International Bank for Reconstruction and Development International Development Association

FOR OFFICIAL USE ONLY Public Disclosure Authorized SecM87-87 FROM: Vice President and Secretary January 29, 1987

Public Disclosure Authorized MONTHLY OPERATIONAL SUMMARY

OF BANK AND IDA PROPOSED PROJECTS (As of December 31, 1986) Public Disclosure Authorized

Distribution: Executive Directors and Alternates President Senior Vice Presidents Senior Management Council

Public Disclosure Authorized Vice Presidents, IFC Directors and Department Heads, Bank and IFC

This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization.

TABLE OF CONTENTS

SECTION REGION PAGES

I. EASTERN AND SOUTHERN AFRICA 1 11 Botswana 1 Burundi 1 Comoros . 2 Djibouti 2 Ethiopia 2 Kenya 3 Lesotho 3 Madagascar 4. Malawi 5 Mauritius 5 Mozambique 6 Rwanda 6 The Seychelles 7 Somalia 7 Sudan 7 Tanzania 8 Uganda . 8 Zaire 9 Zambia 10 Zimbabwe 11 Regional 11

II. WESTERN.AFRICA 12 26 Benin 12 Burkina Faso . 12 Cameroon . 13 Cape Verde 14 Central African Republic 14 Chad 14 Congo, People's Republic of the 15 Cote d'Ivoire 15 Equatorial Guinea 16 The Gambia 16 Ghana 17 Guinea 18 _Guinea-Bissau 19 Liberia 20 Mali 20 Mauritania . 21 Niger 21 Nigeria 22 Sao Tome and Principe 24 Senegal 24 Sierra Leone .. 25 Togo 26 - ii -

SECTION REGION PAGES

III. EAST ASIA AND PACIFIC 27 - 38 China 27 Fiji 29 Indonesia. 29 Korea 32 Lao People's Democratic Republic 32 Malaysia 33 Papua New Guinea 34 35 Thailand 37 Vanuatu 38 Western Samoa 38

IV. SOUTH ASIA 39 - 51 Bangladesh 39 Bhutan 40 Burma 41 India 42 Maldives 47 Nepal 47 Pakistan ~ 48 Sri Lanka. 50 v. EUROPE, MIDDLE EAST AND NORTH AFRICA 52 - 61 Algeria 52 Cyprus 52 Egypt, Arab Republic of 52 Hungary 53 Jordan 54 Morocco 54 Oman 55 Portugal 56 Romania 56 Syrian Arab Republic 56 Tunisia 57 Turkey 57 Yemen Arab Republic 58 Yemen, People's Democratic Republic of 59 Yugoslavia 60

VI. LATIN AMERICA AND CARIBBEAN 62 - 75 Argentina 62 Bahamas 63 Barbados 63 Beli?:e 63 Bolivia 63 Brazil 63 - iii -

SECTION REGION PAGES

LATIN AMERICA AND CARIBBEAN (Cont'd)

Caribbean Region 66 Central America Regional 66 Chile 66 Colombia 66 Costa Rica 67 Dominica 68 Dominican Republic 68 Ecuador 68 El Salvador 68 Guatemala 69 Guyana. 69. Haiti 69 Honduras 70 Jamaica 70 Mexico 71 Panama 73 Paraguay 73 Peru 74 Uruguay . 74

VII. NEW PROJECTS 76 - 79

EASTERN AND SOUTHERN AFRICA 76 Ethiopia. 76 Rwanda 76

WESTERN AFRICA 76 Congo People's Republic of. 76 Ghana. 76 Mauritania 76 Nigeria 76 Senegal 77 Togo 77

EAST ASIA AND PACIFIC 77 Fiji 77 Indonesia • 77 Papua New Guinea 77 Philippines • 78

Europe, Middle East and North Africa 78 Turkey 78 - iv -

SECTION REGION PAGES

LATIN AMERICA AND CARIBBEAN 78 Argentina 78 Belize 78 Chile 78 Ecudador. 78 Haiti • 79 Jamaica 79

Secretary's Department Member Country, Amount & and Implementing Probable Stage of Processing and Agency l_/ Lender '!:._/ Consulting Services Action on Procurement!±/

I, EASTERN AND SOUTHERN AFRICA

BOTSWANA

Ministry of 7.6 Selebi-Phikwe - Technical Consultants will be re­ Approved by the Executive Finance and (Bank) assistance for diversification quired for technical Directors on May 15. Development of mining town; regional devel­ assistance for multi­ Planning opment. Total project cost sectoral promotional about $12.0 million, of which unit, industrial devel­ $7.6 million in foreign ex­ opment/promotion, and change. irrigation agronomy; studies for various as­ pects of small scale industry and irrigation development and market­ ing; and technical assistance for housing policy implementation at national/regional level.

Water Utilities About (R) Fourth Water Supply - Augment­ Consultants recruited for Appraisal report Corporation 11.5 ation of water supply to detailed engineering. being prepared. (Bank) Gaborone/Lobatse area. Total project cost estimated at $50.0 million.

Ministry of About (R) Agriculture Muyinga - Develop­ FAO Cooperative Program Appraisal report under Agriculture 14.0 ment of coffee and foodcrop pro­ prepared project. preparation. (Cofinan­ (IDA) duction in the Muyinga Consultants will be cing will be required Province. Total project cost required. for about $4.5 million.) estimated at $34.0 million.

Ministry of About Agricultural Services. Total A consultant has been re­ Project under prepar­ Agriculture 15.0 project cost to be determined. cruited for preparation. ation. (IDA)

Ministry of 7.0 Health/Population I - Strength­ Consultants have been Appraisal mission tentat­ Health (IDA) ening of basic maternal/child recruited for prepar­ ively scheduled for health services; support to fam­ ation. February 1987. ily planning activities. Total project cost estimated at $11.0 million.

Ministry of About (R) Economic and Public Enterprise Consultants will be Appraisal report Planning 5.0 Management - Strengthening of required. under preparation. (IDA) services of Ministry of Plan­ ning, Finances and Technical Ministries in support of struct­ ural adjustment program.

Ministry of About (R) Education IV - To be identified. No decision has been made Project under Education 30.0 whether consultants will preparation. (IDA) be required.

Ministry of About (R) Communication II - Improvement Consultants have been Negotiations scheduled Transport, Post 4.5 and expansion of postal and recruited for tariff for February. and Telecom­ (IDA) telecommunications services. study. munications Total project cost estimated at $28.S million.

1/ Addresses of the Implementing Agencies of new projects are given in Section VII of the Summary. I_! The amount is in millions of U.S. dollars and is approximate and tentative. SAF is the acronym for the Special Facility for Sub-Saharan Africa. }..I The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary contains a recapitulatioD. of the new projects listed in this issue. This column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA. - 2 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender Y Consulting Services Action on Procurement fi/ BURUNDI (Cont'd)

Ministry of About (R) SAL II - Second phase of the Consultants will be Project preparation under Planning 43.0 structural adjustment program. required. way. (IDA)

Ministry of About Urban II - Urban Development in Consultants have been Project under Pub lie Works 30.0 five secondary centers: Gitega, recruited. preparation. (IDA) Ngozi, Kayanza, Burundi and Rumonge.

Ministries of About Public Sector Management - To Consultants will be re- Project under prepara­ Finance and 5.0 assist Government in improving quired. tion. Planning (IDA) formulation of economic policy, planning, and management of key IDA Project Preparation sectors. Facility advance of $300,000 approved to finance start up of technical assistance activities.

Ministry of 7.9 (R) Education II - Educational plan­ No consultants required. Approved by the Executive National Educ­ (IDA) ning and technical assistance; Directors on January 6. ation, Culture, vocational management and Youth and Sports teacher training. Total project (MEN) cost estimated at $8.8 million, of which $6.1 million in foreign exchange. DJIBOUTI

Institut 5.0 Geothermal II - Follow up Consultants will be Project under Superieur (IDA) project to Cr. 1488. required. preparation. d'Etudes et de Recherches Techniques et Scientifiques (ISERST)

ETHIOPIA

Ministry of About (R) Livestock IV - Support for Consultants will be re­ Negotiations substan­ Agricu 1 ture 41.0 improving animal health and quired. tially completed. (IDA) nutrition, utilization of graz­ ing land, soil conservation, and applied research.

Ministry of About Peasant Agriculture Development Consultants will be re­ Appraisal report under Agriculture 68.0 I - Support for expansion and quired for technical as­ preparation. (IDA) intensification of integrated sistance. agricultural services, including IDA Project Preparation construction of rural roads, Facility advance under seed multiplication programs; consideration. provision of training facilities in selected areas. Total proj­ ect cost to be determined.

Ministry of About (R) Family Health - Strengthening of Consultants will be Appraisal report under Health 42.0 family planning and health required. preparation. (IDA) services; support for training, information, education and An IDA Project Prepara-\ communication and pharmaceutical tion Facility advance oi development. $0,5 million approved fo\• consultants for manpower\ development; pharmaceu- 1 tical development; in­ formation, education and cODDunication; insti­ tutional development; preparation of a zonal project; over.all project preparation and archi­ tectural services.

Ministry of About (N) Irrigation - Small scale Consultants will be Negotiations concluded. Agriculture 7.0 irrigation and conservation. required. (This project was (IDA) developed by IFAD,)

See page 1 for footnotes. - 3 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency};_/ ~?:/ Consulting Services Action on Procurement!±_/ gHIOPIA (Cont'd)

Commission for About (R) Technical Education and Training No decision made whether Pre-appraisal mission Higher Education 60.0 - To be defined. consultants will be end-January/February. (IDA) required.

Ministry of ~5 .o (R) Animal Health - Support for No decision made whether Negotiations substan­ Agriculture and (IDA) rehabilitation of animal health consultants will be re­ tially completed. Livestock services. quired. (Cofinancing with IFAD Development $8.2 million; OPEC $5.0 million; UNDP $0.8 million.)

Ministry of About Railways II - Institutional Consultants have been en­ Draft appraisal report Transport and 30.0 development, motive power and gaged. awaiting Cabinet approval Communications (IDA) rolling stock and operations. of Kenya Railways special action plan and corporate plan.

Ministry of About Agricultural Research - Support No decision made whether Project under prepara­ Agriculture and 20.0 for a national research program. consultants will be re­ tion. Livestock (IDA) quired. Development

Ministry of 11.5 Agricultural Management Assist­ Previously engaged con­ Approved by the Executive Agriculture and (IDA) ance - Phase II of agriculture sultants expected to Directors on June 23. Livestock technical assistance. Total continue. (Cofinancing with CIDA Development project cost about $20.6 mil­ for $2.2 million, UNDP lion, of which $14.5 million in for $1.6 million, SIDA foreign exchange. for $0.4 million, USAID for $0.3 million.)

Ministry of 20.0 Agricultural Sector Operation - No decision made whether Approved by the Executive Agriculture and (IDA) Policy-oriented sector operation consultants will be Directors on June 23. Livestock 40.0 to be supported by Agricultural required. Development (SAF) Management Assistance Project.

Ministry of About Population III - Project to be No decision made whether Project preparation will Health and 30.0 second timeslice of ongoing consultants will be depend on progress of Ministry of Home (IDA) program. required. ongoing project. Affairs

Ministry of About Agricultural National Extension No decision made whether Project preparation will Agriculture and 30.0 II - Followup project to consultants will be depend on progress of Livestock (IDA) National Extension Project now required. ongoing project. Development under implementation.

Nairobi City About Nairobi Water III - Rehabili­ Consultants may be Project at early stage of Commission, 40.0 tation and expansion of the required for technical preparation. Water and Sewer­ (Bank) Nairobi water supply and assistance. age Department sewerage systems; training and technical assistance.

Ministry of About Forestry IV - Support for in­ No decision has been made Project under prepar­ Environment and 20.0 tegrated forestry development whether consultants will ation. General (IDA) (fuelwood, timber, agro­ be required. Resources forestry).

Ministry of 30.0 Industry Sector - To support No decision made whether Appraisal mission Comm.erce and (Bank) specific measures of import consultants will be scheduled for April Industry 30.0 liberalization, strengthening of required. 1987. (IDA) export incentives, and reform of the price control mechanism.

Ministry of 9.8 (R) Highlands Water Engineering - Consultants will be re­ Credit signed on December Water, Energy (IDA) Preparation of engineering quired for engineering 15. (Cofinancing total­ and Mining/ designs and tender documents for designs, tender documents ling $38.4 million will Lesotho High­ Phase I of development of and investment-planning be provided by: European lands Develop­ Lesotho 1 s water resources for studies. Development Fund, Euro­ ment Authority export and hydro-electricity, pean Investment Bank, UK, and technical assistance for USAID, Germany, UNDP and project entity. Total project the Republic of South cost estimated at $51.3 million, Africa.) of which $37.8 million in for­ eign exchange. IDA Project Preparation Facility advance of $100,000 approved to finance project start-up activities.

See page l for footnotes. - 4 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ Lender J:.l Consulting Services Action on Procurement!!} LESOTHO (Cont'd)

Ministry of About Agriculture - Land resource To be determined, Preparation mission Agriculture/ 10,0 management and conservation. in January. Ministry of (IDA) Interior

Ministry of About (R) Urban Development II (Formerly To be determined. Pre-appraisal mission in Interior 25.0 Urban Component of Agriculture/ January. (IDA) Urban), To enhance delivery of urban services through esta­ blishment of a Municipal Council in Maseru; to develop a national housing policy and restructure the existing institutions,

MADAGASCAR

Ministry of About Forestry III - To provide fuel­ Consultants likely to be Pre-appraisal mission Agricultural 10,0 wood supplies (charcoal) to required. scheduled for January/ Production (IDA) Antananarivo, Mahajanga and February. (Cofinancing Toliary. Total project cost to will be required.) be determined,

Ministry of 16,0 (R) Ports - Rehabilitating physical Consultants will be Approved by the Exe­ Transport (IDA) infrastructure in the ten prior­ required. cutive Directors on Jan. ity ports; improving cargo hand­ 6. (Cofinancing ling, navigation aide, dredging confirmed with FAC/CCCE and services to the shipping $12.6 million; KfW sector; developing the instit­ Germany $2,3 million; and utional capability, and particu­ ODA (UIC) $0,l million,) larly at the Port of Toamasina, required to operate and maintain An additional IDA advance physical assets at a reasonable of $550,000 under the level of efficiency. Total pro­ Project Preparation ject cost estimated at $34,8 Facility was approved on million, of which $28,6 million March 14 to cover tech­ in foreign exchange. nical assistance required to complete the reorg­ anization of the ports­ sub-sector. A first advance under the PPF for $450,000 was approved on January 4, 1985,

Ministry of About (R) Industry and Trade Policy Consultants may be Appraisal report being Industry; and 15,0 Adjustment Credit - Follow-up required. prepared. (Cofinancing Banking ny (IDA) Project to 1541 MAG, being sought,) Indostria (Plus (National 60.0 Industrial expec­ Development ted Bank) from SAF)

Ministry of About Education III - Credit to Consultants likely to be Project being prepared. Education 10,0 support Government education required, (IDA) policy reform by financing A first advance of education materials and $270,000 under the IDA equipment. Project Preparation Facility approved to support urgently needed studies in the education sector both for a precise definition of the project and as background mater­ ial for the forthcoming Structural Adjustment Credit,

See page 1 for footnotes, - 5 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency};_/ Lender 1_/ Consulting Services Action on Procurement!!._/

MADAGASCAR (Cont'd)

Ministry of In­ About (R) Energy I - Integrated energy Consultants will be Negotiations scheduled dustry, Energy 25.0 project, including planning and required. for January/February. and Mines/ (IDA) programming rehabilitation and (Cofinancing being National Power expansion of power facilities. sought.) Authority Total project cost about $69.6 (JIRAMA) million, including $50.0 million A first advance of in foreign exchange. $500,000 under the IDA Project Preparation Facility was approved for urgently needed studies for the rehabilitation of the Volbe hydroelectric plant which was damaged by the recent cyclone Honorinina. An addi­ tional PPF advance of $370,000 approved to (a) assess electricity sector functioning and rehabili­ tation needs, and (b) establish an Energy Unit within the Ministry of Energy and Mines and a Project Implementation Unit.

Ministry of About BTM - Line of credit to for Consultants will be Negotiations scheduled Agricultural 5.0 agriculture and agro-industry required for technical for mid-March. Production/Na­ (IDA) and to provide institutional assistance program. tional Agricul­ support. tural Bank (BTM)

Ministry of About Highway VII - Maintenance and Consultants will be Project being ident-· Public Works 25.0 rehabilitation of highway net­ required. ified. (Cofinancing (IDA) work and rural roads; and prospects being ex­ strengthening of Ministry of plored.) Works and privs te road transport.

Ministry of About (R) SAL/Macro Technical Assistance I Consultants likely to be Project being Finance 75.0 - To broaden thrust of reforms required for the im­ identified. (IDA) aimed at improving export incen­ plementation of the macro tives and support measures aimed technical assistance at reforming the financial component. sector.

Ministry of About Health 11 - Expansion of health Consultants will be re­ Appraisal report being Health 10.2 care delivery and maternal and quired for management and prepared. (Cofinancing (IDA) child health and family planning financial planning, and being confirmed.) services. Total project cost primary health care estimated at $22.9 million. evaluation. Pharmaceu­ tical specialists will also be required.

Lilongwe Water 20.0 Water 11 - Extension of water Consultants will be Approved by the Executive Board (iDA) supply to Lilongwe. Total required to help improve Directors on November project cost about $30.5 mil­ management planning and 20. (Cofinancing con­ lion. Total project cost about technical capabilities. firmed with EIB $6.5 mil­ $30.5 million, of which $18.9 lion, and UK ODA $0.7 million in foreign exchange. million.)

Ministry of About Transport I - Upgrading Northern Consultants selected and Negotiations completed. Works and 13.4 Access Corridor. Total project are undertaking detailed (Cofinancing expected! Supplies; and (IDA) cost about $100.0 million. engineering studies. from USAID, KfW Ministry of (Germany), ODA, EEC Transportation and the Netherlands.) and Communica­ tions

Ministry of About Education VI - Education Sector Consultants will be Appraisal report being Education 25.0 Loan - Extension of primary/ required to help improve prepared. (Cofinancing (IDA) secondary education; insti­ management and quality of being sought.) tutional strengthening; improve­ education. ment in quality of teaching materials, training and exam­ ination systems. Total project cost about $44.2 million,

See page l for footnotes, - 6 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j Lender J:./ Consulting Services Action on Procurement 4/

MALAWI (Cont'd)

Ministry of About Agricultural Credit - Provision Agricultural credit Appraisal mission Agriculture 15.0 of credit for support of small­ specialists to advise on scheduled for January. (IDA) holder production, small rural organization of a new industries and agricultural institutional framework marketing enterprises. Institu­ will be required. tional reorganization of small­ holder credit system.

Ministry of About Agricultural Diversification. To be determined. Project under Agriculture 15.0 preparation. (IDA)

MAURITIUS

Bank of About (R) Industrial Sector Adjustment No consultants required. Negotiations scheduled Mauritius 23.0 Loan - Finance for export for January/February. (Central Bank) (Bank) industry. Total project cost (Cofinancing with AfDB estimated at $43.0 million. for $20 million con­ firmed.) \ Central About Energy I - Rehabilitation of Consultants will be Project under prepar­ Electricity 10.0 power systems, and technical required. ation. (Cofinancing Board (CEB) (Bank) assistance. Project cost to be with CCCE and EIB determined. possible.)

Ministry of About Agricultural Resources and In­ Consultants may be Project under Agriculture, 20.0 stitutional Development - Agri­ required. preparation. Fisheries and (Bank) cultural diversification through Natural land planning; strengthening Resources land administration, records management, policy-making institutions. Total project cost to be determined.

Development Bank About (R) DBM/Industrial Sites - To sup­ Consultants may be Appraisal mission of Mauritius 17.0 port development of export man­ required. scheduled for (DBM)/Mauritius (Bank) ufacturing industry through a January/February. Export Develop­ line of credit, preparation of (Cofinancing being ment Investment industrial sites,and con­ sought.) Authority struction of industrial build­ (MEDIA) ings for export manufacturing industries.

MOZAMBIQUE

Bank of To be Rehabilitation II - Follow-up to To be determined. Project under Mozambique deter­ first rehabilitation program; preparation. mined expected to focus on agricul­ (IDA) ture.

Bank of About Technical Assistance in economic Consultants will be Appraisal report Mozambique 10.0 planning, financial management required. being prepared. (IDA) and accounting, statistics and international law.

Ministry of About Energy Technical Assistance and Consultants will be Appraisal report being Energy 18.0 Rehabilitation - Assistance to required. prepared. (Cofinancing (IDA) ENH, PETROMOC, and EDM in plan­ with Norway for $5 mil­ ning and in management opera­ lion. Additional co­ tions. Equipment will be financing being ex­ provided for EDM and PETROMOC plored.) facilities.

Ministry of About (R) Water Supply II - Rehabilit­ Consultants will be Appraisal report being Pub lie Works 15.0 ation, maintenance and expansion required. prepared. (Cofinancing (IDA) program of rural water supply with BADEA, Austria, systems; construction focus in Switzerland and CCCE Lava Region, along with a na­ probable.) tional rehabilitation and maint­ enance program and support to the institutional strengthening of the Water Department (DGE). Total project cost estimated at $61.0 million.

Ministry of About (R) Forestry II - Follow up to on­ Consultants will be Appraisal report being Agriculture 16.0 going integrated Agro-Forestry/ required. prepared. (IDA) Livestock Project. Total pro - ject cost estimated at $25.0 IDA Project Preparation million. Facility advance being prepared.

See page 1 for footnotes. - 7 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ Lender ?:.I Consulting Services Action on Procurement!}_/ RWANDA (Cont'd)

Ministry of About (R) Agricultural Services II - Proj­ Consultants will be Project preparation Agriculture 55.0 ect would consist of a number of required. under way. (IDA) components with emphasis on the development of national exten­ A number of studies are sion services and a national under preparation with coffee development program. Special Project Prepar­ ation Facility and Study Fund financing.

Ministry of About (R) Public Sector Management III - Consultants will be Appraisal report under Planning 8.3 Project would assist Government required. preparation. (Related (IDA) to strengthen its institutional UNDP-financed project development and to improve eco­ being finalized.) nomic and financial management in key sectors. Total project cost estimated at $10.2 million.

Ministry of About (R) Urban Institutions - Resource Consultants will be Project preparation under Pub lie W_orks 35.0 mobilization with improvement required. way with IDA Project (IDA) in local tax base; strengthening Preparation Facility of urban institutions; upgrading advance of $400,000. and land tenure improvements; employment and income gener­ ation. Total project coat estimated at $43.0 million.

Ministry of About (N) Telecommunications II - To Consultants will be Project under 1 Transport and 22.0 follow up first telecommunica­ required. preparation. Telecommu­ (IDA) tions project to support sector ·1 nications restructuring. I THE SEYCHELLES

Seychelles 5.0 Water Supply Rehabilitation - Consultants are financed Project under prepar­ f Public Utilities (Bank) Reinforcement of existing water by bilateral sources. ation. I Corporation facilities in Mahe Island.

Ministry of 22.6 Ports Modernization - Mainten­ Consultants will be Approved by the Executive Pub lie Works (IDA) ance and rehabilitation of exis­ required. Directors on July 3. Not ting ports. Total project cost yet signed because of !DA about $24.4 million, of which constraints. $22.6 million in foreign ex­ change. Procurement: Tender documents being prepared under bilateral funding.

Ministry of About (R) Shebelli Irrigation Consultants will be Appraisal mission Agriculture 20.0 Rehabilitation - To be required. scheduled for June. (IDA) determined. An IDA Project Prepar­ ation Facility advance of up to $1.0 million ap­ proved to engage consul­ tants.

Ministry of About Semi-Mechanized Rainfed Farming Consultants will be Appraisal report Agriculture 13.6 - To replicate and expand a required. under preparation. (IDA) successful experiment in semi­ mechanized farming under way. An IDA Project Prepar­ ation Facility advance of $1.3 million has been approved for start-up activities.

Ente Nazionale About Power Rehabilitation - To pro­ Consultants will be Appraisal mission sched­ Energia 10.0 vide for urgently needed rehab­ required. uled for March/April. Elettrica (IDA) ilitation of electric power plant nnd distribution systems, training, and institutional gtrengthening.

National 38.0 Power IV - Power generation and No decision made whether Appraisal report Electric (IDA) transmission distribution/expan­ consultants will be under preparation. Corporation sion. Total project cost esti­ required. (NEC) mated at $105 million.

Ministry of 7.0 Technical Aaeiatance - Macro­ To be determined after Appraisal report under Finance and (IDA) economic; Public Enterprise project is defined. preparation. Economic Management. Planning

See page 1 for footnoteo. - 8 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender];_/ Consulting Services Action on Procurement!!_/ SUDAN (Cont'd)

Ministry of 30,0 Forestry - Protection and To be determined after Preparation under way; Agriculture (IDA) management of existing wood­ project is defined. appraisal tentatively lands, establishment of plant­ scheduled for June 1987, ations and small scale woodlots, and foresting research.

Ministry of 30.0 {R) South Kordofan Agricultural To be determined after Appraisal mission end­ Agriculture (IDA) Development. project is defined. January/February.

TANZANIA

Ministry of About Agricultural Rehabilitation - No decision made whether Project being prepared, Agriculture and 20.0 Rehabilitation of major export consultants will be re­ (Cofinancing being Livestock (IDA) industries, including inter quired. explored,) alia, coffee, tea, cashew nuts, sisal and cotton,

Ministry of About Industrial Rehabilitation - In­ No consultants required. Project being prepared. Industry and 25.0 dustrial rehabilitation through Trade (IDA) lines of credit to Tanzania In­ vestment Bank, Tanganyika Devel­ opment Finance Ltd. and National Bank of Commerce.

