CONTRACT AGREEMENT MRT Blue Line Extension Project Hua

Total Page:16

File Type:pdf, Size:1020Kb

CONTRACT AGREEMENT MRT Blue Line Extension Project Hua Contract Agreement CA-1 CONTRACT AGREEMENT MRT Blue Line Extension Project Hua Lamphong - Bang Khae and Bang Sue - Tha Phra Sections Contract 4: Elevated Civil Works Tha Phra - Lak Song Section This Contract is made at the Mass Rapid Transit Authority of Thailand, 175 Rama IX Road, Huay Khwang, Bangkok 10320 on 17 day of February B.E. 2554 (A.O. 2011) between: (1) MASS RAPID TRANSIT AUTHORITY OF THAILAND by Mr.Ronnachit Yaemsaard, the MRTA Acting Governor, with office located at 175 Rama IX Road, Huay Khwang, Bangkok 10320, hereinafter referred to as the "MRTA" or the "Employer", as the case may be, of the one part and ; (2) SINO-THAI ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED a company registered and existing under the laws of Thailand, with head office located at 27th floor, Sino-Thai Tower, 32/59-60, Sukhumvit 21 Road , Klang Toey Nua Sub-District, Wattana District, Bangkok, 10110, Thailand by Mr. Vallop Rungkijvorasathien authorized to sign and bind the company, hereinafter referred to as the "Contractor" of the other part. WHEREAS the Employer is desirous that certain Works should be executed by the Contractor, viz, the construction of Elevated Structure at Tha Phra - Lak Song Section with precast segment box girder viaduct of approximately 10.5 km. in length, elevated approximately 17 meters above existing ground, transition structure, with the construction of 7 elevated stations, architectural works and building services within the stations, and the intermodal transfer facilities (ITF), Depot, Operation and Control Center (OCC), Park & Ride Buildings and other works as defined in the Contract, and has accepted a Tender by the Contractor for execution and completion of such Works and the remedying of any defects therein. Now this Agreement witnesseth as follows: 1. In this Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions of Contract hereinafter referred to. 2. The following documents shall be deemed to form and be read and construed as part of the Contract, viz; Volume 1 The Contract Agreement; Volume 2 Memorandum of Understanding (MOU) I Addenda I Clarifications; Volume 3 The Tender and the Appendix to Tender; Volume 4 The Conditions of Contract; Volume 5 The priced Bill of Quantities; Volume 6 The Drawings; and Volume 7 The Specifications. 3. In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works and remedy any defects therein in conformity in all respects with the provisions of the Contract. 4. The Employer hereby covenants to pay the Contractor in c completion of the Works and the remedying of defects th~::l\'$•"'ll!liii . manner prescribed by the Contract. CONTRACT4 Volume 1 Contract Agreement CA-2 In Witness whereof the parties hereto have caused this Agreement to be executed the day and year first before between. MRTA, The Employer The Contractor MASS RAPID TRANSIT SINO-THAI ENGINEERING AND AUTHORITY OF THAILAND CONSTRUCTION PUBLIC COMPANY LIMITED f) //. / - ll---J. f lk ~ SIGNED by : ~~~ - · - ··· SIGNED by: .. ........................... ..... .. ..... (Mr. Ronnachit Yaemsaard) (Mr. Vallop Rungkijvorasathien) Deputy Governor (Operations) Acting Governor Mass Rapid Transit Authority of Thailand For and on behalf of The MRTA in the presence of WITNESS: -= ·············· ···· ·G··· ··············· 60YVT I< ~~········ · ·· ·· (Mr. Chaisit Gururatana) (Mr. Varatt Kusolmanomai) Deputy Governor (Engineering and Construction) Mass Rapid Transit Authority of Thailand (Mr. Somjade U-snit) CONTRACT4 Volume 1 .
