Proposed Improvement Projects in the US 422 River Crossing Complex
Total Page:16
File Type:pdf, Size:1020Kb
c. 2500 ft 1) Betzwood Bridge Replacement (SR 3051 Sec. 78B) • New bridge on existing footprint with one traffic lane in each direction DRAFT Work with Lower Providence and a 12-foot wide trail for bicycle and pedestrian travel to the Vally Township to reconfigure proposed Forge National Historical Park 23 P access to US 422 westbound with P Outer Line Drive o o entrance from PA 363 instead of r • Intersection and roadway modifications for improved boat ramp and r t t the Adams Ave. area 422 Park access, local traffic and multi-use trail access Ongoing efforts to optimize new Countyounty LineLine DriveDrive K K “gateway” design opportunities e e Valley Forge n 2) PA 23/US 422 Interchange Modernization n Create pedestrian for the Valley Forge National n n National Historical e Historical Park and the planned e underpass under d (SR 0422 Sec. 2NG) d y Trooper Rd. to y Park • Interchange modified for improved operations and capacity on US American Revolution Center. PA 363 Interchange design accommodate future recfined for less impacts in R 422 and local roadways American R extension of Upper o o adajcent areas (exit ramp from US • Relocation of N. Gulph Rd. to provide “gateway” opportunities (shown aa Merion trail under Revolution dd 422 East now passes under US 422 in green) for future park use and for the planned American Revolution Center entrance ramp to US 422 east) Center at Valley Forge (ARC) Center at • Modification of existing westbound US 422 Schuylkill River bridge Direct access to and from Valley Forge Valley Forge parapet and median to improve evening traffic flows US 422 West will be available Crossing (future) • Relocation of PA 23 traffic to US 422 eastbound to the First Ave. (future) to Valley Forge Crossing and ramp with intersection and ramp modifications Re-design US 422’s Riverview communities widened overpass to 3) PA 363/US 422 Interchange Improvement Project accommodate 5 lanes on and US 422 Widening (SR 0422 Sec. 4TR) widened N. Gulph Rd. • Improved interchange operations, capacity, access, and local mobility VF Park for regional commuting and adjacent communities Valley Forge Boat National Historical • New ramps for access to and from US 422 West of PA 363 National Historical Launch Park • Ramp for direct access from US 422 West to the Adams Ave. industrial/office center New “gateway” area AAudubonudubon RdRd.. • Widening of US 422 from US 202 through the PA 363 Interchange Valley with: a) addition of 2 new lanes in the median area of US 422 and b) Forge replacement (with widening to the east side) of the Schuylkill River Trout Corporate bridge to provide 4 lanes in each direction. d.. h R Creek llph Gu Work with PA Turnpike Comm. Rd.. N.. harrds atted x to provide opportunity to widen Riich Relloca x Pennsylvania Turnpike Trooper Road Pennsylvania Turnpike US 422 to 6 lanes under the Riverview Trooper Road proposed widening of the I-76 at 422 x overpass Valley Forge SchuylkillSchuylkill RiverRiver TrailTrail Develop Interim Action plan to (under(under construction)construction) relieve afternoon congestion on Schuylkill River US 422 West by providing an additional lane via parapet Schuylkill River First Avenue modifications on the existing US First Avenue 422 bridge and minor lane width Minor widening of Audubon reductions Rd. for improved access and safety to adjacent residents and businesses Re-design off ramp to N.. GulphGulph Rd.Rd. improve operations, safety 23 and storage Norfolk & Southern (future Schuylkill Valley Metro) TheThe ProposedProposed ImprovementImprovement ProjectsProjects inin thethe RiverRiver CrossingCrossing ComplexComplex Two projects consist of modernizing US 422 76 interchanges, along with replacing bridges and widening US 422 in the Schuylkill River crossing Moore Road W. Valley Forge Rd. area. These draft improvement projects are functionally independent, but they will work together to improve traffic flows, both on US 422 and on adjacent roadways through 2030. The Betzwood Bridge replacement project, adjacent to US 422 and LEGEND now in final design, is also shown on this aerial photo. Boundary of the Trout Valley Forge National Historical Park PennDOT’s environmental review and traffic analysis, Area of “gateway” opportunity in the Creek Valley Forge National Historical Park as well as citizen input, have helped refine the projects Project developments and activities to maximize transportation service and minimize since the September 2004 public impacts and resource involvement. Key project Open House 276 revisions since the first Open House are noted in the 0 400 N pale green tags. PennDOT is also exploring early 800 ft. 23 action opportunties to improve traffic flows where rev: 4-26-05 feasible and appropriate..