Ministry of About Agricultural Research - Streng­ No decision made whether Project being prepared, Agriculture and 10.0 thening national agricultural consultants will be re­ Livestock (IDA) research services. quired.

Tanzania Posts About Second Telecommunications - To be determined. Project being prepared. and Telecom­ 20.0 Support to the maintenance and munications (IDA) rehabilitation component of Corporation TPTC's 1986/89 investment pro­ (TPTC) gram by providing spare parts, vehicles, equipment and tech­ nical assistance.

Ministry of 30.0 Tea Rehabilitation - Rehabi­ Consultants will be re­ Appraisal report under Agr{culture and (IDA) litation of estate tea holdings quired for factory engin­ preparation. Forestry and smallholder tea gardens and eering and management. of tea processing facilities, and strengthening of institu~ tions in the tea sector, Total project cost estimated at $72 million.

Uganda Poets and 20.0 Telecommunications II - Contin­ Consultants will be re­ Appraisal report under Telecommuni­ (IDA) uation of rehabilitation program quired for financial and preparation, cations in posts and telecommunications engineering management/ Corporation sector. Total project cost planning; and for insti­ estimated at $32 million. tutional and manpower development,

Ministry of 25.0 Sugar Rehabilitation - Rehabili­ Consultants are Appraisal report Industry and (IDA) tation of cane production, fac­ being recruited for under preparation. Technology/ tory and infrastructure in factory engineering. (Cofinancing being Kakira Sugar Kakira sugar scheme; support to explored.) Works sector policy and institu­ tions, Total project cost estimated at $65 million.

Ministry of 25.0 Fourth Highway - Rehabilitation Consultants will be re­ Appraisal report under Worko (IDA) of four major artery roads quired for engineering preparation. prepared under Third Highway studies, construction, Project. Total project cost supervision and institu­ estimated at $70,0 million. tional development,

Ministry of 15.0 Forestry Rehabilitation - Social Consultants will be Appraisal report under Agriculture and (IDA) forestry, peri-urban fuelwood required for project preparation,· (Cofinan­ Forestry plantations, improved management planning and management. cing being explored,) of the national forests and softwood plantations, rehabil­ itation of the Forestry Depart­ ment, Total project cost about $37 million,

See page l for footnotes, - 9 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender Jj Consulting Services Action on Procurement 4/ ZAIRE

Ministry of About Kwango Kwilu - Agricultural De­ No consultants required Negotiations tentatively Agriculture 13.2 velopment Project in Bandundu for project preparation, scheduled for March. (IDA) Region. Total project cost estimated at $18.l million.

Societe 37.0 Power II - Rehabilitation and Consultants will be re­ Approved by the Executive Nationale (IDA) expansion of the Kivu region hy­ quired for training and Directors on June 19. d 'Electricite draulic network, including the engineering services. (Cofinancing with UNDP (SNEL) Ruzizi I facility. Total proj­ Consultants have been for $0.6 million.) ect cost estimated at $41.9 mil­ recruited for studies lion, of which $37.6 million in financed under the An IDA Project Prepara­ foreign exchange. Project Preparation tion Facility advance of Facility. $440,000 has been ap­ proved to finance cost and engineering studies.

Ministry of About Food Crops TAS - Foodcrop No decision made whether Project under Agriculture 15.0 production through improved consultants will be re­ preparation. (IDA) input supply system and in­ quired. frastructure support. Total project cost to be determined.

Regie des Voies 27 .6 (R) Navigation Improvement - Streng­ Consultants prepared Board presentation tenta­ Fluviales (RVF); (IDA) thening management rehabilita­ project financed under tively scheduled for Regie des Voies tion of facilities, and intro­ Credit 1335-ZR. February. Maritimes (RVM) duction of new techniques for Regies des Voies Fluviales/Mari­ times. Total project cost es­ timated at $45.0 million.

Ministries of About Technical assistance for Consultant being Project under Finance, Plan­ 10.0 public sector management and identified. preparation. ning and Higher (IDA) higher education. Total project Education cost to be determined.

Regie de About Water Supply and Urban Deve­ To be determined. Project under Distribution 30.0 lopment - Improvement and preparation. d'Eau (REGIDESO) (IDA) construction of water systems in some eight centers. Total An IDA Project Prepar­ project cost to be determined. ation Facility advance of $700,000 has been ap­ proved for equipment and technical assistance.

Societe About Power III - Energy I/Petroleum Consultants have been Project under prepar­ d'Electricite 40.0 Distribution - High priority retained to assist in ation. (Cofinancing (SNEL); and (IDA) items of SNEL Investment preparation. will be required.) Ministry of Program; petroleum distribution Environment and pricing; management assis­ tance, and possibly support for fharcoal production and demand management of household fuels. Total project cost to be determined.

Department of About Railways III - Continuation of Consultants will be Project in early Transportation 35.0 the Rehabilitation Program of needed. stage of identification. (IDA) the Railways.

Department of About ONATRA - Continuation of the Consultants will be Project under Transportation 40.0 rehabilitation of the rail and needed. preparation. (IDA) river transport systems, and management.

Office des About Highways VII/Feeder Roads - Re­ To be determined. Project under Routes; and 60.0 habilitation and maintenance of preparation. ·1 Ministry of (IDA) main and feeder roads and key I Agriculture agricultural roads, strength­ I ening of sector institutions and training. Total project cost to I be determined. Central Bank of About SSE/DFC IX - Term lending for To be determined. Project under Zaire 25.0 viable small-scale enterprises preparation. \ (IDA) (SSE) through several financial intermediaries and provision of technical assistance.

See page 1 for footnotes. - 10 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1/ Lender J/ Consulting Service& Action on Procurement 4/ ZAIRE (Cont'd)

Ministry of About (R) South Shaba Agricultural Devel­ Consultants will be Negotiations tentatively Agriculture 5.1 opment - Improvement of food required. scheduled for February. (IDA) crop production and related technical assistance and training.

Department of 55.0 Structural Adjustment Credit - To be determined. Project under prep­ Plan (IDA) To support the Government's aration. An IDA Project 105.0 economic adjustment program. Preparation Facility (SAF) Key components include invest­ advance of $500 1 000 ment/expenditure progran111ing, approved to finance public enterprise reform, fiscal project preparation. and financial management, agric­ ulture.

Ministry of About (R) Bateke Fuelwood - Fuelwood This project is now part Agriculture 15.0 development in Bateke plateau. of the Power III - Energy (IDA) Total project coat to be deter­ I project. _Reporting mined. will be discontinued.

Ministry of About (R) Agricultural Research and Consultants will be re­ Approved by the Executive Agriculture and 13.0 Extension - Agricultural re­ quired; various experts Directors on December Water Develop­ (IDA) search and extension service and specialists in 9. (Cofinancing arranged ment support for Ministry of Agri­ research and extension. with AfDB $12.6 million culture. Total project cost and Norway $7.2 million.) estimated at $38.8 million, of which $12.4 million in foreign exchange.

Ministry of About Family Health - Objectives are Consultants will be re­ Project under prepa~­ Health 8.0 to improve primary health care quired to prepare clinic ation. (Cofinancing (IDA) services, expand family planning designs and tender doc­ being explored.) activities, and introduce cost­ uments, and help design recovery in the health sector. and install financial and An IDA Project Prepar­ Total project cost estimated at procurement systems. ation Facility advance $15 million. of $500,000 approved for technical assistance and consultants services.

Ministry of 20.4 (R) Coffee II - To expand the pro­ Consultants will be re­ Credit signing on Agriculture and (IDA) duction of coffee for export. quired. January 9. Water Devel­ Total project cost estimated at opment $34.9 million, of which $21.8 million in foreign exchange.

Tazama Pipeline/ About (R) Tazama Pipeline Rehabilitation Consultants will be re­ Appraisal mission sched­ Indenti Petro­ 15.0 and Refinery Improvement - Reha­ quired, but terms of ref­ uled for late January/ leum Refinery (IDA) bilitation of Tazama Petroleum erence still not fully February. (Cofinancing Co. Pipeline and minor modifications defined. being explored with EIB to Indeni Refinery. Total pro­ and others.) ject cost tentatively estimated at $41.3 million.

Ministry of About Agricultural Credit - Develop­ Consultants will be Further processing Agriculture and 10.0 ment of rural financial institu­ required. depends on various stages Water Devel­ (IDA) tions and support to financial of project preparation to opment intermediaries. be taken by the Govern­ ment.

Development Bank About (R) DBZ III - Third Line of Credit Consultants will be Approved by the Executive of Zambia (DBZ) 10.0 _to Development Bank of Zambia. required. Directors on January 6. (IDA) To help DBZ improve its per­ (Cofinancing agreed with formance and its ability to EIB for $8 million.) mobilize resources through a major capital increase; upgrade the quality of DBZ's portfolio and increase the efficiency of financial and management decision-making by establishing a Management Information System and training DBZ staff in its use.

See page l for footnotes. - 11 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender J:../ Consulting Services Action on Procurement!±._/ ZIMBABWE

Ministry of About Power II - Power system rehabil­ No decision made whether Project under prepar­ Energy, Water 30.0 itation and manpower develop­ consultants will be re­ ation. (Cofinancing Resources and (Bank) ment. Total project cost estim­ quired. required.) Development/ ated at $150 million. Electric Supply Commission

Ministry of About Manpower Development - Technical No decision made whether Project under Labor, Manpower 40.0 education; vocational training; consultants will be preparation. Development and (Bank) and management training. required. Social Welfare (MLMDSW)

Ministry of About (R) Highways II - Construction and No decision made whether Project under Transport 50.0 improvement of feeder roads in consultants will be preparation. (Bank) communal areas; construction of required. key bridges; regravelling and resealing program; strengthening of paved roads and assistance to trucking industry training.

REGIONAL

East African About DFC III - Continuation of sup­ No consultants required. Project under Development Bank 10.0 port through a third line of preparation. (IDA) credit, with emphasis on region­ al projects.

See page 1 for footnotes. - 12 -

Member Country, Amount Ii and Probable Stage Processing and Agency l/ Lender !/ Consulting Services Action on Procurement 4/

II. WESTERN AFRICA

Ministry of 15, 0 (R) Public Enterprises - Rehabili­ Consultants have been Approved by the Executive Justice in (IDA) tation of the Public Enterprise recruited for studies. Directors on December Charge of State Sector through policy reform, 16. Credit signing on Enterprise technical assistance and re­ January 9. (Cofinancing Inspection structuring investments in key with Swiss Agency for state enterprises. Project cost Development Cooperation estimated at $31.5 million, of for $8 .4 million,) which $15,5 million in foreign exchange. An IDA Project prepara­ tion Facility advance of $1,500,000 was previously approved to help finance project preparation.

Office des 7,5 Telecommunications - Rehabi­ Consultants have been Project under prepar­ Postes et des (IDA) litation and expansion of local recruited for studies. ation. Telecommunica­ telephone networks, and tech­ tions nical assistance to the Office des Pastes et Telecommunications du Benin.

Ministry of 19 .5 Transport Infrastructure - Roads Consultants will be Appraisal report being Transport and (IDA) and Ports rehabilitation and required for studies and prepared. (Cofinancing Equipment maintenance; institution build­ technical assistance. agreed with BOAD, EDF, ing, training and transport CCCE, FAC, OPEC, IsDB, planning studies. Total project and Kuwait Fund.) cost about $63.3 million, of which $43.8 million in foreign IDA Project Preparation exchange. Facility advances tot­ aling $980,000 have been approved to help finance project preparation.

Societe Benin­ 10.0 Water II - Expansion of urban Consultants for detailed Approved by the Executive oiee d 'Electri­ (IDA) water supply facilities in studies and tender docum­ Directors on June 30. cite et d 'Eau Cotonou, and Porto Novo. Re­ ents selected. (Financed (Cofinancing with CCCE (SBEE) inforcement of SBEE's managerial under ongoing engineering for $10 million, IsDB for and financial capabilities. credit), $4.5 million and OPEC for Total project cost about $33.0 $2,7 million being con­ million, of which $23.7 million firmed.) in foreign exchange.

Ministry of 14.0 Phase II Borgou Province Rural Consultants will be Appraisal report under Rural Develop­ (IDA) Development - Cotton and food required for various preparation. (CCCE, IFAD ment and Coop­ crop development through input studies and assistance in and the Swiss Development erative Action, supply, expansion of draft cul­ financial management. Corporation have ex­ Centre d'Action tivation, credit for purchase of pressed interest in co­ Regional pour le inputs, oxen and draft equip­ financing.) Developpement ment, increased local production Rural (CARDER), of ox-drawn equipment, foodcrop Societe Nation­ storage at farmers' level, and ale pour la the strengthening of CARDER and Promotion de SONAPRA's administrative ser­ l'Agriculture vices, Support for stabil­ (SONAPRA) isation of cotton subsector.

Ministry of 8.0 Health - Improvement of (a) de­ Consultants will be IDA Project Preparation Public Health (IDA) sign and management of primary required for various Facility advance of health care network; (b) manage­ studies. $325,000 has been ap­ ment practices in hospital sub­ proved to help finance sectors; and (c) pharmaceutical project preparation. distribution system.

BURKINA FASO

Ministere de la 20.0 Technical Assistance - Esta­ Consultants will be re­ Project processing Planification et (IDA) blishment of Development Invest­ quired to help prepare dependent upon Govern­ du Developpement ment budget and assistance in and execute project. ment I s broad agreement on financial management to streng­ investment priorities and then investment budgeting and financial reBtructuring monitoring development expend­ which are under active itures. discussion.

See page 1 for footnotes, - 13 -

Member Country, Amount & and Probable Stage Processing and Agency J./ ~ll Consulting Services Action on Procurement!!../ BURKINA FASO (Cont'd)

Minis tere de 25.0 Highways Maintenance - Main·­ Consultants will be Project processing depen­ l'Equipement (IDA) tenance of existing roads in­ required., dent upon resolution of cluding upgrading of the transport sector issues Ouagadougou-Kaya-Dori road and which are under active improvement of Kaya-Dori road to discussion with the .all weather standards. Total Government. (Contract cost estimated at $60.0 million. awarded for upgrading Kaya-Dori road to all weather gravel standard, financed by Italy. KfW Germany has allocated DM 38 million for Ouaga-Kaya road.)

Minietere de 25.0 Agricultural Research - To Consultants will be Appraisal mission in l 'Ense ignement (IDA) strengthen the Burkinabe insti­ required. the field. (France and et de la tutes responsible for agricultur­ the Netherlands have Recherche al (including livestock) and expressed interest in Scientifique forestry research (INERA and co financing.) IRBET, respectively); develop research infrastructure; re­ IDA Project Preparation orient research programs; and Facility advance of strengthen linkage between $275,000 approved to fin­ research and extension services. ance research advisor and workshop/seminar. An ad­ ditional advance of $225,000 approved to con­ tinue preparation activities.

Ministere de 35.0 Urban II - Infrastructure re­ Consultants provided by Appraisal mission 1 'Administration (IDA) habilitation, and financial and Consortium BCEOM/Groupe scheduled for April. Territoriale et human resource mobilization for Huit heve completed first de la Securite Ouagadougou and Bobo Dioulasso phase of feasibility IDA Project Preparation to improve (a) tax collection; study. Second phase of Facility (PPF) advance of Cb) urban municipal management studies pending Govern­ $500 1000 approved to fin­ and resource allocation includ­ ment's approval. ance preparation acti­ ing civil works and detailed vities for Urban II and a engineering. Total project cost pilot maintenance program estimated at $35.0 million. of existing infra­ structure.

Ministere de 44.0 Agricultural Extension - Streng­ To be determined. Preparation under way. l'Agriculture et (IDA) thening of agricultural support de l 'Elevage services at national level. CAMEROON

Minis tere de 75.0 (R) Cocoa Rehabilitation - To mod­ Consultants will be Negotiations postponed l 'Agriculture et (Bank) ernize the Cameroonean cocoa required for export pending resolution of Societe de industry through reforms in the strategy, technology sector issues. Development du incentive and institutional development and monitor­ Cacao (SODECAO) systems. ing and evaluation.

Ministere de 20.0 Technical Teacher Training - Consultants will be Appraisal report being l'Enseignement (Bank) Increasing the output and im­ required for workshop prepared. (Cofinancing Superieur et de proving the qualifications of organization and being sought.) la Recherche technical teachers. Improving maintenance and for Scientifique planning and management of education planning and resources. project management.

Ministere de 115.0 (R) Douala Infrastructure - Removal Detailed engineering Negotiations tentatively 1 'urbanisme et (Bank) of major infrastructure cons­ studies are in progress. scheduled for early de l 'Habitat traints in Douala through March. traffic management plan, rehs - bilitation and construction of primary and secondary urban roads, improvements and con­ struction of major storm drains, institutional strengthening for efficient operation and main­ tenance of urban transportation and drainage system. Total pro­ ject cost about $240.0 million, of which $115.0 million in for­ eign exchange.

See page l for footnotes. - 14 -

Member Country, Amount & and Probable Stage Processing and Agency l/ Lender Y Consulting Services Action on Procurement 4/ CAMEROON (Cont'd)

Ministere de 25.0 (R) Netionsl Csdastre - Aime to Consultants will be Appraisal mission tenta­ l'Urbanisme et (Bank) extend secure land ownership to required for project tively scheduled for late de l 'Habitat urban dwellers. Project el­ implementation and March. ements include: geodetic net­ technical assistance. work for the whole country, ae~ rial photographs at various scales; equipment, material, vehicles and facilities for the services and technical as­ sistance and training programs.

CAPE VERDE

Ministry of 3.0 (R) Basic Education Development - Technical assistance (yet Appraisal mission National (IDA) Support of basic education to be determined) expect­ tentatively sched­ Education development and strengthening of ed to be required. uled for March. education administration.

Ministries of To be (R) Water Sector - Definition of Consultants will be Preparation mission Rural Develop­ deter­ policies in water sector, required for feasibility scheduled for'February. ment, and mined including urban/rural water studies, project prep­ Fisheries; (IDA) supply and irrigation, form­ aration and tariff Energy and ulation of a water and energy studies. Industry master plan, implementation of national water code, rehabili­ tation of infrastructure, tariff studies.

CENTRAL AFRICAN REPUBLIC

Ministry of 25.0 (R) Education Rehabilitation - Im­ There will be a need for Appraisal mission tentat­ Education (IDA) provement of the quality and technical assistance in­ ively scheduled for internal efficiency of primary cluding project prepar­ March. education sector aimed at im­ ation. proving the overall management of the system and of scarce resources.

Ministry of 25.0 Rural Fund II - To provide funds To be determined. Identification under Agriculture and (IDA) for financing small-scale rural way. Rural Devel­ development schemes and streng­ opment (MADR) then Chadian institutions invol­ ved with rural development.

Ministry of 16.6 (R) Agriculture Planning and Technical assistance Board presentation Agriculture and (IDA) Rehabilitation - Central personnel for: (I) scheduled for February Rural Devel­ objectives involve the strategy planning in key 10. opment (MADR) development of agricultural departments; (2) sub­ institutions and pilot actions sector studies. IDA Project Preparation and studies to expand crop Facility advance of production. $500,000 approved for consultants for sub­ sector studies.

Ministry of '25.0 Agriculture Sector - Strengthen To be determined. Pre-appraisal mission Agriculture and (IDA) And improve the organization and scheduled for late 1987. Rural management of the MADR and rural Development planning organizations, and sti­ (MADR) mulate new subsector develop­ ments in crop production, for­ estry and agro-industries.

Office National 25.0 Road Rehabilitation and Maint­ To be determined. Project being des Routes (IDA) enance - Rehabilitation of prepared. (OFNAR) transport and related insti­ tution building.

Ministry of 30.0 Petroleum - To support implem­ To be determined. Appraisal mission Planning and (IDA) entation of a least cost product scheduled for March. Reconstruction supply system and provide tech­ nical assistance to strengthen IDA Project Preparation the Government's management of Facility advance of the petroleum sector. $1,000,000 approved to help finance start-up of the project.

See page l for footnotes. - 15 -

Member Country, Amount ti, and Probable Stage Processing and Agency l/ Lender 1/ Consulting Services Action on Procurement 4/ CHAD (Cont'd)

Ministry of 20.0 Livestock - Institution building To be determined. Appraisal mission Livestock (IDA) with particular emphasis on for­ scheduled for Hay. mulation of national policies in the livestock sector, livestock IDllrketing, animal health and training.

Ministry of 30.0 Cotton Supplement - Structural To be determined. Appraisal mission Agriculture (IDA) adjustment in the cotton sub­ scheduled for February. sector and financial assistance to help Government deal with the cotton crisis.

CONG0 1 PEOPLE'S REPUBLIC OF THE

Miniotere du 10.0 (R) Extension - To strengthen Consultants likely to Request for an advance Developpement (Bank) research and extension be required to provide under Project Preparation Rural organizations and coordination technical assistance Facility to finance pilot of their activities. during implementation. operation in prepbrstion.

To be determined 50.0 (R) Public Enterprise Reform - Conoultants required to Project under prepar­ (Bank) Support for rationalization and asaist .Government in ation. Appraisal contin­ reform of public enterprise execution of reform plan gent on satisfactory sector. and for project implem­ resolution of credit entation. worthiness issue.

To be determined 50.0 (N) SAL - To support macro-economic To be determined. Project.being prepared. (Bank) policy adjustment measures. Appraisal contingent on satisfactory resolution of credit worthiness issue.

COTE D'IVOIRE

Ministry of 34.0 (R) Agricultural Extension - Improv­ Consultants will be Loan signed on Agriculture; (Bank) ing extension services in three required for study and December 17. Ministry of main extension agencies CIDT, assistance in financial Rural Develop­ SATHACI and SODEPALM and links management. ment; and with Agricultural Research. Ministry of Total project cost about $58.5 Scientific million, of which $15.6 million Research in foreign exchange.

Ministry of 34.0 (R) Agricultural Research - To cre­ Requirements not yet No further project Scientific (Bank) ate a new institutional frame­ defined. processing envisaged Research work for research. Project until satisfactory would emphasize expansion of conclusion of ongoing food crops and farming systems negotiations between research and consolidation of Government and France of tree crops resear~h. Ivorianization of research.

Ministere des 115.0 (R) Urban III - (a) assistance to: Consultants will be Negotiations in mid­ Travaux Publics; (Bank) Ci) re-orient the policies and required for technical January. (Cofinancing and Ministere de programs of the public sector assistance. with AID for $10.0 la Construction housing and land servicing agen­ million.) et de l'Urban­ cies; and (ii) introduce mechan­ isme isms to provide long-term re­ sources to encourage private sector finance for housing and for households; and (b) finan­ cing of complementary invest­ ments required to make optimal use of infrastructure and public transportation facilities finan­ ced under the on-going second project. Total project cost estimated at $270.0 million.

See page 1 for footnotes. - 16 -

Member Country, Amount & and Probable Stage Processing and Agency}_/ ~1/ Consulting Services Action on Procurement!!_/ COTE D'IVOIRE (Cont'd)

Port Autonome 9.5 Port Rehabilitation - Improve­ Consultants will be Project being prepared. d 'Abidjan (PAA) (Bank) ments to existing port facil­ required for improvement ities and institution building. in management, operations and planning.

Societe 10,4 (R) Rubber V - Planting additional Consultants may be Negotiations in mid­ Africaine de (Bank) outgrower rubber on small - and required for land use January. Plantations medium-size holdings and ex­ survey. d'Heveas tending a nucleus estate; main­ (SAPH)/Ministry taining into production rubber of Agriculture planted under projects 111 & IV; land use survey of tree crop development in the Southwest.

Ministry of Eco­ 200.0 Agricultural Sector Loan - To Requirements not yet Project being prepared. nomy and Fin­ (Bank) consolidate and expand struc­ defined. ance; Minis try tural adjustment reforms in of Agriculture; agricultural sector policy and Ministry of institutional improvements. Rural Develop­ ment; and Ministry of Forestry

Miniatere de 20.0 Municipal Development - Country­ Consultants would be Project being prepared. l'interieur - (Bank) wide strengthening of local required for the implem­ Direction des government institutions through entation of the institu­ Collectivites technical assistance to Ministry tional components of the Locales of Interior; creation of a mun·i­ project. cipal development fund, and implementation of urban infra­ structure works in selected cities.

EQUATORIAL GUINEA

Ministerio de 7.0 Primary Education - Improvement Consultants will be Appraisal report being Educacion y (IDA) and expansion of the primary required for school prepared. Deportee education eubsector; strength­ construction, text book ening of education administra­ development and project tion as a prerequisite for accounting. further educational development.

Ministry of . 22.0 Reconstruction - Rehabilitation To be determined. Preparation mission ten­ Planning (IDA) of infra~tructure in rural sec­ tatively scheduled for tor, agricultural sector plan­ late 1987. ning, diversification of agri­ cultural production,

THE GAMBIA

Central Bank of 6,0 (R) Private Sector Development - Consultants for project Preparation report by IDA the Gambia and (IDA) Line of credit for financing re­ preparation financed by -financed consultants coDDD.ercial banks habilitation of existing enter­ the Project Preparation currently under review. prises and new investments in Facility. the private sector through the Appraisal mission sched­ banking system; technical as­ uled for May. (ADF has sistance to enterprise support expressed interest in agencies and entrepreneurs, as cofinancing.) well as to the Gambia Commercial and Development Bank (GCDB) for IDA Project Preparation its financial and organizational Facility advance of restructuring. Total project $450,000 approved to fin­ cost estimated at $12.0 million. ance (a) banking con­ of which $10.7 million in sultant services and foreign exchange. overseas training for GCDB staff; and (b) a· consultant study of technical assistance needs and design of institutional arrange­ ments for delivery of extension services to private enterprises.

