Bhopal (Open Line)
Total Page:16
File Type:pdf, Size:1020Kb
Division – Bhopal (Open Line) 2(A) Status of release of Performance Guarantee From 01.07.2018 to 31.07 .2018 Sl Name of work Name of firm Date of Date of Date of letter Date of Remarks No physical passing of sent to finance release completion final bill to release of work 1 ADEN(M)SFY-White wash, colour wash, special repair and M/s.Kakkaji 25.06.17 20.09.17 12.07.18 13.07.18 maintenance zone for all residential and service buildings Builders under the Jurisdiction of SSE(W)SFY and supply of building materials including sand as per USSOR 2011 costing upto Rs.2.00 Lakh each for the year 2016-17 2 Part-A) ADEN(M)SFY sec-Repairs/Improvement of Sarangpur M/s.Kakkaji 28.6.17 4.10.17 12.07.18 13.07.18 and Chachora Binaganj colony. Part-B)Repairs of boundary Builders wall at SVPI old Railway colony under ADEN(M)SVPI 3 Miscellaneous repairs and maintenance of track work under M/s.Champalal 20.03.18 28.6.18 30.07.18 31.07.18 SSE(P.Way)SFY and SSE(P.Way)BRRG under Jain ADEN(M)SFY Sub-Divn 4 Hiring of Inspection vehicle for DEN(S)BPL for two years H.K.Traders 26.04.180 26.06.18 17.07.18 22.07.18 Mahendra, Tata Sumo Bolero etc. 5 ADEN/Harda- White wash, colour wash, distempering, M/s.Dinesh Kumar 29.06.17 09.10.17 16.07.18 20.07.18 painting and Repair and maintenance zone for all residential Chouksey and service buildings under the Jurisdiction of SSE(W) Harda and supply of building materials including sand as per USSOR 2011 costing upto Rs.2.00 Lakh each from Khandwa excluding to Timarni excluding for the year 2016-17 6 Heavy repairs to gate lodge fencing surface M/s.Dayal - 08.11.17 15.07.18 16.07.18 Construction Sl Name of work Name of firm Date of Date of Date of letter Date of Remarks No physical passing of sent to finance release completio final bill to release n of work 7 Part-A) Maintenance of track work for RVNL 3rd line on HBJ- M/s.Dayal - 18.06.18 31.07.18 31.07.18 Bina section between Bareth-Ganj Basoda-Pabai-Gulabganj Construction block section including Bareth-Ganj Basoda-Pabai-Gulabganj Yard for one year in connection with commissioning of 3rd line in Bhopal Division of WCR. (Part-B)Miscellaneous P.Way repairs and maintenance Of track works under SSE/PW/ Ganj Basoda under ADEN/ Vidisha Sub-Division. 8 BPL Divn-Supply of fabricated 08 Nos. RH (Restricted Height) M/s. United - 5.6.18 30.07.18 31.07.18 Plate girder welded type 20.40 m on overall length as per Engineering RDSO Drg. No. RDSO/B 11040, 11040/01 and 11040/02. Industries Private Limited 9 Maintenance and up gradation of quarters at BPL.BPL- Shri Amit Gupta 27.06.17 26.12.17 16.07.18 16.07.18 Improvement to staff quarters in east and NSZ 10 ET-Improvement to roof/ceiling/floor etc in ladies and Gents M/s.Gulab Chand 19.04.17 24.01.18 07.07.18 07.07.18 waiting room Agarwal 11 BPL-Improvement to water supply at BPL station by providing Aqua Pure 15.10.16 16.01.17 20.07.18 10.07.18 RO Technologies (P) Ltd 12 Provision of LHS in lieu of manned LC No.35 in Bina-RTA M/s.Vivek 20.04.16 15.07.18 20.07.18 sec Industries 13 All new minor and special sanctioned zone Year 2013-14 M/s.Shanker 30.06.14 12.07.18 18.07.18 Construction 14 Provision of RUB/LHS in lieu of manned LC No.13 in Bina- M/s.Vivek 10.08.17 08.03.18 17.07.18 20.07.18 RTA under ADEN(M)Guna sec Industries 15 Improvement to drain in various cutting of Guna-RTA – M/s.S.K.Jain 282.06.17 13.10.17 27.07.18 31.07.18 MDVK 16 Supply of quarry dust for monsoon rake M/s.S.K.Jain 25.03.09 06.04.17 27.07.18 31.07.18 17 Repairs to west colony Guna M/s.Sudarshan 25.09.17 23.03.18 31.07.18 31.07.18 Goyal -.