Recommended publications
  • Bangkok Expressway and Metro Public Company Limited (BEM) FEBRUARY 2021 Business Overview
    Bangkok Expressway and Metro Public Company Limited (BEM) FEBRUARY 2021 Business Overview COMMERCIAL ROAD INVESTMENT RAIL DEVELOPMENT Total Expressway Total Rail BL = IBL + BL Ex Infrastructure portfolio SES 38.50 km BL 48 km 38 stations For advertising in Stations & • Owns 99.99% in NECL Sector C+ 32.00 km PPL 23 km 16 stations Trains, Retailing and • Owns 90.52% in BMN SOE 17.06 km Total 71 km 54 stations Telecommunications • Owns 18.47% in TTW Total 87.56 km • Owns 16.64% in CKP BL Ridership PPL to be negotiated with MRTA Traffic Volume Jan 2021 Profit sharing in P&L Jan 2021 151,237 trips/day Expressway Ads on SES Y2019 173 MB 799,583 trips/day Growth -61.95% YoY 9M/2020 - MB Growth -34.30% YoY Avg. 2021 CD Revenue Avg. 2021 151,237 trips/day Y2019 783 MB Cash Dividend Received 799,583 trips/day Growth -61.95% YoY 9M/2020 586 MB Y2019 489 MB Growth -34.30% YoY Growth 4.30% YoY 9M/2020 483 MB BL farebox Tolls Revenue Jan 2021 Jan 2021 4.24 MB/day 17.33 MB/day Growth -60.05% YoY Growth -37.67% YoY Avg. 2021 Avg. 2021 4.24 MB/day 17.33 MB/day Growth -60.05% YoY Growth -37.67% YoY PPL O&M service income Annual Income apx.1,800 - 2,000 MB/year 2 Financial Highlights & Earnings Outlook REVENUE STRUCTURE TOTAL REVENUE As of 9M/2020 Unit: MB SteadyRevenue with Growth 20,404 trong Earnings with Good Dividend 19,087 S Rail : 34% 15,393 13,232 Stable Cash Flow Road : 60% 10,589 Road Gearing for new investment Rail Commercial CD Development : Other 6% 2016 2017 2018 2019 9M/2020 NET PROFIT DPS / EPS NET IBD/E Unit: MB Unit: THB Unit : Times 5,317* 5,435** 1.44 3,123 0.35* 0.36** 1.38 2,606 1.37 1.34 1,482 0.20 1.33 0.17 0.15 0.15 0.11 0.13 0.10 DPS EPS 2016 2017 2018 2019 9M/2020 2016 2017 2018 2019 9M/2020 2016 2017 2018 2019 9M/2020 Remark : * Including non - cash extra item from reclassified the investment in CKP ** Including non - cash extra item from reclassified the investment in TTW 3 Expressway Map Expressway Network Distance (km) Operator 1.
    [Show full text]
  • ESCAP PPP Case Study #1
    Public-Private Partnerships Case Study #1 Traffic Demand Risk: The case of Bangkok’s Skytrain (BTS) by Mathieu Verougstraete and Isabelle Enders (March 2014) The following case study examines the issue of traffic demand risk and sheds light on how the problem of inaccurate ridership forecasts can impact a PPP project by using the example of the Bangkok SkyTrain. TRAFFIC DEMAND RISK FIGURE 1 : ACTUAL/FORECAST TRAFFIC Even though literature is rich about theory and practice of traffic forecasting, insufficient attention has been paid to the predicted accuracy of traffic forecasting models and the consequences of occurring errors. Emperical studies suggest however that traffic forecasts in the transport sector are characterized by large errors and considerable optimism bias.1 This statement goes in line with the review conducted on PPP projects financed by the European Investment Bank which states that major issues in road projects BANGKOK BTS: CASE SUMMARY occurred because of traffic performance has been overestimated. Findings disclose that Bangkok covers about 606 square miles 1/2 of toll road projects failed to meet their and is densely populated. By 1990 it was early-year forecasts; often by some margin renowned for its chronic traffic congestion, 2 (errors of 50% - 70%). and over the subsequent decade vehicle ESCAP supports govern- ownership more than doubled. Heavy traffic ments in Asia-Pacific in This pattern of forecasting error and volume which is caused by bus, car and implementing measures systematic optimism-bias is even more motorbike journeys was making Bangkok to efficiently involve marked in the case of toll roads compared the private sector in one of the worst cities in the world in terms infrastructure develop- to toll-free road as illustrated in figure 1, of congestion and air pollution caused by which compares two samples of international ment.
