City of Ottawa Stage II Light Rail Program
Total Page:16
File Type:pdf, Size:1020Kb
2/6/2020 Light Rail Transit in Ottawa January 28, 2020 Michael Morgan Director, Rail Construction Program City of Ottawa 1 1 Stage 1 2 2/6/2020 Confederation Line Alignment 3 Tunney’s Pasture Station 4 2/6/2020 Lyon Station 5 Rideau Station 6 2/6/2020 St-Laurent Station 7 Light Rail Vehicles 8 2/6/2020 Stage 2 Project Progress 9 Stage 2 Rail Network 10 2/6/2020 Stage 2: Trillium Line Design Build Finance Maintain (DBFM) Procurement: • 16 km of new track and eight new stations • Rail link from South Keys to E&Y Centre and Airport Station • Seven (7) Stadler FLIRT vehicles added to fleet of vehicles • Purpose built Walkley Storage & Maintenance Facility • Extensive safety and reliability enhancements 11 Stage 2: Trillium Line Safety Enhancements: • Signal system to provide continuous speed control • Grade separation of Ellwood diamond (interface with VIA) • Rail Control (dispatch) to be run out of Transit Control Center providing access to resources and technology to manage incidents • Dow’s Lake Tunnel to be fully equipped with new tunnel ventilation system, upgraded to meet NFPA standards, and will include full radio coverage for emergency responders • Stadler FLIRT vehicles equipped with crash energy management 12 2/6/2020 Walkley Yard 13 Limebank Station 14 2/6/2020 Bowesville Station 15 Uplands Station 16 2/6/2020 Airport Station 17 Gladstone Station 18 2/6/2020 Stadler Vehicle • Seven (7) Additional Stadler Vehicles • Tier IV Final Emissions Standards (latest EPA standard); • Increased door count for efficient passenger flow as compared to the previous and existing vehicles; and, • Operating range of -40C to +40C degrees; 19 Walkley Yard Lead Track 20 2/6/2020 Walkley Yard 21 Old Rail Tie Removal 22 2/6/2020 Tree Clearing 23 Guideway Excavation 24 2/6/2020 Airport Link 25 Embankment Construction 26 2/6/2020 Uplands Culvert Installation 27 Uplands Caisson Installation 28 2/6/2020 Earl Armstrong Caisson 29 Rail Delivery 30 2/6/2020 Stage 2: Confederation Line Design Build Finance (DBF) Procurement: • 27 km of track • Sixteen passenger light rail stations • 3 km cut and cover tunnel through Byron Linear Park • Light maintenance and storage facility 31 Confederation Line East Schedule 32 2/6/2020 Orleans Station 33 Trim Station 34 2/6/2020 Montreal Station 35 Montreal Interchange 36 2/6/2020 Montreal Road 37 Montreal Road 38 2/6/2020 Montreal Road 39 Confederation Line West Schedule 40 2/6/2020 Lincoln Fields Station 41 Iris Station 42 2/6/2020 Westboro Station 43 Stage 2 Tunnel Works 44 2/6/2020 Stage 2 Tunnel Works 45 SJAM Detour 46 2/6/2020 SJAM Detour 47 Testing Stage 2 Vehicles 48 2/6/2020 Stage 2 Summary 49 Questions? 50.