A120 BRAINTREE to A12 Consultation on Route Options 17 January – 14 March 2017
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Standon Neighbourhood Plan [2MB]
Barwick Standon Bromley Latchford Puckeridge Colliers End Old Hall Green LATEST NEWS Wellpond Green STANDON PARISH NEIGHBOURHOOD DEVELOPMENT PLAN Pre-Submission Draft 2016 BARWICK I STANDON I BROMLEY I LATCHFORD I PUCKERIDGE COLLIERS END I OLD HALL GREEN I WELLPOND GREEN SSTTAANNDDOONN •• PPUUCCKKEERRIIDDGGEE •• BBRROOMMLLEEYY •• CCOOLLLLIIEERRSS EENNDD •• LLAATTCCHHFFOORRDD •• BBAARRWWIICCKK •• OOLLDD HHAALLLL GGRREEEENN •• WWEELLLLPPOONNDD GGRREEEENN CONTENTS PREFACE 1. Introduction 4 A NEIGHBOURLY PARISH 2. The Parish of Standon 6 Standon is a neighbourly Parish, and 3. How the Plan was Prepared: An Inclusive Process 12 its Parishioners believe that the obligation on neighbours to behave in Stage 1: Setting Up 12 a neighbourly manner, in their mutual Stage 2: Spring and Summer Consultations 2015 13 interests, also extends equally and Stage 3: Survey 13 Stage 4: Land Allocations 14 still mutually, to those who come Stage 5: Public Meetings 15 proposing development. Stage 6: Drafting of the Plan 16 The physical presence of those Stage 7: Pre-Submission 16 individuals and companies, as 4. Vision and Objectives 17 neighbours, may be transitory, but 5. The Policies 20 the changes they introduce in and around the neighbourhood area, and Context 20 the ramification of those changes, can Environment 22 have a lasting effect on the quality of Housing and Development 26 life of many local residents. Economy and Employment 32 Transport 33 The Parish therefore responds Facilities and Services 37 positively to developers who share 6. Implementation and Monitoring 43 this approach. Introduction 43 Development Management 43 Infrastructure Projects 43 Monitoring and Review 44 A10 Road Access Proposal 44 7. Appendix 45 Housing Development Proposal 2016-2031 45 Standon Conservation Map 46 Puckeridge Conservation Map 47 Colliers End Boundary Map 48 Areas of Beauty Map 49 2 STANDON PARISH NEIGHBOURHOOD PLAN STANDON PARISH NEIGHBOURHOOD PLAN 3 1. -
Braintree District Council Infrastructure Delivery Plan June 2021 BRAINTREE DISTRICT COUNCIL INFRASTRUCTURE DELIVERY PLAN
BDC/058 Braintree District Council Infrastructure Delivery Plan June 2021 BRAINTREE DISTRICT COUNCIL INFRASTRUCTURE DELIVERY PLAN PREPARED BY: Troy Planning + Design and Navigus Planning TROY PLANNING + DESIGN 41-42 Foley Street, Fitzrovia, London W1W 7TS www.troyplanning.com NAVIGUS PLANNING Truro, Lushington Road, Manningtree, Essex, CO11 1EF, UK www.navigusplanning.co.uk PREPARED ON BEHALF OF: Braintree District Council COPYRIGHT The concepts and information contained in this document are the property of Troy Planning + Design (Troy Hayes Planning Limited). Use or copying of this document in whole or in part without the written permission of Troy Planning + Design constitutes an infringement of copyright. LIMITATION This report has been prepared on behalf of and for the exclusive use of Troy Planning + Design’s Client, and is subject to and issued in connection with the provisions of the agreement between Troy Planning + Design and its Client. Troy Planning + Design and Navigus Planning accepts no liability or responsibility whatsoever for or in respect of any use or reliance upon this report by any third party. Revision Description Issued by: Date Checked 1 Final LI 21.06.21 CB, LI 2 CONTENTS 1. Introduction............................................................................................................................. 5 1.1. Infrastructure Covered in this Plan ............................................................................................... 5 1.2. Purpose of the Report .................................................................................................................. -
Road Investment Strategy 2: 2020-2025