See page 1 for footnotes. - 17 -

Member Country, Amount & and Probable Stage Processing and Agency}_/ ~II Consulting Services Action on Procurement!±./ THE GAMBIA (Cont'd)

The Gambia 7 .o Water Supply/Electricity - Re­ Consultants for detailed Approved by the Executive Utilities (IDA) habilitation and expansion of engineering design have Directors on July 8, Corporation water supply systems in Greater been selected, Con­ (Cofinancing with ADF for (GUC) Banjul and provincial urban sultant for technical $4.0 million, EDF for areas, Banjul electricity sys­ assistance and training $2.6 million,IDB for $4.0 tem rehabilitation, technical will be required. million,) assistance and training. Total project cost estimated at $19,4 million, of which $15,1 million in foreign exchange.

Ministry of 5.6 (R) Population, Health and Nutrition Consultants for project Board presentation Health, Labor (IDA) - Strengthening of family plan­ preparation financed by scheduled for February and Social ning, health, and nutrition the Project Preparation 10, (Cofinancing Welfare facilities through financing of Facility, confirmed with the drugs, rehabilitation, acqui­ Netherlands $2.0 million; sition of essential equipment, Italy $9,6 million; nurse training, improvement in United Kingdom $0.8 communications infrastructure. million; UNCDF $0,4 Total project cost estimated at million. China has $18.2 million, of which $15,8 expressed interest.) million in foreign exchange. IDA Project Preparation Facility advance of $400,000 approved to finance consultant services to complete necessary preparation studies and the detailed plans,

Ghana Cocoa 30.0 (R) Cocoa III - Comprehensive reha­ To be determined. Further pre-appraisal Marketing Board (IDA) bilitation of cocoa industry, mission planned for late including assistance for disease January. control, cocoa research, plan­ ting of hybrids and further in­ stitutional work, Total project cos·t estimated at $30,0 million.

Office of the 35,0 (R) Public Enterprises Rehabilita­ External consultants have Appraisal mission sched­ Chairman, Com­ (IDA) tion - Institutional and policy completed preparatio~ uled for March. (Co­ mittee of reforms to improve performance study. Other consulting financing will be Secretaries of the public enterprise sector, services to be determined required,) and rationalization of size with Government. through divestiture. Total IDA Project Preparation project cost estimated at $35.0 Facility advance of million. $400,000 approved to finance consultant ser­ vices and certain equip­ ment required to complete preparation work, UNDP is also contributing $308,000 to finance their preparatory work of Phase I.

GOIL/GHAIP 15.0 (R) Refining and Distribution - To Consultants are likely Appraisal report being Ministry of Fuel (IDA) rehabilitate and improve Tema to be required but prepared, (Cofinancing and Power Refinery and the transportation details are still to be confirmed with KfW and distribution of petroleum worked out, (Germany) for $8,0 mil­ products, Total project cost lion, Danida (Denmark) estimated at $35,0 million. has expressed interest; CCCE has been ap­ proached.)

Ministry of 34,5 (R) Education Sector Adjustment - Consultants will be Approved by the Executive Education (IDA) Budgetary support for implement­ required for school Directors on December ;] ation of 1987-89 structural re­ location planning, and 9, (Cofinancing agreed forms in educational system and universities rational­ with ODA (UK) $2,7 i policy changes in financing o( ization planning. million, Norway $3.4 education sector, Total est­ million, OPEC Fund $4,4 million, Switzerland $0.9 1; imated program cost about $463,9 million, of which $93.3 million million, and UNDP $1.4 ,1 to be externally financed. million,) I IDA Project Preparation Facility advance of $300,000 approved for consultant services and other essential project preparation work.

See page 1 for footnotes. - 18 -

Member Country, Amount & and Probable Stage Processing and Agency lJ Lender]/ Consulting Services Action on Procurement! GHANA (Cont'd)

Ministry of 25.0 Structural Adjustment Credit - To be determined. President's Report being Finance and (IDA) Reform of incentives, parti­ prepared. Economic 96.0 cularly through trade liberal­ Planning (SAP) ization and cocoa producer IDA Project Preparation prices; financial sector re­ Facility advance of forms; strengthening the econo­ $750,000 approved for mic management capabilities of completion of preparatio key government institutions, activities and strength­ improving the allocation of ening core economic and resources through formulation of financial institutions a 3-year public expenditure required to carry out th program; monitoring of state project. enterprise.

Ministry of 4.0 Technical Assistance - In Sup­ Long term consultants in President's Report being Finance and (IDA) port of Structural Adjustment economics, public finance prepared. (ODA (UK), Economic Program. and management required, USAID and UNDP to Planning to be financed by ODA cofinance.) (UK), IDA and UNDP.

Ministry of 3.0 (R) Agriculture Services Rehabilita­ To be determined. Appraisal report being Agriculture (IDA) tion - To assfst in rehabilita­ prepared. (AFDB 17 .o ting Ghana's food and industrial expressed interest in (SPA) crops. Total project co~t esti­ parallel financing, for mated at $22.5 million. imported inputs for $20 .1 million; KfW (Germany) for $8 million.)

Volta River 6.3 (R) Northern Grid Extension - Re­ Consultants to be ap­ Board pre~entation Authority (IDA) inforcement and extension of pointed for the distri­ scheduled for January Volta River Authority (VRA) bution component. 27. (Cofinancing Transmission Grid to Northern confirmed with AfDB for Ghana with related distribution. $38.3 million, CIDA $7.5 million, EIB/CDC $36."7 million, and Japanese Ex· Im-Bank $5.0 million.)

Ministry of 60.0 (R) Transport Rehabilitation - Im­ To be determined. Appraisal mission Transport and (IDA) provement of transport sector scheduled for March. Communications policy; rehabilitation and im­ provement of transport services, infrastructure and institutions.

Bank of Ghana; 60.0 (N) Industrial Sector Adjustment II To be determined. Preparation to start and Ministry of (IDA) - Restructuring of Industrial in June. Industry Public Enterprises; reform of incentive policies; provision of finance for inputs and rehabili­ tation; institutional streng­ thening of Ministry of Industry, Bank of Ghana and commercial banks.

Ministry of 9.8 Livestock Sector Rehabilitation Long-term consultants to Approved by the Executive Rural (IDA) Development - Program to improve be financed by CCCE and Directors on July 8. Development animal health, veterinary ser­ PAC. Some short-term (Cofinancing with CCCE vices and support to herders. consultants will be re­ for $3.8 million; PAC fot Total project cost about $22.2 quired for various $1.4 million and BADEA million, of which $19.2 million studies. for $4.5 million.) in foreign exchange. IDA Project Preparation Facility advance of $465,000 to finance project start-up.

See page 1 for footnotes. - 19 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency}_/ ~y Consulting Services Action on Procurement 4/ GUINEA (Cont'd)

Ministry for 15.0 Second Water Supply - Rehabili­ Consultants for prepar­ Pre-appraisal mission Natural (IDA) tation of operations and water ation selected, financed scheduled for February. Resources, supply systems. Expansion of under the Project Prepar­ (Cofinoncing will be Energy, and the Conakry and secondarycenters ation Facility Advance. required.) Environment facilities, IDA Project Preparation Facility advance of $400,000 to finance in­ ventory of customers, investment program, water tariff, legal framework.

Secretary of 20.0 (R) Transport Sector - Policy Consultants for prep­ Appraisal mission sched­ State for (IDA) reforms in transport sector; aration selected, fin­ uled for end-January. Transport 10.0 rehabilitation and maintenance anced under PPP advance. (SAF) of transport sector, in~luding IDA Project Preparation road transport, ports and Facility (PPF) advance of airfields. $515,000 approved for consultants services in project preparation, in­ cluding institutional reforms of ports, and civil aviation opera­ tions.

Ministry of 11.0 (R) Rural Health - Quantitative and Consultants for prepar­ Appraisal report being Health and (IDA) qualitative improvements in ation selected. prepared. Social Affairs rural health systemand develop­ ment of family planning services IDA Project Preparation with primary health care. Facility advance of $800,000 to finance prep­ aration assistance (tech­ nical coordinator, archi­ tect, epidemologist), equipment and vehicles.

Secretariat of 20.0 Telecommunications - Reorgani­ Consultants will be Identification report State for (IDA) zation of Post and Telecom­ required for project under review. Telecom­ munications Sector - Program for preparation. munications strengthening new entity to manage and operate the sector, program for rehabilitation of local and trunk network, ve­ hicles and miscellaneous equip­ ment.

Ministry of 80.0 (R) Second Structural Adjustment Not required, Program under discussion Economy and (IDA) Credit - Support for second with authorities. Ap­ Finance phase of economic reform praisal mission scheduled program. for June.

Ministry of 15.0 Agricultural Seeds - A national To be determined. Project preparation Rural (IDA) program for producing, multi­ completed by FAO/CP Development plying and distributing seeds. mission. Appraisal (MDR) mission scheduled for May.

Miniotry of 25.0 (R) Second Agricultural Services - Consultants for prep­ Preparation mission in Rural (IDA) Program to improve extension, aration selected, the field. (Cofinancing Development research and training, and financed under an IDA will be required.) (MDR) organization of MDR. Project Preparation Facility advance. IDA Project Preparation Facility advance of $320,000 to finance pilot extension, and $430,000 to finance project preparation,

GUINEA-BISSAU

Ministry of 3.7 (R) Agricultural Services - Insti­ Consultants required for Awaiting Goveroment Rural Devel­ (IDA) tutional develoP\Uent in agri­ adviaory services in pro­ approval. · opment and cultural sector planning; and ject administration, Fischeries specific formulation of invest­ planning, forestry, fish­ ments. eries, animal production, fruit production end irrigation.

See page 1 for footnotea. - 20 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency Jj ~y Consulting Services Action on Procurement 4/ GUINEA BISSAU (Cont'd)

Ministry of 10.0 (R) Structural Adjustment Credit to To be determined. Negotiations tentatively Finance (IDA) assist in financing import needs scheduled for early 11.5 (1987-1988). March. (Cofinancing witt (SAF) AfDB, FAD, Swiss, Saudi and German Governments.)

Ministry of 10.4 Structural Adjustment Credit to Technical assistance to Will require reappraisal. Finance (IDA) bring about an improvement of be provided under sep­ the Government's fiscal per­ arate IDA credit. formance in the quality of its investment program, in the effi­ ciency of public enterprises and in export performance.

Ministry of 3.3. Technical Assistance in support Consultants for technical Will require reappraisal. Planning and (IDA) of structural adjustment pro­ assistance to new Bureau (Cofinancing with UNDP Economic Affairs gram. Total project cost about of State Enterprises have for $0.4 million envi­ $3.8 million, of which $3.3 mil­ been selected and terms saged.) lion in foreign exchange. of reference and con­ tracts are being negotia­ ted.

Ministry of 5.1 Population and Health - To help Consultant to be Date of negotiations Planning and (IDA) develop a national population appointed by the to be determined. Economic policy and program and streng­ Government. Affairs; and then the health service delivery IDA Project Preparation Ministry of support systems. Total project Facility (PPF) advance Health and cost estimated at $5.6 million, of $300,000 approved. Social Welfare of which $3.2 million in foreign exchange.

Minis tere de 25.0 (R) Office du Niger II - Streng­ Consultants will be re­ Appraisal report being l 'Agriculture; (IDA) thening and rehabilitation of quired for assistance in prepared. (Cofinancing Office du Niger 28.0 Office du Niger. Total project project implementation, with DIGIS (Netherlands) (SAFI cost estimated at $72.l million, and in financial re­ for $1.3 million, FAC/ SJF) of which $55.7 million in for­ structuring of the Office CCCE for $1.9 million, eign exchange. du Niger. and CCCE for $0.4 million confirmed. )

An advance of $1,500,000 under the IDA Project Preparation Facility approved for the fin­ ancing of technical assistance, training program, maps and studies.

Ministere du 14.9 (R) Public Entreprise - Rationaliza­ Consultants to provide Negotiations substan­ Plan (IDA) tion of the size of the public overall advisory services tially completed. 57.0 enterprise sector to reduce bur­ to Bureau des Entreprises (SAF/ den on Mali's economy; policy Publiques have been se­ An advance of $992,000 SJF) and institutional reforms to im­ lected, and proposals for under the IDA Project prove the performance of the specific aspects of pro­ Preparation Facility public enterprise sector and ject preparation have approved for the finan­ financial restructuring of the been received from short­ cing of studies and sector. Total project coat es­ listed firms. Consult­ audits of public enter­ timated at $153.6 million of ants will also be re­ prises to be closed, which $89.7 million in foreign quired to assist Govern­ rehabilitated or trans­ exchange. ment in project implem­ ferred to the private entation. sector for the proposed public enterprise pro­ ject. A second PPF advance of $508,000 has been approved.

See page 1 for footnotes. - 21 -

Member Country Amount & and Implementing Probable Stage of P,rocessing and Agency];/ Lender!/ Consulting Services Action on Procurement 4/ ii MALI (Cont'd) I Energie du Mali 40.0 (R) Power 11 - Policy and institu­ Consultants have been Appraisal mission sched­ (EMD) (IDA) tional reforms, and financial recruited to prepare the uled for March/April. restructuring, to improve per­ studies under ongoing (Cofinancing with CIDA formance of the energy sector. Power Project. Consul­ for $5.0 million, EIB for Reinforcement and extension of tants will be required to $5.0 million and KfW the services of EDM by con­ provide technical assist­ (Germany) for $9.0 mil­ structing a transmission line ance, including addition­ lion confirmed. OPEC between Bamako and Segou; rein­ al studies. Fund, DIGIS, AfDB, CCCE 1 forcement and extension of di­ and FAC have been stribution system, rehabilita­ approached for cofinan­ tion of Felou, Sotuba and cing. Austria has Selingue hydro plants. Rehabi­ expressed interest.) litation of diesel units in isolated centers, technical assistance training, spare parts and studies. Total project cost about $63.0 million, of which $55.0 million in foreign ex­ change.

Ministere du 72.0 (R) SAL - Macro-sectoral policy re­ Consultants have been A public expenditure Plan (IDA) forms addressing management of employed to assist in review was completed in public resources, the structure public expenditure November. Processing of macro incentives and agri­ review. Additional schedule of SAL dependent cultural policy framework. consultant services upon actions being taken likely to be required at on reforms being sup­ appraisal stage. ported by proposed Public Enterprises and Office du Niger Credits.

MAURITANIA

Ministere de 10.0 (R) Development Management - Tech­ To be determined. Appraisal mission l'Economie et (IDA) nical assistance to key Govern­ scheduled for end­ des Finances ment agencies to aid in imple­ January/February. mentation of economic recovery (Cofinancing needs programand to initiate reform of to be determined.) public administration. IDA Project· Preparation Facility advance of $500,000 approved for financing of studies and technical assistance.

Ministere de 5.0 Structural Adjustment Credit - To be determined. President's Report · 1 'Economie et (IDA) Support to Government's recovery being prepared. des Finances 28.0 program. Total project cost (SAF) estimated at $33.0 million in foreign exchange.

To be determined 20.0 (N) Irrigation IV - To finance the To be determined. Project identification (IDA) first phase of the post­ under way. Manantali investments, probably limited to the Government's contribution to joint-venture irrigation projects. Total project costs estimated at $21.0 million.

Ministere du 10.0 Small Rural Operations - Small­ No decision made whether Preparation completed by Plan (IDA) scale irrigation and bottomland consultants will be re­ FAO/CP, but appraisal development schemes; cooperative quired. mission postponed and and group support activities; tentatively scheduled for medium term loans to farmers. July 1987, in view of Total project cost estimated at issues still pending. $12.0 million. Financing to help prep­ aration was provided for by an advance of $430,000 from the IDA Project Preparation Facility.

See page l for footnotes. - 22 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency }j ~];_I Consulting Services Action on Procurement!!_/ NIGER (Cont'd)

Ministere de 18.4 (R) Primary Education Development - Consultants in textbook Credit signed on December ! 'Education (IDA) Expansion and rehabilitation of editing and publishing, 15. (Cofinancing with primary schools; education plan­ in project management, KfW Germany for $1.7 mil­ ning, textbooks, teacher trai­ educational planning and lion, and Norway for $4.7 ning and institution building. evaluation and systems million confirmed in Total project cost about $26.2 analysis will be principle.) million, of which $15.l million required. in foreign exchange.

Ministere de 40.0 Public Enterprise - Policy and Consultant was selected Preparation under way. Tutelle des (IDA) institutional reforms to improve to design and implement Entreprises the performance of the sector; public enterprise reform IDA Project Preparation Publiques and rehabilitation of selected measures. Facility advance of public enterprises. Total $750,00 approved to fin­ project cost estimated at $66.5 ance start-up, studies of million. enterprises and audits.

Ministere de 25.0 (R) Water Supply II - Extension of Consultant to be re­ Pre-appraisal mission l'Hydraulique et (IDA) assistance to the new water au­ cruited to provide tech­ scheduled for de l' environ­ thority and to the Ministry of nical assistance to the September. (CCCE has nement Hydraulics for rural water sup­ water authority and the expressed interest in co­ ply policy reform. Expansion of Ministry. financing.) Niamey water supply. Total pro­ ject cost estimated at $37.0 million, of which $22.0 million in foreign exchange.

Ministry of 35.0 (R) Energy - Continuation of finan­ Consultants will be Appraisal mission Energy (NIGELEC) (IDA) cing priority investments in required for distribution scheduled for end­ energy sector. Total project and transmission studies January/February, cost estimated at $40.0 million, as well as land manage­ (Belgium, EIB, CCCE of which $39.0 million in ment/energy conservation and KfW (Germany) have foreign exchange. study. expressed interest"in co financing.)

Federal Ministry 71.0 Forestry II - The project will Consultants will be re­ Approved by the Executive of Agriculture, (Bank) (1) support an afforestation quired for post planting Directors on October Water Resources program; (2) establish pulpwood management. 21. and Rural Deve­ and timber plantations; and pro­ lopment vide support to forest manage­ Bank Project Preparation ment in three middle belt Facility advance of states. Total project cost $900,000 approved to estimated at $110.7 million, of finance start-up which $41.4 million in foreign activities. exchange.

National 350.0 (R) Power VII - Transmission and NEPA is appointing Appraisal mission Electric Power (Bank) distribution system expansion to consultants. expected in early 1987. Authority (NEPA) utilize available generation; rehabilitation of existing gene­ ration and transmission facili­ ties; vehicles; computers; spare part purchases; and technical assistance and training to improve all aspects of NEPA.ls operations. Total project cost estimated at $750 million, of which $500 million in foreign exchange.

Federal Ministry 100.0 (R) Water Fund Rehabilitation - Consultants being Preparation under way. of Agriculture, (Bank) Provision of funds through FMAWR appointed to carry out Water Resources to assist states with rehabilita­ assessment of urban water Bank Project Preparation and Rural tion of existing water supply facility rehabilitation Facility advance of Development facilities, provide sector train­ needs. $0.3 million approved to ing; accounting systems; techni­ finance technical assis­ cal assistance. Total cost esti­ tance/rehabilitation mated at $152.0 million, of which studies. $75.0 million in foreign ex­ change.

See page l for footnotes.

, I I I

f - 23 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency l/ ~y Consulting Services Action on Procurement !!.I NIGERIA (Cont'd) I Lagos State 173,2 (R) Lagos Water Supply - Expansion Consultants have com­ Negotiations substan­ !, Water Cor­ (Bank) of water supply system; reha­ pleted hydraulic analysis tially completed. I poration bilitation, organization and of distribution network, (Cofinancing is envi­ management studies; supervision and organization and man­ saged.) ,1 of construction; technical as­ agement studies. Consul­ I sistance and training. Total tants for construction Project Preparation Fa­ project cost estimated at $422.9 supervision are being cility advances of $1.5 million, of which $354.9 million selected. million approved by Bank in foreign exchange. to carry out hydraulic analysis, design, con­ struction supervision and aerial photography.

Ministry of 67.6 Urban - Infrastructure Develop­ Technical assistance for Appraisal report being Works and (Bank) ment Fund. Establishment of a Fund operation. Design prepared. Housing new mechanism to identify, pre­ and supervision of Fund pare, and finance urban infra­ subprojects. Technical structure investment in Nigeria. assistance to borrowing Technical assistance from local States and local autho­ sources would be provided for rities for improved fi­ the setting up and for opera­ nancial management and tions of the Fund, and pilot urban services. operations in several States would be included. Financing, for a second tranche of sub­ projects to be selected and appraised during the implemen­ tation of the project, would also be included, Total project cost estimated at $90.4 million, of which about $66.5 million in foreign exchange.

Ministry of 200.0 (R) Highway Sector Loan - Strength­ Consultants are required Negotiat~ona substan­ Works and (Bank) ening, rehabilitation and pe­ for detailed designs and tially completed. Housing riodic maintenance of Federal economic analyses, super­ highways, bridge replacement, vision of road improve­ rehabilitation and main­ ment works; coordination tenance. Total project cost of contracts, maintenance estimated at $981.3 billion, of management system deve­ which $84.3 billion in'foreign lopment and training, and exchange. This total project strengthening institu­ cost represents the total tional capacity. proposed highvay investment program for 1988-1990, the expected disbursement period.

Ministry of 34.0 (R) Imo Health and Population - To To be determined. Appraisal mission tenta­ Health (Bank) assist Imo State improve primary tively scheduled for health services and to initiate March. a population awareness and fa­ mily planning service program. Total project cost estimated at $50,0 million, of which $34.0 million in foreign exchange.

Federal Ministry 200.0 Second Multi-State Agricultural To be determined. Project being prepared by of Agriculture, (Bank) Development - Phased financing consultants. Pre­ Water Resources of agricultural development appraisal mission tenta­ and Rural projects in about six states. tively scheduled for Development Total project cost estimated at February. $300 million of which $150 million in foreign exchange.

Federal Ministry 25.0 Technical Education - To (a) Limited number of tea­ Appraisal mission tenta­ of Education, (Bank) upgrade the quality of training ching staff for the poly­ tively scheduled for Science and of middle-level technical man­ technics will be needed. March. Technology power in selected federal tech­ nical, institutions, primarily polytechnics; and (b) to streng­ then national capability for mo­ nitoring and coordinating tech­ nical and vocational educa­ tion, Total project cost esti­ mated at $32 million,

See page 1 for footnotes, - 24 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency l/ Lender Y Consulting Services Action on Procurement 4/

~ (Cont'd)

Ministry of 50.0 (N) Public Enterprise Restructuring To be determined. Preparation mission Finance (Bank) and Technical Assistance - tentatively scheduled Assistance to Government to for January/February. implement measures to privatize and commercialize public enter­ prise sector.

Ministry of 500.0 (N) Trade Policy II - To support To be determined. Preparation to start Finance; Central (Bank) trade reform initiatives in early 1987. Bank of Nigeria; commenced under first Trade and Ministry of Policy Loan. Industries and Commerce

SAO TOME AND PRINCIPE

Ministry of 7.4 Cocoa - Rehabilitation of cocoa Two foreign firms have Negotiations tentatively Agriculture and (IDA) plantations through improved or­ been se lee ted for manage­ scheduled for March. Rural Develop­ ganization and management, tech­ ment service contracts ment nical assistance, and provision . with the Government to of inputs. manage one plantation each, with the possibi­ lity of adding a further plantation each after 2-3 years.

Ministry of 12.0 Primary Education Development - Consultants will be re­ Approved by the Execu­ Education (IDA) To help improve the cost­ quired in education tive Directors on October effectiveness of education planning, financial 14. (AfDB confirmed co­ resources and strengthen the management and school financing equivalent to institutions responsible for construction design. $5 .3 million.) education quality and resource management. Total project cost about $19.6 million, of which $12.2 million in foreign ex­ change.

Societe 18.0 (R) Irrigation IV - Irrigation and To be determined. Board presentation sched­ d'Amenagement et (IDA) drainage rehabilitation works on uled for April. (Cofi­ d'Exploitation existing perimeters; agricul­ nancing confirmed with du Delta (SAED) tural credit training, applied IFAD $7.2 million, KfW and adapted research; refores­ Germany $7.0 million, tation, health and studies. BADEA $5.0 million, FAC Total project cost estimated at $4.0 million and CCCE $49.0 million, of which $32.0 $3.3 million.) million in foreign exchange.

Ministry of 40.0 Transport Sector Rehabilitation To be determined. Project preparation in Equipment (IDA) - Road upgrading and streng­ progress. (Cofinancing thening; road maintenance will be required.) program; technical assistance and studies.

Ministry of 40.0 (R) Water Supply to Dakar and Muni­ Consultants for studies Project preparation in Works; Minis try (IDA) cipal and Housing Policy - Pro­ and technical assistaRce progress. (Cofinancing of Urbanism; ject would consist of two compo­ will be required. will be required.) Ministry of nents: (i) Water Supply: in­ Hydraulics; crease in capacity of water Municipality treatment plants and pumping of Dakar stati§Ds; construction of 2 x 1000m reaervoirs; rehabili­ tation and expansion of water networks; technical assistance and studies; and (ii) Urban Development: small sc~ investments in the Dakar metro­ politan area; generation of sources of revenues for the municipalities of Greater ·Dakar; reorganization of the municipal administration; and streng­ thening of finance to the Hou­ sing Bank (BHS) as an interme­ diation agency for the financing of land development, housing construction and municipal investment.

See page 1 for footnotes. ·- 25 -

Member Country Amount & and Implementing Probable Stage of Processing and Agency lJ ~~, Consulting Services Action on Procurement 4/ ~(Cont'd)

Ministere du 14.0 Development Management - Tech­ To be determined. Project preparation in Plan et de la (IDA) nical assistance, equipment, and progress. (Cofinancing Cooperation training to key government agen­ to be determined.) cies to strengthen economic and financial management and to un­ dertake reform of public admi­ I I nistration. Ministry of 3.0 Technical Assistance to Ministry Consultants for prepar­ Project preparation in Rural (IDA) of Rural Development - Project ation study financed by progrese. Development would include: providing the the Project Preparation Ministry with policy development Facility. IDA Project Preparation and planning capability and s.n Facility advance of information system; overall or­ $685,000 has been ap­ ganization of the Ministry and proved to finance con­ allocation of responsibility; sultant services and training and manpower develop­ logistical suppo_rt to ment system; studies of rural undertake a reorga­ institutions. Total project nization study of the cost estimated at $4.0 million. Ministry of Rural Develo~ent.

