Data Sheet Blue Line Extension Bangkok English

Total Page:16

File Type:pdf, Size:1020Kb

Data Sheet Blue Line Extension Bangkok English Extending Bangkok’s Blue Line Delivery of a metro system in a turnkey approach including 35 three-car trains over a minimum project period An ever-growing city Blue Line Extension Highlights In Thailand’s capital Bangkok commuters In 2017, the Bangkok Expressway and spend countless hours in traffic jams, Metro Public Company Limited (BEM) • Very tight project schedule with but the number of private vehicles in and CH. Karnchang Public Company only 27 months from project start use still continues to grow. This comes Limited awarded a consortium of to trial run in one section of at extensive costs and above all at the Siemens Mobility and ST Electronics the system expense of human health. Whereas (Thailand) Limited a contract to deliver • Railway operation taken up roads cannot tackle these problems, rail technology for the extension of three months ahead of schedule public transport can. That is why the Bangkok’s Blue Line Metro. in a very challenging project time city planned to increase the number Siemens Mobility’s scope of delivery plan of 36 months of people using mass transit systems. included 35 three-car metro trains, • A lightweight stainless-steel car The metro systems in place were used the signaling system, the traction power body and state-of-the-art traction frequently. In peak hours the Blue supply and all the equipment for the technology reduces energy Line, Bangkok’s first subway system, depot and workshop as well as project consumption needed to run all available trains. management. The project was executed • Interior and exterior LED lights This initial line was delivered as a in a turnkey approach, with Siemens reduce maintenance costs turnkey rail system by Siemens in Mobility also handling the integration and energy consumption 2004 and included 19 three-car trains. of the telecommunication and platform • > 99.99 % availability on original screen door system. line, which is serviced by Siemens Mobility siemens.com/mobility To prepare for operation, personal of the customer as well as Siemens Mobility’s own staff was trained extensively, with a transfer of technical knowledge taking place in the process. Overall, the turnkey setup and efficient project management made it possible to open section by section for a public demo run starting in July 2019. The full extension was already in operation on December 23, 2019 – three months before contractually agreed. The project team also had a focus on safety, achieving a total of 742,000 man hours with zero safety incidents. Rolling stock In addition, the company is to perform The trains on the Blue Line Extension are Car bodies The modular system is used on more than maintenance service for the transit system an evolution of existing Bangkok metro trains The metro train has been designed with 22 metro lines worldwide that need to for a period of ten years. with an improved car design. The rolling a lightweight stainless-steel construction. increase traffic volume with short headways. stock was designed for manual operation. The exterior car body surfaces are painted, Commissioning of the line extension carried The Trainguard LZB 700 M equipment, for The trains are capable of carrying more than and the color stripes are made of adhesive out section by section in 2019. BEM is the example, enables actual driving instructions 800 passengers each and have a top speed foil. operator of the Blue Line. A large part of to be displayed continuously in the driver’s of 80 km/h. They were manufactured in the extension, from Hua Lamphong to cab. It also allows for the continuous moni- Vienna, tested in the Test and Validation Passenger Information System Lak Song in the south and from Bang Sue toring of train speeds. Signals can be reduced Center Wegberg-Wildenrath in Germany The Passenger Information Display and in the north to Tha Pra, runs above ground, to a minimum, as only necessary for degraded and shipped by sea vessel to Thailand. Announcement System provides both visual with 22 kilometers over viaduct. mode operation. and audio information about the train. Additionally, the existing fleet of 19 metro The line will transport up to 500,000 Displays for the train’s destination are trains from Siemens Mobility was upgraded passengers per day. installed on the exterior of the cars. Inside, in the project. dynamic map displays are installed above System integration each door to show the current station and Design concept Technical data and project management the name of the next and previous station. During design of the new metro vehicles, Siemens Mobility delivered the extension Each car also includes displays above the Train configuration Mc-T-Mc (Motor car – trailer car – motor car) a focus was placed on reduction of lifecycle in a turnkey approach and thus was respon- windows for emergency messages, opera- Wheel arrangement