    [Show full text]
  • 3 Assessment of Urban Transport Systems in Bangkok
    Assessment Urban Transport System: Bangkok, Thailand Siradol Siridhara Mahidol University BLAK Bangkok Metro and Vicinity Population 16.43 million Bkk Population 5.56 million Employment 10.42 million Income 39,459 baht/hh Bangkok Metro and Vicinity 35 million trips per day. ≈ 70% by private vehicles. Average Speeds Morning peak hour 10.7 kph Evening peak hour 14.2 kph Key Players Regulators, Project Owners & Operators Rail Bus Regulators Project Owners Project Operators 3 Current Rail Network Current Network: 5 Lines, 97 Stations, 142.9 km Light Green Line 32 stations 39.5 km Dark Green Line 13 stations 14.7 km Blue Line 26 stations 47.0 km Purple Line 16 stations 23.6 km Airport Rail Link 8 Stations 28.6 km Total 153.4 km Green Blue Purple Red Ridership (approx.) 1500000 trips/day4 Future Rail Network Future Network: Approx. 540 km Light Green Line 55 stations 66.5 km Dark Green Line 20 stations 22.5 km Blue Line 42 stations 55.0 km Purple Line 32 stations 42.8 km Orange Line 30 stations 35.4 km Pink Line 30 stations 36.0 km Yellow Line 23 stations 30.4 km Brown Line 23 stations 21.0 km Gold Line 4 stations 2.7 km Grey 39 stations 26.0 km Light Blue Line 19 stations 30.0 km Light Red Line 55 stations 58.5 km Dark Red Line 20 stations 80.8 km Airport Rail Link 14 Stations 49.5 km Total 504 km 5 Assessment Urban Transport System: Bangkok SUTI01 Extent to Which Transport Plans Cover Public Transport, Intermodal Facilities and Infrastructure for Active Modes MIN SCORE MAX 0 11 16 No Aspects Explanation Score 1 Walking Networks Little attention has been paid to pedestrian network planning, although the awareness of maintenance of walkways and other pedestrian facilities have 2 been raised from the general public.
    [Show full text]
  • Skripsi Yunda
    CHAPTER 1 INTRODUCTION 1.1 General Overview of Research Object 1.1.1 Light Rail Transit Figure 1.1 LRT Source : www.kabar3.com The Palembang Light Rail Transit (Palembang LRT) is an operational light rail transit system in Palembang, Indonesia which connects Sultan Mahmud Badaruddin II International Airport and Jakabaring Sports City. Starting construction in 2015, the project was built to facilitate the 2018 Asian Games and was completed in mid-2018, just a few months before the event. Costing Rp 10.9 trillion for construction, the system is the first operational light rail transit system in Indonesia, and utilizes trains made by local manufacturer PT.INKA. The system's only line has a total of 13 stations (6 operational). As Palembang was to host the 2018 Asian Games, the project was pushed to be completed before the event began. Groundbreaking for the project occurred on 1 November 2015, with state-owned company Waskita Karya being appointed as the primary contractor following the issuance of Presidential Regulation 116 of 2015 on Acceleration of Railway Train Operation in South Sumatera Province. The contract, which was signed in February 2017, was initially valued at Rp 12.5 trillion. Construction was scheduled for completion in February 2018, with commercial service beginning in May 2018. However, the completion date was moved to June 2018 with operations beginning in July, only one month before the Asian Games. A test run was done on 22 May 2018 and was inaugurated by President Joko Widodo on 15 July 2018. Operations for the LRT started on 1 August, several days before the Jakarta LRT began running, making it the first operational LRT system in the country.
