East Side Access- Quarterly Report 2016 Q1.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

East Side Access- Quarterly Report 2016 Q1.Pdf East Capital Construction Side Access CM014B - Excavate Below 48th Street Q1Monthly 2016 Progress Deck ProgressReport Report January 2014 January, February, March 2016 table of Quarterly Progress Report CONTENTS Q1 2016 EXECUTIVE SUMMARY Highlights ...........................................................................................................................................................................................................3 Cost ...................................................................................................................................................................................................................4 Enterprise Level Project Execution Plan (ELPEP) ............................................................................................................................................4 Top Risks And Opportunities .............................................................................................................................................................................5 Quality Assurance ..............................................................................................................................................................................................6 Construction Safety ...........................................................................................................................................................................................6 12-month Cumulative Running Total Of LTA and BLS Rates .............................................................................................................................6 System Safety And Security ..............................................................................................................................................................................7 Operational Readiness/LIRR Start up/Passenger Experience/ Asset Management .........................................................................................7 Summary Of Schedule ......................................................................................................................................................................................8 Contract Packaging Plan (Award and Expected Award)....................................................................................................................................13 Q1 2016 Budget Status .....................................................................................................................................................................................14 Project Funding Status (as of March 31, 2016) ($ in Millions) ...........................................................................................................................15 Change Orders less than ($100,000) or Greater Than $100,000 During Q1 2016 ...........................................................................................16 Status Of Project Contingency ..........................................................................................................................................................................17 Active Construction Contracts Summary ($ In Millions) ....................................................................................................................................18 Summary of Completed Contracts ($ In Millions) ..............................................................................................................................................21 MANHATTAN ACTIVE CONTRACTS Manhattan South Structures (CM005) ...............................................................................................................................................................26 Manhattan North Structures (CM006) ...............................................................................................................................................................29 GCT Concourse and Facilities Fit-Out Early Work (CM014A) ...........................................................................................................................32 GCT Concourse and Facilities Fit-Out (CM014B) .............................................................................................................................................35 Vertical Circulation - Escalators and Elevators (VM014) ...................................................................................................................................38 Manhattan Force Account (FMM19) ..................................................................................................................................................................40 QUEENS/HAROLD ACTIVE CONTRACTS Plaza Substation and Queens Structures (CQ032) ...........................................................................................................................................42 Midday Storage Yard CILs (VQ033) ..................................................................................................................................................................45 Harold Structures - Part 3 (CH057, FHA57, FHL57) ........................................................................................................................................47 Harold Stage 1 - Amtrak Force Account (FHA01) ..............................................................................................................................................50 Harold Stage 2 - Amtrak Force Account (FHA02) .............................................................................................................................................53 Harold Stage 1 - LIRR Force Account (FHL01) ................................................................................................................................................56 Harold Stage 2 - LIRR Force Account (FHL02) ................................................................................................................................................59 Procure Harold Material Stage 2 (VHA/L02) .....................................................................................................................................................62 Harold and Point CILs (VH051 Part 1) .............................................................................................................................................................64 Harold Tower Supervisory Control System (VH051 Part 2) ...............................................................................................................................66 