICTIONS between 3/7/16-9/2018 James D. Morrissey, $14.8 million Horsham, Montgomery twps. Kulp Rd. & Stump Rd. 7 AM - 3 PM. Inc.

PA 23 (River Rd.), Upper Merion Road Widening: LANE CLOSURES between 3rd St. & 11/16/15-9/30/16 Upper Merion Twp. McCoy Lane. Weekdays. 9 AM - 3 PM & 7 PM - 6 Township AM. Balligomingo Rd., West Slope Stabilization: CLOSED & DETOURED between 6/27/15-Indef. Conshohocken Bor. PA 23 (Front St.) & Portland Rd. 24-HOUR DETOUR. DETOUR POSTED.

9/30/2016 Page 25 of 26 LOCATION RESTRICTION DATE CONTRACTOR COST PA 724 ramp to US 422 East, Lower Roadwork: RAMP CLOSED & DETOURED. 24- 5/27/15-3/2018 J.D. Eckman, Inc. $73.3 million Pottsgrove Twp. HOUR CLOSURE. DETOUR POSTED.

*US 422 E & W, Lower Pottsgrove Road Construction: TRAFFIC PATTERN SHIFT 2/2/13-8/2018 J.D. Eckman, Inc. $73.3 million Twp. between Sanatoga & PA 724 (Schuylkill Rd.) Interchanges. 24-HOUR PATTERN.

*US 422 E & W, West Pottsgrove Bridge Construction: REDUCED TO ONE LANE 11/27/14-9/2018 J.D. Eckman, Inc. $36 million Twp. between Stowe & PA 100 Interchange. 24-HOUR RESTRICTION.

County Line Rd., Upper Merion Twp. Road Work: CLOSED & DETOURED WEEKDAYS 5/9/14-12/31/16 Valley Forge National between PA 23 & Gulph Rd. 7 AM Mondays thru 5 PM Historical Park Fridays. 24-HOUR CLOSURE. DETOUR POSTED.

9/30/2016 Page 26 of 26