West Midlands Rail Franchise Award PDF 293 KB
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
HS2 Unlocking the Benefits
i HS2 Unlocking the benefits West Midlands Connectivity Package ii 2.7 million people live in the West Midlands metropolitan area, the largest urban area outside of London 1 The Connectivity Package will improve regional and local links The High Speed to High Speed Rail Two (HS2) and encourage sustainable Rail Network will growth using the released rail capacity from the West Coast Main Line. Economic benefits will therefore be maximised provide much- across the West Midlands region with capacity constraints on needed additional rail the already congested local transport networks being relieved. capacity connecting Based on international experience of High Speed Rail, the main urban areas implementation of the Connectivity Package to transform the proposed HS2 interchanges into integrated regional of the UK along a transport hubs is fundamental if our businesses are to expand new North-South fast their markets, access a wider workforce and develop local economic networks. Improved connectivity will undoubtedly connection. To capture attract new business and promote innovation across our and maximise the manufacturing and service sectors. distribution of HS2’s The Package will have a positive impact across a range of economic challenges facing Local Enterprise Partnerships potential benefits, (LEPs) in the West Midlands such as slow business cluster authorities across formation, urban youth unemployment and limited access to international gateways. The arrival of HS2 also underpins the West Midlands development plans for Birmingham city centre and UK region have prepared a Central, stimulating further job creation from high-value economic activity in the West Midlands. Delivery of the Transport Connectivity Package will ensure that key locations are effectively linked Package, which will up to HS2 stations overcoming any potential consequences of building HS2 without connections to these places. -
PLATFORM Is Published By: the Stourbridge Line User Group, 46 Sandringham Road, Wordsley, Stourbridge, West Midlands, DY8 5HL
Issue 18 December 2019 Worcester Shrub Hill will be getting faster services on the route to London this month using bi-mode trains. Up to the 1960s, this route was the domain of GWR Castle Class locomotives such as 7029 Clun Castle, seen at Shrub Hill on 24 August. CONTENTS 2 A Winter Of Discontent ? 4 Bridging The Missing Link … An Update 4 News In Brief 5 A Time To Consolidate 6 A New Community Rail Partnership 7 Promises, Promises, Promises 8 Christmas Photo Quiz - Name The Film PLATFORM is published by: The Stourbridge Line User Group, 46 Sandringham Road, Wordsley, Stourbridge, West Midlands, DY8 5HL - 1 - www.stourbridgelineusergroup.info A WINTER OF DISCONTENT ? by Roger Davis If you believe Ben Elton’s BBC2 This poor bloke’s comedy series Upstart Crow, the been waiting since speech that starts “Now is the winter 1557 for a Stratford train of our discontent” was written by William Shakespeare one night when his train from Moor Street to Stratford was cancelled, the following service terminated at Whitlocks End, and he was forced to complete his journey on a replacement stagecoach service. While this is a corruption of the truth, many rail passengers in the (Radio Times) West Midlands are asking whether we really are heading towards a winter of discontent to follow what has been an autumn of discontent. West Midlands Railway has admitted that problems exist and has pointed to “an over-ambitious timetable enhancement in May 2019”. This is certainly true on the Chase Line between Walsall and Rugeley Trent Valley where the extension of services to London Euston has resulted in regular late running and an unacceptable level of cancellations north of Walsall. -
Milton Keynes Rail Services – Matter 5 – Transport – 24 July
Milton Keynes rail services – Matter 5 – Transport – 24 th July – Jim Middleton – REP/269971 1. Since I wrote my initial submission there have been some positive changes so I have revised my statement. Firstly on Crossrail there is now the inclusion in the Network Rail Programme of a Crossrail extension to join the West Coast mainline near Willesden. I petitioned and appeared before both the Commons and Lords Crossrail Select Committees to put my basic case that the Crossrail services proposed were a waste of expensive tunnelling under Central London and that Crossrail should be a Thameslink style regional rail scheme. Not a downgrading of main railway lines to a London Underground type operation that hardly crosses the M25. The Committees were only allowed to consider details of the scheme and not whether it made transport sense but particularly the Lords Select Committee encouraged me to continue my campaign. 2. The recent work done by the wider rail industry for their report London and SE RUS confirms that the Crossrail scheme is poor use of the central tunnels and the 28 trains out of the 48 each hour not getting west of Paddington are wasted. The RUS proposes a link to WCML which will allow trains from WCML to access directly Paddington, Bond Street, Tottenham Court Road, Farringdon, Liverpool Street and Canary Wharf. Potentially there are huge benefits for Milton Keynes if the opportunity is taken – particularly when HS2 allows more fast suburban services into London. 3. Although the West Coast mainline has been upgraded at enormous expense with years of chronic disruption and weeks of blockades for Milton Keynes residents what has emerged nothing like what people were expecting. -