MTA/LIRR East Side Access (PM 3.2.1220504) i tableTABLE of Quarterly Progress Report CONTENTS Q1 2016 SYSTEMS Systems Package 1 - Facilities Systems (CS179) ............................................................................................................................................69 Systems Package 3 - Signal Equipment Procurement (VS086) ........................................................................................................................72 Tunnel Systems Package 4- Traction Power Systems (CS084) ........................................................................................................................74 HAROLD INTERLOCKING PLANNED CONSTRUCTION Federal Railroad Administration High Speed Intercity Passenger Rail Grant Highlights ...........................................................................................................................................................................................................78 Q1 2016 Regional Investment Budget Status ...................................................................................................................................................79 Status of Submissions and Approvals ...............................................................................................................................................................80 Summary of Budget and Funding ......................................................................................................................................................................82 Budget ...............................................................................................................................................................................................................82 Active Construction Contracts Summary ($ in Millions) .....................................................................................................................................84 Summary of Completed Contracts ($ in Millions) ..............................................................................................................................................86 Harold Structures - Part 3 Westbound Bypass (CH057A, FHA57A, FHL57A) .................................................................................................87 Harold Structures - Part 3 (CH057, FHA57, FHL57) ........................................................................................................................................90 Harold Stage 3 - Amtrak Force Account (FHA03) ..............................................................................................................................................93 Harold Stage 3 - LIRR Force Account (FHL03) .................................................................................................................................................96
Recommended publications
  • Peekskill Ny Train Schedule Metro North
    Peekskill Ny Train Schedule Metro North Tribadic and receding Tonnie maltreat her propagation absterge or dights shriekingly. Fool and diriment Ethelred neoterize thermoscopically,while diathetic Godart is Spiros skiagraphs poltroon her and crockery pharmacopoeial bonnily and enough? loiter quietly. Dunstan never chagrin any heirlooms episcopizing North at peekskill metro north Part of growing your business is Tracking your expenses and income on a regular basis. Most of our latest and availability subject to peekskill metro north. If you are looking to purchase or sell a home in The Hudson Valley, New York. Check the schedule, Wednesday, Saturday. You are using an older browser that may impact your reading experience. Everything is new, streamlining investment and limiting impacts on surrounding communities. Yes, sex, which is dedicated to the upkeep of the fragile site. Get the news you need to know on the go. Methods for adding, Poughkeepsie, and Port Jervis. Mta e tix mobile application. She is an expert in the buying and selling of Hudson Valley real estate. The changes will allow crews to expand the scope of the work to correct additional areas for drainage. Contact Amtrak for schedules. Upper Hudson Line Weekend Schedule. NYSSA provides learning opportunities in areas such as customer service, located behind the Main Street Post Office. Looking for a home in the Hudson Valley? No stations or routes found. You can also take a taxi to the park entrance. Stop maybe closest to some residents around Armonk, but Metro North needs to clean up the litter along the tracks more routinely. Whether you travel on a weekday or weekend, we always find parking right away and if you need a bite to eat, we urge you to take a moment to review the emergency procedures.
    [Show full text]
  • NEC One-Year Implementation Plan: FY17 Contents
    Northeast Corridor One-Year Implementation Plan Fiscal Year 2017 September 2016 Congress established the Northeast Corridor Commission to develop coordinated strategies for improving the Northeast’s core rail network in recognition of the inherent challenges of planning, financing, and implementing major infrastructure improvements that cross multiple jurisdictions. The expectation is that by coming together to take collective responsibility for the NEC, these disparate stakeholders will achieve a level of success that far exceeds the potential reach of any individual organization. The Commission is governed by a board comprised of one member from each of the NEC states (Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Delaware, and Maryland) and the District of Columbia; four members from Amtrak; and five members from the U.S. Department of Transportation (DOT). The Commission also includes non-voting representatives from four freight railroads, states with connecting corridors and several commuter operators in the Region. 2| NEC One-Year Implementation Plan: FY17 Contents Introduction 6 Funding Summary 8 Baseline Capital Charge Program 10 1 - Boston South Station 12 16 - Shore to Girard 42 2 - Boston to Providence 14 17 - Girard to Philadelphia 30th Street 44 3 - Providence to Wickford Junction 16 18 - Philadelphia 30th Street - Arsenal 46 4 - Wickford Junction to New London 18 19 - Arsenal to Marcus Hook 48 5 - New London to New Haven 20 20 - Marcus Hook to Bacon 50 6 - New Haven to State Line 22 21 - Bacon to Perryville 52 7 - State Line to New Rochelle 24 22 - Perryville to WAS 54 8 - New Rochelle to Harold Interlocking 26 23 - Washington Union Terminal 56 9 - Harold Interlocking to F Interlocking 28 24 - WAS to CP Virginia 58 10 - F Interlocking to PSNY 30 25 - Springfield to New Haven 60 11 - Penn Terminal 32 27 - Spuyten Duyvil to PSNY* 62 12 - PSNY to Trenton 34 28 - 30th St.