Ministry of 15.0 Structural Adjustment Credit III To be ·determined. Appraisal mission sched­ Economy and (IDA) - To continue support for the uled for end-January. I Finance 35.0 Government's medium-and long­ (Cofinancing from Special I (SAF) term. economic and financial Africa Facility confirmed adjustment program started under for $35.0 million.) I the SAL II, with emphasis on pu­ blic sector management, finan­ I cial sector reforms, public investments, employment and I energy policies, and rice import ( liberalization. SOFISEDIT 24.0 Industrial Sector Rehabilitation To be determined, Project preparation in (IDA) - Support to Government 1 s sector progress. policies, financial assistance to industries, technical assist­ IDA Project Preparation ance to help prepare and imple­ Facility advance of ment policy and institutional $450,000 has been ap­ reforms, and restructuring proved to finance mainly programs. consultant services to undertake necessary prep­ aration studies.

To be determined 40.0 (N) Rainfed Agriculture -·Main To be determined. Project identification (IDA) objectives will be the rehabi­ under way. litation of land as a social capital and to finance inter­ ventions which will rapidly increase income in the rainfed sector (i.e., groundnuts, cereals and other rainfed crops). Individual investment components not yet defined. Project will also consider sector-wide operations such as seed. Total project cost estimated at $40.0 million.

SIERRA LEONE

Ministry of 18.0 Structural Adjustment Credit - To be determined. President's Report Finance (IDA) To support policy reforms in being prepared. 16.0 public enterprises and in­ (SAF) centives for agriculture and industry.

Ministry of 2.0 Technical Assistance in Support To be determined. President's Report Finance (IDA) of Structural Adjustment Pro­ being prepared. gram.

See page l for foo tno tee • - 26 -

Member Country Amount 15, and Implementing Probable Stage of Processing and Agency }j ~~/ Consulting Services Action on Procurement !/ .!QQQ

Ministry of 15.0 Agricultural Extension Services Consultants preparation Appraisal report being Rural Develop­ (IDA) Improvement - Extension services study completed. prepared. ment rehabilitation, with emphasis on improving organization of field IDA Project Preparation operations. Facility advance of $200,000 to defray cost of consultants to prepare project.

Ministry of 14.0 Agricultural Services Rehabi­ No decision made on need Project being identified. Rural (IDA) litation - Rehabilitation of for consultants. Development General Agricultural Support Services including input supply, seed production, applied research and cooperative deve­ lopement.

Ministry of 17.9 (R) Cocoa/Coffee III - Replanting Short term consultants Approved by the Executive Rural (IDA) and maintenance of 10,000 ha old will be required for Directors on December Development cocoa and coffee; disease con­ project implementation 9. (Cofinancing with trol over 35,000 ha mature co­ and studies. CCCE $5.7 million and FAC coa; pruning of 7,700 ha mature $2.9 million confirmed.) coffee; integration of food crops; research in cocoa, cof­ fee, food crops. Total project cost about $33.2 million, of which $19.9 million in foreign exchange.

Ministry of 20:0 (R) Transport Sector Investment and Consultants preparation Appraisal mission sched­ Equipment, (IDA) Maintenance - Road maintenance study under review. uled for March. (Sub­ Mines and Post and rehabilitation, related ins­ stantial cofinancing will and Telecommuni­ titutional strengthening and be required.) cations coastal protection.

CEET (Compagnie 10.0 Power Distribution - Institu­ Consultants required for Project preparation under Energie Elec­ (IDA) tional diagnostic study and institutional studies, way. trique du Togo) action plan. Rehabilitation and technical assistance and extension of distribution system training, and engineering in Lome; purchase of spares and for rehabilitation and equipment; technical assistance extension of system. and training at all levels to improve all aspects of opera­ tions.

Ministry of 14.0 (R) Private Enterprise Development - Study on SME support sys­ Appraisal report being Planning and (IDA) Line of credit, and technical tem completed. Implemen­ prepared. (Cofinancing Industry assistance for development of tation under way. required.) small and medium enterprise (SME) projects. A component for Consultants may be privatization of industrial required for privati­ parastatals may be added. zation studies.

Ministry of 50.0 Third Structural Adjustment No decision made on use Program being Planning and (IDA) Program - Action program aimed of consultants. identified. Industry at accelerating real economic growth; continuous improvement of public sector management (public investment, divestiture of PES) and incentives to agri­ culture and other productive sectors.

Ministry of 4.0 (R) Health - Reconstruction and Re­ Consultant services Project preparation Health (IDA) habilitation of existing faci­ required to prepare under way. lities; institutional reform to project. improve management and planning; testing of integrated low cost primary health care system; in­ service training, health education.

Ministry of 25.0 (N) Third Cotton Rural Development - No decision made on need Project being Rural (IDA) Cotton and foodcrop development. for consultant. identified. Development

See page I for footnotes. - 27 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J./ Lender];_/ Consulting Services .Action on Procurement!±/

III. EAST ASIA AND PACIFIC

£!!!!!! Shanghai Ma~hine 100.0 (R) Shanghai Machine Tools - Ration­ Evaluation of consult­ Negotiations in mid­ Tool Works (Bank) alization and product upgrading ants' proposals for January. (SMTW) and of the industry in Shanghai, feasibility·atudies Corporation completed. (SMTC)

Ministry of 65.0 Health II - Two main parts: Consultant services to be Approved by the Exec­ Public Health (IDA) preventive medicine and rural financed by Government. utive Directors on 15.0 health. ·For preventive medi­ June 19. (Bank) cine, assistance to 1) National Center for Preventive Medicine; 2) rehabilitation of vaccine production; 3) improvement of drug quality testing, For rural health, support to county level activities in 8 provinces. Total project cost about $177.4 million, of which $78.4 million in foreign exchange.

Ministry of 55.0 (R) Beijing-Tianjin-Tanggu Express­ Most consultant services Negotiations scheduled Communications (Bank) way - Civil works; tra.ining and provided under bilateral for March. 95.0 possibly technical assistance. aid, (IDA)

Municipality of 65.0 (R) Shanghai Sewerage - Construction Consultant services will Negotiations scheduled Shanghai (Bank) of sewers to remove and dispose be required. for February, r 80.0 of wastewater from the central (IDA) commercial district, areas with high population density and industrial concentration in Shanghai; and for institutional strengthening to improve the environmental conditions in the city of Shanghai.

Ministry of 40.0 (R) Red Soils Area Development Consultant services will Credit signed on Agriculture, (IDA) Agricultural development in be required. December 18. Animal Husbandry certain counties of Jiangxi and Forestry and Fujian Provinces. Total project cost about $122,2 mil­ lion, of which $40,5 million in foreign exchange.

State Ad­ 100.0 (R) Cement - Rehabilitation and Consultant services will Feasibility study ministr8tion (Bank) modernization comprising new be required. under preparation. for Building plant, wet-to-dry process con­ Materials version, and technical assis­ Industry tance for optimization of small­ scale plant design and for design and research institutes.

Ministry of 70.0 (R) Xinjiang Development - Integra­ Need for consultants to Negotiations in mid­ Agriculture, (IDA) ted development in agricultural be determined. Janusry. Animal Husbandry production, livestock and pas­ and Forestry ture improvement, irrigation, (MAAF) hydropower, and agro-processing.

Ministry of 108.0 Huangpu Port - Construction of Need for consultants to Awaiting Govermnent 1 s Communications (Bank) new berths and technical assis­ be determined. decision on timing of tance and training. negotiations.

Ministry of 140.0 (R) Power V - Shuikou Hydro-power. Consultants have been Board presentation Water Resources (Bank) Provision of peaking and reserve appointed. on January 6. and Electric capacity to the East China power Power (MWREP) grid, by construction of a con­ crete gravity dam with naviga­ tion facilities and transmission lines, installation of genera­ ting units, resettlement of people, and relocation of rail­ road and highways. Total pro­ ject cost about $856 million, of which $399 million in foreign exchange.

See page 1 for footnotes, - 28 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency];_/ Lender J:./ Consulting Services Action on Procurement!!_/

~ (Cont'd)

Ministry of 90.0 Dongpu Basin Natural Gas - Ex­ Need for consultants to Awaiting Govermnent's Petroleum (Bank) ploration, appraisal and pro­ be determined. decision on project Industry duction of natural gas in Dongpu scope. Basin. Also introduction of integrated approach to planning for gas development, transport and utilization.

China Investment 200.0 (R) Fourth Industrial Credit (CIB No decision yet made, Negotiations in mid­ Bank (Bank) IV) - To finance expansion and January. 50.0 modernization in light industry, (IDA) principally._

Gansu Provincial 20.0 Gansu Agriculture - Completion No decision yet made. Appraisal report Government (Bank) of irrigation projects serving being reviewed. ll0.0 90,000 ha and land development (IDA) for rainfed agriculture on 200,000 ha, training and research.

Gansu Provincial 20.5 (R) Gansu Industrial Credit - Line No decision yet made. Appraisal report Government (Bank) of Credit to one or two finan­ being reviewed. 0.5 cial institutions or agencies in (IDA) Gansu to support light industry development in the province.

Gansu Provincial 20.0 Gansu Education - Improving Consultant services will Appraisal report being Government (IDA) training for primary and lower be required. reviewed. secondary teachers, improving the planning and information systems, impr,oving science instruction in lower secondary schools, and establishing supervision and inspection.

Ministry of 191.0 (R) Coal II (Coal mine expansion) - Consultants will be Project design being Coal Industry (Bank) -Rehabilitation of existing mines required for design and revised by Government and 15.0 in Shanxi Province. engineering. might require reapprai­ (IDA) sal.

State Education 100.0 Text Book - Modernization of Need for consultants to Sector report being Commission (IDA) textbook design, production and be determined. prepared. distribution for primary, se­ condary and higher education. The project would assist inter alia a National Curriculum Development Center, and pro­ duction and distribution facilities.

Ministry of 105.0 Fertilizer II - Plant rehabili­ Need for consultants to Project preparation Chemical (Bank) tation; production diversifica­ be determined. under way. Industry tion; energy saving modifica­ tions; technical assistance to improve financial management and accounting systems; training.

Agricultural To be Rural Credit III - To provide Need for consultants to Project preparation Bank of China deter­ funds to ABC for medium to long­ be determined. under way. (ABC) mined term loans to individual ·farmers and households, collectives and enterprises.

China National To be South China Sea Gas - Provision Consultants will Awaiting Government's Offshore Oil deter­ of well-head services, technical be required, decision on project Corporation mined assistance and training to CNOOC scope. (CNOOC) for the development of natural gas at South China Sea. Project would include construction of a pipeline, gas-fired power plant and possibly some distribution network.

Ministry of 200.0 (R) Power VI - To consist of 2x300 To be determined. Appraisal report Water Resource (Bank) mw coal-fired thermal power being prepared. and Electric station located at Wujing in Power Shanghai.

See page 1 for footnotes. - 29 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ ~:!:_I Consulting Services Action on Procurement !ii CHINA (Cont'd)

Ministry of 100.0 Shandong Roads Development III - To be determined. Project preparation Communications (Bank) Construction of class one roads under way. in Shandong (Jinan-Qingdao); training to provincial highway design institutes.

Ministry of Coal 200.0 (R) Coal III - Modernization and To be determined. Appraisal mission post­ Industry (Bank) expansion of Kailuan and Datun poned pending Government coal mines. decision on project design.

Ministry of 136.0 Dalian Port - To assist in ins­ To be determined. Appraisal report Communications (Bank) titution building and cons­ being prepared. truction of a break-water, two container berths, two general purpose berths, erection of necessary infrastructure and procurement of equipment.

Ministry of To be Special Technical Assistance To be determined. Project preparation Finance deter­ Credit - Technical assistance under way. mined and training sub-projects for (IDA) economic sector and feasibility studies.

State Education 80.0 (R) Teacher Education - To assist To be determined. Project preparation Commission (IDA) Government in improving its under way. teacher education network in order to attain its goal of universal basic education.

Ministry.of 150.0 He Tao Irrigation - Rehabili­ To be determined. Project preparation Agriculture, (IDA) tation of 200,000 ha of existing under way. Animal Husbandry irrigation area in inner and Fishery Mongolia autonomous region.

Ministry of To be (R) Phosphate Mining - Development To be determined. Project preparation Chemical deter­ of Wengfu/Dayukou/Huangmailing in January. Industry mined phosphate mining and benefi­ ciation projects.

Ministry of To be Power VII - Assist in con­ To be determined. Project preparation Water Resources deter­ struction of 2x300MW coal-fired under way. and Electric mined thermal power units located at Power Yenshi in the vicinity of coal mines in Henan province.

Ministry of To be Sichuan Roads Development - To be determined. Project preparation Communications deter­ Construction of Chengdu­ under way. mined Chongqing Road.

Ministry of 13.6 Road Improvement - Upgrading of Consultants will be Negotiations completed. Communications, (Bank) selected road segments in required for revision of (Cofinancing with ADD for Transport and Government's development detailed engineering; $13.6 million awaiting Works program. preparation of bidding final agreement.) and contract documents, construction supervision, and road maintenance engineering.

Post and 10.5 (N) Telecommunications III - To Consultants will be Project preparation Telecommuni­ (Bank) assist Government of Fiji to required to assist with under way. cations restructure the te lecommunica­ restructuring. Department tions sector. Total project (P & T) cost about $33.0 million.

National 226.0 (R) Power Transmission and Distri­ Engineering consultants Board presentation on Electricity (Bank) bution - To expand the trans­ already in place. Other January 20. (Cofinan­ Authority (PLN) mission and distribution facili­ consultancy needs relate cing of $14.2 million ties in Java. Total project to equipment selection arranged with Germany.) cost about $366 million, of for Testing and Research which $240 million in foreign Center; and establishment exchange. of an Engineering Center within PLN.

See page l for footnotes. - 30 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender!/ Consulting Services Action on Procurement-4/ INDONESIA (Cont'd)

Ministry of 25.7 (R) Maritime Training - To develop Consultant services will Negotiations scheduled Communications (Bank) manpower within the maritime be required for training for January/February. sector by establishing large­ services and technical scale training systems in the assistance. sector.

National 200.0 Paiton Thermal - The project Consultants are already Project preparation Electricity (Bank) includes construction of 2/400 in place. under way. Authority (PLN) MW coal fired generating units at Paiton in East Java, 500 kV transmission lines from Paiton to Krian and associated sub­ stations at Paiton and Krian.

Directorate 52.0 (R) Regional Cities Urban Transport Consultants have been Negotiations scheduled General for (Bank) - Road improvements and traffic recruited for project for February. Highway Con­ management measures in a few preparation; need for struction, selected secondary cities. other consultants to be Ministry of determined. Pub lie Works (Bins Marga)

Director General 18.0 (R) Treecrops Human Resources Consultants may be Negotiations in January. of Estates (Bank) Development - To ease manpower required for the (DGE), Ministry constraints in the implement­ technical assistance of Agriculture ation of the estate crop pro­ component. gram, through training to small­ holders and to DGE provincial and headquarters staff.

Indonesia State 28.0 (R) Railways Technical Assistance - Consultants will be Negotiations scheduled Railways (PJKA) (Bank) To assist the Indonesian State required for technical for March. Railway in raising operational assistance and training. efficiency through training and technical assistance and select­ ed items of equipment needed to improve operations and mainten­ ance.

Ministry of 21.0 Industrial Energy Conservation - Consultants will be Negotiations scheduled Mines and (Bank) Establishment of national energy required in the area of for mid-February. Energy/P.T. conservation center to assist energy audits/feasibility Pupuk Sriwidjaja the industrial sector in redu­ studies. Indonesia cing energy costs through con­ (PUSRI), (a gov­ servation and rationalization ernment-owned activities, modification in fertilizer PUSRI ammonia plants to reduce company) energy use and optimize produc­ tion capacity, and carrying out of feasibility studies in four other fertilizer plants to eval­ uate potential for energy savings.

Ministry of Home 150.0 (R) Rural Roads II - Civil works for Consultants will be Appraisal mission Affairs (Bank) road construction; rehabilita­ required for technical in January. tion equipment; workshops for assistance and training. maintenance, and technical assistance and training.

Ministry of 54.0 Forestry Institutional Develop­ No decision yet made. Project preparation Forestry (Bank) ment - Forestry planning, mana­ under way. gement, research, conservation, and assistance to prepare future forestry projects.

Directorate 24.5 (R) Fisheries Support Services - To Consultants needed for Approved by the Executive General of (Bank) strengthen fisheries technique construction supervision, Directors on December 16. Fisheries, development, program support, technical assistance to Ministry of credit, input supply, infra­ hatcheries, and marketing Agriculture structure and marketing support support. services for fisheries in Aceh, Sulawesi and Fores. Total pro­ ject cost about $41.0 million, of which $17.4 million in foreign exchange.

See page l for footnotes. - 31 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency y ~:!:_/ Consulting Services Action on Procurement !!J INDONESIA (Cont'd)

Ministry of 150.0 Rural Electrification - A No consultants Project identification Hines end (Bank) timeslice of the investment required. The project planned for early 1987. Energy; and program for transmission and will be prepared by PLN. National distribution, including Electricity extension of supply to rural Corporation areas. (PLN)

Directorate 250.0 Irrigation Subsector - Upgrading To be determined. Appraisal mission General for (Bank) O&M of complete projects and en­ scheduled for end­ Water Resources suring adequate cost recovery; January. Development completing on-going wholly GOI­ financed projects; promoting groundwater development; and institutional strengthening.

Ministry of 50.0 (R) Third Health - Strengthening of Consultant services will Appraisal mission sched­ Health (Bank) health planning and the pro-· be required. uled for May. vision of services, in provinces tentatively identified to include Kalimantan Timur, and Nuea Tenggara Barat.

Bank Rakyat 101.0 KUPEDES/Rural Banking - To Consultant may be Appraisal report Indonesia (Bank) provide support to Bank Rakyat required in the area of being prepared. Indonesia in relation to its rural branch banking. KUPEDES (small loan) program to enable it to transform its unit deaa system into a viable rural banking system.

Directorate 125.0 Smallholder Tree Crops Deve­ To be decided, Project preparation , General of (Bank) lopment - To support Govern­ under way. Estate ment' a efforts to improve smallholder coconut production.

Ministry of 75.0 Accountancy Development - Two Consulting (both local Project preparation Finance (Bank) components: (1) to reform the and foreign) services under way. system of accountancy throughout will be needed in both the Government and private components. sector through establishment of professional organization and standards; and (2) to expand and improve accountancy education to meet demand for graduates of varying levels of education.

Ministry of 250.0 Urban Sector - Support for on­ Consultants needed for Appraisal report Finance (Bank) going urban infrastructure pro­ property valuation and being prepared. gram expenditures for FY87/88 property tax admi­ and FY88/89; and urban sector nistration; sector policy fiscal policy reform and man­ studies and training. power development.

Ministry of 80.0 Industry Engineering Subsector - Consulting services will Project preparation under Indus try (HCll) (Bank) To include: (1) Technical be required. way. assistance for monitoring group in MDI; (2) policy changes and institution building; "(3) specific restructuring or development programs in key areas; and (4) technical assistance to enterprises.

Director General 50.0 Regional Cities Water Supply - Consulting services will Project preparation for Cipte Karya (Bank) To include construction/rehabil­ be needed. Scott and under way. itation of water works, ex­ Furphy (Australia), and tension of distribution and Sinotech (Taiwan), sup­ technical assistance for about ported by local firms. 20 water enterprises in pro­ vinces of Irian Jaya, North Sulawesi, and South Sulawesi and city of Denpasar.

Directorate 100.0 Tree Crops Processing - Rehab­ Need for consultants to Project preparation General of (Bank) ilitation of existing oil palm be determined. under way. Estates (DGE) mill and rubber factories. 'Provision of additional proces­ sing capacity. Technical as­ sistance for marketing study. Training also included.

See page 1 for footnotes. - 32 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency lJ Lender ii Consulting Services Action on Procurement f!/ INDONESIA (Cont'd)

Ministry of 300.0 (R) Trade Policy Adjustment - To Need for consultants to Negotiations completed, Finance (Bank) assist in the financing of im­ be determined, Board presentation ached· ports, the flow of which are uled for February 3, increasing as a result of trade liberalization (lowering tariffs, removing some quan­ titative restrictions.)

BAPPENAS 5.0 (N) Technical Assistance VI - To Consultant services Project preraration (Bank) provide follow-up technical will be required. under way. assistance and studies in support of the Trade Policy Adjustment loan and other requirements to be determined.

Ministry of 132,0 Kyonggi Region Multi-Modal Detailed engineering to Appraisal report Construction; (Bank) Transport - To provide in­ be carried out.by Korean being prepared. and Korean tegrated network of suburban Highway Corporation and National expressways and railways in the KNR plus consultant Railroad (KNR) Kyonggi Region. assistance.

Ministries of 150.0 (R) Housing Finance Sector - To sup­ Need for consultants to Appraisal mission sched­ Finance and (Bank) port institutional and policy be determined, uled for February/March, Construction improvements relating to public sector housing programs and to the housing finance system,

Ministry of 200.0 Third Education Sector Loan - To Need for consultants to Project preparation is Education (Bank) upgrade capacity and quality of be determined. being delayed. training and of advanced tech­ nology research undertaken by universities and by the Ministry of Science and Technology.

Korea Technology 50.0 Technology Development - To sup­ Need for consultants to Project preparation Development (Bank) port institutional improvements be determined. is being delayed, Corporation in KTDC and to finance a line of (KTDC) credit for enterprises engaged in the development of new tech­ nologies.

Pusan City 50,0 (R) Pusan Urban Management - To Need for consultants to Appraisal completed. Government (Bank) strengthen financial management be detemined. Negotiations planned of the City's development pro­ for February. gram, to improve project evalua­ tion and investment planning, and to help finance priority infrastructure investment.

Daegu City 30.0 Daegu Urban Transportation - To Need for consultants to Project under Government (Bank) help finance priority invest­ be determined, preparation. ments in urban transportation and establish transportation system management. LAO PEOPLE'S DEMOCRATIC REPUBLIC

Electricite du 27 .o (R) Electrification of Southern Consultants being engaged Appraisal mission Laos (EDL) (IDA) Provinces - Transmission, and to ~ompl~te preparatory scheduled for early distribution of electricity in engLneerLng funded out of February. selected provinces. existing IDA credit.

Ministry of 3.9 (R) Telecommunications Rehabilita­ Consultant shortlist for Credit signed Transport and (IDA) tion - Rehabilitation and re­ engineering and planning, on December 12, Posts equipping of existing telephone financial management and network, institutional develop­ project coordination and ment, training, and preparation implementation (to be of a phased expansion program, financed from UNDP funds) Total project cost estimated at to be prepared by the $7.8 million, of which $4.3 mil­ executing agency. lion in foreign exchange.

See page l for footnotes, - 33 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender!/ Consulting Services Action on Procurement!!./ LAO PEOPLE'S DEMOCRATIC REPUBLIC (Cont'd)

Ministry of 10,6 (R) Polytechnic - To set up an en­ Consultants required for Pre-appraisal mission Education (IDA) gineering school specializing in architectural design, ad­ postponed because Govern­ civil, mechanical and electrical ministration and academic ment has yet to advise engineering. This would include program. Bank on project scope the provision of instructional and financing, facilities, purchase of equip­ ment and educational materials and the supply of technical assistance and fellowships.

Ministry of 10.0 Southern Transport - .Repair and Need for consultants to Project under Transport and (IDA) maintenance of national road be determined. preparation. Ports surface, bridges and drainage systems.

MALAYSIA

National 100.0 (R) Energy Efficiency and Plant Consultants wi11 be re­ Approved by the Executive Electricity (Bank) Rehabilitation (Power XII) ·· quired for project Directors on December 16. Board (NEB) Power transmission and dis­ implementation. tribution facilities. Total project cost estimated at $160.0 million, of which about $105,8 million in foreign exchange.

Bank Kemajuan 65.0 (R) Development Finance - Financing No consultants required. Approved by the Executive Perusahaan (Bank) of medium- and large-scale Directo~s on December 16. Malaysia Berhad enterprises in the Industrial (BKPMB); Sabah sector through participation of Development Bank public and private financial (SDB) institutions.

Pub lie Works 85.0 (R) Road Rehabilitation and Improve­ No decision made whether Project processing sus­ Department (Bank) ment - Rehabilitation and consultants will be pended pending Government maintenance program for federal required. decision on budget and state highways. allocation.

Forest Research 10,0 (R) National Forest Research and Consultants may be Project preparation under Institute of (Bank) Technical Assistance - Streng­ required. way. (Cofinancing may be Malaysia (FRIM) thening of research and forestry sought,) related studies in Peninsular Malaysia and Sarawak.

Ministry of 75.0 . (R) Higher Education - To assist the Consultants will be Project preparation Education (Bank) Government to expand the univer­ required. under way. sity system and to improve qua­ lity and relevance.

Federal Land 50,0 FELCRA II - Rehabilitation as Need for consultants to Project preparation Consolidation (Bank) mini-estates of about 40,000 ha be determined. under way. and Rehab­ of idle padi lands; senile tree ilitation crop areas with oil palm (35,000 Authority ha); rubber and diversified (FELCRA) crops (5,000 ha); and mainte­ nance to harvest (19,000 ha) of tree crops planted under FELCRA I. Construction of scheme access roads and infrastructure; palm oil processing mills; trai­ ning facilities; and streng­ thening of support services.

Ministry of 30.0 Samarahan Rural Development - Consultants will be Project preparation Agriculture/ (Bank) Drainage irrigation and flood required for project under way. Department of mobilization works, roads and implementation. Irrigation and agricultural development in the Drainage Samarahan River Basin, Total project cost estimated at $160.0 million.