Road Investment Strategy 2: 2020–2025 March 2020 CORRECTION SLIP Title: Road Investment Strategy 2: 2020-25 Session: 2019-21 ISBN: 978-1-5286-1678-2 Date of laying: 11th March 2020 Correction: Removing duplicate text on the M62 Junctions 20-25 smart motorway Text currently reads: (Page 95) M62 Junctions 20-25 – upgrading the M62 to smart motorway between junction 20 (Rochdale) and junction 25 (Brighouse) across the Pennines. Together with other smart motorways in Lancashire and Yorkshire, this will provide a full smart motorway link between Manchester and Leeds, and between the M1 and the M6. This text should be removed, but the identical text on page 96 remains. Correction: Correcting a heading in the eastern region Heading currently reads: Under Construction Heading should read: Smart motorways subject to stocktake Date of correction: 11th March 2020 Road Investment Strategy 2: 2020 – 2025 Presented to Parliament pursuant to section 3 of the Infrastructure Act 2015 © Crown copyright 2020 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at https://www.gov.uk/government/publications. Any enquiries regarding this publication should be sent to us at https://forms.dft.gov.uk/contact-dft-and-agencies/ ISBN 978-1-5286-1678-2 CCS0919077812 Printed on paper containing 75% recycled fibre content minimum. Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery Office. -
Environmental Assessment Report Volume 1 B3553T41-JAC-EGN-00-REP-EN-0001 | P00.1 24/11/16
A120 Braintree to A12 Essex County Council Environmental Assessment Report Volume 1 B3553T41-JAC-EGN-00-REP-EN-0001 | P00.1 24/11/16 ENVIR ONMEN TAL ASSESSM ENT R EPORT Essex C ounty Council ENVIRONMENTAL ASSESSMENT REPORT Contents Executive Summary ............................................................................................................................................... 6 Introduction ............................................................................................................................................................ 9 1. Purpose and structure of this report ..................................................................................................... 10 2. The scheme .............................................................................................................................................. 12 2.1 Need for the scheme ................................................................................................................................. 12 2.2 Location ..................................................................................................................................................... 12 2.3 History........................................................................................................................................................ 12 2.4 Planning policies and context .................................................................................................................... 12 2.5 Aims and objectives .................................................................................................................................. -
All Saints Colchester Marriages 1609-1720 (Grooms) Groom Surname Groom 1St Status Bride 1St Bride Surname Status Marriage Date Notes ? Tho
All Saints Colchester marriages 1609-1720 (grooms) Groom surname Groom 1st Status Bride 1st Bride surname Status Marriage date Notes ? Tho. Single man Martha WOODWARD Single woman 05 Sep 1653 No groom's surname. [BR]USSE Samuell Jane BROCK 05 Sep 1677 Licence. Both of Feareing [FP]OSTER Edward Ann BARKER 15 Jun 1686 Bride of St Leonard's [LR]OWTH Ambrose Single man Sarah PURSLOW Single woman 15 Feb 1676/7 The L and R are over each other. Licence. ABBOT Gyles Widower Mary WEBB Widow 07 Mar 1697/8 Both of St Buttolph's ABEL James Anne WILLIAMS 01 Feb 1680/1 Licence. Both of St Leonard's ABLET Henry Single man Mary MILLAR Single woman 20 Feb 1701/2 Licence. Groom of S. Buttolphs, bride of Hadley ADAMS George Single man Anne SMALLEDGE Single woman 20 Feb 1678/9 A [= allegation ?]. Both of St Buttolphs ADAMS William Mary WRIGHT 31 Oct 1689 ADLER John Sara LANGHAM 15 Feb 1685/6 Licence. Both of St Leonard's AERIS George ? ? 20 Oct 1667 Groom of Sawkitt [ Salcott ?] AGAR John Phoebe GREENFEILD 25 Dec 1693 Bride of Greenstead AGNES Robert Ann TODD 07 Mar 1720/1 AILEWARD John Single man Mary BEMISH Single woman 24 Dec 1675 Licence. Both of Inworth No bride's surname. Year is given as 166 and is probably one ALAIS Petar Mary ? 03 Oct 1660 of 1660 to 1664. [ Alliss ? ]. ALCOCK James Mary FOAKES 31 Jul 1681 Both of West Marsey [ West Mersea ]. ALDERTON Anthony Single man Hannah ROGERS Single woman 31 Oct 1676 Licence. -
