A120 BRAINTREE to A12 Consultation on Route Options 17 January – 14 March 2017

Total Page:16

File Type:pdf, Size:1020Kb

A120 BRAINTREE to A12 Consultation on Route Options 17 January – 14 March 2017 A120 BRAINTREE TO A12 Consultation on Route Options 17 January – 14 March 2017 1 2 A120 Braintree to A12 Consultation on Route Options 1. FOREWORD I am delighted to announce the start of the public consultation on five options for improving the A120 between Braintree and the A12. For both motorists and communities, To the west of Braintree and the east of still a lot of work to be done to make any improvement to this part of the A120 has Colchester, the A120 is in part a high long term improvement a reality. been a long time coming. The options quality, modern road. While, between These five options support our ambitions to be considered will improve the safety Braintree and the A12, it too often around economic growth and ensure on this stretch of road and improve the resembles a country road – pulling heavy that our roads meet the demands of levels of congestion. goods vehicles through villages. Now, our residents. This consultation is so we have the opportunity to move the In its current form this stretch of road important and I encourage all those A120 away from our villages and double does not have the capacity to meet affected by these proposals to contribute the capacity of our road network. The current or future vehicle demands. their views on the five options that are number of vehicles on the road will grow This is emphasised further by its being presented. as our children become drivers and our increasing strategic importance as a key Councillor Kevin Bentley growing businesses create more jobs Councillor Kevin Bentley international trade route connecting the and the Essex economy grows. Haven Ports, the Midlands, the North, Deputy Leader and Cabinet Member M25 and Stansted Airport. The A120 This public consultation is the for Economic Growth and Partnerships plays a vital role in the international trade culmination of not just a year’s technical and economic success of the East of work, but almost 10 years of community England and the UK. and political persistence. But there is 2 3 4 A120 Braintree to A12 Consultation on Route Options 2. INTRODUCTION Essex County Council is committed to supporting local and regional growth through the improvement of local infrastructure to leave a long term legacy of jobs, homes, and strong communities for our children and future generations. The A120 is the primary route linking the to support local and regional growth options. We now have sufficient It is important to remember that at A10 at Hertford in the West to the port is restricted by the last major section information to consult individuals, this early stage the options have of Harwich in the East, roughly following of single carriage way road between communities, representative bodies and been technically developed to a point the original Roman road corridor, Stane Braintree and the A12. businesses on the five best performing where we are confident that they can Street. In the 1970’s and 1980’s road route options for the A120 between be built. However exact details about Already heavily over-capacity, traffic improvements provided bypasses of Braintree and A12. road alignments, junction design volumes are set to increase further - Bishops Stortford, Great Dunmow and and environmental assessments and and without improvement the regular After consultation, Essex County Council Coggeshall and the line of the A120 mitigation measures have not been bottlenecks on the A120 will get worse will consider all responses, and use this around Colchester was diverted to follow completed. Like other major road for everyone. The continual increase in information to make a preferred route the A12 via its upgrades at Stanway and projects this work is undertaken once a traffic over the years and incidents has option recommendation to the Secretary the Colchester Northern Bypass. Finally single option has been selected. led to greater delays. Upgrading this of State and Highways England. a completely new line for the road to strategically important road is essential reach Harwich itself was constructed A1 to unlocking more economic potential east of Colchester. In the early 2000’s i in Essex and the wider South East the Braintree to Stansted Airport dual with tangible benefits to road users, 55 eitoe carriage way bypass was opened. B102 A1 businesses and local neighbourhoods. A12 On 7th March 2005 the Secretary of ari Although the A120 is part of the Strategic 2 State for Transport made the A120 A120 Road Network operated by Highways ar ar rae r from the M11 to Marks Tey part of the onaot it oea ane 2 oeter England, in 2015 the Government A120 Strategic Road Network in recognition of agreed that Essex County Council will B102 its essential role in the supporting long A12 lead on the work to determine the way Braintree distance travel and commerce in the 2 forward. This is a unique opportunity for eeon East of England. 