Suggested Alternative Routes During Disruption
Suggested alternative routes during disruption When Southern services from this station are subject to unplanned disruption, we have Issued Date: arranged for your ticket to be accepted as indicated below to get you to your destination May 2018 Suggested alternative route details from Coulsdon South Southern ticket holders To: Suggested routes: See how to get to Bedford, then bus 72 (Mondays to If running, Southern or Thameslink train OR bus 405 from Arlesey Leigh Saturdays only) to Arlesey stop E to Redhill, then Southern train to Leigh See how to get to Gatwick Airport, then Southern or If running, Southern or Thameslink train OR bus 405 from Balcombe Thameslink train to Balcombe Littlehaven stop E to Redhill, bus 100, 400, 420 or 460 to Gatwick See how to get to London Victoria, Victoria line to Euston, Airport then bus 200 to Littlehaven West Midlands Trains to Bletchley or Milton Keynes Central, See how to get to London Victoria, then Circle or District London Blackfriars Bedford then either West Midlands Trains from Bletchley (Mondays line to Blackfriars to Saturdays only) to Bedford, OR bus X5 from Milton See how to get to East Croydon, then Thameslink train Keynes Central (daily) to Bedford London Bridge to London Bridge OR Southern train to Balham, then See how to get to Bedford, then bus 73 (Mondays to Northern line to London Bridge Biggleswade Saturdays only) to Biggleswade See how to get to London Victoria, then Victoria line London St Pancras See how to get to Gatwick Airport, then Southern or to King's Cross St Pancras (for -
Moseley in the Nineteenth Century: Transport
Moseley in the Nineteenth Century: Transport. At the beginning of the nineteenth century, Moseley was a small, rural, idyllic village. By the end of the century, Moseley had changed considerably. One regular visitor to Moseley, Thomas Anderton, writing in 1900, recalled Moseley in the early 1840s and described the changes (Illustration 1):1 As for Moseley . it was a pretty little village in those days. The old village green, the rustic country inns (of which the "Fighting Cocks" was the chief), and some low-roofed, old-fashioned houses, backed by the parish church tower, made up a picture which still remains in my mind's eye. Beyond Moseley Church was a pretty road to Moseley Wake Green, in which were, if I remember rightly, one or two timbered houses and some old-fashioned residences, surrounded by high trees. Many of these have now disappeared. In another direction from the church was a country road running to Sparkbrook, and near which were an important house and lands belonging to the wealthy Misses Anderton, whose possessions have been heard of in more recent days. I now often visit Moseley, and change, but not decay, in all around I see. The prevailing colour of the old village green is now red brick, and the modern colour does not agree so well with my vision as the more rustic tones of a bygone day; whilst the noise and bustle of tram cars, the swarms of suburban residents that emerge from the railway station (especially at certain times in the day), are fast wiping out the peaceful, pretty Moseley of my youthful days. -
West Midlands & Chilterns Route Study Technical Appendices
Long Term Planning Process West Midlands & Chilterns Route Study Technical Appendices August 2017 Contents August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 02 Technical Appendices 03 A1 - Midlands Rail Hub: Central Birmingham 04 elements A2 - Midlands Rail Hub: Birmingham to 11 Nottingham/Leicester elements A3 - Midlands Rail Hub: Birmingham to 17 Worcester/Hereford via Bromsgrove elements A4 - Chiltern Route 24 A5 - Birmingham to Leamington Spa via 27 Coventry A6 - Passenger capacity at stations 30 A7 - Business Case analysis 50 Technical Appendicies August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 03 Introduction to Technical Appendices Cost estimation These Technical Appendices provide the technical evidence to Cost estimates have been prepared for interventions or packages of support the conclusions and choices for funders presented in the interventions proposed in the Route Study. The estimates are based main Route Study document. The areas of technical analysis on the pre-GRIP data available, concept drawings and high level outlined in these appendices are capability analysis, concept specification of the intervention scope. To reflect the level of development (at pre-GRIP level), cost estimation, business case information available to support the estimate production, a analysis and passenger capacity analysis at stations. contingency sum of 60% has been added. The estimates do not include inflation. Indicative cost ranges have been provided based The appendices are presented by geographical area with the on this assessment. exception of the business case analysis and passenger capacity analysis. Business case analysis The areas of technical analysis are summarised below. Business case analysis has been undertaken to demonstrate to funders whether a potential investment option is affordable and Capability Analysis offers value for money. -