Essex County Council (The Commons Registration Authority) Index of Register for Deposits Made Under S31(6) Highways Act 1980
Essex County Council (The Commons Registration Authority) Index of Register for Deposits made under s31(6) Highways Act 1980 and s15A(1) Commons Act 2006 For all enquiries about the contents of the Register please contact the: Public Rights of Way and Highway Records Manager email address: [email protected] Telephone No. 0345 603 7631 Highway Highway Commons Declaration Link to Unique Ref OS GRID Statement Statement Deeds Reg No. DISTRICT PARISH LAND DESCRIPTION POST CODES DEPOSITOR/LANDOWNER DEPOSIT DATE Expiry Date SUBMITTED REMARKS No. REFERENCES Deposit Date Deposit Date DEPOSIT (PART B) (PART D) (PART C) >Land to the west side of Canfield Road, Takeley, Bishops Christopher James Harold Philpot of Stortford TL566209, C/PW To be CM22 6QA, CM22 Boyton Hall Farmhouse, Boyton CA16 Form & 1252 Uttlesford Takeley >Land on the west side of Canfield Road, Takeley, Bishops TL564205, 11/11/2020 11/11/2020 allocated. 6TG, CM22 6ST Cross, Chelmsford, Essex, CM1 4LN Plan Stortford TL567205 on behalf of Takeley Farming LLP >Land on east side of Station Road, Takeley, Bishops Stortford >Land at Newland Fann, Roxwell, Chelmsford >Boyton Hall Fa1m, Roxwell, CM1 4LN >Mashbury Church, Mashbury TL647127, >Part ofChignal Hall and Brittons Farm, Chignal St James, TL642122, Chelmsford TL640115, >Part of Boyton Hall Faim and Newland Hall Fann, Roxwell TL638110, >Leys House, Boyton Cross, Roxwell, Chelmsford, CM I 4LP TL633100, Christopher James Harold Philpot of >4 Hill Farm Cottages, Bishops Stortford Road, Roxwell, CMI 4LJ TL626098, Roxwell, Boyton Hall Farmhouse, Boyton C/PW To be >10 to 12 (inclusive) Boyton Hall Lane, Roxwell, CM1 4LW TL647107, CM1 4LN, CM1 4LP, CA16 Form & 1251 Chelmsford Mashbury, Cross, Chelmsford, Essex, CM14 11/11/2020 11/11/2020 allocated. -
Tackling High Risk Regional Roads Safer Roads Fund Full
Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION The Royal Automobile Club Foundation for Motoring Ltd is a transport policy and research organisation which explores the economic, mobility, safety and environmental issues relating to roads and their users. The Foundation publishes independent and authoritative research with which it promotes informed debate and advocates policy in the interest of the responsible motorist. RAC Foundation 89–91 Pall Mall London SW1Y 5HS Tel no: 020 7747 3445 www.racfoundation.org Registered Charity No. 1002705 October 2018 © Copyright Royal Automobile Club Foundation for Motoring Ltd Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION About the Road Safety Foundation The Road Safety Foundation is a UK charity advocating road casualty reduction through simultaneous action on all three components of the safe road system: roads, vehicles and behaviour. The charity has enabled work across each of these components and has published several reports which have provided the basis of new legislation, government policy or practice. For the last decade, the charity has focused on developing the Safe Systems approach, and in particular leading the establishment of the European Road Assessment Programme (EuroRAP) in the UK and, through EuroRAP, the global UK-based charity International Road Assessment Programme (iRAP). Since the inception of EuroRAP in 1999, the Foundation has been the UK member responsible for managing the programme in the UK (and, more recently, Ireland), ensuring that these countries provide a global model of what can be achieved. -
Forward Plan Reference Number: FP/830/05/17 Report Title: A120 Braintree to A12: Report on Option Selection and Consultation