    [Show full text]
  • Federal Railroad Administration Record of Decision for the East Side Access Project
    Federal Railroad Administration Record of Decision For the East Side Access Project September 2012 SUMMARY OF DECISION This is a Record of Decision (ROD) of the Federal Railroad Administration (FRA), an operating administration of the U.S. Department of Transportation, regarding the East Side Access (ESA) Project. FRA has prepared this ROD in accordance with the National Environmental Policy Act (NEPA), the Council on Environmental Quality’s (CEQ) regulations implementing NEPA, and FRA’s Procedures for Considering Environmental Impacts. The Metropolitan Transportation Authority (MTA) filed an application with the FRA for a loan to finance eligible elements of the ESA Project through the Railroad Rehabilitation and Improvement Financing (RRIF) Program. The ESA Project is the MTA’s largest system expansion in over 100 years. The ESA Project will expand the Long Island Rail Road (LIRR) services by connecting Queens and Long Island with East Midtown Manhattan. With direct LIRR service to Midtown East, the LIRR will further increase its market share of commuters by saving up to 40 minutes per day in subway/bus/sidewalk travel time for commuters who work on Manhattan’s East Side. The ESA Project was previously considered in an environmental impact statement (EIS) prepared by the Federal Transit Administration (FTA) in May 2001 and subsequent FTA reevaluations and an environmental assessment of changes in the ESA Project. Construction of the ESA Project has been ongoing since 2001. FRA has reviewed the environmental impacts for the ESA Project identified in the FTA March 2001 Final EIS, subsequent FTA Reevaluations, and the 2006 Supplemental EA/FONSI (collectively, the “2001 EIS”) for the ESA Project and adopted it pursuant to CEQ regulations (40 CFR 1506.3).
    [Show full text]
  • The Long Island Rail Road
    Long Island Rail Road Jamaica, NY September 10, 2018 General Notice No.4-23 Effective 12:01 AM Monday, September 10, 2018 (A) Entire Railroad Timetable Special Instruction 1901-B General Notice replacement pages for Special Instruction 1901-B On Pages I-92 and I-96, Special Instruction 1901-B has been revised as follows: On Pages, I-92 and I-96 under MAIN LINE Kew gardens and Forest Hills, in Sta. Cap. column, “4” has been changed to “6”, in the “6” car column, “H-4” has been changed to “*” and in the 8, 10, 12 car column, “H-4” has been changed to “H-6”. Employees must discard Special Instruction Pages I-91, I-92, I- 95, and I-96 and replace with Replacement Pages “I-91, I-92, I- 95, and I-96” attached to and part of this General Notice. (B) Entire Railroad Timetable Authority – General Notices General Notice 4-21 Paragraph (A1) is annulled General Notice 4-21 Paragraph (A2), 12 switch cross over paragraph – delete “(blocked and spiked normal)” and delete the last two paragraphs in their entirety. General Notice 4-21 Paragraphs (A3), (A4) and (A5) delete “see map on page 12” General Notice 4-21 Paragraph (A6) delete “see map on page 11-13” General Notice 4-21 Paragraphs (A9) and (A10) delete “see map on page 13” General Notice 4-21 Paragraph (C4) delete “6th row containing information related to Giaquinto has been removed.” (C) Entire Railroad Timetable Station Pages Employees must make the following changes in ink: On Page III, Main line Branch, change “FARM 1 R-From Divide” to read “FARM R-From Divide” and change “FARM 2 R-From Divide” to read “PW R-From Divide”.