Federal Land 30,0 (R) Sabah Land Settlement - Time To be determined. Project preparation Develo:;,ment (Bank) slice financing of FELDA's Land under way, Authority Settlement Program in Sabah. (FELDA)

Ministry of 200.0 Trade and Induetrial Sector Need for consultants to Project preparation Trade and (Bank) Adjustment - To assist the be determined. under way. Industry Government in taking policy measures.

See page 1 for footnotes. - 34 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ ~ll Consulting Services Action on Procurement 41 PAPUA NEW GUINEA

Department of 45.5 Transport Improvement II - Consultants will be re­ Approved by the Executi, Transport and (Bank) Construction and improvement of quired for detailed en­ Directors on July 22. Civil Aviation about 90 km of national roads, gineering, institution (DTCA) and improvement of four national building for DTCA and Department of aerodromes, road maintenance, DWS, and local staff Works and Supply and consultant services and training. (DWS) technical assistance. Total project cost estimated at $64.7 million, of which $48.6 million in foreign exchange.

Electricity 28.5 Third Power - Construction of Consultants for project Approved by the Executiv Commission (Bank) dam at Yonki to firm up· existing preparation are being fi­ Directors on June 19. (ELCOM) capacity at Ramu Power Station nanced by the Bank Pro­ (Cofinancing with OECF and provision of two additional ject Preparation Faci­ (Japan) for $38 million, generating units (2xl5 MW), plus lity. Consultants also and EIB for $16 million. training and technical assis­ required for supervision tance for Rural Electrification of project construction A $1.0 million advance Study. Total project cost about and to review the design from Bank Project Pre­ $99.6 million, of which $52.6 and safety of the dam. paration Facility million in foreign exchange. approved to finance consultant services for preliminary design and detailed engineering.

Ministry of 35.3 Education IV - (Primary educa­ No decision made whether Further processing Education (Bank) tion) - Improvement of quality, consultants will be delayed indefinitely, enrollment rates and sub-sector required. pending Govermuent management. Total project cost decision on funding. estimated at $52 million.

Department of 15.0 Land Evaluation and Demarcation Consultants will be re­ Project preparation Lands; Depart­ (Bank) - Institution building for quired for project pre­ under way. ment of Primary Department of Lands; demarcation paration. Consultants Industry; and of alienated and customary land; would also be required Department of land resources and forest in­ for the project to assist Forest ventories; national mapping and in institution building coordination of mapping activi­ and training. ties; and preparation of selected agricultural and forestry projects.

National Water 25.0 Urban and Water Supply - Pro­ Consultants will be Project preparation Supply and (Bank) vision of serviced plots to be required for project under way. Sewerage Board sold to low-income families for implementation. (NWSSB) and construction of individual Department of houses; seed money for mortage Housing financing; rehabilitation and expansion of several water supply systems; technical assistance to strengthen NWSSB.

Department of 25.0 Embi-Garua Oil Palm - To develop To be determined. Project preparation Primary In­ (Bank) about 6,000 ha of land at Embi­ under way. dustry; and Garua into oil palm estate and Higaturu Oil smallholder settlements. Palm Pty. Ltd.

Posts & Telecom­ 30.0 Telecommunications III - To No decision made whether Project preparation munications (Bank) strengthen Posts and Telecom­ consultants will be under vay. Corporation munications to enable it to required. (PTC) manage the sector efficiently; to improve quality of service and to extend services to rural areas. The project would com­ prise: a) digital switching and transmission; b)'cable networks; c) computer facilities for mana­ gement systems; d) upgrading planning, financial controls, operations and maintenance; and e) training.

Department of 70.0 Petroleum II - To assist Govern­ To be determined. Project preparation Minerals and (Bank) ment in joint venture develop­ under vay, but project Energy ment of current hydrocarbon dis­ contingent on results coveries; development of infra­ of current test wells. structure to transport gas; pro­ vide technical assistance and manpower development.

See page l for footnotes.

I ' - 35 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender J) Consulting Services Action on Procurement 4/ PAPUA NEW GUINEA (Cont'd)

Agriculture 25.0 (N) Agricultural Credit IV - Insti­ To be determined. Governnent is preparing Development Bank (Bank) tutional strengthening for Agri­ project. culture Development Bank and financinl support, primarily for smallholders, for agricultural expa~.sion.

Department of 25.0 (N) NES III - Collingwood or Mamai­ To be determined. Governnent is preparing Lands and (Bank) Baibara area; development of project. Physical tree crop estate and smallholder Planning settlements.

Ministry of 40.0 (N) Education V - Manpower training To be determined. Gove rnnen t is preparing Education (Bank) and development to overcome key project. skills gaps in selected high­ priority sectors.

Department of 40.0 (N) Transport Improvement II - To be determined. Goverrment is preparing Transport (Bank) Continuation of institutional project. strengthening of key line department, and financial support for expansion and maintenance of transport infrastructure.

PHILIPPINES

National 28.0 (R) Central Visayas Regional II This project wili be Economic and (Bank) (Urban) - Emphasis on urban deleted from the lending Development development in metro Cebu and program and reporting Authority (NEDA) two smaller cities in Region will be discontinued. VII, supporting upgrading of mu­ nicipal infrastructure, manage­ ment of municipal enterprises, transportation, traffic manage­ ment, maintenance and train­ ing. Total project cost es­ timated at $42.2 million, of which about $19.7 million in foreign exchange.

Philippine 25.0 Geothermal Development - Bacon­ Consultants will be re­ Governnent is preparing National Oil (Bank) Manito I - To finance the dril­ quired for engineering project. Its timing will Company (PNOC) ling of about 17 additional studies and drilling man­ depend on newly defined wells, plus the installation of agement. investment priorities. 21 kilometers of steam-gathering (Cofinancing is envi­ and reinjection lines and 2 saged.) steam separator stations for a 110 MW power plant in Bacon­ Manito (Southern Luzon). Total cost estimated at $50 million, of which about $25 million in foreign exchange.

National 45.0 (R) Ir~igation Operations Support - No consultants required. Appraisal mission ten­ Irrigation (Bank) Assistance to National Irri­ tatively scheduled for Authority gation Authority for systems mid-May. (Cofinancing is (NIA) improvement, maintenance and envisaged.) rehabilitation. Total project cost estimated at $65 million, of which about $25 million in foreign exchange.

Ministry of 50.0 (R) Urban Transport - Pro­ Consultants for project Govermnent is preparing Public Works and (Bank) vision of improved road system preparation are being project. Highways (MPWH); capacity and safety; strength­ financed under an ongoing and Ministry of ening the Government's trans­ loan. Consultants will Transportation portation planning, programming, be required for project and Communic­ and policy formulation acti­ implementation. ations (MOTC) vities; and encouraging an in­ creased role for affected local Goverrunente in project implem­ entation and financial respon­ sibilities. Total project cost estimated at $100 million.

See page 1 for footnotes. - 36 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J./ Lender!/ Consulting Services Action on Procurement 4/ PHILIPPINES (Cont'd)

Presidential 150.0 (R) Public Corporate Sector Ratio­ Consultants will be Appraisal mission in Commission on (Bank) nalization Loan - To support a required for technical January/February. Reorganization program of reform to rationalize assistance. of Government and improve the efficiency of (PCRG); and government owned or controlled National Eco­ corporations; including tech­ nomic and Deve­ nical assistance to strengthen lopment Autho­ the performance monitoring and rity (NEDA) control functions, cost reco­ very, personnel and compensation policies, and management audits of selected corporations.

Central Bank of 65.0 Small and Medium Industries IV - No decision made whether Appraisal mission now the Philippines (Bank) To provide funds for relending consultants will be scheduled for mid­ (CBP); and to small and medium industries required. April. (Cofinancing may Ministry of with emphasis on export-oriented be sought.) Trade and activities, and supporting tech­ Industry (MTI) nical assistance to specific subsectors. Total project cost estimated at $110 million, of which about $65 million in for­ eign exchange.

Ministry of 70.0 (R)-Sugar Rehabilitation and Divers­ No decision made whether Appraisal mission now Finance (MOF) (Bank) ification - To assist crop sub­ consultants will be scheduled for mid-May. and Ministry of stitution/diversification in required. (Cofinancing is envi­ Agriculture and sugar areas; increased product­ sag~d.) Food (MAF) ivity and efficiency of the su­ gar sector; rationalization of sugar milling capacity and pro­ duction, and watershed manage­ ment. Ministry of so.o Population/Health - To assist Consultants will be Project being prepared Health (MOH) (Bank) the Government in the implemen­ required. by the Government. (Co­ and CoDDI1.is~ion tation of policy reforms per­ financing is envisaged.) on Population taining to the decentralization (POPCOM) of program implementation, inte­ gration of rural health and hos­ pital services, intensification of family planning service deli­ very, unification of outreach networks, improvement in finan­ cial management logistics and maintenance. Total project cost estimated at $92 million, of which about $52 million in foreign exchange.

Ministry of 8.5 Land Classification and Titling No decision made whether Appraisal report being Natural (Bank) Technical Assistance - To es­ consultants will be prepared. (Cofinancing Resources (MNR) tablish a geodetic network and required. is envisaged.) · to lay the institutional and technical foundation for a long­ term program in land-mapping, land classification, land adju­ dication, titling, and regi­ stration and to set up a land information system. Total project cost estimated at. $12 million.

National Home 100.0 Housing Sector Loan - To assist No decision made whether Project preparation Mortgage Finance (Bank) the Government in the develop­ consultants will be under way. Corporation ment of an equitable, viable and required. (NHMFC) eventual self-sustaining housing production and finance system with an increasing degree of privatization.

National Council 30.0 Rural Development (Mindanao) - No decision made whether Project being prepared for Integrated (Bank) To improve the standard of li­ consultants will be by Government. Area Development ving of the population in the required. (NACIAD) provinces of Bukidnon, Davao and Grant or soft loan Lanao Del Sur (Mindanao) through financing from other coordinated planning and implem­ sources under consid­ entation of multi-sectoral rural eration. development activities.

See page 1 for footnotes. - 37 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J:./ Lender J:/ Consulting Services Action on Procurement 4/ PHILIPPINES (Cont'd)

Philippine Ports 37 .o (R) Provincial Ports (Ports IV) - No decision made whether Appraisal report Authority (PPA) (Bank) Secondary Ports Development consultants will be being prepared. Program for Calapan, San Jose, required. Nasipit, Pulupandan, Tagbilaran, rehabilitation of typhoon damaged port of Sur igao and other ports, technical assistance and improvement of inter-island shipping. Total project cost estimated at $52.2 million, of which about $31.6 million in foreign exchange.

Ministry of 50.0 Secondary Education - To improve No decision on whether Project being prepared Education, (Bank) quality, increase efficiency and consultants will be by Government. (Cofinan­ Culture and expand access to secondary required. cing is envisaged.) ~ Sports (MECS) education.

Central Bank of 100.0 DFC - Industrial Finance II - No decision made whether Project preparation the Philippines (Bank) Follow-up to the ongoing consultants will be under way. industrial finance (Apex) required. project; to support lending through accredited financial intermediaries to industrial enterprises, and continued strengthening of financial sector through strengthening term lending capabilities of accredited intermediaries, and possibly selected financial sector reform measures.

National Power 60.0 Power VIII - Tentative proposal Ho decision made whether Project preparation Corporation (Bank) from National Power Corporation consultants will be under way. (NPC) (NPC) consists of rehabilitation required. of the Sucat Oil fired power Possible financing by plant and upgrading of Luzon export credit instit­ dispatching counter in Metro utions. Manila.

Ministry of 300.0 (R) Economic Recovery Program - To No consultants will be Negotiations in pro­ Finance (Bank) support essential reforms required. gress, (Cofinancing is covering Goverrunent Financial envisaged.) Institutions (GFis), public inv~stm.ent, trade and tax Procurement: system, and related technical assistance. Retroactive financing may be considered.

Ministry of 10.0 (N) Economic Recovery Program Consultants will be Negotiations in Finance (Bank) Technical assistance. required to carry out progress. financial studies and institutional streng­ thening.

THAILAND

Bangkok 51.9 Bangkok Flood Control - To Consultants will be re­ Further processing in Metropolitan (Bank) provide flood protection and quired for construction abeyance pending Govern­ Administration drainage in the city core area, supervision and advisory ment decision to borrow (BMA) technical assistance, and trai­ services for institu­ for the project. ning. Total project cost esti­ tional development, and mated at $90.8 million, of which for training in drainage foreign exchange component $26 .6 management, and corporate million. management.

National Housing 44.0 (R) Third Shelter - To support the Consultants required for Negotiations in early Authority (NHA) (Bank) National Housing Authority's (i) strengthening NHA'e January. (NHA) low-income housing pro­ planning and policy de­ grams in metropolitan Bangkok velopment functions and and regional cities, to in­ computer data processing troduce mortgage financing by capabilities; (ii) deve­ the Government Housing Bank as a loping housing prototypes part of NHA' s program and tech­ and infrastructure stan­ nical assistance to strengthen · dards; (iii) developing NHA. Housing Information Center.

See page 1 for footnotes. - 38 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J:./ Lender l=_/ Consulting Services Action on Procurement !!J

THAILAND (Cont I d)

Electricity 70.0 (R) Power Transmission - Main Engineering and super­ Appraisal mission ten­ Generating (Bank) components might include: (a) vision consultants will tatively scheduled for Authority of transmission system for Mae Moh be required. mid-February. Thailand (EGAT) Unit 9; (b) transmission link between the southern and central regions as well as related in­ vestments; (c) seventh trans­ mission system expansion; and (d) load dispatch centers.

To be determined 30.0 Rural Land Use - Financing of Consultants have been Project preparation (Bank) land policy and management selected for project under way. center, resource inventory, land preparation. reclassification, land ownership titling, infrastructure develop­ ment and forestry.

Electricity 30.0 (R) Lignite Ill Mae Moh Expansion - To be determined. Review of mine develop­ Generating (Bank) Lignite development in support ment requirements indi­ Authority of of power generation expansion at cate that project invest­ Thailand (EGAT) Mae Moh Units# 8 and# 9. ments not needed for some time; project preparation will be held in obeyance.

Petroleum 60.0 Energy IV (Oil/Gas) - Project To be determined. Discussions on project· Authority of (Bank) could consist of expansion of scope in progress. Thailand (PTT) LPG plant, products pipeline, and new gas pipeline to Southern Thailand.

Ministry of 100.0 (R) Highway Sector - To support the No decision made whether Appraisal mission Communications (Bank) road strengthening and rehabi­ consultants will be scheduled for late litation program including over­ required. February. lay,road safety program, train­ ing and technical assistance.

State Railway of 13.0 (R) Rail Efficiency Improvement - To Consultants will be Negotiations scheduled Thailand (SRT) (Bank) support a package of efficiency needed in marketing, for early February. enhancing policy and operational traffic, and operation. changes and ·certain investments.

Telephone 100.0 Telecommunication V - Expansion To be determined. Project preparation Organization of (Bank) of Thailand's domestic telephone under way._ Thailand network by about one million lines; and technical assistance.

Ministry of 5.0 Education - Improving quality of Consultants will be Appraisal report Education (IDA) primary and secondary education. required. being prepared.

WESTERN SAMOA

Electric Power 3.0 Power - Construction of a 4 MW Consultants will be Appraisal report Corporation (IDA) hydro power plant along with the required. being prepared. associated dam, reservoir, pen­ stock and powerhouse. The pro­ ject will have energy storage potential and will obviate need for Western Samoa to import diesel fuel for electricity generation.

See page 1 for footnotes. · - 39 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ ~ll Consulting Services Action on Procurement !!I

IV. SOUTH ASIA

BANGLADESH

Dhaka Water and 30.0 Dhaka WASA III - To continue Consultants for project Approved by the Executive Sewerage {IDA) development of ground water preparation financed Directors on September 9. Authority supply in Dhaka and of secondary under ongoing project. system; to further institutional development of OWASA through Consultants will be technical assistance; and to required for leak promote the use of low cost detection study and sanitation through a pilot produ~tion study. project. Total project coat about $41.4 million, of which $13.6 million in foreign exchange.

Bangladesh Bank 60.0 Agricultural Credit II - To sup­ Consultants b.eing Project preparation will {IDA) port further reform of agricul­ recruited to assist in be coordinated with tural credit system, strengthen project preparation. Financial Sector Review. agricultural financial institu­ tions and to provide credit to farmers for on-farm investments.

Bangladesh Bank 50.0 Industrial Investment - Provi­ As part of the project, Project timing dependent {IDA) sion of term finance to.private consultants will be on improved recovery sector industry through finan­ required for training in rates for industrial cial institutions to be the preparation of sub­ loans. (Cofinancing selected. sector studies. with AsDB likely.)

Bangladesh 47.0 (R) Refinery Modification and LPG Consultants being re­ Approved by the Exe~utive Petroleum {IDA) Recovery - To establish a sec­ cruited for engineering Directors on December 16. Corporation ondary conversion capacity at design work. facilities of Eastern Refinery Limited. Total project cost about $86.5 million, of which $56.0 million in foreign exchange.

Bangladesh Rural 15.0 Hand Tubewells II - To increase FAO/CP assisted in Appraisal mission Development {IDA) agricultural production and em­ project preparation. to be scheduled. Board ployment by providing low coot manual irrigation facilities.

Ministry of 75.0 (R) Road Rehabilitation and Main­ Consultants conducting Appraisal mission in mid­ Communications {IDA) tenance - To rehabilitate about feasibility and finan­ January, (Cofinancing 300 km of trunk-roado including cial/engineering studies being explored.) bridges; to provide institu­ are in the field. tional assistance for the devel­ opment of a road maintenance program.

Cabinet Division 6.0 Rural Employment and Training - Consultants will be re­ Preparation mission find­ {IDA) To promote rural non-farm em­ quired to survey demand ings under review. (To ployment opportunities in 15 for viable investment be cofinanced with SIDA.) upazilas of Faridpur and Rajbari items. districts.

Bangladesh Water 20.0 (R) Flood Control and Drainage IV - Consultants requirements Board presentation now Development (IDA) To improve physical production to be determined. scheduled for February 10 Board environment by controlling pending fulfillment of floods and improving drainage conditions. system. Total project cost estimated at $27 .5 million, .of which $4.6 million in foreign exchange.

Ministry of 28.0 (R) Urban Development - To improve Consultants (Louis Berger Negotiations now sched­ Works; and (IDA) the efficiency of delivery of International Inc,) have uled for February/March. Miniotry of urban infrastructure, services been selected for project Local Govern­ and affordable shelter at local preparation. ment, Rural level, and to strengthen the Development and management of sector agencies Cooperatives and increase reliance on local resource mobilization, Total project cost estimated at $42.4 million, of which $11.8 million in foreign exchange,

See page 1 for footnotes. - 40 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency ]j Lender 1./ Consulting Services Action on Procurement 4/ BANGLADESH (Cont'd)

Ministry of 190.0 (R) Industrial Sector Credit - Pro­ Consultants may be Negotiations tentatively Fin.ance (IDA) vision of foreign exchange for employed to help scheduled for March, financing imports, and would strengthen export advance a policy reform program administration and focussing mainly on industrial financing. sectors.

Ministry of 20.0 Industrial Energy Efficiency - Consultants will be· Appraisal mission delayed Energy and (IDA) To reduce energy import require­ required during project pending improvement in Mineral ments and enhance industrial implementation to assist recovery of industrial Resources efficiency by providing credit Energy Management Unit, loans. for investments to improve energy efficiency of existing industries.

To be determined 55.0 Cyclone Protection II - To pro­ Consultants will be Discussiono being held (IDA) vide assistance to establish in­ required for project with Government on scope frastructure to reduce the loss preparation. of project. (Cofinancing of life and property due to cy­ being explored.) clones. Project will provide for coastal embankments, feeder roads, and technical assistance.

To be determined 120.0 (R) Energy Sector - To encourage the Consultants have been Project preparation (IDA) efficient use of resources and identified to assist in under way. Appraisal improve resource mobilization; project preparation. mission tentatively support institutional reforms scheduled for February/ and sectoral coordination; and March. identify and assist GOB in im­ plementing a core least-cost in­ vestment program for the energy sector.

Ministry of 40.0 Rural Roads and Marketing - To Technical consultancy Project preparation. Local Govern­ (IDA) complement past investments to services are likely to be under way. ment, Rural increase food grain production required. Development and by providing necessary road and Cooperatives marketing infrastructure. Pro­ ject would include construction of feeder roads, bridges and culverts, improvement of mar­ kets, and technical assistance.

Bangladesh Water 35.0 Small Scale Flood Control and Consultant requirements Project preparation Development (IDA) Drainage II - To increase agri­ to be determined. under way. Board cultural production and incomes through physical improvement of small hydrological systems in cooperation with the food-for­ work program. Continue to pro­ vide and expand opportunities for training of staff of project agency.

Power 95.0 (R) Power Distribution - To extend Consultant requirements Identification mission Development (IDA) and rehabilitate power distri­ to be determined, scheduled for January/ Board bution systems in about 25 ·town­ February. ships,

Ministry of 110.0 Structural Adjustment Credit I - Consultant requirements Project preparation Finance (IDA) To assist in resource mobi­ to be determined. under way. lization and use. It would cover reforms and institutional development in public revenue mobilization through taxation and public pricing policies; banking and credit markets; and public expenditure planning.

Ministry of 7.2 (R) Forestry II - Salvage logging Consultants may be Appraisal mission in Trade, Industry (IDA) and reforestation in forest required. mid-January, and Forests areas near Paro affected by beetles and fungal attacks,

See page 1 for footnotes, - 41 -

Member Country, Amount & and Implementing Probable Stage of Procesaing and Agency 1./ Lender 1:_/ Consulting Services Action on Procurement!!./ BHUTAN (Cont'd)

Department of 5.0 Education - To assist the Consultants will be Project preparation Education c/o (IDA) Government in meeting both required for education under way, Ministry of qualitative and quantitative planning, curriculum Development demands in its primary development, school schools, The project would aim design, etc, to (a) strengthen planning and the administration of the edu­ cation sector; (b) improve Grade 1 participation rates and reduce dropout; and Cc) improve teacher effectiveness in the classroom especially in the primary grades,

Ministry of 35,0 (R) Tank Irrigation II (Crop Divers­ Consultants will be Project preparation Agriculture and (IDA) ification) - The project would required. under way. Forests (a) complement the Government'o efforts in agricultural divers­ ification with particular empha­ sis on production of export pro­ moting and import substituting crops; and (b) increase crop production and farm incomes in areas where Government invest­ ments in irrigation have been relatively small, Major com­ ponents of the project are (a) construction of one or two earth-fill dams in Yin Basin with heights ranging from 90-160 ft,; (b) construction of main canals and irrigation distri­ bution systems for each command area ranging from 10,000 to 40,000 ac,; Cc) agricultural support including extension, research and inputs for crop diversification; (d) technical assistance and training; and Ce) monitoring and evaluation.

Ministry of 20,0 (R) Groundwater II (Crop Diversifi­ Project has been moved to Agriculture and (IDA) cation) - The project would ex­ FY89 Reserve lending Pro­ Forests pand diversified crop production gram, Further reporting and farm incomes in Taze/Ye U, will be discontinued. Budalin and Pale/Salingyi by in­ creasing the irrigation area from 400 ac, to 43,500 ac., using groundwater resources. The project would include: (a) construction of 255 new deep tubewells and provision of pum­ ping equipment; (b) construction of irrigation and drainage sys­ tems for these 255 new wells; Cc) construction of a 132 kV transmission line from Mandalay to Ye u, to provide power to the Taze/Ye U wells; (d) construc­ tion of power distribution lines to serve the new wells in all three areas; Ce) provision of agricultural extension, increm­ ental fertilizer and agro­ chemicals requirements for crop diversification; (f) technical assistance and training; and (g) monitoring and evaluation.

Ministry of 40.0 (R) Gas Development and Utilization Consultants will be Appraisal report under Energy (IDA) - To include drilling of apprai­ required. preparation. ·substantial sal and development wells, con­ technical assistance and struction of surface facilities training component; con­ and a 16-inch pipeline from siderable cofinancing Payagon to Ywama. Technical involved. assistance and training.

See page 1 for footnotes, - 42 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender J:./ Consulting Services Action on Procurement 4/

Haldia Water 125.0 Haldia Water Supply and Sewerage Consultants' services Project preparation under Development (IDA) - Construction of 225 million likely· to assess tech­ way. Authority, liters/day treatment plant, 4 nical options for the Government of pumping stations and a 90 km project, West Bengal long water transmission main to serve the Haldia Development Authority, 2 towns and rural comm.unities en route. Total project cost estimated at $180 million, of which $36 million in foreign exchange.

Narmada Planning 350.0 (R) Narmada (Madhya Pradesh) Dam and Project preparation as­ Further processing of Agency, Govern­ (Bank) Power - Construction of the sisted by mainly local this project awaits ment of Madhya Narmada Sagar dam and hydropower consultants financed from environmental clearance Pradesh station to generate 1,000 MW of Project Preparation Faci­ .by GOI. power and to evaluate future lity advance included in irrigation of about 300,000 ha. Credit 1332-IN. of land, Total project cost is estimated at $953 million, of Consultants will be used which $266 million in foreign for design and construc­ exchange. tion management.

Narmada Planning 70.0 (R) Narmada (Madhya Pradesh) Reset­ Project preparation as­ Further processing of Agency, Govern­ (IDA) tlement and Rehabilitation - sisted by mainly local this project awaits ment of Madhya Resettlement of about 100 1 000 consultants financed from environmental clearance Pradesh people affectP.d by Narmada Sagar Project Preparation Fund by GOI. reservoir submergence. Total advance included in project cost is estimated at Credit 1332-IN, No deci­ $250,0 million, of which $5 sion yet made whether million in foreign exchange. consultants are required during implementation,

Indian Council 80.0 (R) Forestry, Research, Education Foreign technical Project preparation· for Forestry (IDA) and Training - The project will assistance to upgrade under way. Research; ·and develop and support forestry forestry research, Indian Council research, education and manpower education and training for Agricultural development at all levels, and methodology is likely to Research support the proposed Indian be required, Council for Forestry Research. Total project cost estimated at $160 million, of which $40 million in foreign exchange.

