City of Ottawa Stage II Light Rail Program

City of Ottawa Stage II Light Rail Program

2/6/2020 Light Rail Transit in Ottawa January 28, 2020 Michael Morgan Director, Rail Construction Program City of Ottawa 1 1 Stage 1 2 2/6/2020 Confederation Line Alignment 3 Tunney’s Pasture Station 4 2/6/2020 Lyon Station 5 Rideau Station 6 2/6/2020 St-Laurent Station 7 Light Rail Vehicles 8 2/6/2020 Stage 2 Project Progress 9 Stage 2 Rail Network 10 2/6/2020 Stage 2: Trillium Line Design Build Finance Maintain (DBFM) Procurement: • 16 km of new track and eight new stations • Rail link from South Keys to E&Y Centre and Airport Station • Seven (7) Stadler FLIRT vehicles added to fleet of vehicles • Purpose built Walkley Storage & Maintenance Facility • Extensive safety and reliability enhancements 11 Stage 2: Trillium Line Safety Enhancements: • Signal system to provide continuous speed control • Grade separation of Ellwood diamond (interface with VIA) • Rail Control (dispatch) to be run out of Transit Control Center providing access to resources and technology to manage incidents • Dow’s Lake Tunnel to be fully equipped with new tunnel ventilation system, upgraded to meet NFPA standards, and will include full radio coverage for emergency responders • Stadler FLIRT vehicles equipped with crash energy management 12 2/6/2020 Walkley Yard 13 Limebank Station 14 2/6/2020 Bowesville Station 15 Uplands Station 16 2/6/2020 Airport Station 17 Gladstone Station 18 2/6/2020 Stadler Vehicle • Seven (7) Additional Stadler Vehicles • Tier IV Final Emissions Standards (latest EPA standard); • Increased door count for efficient passenger flow as compared to the previous and existing vehicles; and, • Operating range of -40C to +40C degrees; 19 Walkley Yard Lead Track 20 2/6/2020 Walkley Yard 21 Old Rail Tie Removal 22 2/6/2020 Tree Clearing 23 Guideway Excavation 24 2/6/2020 Airport Link 25 Embankment Construction 26 2/6/2020 Uplands Culvert Installation 27 Uplands Caisson Installation 28 2/6/2020 Earl Armstrong Caisson 29 Rail Delivery 30 2/6/2020 Stage 2: Confederation Line Design Build Finance (DBF) Procurement: • 27 km of track • Sixteen passenger light rail stations • 3 km cut and cover tunnel through Byron Linear Park • Light maintenance and storage facility 31 Confederation Line East Schedule 32 2/6/2020 Orleans Station 33 Trim Station 34 2/6/2020 Montreal Station 35 Montreal Interchange 36 2/6/2020 Montreal Road 37 Montreal Road 38 2/6/2020 Montreal Road 39 Confederation Line West Schedule 40 2/6/2020 Lincoln Fields Station 41 Iris Station 42 2/6/2020 Westboro Station 43 Stage 2 Tunnel Works 44 2/6/2020 Stage 2 Tunnel Works 45 SJAM Detour 46 2/6/2020 SJAM Detour 47 Testing Stage 2 Vehicles 48 2/6/2020 Stage 2 Summary 49 Questions? 50.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    25 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us