Performance Based Navigation Implementation (2017- 19)

Total Page:16

File Type:pdf, Size:1020Kb

Performance Based Navigation Implementation (2017- 19) PERFORMANCE BASED NAVIGATION IMPLEMENTATION (2017- 19) PLAN VERSION : 3.0 DATE OF IMPLEMENTATION : 15-08-2017 OFFICE OF PRIME INTEREST : OPERATIONS DIRECTORATE (ANS DIVISION) 15/08/2017 PLN-001-OPAT-3.0 PERFORMANCE BASED NAVIGATION IMPLEMENTATION (2017-19) NAME DESIGNATION SIGNATURE Sr. Joint Director MUHAMMAD PREPARED BY Airspace & PBN / ASLAM AWAN ICAO Actg. AdlD REVIEWED BY ARIF MUMTAZ Flight Procedure Design LIAQUAT ALI Director Operations SHAHZAD VERIFIED BY A/Cdr SYED NASIR Director SQMS / MR RAZA HAMDANI Air Marshal (R) Director General APPROVED BY ASIM SULEIMAN Pakistan Civil Aviation Authority TYPE PLAN (PLN) OF DOCUMENT STATUS CONTROLLED OF DOCUMENT 15/08/2017 PLN-001-OPAT-3.0 PERFORMANCE BASED NAVIGATION IMPLEMENTATION (2017-19) 15/08/2017 PLN-001-OPAT-3.0 PERFORMANCE BASED NAVIGATION IMPLEMENTATION (2017-19) RECORDS OF AMENDMENTS AND CORRIGENDA AMENDMENTS CORRIGENDA Date Date Date Entered No Entered by No. Date of Issue Applicable Entered Entered by 15/08/2017 i PLN-001-OPAT-3.0 PERFORMANCE BASED NAVIGATION IMPLEMENTATION (2017-19) EXECUTIVE SUMMARY Performance Based Navigation (PBN) has promising potential for efficient, reliable air navigation and utilization of airspace. The PBN concept links the Area Navigation application to Oceanic, Continental En route, Terminal Area, and Approach navigation specifications and supporting technologies and ensures worldwide harmonization of Area Navigation. Application of these technologies enhances airspace capacity in line with the projected aviation demand, ensuring fuel saving and reduced environmental impact. ICAO Assembly vide resolution A36/23 and A37/11 urged member States to implement PBN (RNAV and RNP) for all phases of flight in accordance with the ICAO PBN concept laid down in the Performance Based Navigation Manual (Doc 9613). APANPIRG/18 and 44th DGCA Conference also fully supported the ICAO PBN program. Pakistan is a signatory to the Chicago convention and is accredited to ICAO Asia/Pacific Regional Office. The first version of Performance Based Navigation Implementation Plan (Roadmap) was developed in May 2009 in compliance to initiatives of APANPIRG, DGCA Conference and ICAO Assembly and was subsequently reviewed in 2012. The PBN Roadmap provided phased strategy for PBN implementation which encompasses instrument approaches, Standard Instrument Departures (SID), Standard Terminal Arrival (STAR) operations and enroute operations in line with Regional PBN Implementation Plan. Pakistan has shown good progress during the medium term ending by 2016. About 90% of the planned work on PBN (GNSS) Instrument Approach Procedures for instrument runway ends have been completed / implemented. Work on en-route phase is also in progress and almost all major air traffic flow routes supporting air traffic flow between Europe and Asia have been transformed to PBN routes based on RNAV10 and RNAV5 PBN specifications. The revised PBN Plan (Ver.3.0) encompasses Pakistan’s actions to accomplish targets for strategic objectives for the triennium 2017 – 2019 and beyond. The PBN implementation plan is also intended to assist aviation stakeholders i.e. airline operators, general aviators and regulators in understanding the application PBN for meeting operational goals with the focus on addressing future efficiency and capacity needs while improving the safety of flight operations and reducing environmental impacts (LIAQUAT ALI SHAHZAD) Director Operations Dated: _______________2017 15/08/2017 ii PLN-001-OPAT-3.0 PERFORMANCE BASED NAVIGATION IMPLEMENTATION (2017-19) Contents RECORDS OF AMENDMENTS AND CORRIGENDA ............................................................................................... i EXECUTIVE SUMMARY ..................................................................................................................................... ii GLOSSARY OF TERMS AND ABBREVIATIONS/ACRONYMS .......................................................... V CHAPTER 1 ......................................................................................................................................... 1-1 OVERVIEW .......................................................................................................................................... 1-1 1.1 BACKGROUND ................................................................................................................................... 1-1 1.2 PURPOSE ........................................................................................................................................... 1-1 1.3 STRATEGIC OBJECTIVES ..................................................................................................................... 