Third Party Funding
THIRD PARTY FUNDING IS WORKING IAN BAXTER, Strategy Director at SLC Rail, cheers enterprising local authorities and other third parties making things happen on Britain’s complex railway n 20 January 1961, John F. Kennedy used being delivered as central government seeks be up to them to lead change, work out how his inaugural speech as US President more external investment in the railway. to deliver it and lever in external investment Oto encourage a change in the way of into the railway. It is no longer safe to assume thinking of the citizens he was to serve. ‘Ask DEVOLUTION that central government, Network Rail or not what your country can do for you,’ intoned So, the theme today is: ‘Ask not what the train operators will do this for them. JFK, ‘but what you can do for your country.’ the railway can do for you but what However, it hardly needs to be said, least of Such a radical suggestion neatly sums up you can do for the railway’. all to those newly empowered local railway the similar change of approach represented Central government will sponsor, develop, promoters themselves, enthusiastic or sceptical, collectively by the Department for Transport’s fund and deliver strategic railway projects that the railway is a complex entity. That March 2018 ‘Rail Network Enhancements required for UK plc, such as High Speed 2, applies not only in its geographical reach, Pipeline’ (RNEP) process, Network Rail’s ‘Open for electrification, long-distance rolling stock scale and infrastructure, but also in its regularly Business’ initiative and the ongoing progress of replacement or regeneration at major stations reviewed post-privatisation organisation, often devolution of railway planning and investment like London Bridge, Reading or Birmingham New competing or contradictory objectives, multiple to the Scottish and Welsh governments, Street. -
Enter Document Reference Number E.G. CQP-001
CQP-013 Chiltern Railways PIDD Local Plan Review Date: 1st September 2019 Synopsis This document outlines the arrangements that Chiltern Railways has in place to deliver information to customers during service disruption as well as details of ongoing workstreams that will further improve information provided to our customers. Authorisation Owned by Andy Poole Head of Customer Service Quality Authorised by Jennifer Payne Customer Services Director Published by HSQE Team Unit 1, Tramway Industrial Estate Banbury Oxfordshire OX16 5TB Chiltern Railways CQP-013 Version 3-October 2016 UNCONTROLLED COPY WHEN PRINTED Page 1 of 25 Contents A Administration ................................................................................................... 3 B Requirements ..................................................................................................... 4 1 Purpose & Scope .......................................................................................... 4 2 People ......................................................................................................... 4 C Procedure .......................................................................................................... 5 1 Introduction ................................................................................................. 5 2 Our Key Principles of Information Flow and Deliverance ................................... 6 3 Operations - In the Control Room ................................................................... 7 4 Customer Service....................................................................................... -
Submissions to the Call for Evidence from Organisations
Submissions to the call for evidence from organisations Ref Organisation RD - 1 Abbey Flyer Users Group (ABFLY) RD - 2 ASLEF RD - 3 C2c RD - 4 Chiltern Railways RD - 5 Clapham Transport Users Group RD - 6 London Borough of Ealing RD - 7 East Surrey Transport Committee RD – 8a East Sussex RD – 8b East Sussex Appendix RD - 9 London Borough of Enfield RD - 10 England’s Economic Heartland RD – 11a Enterprise M3 LEP RD – 11b Enterprise M3 LEP RD - 12 First Great Western RD – 13a Govia Thameslink Railway RD – 13b Govia Thameslink Railway (second submission) RD - 14 Hertfordshire County Council RD - 15 Institute for Public Policy Research RD - 16 Kent County Council RD - 17 London Councils RD - 18 London Travelwatch RD – 19a Mayor and TfL RD – 19b Mayor and TfL RD - 20 Mill Hill Neighbourhood Forum RD - 21 Network Rail RD – 22a Passenger Transport Executive Group (PTEG) RD – 22b Passenger Transport Executive Group (PTEG) – Annex RD - 23 London Borough of Redbridge RD - 24 Reigate, Redhill and District Rail Users Association RD - 25 RMT RD - 26 Sevenoaks Rail Travellers Association RD - 27 South London Partnership RD - 28 Southeastern RD - 29 Surrey County Council RD - 30 The Railway Consultancy RD - 31 Tonbridge Line Commuters RD - 32 Transport Focus RD - 33 West Midlands ITA RD – 34a West Sussex County Council RD – 34b West Sussex County Council Appendix RD - 1 Dear Mr Berry In responding to your consultation exercise at https://www.london.gov.uk/mayor-assembly/london- assembly/investigations/how-would-you-run-your-own-railway, I must firstly apologise for slightly missing the 1st July deadline, but nonetheless I hope that these views can still be taken into consideration by the Transport Committee. -