2 everyone in Essex to work with us to find tante Over 40 years of piecemeal the best solution to the problems. ae orner A12 improvements have provided Essex with M11 onaot In the last year we have identified issues, an essential East/West link, however the eor developed 68 options, assessed and 1 A10 effectiveness of the road and its ability reduced these to five best performing oten A12 4 5 This public consultation will run from the 17th January to the 14th March 2017. The five route options that we are asking your views on are: Option This route option is approximately A 14km long, 5km of which runs along the line of the current A120. It starts just west of Galleys Corner then bypasses Bradwell to the north, crossing the River Blackwater, and then joins the current A120. East of Coggeshall, it leaves the current A120, heading south east where it joins the A12 at a new junction between Kelvedon and Marks Tey. Option This route option does not follow the B current A120 and is approximately 13km long. It starts just west of Galleys Corner, passes to the south of Glazenwood Park, runs through Bradwell Quarry, crosses the River Blackwater, joining the A12 at a new junction between Kelvedon and Marks Tey. Option This route option does not follow the C current A120 and is approximately 15km long. It starts on the Braintree southern bypass, passes north of Tye Green and Cressing, runs through Bradwell Quarry, crosses the River Blackwater, joining the A12 at a new junction between Kelvedon and Marks Tey. Option This route option does not follow the D current A120 and is approximately 9.5km long. It starts just west of Galleys Corner, passes south of Glazenwood Park, runs through the south-west corner of Bradwell Quarry, joining the A12 at Kelvedon south junction. Option This route option does not follow the E current A120 and is approximately 11km long. It starts on the Braintree southern bypass, passes north of Tye Green and Cressing, runs through the south-west corner of Bradwell Quarry, joining the A12 at Kelvedon south junction. 6 A120 Braintree to A12 Consultation on Route Options This document provides further We want to hear your views information on the purpose of this consultation, it explains what will We need to understand the views of everyone who may use or be affected by the scheme. happen following the consultation We are asking you to: and informs you when we will be in a Indicate your preferred option and provide comments position to report on the results. Tell us your views about future junction locations Alongside this consultation document, The consultation will run for 8 weeks, commencing on Tuesday 17th January and closing at 23:59 on Tuesday 14th March 2017. the individual option maps and Responses will be analysed and summarised in a Consultation Response Analysis Report. the Options Assessment Report is The project team will then consider the results of the consultation and a Preferred Option recommendation will be taken to Essex available and can be found on our County Council. If the Council endorses the recommendation the Preferred Option will be presented to the Secretary of State and website: www.a120essex.co.uk Highways England for potential inclusion in the Road Investment Strategy. After the Preferred Option is announced by Essex County Council further detailed work will take place. This will include: continued engagement with local communities further investigations into environmental effects, including additional surveys further design work investigation into what mitigation may be required consideration of additional or improved paths/routes for cyclists, pedestrians and horse riders, and redirecting or providing local access routes. Once this work is complete a further public consultation will take place before a planning application is submitted (Development Consent Order). 6 7 • Reliance is poor - the road isn’t built to deal with today’s In the evening peak vehicles travel level of traffic and any unexpected condition or incidents • If there is an incident then the carriage way is too narrow for other traffic to easily pass 15% 22 mph of vehicles each day are SLOWER • Speed is slow due to the number of vehicles and the up to heavy good vehicles and journeys are 14 minutes longer narrow carriageway • No real time signage to raise awareness if any incident • Few suitable alternative routes for many road users uts bo a GALLEY´S CORNER d Major pinch points, n that hold up u There can be less than o PINCH r between passing drivers and create POINTS 90cm 41% congestion are: heavy good vehicles on of traffic using Marks Farm roundabout some parts of the road – is staying on the A120.