1-1 1.4 ASSUMPTIONS: ................................................................................................................................. 1-2 CHAPTER 2 ......................................................................................................................................... 2-1 PERFORMANCE BASED NAVIGATION ............................................................................................ 2-1 2.1 PBN CONCEPT .................................................................................................................................... 2-1 2.2 BENEFITS OF PBN IMPLEMENTATION ................................................................................................ 2-1 2.3 PBN IMPLEMENTATION - CURRENT STATUS ...................................................................................... 2-2 2.4 AIRCRAFT FLEET CAPABILITIES ........................................................................................................... 2-3 2.5 STATE CNS/ATM CAPABILITIES .......................................................................................................... 2-4 2.6 APPLICABLE PBN NAVIGATION SPECIFICATIONS ................................................................................ 2-4 CHAPTER 3 ......................................................................................................................................... 3-1 IMPLEMENTATION CONSIDERATIONS ........................................................................................... 3-1 3.1 SAFETY .............................................................................................................................................. 3-1 3.2 AIRCRAFT OPERATIONS ..................................................................................................................... 3-1 3.3 INFRASTRUCTURE .............................................................................................................................. 3-1 3.4 EFFICIENCY AND CAPACITY ................................................................................................................ 3-2 3.5 ENVIRONMENT (NOISE AND EMISSIONS) .......................................................................................... 3-2 3.6 REGULATORY ..................................................................................................................................... 3-3 3.7 RESOURCES ....................................................................................................................................... 3-4 3.8 AIR NAVIGATION SERVICE PROVIDER (ANSP) .................................................................................... 3-4 CHAPTER 4 ......................................................................................................................................... 4-1 IMPLEMENTATION TARGETS........................................................................................................... 4-1 4.1 GENERAL ........................................................................................................................................... 4-1 4.2 SHORT TERM (2017) .......................................................................................................................... 4-1 4.3 MEDIUM TERM (2018-19) .................................................................................................................. 4-1 4.4 LONG TERM (2020 & BEYOND) .......................................................................................................... 4-1 CHAPTER 5 ......................................................................................................................................... 5-1 PLAN COORDINATION ...................................................................................................................... 5-1 5.1 COORDINATION AND CONSULTATION ............................................................................................... 5-1 5.2 PLAN RESPONSIBILITY ....................................................................................................................... 5-1 5.3 PLAN REVIEW .................................................................................................................................... 5-1 5.4 STAKEHOLDER COMMITMENT ........................................................................................................... 5-1 CHAPTER 6 ......................................................................................................................................... 6-1 SAFETY ............................................................................................................................................... 6-1 6.1 PRELIMINARY SAFETY ASSESSMENT .................................................................................................