    [Show full text]
  • Social Impact of Railway Project A
    SOCIAL IMPACT OF RAILWAY PROJECT A CASE STUDY OF MASS RAPID TRANSIT (MRT) JAKARTA, INDONESIA DAMPAK SOSIAL PROYEK KERETA API STUDI KASUS MASS RAPID TRANSIT (MRT) JAKARTA, INDONESIA Listifadah Research and Development Land Transportation-Ministry of Transportation Jl. Medan Merdeka Timur No. 5 Jakarta Pusat 10110 email: [email protected] Diterima: 11 November 2014, Revisi 1: 1 Desember 2014, Revisi 2: 10 Desember 2014, Disetujui: 19 Desember 2014 ABSTRACT Jakarta MRT system had been planned since the 1980’s. Many constraints such as political, finan- cial, as well as bureaucratic make the project delayed for a long time. When the plan scheduled to be implemented in a couple years ago, some protests arise. Communities and some interest group against. The fears of income decline and loss of livelihood become their main concerns which in- duce protests before the project really started. Based on this experience, this paper tries to reveal social impacts of transport development in case MRT Jakarta. Now the project construction is being carried out. Social impact as well as the project construction continues. This study investigate how social impact of railway project was happened. Literatures and documents analysis was used to analyze this study. The result of the study were the MRT Jakarta project inevitably have negative and positive impacts both for society and environment. But with the start of the project after a long delay, it gives hope to the community for better transportation. It is a positive impact before the project was completed. Community engagement in a meeting or discusssion should more be em- phasized in the process in order to minimize the conflicts of interest.
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • Thailand MRTA Initial System Project (Blue Line) I–V
    Thailand MRTA Initial System Project (Blue Line) I–V External Evaluator: Hiroyasu Otsu, Graduate School of Kyoto University Field Survey: August 2007 – March 2008 1. Project Profile and Japan’s ODA Loan Myミャンマーanmar ラオスLaos Thailandタイ Banバンコクgkok ◎ カンボジアCambodia プロジェクトサイトProject Site Map of the project area Bangkok Subway (MRT Blue Line) 1.1 Background Accompanying the rapid economic development in Bangkok starting in the 1990s, regular traffic congestion and the associated air pollution became evident in the urban area. The Thai government drew up the Bangkok Mass Transit Master Plan (produced by the Office of the Commission for the Management of Road Traffic (OCMRT) and hereinafter referred to as the “master plan”) in 1995 based on the 7th National Economic and Social Development Plan (1992–1996) for the purpose of developing a mass transit network and also for developing a network of ordinary roads and expressways to achieve steady economic growth, together with resolving the above-mentioned traffic congestion and air pollution. Furthermore, the development of the mass transit network proposed in the master plan is also specified in the subsequent 8th National Economic and Social Development Plan (1997–2000), and it is positioned as an extremely important national project in Thailand. The plan for the Bangkok mass transit system, part of the master plan, involves the construction of five lines that will radiate out and join the Bangkok Metropolitan Area (BMA) with the Bangkok Metropolitan Region (BMR)1 together with creating a network 1 The Bangkok Metropolitan Region includes Bangkok, which is a special administrative area, and the surrounding five provinces of Samut Prakan, Pathum Thani, Samut Sakhon, Nakhon Pathom, and Nonthaburi.