Recommended publications
  • Standon Neighbourhood Plan [2MB]
    Barwick Standon Bromley Latchford Puckeridge Colliers End Old Hall Green LATEST NEWS Wellpond Green STANDON PARISH NEIGHBOURHOOD DEVELOPMENT PLAN Pre-Submission Draft 2016 BARWICK I STANDON I BROMLEY I LATCHFORD I PUCKERIDGE COLLIERS END I OLD HALL GREEN I WELLPOND GREEN SSTTAANNDDOONN •• PPUUCCKKEERRIIDDGGEE •• BBRROOMMLLEEYY •• CCOOLLLLIIEERRSS EENNDD •• LLAATTCCHHFFOORRDD •• BBAARRWWIICCKK •• OOLLDD HHAALLLL GGRREEEENN •• WWEELLLLPPOONNDD GGRREEEENN CONTENTS PREFACE 1. Introduction 4 A NEIGHBOURLY PARISH 2. The Parish of Standon 6 Standon is a neighbourly Parish, and 3. How the Plan was Prepared: An Inclusive Process 12 its Parishioners believe that the obligation on neighbours to behave in Stage 1: Setting Up 12 a neighbourly manner, in their mutual Stage 2: Spring and Summer Consultations 2015 13 interests, also extends equally and Stage 3: Survey 13 Stage 4: Land Allocations 14 still mutually, to those who come Stage 5: Public Meetings 15 proposing development. Stage 6: Drafting of the Plan 16 The physical presence of those Stage 7: Pre-Submission 16 individuals and companies, as 4. Vision and Objectives 17 neighbours, may be transitory, but 5. The Policies 20 the changes they introduce in and around the neighbourhood area, and Context 20 the ramification of those changes, can Environment 22 have a lasting effect on the quality of Housing and Development 26 life of many local residents. Economy and Employment 32 Transport 33 The Parish therefore responds Facilities and Services 37 positively to developers who share 6. Implementation and Monitoring 43 this approach. Introduction 43 Development Management 43 Infrastructure Projects 43 Monitoring and Review 44 A10 Road Access Proposal 44 7. Appendix 45 Housing Development Proposal 2016-2031 45 Standon Conservation Map 46 Puckeridge Conservation Map 47 Colliers End Boundary Map 48 Areas of Beauty Map 49 2 STANDON PARISH NEIGHBOURHOOD PLAN STANDON PARISH NEIGHBOURHOOD PLAN 3 1.
    [Show full text]
  • Braintree District Council Infrastructure Delivery Plan June 2021 BRAINTREE DISTRICT COUNCIL INFRASTRUCTURE DELIVERY PLAN
    BDC/058 Braintree District Council Infrastructure Delivery Plan June 2021 BRAINTREE DISTRICT COUNCIL INFRASTRUCTURE DELIVERY PLAN PREPARED BY: Troy Planning + Design and Navigus Planning TROY PLANNING + DESIGN 41-42 Foley Street, Fitzrovia, London W1W 7TS www.troyplanning.com NAVIGUS PLANNING Truro, Lushington Road, Manningtree, Essex, CO11 1EF, UK www.navigusplanning.co.uk PREPARED ON BEHALF OF: Braintree District Council COPYRIGHT The concepts and information contained in this document are the property of Troy Planning + Design (Troy Hayes Planning Limited). Use or copying of this document in whole or in part without the written permission of Troy Planning + Design constitutes an infringement of copyright. LIMITATION This report has been prepared on behalf of and for the exclusive use of Troy Planning + Design’s Client, and is subject to and issued in connection with the provisions of the agreement between Troy Planning + Design and its Client. Troy Planning + Design and Navigus Planning accepts no liability or responsibility whatsoever for or in respect of any use or reliance upon this report by any third party. Revision Description Issued by: Date Checked 1 Final LI 21.06.21 CB, LI 2 CONTENTS 1. Introduction............................................................................................................................. 5 1.1. Infrastructure Covered in this Plan ............................................................................................... 5 1.2. Purpose of the Report ..................................................................................................................
