City of Ottawa Stage II Light Rail Program

Total Page:16

File Type:pdf, Size:1020Kb

City of Ottawa Stage II Light Rail Program 2/6/2020 Light Rail Transit in Ottawa January 28, 2020 Michael Morgan Director, Rail Construction Program City of Ottawa 1 1 Stage 1 2 2/6/2020 Confederation Line Alignment 3 Tunney’s Pasture Station 4 2/6/2020 Lyon Station 5 Rideau Station 6 2/6/2020 St-Laurent Station 7 Light Rail Vehicles 8 2/6/2020 Stage 2 Project Progress 9 Stage 2 Rail Network 10 2/6/2020 Stage 2: Trillium Line Design Build Finance Maintain (DBFM) Procurement: • 16 km of new track and eight new stations • Rail link from South Keys to E&Y Centre and Airport Station • Seven (7) Stadler FLIRT vehicles added to fleet of vehicles • Purpose built Walkley Storage & Maintenance Facility • Extensive safety and reliability enhancements 11 Stage 2: Trillium Line Safety Enhancements: • Signal system to provide continuous speed control • Grade separation of Ellwood diamond (interface with VIA) • Rail Control (dispatch) to be run out of Transit Control Center providing access to resources and technology to manage incidents • Dow’s Lake Tunnel to be fully equipped with new tunnel ventilation system, upgraded to meet NFPA standards, and will include full radio coverage for emergency responders • Stadler FLIRT vehicles equipped with crash energy management 12 2/6/2020 Walkley Yard 13 Limebank Station 14 2/6/2020 Bowesville Station 15 Uplands Station 16 2/6/2020 Airport Station 17 Gladstone Station 18 2/6/2020 Stadler Vehicle • Seven (7) Additional Stadler Vehicles • Tier IV Final Emissions Standards (latest EPA standard); • Increased door count for efficient passenger flow as compared to the previous and existing vehicles; and, • Operating range of -40C to +40C degrees; 19 Walkley Yard Lead Track 20 2/6/2020 Walkley Yard 21 Old Rail Tie Removal 22 2/6/2020 Tree Clearing 23 Guideway Excavation 24 2/6/2020 Airport Link 25 Embankment Construction 26 2/6/2020 Uplands Culvert Installation 27 Uplands Caisson Installation 28 2/6/2020 Earl Armstrong Caisson 29 Rail Delivery 30 2/6/2020 Stage 2: Confederation Line Design Build Finance (DBF) Procurement: • 27 km of track • Sixteen passenger light rail stations • 3 km cut and cover tunnel through Byron Linear Park • Light maintenance and storage facility 31 Confederation Line East Schedule 32 2/6/2020 Orleans Station 33 Trim Station 34 2/6/2020 Montreal Station 35 Montreal Interchange 36 2/6/2020 Montreal Road 37 Montreal Road 38 2/6/2020 Montreal Road 39 Confederation Line West Schedule 40 2/6/2020 Lincoln Fields Station 41 Iris Station 42 2/6/2020 Westboro Station 43 Stage 2 Tunnel Works 44 2/6/2020 Stage 2 Tunnel Works 45 SJAM Detour 46 2/6/2020 SJAM Detour 47 Testing Stage 2 Vehicles 48 2/6/2020 Stage 2 Summary 49 Questions? 50.
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • Uptown Rideau STREET COMMUNITY DESIGN PLAN Draft V2 - November 2015
    UPTOWN RIDEAU STREET COMMUNITY DESIGN PLAN Draft v2 - November 2015 City of Ottawa Planning and Growth Management Ottawa.ca/planning Ottawa.ca/urbanisme CONTENTS 1.0 Introduction ............................................................... 5 4.0 The Plan .................................................................... 51 1.1 What is a Community Design Plan? ....................................................... 7 4.1 General Approach ................................................................................ 52 1.2 2005 Uptown Rideau CDP ...................................................................... 7 4.2 Vision, Core Principles and Key Directions ............................................. 52 1.3 How to Use This CDP ............................................................................. 7 4.3 Built Form ............................................................................................ 54 1.4 The CDP Area ......................................................................................... 8 4.4 Open Space .......................................................................................... 68 1.5 Study Process ......................................................................................... 8 4.5 Mobility .............................................................................................. 74 1.6 As We Heard It .................................................................................... 10 4.6 Heritage ..............................................................................................