Recommended publications
  • Annual Procurement Plan FY 2019-20
    ANNUAL PROCUREMENT PLAN FY 2019- 20: PAKISTAN CIVIL AVIATION AUTHORITY Procurement of Goods & Services Tentative Estimated Tentative Date of Tentative Cost Procurement Date of Remarks S# Name of Procurement (Description) Procurement Date of (PKR in Method Award of (If any) Notice Completion Mil) Contract Publication Procurement Agency: Logistics (APS) HQ CAA, Karachi Open Competitive 1 Revamping of LAN & WiFi Infrastructure of JIAP 35 Jan, 2020 Feb, 2020 Jul, 2020 Bidding Procurement of various softwares (i.e. NMS, MS- Open Competitive 2 Exchange, MS-Office, Operating System, Auto 14 Sep, 2019 Oct, 2019 Jan, 2020 Bidding CAD, 3D Max & etc) Procurement of computer equipment (i.e. Desktop / Open Competitive 3 35 Aug, 2019 Oct, 2019 Jan, 2020 VDI, Laptop, Printers, Scanners and Desktop UPS Bidding Electronics Document Management System for HR Open Competitive 4 30 Sep, 2019 Nov, 2019 Jun, 2020 & other section of CAA Bidding Open Competitive 5 Up-gradation / enhancement of Enterprise Storage 10 Urgent Sep, 2019 Dec, 2019 Bidding Open Competitive 6 Establishment of Primary Data Centre at HQCAA 150 Aug, 2019 Sep, 2019 Jan, 2020 Bidding Open Competitive 7 Procurement of Fire & Safety Equipment 8 Aug, 2019 Nov, 2019 Mar, 2020 Bidding Open Competitive 8 Procurement of Rescue Equipment 3 Sep, 2019 Dec, 2019 Apr, 2020 Bidding Procurement of Misc. facilitation and E/M Open Competitive 9 20 Aug, 2019 Oct, 2019 Jun, 2020 equipment Bidding Replacement of Split & Window type Air Open Competitive 10 2 Aug, 2019 Oct, 2019 Jun, 2020 Conditioners for CAA
    [Show full text]
  • Pakistan Civil Aviation Authority Multan International Airport
    Pakistan Civil Aviation Authority Multan International Airport Internship Report Submitted To: Mr. Tariq Mehmood Gill (Airport Manager) 15 INSTITUTE OF SOUTHERN PUNJAB, MULTAN Department of Business Administration Supervisor : Sir Farhan Gillani Submitted by : Marium Zahid Student of BBA (Hon’s) Reg. No : BBA-013R11-25 Session : Oct Fall-2011 Specialization : Finance Page | ii Abstract By definition “Internship is a working program arranged for gaining experience.” After completion of the 8th semester the students of the Department of Business administration of ISP are required to undertake training in an organization selected by them, for a period of 8 weeks. The benefits of internship are: 1. Internships will provide students the opportunity to test their interest in a particular career before permanent commitments are made. 2. Internship students will develop skills in the application of theory to practical work situations. 3. Internships will provide students the opportunity to test their aptitude for a particular career before permanent commitments are made. 4. Internship students will develop skills and techniques directly applicable to their careers. 5. Internships will aid students in adjusting from college to full-time employment. 6. Internships will provide students the opportunity to develop attitudes conducive to effective interpersonal relationships. 7. Internships will increase a student's sense of responsibility. 8. Internship students will be prepared to enter into full-time employment in their area of specialization upon graduation. Page | iii ACKNOWLEDGEMENT In the Name of Allah, the Most Beneficent, the Most Merciful! I would like to thank other officials ,Superintendent and all the concerned staff who were so cooperative in completing my internship and also provide all necessary information about polices and procedure of finance Management of Pakistan Civil Aviation Authority.
    [Show full text]
  • Flight Plan Package