West Midlands Railway Urges Snow Hill Customers to Check Journeys Ahead of Timetable Changes
West Midlands Railway urges Snow Hill customers to check journeys ahead of timetable changes October 19, 2020 Passengers using West Midlands Railway (WMR) services via Birmingham Snow Hill are being urged to check their journeys ahead of a new timetable coming into effect next week (w/c Oct 26). The new timetable formalises temporary arrangements announced last month as the impact of COVID-19 continues to make it difficult for the operator to provide the normal train schedule. The timetable has been brought in to provide a reliable service to passengers on the route, which serves destinations including Stratford-upon-Avon, Worcester and Kidderminster. Peak-time travel and school trains have been prioritised in the new schedule. WMR customer experience director Jonny Wiseman said: “We are committed to providing as many trains as we can with the resources available to meet demand. This new timetable has been designed to provide a simple, straightforward service our customers can rely on. “In recent weeks the impact of COVID-19 has meant we have had to cancel a number of trains on the Snow Hill lines, which we know is frustrating for our customers. “That’s why we have created a new timetable which will reduce the need for short-notice cancellations while still providing a service to match the level of demand on the route. “We will continue to run trains with the maximum possible number of carriages in order to help our customers socially distance while on board.” With cases of COVID-19 increasing and restrictions tightening in some places, WMR is monitoring passenger numbers across the network to provide an appropriate level of service which matches customer demand and takes account of train crew availability. -
C2c Rail Limited 46Th SA- Application Form P
Form P Application to the Office of Rail Regulation for a passenger track access agreement, or amendment to a passenger track access agreement under sections 17-22A of the Railways Act 1993 1. Introduction Please use this form to apply to the Office of Rail Regulation (ORR) for: • directions under section 17 of the Railways Act 1993 for a new track access contract. Section 17 allows companies who want the right to use a railway facility (including Network Rail’s network) to apply to ORR for access if they are not able (for whatever reason) to reach agreement with the facility owner. • approval under section 18 of the Railways Act 1993 for a new track access contract. Section 18 allows companies to apply for approval if they have agreed terms with the facility owner. • approval of a proposed amendment (agreed by both parties) under section 22 of the Railways Act 1993 to an existing track access contract. • directions under section 22A of the Railways Act 1993 for an amendment to an existing track access contract. Section 22A allows anyone seeking an amendment to an existing track access contract which allows the operation of more extensive services to apply for a compulsory amendment if they are not able (for whatever reason) to reach agreement with the facility owner. If it is the facility owner, Network Rail will carry out a pre-application consultation. In this case fill in this form up to section 7.3. You should fill in the rest of the form after the consultation and before applying to ORR. -
We're Working Hard on How We Deal with Delays
Suggested alternative routes during disruption When Thameslink services from this station are subject to unplanned disruption, we have Issued Date: arranged for your ticket to be accepted as indicated below to get you to your destination May 2017 National rail and local bus alternatives Suggested alternative route details from Bedford Thameslink ticket holders To: Suggested routes: Walk (9 minutes/0.4 miles) via Woburn Road, Alexandra Road, Alexandra Place and Greyfriars to Bedford Flitwick, Harlington bus station; then bus 42# (from stand B) to your destination Walk (9 minutes/0.4 miles) via Woburn Road, Alexandra Road, Alexandra Place and Greyfriars to Bedford bus BEDFORD Leagrave station; then bus 81# Mondays to Saturdays only (from stand L) to Luton (Gallaxy Centre); walk (5 minutes/0.3 X5# X5# St Neots miles) to Luton (Silver Street) via Bridge Street and Library Road; then bus 23#, 27#, 28# to Leagrave MILTON Sandy KEYNES Walk (9 minutes/0.4 miles) via Woburn Road, Alexandra Road, Alexandra Place and Greyfriars to Bedford Flitwick Biggleswade CENTRAL Harlington 81# Luton bus station; then bus 81# Mondays to Saturdays only (from stand L) to Luton (Gallaxy Centre); then walk Arlesey (6 minutes/0.3 miles) to Luton Station Interchange via Bridge Street, Guildford Street and Station Road Leagrave 101 See above how to get to Luton Station Interchange; then bus A# (from stand 1) or bus 100 (from stand 4) LUTON Luton Airport Parkway to Luton Hampton Hotel; walk (2 minutes) to Luton Airport Parkway station via adjoining footpath Bletchley