    [Show full text]
  • Pl180670-Apr-06-2021
    Local Planning Appeal Tribunal Tribunal d’appel de l’aménagement local ISSUE DATE: April 06, 2021 CASE NO(S).: PL180670 The Ontario Municipal Board (the “OMB”) is continued under the name Local Planning Appeal Tribunal (the “Tribunal”), and any reference to the Ontario Municipal Board or Board in any publication of the Tribunal is deemed to be a reference to the Tribunal. PROCEEDING COMMENCED UNDER subsection 34(19) of the Planning Act, R.S.O. 1990, c. P.13, as amended Appellant: Ross Meredith Appellant: Michael Olsen Appellant: Daniel Spence Appellant: Westboro Community Association Subject: By-law No. BL 2018-193 Municipality: City of Ottawa OMB Case No.: PL180670 OMB File No.: PL180670 OMB Case Name: Meredith v. Ottawa (City) HearD: Written Hearing APPEARANCES: Parties Counsel City of Ottawa (the “City”) Timothy Marc Domicile Development Inc. Alan Cohen (the “Applicant”) Meagan Brodie Ross Meredith, Michael Olsen, Kristi Ross Daniel Spencer and Westboro Community Association (the “Appellants”) 2 PL180670 DECISION OF THE TRIBUNAL DELIVERED BY DAVID L. LANTHIER AND ORDER OF THE TRIBUNAL [1] This Decision follows a written hearing of the Tribunal undertaken to determine the Appeals brought by the Appellants pursuant to s. 34(19) of the Planning Act (“Act”) as it was amended by Bill 139. [2] The Applicant made application to the City for a Zoning By-law Amendment to permit the development of what is ultimately now proposed as a 6-storey mixed use building containing 35 condominium units, some commercial space with both in-ground and surface parking (“DeVelopment”) on an assembly of three lots located at 398, 402 and 406 Roosevelt AVe (“Site”) in the City of Ottawa.
    [Show full text]
  • 2019 City Wide Development Charges Background Study
    2019 City-Wide Development Charges Background Study Version for Public Consultation HEMSON C o n s u l t i n g L t d. March 15, 2019 Table of Contents List of Acronyms .......................................................................................... 1 Executive Summary ...................................................................................... 2 A. Purpose of 2019 Development Charges (DC) Background Study .. 2 B. City-Wide and Area-Specific DCs Have Been Calculated ............... 3 C. Development Forecast .................................................................... 4 D. Public Transit Ridership Forecast ................................................... 5 E. Calculated Development Charges .................................................. 5 F. Cost of Growth Analysis .................................................................. 6 G. Development Charges Administration & Policy Considerations ...... 7 I Purpose of 2019 Development Charges Background Study ............. 8 A. Introduction and Background .......................................................... 8 B. Legislative Context .......................................................................... 9 C. The 2019 DC Study is Intended to be an Interim Update ................ 9 D. Consultation And Approval Process ................................................ 9 E. Key Steps In Determining DCs for Future Development-Related Projects ......................................................................................... 10 F. Long-Term Capital
    [Show full text]
  • No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker
    2021 No. 48, Port Lands Flood Protection and Enabling Infrastructure, Page 54 Credit: Waterfront Toronto/Vid Ingelevics/Ryan Walker Top100 Projects 2021 Changing the Language of Top100 Projects — 2021 An annual report inserted in Infrastructure ReNew Canada’s had an interesting encounter following the release of last January/February 2021 issue year’s report, and I wanted to share in an effort to get I feedback from the rest of the industry. MANAGING Andrew Macklin We had released the 2020 Top100 Projects report and were EDITOR [email protected] getting set for the Key Players and Owners Dinner, which we host every February in Toronto as a celebration of the accomplishments GROUP Todd Latham PUBLISHER of the industry in developing infrastructure megaprojects. I had heard through one of my colleagues that a couple of well-respected PUBLISHER Nick Krukowski members of the industry wanted to chat with me at the event and I should seek them out. So I did. ART DIRECTOR AND Donna Endacott SENIOR DESIGN My first thought was that, not having nearly the expertise as many of you, that I had somehow managed to royally screw something ASSOCIATE Simran Chattha up. Or perhaps they wanted to tell me that I should try a different EDITOR tact to the report? Maybe a new idea for adding a complementary DIGITAL MARKETING Becky Umweni piece for this report? But as it turned out, they wanted to have a COORDINATOR conversation with me about… language. DIGITAL The language of this report has become, to some, quite convoluted. Connie Vitello EDITOR As different jurisdictions use the language familiar to them, it can often mean that, from one project to the next, different words are EVENT Natasha Mawji MANAGER used to describe the same thing.