    FLIGHT PLAN PACKAGE PIA 788 LHR-LHE 02SEP12 FLT PLAN ID 92011103 FTPRLS 92011103 ------------------------------------------------------------------- DISPATCH RELEASE MESSAGE -------------------------------------------------------------------- BAY NO:........ CORD:................ PK:788 CAPTAIN: SECTOR:LHR-LHE REG:APBID SDEP: 16:00 SARR: 23:40 BLK-TIME: 07:40 FLT-TIME: 06.56 TTL.FUEL: 74400 TRIP: 56344 FOD: 16856 HOLD: 3168 ALT: 10870 EST.TOGW: 297615 EST.LGWT: 241271 RESERVE FUEL: 14038 EST.ZFW: 224500 RVD.ZFW: ......... ------------------------------------------------------------------- ------------------------------------------------------------------- ------------------------------------------------------------------- ------------------------------------------------------------------- MINIMUM EQUIPMENT LIST ITEMS APPLICABLE FOR THIS AIRCRAFT --------------------------------------------------------- FOR C/F SNAGS MENTIONED IN TECH LOG, PLZ REF. MEL/CDL/DDG ------------------------------------------------------------------- F.O.O. NOTES TO CREW ------------------------ PREFERRED EN-ROUTE ALTERNATE AIRPORT EGLL EHAM EBBR EDDF EDDB EPWA LKPR LHBP UKBB UKOO UGTB UBBB UTAA OIMM UTSB UTSS UTDD UTSS OAKB OPRN OPLA CUT CHANNEL FREQ AT LHR 131.425 MHZ CALL SIGN DANATA ------------------------------------------------------------------- ROUTE AND PROFILE ----------------- EGLL BPK6J BPK M185 CLN UL620 ARNEM UP147 RKN UL980 SUI L980 USTIL UL980 TAMAK A87 AKT B363 NAKUK B198 BUPOR A107 GR A466 AMDAR M875 SITAX A466 HARPA ZARAF ZARA1A OPLA 310 ROBEG
    [Show full text]
  • Technical Standards Tentative Safety Oversight Audit/Inspection Plan 2020 Plan
    TECHNICAL STANDARDS TENTATIVE SAFETY OVERSIGHT AUDIT/INSPECTION PLAN 2020 PLAN VERSION : 4.0 DATE OF IMPLEMENTATION : 01-01-2020 OFFICE OF PRIME INTEREST : TECHNICAL STANDARDS BRANCH, AAR DIRECTORATE 01/01/2020 PLN-004-ARTS-4.0 TECHNICAL STANDARDS SAFETY OVERSIGHT AUDIT/INSPECTION PLAN (2020) NAME DESIGNATION SIGNATURE Assistant Director SOHAIL AHMED Tech. Standards (Com-Ops) Sr. Joint Director ENGR. ASIF PREPARED BY Tech. Standards MAHMOOD AKHTAR (Surveillance) Sr. Joint Director ENGR. SYED IRFAN Tech. Standards HAIDER GERDEZI (Navigational Aids) Additional Director ENGR. ZULFIQAR ALI REVIEWED BY Technical Standards MIRANI Branch Additional Director VERIFIED BY HASSAN MUJAHID SQMS (APS/ANS) Actg. Director APPROVED BY JAVED AZIZ FAROOQI Airspace and Aerodrome Regulations TYPE OF PLAN (PLN) DOCUMENT STATUS OF CONTROLLED DOCUMENT 01/01/2020 PLN-004-ARTS-4.0 TECHNICAL STANDARDS SAFETY OVERSIGHT AUDIT/INSPECTION PLAN (2020) 1. PURPOSE: The purpose of this document is to issue a tentative plan for Annual Safety Oversight Audit (SOA) / Inspection of Service Providers of Communication, Navigation and Surveillance (CNS) systems & Communications Operations in accordance with ANO-001-ARTS and CNS Inspectors Handbook (MNL-001-ARTS). 2. SCOPE: The Technical Standards (TS) Tentative Safety Oversight Audit / Inspection Plan is applicable, as per Para-4 and 10, to all airports/locations providing CNS & Com-Ops services. 3. OBJECTIVE OF SAFETY OVERSIGHT AUDIT / INSPECTION: 3.1 The objective of safety oversight audit / inspection is to assess compliance
    [Show full text]
  • KODY LOTNISK ICAO Niniejsze Zestawienie Zawiera 8372 Kody Lotnisk
    KODY LOTNISK ICAO Niniejsze zestawienie zawiera 8372 kody lotnisk. Zestawienie uszeregowano: Kod ICAO = Nazwa portu lotniczego = Lokalizacja portu lotniczego AGAF=Afutara Airport=Afutara AGAR=Ulawa Airport=Arona, Ulawa Island AGAT=Uru Harbour=Atoifi, Malaita AGBA=Barakoma Airport=Barakoma AGBT=Batuna Airport=Batuna AGEV=Geva Airport=Geva AGGA=Auki Airport=Auki AGGB=Bellona/Anua Airport=Bellona/Anua AGGC=Choiseul Bay Airport=Choiseul Bay, Taro Island AGGD=Mbambanakira Airport=Mbambanakira AGGE=Balalae Airport=Shortland Island AGGF=Fera/Maringe Airport=Fera Island, Santa Isabel Island AGGG=Honiara FIR=Honiara, Guadalcanal AGGH=Honiara International Airport=Honiara, Guadalcanal AGGI=Babanakira Airport=Babanakira AGGJ=Avu Avu Airport=Avu Avu AGGK=Kirakira Airport=Kirakira AGGL=Santa Cruz/Graciosa Bay/Luova Airport=Santa Cruz/Graciosa Bay/Luova, Santa Cruz Island AGGM=Munda Airport=Munda, New Georgia Island AGGN=Nusatupe Airport=Gizo Island AGGO=Mono Airport=Mono Island AGGP=Marau Sound Airport=Marau Sound AGGQ=Ontong Java Airport=Ontong Java AGGR=Rennell/Tingoa Airport=Rennell/Tingoa, Rennell Island AGGS=Seghe Airport=Seghe AGGT=Santa Anna Airport=Santa Anna AGGU=Marau Airport=Marau AGGV=Suavanao Airport=Suavanao AGGY=Yandina Airport=Yandina AGIN=Isuna Heliport=Isuna AGKG=Kaghau Airport=Kaghau AGKU=Kukudu Airport=Kukudu AGOK=Gatokae Aerodrome=Gatokae AGRC=Ringi Cove Airport=Ringi Cove AGRM=Ramata Airport=Ramata ANYN=Nauru International Airport=Yaren (ICAO code formerly ANAU) AYBK=Buka Airport=Buka AYCH=Chimbu Airport=Kundiawa AYDU=Daru Airport=Daru