Bombay Municipal 40.0 (R) Bombay III Water Supply - Pro­ Local and expatriate Approved by the Executive Corporation (Bank) duction of an additional 100 mgd consultants required for Directors on December 16. 145.0 of water for the Bombay Metro­ project management and (IDA) politan area from the Bhatsai implementation. River, trunk distribution, dis­ tribution mains and sewage col­ lectors, low-cost sanitation, and studies to determine the next incremental production of water required to serve the Bombay area, Total project cost about $304 million, including a $60 mi 11 ion foreign exchange component.

Ministry of 113.0 (R) National Water Management - Sup­ No decision on consult­ Negotiations tentatively Water Resources; (IDA) port for improved water manage­ ants. scheduled for and Irrigation ment activities in selected pro­ January/February. Department of jects covering 500,000 ha in participating three States (Andhra Pradesh, States Karnataka, and Tamil Nadu). Total project cost estimated at $155 million.

India Department 345.0 (R) Telecommunications IX - Provi­ No decisioD on consult­ Negotiations completed. of Telecom­ (Bank) sion of imported equipment and ants Board presentation sched­ munications raw materials to support reha­ uled for Karch. (Co­ bilitation and expansion of financing likely.) telecommunications networks in four major metropolitan areas, Procurement: Standard and provide for expansionand bidding documents modernization of long-distance approved, transmission links. Total cost estimated at $2.4 billion, of which $845 million in foreign exchange.

See page 1 for footnotes. - 43 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency]_/ Lender];_/ Consulting Services Action on Procurement!!._/

INDIA (Cont'd)

National Thermal 350.0 (R) National Capital Power Supply - Consultants may be Negotiations tentatively Power Corp­ (Bank) Installation of four coal/oil­ required for design of scheduled for late oration; and fired 200 MW units as first ash disposal facility. January/February. Delhi Electric stage of a new plant in Supply Under­ Ghariziabad District in the taking State of Utter Pradesh, together with associated 400 kV trans­ mission lines; rehabilitation of power station at Badarpur; com­ pletion of transmission ring around Delhi; execution of a series of technical managerial and financial studies. Total project cost about $1.5 billion, of which $663 million in foreign exchange.

Ministry of 85.0 (R) National Agricultural Extension No expatriate consultants Board presentation on Agriculture; (IDA) III (NAEP III) - Assistance required. January 20, and State Go­ to: -(a) the State of Assam in vernments of. strengthening its training and Uttar Pradesh, visit (T&V) system; (b) the Himachal Pradesh introduction of T&V system to and Assam the States of Uttar Pradesh and Himachal Pradesh; and (c) the replenishment of the Special Sub-project Fund established under NAEP I. Total project cost estimated at $140 million, of which $5.5 million in foreign exchange.

Coal India Ltd, 340.0 (R) Gevra Thermal Coal - Assistance No decision on Completion of negotia­ (CIL) (Bank) to CIL Subsidiaries in expanding consultants. tions subject to agree­ production of thermal coal at ment on medium-term' cost two mine sties ($180 million) reductions program for plus support for imports of Coal India Limited, CIL coking coal ($160 million), is expected to submit Total project cost about $643 such program by end­ million, of which $318 million January. in foreign exchange.

Roads and 119.0 (R) Gujarat Rural Roads - Assistance Expatriate consultants Negotiations com­ Buildings (IDA) to GOG to upgrade rural road not likely to be pleted. Board pres,an­ Department, construction, maintenance, and required. tati~n scheduled for Government of management capabilities, pro­ February 10. Gujarat (GOG) vision of equipment and tech­ nical assistance for studies. Total project cost estimated at $171 million of which $30 mil­ lion in foreign exchange.

Industrial 250.0 (R) Automotive Industry - Modern­ No decision on consult­ Pre-appraisal mission Credit and (Bank) ization, rationalization and in­ ants tentatively scheduled Investment tegration of vehicle ancillary for mid-February. Corporation of equipment manufacturers. India Limited.

Karnataka Power 330.0 (R) Karnataka Power (formerly No decision on consul­ Appraisal report being Corporation; and (Bank) Kalinadi II Hydro) - Increase tants prepared. Negotiations Karnataka Elec­ the power supply and reduce the tentatively scheduled for tricity Board power outages in the State of April 1987. (Cofinancing Karnataka (Southern Region) possible.) through the development of the hydroelectric potential of the Kalinadi River, It would provide 280 MW of additional installed generation capacity. Total project cost estimated at $623 million, of which $188 million in foreign exchange.

See page 1 for footnotes. - 44 -

Member Country, Amount r. and Implementing Probable Stage of Processing.and Agency J./ Lender!/ Consulting Services Action on Procurement 4/ INDIA (Cont'd)

Governments of 60,0 (R) Bombay and Madras Population - No decision on consult­ Pre-appraisal mission Tamil Nadu and (IDA) Reduce infant/child/maternal ants. tentatively scheduled Maharashtra; and mortality; moderate fertility; for early February. Greater Bombay and improve municipal autho­ Municipal rities'abilities to design and Corporation implement health and family welfare program.

Government 68.0 Bihar Tubewells - Construction No decision on consult­ Approved by the Executive of Bihar (IDA) of new public tubewells and the ants. Directors on October 16, rehabilitation of existing tube­ wells; construction of power lines to serve only public tube­ wellsj and organization and man­ agement improvements. Total project cost estimated at $100 million, of which $15 million in foreign exchange~

Steel Authority 250.0 (R) Steel Sector Modernization/ Consultant requirements Pre-appraisal mission in of India Limited (Bank) Restructuring - Restructuring of not known at this time. mid-January. (Cofinan­ (SAIL) SAIL and its operations, and mo­ cing likely, ) dernization of one SAIL's exis­ ting integrated steel mills. Total project cost estimated at $1.0 billion, of which $400 mil­ lion in foreign exchange.

Oil India 140.0 (R) Oil India Limited Petroleum - To Consultants services not Negotiations completed. Limited (OIL) (Bank) accelerate India's exploration known at this time. Board presentation sched­ efforts, to build up the insti­ uled for late March. tutional capabilities of OIL; (Cofinancing likely,) and to facilitate the intro­ duction of the private sector into the petroleum sector in India. Total project cost estimated at approximately $569 million, of which $251 million in foreign exchange.

Government of 350.0 (R) Nathpa Jhakri Hydro - To support Consultant requirements Appraisal mission India; and State (Bank) the development of the Hydro­ not yet determined, but tentatively scheduled Electricity electric potential of the Satluj unlikely to be needed. for mid-May, (Cofinan­ Board of River, as well as add 1,500 MW cing likely.) Himachal Pradesh of power generating capacity to the Northern Region thereby helping to alleviate critical power shortage there. Total project cost estimated at $1,2 billion, of which $335 million in foreign exchange,

Department of 75.0 (R) Upper Krishna Irrigation II - No expatriate consultants Appraisal mission Irrigation, (Bank) The objectives of the project required. scheduled for early Government of 125.0 are to: (a) develop over five March. Karnataka (IDA) years a total of about 200,000 ha out of a command area of 425,000 ha, and (b) provide a modern irrigated agriculture based on rotational water supply technique. Total project cost estimated at $500 million, of which $100 million in foreign exchange.

Madras 30,0 (R) Madras Water Supply and Sewerage Expatriate and local Appraisal mission fin­ Metropolitan (Bank) - To increase the effectiveness consultants expected for dings under review. Water Supply and 27.0 of abstraction, distribution and institution building. Negotiations tentatively Sewerage Board (IDA) usage of water supply; ensure scheduled for mid-April, (MMWSSB) full recovery of MMWSSB I s in­ vestment and operational costs; support appropriate programs for conjunctive water sharing. Total project cost estimated at $122 million, of which $37 mil­ lion in foreign exchange.

See page 1 for footnotes. - 45 - Member Country, Amount & and Implementing Probable Stage of Processing and Agency Jj Lender 1/ Consulting Services Action on Procurement!!_/ INDIA (Cont'd)

Department of 113.0 (R) Uttar Pradesh Urban Development Expatriate and local Negotiations scheduled Housing and (IDA) - Serviced lend, core housing, consul tan ts expected for for January/February, Urban Develop­ slum upgrading, area develop­ institution building, ment, Govern­ ment, water supply, sewerage, ment of Uttar sanitation in about 12 towns, Pradesh Total project cost estimated at $237 million, of which $67 mil­ lion in foreign exchange,

Metropolitan 75.0 (R) Tamil Nadu Urban Development - Consultants expected for Project preparation Development (Bank) Improve sector institutions management improvement. under way, Authority 125,0 responsible for managing urban \ (IDA) development and public urban investment; strengthen local government financial and manage­ rial capability; secure private participation in land develop­ ment; and reform procedures for revising tariffs for public services. Total project cost estimated at $440 million, of which $330 million in foreign exchange,

Government of 50.0 Kerala Urban Development - Area Local consultants ex­ Project preparation Kerala (IDA) development, alum upgrading, im­ pected for management under way, provements in delivery and man­ improvement . agement of urban services. Total project cost estimated at $80 million, of which $70 mil­ lion in foreign exchange.

Governments of 50.0 Northwest Irrigation and Drai­ No decision on consul­ Project preparation Haryana, Punjab, (Bank) nage - To provide for a sus­ tants. under way. and Rajasthan 150.0 tained irrigated agriculture and (IDA) control emerging salinity pro­ blems, Key components to be financed under the project would include: lining of main and distributory canals, development of operation plans, development of long-term plan for ground­ water management, control of water-logging and salinity,

Department of 150.0 (R) Electronics - Industrial Devel­ Consulting services not Project preparation under Energy; ICICI (Bank) opment - To support fixed in­ yet known. way. Sector report to be and IDBI vestment for private and joint discussed with Govern­ sector electronics firms; may ment. Pre-appraisal mis­ involve a small venture capital sion tentatively sched­ element, a productivity fund and uled for June. (Co­ a training component. Other financing likely, ) elements of the project could include: financing of the end­ Use of electronics and an Export Marketing Fund.

Government of so.a Madhya Pradesh Water Supply - To Consulting services, Project preparation Madhya Pradesh: (Bank) enable water supply and sewerage mostly local, needed for under way, Public Health 50,0 operations in Madhya Pradesh to financial and accounting Engineering (IDA) be financially self-supporting, management systems. Department Total project cost estimated at $130 million, of which $30 mil­ lion in foreign exchange.

National Thermal 300,0 (R) Talcher Thermal Power - Includes Consultant services not Negotiations tentatively Power Corpor­ (Bank) (a) construction and instal­ yet known, scheduled for February/ ation (NTPC) lation of two coal-fired 500 MW March, units in the State of Orissa; (b) the construction of trans­ mission lines to integrate the plant with the Eastern Regional grid; (c) a communications network linking NTPC's plants with headquarters via satellite and terrestial microwave links; and (d) a series of studies on organizational aspects of power sector institutions. Total project cost estimated at $1,27 · billion, of which $516 million in foreign exchange.

See page 1 for footnotes - 46 - Member Country, Allount Ii and Implementing Probable Stage of Processing and Agency 1/ ~y Consulting Services Action on Procurement 4/

~ (Cont'd) Oil and Natural 325.0 (R) Western Gas Development - Con­ No decision on Negotiations tentatively Gas Commission (Bank) struction of Phase II of the consultants. scheduled for mid­ (ONGC) and Gas South Basin development to April. (Cofinancing Authority of increase gas production and likely.) India Limited onshore treatment capacity fr

Government of . 60.0 (R) Utter Pradesh II Population - To Project preparation has Utter Pradesh (IDA) assist UP in strengthening key been temporarily sus­ elements (management, communi­ pended at the request of cations, monitoring/evaluation) the Goverlllllent. Further of the State family welfare pro­ reporting will be discon­ gram and implementing appro­ tinued. priate service delivery stra­ tegies.

National Dairy 35.0 (R) National Dairy II - To assist in Expatriate consultancy Pre-appraisal mission's Development · (Bank) optimizing past dairy invest­ not required. findings under review. Board (NDDB)/ 115.0 ments, extending the cooperative Appraisal mission tenta­ Indian Dairy (IDA) dairy infrastructure to new tively scheduled for mid­ Corporation states, and removing various March. (IDC) and institutional policy constraints National to dairy development. Cooperative Development Corporation (NCDC)

Ministry of 78.0 National Agricultural Extension No decision on Project preparation Agriculture; and (IDA) IV - Project would finance: in­ consultants. under way. State Govem­ troduction of training and visit ments of Utter system in Western Utter Pradesh Pradesh, Tamil and eight districts of Bihar, as Nadu, West well as improvement of extension Bengal, Kerala in four-second phase states, and and Maharashtra special Directorate of Extension subprojects. Total project cost estimated at $130.0 million.

Indian Railvaye 300.0 (R) Railway Modernization III - To No decision on Pre-appraisal mission. (Bank) support implementation of ope­ consultants. tentatively scheduled for rational information systems and mid-February; and apprai­ associated telecommunications sal mission scheduled for facilities for Indian railways; May. to upgrade 1,000-1,200 li:m of track on major routes; to sup­ port acquisition of modem track renewal and maintenance equip­ ment. Total project cost esti­ mated at $840 million, of which $350 million in foreign ex­ change.

Ministry of 50.0 (R) National Seeds III~ To create a No decision on Pre-appraisal mission Agriculture (IDA) market-responsive-farmer-orien­ consultants. in mid-January. ted and ·financially viable in­ dustry that would provide ade­ quate and timely supplies of high quality seeds.

Ministry of 250.0 CR) Fertilizer Distribution - Infra­ Consultancy requirements Pre-appraisal mission Agriculture (Bank) structure associated with a sys­ to be determined. scheduled for early tem of nodal points to overcome February. bottleneck in fertilizer distri­ bution in North.India.

Uttar Pradesh 250.0 Utter Pradesh Power (Srinagar) - Consultancy requirements Project preparation State Elec­ (Bank) Project, as initially proposed, to be determined. under way. tricity Board comprises a 300MW run-of-river hydro scheme at Srinagar, reha­ bilitation of two thermal power stations, about 340 KM of 400-KV transmission lines and asso­ ciated substations, and possibly distribution component.

See page 1 for footnotes - 47 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ ~y Consulting Services Action on Procurement 4/ MALDIVES

Bank of Maldives 5.0 Atolls Credit - To assist BOM to Will be required for Appraisal report under (BOM) (IDA) become a national development technical assistance preparation. (Cofinan­ finance institution, and to pro­ component. cing with IFAD for about mote private sector invest­ $1.0 million.) ments. Key components financed under the project would be: vegetable, fruit, coconut, palm­ wood and firewood production, animal husbandry, cottage in­ dustries and transport vessels, along with technical assistance.

Ministry of 5.0 Manpower Development - Project Not yet determined. Identification to be Education (IDA) scope and design to be deter­ completed in January/ mined. February pending further discussions with the Gove rmnen t .

Ministry of About Babai Irrigation - Includes con­ Consultants will be Project processing Water Resources 37.0 struction of weir and headworks required. delayed indefinitely due (IDA) on Babai River, construction of to riparian issue, and irrigation and drainage faci­ country assistance lities on about 13,000 ha of strategy considerations. land, and strengthening of agri­ cultural extension services in the area. Total project cost estimated at $64.5 million, of which $45.2 million in foreign exchange.

Ministry of 10.0 Deep Aquifer Exploration - Iden­ Consultants recruited for Project preparation de­ Water Resources (IDA) tify new and untapped sources of project preparation. layed indefinitely pen­ irrigation water supply from ding agreement on project deep aquifers which would in­ scope and design. crease cropping intensity in the Terai. This would include dril­ ling of exploratory boreholes; construction of wells; in­ service training; and prepar­ ation of reports. Total project cost estimated at $15.5 million.

Tribhuvan 15.0 Technical and Engineering Edu­ Consultants will be Project preparation University (IDA) cation - (i) Rationalize exis­ required. under way. ting teaching programs and resources; (ii) improve the-in­ ternal efficiency, quality and relevance of technical and en­ gineering education; and (iii) to establish the physical capa­ city to educate technicians and professional engineers at the Institute of Engineering (IOE) of Tribhuvan University.

Ministry of 40.0 (R) Sunsari Morang II - Further im­ Consulting services will Appraisal report Water Resources (IDA) provement of Chatra Main Canal; be required. under preparation. rehabilitation of irrigation distribution system and drai­ nage; improved water management; strengthening agricultural ser­ vices; equipment and buildings; technical assistance.

Ministry of 20.0 Transit Transport - Project Will be required. Project preparation Transport and (IDA) scope to be determined. under way. 1 Communications

Forestry 20.0 Forestry III (Hills) - To help Will be required. Project preparation Department (IDA) strengthen forestry organization under way. as whole and increase reafor­ estation rate to keep pace with deforestation.

See page 1 for footnotes - 48 - Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender];/ Consulting Services Action on Procurement 4/ NEPAL (Cont'd)

Water Supply and 20.0 Municipal Management and Rea­ Will be required. Project preparation Sewerage (IDA) bilitation - To improve water under way. Corporation supply, sanitation and drainage facilities in 20 towns and strengthen operating capability of the Water Supply and Sewerage Corporation.

Ministry of 50.0 Structural Adjustment - To deve­ Consultants will be President's Report under Finance (IDA) lop a structural adjustment pro­ required, preparation. Negotia­ gram for Nepal. Main areas to tions scheduled for early be covered include: macro­ 1987. economic; development expen­ diture; industrial, trade and investment policies; public enterprises and agriculture.

State Cement 75.0 (R) Cement Industry Restructuring Consultants, financed by Appraisal mission Corporation/ (Bank) To support rehabilitation and IDA Technical 'Assistance in January. Ministry of introduction of energy effi­ Project, being used for Production ciency measures in existing preparation. Additional public sector cement plants. consultants will be re­ quired for project im­ plementation.

Ministry of 30.0 Private Tubewell Development. Consultants have been Project preparation under Water and Power; (Bank) recruited for project way, financed by UNDP. and Provincial preparation. Additional Departments of consultants will be Irrigation and/ required for project im­ or Agriculture plementation.

National Highway 152.0 (R) Highway IV - Construction of . Consultants will be Negotiations tentatively Board (Bank) about 490 km of 7.3 m carriage­ required for implement­ scheduled for early way on priority sections of the ation. March. existing North-South main road.

Ministry of 150.0 Agriculture Sector Loan - To Consultants will be Appraisal to be resumed Food, Agri­ (Bank) support program of structural required for implement­ when conditions are met. culture and reforms to include setting of ation. Cooperatives investment priorities, rationa­ lization of incentives and strengthening of institutions.

Ministry of 144.0 Primary Education III - To im­ Consultants will be Appraisal report being Education (IDA) prove the quality of primary required for implementa­ prepared. education in Punjab province. tion.

Ministry of 80.0 (R) Irrigation Rehabilitation II - Consultants will be Appraisal may be delayed Water and Power, (IDA) To rehabilitate deteriorated required. awaiting resolution of and Provincial canals and surface drains in policy issues on water Department of four provinces. charges. Irrigation

Provincial 42.5 (R) Agricultural Extension IV - Consultants will be Board presentation Department of (IDA) Second phase extension project required. tentatively scheduled Agriculture in Sind and Punjab Provinces. for February.

Punjab Depart­ 90.0 (R) Punjab Urban and Water Supply - No decision made whether Appraisal mission tenta­ ment of Planning (IDA) Water supply, sewerage and urban consultants will be tively scheduled for services in various cities in required. April. Punjab province.

Ministry of 54.0 (R) Small Industries III - To conti­ Consultants will be Appraisal report under Finance (Bank) nue support for small industries required for project review. through delivery of financial implementation. resources and technical and marketing services.

State 50.0 (R) Heavy Industries - To rehab­ Replaced by E·ngineering Engineering (Bank) ilitate and improve the effi­ and Steel Project listed Corporation ciency of selected engineering on following page, companies and a steel mill, as Further reporting will well as to rationalize the be discontinued, policy environment in the sub­ sector.

See page 1 for footnotes - 49 - Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1./ Lender J:/ Consulting Services Action on Procurement!!/ PAKISTAN (Cont'd)

Water and Power 150.0 Kalabagh Dam - Dam construction Main consultants for pre­ Project preparation being Development (Bank) and installation of 2400 mw paration and drafting of finalized, Authority hydro capacity. tender documents re­ cruited, Further spe­ cialist consultants likely to be required,

National 21.0 (R) Refinery Energy Conservation and Consultants will be Appraisal report under Refinery Ltd, (Bank) Technology Acquisition - To im­ required. preparation. (NRL) prove efficiency and increase (marginally) the refining capa­ city of the NRL, while reducing energy consumption and streng­ thening management capability.

Water and Power 70.0 (R) Power Plant Efficiency Improve­ Consultants will be Negotiations substan­ Development (Bank) ment (formerly called WAPDA VII) required, tially completed, Board Authority - To rehabilitate WAPDA's ther­ presentation scheduled (WAPDA) mal generating facilities to for early March, improve their reliability and efficiency as well as augment their generating capacity,

Ministry of 7.0 (R) Technical Assistance III - The Consultants will be Board presentation Planning and (IDA) project would finance studies, required. on January 20, Development specialized consultancies and equipment and related training in support of the Government's program of structural and policy reforms in key aectors/sub­ sectors policy adjustment pro­ grams, Total project cost about $8.5 million, of which $5,9 mil­ lion in foreign exchange,

Sui Northern Gas 100.0 Gas Development - To provide No decision on Project preparation Pipe lines Ltd; (Bank) production facilities in the consultants under way. and Oil and Gas Loti and Dhodak gas fields, and Development improved gas transmission faci­ Corporation lities from the Pirkah, Loti and Dhodak fields,

Government of 150.0 Energy Sector Loan II - To Consultants will be Identification Pakistan Plan­ (Bank) continue the program of reforms required for implement­ under way, ning and Deve­ in pricing policies, investment ation. lopment Depart­ programming and institutional ment; Water and development started under the Power Develop­ First Energy Sector Loan, ment Authority; Karachi Electri­ city Supply Corp.; Oil and Gas Development Corp,; Southern Gas Co. Ltd.; Pakistan State Oil Co. Ltd,; Pakistan Mineral Development Corp.; Sui Northern Gas Pipeline Ltd,

Water and 100,0 Jamshoro Thermal Power Plant Ex­ Consultants will be Project preparation Power Develop­ (Bank) pansion - Installation of three required, being completed, ment Author- 300 MW oil-fired generation ity (WAPDA) unite at Jamsboro.

See page 1 for footnotes - 50 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency l/ Lender Y Consulting Services Action on Procurement 4/ PAKISTAN (Cont'd)

Civil Aviation 100.0 Transport Sector Loan - To sup­ Consultants will be Preparation under Authority; (Bank) port a program of policy required. way. Karachi Port reforms, investment, institu­ Trust; Ministry tional and organizational of Communic­ reform, and training in the ations; Ministry transport sector. of Railways; National High­ ways Board; Pakistan Rail­ ways Planning and Development Department; Ports and Ship­ ping; Port Qasim Authority

Ministry of 30.0 Oil Seeds Development - To No decision on An FAO/CP preparation Food, Agricul­ (Bank) .reduce national dependence on consultants mission has been com­ ture and Cooper­ 20.0 imported edible oil by support­ pleted. Project prep­ atives (IDA) ing policy reforms and invest­ aration report received ments to increase domestic pro­ and under review. duction of edible oilseeds and efficiency of the edible oil processing sub-sector.

Population 30.0 Population II - To build upon Consultants likely to be Identification Welfare (IDA) ongoing project and promote needed for preparation under way. Division, expanded efforts to limit and execution. Ministry of population growth. Planning and Development

To be determined 50.0 Industrial Development Textiles Consultants, financed by Preparation under (Bank) - Policy reforms, technical as­ IDA, being used for pre­ way. sistance, and possible selected paration. Additional investments to improve the long­ consultants may be needed term efficiency and competitive­ for implementation.· ness of the textile industry.

Ministry of ·100.0 Industrial Credit Ill - Finan­ Consultants may be needed Identification Finance (Bank) cial sector reforms and support for preparation and.or under way. to private investment through implementation. line of credit to financial institutions.

Ministry of 100.0 (R) Engineering and Steel - Policy Consultants, financed by Preparation Production (Bank) reforms, technical assistance, IDA, being used for under way. and selected investments to preparation. Additional improve the efficiency of the consultants likely to be public and private sector steel needed for execution. and engineering industries.

SRI LANKA

Ministry of Up to Fifth Tree Crops Diversification No decision made whether Project preparation unde1 Plantation 15.0 - Increased production of tea, consultants will be way. Industries (IDA) rubber and coconut for small­ required. holder sector by enhancing producer incentives, improving extension services and the sup­ ply of inputs, reducing con­ straints to credit, rehabili­ tating private factories, and improving marketing mechanism for smallholder output.

Ministry of 18.6 (R) Agricultural Research - Esta­ Consultanta will be Negotiations substan­ Agricultural (IDA) blishment of a national agency required. tially completed. Board Development and to ensure coordinated research presentation scheduled Research planning, and strengthening of for early February. the national agricultural re­ search institutions.

See page l for footnotes ~1 -

Member Country, Amount & and Implementing Probeble Stage of Proceseing and Agency J.J Lender~/ Project]./ Consulting Services Action on Procurement !!_I SRI LANKA (Cont'd)

Ministry of 15.0 Health and Population - Project No decision on Project preparation Health (IDA) to (a) strengthen management of consultants under way. the health system; (b) increase cost-effectiveneaa of the health logistics system; and (c) pro­ mote maternal-child health and reduce fertility.

National Devel­ Up to Small and Medium Industries III No decision on Project preparation opment Bank 15.0 - To complement and expand on­ consultants under way. (NDB) (IDA) going program of amall and me­ dium industry development through financing of eligible industries in selected sub­ sectore.