    [Show full text]
  • Ottawa Transportation Report.Pdf
    OTTAWA THE IMPACT OF TRANSPORTATION IMPROVEMENTS ON HOUSING VALUES IN THE OTTAWA REGION Don R Campbell, Senior Analyst Melanie Reuter, Director of Research Allyssa Epp, Research Analyst WWW.REINCANADA.COM AUTHORS Don R. Campbell, Senior Analyst, REIN Ltd Melanie Reuter, Director of Research, REIN Ltd Allyssa Fischer, Research Analyst, REIN Ltd © The Real Estate Investment Network Ltd. 6 – 27250 58 Cr Langley, BC V4W 3W7 Tel (604) 856-2825 Fax (604) 856-0091 E-Mail: [email protected] Web Page: www.reincanada.com Important Disclaimer: This Report, or any seminars or updates given in relation thereto, is sold, or otherwise provided, on the understanding that the authors – Don R. Campbell, Melanie Reuter, Allyssa Fischer, and The Real Estate Investment Network Ltd and their instructors, are not responsible for any results or results of any actions taken in reliance upon any information contained in this report, or conveyed by way of the said seminars, nor for any errors contained therein or presented thereat or omissions in relation thereto. It is further understood that the said authors and instructors do not purport to render legal, accounting, tax, investment, financial planning or other professional advice. The said authors and instructors hereby disclaim all and any liability to any person, whether a purchaser of this Report, a student of the said seminars, or otherwise, arising in respect of this Report, or the said seminars, and of the consequences of anything done or purported to be done by any such person in reliance, whether in whole or part, upon the whole or any part of the contents of this Report or the said seminars.
    [Show full text]
  • IBI Group Ottawa LRT Release 10-07-19 FINAL
    Media Contact: Julia Harper, IBI Group [email protected] 416-596-1930 ext. 61187 or 647-330-4706 - For immediate release - IBI Group-Designed Confederation Line LRT Downtown Tunnel Opens to Public – Global design and technology firm designs underground segment of Ottawa’s largest infrastructure project – TORONTO, ON (October 7, 2019) – Global design and technology firm, IBI Group (TSX:IBG), completed the station design of the downtown tunnel portion of Ottawa’s Confederation Line – a 13-station, 12.5km light rail transit line with a 2.5km underground segment beneath the city center – which is now open to the public. As part of the Rideau Transit Group consortium, IBI Group led the design of the three underground stations – Lyon, Parliament and Rideau – creating iconic facilities that offer spacious and elegant designs with convenient passenger flow systems. This $2.1B, world-class transit system represents the largest infrastructure project in Ottawa’s history and is set to transform how people travel throughout the nation’s capital. “One of the challenges of designing underground transit stations is establishing a design that doesn’t feel like it’s underground. We wanted to create a lot of transparency within the station, focusing on a neutral palette to help bring more light into the space,” said IBI Group Transit Architecture Director, Charlie Hoang. “You also won’t see a lot of obstructions throughout our stations. When going down to platform level you will see a nice wide path to the concourse, then the stairwells, escalators and elevators. Our main goal is always to try to open that up if possible.” The IBI design team selected a neutral material palette, consisting of white, cream and light grey tones accented with stainless steel and glass to help bring more light into the space.