    [Show full text]
  • 1 (33Rd Session) NATIONAL ASSEMBLY SECRETARIAT
    1 (33rd Session) NATIONAL ASSEMBLY SECRETARIAT ———— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Monday, the 24th May, 2021 75. *Ms. Mehnaz Akber Aziz: (Deferred during 29th Session) Will the Minister In-charge of the Poverty Alleviation and Social safety Division be pleased to state the details of Pakistan’s Covid fund collected by the Federal Government, break-up of expenditures made thereof? Minister In-charge of the Poverty Alleviation and Social safety Division: As per proposals approved by the ECC in its meeting held on 15-05-2020 and ratified by Federal Cabinet in its meeting held on 16-05-2020, it was decided that the funds collected through Prime Minister’s Covid-19 Pandemic Relief Assistance Fund-2020 will be used to provide cash grant to the laborers through Ehsaas Emergency Cash Programme (EECP). Accordingly, the BISP identified around 1.26 million laborer beneficiaries under Category-IV of EECP and accordingly approximately Rs. 15.5 billion were released by Finance Division as supplementary grant to the BISP. As of 24-03-2021, BISP has disbursed approximately Rs. 14.18 billion to around 1.181 million laborer beneficiaries under Category-IV of EECP. The fund received generous donations from within Pakistan and overseas totaling to Rs. 4.886 billion. The Prime Minister announced two policies with respect to this fund, committing that these funds would be disbursed through Ehsaas Emergency Cash to assist COVID-19 job loss affectees. Secondly, a “matching funds policy” was announced which stipulated that for every rupee donated into the fund, Rs.
    [Show full text]
  • Sample Bidding Documents
    Pakistan Meteorological Department, Karachi _________________________________________________________________________________________________ GOVERNMENT OF PAKISTAN Pakistan Meteorological Department Met. Complex, University Road, Karachi–75270 P M D (Bidding Documents) No. QMS-IMG(7)-5(5)/2016/ for Proposals for Re-certification Audit of QUALITY MANAGEMENT SYSTEM AS PER ISO 9001:2015 Under The August– 2021 DIRECTOR GENERAL PAKISTAN METEOROLOGICAL DEPARTMENT, KARACHI Islamic Republic of PAKISTAN Ph: 021-99261408 Fax: 021-99261405 1 of 17 Pakistan Meteorological Department, Karachi _________________________________________________________________________________________________ Tender Notice 2 of 17 Pakistan Meteorological Department, Karachi _________________________________________________________________________________________________ GOVERNMENT OF PAKISTAN PAKISTAN METEOROLOGICAL DEPARTMENT (Headquarters Camp Office) University Road, KARACHI-75270. Tender Notice Separate Sealed Proposals / Tenders are invited on F.O.R basis from the reputed Registrar/ Company registered with Income and Sales Tax Departments and accredited with ISO 9001:2008 compliant Quality Management System certificate awarding bodies for carrying out the following activity: Closing Opening S. Item Sites Date & Date & No. Time Time Re-Certification Audit of implemented Quality Management System, as per 23-08-2021 23-08-2021 1 ISO 9001:2015, in “Provision of 25 at at Aviation Meteorological Service to 11:00PST 11:30PST International Air Navigation” 23-08-2021 23-08-2021 A complete 3-year Annual 2 25 at at Surveillance Audit plan 11:00PST 11:30PST Terms & Conditions: 1. Bid Security (2% of the Offer) in shape of Bank Draft / Pay Order in favour of D.G. Met. Services, Islamabad should be submitted with the Bid. 2. Incomplete or late received offer will not be considered. 3. Detail specifications can be obtained from websites: www.ppra.org.pk or www.pmd.gov.pk or undersigned during office hours.