    [Show full text]
  • Special Assistance for Project Implementation for Bangkok Mass Transit Development Project in Thailand
    MASS RAPID TRANSIT AUTHORITY THAILAND SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION FOR BANGKOK MASS TRANSIT DEVELOPMENT PROJECT IN THAILAND FINAL REPORT SEPTEMBER 2010 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS, CO., LTD. EID JR 10-159 MASS RAPID TRANSIT AUTHORITY THAILAND SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION FOR BANGKOK MASS TRANSIT DEVELOPMENT PROJECT IN THAILAND FINAL REPORT SEPTEMBER 2010 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS, CO., LTD. Special Assistance for Project Implementation for Mass Transit Development in Bangkok Final Report TABLE OF CONTENTS Page CHAPTER 1 INTRODUCTION ..................................................................................... 1-1 1.1 Background of the Study ..................................................................................... 1-1 1.2 Objective of the Study ......................................................................................... 1-2 1.3 Scope of the Study............................................................................................... 1-2 1.4 Counterpart Agency............................................................................................. 1-3 CHAPTER 2 EXISTING CIRCUMSTANCES AND FUTURE PROSPECTS OF MASS TRANSIT DEVELOPMENT IN BANGKOK .............................. 2-1 2.1 Legal Framework and Government Policy.......................................................... 2-1 2.1.1 Relevant Agencies....................................................................................... 2-1 2.1.2
    [Show full text]
  • Climate Policies in Transport Sector of Vietnam And
    MINISTRY OF TRANSPORT TRANSPORT DEVELOPMENT AND STRATEGY INSTITUTE URBAN PUBLIC TRANSPORT SYSTEM IN VIETNAM Presenter: Le Thi Thanh Nhan (MSc) Energy Efficiency in Emerging Economies Training Week for Southest Asia Jakarta, 16 to 20 July, 2018 Vietnam at a glance Population: 93.5 million people Urban population: 32.3 million people Urbanization rate: 34.5% Urban contribution: 70 - 75% of the GDP Vietnam at a glance • There are 788 urban areas in the whole Viet Nam, including 02 special urban areas (Ha Noi, HCMC) Several figures: 2.9 million automobiles 46 million motorbikes 492 motorbike/1000 population • The competitive index of Vietnam transport infrastructures ranked the 67th of the 138 countries in 2015-2016 period • The urbanization process growths very fast (3.4% per year) resulting in higher and higher traffic demands, and a boom of individual vehicles (i.e. cars, motorbikes) in large urban areas, and severe status of traffic congestion Urban Public Transport in Vietnam Conventional bus BRT Metro River bus Urban Public Transport in Vietnam Conventional bus 61/63 provinces have public bus system with total passenger transported: more than 1 billion/year Structure of bus routes in cities in 2015 Urban Public Transport in Vietnam River bus Operating in Ho Chi Minh City with 01 route 10,8km Metros Under construction in 02 cities are Ha Noi and Ho Chi Minh City MRT system in Hanoi Hanoi: ( Decision 1259/2011/QD-TTg) 8 metro lines with 318 km Line 2A and 3: under construction Line 2A: 13.1 km elevated, 12 stations Line 3: 12.5 km (8.5 km elevated, 4 km underground, 12 stations MRT system in HCMC HCMC: (Decision 568/2013/QD-TTg) 08 metro lines (1, 2, 3a, 3b, 4, 4b, 5, 6) 03 tram lines/1 monorail line (T) 01 elevated rail line (E) MRT Line 1, 2, 5: Under construction BRT system in Hanoi .
    [Show full text]
  • Data Sheet Blue Line Extension Bangkok English
    Extending Bangkok’s Blue Line Delivery of a metro system in a turnkey approach including 35 three-car trains over a minimum project period An ever-growing city Blue Line Extension Highlights In Thailand’s capital Bangkok commuters In 2017, the Bangkok Expressway and spend countless hours in traffic jams, Metro Public Company Limited (BEM) • Very tight project schedule with but the number of private vehicles in and CH. Karnchang Public Company only 27 months from project start use still continues to grow. This comes Limited awarded a consortium of to trial run in one section of at extensive costs and above all at the Siemens Mobility and ST Electronics the system expense of human health. Whereas (Thailand) Limited a contract to deliver • Railway operation taken up roads cannot tackle these problems, rail technology for the extension of three months ahead of schedule public transport can. That is why the Bangkok’s Blue Line Metro. in a very challenging project time city planned to increase the number Siemens Mobility’s scope of delivery plan of 36 months of people using mass transit systems. included 35 three-car metro trains, • A lightweight stainless-steel car The metro systems in place were used the signaling system, the traction power body and state-of-the-art traction frequently. In peak hours the Blue supply and all the equipment for the technology reduces energy Line, Bangkok’s first subway system, depot and workshop as well as project consumption needed to run all available trains. management. The project was executed • Interior and exterior LED lights This initial line was delivered as a in a turnkey approach, with Siemens reduce maintenance costs turnkey rail system by Siemens in Mobility also handling the integration and energy consumption 2004 and included 19 three-car trains.
