2 Billion Midlands Rail Hub Plans “The Most Ambitious for a Generation” As Government Is Urged: Don’T Ignore the Midlands
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Framework Capacity Statement
Framework Capacity Statement Network Rail December 2016 Network Rail Framework Capacity Statement December 2016 1 Contents 1. Purpose 1.1 Purpose 4 2. National overview 2.1 Infrastructure covered by this statement 6 2.2 Framework agreements in Great Britain 7 2.3 Capacity allocation in Great Britain 9 2.4 National capacity overview – who operates where 10 2.5 National capacity overview – who operates when 16 3. Network Rail’s Routes 3.1 Anglia Route 19 3.2 London North East & East Midlands Route 20 3.3 London North Western Route 22 3.4 Scotland Route 24 3.5 South East Route 25 3.6 Wales Routes 27 3.7 Wessex Route 28 3.8 Western Route 29 4. Sub-route and cross-route data 4.1 Strategic Routes / Strategic Route Sections 31 4.2 Constant Traffic Sections 36 Annex: consultation on alternative approaches A.1 Questions of interpretation of the requirement 39 A.2 Potential solutions 40 A.3 Questions for stakeholders 40 Network Rail Framework Capacity Statement December 2016 2 1. Purpose Network Rail Framework Capacity Statement December 2016 3 1.1 Purpose the form in which data may be presented. The contracts containing the access rights are publicly available elsewhere, and links are provided in This statement is published alongside Network Rail’s Network Statement section 2.2. However, the way in which the rights are described when in order to meet the requirements of European Commission Implementing combined on the geography of the railway network, and over time, to meet Regulation (EU) 2016/545 of 7 April 2016 on procedures and criteria the requirements of the regulation, is open to some interpretation. -
Moseley in the Nineteenth Century: Transport
Moseley in the Nineteenth Century: Transport. At the beginning of the nineteenth century, Moseley was a small, rural, idyllic village. By the end of the century, Moseley had changed considerably. One regular visitor to Moseley, Thomas Anderton, writing in 1900, recalled Moseley in the early 1840s and described the changes (Illustration 1):1 As for Moseley . it was a pretty little village in those days. The old village green, the rustic country inns (of which the "Fighting Cocks" was the chief), and some low-roofed, old-fashioned houses, backed by the parish church tower, made up a picture which still remains in my mind's eye. Beyond Moseley Church was a pretty road to Moseley Wake Green, in which were, if I remember rightly, one or two timbered houses and some old-fashioned residences, surrounded by high trees. Many of these have now disappeared. In another direction from the church was a country road running to Sparkbrook, and near which were an important house and lands belonging to the wealthy Misses Anderton, whose possessions have been heard of in more recent days. I now often visit Moseley, and change, but not decay, in all around I see. The prevailing colour of the old village green is now red brick, and the modern colour does not agree so well with my vision as the more rustic tones of a bygone day; whilst the noise and bustle of tram cars, the swarms of suburban residents that emerge from the railway station (especially at certain times in the day), are fast wiping out the peaceful, pretty Moseley of my youthful days. -
West Midlands & Chilterns Route Study Technical Appendices
Long Term Planning Process West Midlands & Chilterns Route Study Technical Appendices August 2017 Contents August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 02 Technical Appendices 03 A1 - Midlands Rail Hub: Central Birmingham 04 elements A2 - Midlands Rail Hub: Birmingham to 11 Nottingham/Leicester elements A3 - Midlands Rail Hub: Birmingham to 17 Worcester/Hereford via Bromsgrove elements A4 - Chiltern Route 24 A5 - Birmingham to Leamington Spa via 27 Coventry A6 - Passenger capacity at stations 30 A7 - Business Case analysis 50 Technical Appendicies August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 03 Introduction to