Forward Plan reference number: FP/830/05/17 Report title: A120 Braintree to A12: report on option selection and consultation. Report to: Cabinet Report author: Andrew Cook - Director, Highways and Transportation Date: 23 November 2017 For: Decision Enquiries to: Chris Stevenson, Head of Commissioning, Connected Essex, Integrated Transport Telephone: 03330 136577| of: 07970 766769 Email: [email protected] County Divisions affected: All Essex 1. Purpose of Report 1.1. To present an update on the A120 route options following public consultation for a new dual carriageway road between Braintree and the A12, to outline and assess the choices open to Essex County Council (ECC) for their post- public consultation announcement and to recommend the way forward. 2. Recommendations 2.1. That Cabinet agrees : • that of the initial 68 route options assessed and the 5 options taken to consultation only 2 broad options, corresponding to the central (routes B and C) and southern corridors (routes D and E), will now be pursued in greater detail to determine the best overall performing route; • that Option A (northern corridor) is the worst performing option and would appear unlikely to emerge as a candidate for preferred route status through further study; • that work continues to present a full set of route option appraisals to Government in accordance with Highways England processes; • that a final decision on Essex County Council’s preferred route option be delegated to the Deputy Leader and Cabinet Member for Economic Growth, Skills, Infrastructure and the Digital Economy in consultation with the Executive Director for Infrastructure and Environment. 3. -
Colchester Borough Council's Housing Land Supply Position July 2018
Housing Land Supply Position Statement Colchester Borough Council’s housing land supply position J 2018 1 uly Contents Page 1. Status of Document 3 2. Local Context 3 3. National Policy 4 4. Housing Target for Colchester 6 5. Windfall Allowance 8 6. Emerging Allocations 11 7. Five Year Supply Calculation 13 8. Monitoring 14 Appendix One – Housing Trajectory 15 2 1. Status of this document 1.1 This document sets out Colchester’s housing land supply position and explains how this position complies with the requirements of national policy and guidance. 1.2 The document represents the current housing land supply position as of 1st April 2018. The relevant five year housing land supply period therefore covers the period between 1st April 2018 and 31st March 2023. 1.3 The information contained in this document is correct in respect of the time period it covers but due to the nature of housing supply and delivery it is considered to be a ‘live document’. It is therefore subject to change as and when new information is received which changes the housing supply and/or housing delivery position. 2. Local Context 2.1 Colchester Borough Council has an adopted Local Plan which consists of its Core Strategy (adopted in 2008 and subject to a Focused Review in 2014), Site Allocations DPD (adopted 2010) and Development Policies DPD (adopted 2008 and reviewed 2014). The Tiptree Jam Factory Plan DPD (2013) also forms part of the development plan. In addition there are two adopted Neighbourhood Plans within Colchester Borough in the form of the Myland and Braiswick Neighbourhood Plan and Boxted Neighbourhood Plan, both of which were adopted in 2016. -
STATEMENT of CASE Rule 7 – Compulsory Purchase (Inquiries Procedure) Rules 2007 Rule 16- Highways (Inquiries Procedure) Rules 1994
THE HERTFORDSHIRE COUNTY COUNCIL (A120 BYPASS (LITTLE HADHAM)) COMPULSORY PURCHASE ORDER 2017 and THE HERTFORDSHIRE COUNTY COUNCIL (A120 (LITTLE HADHAM) BYPASS CLASSIFIED ROAD) (SIDE ROADS) ORDER 2017 STATEMENT OF CASE Rule 7 – Compulsory Purchase (Inquiries Procedure) Rules 2007 Rule 16- Highways (Inquiries Procedure) Rules 1994 Department for Transport Reference: NATTRAN/E/LAO/136 1 HIGHWAYS ACT 1980 ACQUISITION OF LAND ACT 1981 THE HERTFORDSHIRE COUNTY COUNCIL (A120 BYPASS (LITTLE HADHAM)) COMPULSORY PURCHASE ORDER 2017 and THE HERTFORDSHIRE COUNTY COUNCIL (A120 (LITTLE HADHAM) BYPASS CLASSIFIED ROAD) (SIDE ROADS) ORDER 2017 STATEMENT OF CASE OF HERTFORDSHIRE COUNTY COUNCIL Contents: Introduction 1. Section (i) a brief description of the order land and its location, topographical features and present use 2. Section (ii) an explanation of the use of the particular enabling power 3. Section (iii) an outline of the authority’s purpose in seeking to acquire the land 4. Section (iv): a statement of the authority’s justification for compulsory purchase, with regard to Article 1 of the First Protocol of the European Convention on Human Rights, and Article 8 if appropriate 5. Section (v): a description of the proposals for the use or development of the land 6. Section (vi) a statement about the planning position of the order site. See also Section 1: advice on Section 226 of the Town and County Planning Act 1990 for planning orders 7. Section (vii) information required in the light of government policy statements where orders are made in certain circumstances. 