    [Show full text]
  • 1 Report to Rapport Au
    1 Report to Rapport au: Transit Commission Commission du transport en commun 19 June 2019 / 19 juin 2019 Submitted on June 10, 2019 Soumis le 10 juin 2019 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: John Manconi, General Manager / Directeur général Transportation Services Department / Direction générale des transports 613-580-2424 ext./poste 52111, [email protected] Ward: CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-TS-0002 VILLE SUBJECT: Confederation Line: Customer Service Operational Readiness OBJET: Ligne de la Confédération : Préparation opérationnelle du service à la clientèle REPORT RECOMMENDATION That the Transit Commission receive this report for information. RECOMMANDATION DU RAPPORT Que la Commission du transport en commun prenne connaissance de ce rapport. 2 EXECUTIVE SUMMARY The opening of O-Train Line 1, the Confederation Line, will mark an exciting and historic transformation in the way transit service is delivered in the city of Ottawa. OC Transpo has been working with the Rideau Transit Group (RTG) and partners from across the city to transform the current transit service into a world-class multimodal transit system and ensure a positive end-to-end customer experience starting on day one. The opening of Line 1 and the major changes to the bus route network that will follow, will be the largest service change ever for OC Transpo customers. Because our customers are our priority and their experience through and beyond this transitional period is important to us, OC Transpo staff are committed to ensuring that customers are prepared, comfortable and knowledgeable about these changes and the transition period in which they will occur.
    [Show full text]
  • Operational Readiness
    Operational Readiness Transit Commission March 20, 2019 OCTRANSPO.COM/READY4RAIL0 We’re Ready For Rail You can view the video from the presentation at the link below. https://youtu.be/oDMadi_Nbw0 1 1 OCTRANSPO.COM/READY4RAIL The Customer Journey • The opening of O-Train Line 1 will mark a historic positive transformation in the way transit service is delivered in Ottawa; • The shift towards creating an integrated multimodal transit operation begins with ensuring that the customer is taken care of every step of the way; • In support of this goal, OC Transpo completed the Multimodal Customer Journey project to help put the interests of customers at the heart of all decision-making; • The results of the customer journey mapping project highlighted what customers need to know so that they are informed, educated, prepared and excited for their new journey on the system; and, • Using the results and themes drawn from the multimodal Customer Journey project, ten priority topics were identified. 2 2 OCTRANSPO.COM/READY4RAIL Top 10 Things Customers Want To Know Bus, bike, ride Transfers / Bus routes & walk Fare-paid and stations connections zones Frequency of Ready for Rail Ticket Fare gates service travel planner machines Safety and Train capacity Accessibility security and doors features features 3 3 OCTRANSPO.COM/READY4RAIL Best Practices Best practices and review of other multimodal operations have been used in our planning: • Montréal; • Toronto; • Calgary; • Edmonton; • Vancouver; • Seattle • Boston; • Philadelphia; • Dallas; • Chicago; and, • Hudson Bergen (Jersey City). 4 4 OCTRANSPO.COM/READY4RAIL A Multimodal Commute • Line 1 will connect 13 stations from Tunney’s Pasture in the west to Blair in the east; and, • Customers can connect with Line 1 by: - Bus at 10 of 13 Line 1 stations; - O-Train Line 2 at Bayview Station; and, - Walking, mobility device, and bike, via local streets and many multi-use pathways.