Technical Appendices Cost estimation These Technical Appendices provide the technical evidence to Cost estimates have been prepared for interventions or packages of support the conclusions and choices for funders presented in the interventions proposed in the Route Study. The estimates are based main Route Study document. The areas of technical analysis on the pre-GRIP data available, concept drawings and high level outlined in these appendices are capability analysis, concept specification of the intervention scope. To reflect the level of development (at pre-GRIP level), cost estimation, business case information available to support the estimate production, a analysis and passenger capacity analysis at stations. contingency sum of 60% has been added. The estimates do not include inflation. Indicative cost ranges have been provided based The appendices are presented by geographical area with the on this assessment. exception of the business case analysis and passenger capacity analysis. Business case analysis The areas of technical analysis are summarised below. Business case analysis has been undertaken to demonstrate to funders whether a potential investment option is affordable and Capability Analysis offers value for money. -
Third Party Funding
THIRD PARTY FUNDING IS WORKING IAN BAXTER, Strategy Director at SLC Rail, cheers enterprising local authorities and other third parties making things happen on Britain’s complex railway n 20 January 1961, John F. Kennedy used being delivered as central government seeks be up to them to lead change, work out how his inaugural speech as US President more external investment in the railway. to deliver it and lever in external investment Oto encourage a change in the way of into the railway. It is no longer safe to assume thinking of the citizens he was to serve. ‘Ask DEVOLUTION that central government, Network Rail or not what your country can do for you,’ intoned So, the theme today is: ‘Ask not what the train operators will do this for them. JFK, ‘but what you can do for your country.’ the railway can do for you but what However, it hardly needs to be said, least of Such a radical suggestion neatly sums up you can do for the railway’. all to those newly empowered local railway the similar change of approach represented Central government will sponsor, develop, promoters themselves, enthusiastic or sceptical, collectively by the Department for Transport’s fund and deliver strategic railway projects that the railway is a complex entity. That March 2018 ‘Rail Network Enhancements required for UK plc, such as High Speed 2, applies not only in its geographical reach, Pipeline’ (RNEP) process, Network Rail’s ‘Open for electrification, long-distance rolling stock scale and infrastructure, but also in its regularly Business’ initiative and the ongoing progress of replacement or regeneration at major stations reviewed post-privatisation organisation, often devolution of railway planning and investment like London Bridge, Reading or Birmingham New competing or contradictory objectives, multiple to the Scottish and Welsh governments, Street. -
Delivering a Rail Revolution for Communities
Delivering a Rail Revolution for Communities Malcolm Holmes, Executive Director West Midlands Rail Executive is a movement for change, driving a revolution in rail services for West Midlanders • Increasing local influence over our rail network through: • A strong role in the specification and procurement of the 2017 West Midlands franchise • Leading the local management of the franchise • A role in specification of other franchises that operate in the region • A fully devolved West Midlands rail franchise WMRE Strategic Focus Single Network Vision West Midlands Rail Investment Strategy West Midlands West Midlands Rail Franchising Rail Programme Stations Alliance & Partnerships WMRE Strategic Focus Single Network Vision West Midlands Rail Investment Strategy West Midlands West Midlands Rail Franchising Rail Programme Stations Alliance & Partnerships Franchises in WMRE Area Crewe Stoke-on-Trent West Midlands Franchise - WMSBU West Midlands Franchise - WCSBU Derby Cross Country Nottingham Stafford Chiltern Railways Rugeley Trent Valley Wales & Borders (Arriva Trains Wales) Burton-on- Rugeley Town Trent Inter City West Coast (Virgin Trains) Cannock Lichfield Trent Lichfield City Valley Great Western (First Great Western) East Midlands Walsall Tamworth Shrewsbury Sutton Coldfield Tame Bridge Pky Wolverhampton Nuneaton Birmingham Aston Snow Hill Hinckley Leicester Telford Telford Central Smethwick Galton Bridge New St Rowley Regis Birmingham International Cradley Heath Birmingham Moor St University Coventry Rugby Stourbridge Solihull Long Buckby -