    [Show full text]
  • Road Investment Strategy 2: 2020-2025
    Road Investment Strategy 2: 2020–2025 March 2020 CORRECTION SLIP Title: Road Investment Strategy 2: 2020-25 Session: 2019-21 ISBN: 978-1-5286-1678-2 Date of laying: 11th March 2020 Correction: Removing duplicate text on the M62 Junctions 20-25 smart motorway Text currently reads: (Page 95) M62 Junctions 20-25 – upgrading the M62 to smart motorway between junction 20 (Rochdale) and junction 25 (Brighouse) across the Pennines. Together with other smart motorways in Lancashire and Yorkshire, this will provide a full smart motorway link between Manchester and Leeds, and between the M1 and the M6. This text should be removed, but the identical text on page 96 remains. Correction: Correcting a heading in the eastern region Heading currently reads: Under Construction Heading should read: Smart motorways subject to stocktake Date of correction: 11th March 2020 Road Investment Strategy 2: 2020 – 2025 Presented to Parliament pursuant to section 3 of the Infrastructure Act 2015 © Crown copyright 2020 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at https://www.gov.uk/government/publications. Any enquiries regarding this publication should be sent to us at https://forms.dft.gov.uk/contact-dft-and-agencies/ ISBN 978-1-5286-1678-2 CCS0919077812 Printed on paper containing 75% recycled fibre content minimum. Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery Office.
    [Show full text]
  • Environmental Assessment Report Volume 1 B3553T41-JAC-EGN-00-REP-EN-0001 | P00.1 24/11/16
    A120 Braintree to A12 Essex County Council Environmental Assessment Report Volume 1 B3553T41-JAC-EGN-00-REP-EN-0001 | P00.1 24/11/16 ENVIR ONMEN TAL ASSESSM ENT R EPORT Essex C ounty Council ENVIRONMENTAL ASSESSMENT REPORT Contents Executive Summary ............................................................................................................................................... 6 Introduction ............................................................................................................................................................ 9 1. Purpose and structure of this report ..................................................................................................... 10 2. The scheme .............................................................................................................................................. 12 2.1 Need for the scheme ................................................................................................................................. 12 2.2 Location ..................................................................................................................................................... 12 2.3 History........................................................................................................................................................ 12 2.4 Planning policies and context .................................................................................................................... 12 2.5 Aims and objectives ..................................................................................................................................
    [Show full text]
  • All Saints Colchester Marriages 1609-1720 (Grooms) Groom Surname Groom 1St Status Bride 1St Bride Surname Status Marriage Date Notes ? Tho
    All Saints Colchester marriages 1609-1720 (grooms) Groom surname Groom 1st Status Bride 1st Bride surname Status Marriage date Notes ? Tho. Single man Martha WOODWARD Single woman 05 Sep 1653 No groom's surname. [BR]USSE Samuell Jane BROCK 05 Sep 1677 Licence. Both of Feareing [FP]OSTER Edward Ann BARKER 15 Jun 1686 Bride of St Leonard's [LR]OWTH Ambrose Single man Sarah PURSLOW Single woman 15 Feb 1676/7 The L and R are over each other. Licence. ABBOT Gyles Widower Mary WEBB Widow 07 Mar 1697/8 Both of St Buttolph's ABEL James Anne WILLIAMS 01 Feb 1680/1 Licence. Both of St Leonard's ABLET Henry Single man Mary MILLAR Single woman 20 Feb 1701/2 Licence. Groom of S. Buttolphs, bride of Hadley ADAMS George Single man Anne SMALLEDGE Single woman 20 Feb 1678/9 A [= allegation ?]. Both of St Buttolphs ADAMS William Mary WRIGHT 31 Oct 1689 ADLER John Sara LANGHAM 15 Feb 1685/6 Licence. Both of St Leonard's AERIS George ? ? 20 Oct 1667 Groom of Sawkitt [ Salcott ?] AGAR John Phoebe GREENFEILD 25 Dec 1693 Bride of Greenstead AGNES Robert Ann TODD 07 Mar 1720/1 AILEWARD John Single man Mary BEMISH Single woman 24 Dec 1675 Licence. Both of Inworth No bride's surname. Year is given as 166 and is probably one ALAIS Petar Mary ? 03 Oct 1660 of 1660 to 1664. [ Alliss ? ]. ALCOCK James Mary FOAKES 31 Jul 1681 Both of West Marsey [ West Mersea ]. ALDERTON Anthony Single man Hannah ROGERS Single woman 31 Oct 1676 Licence.