Bo’Bo’+2’2’+Bo’Bo’ costs. The car body of the train is of light- sible for the design of the overall transit tional news and for advertisements. Car body material stainless steel weight stainless-steel construction, reducing system and integration of all subsystems, Track gauge 1,435 mm energy consumption and allowing passenger as well as smooth interaction with four civil Signaling capacity to be increased through an opti- Length over coupler of train 65,100 mm contractors. Siemens Mobility delivered a safe and mized interior layout. Four electrically Width of car 3,120 mm reliable signaling system. It includes Testing and commissioning on the system powered 1,400 mm-wide doors are Floor height above top of rail 1,160 mm Trainguard LZB 700 M, a continuous was conducted in very short periods with - arranged on each side of the cars and Max. axle load 15.9 t automatic train control system with a out interfering with ongoing operations. enable passengers to board and leave Number of seats per train 126 high-performance solution for automatic Seamless integration of the extension into the train rapidly, minimizing dwell times train protection (ATP) and automatic Passenger capacity per train the existing line without any interruption at stations. This increases system capacity. (6 pass./m2) 878 train operation (ATO). It optimizes both of commercial service was guaranteed. (8 pass./m2) 1,129 Passenger comfort is increased by a parti- punctuality and headways as well as Passenger doors per car 2 x 4 bi-parting outside sliding doors cularly effective high-performance air- eases the burden on the driver – who can conditioning system, taking into account then focus more on passenger safety. Door width 1,400 mm the local weather conditions with prevailing high temperatures and humidity levels. Overview An innovative air diffuser system was System length 28 km implemented for efficient and comfortable Number of stations 19 air supply, avoiding the risk of water condensation. An updated stanchion Fleet size 35 3-car trains arrangement increases the safety for Headway / signaling 120 s / ATO passengers. Maximum operating speed 80 km/h Grade of Automation GoA 2 The rolling stock is compliant with a high Line voltage 750 V DC, third rail safety level according to latest standards EN 50126, 50128, 50129 and IEC 61508 and Project duration 36 months fire safety according to NFPA 130 / EN 45545. Communication system Depot workshop equipment and platform screen doors The new 35 trains are maintained at the The communication system as well as half- existing Rama IX depot in the city center height platform screen doors were designed of Bangkok, which was delivered by Siemens and implemented by the consortium partner Mobility in 2004 and upgraded as part of ST Electronics. 40 platform sides have been this contract during ongoing operations. equipped with twelve platform screen doors Additionally, Siemens Mobility designed, each. Siemens Mobility integrated both sys- installed and commissioned a state-of-the- tems into the overall system for guaranteed art new depot for efficient service and availability. maintenance of the metro trains. A total of 15 sets of depot workshop equipment Electrification were procured and commissioned for this. Electrification comprises a 750 V DC third rail system. The system is connected to the local Customer Services power provider and feeds electricity into Siemens Mobility Thailand is in charge the systems via two bulk power stations. of service and maintenance of the existing Power transformers convert this to 24 kV, fleet and infrastructure 24/7 in a condition- while 16 traction power supply stations based maintenance approach by utilizing provide power throughout the entire a computerized maintenance management system. An emergency power supply system. During peak hours when all trains system consisting of a generator, DC charger need to be utilized, the Siemens Mobility and battery ensure guaranteed availability. team achieved a high system availability The system is designed for a headway of rate of > 99.9 %. In addition to a maintenance two minutes. A Sitras RSC (RailSCADA) contract of ten years for the Blue Line network control system is used for the Extension, the project also includes control, monitoring, archiving, and an extension of the current service evaluation of traction power supply. contact for another 5.5 years. Published by Siemens Mobility GmbH 2020 Otto-Hahn-Ring 6 81739 Munich, Germany [email protected] Article No. MOTP-B10011-00-7600 Printed in Germany Dispo 70727 TH 325-200363 DA 09201.0 Subject to changes and errors. The information given in this document only contains general descrip- tions and/or performance features which may not always specifically reflect those described, or which may undergo modification in the course of further development of the products. The requested performance features are binding only when they are expressly agreed upon in the concluded contract..