    [Show full text]
  • Bangkok MRT Red Line (Thailand)
    mageba – Project information Bangkok MRT Red Line (Thailand) Project description mageba scope Highlights & Facts The MRT (Mass Rapid Transit) red line in In 2015, mageba manufactured more than Bangkok is part of the MRT master plan 5’000 RESTON®SPHERICAL bearings. The mageba products: for the Bangkok metropolitan region. With installation schedule runs from 2015 to Type: RESTON®SPHERICAL a total length of 26.3 km, the red line is 2017. bearings of type KA, KE planned to run from Bang Sue to Rangsit The bearings are designated of types KF, and KF and Bang Sue Stations, bringing passengers KE or KA, depending on their ability to Features: With ROBO®SLIDE to the north. high-grade sliding accommodate sliding movements. material The construction project is part of the As the bearings are installed in this Installation: 2015–2017 infrastructure investment programs led by high-dynamic stressed railway bridge, Strcuture: the Thai Government. the requirements in terms of assuring City: Bangkok Moreover, the master plan comprises a zero friction for smooth transmission of Country: Thailand 26.4 km long line to the north (North Line) horizontal forces had to be fulfilled. Type: Mass transit system and 14.6 km long line to the west (West A further peculiarity features the precast- Owner: Ministry of Transport Line) providing a fully elevated rail system. segement structure that makes great State Railway of Thailand demands on the type of connection to be Designer: Team Consulting used. Engineering and Management Company NorCiv Engineering Co., Ltd The MRT red line is located in Bangkok, the RESTON®SPHERICAL bearings packed and ready for metropolitan region of Thailand delivery Load testing of the RESTON®SPHERICAL bearings Thailand Bangkok Cambodia © 2016 Google Switzerland www.mageba.ch 2016.08 CH-EN ©mageba mageba sa - Solistrasse 68 - 8180 Bülach - Switzerland - T +41 44 872 40 50 - [email protected].
    [Show full text]
  • Urban Rail in Jakarta and Jabodetabek (With Thanks to Fagra Hanif for Supporting Information)
    Urban Rail in Jakarta and Jabodetabek (with thanks to Fagra Hanif for supporting information) Context Jakarta and the strategic metropolitan area known as Jabodetabek (Jakarta and the neighbouring municipalities of Bogor, Depok, Tangerang and Bekasi) has a population of 28mil (10mil Jakarta proper). This region has urban rail heritage, with the original suburban rail infrastructure dating from the early 20th century, during the Dutch colonial period (BOS -Batavia Ooster Spoorweg). Following independence, other priorities meant that funding for the network was constrained and this fact, combined with rapid urbanisation, growing prosperity and growth in car ownership, diminished the use and value of urban rail provision whilst also bringing congestion to the ‘over-capacity’ road network. In the late 1970s, the problems caused by underinvestment in the network became evident and since then, a combination of policy changes and increased resources have brought upgrading to the existing suburban network (double tracking, electrification, new rolling stock etc.), some false starts (monorail), and, more latterly, construction of modern ‘metro-type’ lines. With expansion and modernisation there has been much improvement to the urban rail setting in Jakarta and this city/region now has a comprehensive and interesting multi-modal rail footprint with further expansion in construction. Full Metro: Jakarta MRT The first full metro in Indonesia, Jakarta MRT, opened in late March 2019. The line runs from Lebak Bulus (shedding facilities) through the southern suburbs on viaduct to the Blok M shopping area before heading underground after ASEAN and proceeding below Jalan Surdirman and the main commercial area to the busiest station Dukuh Atas (transfer to KRL, Airport Line, TransJakarta BRT and the future LRT).
    [Show full text]