Rail Business Report PDF 3 MB
Transport Delivery Committee Date 06 January 2020 Report title Rail Business Report Accountable Director Malcolm Holmes, Director of Rail, Transport for West Midlands Email [email protected] Tel 0121 214 7058 Accountable Tom Painter, Head of Rail Franchising and Employee Partnerships, West Midlands Rail Executive Email [email protected] Tel: 07432104161 Report has been Councillor Roger Lawrence – Lead Member Rail and considered by Metro Recommendation(s) for action or decision: The Transport Delivery Committee is recommended to: Note the content of the report 1.0 Purpose To provide an update relating to the performance, operation and delivery of rail services in the West Midlands including on rail operator partnership agreements and West Midlands Rail Executive (WMRE) activity. 2.0 Section A – Background 2.1 Transport for West Midlands (TfWM) and WMRE currently work to influence the management and delivery of rail services and projects. Page 1 of 9 [PUBLIC] 2.2 This report provides a summary of rail activity in the TfWM and wider WMRE areas between September and December 2019. 3.0 Section B – Williams Rail Review, West Coast Franchise and HS2 Williams Rail Review 3.1 Publication of the William’s Review has now been delayed until after the election. West Coast Franchise 3.2 The new (FirstGroup / FS Trenitalia) Avanti West Coast company replaced Virgin Trains as the operator of the West Coast franchise from Sunday 8th December. 3.3 The West Coast Partnership franchise connects important West Midlands centres such as Rugby, Coventry, Birmingham Airport/NEC, Birmingham, Sandwell & Dudley, Wolverhampton and Stafford with London, the North West and Scotland. -
Rail Business Report PDF 3 MB
Transport Delivery Committee Date 05 November 2018 Report title Rail Business Report Accountable Director Malcolm Holmes, Interim Director of Rail, Transport for West Midlands Email [email protected] Tel 0121 214 7058 Accountable Tom Painter, Head of Rail Franchising and Employee Partnerships, West Midlands Rail Executive Email [email protected] Tel: 07432104161 Report to be/has been Councillor Roger Horton – Lead Member Rail and Metro considered by Recommendation(s) for action or decision: The Transport Delivery Committee is recommended to: Note the content of the report 1.0 Purpose To provide an update relating to the performance, operation and delivery of rail services in the West Midlands including on rail operator partnership agreements and West Midlands Rail Executive (WMRE) activity. 2.0 Section A – Background 2.1 Transport for West Midlands (TfWM) and West Midlands Rail currently work to influence the management and delivery of rail services and projects. Page 1 of 16 [PUBLIC] 2.2 This report provides a summary of rail activity in the TfWM and wider WMRE areas between May and September 2018. 3.0 Section B – Rail Review 3.1 On 20th September 2018 the Government announced that it is undertaking a fundamental review of the rail industry following the “systemic failings in the industry”, which the Office of Rail and Road (ORR) concluded were a significant factor in the major disruption which occurred on a number of parts of the rail network around the May timetable change. 3.2 The Rail Review has been commissioned to review these failings alongside other wider structural issues in the industry and will report next Autumn with the intention of its findings being implemented from 2020. -
WMRE Rail Emissions Strategy