Recommended publications
  • CONTRACT AGREEMENT MRT Blue Line Extension Project Hua
    Contract Agreement CA-1 CONTRACT AGREEMENT MRT Blue Line Extension Project Hua Lamphong - Bang Khae and Bang Sue - Tha Phra Sections Contract 4: Elevated Civil Works Tha Phra - Lak Song Section This Contract is made at the Mass Rapid Transit Authority of Thailand, 175 Rama IX Road, Huay Khwang, Bangkok 10320 on 17 day of February B.E. 2554 (A.O. 2011) between: (1) MASS RAPID TRANSIT AUTHORITY OF THAILAND by Mr.Ronnachit Yaemsaard, the MRTA Acting Governor, with office located at 175 Rama IX Road, Huay Khwang, Bangkok 10320, hereinafter referred to as the "MRTA" or the "Employer", as the case may be, of the one part and ; (2) SINO-THAI ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED a company registered and existing under the laws of Thailand, with head office located at 27th floor, Sino-Thai Tower, 32/59-60, Sukhumvit 21 Road , Klang Toey Nua Sub-District, Wattana District, Bangkok, 10110, Thailand by Mr. Vallop Rungkijvorasathien authorized to sign and bind the company, hereinafter referred to as the "Contractor" of the other part. WHEREAS the Employer is desirous that certain Works should be executed by the Contractor, viz, the construction of Elevated Structure at Tha Phra - Lak Song Section with precast segment box girder viaduct of approximately 10.5 km. in length, elevated approximately 17 meters above existing ground, transition structure, with the construction of 7 elevated stations, architectural works and building services within the stations, and the intermodal transfer facilities (ITF), Depot, Operation and Control Center (OCC), Park & Ride Buildings and other works as defined in the Contract, and has accepted a Tender by the Contractor for execution and completion of such Works and the remedying of any defects therein.
    [Show full text]
  • Bangkok Expressway and Metro Public Company Limited (BEM) FEBRUARY 2021 Business Overview
    Bangkok Expressway and Metro Public Company Limited (BEM) FEBRUARY 2021 Business Overview COMMERCIAL ROAD INVESTMENT RAIL DEVELOPMENT Total Expressway Total Rail BL = IBL + BL Ex Infrastructure portfolio SES 38.50 km BL 48 km 38 stations For advertising in Stations & • Owns 99.99% in NECL Sector C+ 32.00 km PPL 23 km 16 stations Trains, Retailing and • Owns 90.52% in BMN SOE 17.06 km Total 71 km 54 stations Telecommunications • Owns 18.47% in TTW Total 87.56 km • Owns 16.64% in CKP BL Ridership PPL to be negotiated with MRTA Traffic Volume Jan 2021 Profit sharing in P&L Jan 2021 151,237 trips/day Expressway Ads on SES Y2019 173 MB 799,583 trips/day Growth -61.95% YoY 9M/2020 - MB Growth -34.30% YoY Avg. 2021 CD Revenue Avg. 2021 151,237 trips/day Y2019 783 MB Cash Dividend Received 799,583 trips/day Growth -61.95% YoY 9M/2020 586 MB Y2019 489 MB Growth -34.30% YoY Growth 4.30% YoY 9M/2020 483 MB BL farebox Tolls Revenue Jan 2021 Jan 2021 4.24 MB/day 17.33 MB/day Growth -60.05% YoY Growth -37.67% YoY Avg. 2021 Avg. 2021 4.24 MB/day 17.33 MB/day Growth -60.05% YoY Growth -37.67% YoY PPL O&M service income Annual Income apx.1,800 - 2,000 MB/year 2 Financial Highlights & Earnings Outlook REVENUE STRUCTURE TOTAL REVENUE As of 9M/2020 Unit: MB SteadyRevenue with Growth 20,404 trong Earnings with Good Dividend 19,087 S Rail : 34% 15,393 13,232 Stable Cash Flow Road : 60% 10,589 Road Gearing for new investment Rail Commercial CD Development : Other 6% 2016 2017 2018 2019 9M/2020 NET PROFIT DPS / EPS NET IBD/E Unit: MB Unit: THB Unit : Times 5,317* 5,435** 1.44 3,123 0.35* 0.36** 1.38 2,606 1.37 1.34 1,482 0.20 1.33 0.17 0.15 0.15 0.11 0.13 0.10 DPS EPS 2016 2017 2018 2019 9M/2020 2016 2017 2018 2019 9M/2020 2016 2017 2018 2019 9M/2020 Remark : * Including non - cash extra item from reclassified the investment in CKP ** Including non - cash extra item from reclassified the investment in TTW 3 Expressway Map Expressway Network Distance (km) Operator 1.