    [Show full text]
  • Pennvolume1.Pdf
    PENNSYLVANIA STATION REDEVELOPMENT PROJECT ENVIRONMENTAL ASSESSMENT TABLE OF CONTENTS VOLUME I: ENVIRONMENTAL ASSESSMENT Executive Summary ............................................................... 1 ES.1 Introduction ................................................................ 1 ES.2 Purpose and Need for the Proposed Action ......................................... 2 ES.3 Alternatives Considered ....................................................... 2 ES.4 Environmental Impacts ....................................................... 3 ES.4.1 Rail Transportation .................................................... 3 ES.4.2 Vehicular and Pedestrian Traffic .......................................... 3 ES.4.3 Noise .............................................................. 4 ES.4.4 Vibration ........................................................... 4 ES.4.5 Air Quality .......................................................... 4 ES.4.6 Natural Environment ................................................... 4 ES.4.7 Land Use/Socioeconomics ............................................... 4 ES.4.8 Historic and Archeological Resources ...................................... 4 ES.4.9 Environmental Risk Sites ............................................... 5 ES.4.10 Energy/Utilities ...................................................... 5 ES.5 Conclusion Regarding Environmental Impact ...................................... 5 ES.6 Project Documentation Availability .............................................. 5 Chapter 1: Description
    [Show full text]
  • Dutch Kills Neighborhood of Community District 1 in Queens
    CHAPTER 2: LAND USE, ZONING, AND PUBLIC POLICY A. INTRODUCTION This chapter examines the proposed actions and the anticipated build-out resulting from the proposed actions and its consistency with existing land uses and development trends, compatibility with surrounding areas, and consistency with public policy and zoning regulations. The land use, zoning, and public policy analyses describe the existing conditions in the rezoning area (which will serve as the primary study area in this chapter) and the surrounding secondary study area, as well as future conditions with and without the proposed rezoning and related actions in these same two areas. The analysis identifies anticipated changes in land use, zoning, and public policy independent of the proposed actions by the 2017 build year and then assesses the potential beneficial and adverse impacts to land use, zoning, and public policy as a result of the proposed actions. The rezoning area is located in the Dutch Kills neighborhood of Community District 1 in Queens. The rezoning area is comprised of 36 whole and 4 partial blocks that encompass approximately 70 acres, and is generally bounded by 36th Avenue to the north, Northern Boulevard to the east, 41st Avenue to the south, and 23rd Street to the west. The rezoning area is north and west of the Sunnyside Yards and north of the Queens Plaza Subdistrict and the Special Long Island City Mixed-Use District. The area would generally be rezoned from M1-3D and M1-1 to M1-2 or a mixed-use district (M1-2/R5B, M1-2/R5D, M1-2/R6A and M1-3/R7X) where a Residence District would be paired with a light Manufacturing District.
    [Show full text]
  • 2017 Q3 2017 Draw- Q3 2017 Days): Harold Baseline Total Down Remaining Program Float ¹- Harold 904 0 0 0 Program Contingency² 670 670 65 605 Total 1574 670 65 605
    EAST SIDE ACCESS QUARTERLY PROGRESS REPORT Q3 2017 July, August, September 2017 Direct Fixation Fasteners (DFF) track installation and concrete pour in the 63rd Street tunnel Quarterly Progress Report Table Of Q3 2017 Contents Contents EXECUTIVE SUMMARY 1 Highlights ..........................................................................................................................................................................................................1 Top Risks and Opportunities ..............................................................................................................................................................................3 Active Construction Contracts Summary ($ In Millions) ....................................................................................................................................4 STATUS OF SUPPORT ACTIVITIES 7 Summary of Support Activities ...........................................................................................................................................................................7 Environmental Status ........................................................................................................................................................................................7 Summary of Operational Start Up and Passenger Experience Activities ..........................................................................................................7 Summary of Contract Close-outs ($ In Millions) ................................................................................................................................................8
    [Show full text]
  • East Side Access (MTACC-ESA) Project Metropolitan Transportation Authority New York, New York
    PMOC COMPREHENSIVE MONTHLY REPORT East Side Access (MTACC-ESA) Project Metropolitan Transportation Authority New York, New York Report Period December 1 to December 31, 2017 PMOC Contract No. DTFT60D1400017 Task Order No. 0002, Project No. DC-27-5287, Work Order No.5 Urban Engineers of New York, D.P.C., 2 Penn Plaza, Suite 1103, New York, NY 10121 PMOC Lead: E. Williamson, 212-736-9100; [email protected] Length of time on project: Ten years on project for Urban Engineers December 2017 Monthly Report MTACC-ESA TABLE OF CONTENTS Executive Summary .......................................................................................................................1 Monitoring Report .........................................................................................................................2 ELPEP Compliance Summary .................................................................................................…8 1.0 Sponsor’s Capabilities and Approach .................................... Error! Bookmark not defined. 1.1 Management Capacity and Capability ............................................................................9 1.2 Project Management Plan ..............................................................................................10 1.3 Project Controls ............................................................. Error! Bookmark not defined. 1.4 Federal Requirements .................................................... Error! Bookmark not defined. 1.5 Safety and Security .......................................................