    [Show full text]
  • Annual Procurement Plan FY 2018-19
    ANNUAL PROCUREMENT PLAN FY 2018- 19: PAKISTAN CIVIL AVIATION AUTHORITY Procurement of Goods & Services Tentative Estimated Tentative Date of Tentative Cost Procurement Date of Remarks S# Name of Procurement (Description) Procurement Date of (PKR in Method Award of (If any) Notice Completion Mil) Contract Publication Procurement Agency: Logistics (APS) HQ CAA, Karachi Open competitive 1 General Medical Equipment for M.I Room AIIAP 1.1 Aug, 2018 Nov, 2018 Mar, 2019 bidding Medical Equipment for Medical Centre Walton Open competitive 2 0.7 Aug, 2018 Nov, 2018 Mar, 2019 Aerodrome bidding Open competitive 3 Disaster Kit for Chitral and Pasni 0.6 Aug, 2018 Nov, 2018 Mar, 2019 bidding Procurement of patient bed, side table, sethi, foot Open competitive 4 2.5 Sep, 2018 Dec, 2018 Apr, 2019 step and overhead table for Medical Centre JIAP bidding Procurement of Medical Equipment to SZIAP Open competitive 5 0.42 Aug, 2018 Oct, 2018 Feb, 2019 Rahim Yar Khan Airport bidding Procurement of Medical Equipment to Moenjodaro Open competitive 6 0.4 Aug, 2018 Sep, 2018 Jan, 2019 Airport bidding Requirement of E&M Equipment for New Terminal Open Competitive 7 32 Oct, 2018 Sep, 2018 Jan, 2019 Building, Multan Bidding Procurement / Replacement of Common user Open Competitive 8 30 Oct, 2018 Feb, 2019 Dec, 2019 vehicles at different CAA Locations Bidding Procurement / Replacement of Specialist vehicle Open Competitive 9 30 Oct, 2018 Feb, 2019 Dec, 2019 along with accessories for different CAA Locations Bidding Procurement of Misc. facilitation and E/M Open Competitive
    [Show full text]
  • Late Ghulam Mustafa Jatoi: Politcal Leadership and Social Services
    Late Ghulam Mustafa Jatoi: Politcal Leadership and Social Services Abdul Basit Solangi Imdad Hussain Sahito Inayatullah Bhatti Ghulam Mustafa Jatoi was born (August, 14. 1931 - November, 20 .2009) was the son of Khan Bahadur Ghulam Rasool Khan Jatoi and his grandfather’s name was Khan Bahadur Imam Bakhsh Khan Jatoi who was also a great poet. He became the Chief Minister (1973 to 1977) and Caretaker Prime Minister (from 6th August 1990 to 6th November 1990) of Pakistan. Jatoi sahib become MNA seven times and MPA two times in his political life. Because of remaining linked with MRD (Movement for Restoration of Democracy) after pledge of Martial law Ghulam Mustafa Jatoi was arrested two times 1983 and 1985. Ghulam Mustafa Khan Jatoi has five sons Rais Ghulam Murtaza, Rais Masroor Ahmed Khan, Rais Arif Mustafa Khan, Rais Asif Mustafa Khan and Rais Tariq Mustafa Khan as well as three daughters. Till the execution of Zulfiqar Ali Bhutto up to 1979; Ghulam Mustafa Jatoi remained closest friend to him.. He was selected as Chairman of District Local Board Nawabshah two times in 1953 and 1956. In 1958, he started political carrier by being as Member of provincial assembly from West Pakistan, however he became Member of National Assembly in 1962 from the seat of Nawabshah. He was also selected as Member of National Assembly in 1966 and 7-December 1970. He was assigned as federal minister of communication, national resources and political matters during the Government of Zulfiqar Ali Bhutto, due to good faith of Zulfiqar Ali Bhutto he was also appointed Chief Minister of Sindh in 22-De 1973 to 5-July 1977.