    [Show full text]
  • ESCAP PPP Case Study #1
    Public-Private Partnerships Case Study #1 Traffic Demand Risk: The case of Bangkok’s Skytrain (BTS) by Mathieu Verougstraete and Isabelle Enders (March 2014) The following case study examines the issue of traffic demand risk and sheds light on how the problem of inaccurate ridership forecasts can impact a PPP project by using the example of the Bangkok SkyTrain. TRAFFIC DEMAND RISK FIGURE 1 : ACTUAL/FORECAST TRAFFIC Even though literature is rich about theory and practice of traffic forecasting, insufficient attention has been paid to the predicted accuracy of traffic forecasting models and the consequences of occurring errors. Emperical studies suggest however that traffic forecasts in the transport sector are characterized by large errors and considerable optimism bias.1 This statement goes in line with the review conducted on PPP projects financed by the European Investment Bank which states that major issues in road projects BANGKOK BTS: CASE SUMMARY occurred because of traffic performance has been overestimated. Findings disclose that Bangkok covers about 606 square miles 1/2 of toll road projects failed to meet their and is densely populated. By 1990 it was early-year forecasts; often by some margin renowned for its chronic traffic congestion, 2 (errors of 50% - 70%). and over the subsequent decade vehicle ESCAP supports govern- ownership more than doubled. Heavy traffic ments in Asia-Pacific in This pattern of forecasting error and volume which is caused by bus, car and implementing measures systematic optimism-bias is even more motorbike journeys was making Bangkok to efficiently involve marked in the case of toll roads compared the private sector in one of the worst cities in the world in terms infrastructure develop- to toll-free road as illustrated in figure 1, of congestion and air pollution caused by which compares two samples of international ment.
    [Show full text]
  • 3 Assessment of Urban Transport Systems in Bangkok
    Assessment Urban Transport System: Bangkok, Thailand Siradol Siridhara Mahidol University BLAK Bangkok Metro and Vicinity Population 16.43 million Bkk Population 5.56 million Employment 10.42 million Income 39,459 baht/hh Bangkok Metro and Vicinity 35 million trips per day. ≈ 70% by private vehicles. Average Speeds Morning peak hour 10.7 kph Evening peak hour 14.2 kph Key Players Regulators, Project Owners & Operators Rail Bus Regulators Project Owners Project Operators 3 Current Rail Network Current Network: 5 Lines, 97 Stations, 142.9 km Light Green Line 32 stations 39.5 km Dark Green Line 13 stations 14.7 km Blue Line 26 stations 47.0 km Purple Line 16 stations 23.6 km Airport Rail Link 8 Stations 28.6 km Total 153.4 km Green Blue Purple Red Ridership (approx.) 1500000 trips/day4 Future Rail Network Future Network: Approx. 540 km Light Green Line 55 stations 66.5 km Dark Green Line 20 stations 22.5 km Blue Line 42 stations 55.0 km Purple Line 32 stations 42.8 km Orange Line 30 stations 35.4 km Pink Line 30 stations 36.0 km Yellow Line 23 stations 30.4 km Brown Line 23 stations 21.0 km Gold Line 4 stations 2.7 km Grey 39 stations 26.0 km Light Blue Line 19 stations 30.0 km Light Red Line 55 stations 58.5 km Dark Red Line 20 stations 80.8 km Airport Rail Link 14 Stations 49.5 km Total 504 km 5 Assessment Urban Transport System: Bangkok SUTI01 Extent to Which Transport Plans Cover Public Transport, Intermodal Facilities and Infrastructure for Active Modes MIN SCORE MAX 0 11 16 No Aspects Explanation Score 1 Walking Networks Little attention has been paid to pedestrian network planning, although the awareness of maintenance of walkways and other pedestrian facilities have 2 been raised from the general public.
