PROJECT SHEET PEEL PORTS MAINTENANCE DREDGING LIVERPOOL, , HEYSHAM & CLYDEPORT, UK

FEATURES

Project Name Peel Ports Maintenance Dredging

Client Peel Ports

Contractor Boskalis Westminster Ltd

Location Liverpool, Manchester, Heysham, & Clydeport, UK PROJECT DESCRIPTION Execution period 2010 -2014

For the Peel Ports Term Maintenance Contract, Boskalis Westminster Limited (BWL) provided maintenance dredging services for all of the Peel Ports facilities in the Northwest of England and Scotland. This entailed the surveying and dredging of the (MSC) from the approaches to Eastham Locks to Trafford Road Bridge in Manchester Docks including Queen Elizabeth Oil Dock; Liverpool Approach Channel and Docks; Heysham Approach Channel, Harbour Entrance and inner Harbour; River Clyde from Greenock to Glasgow.

Originally a three year contract with an option for A another two, this contract was developed by Peel Ports in conjunction with BWL as a follow on from A Location map the previous two ten-year Term contracts executed by B TSHD 'Mersey' at BWL for the maintenance dredging of the Manchester Ship Canal, long term maintenance C 'Shoalway' on the Clyde operations in Heysham and on the Clyde as a result 2010 campaign of Peel Ports taking ownership of Mersey Dock and Harbour Company (MDHC).

While originally designed to be campaign based the contract was developed to better suit the client’s B individual port requirements with more reliance on BWL’s knowledge of the individual ports such as MSC and Heysham; a continued campaign based strategy for Clydeport and Liverpool Approach Channel and targeted maintenance dredging based on Peel Ports’ marketing requirements and priorities for Liverpool Docks.

The vessels were deployed as and when required to suit the operational needs of each individual port. Operational information, knowledge and experience gained through the historical contracts was utilised to maximise production.

C PEEL PORTS MAINTENANCE DREDGING LIVERPOOL, MANCHESTER, HEYSHAM & CLYDEPORT, UK

CHALLENGES • trialling WID in various ports along with maintaining the required plough Boskalis Westminster has executed the maintenance capacity. dredging requirements for Peel Ports on the Manchester Ship Canal for more than 20 years, In addition to this there were requests by Peel Ports and/or their subsidiaries however, a fundamental change in the requirement for works outside of the maintenance contract, all of which had to be and execution philosophy of Peel Ports came about coordinated to ensure that the main contract requirements were met. with the acquisition of MDHC and their desire to have an all ports solution for their dredging requirements. VALUE We believe our extensive knowledge of both work scope and client along This generated challenges such as: with extensive and specific knowledge of all of the working areas has • coordinating ad hoc requirements in Liverpool significantly added value. Immediate efficiencies have been made in both the Docks with planned campaigns elsewhere administration and physical execution of the works. The extension of the • coordinating the varying sized vessels e.g. original contract through negotiation and further projects awarded to BWL by Shoalway/Causeway for Liverpool Approach the client during the course of this contract shows their belief in the value of Channel and Clydeport or Mersey/ Sospan Dau our continued relationship. for MSC and Heysham, to meet the requirements of the different ports and dredge areas