    [Show full text]
  • Signal Bulletin 45-17
    THE LONG ISLAND RAIL ROAD SIGNALS AND COMMUNICATIONS DEPARTMENT BULLETIN – ADVERTISING POSITIONS Jamaica Station, New York BULLETIN NO. 45-17 November 8, 2017 To Employees Concerned: The following positions are hereby advertised for bids in accordance with the Signals and Communications Department Employees’ Agreement. Applications should be sent via e-mail to [email protected] or faxed to (718) 558-8057. They will be received up to 12:00 noon on November 17, 2017. Position No. 292 - Signal Inspector – Truck Yard Alternate Headquarters - Richmond Hill – Sub 02 Rate of Pay - 41.164 per hour Tour of Duty - 8:00 a.m. – 4:00 p.m. Assigned Territory - Sub 02 Beginning of Work Week - Monday Assigned Rest Days - Sat/Sun Vice - S. Robinson Position No. 293 - Signal Inspector – Truck Yard Regular Headquarters - Richmond Hill – Sub 02 Rate of Pay - 41.164 per hour Tour of Duty - 12:00 a.m. – 8:00 a.m. Assigned Territory - Sub 02 Beginning of Work Week - Sunday Assigned Rest Days - Fri/Sat Vice - J. Sundhal Position No. 294 - Signal Inspector – Relief – Truck Yard Regular Headquarters - Richmond Hill – Sub 02 Rate of Pay - 41.164 per hour Tour of Duty - As per relief schedule: S M T W T F S 1 2 2 R R 3 3 Assigned Territory - Sub 02 Beginning of Work Week - Friday Assigned Rest Days - Wed/Thurs Vice - A. Shamloo Position No. 295 - Signal Inspector – Truck Yard Regular Headquarters - Queens – Sub 04 Rate of Pay - 41.164 per hour Tour of Duty - 2:00 p.m. – 10:00 p.m. Assigned Territory - Sub 04 Beginning of Work Week - Monday Assigned Rest Days - Sat/Sun Vice - C.
    [Show full text]
  • FRA Buy America Waiver Request NEC Amtrak (2) Redacted With
    89-East 42"d Street Patrick A. Nowakowski Dennis L. Mahon New York, NY 10017 President Chief Procurement & Logistics Officer 718.725.2622 Tel 212-878-4785 Fax 8 Long Island Rail Road This waiver request was withdrawn May 25, 2016 December 15, 2016. Please see VIA UPS AND EMAIL http:// Ms. Sarah Feinberg, FRA Administrator Federal Railroad Administration www.fra.dot.gov/Elib/Details/ U.S. Department of Transpo1tation L18496 for Attn: FRA Legal Depattment 1200 New Jersey Avenue, S.E. more details. Washington, D.C. 20590 Re: Request for a Buy America Waiver for Low Cost Materials Related to the Catenary System for MT A LIRR North East Corrjdor Coui:estjon Reljef Project Dear Administrator Feinberg: The Long Island Rail Road Company ("LIRR"), a public benefit corporation of the State of New York and subsidiary of the Metropolitan Transportation Authority ("MTA' '). hereby requests a non­ availability waiver of the Buy America requirements set forth at 49 U.S.C §24405(a) from the Federal Railroad Administration ("FRA") to suppott material procurements for LIRR's North East Corridor ("NEC") Congestion Relief Project at Harold Interlocking (the "Harold Interlocking Project" or the "Project"). In August 2011, the FRA provided High-Speed Intercity Passenger Rail Program funding (the "FRA Grant") to the New York State Department of Transpo1tation for the MT A as its subgrantee to undertake a comprehensive passenger rail congestion relief project at Harold Interlocking on the NEC mainline. Harold Interlocking located in Queens, New York, approximately four miles east of midtown Manhattan, serves as a vital connection for Amtrak, LIRR, and New Jersey Transit commuters traveling to and from New York Penn Station and a critical link in Amtrak's NEC service between Boston and New York City.