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • Thailand MRTA Initial System Project (Blue Line) I–V
    Thailand MRTA Initial System Project (Blue Line) I–V External Evaluator: Hiroyasu Otsu, Graduate School of Kyoto University Field Survey: August 2007 – March 2008 1. Project Profile and Japan’s ODA Loan Myミャンマーanmar ラオスLaos Thailandタイ Banバンコクgkok ◎ カンボジアCambodia プロジェクトサイトProject Site Map of the project area Bangkok Subway (MRT Blue Line) 1.1 Background Accompanying the rapid economic development in Bangkok starting in the 1990s, regular traffic congestion and the associated air pollution became evident in the urban area. The Thai government drew up the Bangkok Mass Transit Master Plan (produced by the Office of the Commission for the Management of Road Traffic (OCMRT) and hereinafter referred to as the “master plan”) in 1995 based on the 7th National Economic and Social Development Plan (1992–1996) for the purpose of developing a mass transit network and also for developing a network of ordinary roads and expressways to achieve steady economic growth, together with resolving the above-mentioned traffic congestion and air pollution. Furthermore, the development of the mass transit network proposed in the master plan is also specified in the subsequent 8th National Economic and Social Development Plan (1997–2000), and it is positioned as an extremely important national project in Thailand. The plan for the Bangkok mass transit system, part of the master plan, involves the construction of five lines that will radiate out and join the Bangkok Metropolitan Area (BMA) with the Bangkok Metropolitan Region (BMR)1 together with creating a network 1 The Bangkok Metropolitan Region includes Bangkok, which is a special administrative area, and the surrounding five provinces of Samut Prakan, Pathum Thani, Samut Sakhon, Nakhon Pathom, and Nonthaburi.
    [Show full text]
  • Special Assistance for Project Implementation for Bangkok Mass Transit Development Project in Thailand
    MASS RAPID TRANSIT AUTHORITY THAILAND SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION FOR BANGKOK MASS TRANSIT DEVELOPMENT PROJECT IN THAILAND FINAL REPORT SEPTEMBER 2010 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS, CO., LTD. EID JR 10-159 MASS RAPID TRANSIT AUTHORITY THAILAND SPECIAL ASSISTANCE FOR PROJECT IMPLEMENTATION FOR BANGKOK MASS TRANSIT DEVELOPMENT PROJECT IN THAILAND FINAL REPORT SEPTEMBER 2010 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS, CO., LTD. Special Assistance for Project Implementation for Mass Transit Development in Bangkok Final Report TABLE OF CONTENTS Page CHAPTER 1 INTRODUCTION ..................................................................................... 1-1 1.1 Background of the Study ..................................................................................... 1-1 1.2 Objective of the Study ......................................................................................... 1-2 1.3 Scope of the Study............................................................................................... 1-2 1.4 Counterpart Agency............................................................................................. 1-3 CHAPTER 2 EXISTING CIRCUMSTANCES AND FUTURE PROSPECTS OF MASS TRANSIT DEVELOPMENT IN BANGKOK .............................. 2-1 2.1 Legal Framework and Government Policy.......................................................... 2-1 2.1.1 Relevant Agencies....................................................................................... 2-1 2.1.2
    [Show full text]
  • Urban Rail in Jakarta and Jabodetabek (With Thanks to Fagra Hanif for Supporting Information)
    Urban Rail in Jakarta and Jabodetabek (with thanks to Fagra Hanif for supporting information) Context Jakarta and the strategic metropolitan area known as Jabodetabek (Jakarta and the neighbouring municipalities of Bogor, Depok, Tangerang and Bekasi) has a population of 28mil (10mil Jakarta proper). This region has urban rail heritage, with the original suburban rail infrastructure dating from the early 20th century, during the Dutch colonial period (BOS -Batavia Ooster Spoorweg). Following independence, other priorities meant that funding for the network was constrained and this fact, combined with rapid urbanisation, growing prosperity and growth in car ownership, diminished the use and value of urban rail provision whilst also bringing congestion to the ‘over-capacity’ road network. In the late 1970s, the problems caused by underinvestment in the network became evident and since then, a combination of policy