    [Show full text]
  • HISTORY of AVIATION (Kitty Hawk to Pakistan)
    HISTORY OF AVIATION (Kitty Hawk to Pakistan) BY Mohammad Saad Shahid 12002001-008 Amna Hafeez 12002001-013 RESARCH SUPERVISOR Altamash Pervaiz UNIVERSITY OF MANAGEMENT AND TECHNOLOGY LAHORE HISTORY OF AVIATION (Kitty Hawk to Pakistan) Page 1 HISTORY OF AVIATION (Kitty Hawk to Pakistan) Page 2 HISTORY OF AVIATION (Kitty Hawk to Pakistan) By Mohammad Saad Shahid 12002001-008 Amna Hafeez 12002001-013 Research Supervisor: Altamash Pervaiz A Research Project Submitted to the Aviation Department In Partial Fulfillment of the Requirements of the Bachelor of Science in Aviation Management Degree University of Management and Technology February 2016 HISTORY OF AVIATION (Kitty Hawk to Pakistan) Page 3 Table of Contents ACKNOWLEDGEMENTS ______________________________________________________________________ 8 EXECUTIVE SUMMARY _______________________________________________________________________ 9 INTRODUCTION ________________________________________________________________________________ 10 THE INVENTORS AND PIONEERS OF AVIATION _______________________________________ 11 1. LEONARDO DA VINCI____________________________________________________________________ 12 1.1. Role in Aviation: _______________________________________________________________________ 12 2. CLEMENT ADER __________________________________________________________________________ 14 2.1. Role in Aviation: _______________________________________________________________________ 14 2.2. Success Factors:......................................................................................................................................
    [Show full text]
  • Happy New Year
    31s t March 2008 Newsletter No. 92 Our 14 Millionth Patient Uzma Uzma, a student of Grade-I, lives with her parents in a remote village of Balochistan. Her father works in a Government department and earns Rs.6,000/- (£ 48) per month. He is the sole bread winner and remains under financial strain/debt all the time as he has to support his wife and eight school going children. As luck would have it Uzma developed a pain in her right eye. She complained to her parents who tried some local remedies to manage her pain and suffering but to no effect and her vision started to diminish gradually. Her teachers also noticed her poor vision as Uzma, otherwise an intelligent & enthusiastic student could not see the black-board clearly. Her father was apprised of her condition and advised to get the child treated appropriately. Her parents took her to an Ophthalmologist who diagnosed cataract in both eyes and asked for Rs.10,000/- (£ 80) for surgery of each eye, an amount far beyond their capacity. As a consequence of her diminished vision the child had to drop out of school. Her parents’ dreams about the future of Uzma were shattered. They felt miserable and helpless. Uzma’s father discussed the matter with one of his friends, who informed him about LRBT, where all services are provided absolutely free of cost. He immediately took his daughter to LRBT’s free eye unit at Sibi (Balochistan). After examination, cataract in both eyes was confirmed. Since facilities for children’s surgery under General Anaesthesia were not available at Sibi, she was referred to LRBT`s Free Secondary Eye Hospital at Quetta for surgery.
    [Show full text]
  • NATIONAL ASSEMBLY SECRETARIAT ————— “QUESTIONS for ORAL ANSWERS and THEIR REPLIES” to Be Asked
    1 (49th Session) NATIONAL ASSEMBLY SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Wednesday, the 30th January, 2013 (Originally Starred Question Nos. 54, 67 and 164 were set down for answer during the 48th Session) 54. *Malik Shakir Bashir Awan: Will the Minister for Petroleum and Natural Resources be pleased to state whether it is a fact that Government has to bear additional expenses of one million US dollars in connection with CNG consumption on daily basis as compared to imported fuel; if so, the reasons thereof? Minister for Petroleum and Natural Resources: Yes. The details are as under:- PRESENT SCENARIO (a) Current average monthly consumption = 265,000 MT of MS. (b) Current average daily consumption of MS. = 8,800 MT In Absence of CNG (a) Additional monthly demand of MS. = 215,000 MT (b) Additional daily demand of MS. = 7,100 MT Present cost of MS. = US $ 1000/MT Additional cost per day for additional demand = US $ 7,100,000/- of MS. 2 67. *Dr. Nahid Shahid Ali: Will the Minister for Human Resource Development be pleased to state: (a) the progress made in respect of the implementation on Child Labour Law during the year 2011-12; and (b) the action taken against the violations of said law during the said period? Minister for Human Resource Development (Ch. Wajahat Hussain): (a) After the 18th Constitutional Amendment, labour laws, including Employment of Children Act, 1991, have been transferred to the provinces. They are also responsible for implementation of laws relating to child labour.
    [Show full text]