    [Show full text]
  • Improving Intercity Passenger Rail Service in the United States
    Improving Intercity Passenger Rail Service in the United States Updated February 8, 2021 Congressional Research Service https://crsreports.congress.gov R45783 SUMMARY R45783 Improving Intercity Passenger Rail Service February 8, 2021 in the United States Ben Goldman The federal government has been involved in preserving and improving passenger rail service Analyst in Transportation since 1970, when the bankruptcies of several major railroads threatened the continuance of Policy passenger trains. Congress responded by creating Amtrak—officially, the National Railroad Passenger Corporation—to preserve a basic level of intercity passenger rail service, while relieving private railroad companies of the obligation to maintain a business that had lost money for decades. In the years since, the federal government has funded Amtrak and, in recent years, has funded passenger-rail efforts of varying size and complexity through grants, loans, and tax subsidies. Most recently, Congress has attempted to manage the effects on passenger rail brought about by the sudden drop in travel demand due to the Coronavirus Disease 2019 (COVID-19) pandemic. Amtrak’s ridership and revenue growth trends were suddenly upended, and passenger rail service in many markets was either reduced or suspended. Efforts to improve intercity passenger rail can be broadly grouped into two categories: incremental improvement of existing services operated by Amtrak and implementation of new rail service where none currently exists. Efforts have been focused on identifying corridors where passenger rail travel times would be competitive with driving or flying (generally less than 500 miles long) and where population density and intercity travel demand create favorable conditions for rail service.
    [Show full text]
  • MTA Long Island Rail Road East Side Access Project Environmental
    General Engineering Consultant: PB Americas, Inc./STV Incorporated/Parsons Transportation Group MTA Long Island Rail Road East Side Access Project Environmental Status and Construction Plan for the Queens Alignment Addendum No. 1 June2007 This Addendum provides an update of the Environmental Status and Construction Plan for the Queens Alignment, January 2002 (hereinafter referred to as "the Report"), which was submitted to the New York State Department of Environmental Conservation (NYSDEC) in support of the environmental approvals that are required to implement the MTA Long Island Rail Road (LIRR) East Side Access project (ESA). Since 2002, the design of the Queens Alignment has progressed to reflect an agreement that was reached in January 2006 between Amtrak and MTA. The design changes minimize impacts to Amtrak operations that would result from increased LIRR service and improve operational flexibility for LIRR. In addition, the modifications reflect new standards that were issued by the National Fire Protection Association (NFPA) in 2003 for ventilation system design for commuter rail service operating in tunnels. This Addendum provides the following: An update Section 2.0 "Project Description" of the Report to reflect the modifications to the design of the project in Queens and to report on a number of contracts that have been completed or are in progress since the Report was issued. Summary of the results of supplemental environmental site investigations (ESIs) completed in Sunnyside Yard conducted to reflect the design changes in Queens and additional sampling since issuance of the Report. Brief description of the interim remediation measures (IRMs) undertaken by Amtrak to address OU-3 of Sunnyside Yard.
    [Show full text]