    [Show full text]
  • 1009 Trim Road
    1009 Trim Road Planning Rationale + Design Brief Official Plan Amendment + Zoning By-law Amendment Applications September 14, 2020 Prepared for 9378-0633 Quebec Inc. Prepared by Fotenn Planning + Design 396 Cooper Street, Suite 300 Ottawa, ON K2P 2H7 September 2020 © Fotenn The information contained in this document produced by Fotenn is solely for the use of the Client identified above for the purpose for which it has been prepared and Fotenn undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. 1.0 Introduction 1 1.1 Supporting Material 2 2.0 Site Context and Surrounding Area 3 2.1 Subject Property 3 2.2 Surrounding Area 4 2.3 Amenities 5 2.4 Transportation Network 6 Road Network 6 Rapid Transit Network 8 Cycling Network 9 3.0 Proposed Development 10 4.0 Policy & Regulatory Framework 18 4.1 Provincial Policy Statement (2020) 18 4.2 City of Ottawa Official Plan (2003, as amended) 20 Land Use Designations 20 Urban Natural Features Designation 21 Urban Employment Area Designation 21 City-wide Employment Area Policies (Section 2.2.3) 22 General Urban Area Designation (Section 3.6.1) 23 Mixed Use Centre designation (Section 3.6.2) 25 Collaborative Community Building and Secondary Planning Processes (Section 2.5.6) 25 Designing Ottawa (Section 2.5.1) 27 Urban Design and Compatibility (Section 4.11) 28 4.3 New City of Ottawa Official Plan (ongoing) 32 Industrial and Logistics Lands Strategy 34 4.4 Orléans Corridor Secondary Plan Study (ongoing) 34 4.5 Vacant Industrial and Business Park Lands
    [Show full text]
  • The Confederation Line Ottawa LRT Project
    The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development – Canada Dragados Canada PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook Project Stakeholders Sponsors Equity Developers Project Co Design Build Joint Venture Maintenance Team Engineering Joint Venture PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 1 City of Ottawa • Canada’s Capital City with population of 950,000 • Problem: saturated with buses (BRT) • Solution: replace BRT with Light Rail Transit (LRT) Yukon Northwest Territories Nunavut Newfoundland / Labrador British Columbia Alberta Manitoba Quebec Saskatchewan Ontario Prince Edward Island New Brunswick Nova Scotia PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 2 Confederation Line • 12.5 km LRT line with 13 stations • 10 km at grade in existing BRT Right-of-Way • 2.5 km tunnel between Ottawa University (uOttawa) and Pimisi • 3 underground stations: Lyon, Parliament and Rideau PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 3 Initial Design Approach • Running tunnel: TBM tunnel (mono tube or twin-tube) • Underground stations: cut- and-cover PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 4 Design Options Option Pros Cons Design Single • Lower cost • Higher risk of settlement minimized by Scheme Tunnel • Flexibility in operation rock quality • Multiple faces • Higher cost and longer
    [Show full text]
  • September 2020 Update
    September 2020 Update Transportation Services Department FEDCo September 1, 20201 2 O-Train South Design Progress • The following submissions have been Issued-For- Construction: – Structures throughout the alignment including Rail Bridges at Airport Parkway, Uplands, Leitrim, Bowesville, Earl Armstrong and Lester; and, – Utility Relocations throughout the alignment. 3 O-Train South Design Progress • The City has received construction drawings of the following project elements: – Airport Station; – Guideway for the Airport Link; and, – Structures throughout the alignment including High Road MUP Bridge, Limebank Road Elevated Guideway, Airport Elevated Guideway, VIA Grade Separation, Rideau River Pedestrian Bridge. 4 O-Train South Design Progress • The City has received final design drawings of the following project elements: – Guideway for the South Extension to Limebank; – Guideway for the existing portion of the line; – Landscape design for the existing line and Airport Link; – Dow’s Lake Tunnel, including Tunnel Ventilation; and – Vehicle elements, including the driver’s cab, interior layout and HVAC System. 5 O-Train South Design Progress • The City has received pre-final design drawings of the following project elements: – Walkley Yard Maintenance and Storage Facility (MSF); – Operational Modelling for the Overall System and the MSF; – Signaling and Train Control System; – Greenboro, Carleton, Mooney’s Bay, Gladstone and Walkley Stations; and, – Communication Systems designs for Greenboro and Carleton Stations and interface control documents for several subsystems on the project. 6 O-Train South Construction Progress • Rock excavation started on Gladstone Station; • Walkley Maintenance and Storage Facility structure construction has commenced; • Work has commenced at Ellwood Diamond grade separation. Caisson construction is underway; • Work has begun on Carleton south MUP; and, • Commenced work at South Keys and Bowesville Stations.
    [Show full text]