changes and increased resources have brought upgrading to the existing suburban network (double tracking, electrification, new rolling stock etc.), some false starts (monorail), and, more latterly, construction of modern ‘metro-type’ lines. With expansion and modernisation there has been much improvement to the urban rail setting in Jakarta and this city/region now has a comprehensive and interesting multi-modal rail footprint with further expansion in construction. Full Metro: Jakarta MRT The first full metro in Indonesia, Jakarta MRT, opened in late March 2019. The line runs from Lebak Bulus (shedding facilities) through the southern suburbs on viaduct to the Blok M shopping area before heading underground after ASEAN and proceeding below Jalan Surdirman and the main commercial area to the busiest station Dukuh Atas (transfer to KRL, Airport Line, TransJakarta BRT and the future LRT).
    [Show full text]
  • 861 KB Thailand Infrastructure News Issue 8
    Thailand Infrastructure News Issue 8 15 January 2019 www.pwc.com/th Disclaimer This content is for general information purposes only, and should not be used as a substitute for consultation with professional advisors. © 2019 PricewaterhouseCoopers FAS Ltd. All rights reserved. PwC refers to the Thailand member firm, and may sometimes refer to the PwC network. Each member firm is a separate legal entity. Please see www.pwc.com/structure for further details. PwC Thailand l January 2019 2 Headlines Thailand to promote single-window clearance system for border trade Amata eyes Yangon for next foreign play Cabinet OKs land use for airport rail BoI gears up to snare aerospace investors for U-tapao MRO takes centre stage as sector expands PwC Thailand l January 2019 3 Headlines Brown Line monorail gets nod under PPP framework NOD TO BROWN LINE Udon to push for 'dry port' development High-speed rail needs help to make an impact Phuket seeks tram bidders PwC Thailand l January 2019 4 Headlines Thai-Chinese high-speed rail opened up to foreign finance Local train manufacturing plant on agenda MRTA to call bids for Phuket mass transit in Q3 BoI to focus on rail and cruise ship port investment Govt takes investment roadshow to Japan PwC Thailand l January 2019 5 Headlines Debate on CP rail-link offer today PwC Thailand l January 2019 6 Thailand to promote single-window clearance system for border trade 02 January 2019 IN a push for digital transformation within the Asean region, member countries will join forces to implement the Asean Single Window (ASW) for all 10 nations in the trade bloc by the end of next year.
    [Show full text]
  • Ground Movements in Station Excavations of Bangkok First MRT
    INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND GEOTECHNICAL ENGINEERING This paper was downloaded from the Online Library of the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE). The library is available here: https://www.issmge.org/publications/online-library This is an open-access database that archives thousands of papers published under the Auspices of the ISSMGE and maintained by the Innovation and Development Committee of ISSMGE. Geotechnical Aspects of Underground Construction in Soft Ground – Ng, Huang & Liu (eds) © 2009 Taylor & Francis Group, London, ISBN 978-0-415-48475-6 Ground movements in station excavations of Bangkok first MRT N. Phienwej Asian Institute of Technology, Bangkok, Thailand ABSTRACT: The characteristics of movements of diaphragm wall and ground in the excavation of 18 stations of the first Bangkok underground MRT line were evaluated. Three modes of deflected shapes of the walls were observed at different excavation depths, namely cantilever mode, braced modes with bulge in soft clay and bulge in stiff clay. The ratio of maximum lateral wall deflection developing with excavation depth and the ratio of ground surface settlement to excavation and the normalized zone of ground surface settlement varied with the mode of wall deflection. Back-calculation of undrained soil moduli for different soil layers were made from wall movement data of three selected stations using the 2-D linear elasto-plastic FEM analyses. The modulus values, which were higher than those commonly obtained from conventional triaxial tests, can be used as guideline for future works in Bangkok. 1 INTRODUCTION in soft and subsiding Bangkok ground. The contracts made its compulsory that full instrumentation program Deep excavation by means of strutted concrete be implemented during excavation for design verifi- diaphragm walls is often used for construction of cation and safety assurance.