Ministry of 30.0 (R) Industrial Sector - To support a Not yet determined. Project preparation Finance and (IDA) strategy (compriaing further under vay. Planning tariff reform, export promotion, and rationalization of public manufacturing enterprises).

r

See page 1 for footnotes - 52 -

Member Country, Amount & and Implementing Probable Stage of Processing .and Agency 1J ~!/ Consulting Services Action on Procurement!!_/

V. EUROPE 1 MIDDLE EAST AND NORTH AFRICA

SONELGAZ About Power III - Project would fin­ To be determined. Preparation under way by 100.0 ance part of SONELGAZ'• 85/89 Bank/Government. (Bank) Investment Program.

Ministry of About (R) Highways V - Road maintenance, To be determined. Appraisal report Public Works 80.0 rehabilitation, technical organ­ being prepared. (Bank) ization assistance and training.

Ministry of About Construction of new irrigation To be determined. Appraisal report Hydraulics, 110.0 schemes over 8,000 ha in Haut being prepared. Environment and (Bank) Cheliff and rehabilitation of Forestry 9,300 ha in Bas Che lif River·. Ministry of About National Water Supply II - Pro­ To be determined. Appraisal report being Hydraulics, 125.0 ject would finance part of the prepared. Environment and (Bank) Ministry'• 1985/89 investment Forestry program for water oupply.

Ministry of 10.0 Irrigation Engineering - To help To be determined. Identification under way Hydraulics (Bank) Government prepare a detailed by Bank/Government. investment program for irri­ gation development. Banque de About First Agricultural Credit - To To ba determined. Preparation under I 'Agriculture et 100.0 extend line of credit, provide way by Bank/Governm~nt. de Developpement (Bank) financing for staff training, Rural (BADR) management and financial control system and network expansion.

Sewerage Board About Larnaca Sewerage - Provision of Consultants have been re­ Negotiations postponed at of Larnaca 19.0 sewerage collection, waste water cruited. Government 1 s request. (Bank) treatment ayetems to the major urban and tourist centers.

To be determined About Industrial Sector Technology - To be determined, Further processing 10.0 Promote the growth of manu­ under review. (Bank) facturing exports.

Ministry of About (R) Southern Conveyor II - Phase II Consultants have been Appraisal report pre­ Agriculture 13.0 of the Southern Conveyor Project appointed to undertake pared. (Cofinancing (Bank) including execution of the studies. envisaged.) Dhiarizos Diversion, irrigation schemes, water supply and engin­ eering.

Sewerage Board About Waste Weter II - Provision of Appointment of consult­ Further project prep­ of Paphos 10.0 sewerage and drainage facilities ants to prepare project aration activity awaiting (Bank) for Paphos end eurrouding areas. indefinitely postponed by appointment of consult­ Government. ants. Ministry of About Transport I - Sector Loan to To be determined. Preparation under Communications 10.0 establish self-sustaining •yatem way by Bank/Government. and Works (Bank) for tranaport planning, implem­ entation and management.

EGYPT 1 ARAB REPUBLIC OF Egyptian To be Fourth Power - Tranemieaion, No decision made. Preparation under way by Electricity deter­ distribution end rural electri­ Egyptian Electricity Authority (EEA) mined fication. Authority. (Bank)

To be determined To be Gas Development V - Development No decision made. Project being prepared by deter­ and distribution of natural gea. Egyptian General Petro­ mined leum Corporation (EGPC), (Bank)

See page l for footnoteo. - 53 -

Member cOuntry, Amount & and Implementing Probable Stage of Procesaing and Agency )j Lender~/ Consulting Services Action on Procurement!!)

EGYPT, ARAB REPUBLIC OF (Cont'd)

Ministry of 20.6 Vocational Training II - To in­ May be required for Board presentation Industry (Bank) crease the supply and upgrade technical assistance. delayed; awaiting Govern­ the quality of skilled and semi­ ment confirmation to skilled manpower in the indus­ proceed with project. trial sector and particularly in the automotive, electrical, metals, mechanical, foundry, chemical and marine subsectors by establishing four new Voca­ tional Training Centers (VTCs) and extending the training fa­ cilities of six existing VTCs.

Executive Agency 45.0 Solid Waste - Provision of Consultants for prepara­ Negotiations to be for Joint Pro­ (Bank) equipment, composting and in­ tion have been appointed. scheduled. jects (JP) cinerating plants and studies to Additional consultants support solid waste management will be required for va­ in two governorates. rious studies.

Productivity and 51.0 Industrial and Vocational Train­ Consultants required for Negotiations to be Vocational (Bank) ing - Expanding and upgrading development of training scheduled. Training training in key industrial sec­ programs. Department tors, including textiles, gar­ (PVTD) and ment making, footwear, food pro­ Ministry of cessing, and equipment main­ Social Affairs tenance. (MOSA)

River Transport 75.0 Inland Water Transportation - Consultants selected for Consultants have started Authority (RTA) (Bank) Rehabilitation of the Damietta­ project preparation. feasibility studies. Cairo Branch of the Nile, in­ cluding deepening of the branch, Bank·Project Preparation improvement and construction of Facility advance of river ports, cargo handling $500,000 approved to

equipment I navigational aids and finance consultant ser­ technical assistance. vices for preparation of: technical, financial and economic studies needed to determine the optimal phasing of the project; final designs, drawings, specifications; and other tender documents.

Alexandria Water 38.8 Alexandria Water Supply II - Consultants required for Appraisal report being General (Bank) Rehabilitation of water supply construction supervision, prepared. Tender doc­ Authority (AWGA) system, institutional develop­ updating of distribution uments under preparation ment and training. Total system maps and water by Borrower. (Cofinan­ project cost estimated at $77.6 supply master plan, and cing arranged with million. conducting leak detection Ministry of Economic survey and water study. Cooperation, Federal Republic of Germany, for $3.7 million.)

Ministry of 70.0 Channel Maintenance - Main­ To be determined. Approved by the Executive Irrigation (Bank) tenance of irrigation canals and Directors on June 26, drains, including mechanical and 1986. chemical control of weeds. Pro­ vision of equipment and train­ ing. Total project cost about $126.9 million, of which $78.8 million in foreign exchange.

National Bank of 50.0 Industrial Exports - To promote To be determined. Preparation under way. Hungary (Bank) exports of manufactured goods.

National Bank of 150.0 Industrial Restructuring II - Consultants may be Appraisal report Hungary (Bank) Policy/institutional development required. being prepared. and restructuring of specific sectors.

National Oil and 100.0 Petroleum II/Gas - Unidentified To be determined. Project preparation Gas Trust (OKGT) (Bank) but could entail combination of postponed to permit an exploration promotion com­ consideration of the ponent and gas exploration or results of studies gas development and distribu­ recently completed. tion.

See page 1 for footnotea. - 54 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency);./ Lender];/ · Consulting Services Action on P.rocurement !!/

HUNGARY (Cont'd)

National Bank of 50.0 (R) Telecommunications - Modern­ Consultants may be Appraisal mission in Hungary (Bank) ization of telecODDDunication required. the field. facilities.

Ministry of 50.0 (R) Agro-processing Modernization - ·Consultants may be Pre-appraisal. mission Agricutlure; and (Bank) Increase agro-industrial exports required. scheduled for February. National Bank of to convertible currency markets Hungary and efficiency of production at small fat'lil level and at agro­ industrial level. Project would provide modern equipment for existing agroprocees firms.

National Bank 150.0 Industrial Restructuring III - To be determined. Project preparation of Hungary (Bank) Policy development to support under way. industrial restructuring as well as specific program focussed on restructuring in selected subsectors ..

To be determined 50.0 Transport II. To be determined. Project preparation (Bank) under way.

Jordan About (R) Aqaba Power II - Second phase of Consultants will be Negotiations planned for Electricity 50.0 generation expansion at Aqaba required, for design April. (Cofinancing with Authority (Bank) Power Station. and supervision of Kuwait Fund confirmed. construction. Other cofinanciers have expressed interest.J

Procurement: Retroactive financing of $1.5 million to be recOlllllended.

To be determined About (R) Third Urban Development - To Consultants likely to be Appraisal mission 15.0 replicate, outside of Amman, required. scheduled for late (Bank) low-income shelter solutions January/February. innovated in Amman region, and to include upgrading and sites and services.

Arab Potash About (R) Potash II - Assistance for ·re­ Consultants may be Negotiations substan­ Company 12.0 finery modifications including required for on the job tially completed. (Co­ (Bank) cOrrective optimization measures training and expansion financing with Islamic to assess possibilities for fur­ study. Development Fund and ther expansion in the context of USAID expected.) technology improvements and cost reductions. Procurement: Retroactive financing to be recom­ mended.

Ministry of To be Education Sector Investment Loan Consultants may be Preparation under Education deter­ - Support for Government's five­ required. way. mined year plan for education sector, (Bank) including construction, equip­ ment and technical assistance to replace rented primary and in­ termediate level school build­ ings and purpose-built faci­ lities.

Jordan Phosphate About Phosphate Mining - Initial To be determined. Project preparation Mining Company 25.0 development of the El Shidiya under way. (Bank) Phosphate Mining and Benefi­ ciation Facilities.

Regie Autonome About Sewerage - Rehabilitation and Consultants likely to be Appraisal report being Intercommunale 55.0 extension of sewer network for required for training, prepared. de Distribution (Bank) Casablanca-Mohammedia region. preparation of sewerage d 'Eau et d 'Elec­ masterplans, feasibility tricite de studies, preparation of Casablanca (RAD) design and bidding docu­ ments, institutional and financial studies.

See page 1 for footnotes. - 55 -

Member Country, Amount 6 and Implementing Probable Stage of Processing and Agency},_/ Lender Y Consulting Services Action on Procurement 4/

MOROCCO (Cont'd)

Office National About (R) Telecommunications - Expansion Consultants will be First phase of negotia­ des Postes et 125.0 and modernization of the exist­ required for technical tions completed in April Telecommunica­ (Bank) ing telecommunications systems; assistance to ONPT 1986. Remaining issues tions (ONPT) technical assistance for organ­ (accounting, orga­ need to be resolved to izational strengthening. nization, sector complete negotiations. planning, etc.) (Bilateral and tied financing sought by Government for part of investment program.)

Office National About (R) National Water Supply Rehabili­ Technical assistance Negotiations tentatively de 1 'Eau Potable 44.0 tation - Rehabilitation of di­ would be required to scheduled for March. (ONEP) (Bank) stribution systems. reinforce institutional capability for sub­ project evaluation and implementation monit­ oring.

To be determined About (R) Power Sub-Sector Investment - To be determined. Appraisal mission sched­ 70.0 Improving planning and distri­ uled for February. (Bank) bution in sub-sector and finan­ cing investments in sub-sector.

Ministry of About Agricultural Sector II - Support Consultants will be Appraisal report Agriculture and 150.0 for a second phase of policy re­ needed £or strengthening being prepared. Agrarian Reform (Bank) forms in the sector with empha­ capacity for sectoral sis on pricing. analysis and for managing grain marketing.

Department of About Public Enterprise Rational­ Consulting services Appraisal report Pub lie Enter­ 200.0 ization Loan - Improvement in anticipated in execution being prepared. prises and (Bank) efficiency of public enterprises of enterprise, restruct­ Participations through policy and institutional uring programs, improving reforms and enterprise management information restructuring. and accounting sytems, and in implementation of key reform measures, as well as in training.

To be determined About Industrial Export Development Consultant services will Appraisal report 70.0 Finance - Line of credit and be needed for export being prepared. (Bank) technical assistance to promote facilitation, subsector private sector industrial studies and institutional exports. strengthening.

Ministry of 22.3 (R) Vocational Training II - Second Consulting services Board presentation Public Works and (Bank) phase of program designed to required for a variety on January 20. Vocational improve quality of training in of studies, including the Training newly converted vocational development of a fellow­ training institutions. Total ship program. project cost about $28 million, of which $22 million in foreign exchange.

To be determined About Urban Upgrading - Policies, To be determined. Project scope 70.0 measures, and interventions to being reviewed. (Bank) provide infrastructure in order to contain and avoid unauthor­ ized housing developments.

Ministry of About Small and Medium Irrigation - To be determined. Preparation under Agriculture and 50.0 Rehabilitation of small and way. Agrarian Reform (Bank) medium scale irrigation systems affecting about 30,000 ha.

Ministry of About Education Sector II - Support To be determined. Preparation under Education 150.0 for second phase of policy way. (Bank) reforms to promote basic edu­ cation and to increase effi­ ciency of education system.

Ministry of About Health - Strengthening health Consulting services Appraisal report Health 12.0 information system, planning, provided from UN sources being prepared. I (Bank) health education; construction and ODA (UK) for project of water facilities. preparation. I'

See page 1 for footnotea. - 56 -

Member Country, Amount & .an~ Implementing Probabfe Stage of Processing and Agency];_/ Lender!/ Consulting Services Action on Procurement!!/

~ (Cont'd) Ministry of About Education III - Development of To be determined. Appraisal report Education 10.0 teacher training and secondary being prepared. (Bank) schooling. PORTUGAL

National Housing Institute · 25.0 Housing Finance - A general line No consultants required. Approved by the Executive (Bank) of credit to provide housing fi­ Directors on December 3, nance for construction of hou­ 1985. (Cofinancing of sing· for low-income groups $25.6 million from USAID through a housing development agreed.) bank. Total project cost esti­ mated at $56.6 million, includ­ ing $28 million in foreign exchange.

Junta Autonoma About (R) Highways III - Support for High­ To be determined. Negotiations in de Estradas 50.0 way Rehabilitation Program of late January. . (JAE) . · (Bank) Junta Autonoma de Estradas (J.A.E.) and improvement of maintenance standards, inclu­ ding technical assistance. Total project cost estimated at $400.4 million, including $190.7 million in foreign exchange.

Ministry of About Technology Education - Intro­ To be determined. Appraisal report Education 35.0 duction and/Or improvement of being prepared. (Bank) technology education in second­ ary schools, polytechnics and universities. Total project cost estimated at $76 million, including $46 million in foreign exchange ..

Banco Fomento About (R) IDF/BFN III - Line of credit to To be determined. Appraisal mission Nacional (BFN) so.a BFN to support its restructuring scheduled for February. (Bank) program.

Bank for Agri­ To be (R) Irrigation IX - Time slice None required. Government reviewing culture and deter­ investment for 1986-90 Plan project priority, Food Industry .mined period. (BAFI) (Bank)

Investment Bank To be Power V - Time slice investment None required. Government reviewing deter­ for 1986-90 Plan period. project priority. mined (Bank)

Bank for Agri­ About Livestock V - Time slice None required. Government reviewing culture and Food 150.0 investment for 1986-90 Plan project priority, Industry (BAFI) (Bank) period.

SYRIAN ARAB REPUBLIC To be Damascus Sewerage - Secondary Consultants likely to be Prepara~ion under way. deter­ treatment works, main inter­ required for technical Bank Project Preparation Ministry of mined ceptors and secondary collection assistance in preparation Facility advance of Housing and (Bank) system for Damascus. of bid documents, studies $550,000 approved for Utilities and project supervision. feasibility and engin­ eering studies, detailed design and preparation of bidding documents, (Co­ financing likely to be sought.)

Ministry of About Livestock II - Increasing the No decision made whether Appraisal report Agriculture and 21.0 efficiency of the livestock consultants are required. under preparation. Agrarian Reform (Bank) sector through improved vete­ rinary services, supply of feed and water.

See page l for footnotes. - 57 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency 1f Lender];/ Consulting Services Action on Procurement!!/

SYRIAN ARAB REPUBLIC (Cont'd)

Ministry of To be Gao Appraisal and Petroleum No decision made whether Appraisal report Petroleum and deter­ Engineering - Diagnostic stu­ consultants are required. under preparation, Mineral mined dies, technical assistance, Resources (Bank) training and equipment for appraisal of several gas structures and for petroleum development,

Agence de About Small Scale Industry II - Line No decision made. Appraisal report Promotions des 40,0 of credit to be used for lending being prepared. Investiasements (Bank) to small-scale industries. (API}

Ministry of About (R) Highways Rehabilitation and Consultants required for Negotiations tentatively Equipment and 65.0 Maintenance - Civil works and studies and human re­ ·scheduled for April, Housing (Bank) strengthening organization and source and institutional (Cofinancing for tech­ management of national road development. nical assistance maintenance system. possible,)

Office des About Grain Storage II - Improvement No decision made. Preparation under Cereales 30,0 of storage and distribution of way, (Bank) locally produced grain,

Ministry of About Municipal Development - Improve­ Consultants likely for a Preparation under way by Interior 50.0 ment of municipal finance and tourism sector study and Government. (Bank) management. for the setting of pro­ ductivity standards,

Ministry of 100,0 (R) Industrial and Trade Policy No decision made. Negotiations substan­ Planning (Bank) Adjustment Loan - Policy tially completed. Reforms.

Banque Nationale About (R) Agricultural Credit (IV) - Consultants likely for Appraisal report de Tunisie (BNT} 30.0 Financing for national agricul­ management information being prepared, (Bank) tural credit operations. system for BNT,

Ministry of About (R) Forestry Development and Range No decision made. Apprai$al report Agriculture 25.0 Improvement - Improved forestry being prepared. (Bank) exploitation and management; selected reforestation; range improvement; rural forestrY.

To be determined About Public Enterprises - Financial To be determined, Identification under 75 .o assistance to public enterprises way, (Bank) channelled through intermediary hanks, as well as institutional improvements through key policy actions and techni~al assist­ ance.

Agricultural To be Agriculture Credit III - Streng­ Consultants for studies Appraisal report being Bank of Turkey deter­ thening of agricultural credit of credit cooperative prepared. mined institutions and further ratio­ system, financed by Bank (Bank) nalization of sector policies. Project Preparation Faci­ Bank Project Preparation lity,. Facility advance of $400,000 approved for consultants services.

Ministry of To be Agricultural Extension and Ap­ No decision yet on need Timing dependent upon Agriculture deter­ plied Research II - Introduction for consultants. progress of Agricultural mined of improved extension and ap­ Extension and Applied (Bank) plied research methods in addi­ Research I Project, tional priority areas.

To be determined To be Cukurova Region Urban Develop­ No decision yet on need Scope of proj_ect and deter­ ment - Provision of infra­ for consultants. timing dependent upon mined structure, urban development progress under Cukurova (Bank) and technical assistance for Region Urban Engineering regional planning in the Loan, Cukurova Region.

See page 1 for footnotes, - 58 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency J_/ Lender?:/ Consulting Services Action on Procurement 4/

.!!!!QI;!! (Cont'd)

To be determined To be Energy Sector Adjustment - No decision yet on need Preparation under way, deter­ Financing of imported inputs for consultants. mined for the energy sector. (Bank)

To be determined To be Industrial Restructuring - Loan Consultants studies on Appraisal schedule con­ deter­ to support restructuring of pu­ three sub-sectors have tingent upon Government's mined blic and private sector industry been completed. Privat­ decision on Privatization (Bank) in selected sub-sectors along ization Master Plan under Master Plan. lines of comparative advantage, consideration by the Government

Ministry of 58.5 (R) Non-Formal Vocational Training - Consultants will be Approved by the Exec­ Education, Youth (Bank) Provision of basic and voca­ required for technical utive Directors on and Sports tional training. Total project assistance and training. January 6. cost about $71 million, of which $59 million in foreign exchange.

To be determined To be Izmir Water Supply - Improvement Consultants have been Preparation under way. deter­ of water supply and sewerage hired to assist municip­ mined facilities in the city of Izmir. ality in project prepar­ Bank Project Preparation (Bank) ation work. Facility advance of$ ·1,5 million approved to fin­ ance technical assist­ ance.

To be determined To be Second Agricultural Sector No decision yet on need Timing dependent upon deter- Adjustment Loan - Support for for consultants. progress of first Agric­ mined agricultural sector policy ultural Sector Adjustment (Bank) reforms. Loan.

To be determined To be Drainage and On-Farm Development Consultants under Timing dependent on deter- II - Completion of second time- Drainage and On-farm progress of Drainage and mined slice of core program for eli- Development I expected to On-farm Development I (Bank) minating backlog of drainage and assist in preparation. other on-farm works on ongoing or completed DSI projects,

State Hydraulic To be Boyabat Hydropower - Construe- No decision yet on need Preparation under Works (DSI) deter- tion of Boyebat Kepez Dam and for consultants. way. mined Power Plant on the Kizilirmak (Bank) River in North Central Turkey,

To be determined To be (R) Transport Sector Adjustment Loan No decision yet on need Preparation under deter- - Emphasis on sectoral policy for consultants. way, mined and institutional reforms (Bank)

To be determined To be Industrial Training and Tech- No decision yet on need Project being identified, deter- nology - Training of higher for consultants. mined level technical/industrial (Bank) manpower.

To be determined To be (R) Istanbul Gas Distribution - No decision yet on need Preparation under deter- Natural· gas distribution system for consultants. way. mined in the citie of Istanbul. (Bank)

To be determined To be (N) Ankara Gas Dietribution - No decision yet on need Preparation under deter- Natural gas distribution system for consultants. way. mined in the city of Ankara. (Bank) YEMEN ARAB REPUBLIC

Yemen General 11. 7 Power IV - Phase III of regional Consultants will be re­ Approved by the Executive Electricity (IDA) electrification program, includ­ quired for construction Directors on Mey 15. Corporation ing distribution, technical as­ supervision and technical (Cofinancing from Islamic (YGEC) sistance and training. Total assistance. Development Bsnk $10,5 project cost estimated at $58,9 million; Arab Fund $14.5 million of which $47.2 million million; and Sweden $11,l in foreign exchange. million.)

Procurement: Retroactive financing approved to provide technical assist­ ance.

See page l for footnotes, - 59 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency }j Lender ]J Consulting Services Action on Procurement !!J

YEMEN ARAB REPUBLIC

Ministry of About Southern Regional Agricultural Preparation assistance Negotiations scheduled Agriculture and 12,3 Develoment (SRADP) - Agricul­ provided by FAO-CP, Con­ for February, (Co­ Fisheries (IDA) ture development of areas in sultants likely to be re­ financing will be re­ Southern YAR not covered under quired for project man­ quired. SDC and !FAD SURDP I and II, including agement, technical as­ have expressed interest,) strengthening of extension ser­ sistance and training. vices, establishment of regional IDA Project Preparation operation and maintenance ser­ Facility advance of vice and irrigation improve­ $400,000 approved to ment. Total project cost esti­ finance short-term mated at $28,7 million, of which consultancy services, $17,0 million in foreign ex­ vehicles and equipment change. for use of consulting engineers.

Highway About (R) Sanaa-Hodeidah Road - Rehabil­ Consultants have prepared Appraisal report being Authority (HA) 14.0 itation project; assistance to feasibility studies and prepared, (Cofinancing (IDA) the construction industry. engineering design. will be required, Arab Total project cost about $46,0 Consultants will also be Fund has expressed million of which $34.7 million required to carry out interea t.) in foreign exchange. construction supervision.

Ministry of Oil, 50.0 Gas I - LPG recovery and gas To be determined. Project preparation to and Mineral (Bank) utilization; project related to begin in early 1987, Resources (MOMR) the development of the recent oil recovery.

Yemeni General About Power Distribution V - Likely to Consultants will be Project preparation \J Electricity 12.0 include more power distribution, required to supervise under way. (Co­ i Corporation (IDA) technical assistance and train­ construction. financing will be (YGEC) ing. required,)

Ministry of About Teacher training - Upgrading of Consultants will be Appraisal report being Education 8.0 existing teacher training pro­ required ,for technical prepared, (Cofinancing (IDA) grams and developing supplem­ assistance and training. may be required, UNDP has ental ones, construction and expressed interest.) equipping of Primary Teacher Training Institutes. Total project cost estimated at $22,3 million, of which $11,1 million in foreign exchange.

Ministry of About Urban III - Upgrading of Old Consultants likely to be Project preparation under Municipalities 10.0 City of Taiz, and improving required to assist in way, (Cofinancing may be and Housing transportation conditions in project preparation and required,) (MMH) Sanaa. Total project cost to provide technical estimated at $20.0 million, of assistance. which $12.0 million in foreign exchange.

YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF

Pub.lie Corpor­ To be Power Ill - Rehabilitation of Consultants required to Feasibility studies to be ation for Elec­ deter­ Aden system network. prepare feasibility prepared. (Cofinancing tric Power mined study, detailed engineer­ being explored,) (IDA) ing design, supervise construction management, and other technical as­ sistance.

Pub lie Water 5.6 Phase II of Greater Aden Water Consultants were employed Approved by the Executive Corporation (IDA) Supply project, Total project to prepare feasibility Directors on October 30, cost estimated at $32.2 million, studies. (Cofinancing from the of which $27.95 million in Danish International foreign exchange. Development Corp, (DANIDA) for $10 million, and from Kuwait Fund and Arab Fund for.a total of $12,35 million.)

Ministry of About Highways V - Implementation Continuation of technical Appraisal report being Construction 10.5 phase of road maintenance and assistance for implement­ revised. (Cofinancing (IDA) rehabilitation program initiated ation of road maintenance being explored,) under Highway IV, including and training programs procurement of additional road initiated under Highways maintenance equipment, construc­ IV, Additionally, con­ tion of a new central workshop, sulting services will be preparation of a Higway Master required for preparation Plan, and technical assistance. of a Highway Master Plan.