    [Show full text]
  • Essex County Council (The Commons Registration Authority) Index of Register for Deposits Made Under S31(6) Highways Act 1980
    Essex County Council (The Commons Registration Authority) Index of Register for Deposits made under s31(6) Highways Act 1980 and s15A(1) Commons Act 2006 For all enquiries about the contents of the Register please contact the: Public Rights of Way and Highway Records Manager email address: [email protected] Telephone No. 0345 603 7631 Highway Highway Commons Declaration Link to Unique Ref OS GRID Statement Statement Deeds Reg No. DISTRICT PARISH LAND DESCRIPTION POST CODES DEPOSITOR/LANDOWNER DEPOSIT DATE Expiry Date SUBMITTED REMARKS No. REFERENCES Deposit Date Deposit Date DEPOSIT (PART B) (PART D) (PART C) >Land to the west side of Canfield Road, Takeley, Bishops Christopher James Harold Philpot of Stortford TL566209, C/PW To be CM22 6QA, CM22 Boyton Hall Farmhouse, Boyton CA16 Form & 1252 Uttlesford Takeley >Land on the west side of Canfield Road, Takeley, Bishops TL564205, 11/11/2020 11/11/2020 allocated. 6TG, CM22 6ST Cross, Chelmsford, Essex, CM1 4LN Plan Stortford TL567205 on behalf of Takeley Farming LLP >Land on east side of Station Road, Takeley, Bishops Stortford >Land at Newland Fann, Roxwell, Chelmsford >Boyton Hall Fa1m, Roxwell, CM1 4LN >Mashbury Church, Mashbury TL647127, >Part ofChignal Hall and Brittons Farm, Chignal St James, TL642122, Chelmsford TL640115, >Part of Boyton Hall Faim and Newland Hall Fann, Roxwell TL638110, >Leys House, Boyton Cross, Roxwell, Chelmsford, CM I 4LP TL633100, Christopher James Harold Philpot of >4 Hill Farm Cottages, Bishops Stortford Road, Roxwell, CMI 4LJ TL626098, Roxwell, Boyton Hall Farmhouse, Boyton C/PW To be >10 to 12 (inclusive) Boyton Hall Lane, Roxwell, CM1 4LW TL647107, CM1 4LN, CM1 4LP, CA16 Form & 1251 Chelmsford Mashbury, Cross, Chelmsford, Essex, CM14 11/11/2020 11/11/2020 allocated.
    [Show full text]
  • Tackling High Risk Regional Roads Safer Roads Fund Full
    Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION The Royal Automobile Club Foundation for Motoring Ltd is a transport policy and research organisation which explores the economic, mobility, safety and environmental issues relating to roads and their users. The Foundation publishes independent and authoritative research with which it promotes informed debate and advocates policy in the interest of the responsible motorist. RAC Foundation 89–91 Pall Mall London SW1Y 5HS Tel no: 020 7747 3445 www.racfoundation.org Registered Charity No. 1002705 October 2018 © Copyright Royal Automobile Club Foundation for Motoring Ltd Mobility • Safety • Economy • Environment Tackling High-Risk Regional Roads Safer Roads Fund 2017/2018 FO UND Dr Suzy Charman Road Safety Foundation October 2018 AT ION About the Road Safety Foundation The Road Safety Foundation is a UK charity advocating road casualty reduction through simultaneous action on all three components of the safe road system: roads, vehicles and behaviour. The charity has enabled work across each of these components and has published several reports which have provided the basis of new legislation, government policy or practice. For the last decade, the charity has focused on developing the Safe Systems approach, and in particular leading the establishment of the European Road Assessment Programme (EuroRAP) in the UK and, through EuroRAP, the global UK-based charity International Road Assessment Programme (iRAP). Since the inception of EuroRAP in 1999, the Foundation has been the UK member responsible for managing the programme in the UK (and, more recently, Ireland), ensuring that these countries provide a global model of what can be achieved.