WMRE Rail Emissions Strategy Peter Sargant, Head of Rail Development January 2021 1 | National Strategic Context • RSSB Air Quality Strategic Framework • June 2020 • DfT Decarbonising Transport - March 2020 • Net zero Transport Emissions by 2050 • Transport Decarbonisation Plan to be published Spring 2021 Traction Decarbonisation Network Strategy (TDNS) • Published by Network Rail Autumn 2020 • Outlines long-term proposed outcome for Traction Power on network to eliminate diesel trains • Proposes significant expansion of electrification supplemented by battery and hydrogen • Provides a high-level business case for meeting the 2050 net-zero target • A more detailed Programme Business Case will be published soon – this will show proposed phasing of electrification Traction Power Options • Battery • Limited range • Good solution for extending services short distances “beyond the wires” • Test trains under development • Electric • Optimal solution for traction power • Mature technology • Infrastructure is very expensive • Hydrogen • Reasonable range potential • Practical challenges over hydrogen production, storage and use • Low efficiency, poor energy density • Test trains under development Most WM Routes Proposed for Electrification Diesel/Electric Train Operation in Birmingham Total Trains per off- Based on December 2019 Timetable peak hour Diesel Electric Birmingham New St 48 18 38% 30 63% Birmingham Moor St 15.5 15.5 100% 0 0% Total 63.5 33.5 53% 30 47% • Chase Line electrified in 2019 – Birmingham to Rugeley services converted to electric -
West Midlands and Chilterns Route Utilisation Strategy Draft for Consultation Contents 3 Foreword 4 Executive Summary 9 1
November 2010 West Midlands and Chilterns Route Utilisation Strategy Draft for Consultation Contents 3 Foreword 4 Executive summary 9 1. Background 11 2. Dimensions 20 3. Current capacity, demand, and delivery 59 4. Planned changes to infrastructure and services 72 5. Planning context and future demand 90 6. Gaps and options 149 7. Emerging strategy and longer-term vision 156 8. Stakeholder consultation 157 Appendix A 172 Appendix B 178 Glossary Foreword Regional economies rely on investment in transport infrastructure to sustain economic growth. With the nation’s finances severely constrained, between Birmingham and London Marylebone, as any future investment in transport infrastructure well as new journey opportunities between Oxford will have to demonstrate that it can deliver real and London. benefits for the economy, people’s quality of life, This RUS predicts that overall passenger demand in and the environment. the region will increase by 32 per cent over the next 10 This draft Route Utilisation Strategy (RUS) sets years. While Network Rail’s Delivery Plan for Control out the priorities for rail investment in the West Period 4 will accommodate much of this demand up Midlands area and the Chiltern route between to 2019, this RUS does identify gaps and recommends Birmingham and London Marylebone for the next measures to address these. 30 years. We believe that the options recommended Where the RUS has identified requirements for can meet the increased demand forecast by this interventions to be made, it seeks to do so by making RUS for both passenger and freight markets and the most efficient use of capacity. -
LNW Route Specification 2017
Delivering a better railway for a better Britain Route Specifications 2017 London North Western London North Western July 2017 Network Rail – Route Specifications: London North Western 02 SRS H.44 Roses Line and Branches (including Preston 85 Route H: Cross-Pennine, Yorkshire & Humber and - Ormskirk and Blackburn - Hellifield North West (North West section) SRS H.45 Chester/Ellesmere Port - Warrington Bank Quay 89 SRS H.05 North Transpennine: Leeds - Guide Bridge 4 SRS H.46 Blackpool South Branch 92 SRS H.10 Manchester Victoria - Mirfield (via Rochdale)/ 8 SRS H.98/H.99 Freight Trunk/Other Freight Routes 95 SRS N.07 Weaver Junction to Liverpool South Parkway 196 Stalybridge Route M: West Midlands and Chilterns SRS N.08 Norton Bridge/Colwich Junction to Cheadle 199 SRS H.17 South Transpennine: Dore - Hazel Grove 12 Hulme Route Map 106 SRS H.22 Manchester Piccadilly - Crewe 16 SRS N.09 Crewe to Kidsgrove 204 M1 and M12 London Marylebone to Birmingham Snow Hill 107 SRS H.23 Manchester Piccadilly - Deansgate 19 SRS N.10 Watford Junction to St Albans Abbey 207 M2, M3 and M4 Aylesbury lines 111 SRS H.24 Deansgate - Liverpool South Parkway 22 SRS N.11 Euston to Watford Junction (DC Lines) 210 M5 Rugby to Birmingham New Street 115 SRS H.25 Liverpool Lime Street - Liverpool South Parkway 25 SRS N.12 Bletchley to Bedford 214 M6 and M7 Stafford and Wolverhampton 119 SRS H.26 North Transpennine: Manchester Piccadilly - 28 SRS N.13 Crewe to Chester 218 M8, M9, M19 and M21 Cross City Souh lines 123 Guide Bridge SRS N.99 Freight lines 221 M10 ad M22 -
E-W Rail Position Paper
RAIL FREIGHT GROUP (RFG) East-West Rail Position Paper 18 July 2017 RAIL FREIGHT GROUP (RFG) EXECUTIVE SUMMARY The reopening of East West Rail link will play a vital role in supporting economic development of the Oxford-Cambridge corridor, including new housing and infrastructure. Rail freight has a significant role to play in supporting and servicing that development, in supply of construction materials and in facilitating efficient logistics for consumer goods. Estimates suggest that some 85,000+ homes are planned in the corridor over the next twenty years. As each freight train can move the equivalent of 30 houses worth of building materials, and keep up to 75 lorries off the roads, it is clear that encouraging rail freight must be a key imperative. To demonstrate the potential of the route, we have produced a position paper outlining where rail freight is already successfully operating, and where the reopened route offers opportunities for growth. Yet this cannot happen unless rail freight is planned from the outset, particularly given that new and different approaches to funding, construction and operation are being considered. We therefore urge Government to ensure that rail freight is a key part of the development of this route. EAST - WEST RAIL: FREIGHT POTENTIAL 1. Route and Infrastructure capability This study has assumed the route of East- West Rail (E-WR) phase one to be Oxford North Junc. – Bicester Gavray Junc. - Claydon LNE junc. – Bletchley Flyover Junc. – Bedford St. Johns – Bedford Midland. The route of Phase Two is, at present, unclear but will link the Phase One route at Bedford to Cambridge, with a link on to the ECML in the St. -
The Iron Road Book and Railway Companion from London to Birmingham, Manchester, and Liverpool
LIB R.AHY OF THE U N I VLR.S ITY OF ILLINOIS 385!0942 C&si 1838 I'll V, WATFORD •STATION Bushev <rvove bJlxtr<r Bey/tie i jfhtir i' tLuTon Jmu Benton ''f'Boisdon Hbnwev, BaiLBoads Canals. Turnpike Bonis irossBoads County Hound™■ THE IRON ROAD BOOK AND <smasmsra<i>sf FROM LONDON TO BIRMINGHAM, MANCHESTER, AND LIVERPOOL, CONTAINING AN Account of the Towns, Villages, Mansions, fyc. ON EACH SIDE OF THE LINE ; Times of Arrival and departure of the Trains AT THE SEVERAL STATIONS, Coaches and Omnibuses to the Towns in the Vicinity, WITH TABLES OF DISTANCES AND FARES FROM STATION TO STATION &C. &C. JUustratetr toitfj JRaps ot tf)e entire Htne. v Bv FRANCIS COGHLAN, : Author of Guides to * Paris,’ ‘St. Petersburgh, * The Rhine,’ * Belgium, ‘ Switzerland,’ * London,’ &c. HonDon: A H. BAILY & Co., 83, Cornhill. 1838. cur i* INTRODUCTION. LONDON £LN& BZIUVIZNGHAIVZ RAILWAY. J . The Act of Parliament for forming this great undertaking was obtained in May 1833, and the works were commenced in June 1834. 1 In July 1837, 24£ miles of the line, adjoining London, were opened to the public. Seventy-seven miles are now opened (viz. forty-eight from the London end, and twenty-nine from the Birmingham end) and in the ensuing autumn the whole of the line ; will be completed. Embankments, &c. v A level line for the Railway was obtained by cutting through the hills, and using the earth therefrom to form embankments. The country throughout is of ^ an undulating character, so that there is scarcely a *s mile throughout the whole length in which cuttings or embankments were not necessary.