    [Show full text]
  • The Operator's Story: Case Study of Bangkok BMCL
    Railway and Transport Strategy Centre The Operator’s Story Case Study: Bangkok’s Story © World Bank / Imperial College London Property of the World Bank and the RTSC at Imperial College London Community of Metros CoMET The Operator’s Story: Notes from Bangkok Case Study Interviews February 2017 Purpose The purpose of this document is to provide a permanent record for the researchers of what was said by people interviewed for ‘The Operator’s Story’ in Bangkok. These notes are based upon meetings at BEM (formerly BMCL) offices on 17th March 2016 and the authors’ experience. This document will ultimately form an appendix to the final report for ‘The Operator’s Story’ piece. Although the findings have been arranged and structured by Imperial College London, they remain a collation of thoughts and statements from interviewees, and continue to be the opinions of those interviewed, rather than of Imperial College London. Prefacing the notes is a summary of Imperial College’s key findings based on comments made, which will be drawn out further in the final report for ‘The Operator’s Story’. Method This content is a collation in note form of views expressed in the interviews that were conducted for this study. Comments are not attributed to specific individuals, as agreed with the interviewees and BEM. Acronyms BTS is the Bangkok Mass Transit System, also known as Skytrain. The project sponsor is Bangkok Metropolitan Administration (BMA) led by the City Government. A full BOT concession contract, with no Government funding was awarded. The International Finance Corporation was lead financier with KfW (Germany’s government-owned development bank).
    [Show full text]
  • Bangkok Mass Rapid Transit Project (Pink and Yellow Lines): Details Of
    Bangkok Mass Rapid Transit Project (Pink and Yellow Lines) (RRP THA 51274) DETAILS OF IMPLEMENTATION ARRANGEMENTS A. Regulatory Framework 1. The Mass Rapid Transit Authority of Thailand (MRTA), the State Railway of Thailand, and the Bangkok Metropolitan Administration are three government entities involved in preparing, implementing, and operating mass rapid transit (MRT) projects in Thailand. The MRTA is considered the lead agency in developing and implementing MRT projects. 2. The MRT Pink Line and Yellow Line are being developed as a public–private partnership net cost scheme,1 under which the MRTA is responsible for providing the land and the right of way while the concessionaire invests in civil works, mechanical and equipment systems, and rolling stock, including operation and maintenance services. The project is implemented on a build–transfer–operate basis, under which the concessionaire is obliged to transfer the ownership of the project to the MRTA when the MRTA issues commissioning certificates, and the MRTA will give the concessionaire the right to operate and receive revenues from the project. The concession period is 33 years and 3 months, comprising 3 years and 3 months for the construction period and 30 years for the operation period. B. Management 3. While the tender process was undertaken independently for the MRT Pink Line and Yellow Line, the BSR Joint Venture (BSR) won the concession for both lines. BSR established two special-purpose companies—the Northern Bangkok Monorail Company Limited (NBM) and the Eastern Bangkok Monorail Company Limited (EBM)—in which BTS Group Holdings Public Company Limited (BTS Group) holds 75% of the shares of each company, Sino-Thai Engineering and Construction Public Company Limited (STECON) holds 15% of the shares, and Ratchaburi Electricity Generating Holding Public Company Limited (RATCH) hold 10% of the shares.
    [Show full text]