    [Show full text]
  • Forward Plan Reference Number: FP/830/05/17 Report Title: A120 Braintree to A12: Report on Option Selection and Consultation
    Forward Plan reference number: FP/830/05/17 Report title: A120 Braintree to A12: report on option selection and consultation. Report to: Cabinet Report author: Andrew Cook - Director, Highways and Transportation Date: 23 November 2017 For: Decision Enquiries to: Chris Stevenson, Head of Commissioning, Connected Essex, Integrated Transport Telephone: 03330 136577| of: 07970 766769 Email: [email protected] County Divisions affected: All Essex 1. Purpose of Report 1.1. To present an update on the A120 route options following public consultation for a new dual carriageway road between Braintree and the A12, to outline and assess the choices open to Essex County Council (ECC) for their post- public consultation announcement and to recommend the way forward. 2. Recommendations 2.1. That Cabinet agrees : • that of the initial 68 route options assessed and the 5 options taken to consultation only 2 broad options, corresponding to the central (routes B and C) and southern corridors (routes D and E), will now be pursued in greater detail to determine the best overall performing route; • that Option A (northern corridor) is the worst performing option and would appear unlikely to emerge as a candidate for preferred route status through further study; • that work continues to present a full set of route option appraisals to Government in accordance with Highways England processes; • that a final decision on Essex County Council’s preferred route option be delegated to the Deputy Leader and Cabinet Member for Economic Growth, Skills, Infrastructure and the Digital Economy in consultation with the Executive Director for Infrastructure and Environment. 3.
    [Show full text]
  • Colchester Borough Council's Housing Land Supply Position July 2018
    Housing Land Supply Position Statement Colchester Borough Council’s housing land supply position J 2018 1 uly Contents Page 1. Status of Document 3 2. Local Context 3 3. National Policy 4 4. Housing Target for Colchester 6 5. Windfall Allowance 8 6. Emerging Allocations 11 7. Five Year Supply Calculation 13 8. Monitoring 14 Appendix One – Housing Trajectory 15 2 1. Status of this document 1.1 This document sets out Colchester’s housing land supply position and explains how this position complies with the requirements of national policy and guidance. 1.2 The document represents the current housing land supply position as of 1st April 2018. The relevant five year housing land supply period therefore covers the period between 1st April 2018 and 31st March 2023. 1.3 The information contained in this document is correct in respect of the time period it covers but due to the nature of housing supply and delivery it is considered to be a ‘live document’. It is therefore subject to change as and when new information is received which changes the housing supply and/or housing delivery position. 2. Local Context 2.1 Colchester Borough Council has an adopted Local Plan which consists of its Core Strategy (adopted in 2008 and subject to a Focused Review in 2014), Site Allocations DPD (adopted 2010) and Development Policies DPD (adopted 2008 and reviewed 2014). The Tiptree Jam Factory Plan DPD (2013) also forms part of the development plan. In addition there are two adopted Neighbourhood Plans within Colchester Borough in the form of the Myland and Braiswick Neighbourhood Plan and Boxted Neighbourhood Plan, both of which were adopted in 2016.