8. Section (viii) any special considerations affecting the order site, e.g. ancient monument, listed building, conservation area, special category land, consecrated land, renewal area, etc. -
Issues and Options Report
A PLAN FOR COLCHESTER BRAINTREE BORDERS GARDEN COMMUNITY Issues and Options Report October 2017 2 CONTENTS Have your say ....................................................................................................................................................................................................4 SECTION 1 INTRODUCTION ................................................................................................................................................................................................5 The purpose of this consultation.....................................................................................................................................................................5 Why is a Development Plan needed? ............................................................................................................................................................5 Why are your views important? ....................................................................................................................................................................... 7 What status will the Plan Document have? ................................................................................................................................................... 7 About this Issues and Options Report ...........................................................................................................................................................8 Steps to preparing a Plan (DPD) .....................................................................................................................................................................9 -
Scheme Assessment Report, Part 1
A120 BRAINTREE TO A12 Essex County Council Scheme Assessment Report B3553T41-JAC-HGN-00-REP-C-0008 | P05 12/11/18 Essex C ounty Council A120 Braintree to A12 Scheme Assessment Report A120 Braintree to A12 Project No: B3553T41 Document Title: Scheme Assessment Report Document No.: B3553T41-JAC-HGN-00-REP-C-0008 Revision: P05 Date: 12 November 2018 Client Name: Essex County Council Project Manager: James Burke Author: Ransford Wiredu File Name: B3553T41-JAC-HGN-00-REP-C-0008 Jacobs U.K. Limited Simpson House, 6 Cherry Orchard Road, Croydon, CR9 6BE T +44 (0)20.8686.8212 www.jacobs.com © Copyright 2018 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This report has been prepared on behalf of, and for the exclusive use of Jacobs’ Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. Document history and status Revision Date Description By Review Approved P00 28/09/17 Draft issue for comment RW/MJ/CH JRW JB P01 21/05/18 Draft issue for comment RW JRW JB P02 18/07/18 Draft issue to HE environment team to address HE MW (update of MJ (review of JB comments on environment sections (Sections 2.8 and environment environment section 8) sections only) sections only) P03 25/08/2018 Issue for TPG review CJH (update of MJS (review of JB economics and economics and Decision Decision Framework) Framework) P04 20/10/2018 Final report including TGP comments CJH MJS JB P05 12/11/2018 Final report including appendices RW MS JB B3553T41-JAC-HGN-00-REP-C-0008 ii A120 Braintree to A12 Scheme Assessment Report Contents Contents ......................................................................................................................................................