    [Show full text]
  • STATEMENT of CASE Rule 7 – Compulsory Purchase (Inquiries Procedure) Rules 2007 Rule 16- Highways (Inquiries Procedure) Rules 1994
    THE HERTFORDSHIRE COUNTY COUNCIL (A120 BYPASS (LITTLE HADHAM)) COMPULSORY PURCHASE ORDER 2017 and THE HERTFORDSHIRE COUNTY COUNCIL (A120 (LITTLE HADHAM) BYPASS CLASSIFIED ROAD) (SIDE ROADS) ORDER 2017 STATEMENT OF CASE Rule 7 – Compulsory Purchase (Inquiries Procedure) Rules 2007 Rule 16- Highways (Inquiries Procedure) Rules 1994 Department for Transport Reference: NATTRAN/E/LAO/136 1 HIGHWAYS ACT 1980 ACQUISITION OF LAND ACT 1981 THE HERTFORDSHIRE COUNTY COUNCIL (A120 BYPASS (LITTLE HADHAM)) COMPULSORY PURCHASE ORDER 2017 and THE HERTFORDSHIRE COUNTY COUNCIL (A120 (LITTLE HADHAM) BYPASS CLASSIFIED ROAD) (SIDE ROADS) ORDER 2017 STATEMENT OF CASE OF HERTFORDSHIRE COUNTY COUNCIL Contents: Introduction 1. Section (i) a brief description of the order land and its location, topographical features and present use 2. Section (ii) an explanation of the use of the particular enabling power 3. Section (iii) an outline of the authority’s purpose in seeking to acquire the land 4. Section (iv): a statement of the authority’s justification for compulsory purchase, with regard to Article 1 of the First Protocol of the European Convention on Human Rights, and Article 8 if appropriate 5. Section (v): a description of the proposals for the use or development of the land 6. Section (vi) a statement about the planning position of the order site. See also Section 1: advice on Section 226 of the Town and County Planning Act 1990 for planning orders 7. Section (vii) information required in the light of government policy statements where orders are made in certain circumstances. 8. Section (viii) any special considerations affecting the order site, e.g. ancient monument, listed building, conservation area, special category land, consecrated land, renewal area, etc.
    [Show full text]
  • Issues and Options Report
    A PLAN FOR COLCHESTER BRAINTREE BORDERS GARDEN COMMUNITY Issues and Options Report October 2017 2 CONTENTS Have your say ....................................................................................................................................................................................................4 SECTION 1 INTRODUCTION ................................................................................................................................................................................................5 The purpose of this consultation.....................................................................................................................................................................5 Why is a Development Plan needed? ............................................................................................................................................................5 Why are your views important? ....................................................................................................................................................................... 7 What status will the Plan Document have? ................................................................................................................................................... 7 About this Issues and Options Report ...........................................................................................................................................................8 Steps to preparing a Plan (DPD) .....................................................................................................................................................................9
    [Show full text]
  • Scheme Assessment Report, Part 1
    A120 BRAINTREE TO A12 Essex County Council Scheme Assessment Report B3553T41-JAC-HGN-00-REP-C-0008 | P05 12/11/18 Essex C ounty Council A120 Braintree to A12 Scheme Assessment Report A120 Braintree to A12 Project No: B3553T41 Document Title: Scheme Assessment Report Document No.: B3553T41-JAC-HGN-00-REP-C-0008 Revision: P05 Date: 12 November 2018 Client Name: Essex County Council Project Manager: James Burke Author: Ransford Wiredu File Name: B3553T41-JAC-HGN-00-REP-C-0008 Jacobs U.K. Limited Simpson House, 6 Cherry Orchard Road, Croydon, CR9 6BE T +44 (0)20.8686.8212 www.jacobs.com © Copyright 2018 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This report has been prepared on behalf of, and for the exclusive use of Jacobs’ Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. Document history and status Revision Date Description By Review Approved P00 28/09/17 Draft issue for comment RW/MJ/CH JRW JB P01 21/05/18 Draft issue for comment RW JRW JB P02 18/07/18 Draft issue to HE environment team to address HE MW (update of MJ (review of JB comments on environment sections (Sections 2.8 and environment environment section 8) sections only) sections only) P03 25/08/2018 Issue for TPG review CJH (update of MJS (review of JB economics and economics and Decision Decision Framework) Framework) P04 20/10/2018 Final report including TGP comments CJH MJS JB P05 12/11/2018 Final report including appendices RW MS JB B3553T41-JAC-HGN-00-REP-C-0008 ii A120 Braintree to A12 Scheme Assessment Report Contents Contents ......................................................................................................................................................
    [Show full text]