See page 1 for footnotes, .- 60 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency y Lender~/ Consulting Services Action on Procurement 4/

YUGOSLAVIA

Road Organiza­ 121.5 Highways Sector Project - To Consultants will be Loan approved by the tion of (Bank) assist financing of rehabili­ required for roads and Executive Directors on Slovenia, tation and construction of bridges maintenance June 10. Croatia, Serbia, priority roads including study. Bosnia-Herze­ sections of the Trans-Yugoslav Procurement: Retroact­ govina, and the Highway. Total project cost ive financing for the Federal Asso­ estimated at $268.0 million, maintenance study ciation of with $121,5 million in foreign included. Republican exchange. Provincial Road Organizations (FARP)

Sava Basin Water About (R) Lonjsko Polje Drainage (Pre­ Consultants will be re­ Govermnent reviewing Organization 78.0 viously reported as part of Sava quired for agro-socio­ project priority. (VRO) (Bank) Drainage II) - Provision of economic study, and drainage to about 49 1 000 ha in review of annual produc­ Procurement: Croatia. Will include pumping tion plans. Retroactive"financing stations, on-farm development, will be sought. construction and farm equipment.

To be determined To be Industrial Restructuring I - To be determined. Sub-sector studies and· deter­ Improvement in selected sub­ specific projects for mined sectors and enterprises. chemical, cement, engin­ (Bank) eering and steel are being prepared.

To be determined To be (R) Agricultural Sector Input Loan - To be determined. Government reviewing deter­ Foreign exchange (working ca­ project priority. mined pital) for input manufacturing (Bank) enterprises and oectoral improvements.

Ljubljanska 70.0 (R) Energy Efficiency Credit Line I Consultants may be re­ Awaiting final agreement. Banka Ljubljana (Bank) - Loans to medium-sized indus­ quired to assist local tries primarily in Slovenia for technical enterprises for Procurement: Retroact­ energy conservation investments. energy audits for complex ive financing will be subprojects. sought.

Belgrade Water About (R) Belgrade Water Supply - Second Consultants for prepar­ Government reviewing and Sewerage 46.0 stage of Makis treatment plant ation of final designs project priority. Enterprise (Bank) with transmission mains, and already employed. three tunnels to connect to Procurement: Retroactive existing system. financing will be sought.

To be determined To be Railways VII - Time-slice of To be determined. Preparation under deter­ investment plans for four rail­ way. mined way transport organizations (Bank) directed at increasing the capa­ city of the main trunk line,

Hidroelektrane About Buk Bijela - Construction of dam Local consultants already Preparation under na Drini 200.0 and hydroplant on Drina River employed. way. (Bank) and related transmission facilities.

Stopanska Banka About Energy Efficiency Credit Line II To be determined. Preparation under Skopje 30.0 - Loans to medium-sized indus­ way. (Bank) tries primarily in Macedonia for energy and industrial efficiency.

To be determined To be Textiles and Manmade Fiber - To be determined. Sub-sector study and deter­ Multi-republic subsector loan project iaentification mined for selected export-oriented are under way. (Bank) textile projects.

To be determined About Gas Transmission II - Upgrading To be determined. Preparation under 110.0 of gas supply network through way. (Bank) construction of pipelines, com­ pression stations, underground gas storage and related pro­ duction facilities; long-term planning of gas transmission system.

See page 1 for footnotes, - 61 -

Member Country, .Amount I, and Implementing Probable Stage of Processing and Agency lJ !!!l!!!!. y Consulting Services Action on Procurement!!/

YUGOSLAVIA (Cont'd)

To be About Energy Sector Loan - Rehabil­ To be determined. Preparation under way. determined. 1.50.0 itation projects and/or small (Bank) generation diatribution facil­ ities in energy sectors of various republic& and autonomous provinces.

To be determined About Power - Construction of hydro­ To be determined. Preparation under way. 7.5.0 power plant projects on Drevs, (Bank) Neretva, Treetea, Cefnia and Vardar Rivers.

1, ( I

( I See page 1 for footnotes. I I - 62 -

Member Country, Amount r. and implementing Probale Stage of Processing and Agency 1/ Lender ?:J Consulting Services Action on Procurement 4/

VI. LATIN AMERICA AND CARIBBEAN ARGENTINA

Ministry of Pub­ 46.0 Ports I - Improvements to Bahia Consultants have been Revised appraisal lic Works .and (Bank) Blanca port, Total project cost recruited for final report being prepared, Services estimated at $90.0 million, of design of project. which $53.0 million in foreign exchange.

Energy 14.0. Power Engineering - Financing of Consultants being Approved by the Exec­ Secretariat (Bank) studies to define and analyze recruited for studies on utive Directors on national program for distri­ distribution planning. September 16. bution systems expansion and to unify design and construction standards. Total project cost estimated at $21.3 million, of which $14 million in foreign exchange.

Banco Nacional 1S0.0 (R) Industrial Restructuring - Sup­ To be determined. Project preparation de Desarrollo (Bank) port of institutional mechanism under way. (BANADE) for industrial restructuring of private sector industrial prod­ ucers through investment banking and financial advisory services.

Banco Nacional 100.0 Small and Medium Industries To be determined. Appraisal report de Desarrollo (Bank) Project - Policy; institutional; being prepared. (Banade) financial and technical assis­ tance support to small-and­ medium-sized industries.

Servicios 200.0 SEGBA V Power - Rehabilitation Not required. Awaiting consultants·, Electricos del (Bank) and expansion of distribution report on project Gran Buenos networks in Buenos Aires. Total proposal. Aires (SEGBA) project cost estimated at $600 million, of which $200 million in foreign exchange.

Banco Nacional 1SO.O (R) Industrial Credit III - Finan­ Project dropped fr.om. de Desarrollo (Bank) cing of medium and long-term lending program. Report­ (BANADE) credit through BANADE for in­ ing will be discontinued. dustrial investments.

Banco Central de 1SO.O Export Development - Support of Consultants required for Project preparation under la Repub lica (Bank) financial and non-financial project implementation. way. Argentina (BCRA) mechanisms to promote non­ traditional exports; establish­ ment of an export development facility in BCRA and provision of technical assistance to go­ vernment agencies and exporters.

Banco Central de 1SO.O Financial Sector Loan - Support To be determined. Project preparation la Repub lica (Bank) to the first phase of structural under way. Argentina (BCRA) reform in the financial sector.

Ministry of 3SO.O Trade Policy Loan - Support to Included in the Public President's Report Economy (Bank) first phase of structural reform Sector Management Tech­ being prepared. in the trade regime. nical Assistance Loan.

Entidad 1SO.O (R) Yacyreta II - Rehabilitation of Not required. Preparation mission Binacional (Bank) the power sector finances scheduled for March. Yacyreta through additional financing for the Yacyreta Hydro project (2700MW).

Secretaria de 1SO.O (N) Agriculture Sector II - Agri­ To be determined. Project preparation Agriculture y (Bank) cultural credit for technolo­ under way. Ganaderia gical adjustment; financing medium-term credit for modern­ ization of farm machinery, crop storage and handling facilities.

See page 1 for footnotes. - 65 -

M~mber Country, Amount & and implementing Probale Stage of Processing and Agency }J Lender_]:/ Consulting Services Action on Procurement!±/

BRAZIL (Cont'd)

State of 83.0 Northeast Rural Development - Consultants will be Negotiations postponed Maranhao (Bank) Maranhao - Support of Maranhao required for irrigation to March to allow for (SEPLAN-MA) State plan under N,E, Rural De­ and special studies, compliance with condi­ velopment Program. Total pro­ tions set for solving ject cost estimated at $184,5 Amerindian is sues. million, of which $25.3 million in foreign exchange,

Sao Paulo State 174,0 (R) Sao Paulo State Highway Manage­ Consultants will be Negotiations substan­ Government (Sao (Bank) ment - Highway rehabilitation required for engineering, tially completed. Board Paulo State and institutional improvements de~ign, construction, presentation planned for Department of for highway maintenance oper­ supervision, and tech­ end-February. Roads - DER) ations. Total project cost nical and institutional estimated at $405.7 million, of studies. which $174,4 million in foreign exchange.

Centrais 300.0 (R) Electric Power Sector II - No consultants required. Appraisal mission Eletricas (Bank) Continuation of support for in January. Brasileiras S.A. Government measures to reha­ (ELETROBRAS) bilitate power sector.

Centrais 500.0 (R) Electric Power Sector III - Con­ To be determined. Preparation mission Eletricas (Bank) tinuation of assistance· towards in January. Br~sileiras S.A. the financial rehabilitation of (ELETROBRAS) selected utilities.

Ministry of 75.0 (R) Skills Formation - Support of To be determined. Appraisal report Labor (Bank) Government's efforts to increase being prepared, labor productivity through trai­ ning, Total project cost esti­ mated at $150.0 million,

Companhia de , 125.0 (R) Northeast Irrigation II Consultants required for Project preparation Desenvolvimento (Bank) (Itaparica) - To resettle about engineering and under way. do Vale do Sao 36,000 people presently living settlement planning, Francisco in the area of the Itaparica (CODEVASF) reservoir. It would include relocation of urban centers, roads and power lines but would consist mainly of agricultural resettlement on irrigated farms.

lnstituto 75.0 (R) Minas Gerais Forestry - To fin­ Consultant services Appraisal mission Estadual de (Bank) ance small-scale forestry devel­ required. planned for March, Forestas (IEF) opment; forestry conservation, education and training; a line of credit for industrial scale reforestation; and special studies.

Banco Nacional Up to (R) Water Supply Sector Project for To be determined, · Project preparation da Habitacao 70.0 Low Income Areas and Municip­ under way, (BNH) (Bank) alities - Expansion of water, sewerage, drainage and solid waste services for about two million people.

Federal Ministry Up to Northeast Endemic Disease Con­ To be determined. Project preparation of Health · 125,0 trol - To control endemic under way. (SUCAM/FSESP) (Bank) diseases (Chagas, Shisto­ somiasis, Leishmaniasis) in Northeast Brazil through vector· control, chemotherapy, and institutional development,

Federal Ministry Up to (R) Amazon Bas in Malaria Control - To be determined, Project preparation of Health 150,0 To control malaria in 'malaria under way. ( SUCAM) ; and (Bank) triangle' in Northwest Brazil Federal Ministry (Amazonas, Para, Acre, Rondonia, of Interior Roraima, Amapa, Mato Grosso) (SUDECO/SUDAM) including civil works for sani­ tation and source control, vector control, chemotherapy, / and institution-building,

See page l for footnotes, - 66 -

Member Country, Amount & and implementing Probale Stage of Processing and Agency l/ Lender J:./ Consulting Services Action on Procurement !!./

BRAZIL (Cont I d)

Ministry of Up to Second Northeast Basic Health - To be determined. Project preparation Health 115.0 Support for improvement of basic under way. (Bank) health services in six states of the Northeast (Maranhao, Paraiba, Pernambuco, Aracaju, Sergipe, and Ceara), complement­ ing the rural development ef­ fort; technical assistance to strengthen (federal) Ministry of Health and the State Secret­ ariats of Health.

CARIBBEAN REGION

Caribbean 5.7 CDB IV/Regional Eastern Carib­ To be determined. Negotiations scheduled Development (IDA) bean States Technical Education for February. (Cofinan­ Bank (CDB) - Technical and vocational cing agreed CDB $2.5 mil­ tra1n1ng. Total project cost lion and OPEC Fund $2.5 estimated at $12.4 million, of million.) which $9.6 million in foreign exchange.

CENTRAL AMERICA REGIONAL

Central American 65.0 Central American Regional Deve­ To be determined. Project preparation Bank for (Bank) lopment. under way. Economic Integration

Ministry of 40.0 Irrigation Rehabilitation - To be determined. Project preparation Agriculture (Bank) Rehabilitation of irrigated under way. (MINAG); areas and creation of project Ministry of authority to manage programs. Pub lie Works (MOP)

Empresa Nacional 60.0 Small-and Medium-Scale Mining. Consulting services to be Appraisal mission sched­ de Mineria (Bank) determined. uled for March. (ENAMI)

Ministry of 80.0 Port and Intermodal Transport - First phase of consulting Project prep-a.ration Transport and (Bank) Valparaiso and San Antonio services completed. Bide unde~ way. Telecommunic­ Ports. for follow-up feasibility ations (MTT) and engineering called.

Empresa Up to (R) Railway Rehabilitation Project. Consulting services Appraisal report Ferrocarrilee 17 .o have been contracted. being prepared. del Estado (EFE) (Bank)

Government (to 100.0 Pulp and Paper Project. Consulting services to be Project preparation be determined) (Bank) determined. under way.

Pehuenche S .A. ; 116.2 (R) Power Generation - Construction Consultant services to be Appraisal mission and Empresa (Bank) of Pehuenche hydropower plant determined. in January. Nacional de and related transmission and Electricidad institutional support. S.A. (ENDESA)

Corporacion 50.0 (N) Forestry Development - Credit To be determined. Project preparation de Fomento la (Bank) for financing harvesting, trans­ under way. Producion (CORFO) port, and primary processing of wood products.

COLOMBIA

Financiers 300.0 (R) Power Sector Loan - To improve Consultants required for Appraisal mission planned Electrics (Bank) efficiency of sector through po­ management audits of for February; (Cofinan­ Nacional (FEN) licy changes and institutional power sector utilities, cing being discussed.) and financial restructuring. and other institutional Total external finanicng of development measures. about $1.7 billion being sought. No new generation construction anticipated. See page l for footnotes. - 67 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency 1J Lender];/ Consulting Services Action on Procurement 4/

COLOMBIA

Caja Agraria Up to (R) Caja Agraria - Institutional Consultant required for Appraisal report 120.0 strengthening, and loans to systems analysis. being prepared. (Bank) small and medium-sized far­ mers. Total project cost est­ imated at $2.0 billion, of which $400.0 million in foreign ex­ change.

Presidency's 150.0 National Rehabilitation Plan Consultants. required for Appraisal mission Secretariat (Bank) Project - Institutional planning land titling and institu­ scheduled for August. (S/P) will and monitoring and evaluation tional development. coordinate strengthening of national rehab­ project to be ilitation plan. Project to implemented by a finance production activities large number of and infrastructure in selected agencies. rural areas.

To be determined 60.0 (R) Fifth Small-Scale Industry Ad­ To be determined. Project preparation (Bank) justment - Institutional support under way. and financing of small-scale industry in Colombia.

Ministry of 180.0 Second Highway Sector - Implem­ To be determined. Appraisal report Public Works and (Bank) entation of required adjustments being prepared. Transportation in sector policies and manage­ (MOPT) ment. Project would finance up to 35% of MOPT's 1987-93 invest­ ment and maintenance program.

Banco Central 120.0 Water Supply and Wastes Sector - Consultants will be Project preparation Hipotecario/ (Bank) To support preparation and im­ required for technical under way. Fondo Financiero plementation of a sector adjust­ assistance and institu­ de Desarrolo ment program designed to sub­ tional development. Urbano stantially increase service coverage within macroeconomic constraints. Total project cost estimated at $400.0 million, of which $160 million in foreign exchange.

Ministry of 150.0 Energy Sector Adjustment Loan­ To be determined. Pre-appraisal mission Mines and (Bank) To support policy adjustments scheduled for February. Energy; for pricing and investment ECOPETROL; decisions in the energy sector. CARBOCOL; and ISA

Ministerio de 10.0 (R) Public Sector Management - Consulting services will UNDP grant of $300,000 is Hacienda y (Bank) Reforms in public sector manage­ be required in the organ­ proposed to assist in Credito Publico; ment with particular attention ization and management carrying out diagnostic and Departmento to budget progrannning and execu­ field. work. Nacioanl de tion, tax administration, public Planeacion enterprise monitoring, manage­ ment information systems, and customs adroinistration.

COSTA RICA

Banco Nacional 26.0 Atlantico Agricultural Develop­ Consultant required for Approved by the Executive de Costa Rica; (Bank) ment - Development of agricul­ cacao rehabilitation. Directors on October 21. Ministry of tural exports, mainly cacao re­ Planning; habilitation in Atlantic Region Institute of through credit programs and im­ Agrarian Devel­ proved technology. Total project opment; and cost estimated at $43.5 million, Ministry of of which $11.2 million in Pub lie Works foreign exchange. and Transport

Central Bank 40.0 Financial Sector Loan. To be detennined. Appraisal mission tenta­ (Bank) tively scheduled for January/February.

See page 1 for footnotes. - 68 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency 1/ ~?:.I Consulting Services Action on Procurement!!_/

DOMINICA

Dominica 3.0 Power - Hydroelectric plant, To be determined. Appraisal report being Electricity (IDA) transmission and distribution prepared. (Expected Services Limited improvements, training and cofinancing with CDB, (DOMLEC) technical assistance. Total EIB and Caisse Centrale, project cost estimated at $16.0 France.) million, of which $12.5 million in foreign exchange.

DOMINICAN REPUBLIC

Corporacion 70.0 Power - Financing of expansion To be determined. Appraisal mission tentat­ Dominicans de (Bank) and rehabilitation of distrib­ ively scheduled for Electricidad ution network. March. (CDE)

Ministry of 30.0 Agricultural Sector - To assist To be determined. Project preparation Agriculture (Bank) Government in carrying out under way. reforms in the agricultural sector.

Corporacion Up to Oil production, pipeline Consultants being selec­ Project preparation Estatal 95.0 expansion, and institutional ted. under way. Petrolera (Bank) development. Ecuatoriana Bank Project Preparation (CEPE) Facility advance for $1 million approved to fi­ nance preparatory stud­ ies.

Instituto 8.5 Power Sector Improvement Loan - Consultants will be Approved by the Ecuatoriano de (Bank) To finance management improve­ required. Executive Directors Electrificacion ment and other studies. Total on June 3, 1986. (INECEL) project cost about $11.8 mil­ lion, of which $9.5 million in foreign exchange.

Banco Central 48.0 Agricultural Credit - Line of Consultant required for Approved by the Exec­ (Bank) credit for farmers and insti­ resource mobilization. utive Directors on tutional support for BNF. September 16, 1986.

Empress 31.0 (R) Water Supply - Technical assist­ Consultants required for Approved by· the Exec­ Municipal de (Bank) ance for inotitutional develop­ engineering services and utive Directors on Agua Potable de ment; improvement and expansion construction supervision. December 16. (Cofinan­ Guayaquil of water production; transmis­ cing agreed with CDC for (EMAP-G) sion and distribution facili­ $8.0 million.) ties. Total project cost esti­ mated at $50.5 million, of which about $32 million in foreign exchange.

Instituto Up to Power - Financing of trans­ Consultants will be Project preparation Ecuatoriano de 70.0 mission, subtransmission and required. under way. E lectricidad (Bank) distribution. (INECEL)

Banco 60.0 (N) Housing - Construction and To be determined. Appraisal mission planned Ecuatoriano de (Bank) mortgage financing for lov­ for early 1987. la Vivienda income housing; technical (BEV) assistance for institutional development.

Ministerio de 40.0 (N) Flood Control and Drainage - Consultants will be Project preparation Agricultura y (Bank) Lower Guayas River Basin Flood required planned to begin April. Ganaderia Control and Drainage in an area (MAG/INERHI/ of about 150,000 ha for agri­ CEDEGE) culture production.

EL SALVADOR

Banco Central Up to Export sector - Provision of To be determined. Appraisal mission pend­ 80.0 working capital and investment ing further discussions (Bank) credit for export oriented en­ on policy issues. terprises.

Ministry of About Earthquake Reconstruction. Consultants will be Appraisal report Planning 60.0 required, being prepared. (Bank)

See page 1 for footnotes. - 69 -

Member Country, Amount r. and implementing Probable Stage of Processing and Agency l./ Lender!/ Consulting Services Action on Procurement 4/

GUATEMALA

Municipality of 28.0 Guatemala City - Strengthening Consultants required for Appraisal report I Guatemala City; (Bank) of cadastre end management of land valuation and ced­ being prepared. and National municipality infrastructure in aetre survey; municipal Commit tee for low income housing development; finance and management; I Reconstruction street maintenance and road maintenance and rehabilitation. operation; public pas­ senger transportation; 1· and low-income housing. I Institute 81.0 Power Distribution - Expansion Consultants will be re­ Approved by the Executive Nacional de (Bank) and training program of EEGSA; quired. Directors on June 23. Electrificacion thermal plant rehabilitation, (INDE) and dispatch center, communications, Empress Elec­ preinvestment studies, training trics de program and technical assistance Guatemala (EEG) for INDE. Total project finan­ cing requirements estimated at $133.2 million of which $100.0 million in foreign exchange.

I Ministry of 35.0 Highlands rural development - To be determined. Project preparation under I Agriculture; (Bank) Execution of regional develop­ way. SEGEPLAN ment plan to increase small farmer production through /. introduction of improved agri­ cultural practices, physical access to farm markets, soil conservation and strengthening I of participating agencies. Empresa 23.0 Weter Supply Rehabilitation - To Consultants will be Approved by the Executive Municipal (Bank) improve financial and opera­ required for operational Directors on October 16. l de Aguas tional management of EMPAGUA, and special studies. (EMPAGUA) and prepare a program for red­ ucing water losses. Total pro­ I ject cost about $27.4 million, of which $20.4 million info­ reign exchange.

i Banco de 80.0 Export Development - Support of Consultant services to be Appraisal report l Guatemala (Bank) Government export pr9gram; prov­ determined. being prepared. ision of foreign exchange for priority inputs for Guatemala exporters.

Instituto 60.0 Power VI - Technical assistance To be determined. Identification mission Nacional de (Bank) for sector organization, in­ scheduled for July. Eletricidad cluding definition of distrib­ (INDE) ution and rural electrific­ ation. General facilities to support changes. Transmission, distribution and rural electri­ fication expansion.

Bauxite Industry 7.0 Bauxite Technical Assistance - Consultants have been Approved by the Executive Development Co. (IDA) Financing of management assist­ retained. Directors on August 5, Limited ance contract, including pilot plant for new product develop­ ment and cost control system for bauxite sector. Total project cost estimated et $8.0 million, of which $7.0 million in foreign exchange.

Ministry of 20.0 (R) Transportation VII (Road, Ports) Consultants required for Negotiations substan­ Pub lie Works, (IDA) - Bridge rehabilitation and detailed design and tially completed. Board Transportation reconstruction, road improve­ supervision, organiza­ presentation scheduled and Comnunica­ ment, technical assistance and tion, management and for February 3. tions slipway for boat inspection. training. Total project cost about $24 million, of which $18.7 million in foreign exchange.

Ministry of 11.0 (R) Tree Planting and Forestry - Reporting will be Agriculture (IDA) Fuelwood end multipurpose discontinued. tree planting.

See page 1 for footnotes. - 70 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency}./ Lender?,./ Consulting Services Action on Procurement!!._/

HAITI (Cont Id)

Ministry of About Economic Recovery Credit - To To be determined. Appraisal report Economy and 30.0 support Government's adjustment being prepared. Finance (IDA) efforts in financial, economic, agricultural and budgetary sectors.

Ministry of 4.0 Technical Assistance Credit - To To be determined. Appraisal report Economy and (IDA) support Government's efforts to being prepared. Finance manage and implement the Econo­ mic Recovery Credit.

Electricite 20.0 Power V - To ensure more re­ Engineering and man­ Under preparation. d'Haiti (IDA) liable supply of power by agement consulting will Appraisal mission Electricite d'Haiti by the be required. scheduled for June. installation of generation capa­ city and adjustments to the sub­ transmission and distribution systems.

Fonds de 25.0 (N) Industrial Restructuring and To be determined. Project preparation Developpement (IDA) Development - To provide finan­ under way. (FDI) cing and technical assistance for the restructuring of indus­ trial enterprises affected by the trade reform and to promote export-oriented industries.

Centrale 24.0 (N) Port-au-Prince Weter Supply - To be determined. Project preparation Autonome (IDA) Development of new water under way. Metropolitaine sources, and installation of d 'Eau Potable networks and connections. (CAMEP)

HONDURAS

Ministry of 3.9 Education III - Rural primary To be determined. Appraisal report Public Education (Bank) education management project. being prepared. Pre-investment and pilot invest­ ments. Total project cost est­ imated at $6.0 million, of which $2.5 million in foreign ex­ change.

Ministry of 34.0 Sugar Rehabilitation II - Fac­ Main consulting services Negotiations substan­ Agriculture (Bank) tory and field rehabilitation to will be management con­ tially completed. restore viability of public tract with Tate and Lyle. sugar sector and increase ex­ ports to fill export quotas. Total project cost estimated at $51.3 million, of which $36.7 million in foreign exchange.

Ministry of 10.0 (R) Population III - Continued Consulting services for Negotiations substan­ Health (Bank) strengthening of population and technical assistance to tially completed. family planning services, and the Ministry to be rationalization of Public Health included. expenditures. Total project cost estimated at $12.4 million, of which $7.9 million in foreign exchange.

Ministry of Up to (R) Education IV - Education Program Consulting services for Negotiations scheduled Education 7.7 Preparation and Student Loans various studies in educ­ for February. (Bank) Project. (Project costs being ation will be required. updated.)

Jamaica Pub lie Up to (R) Power IV - Transmission and dis­ Consultants will be Appraisal report being Service Company 17.0 tribution expansion; training, required for engineering prepared. (Bank) design and bidding documents for of coal-fired plants and coal-fired plants including coal coal harbour, distribu­ harbour. Total project cost tion master plan and ins­ estimated at $34.7 million, of titution building. which $23.5 million in foreign exchange.

See page 1 for footnotes. \ - 71 -

Member Country, Amount & I and implementing Probable Stage of Processing and Agency];_/ Lender J:./ Conaulting Services Action on Procurement 4/ I JAMAICA (Cont'd)

Bank of Jamaica 40.0 Trade and Financial Sector No consultants required. President's Report (Bank) Adjustment - Loan to support being prepared. policy reform in industrial and financial sectors.

Bank of Jamaica , 20.0 Public Enterprise Sector No ~onsultants required. President's Report (Bank) Adjustment - To improve the being prepared. financial performance of the public enterprisee.

To be determined 40.0 Agricultural Sector - To support To be determined. Identification report (Bank) development of export agricul­ being prepared, ture, crop diversification and food self-sufficiency.

Clarendon 10.0 (N) Clarendon Alumina Production - To be determined. Preparation under. Alumina (Bank) Construction of red mud lake; way. Production Co. engineering and economic stu­ dies; and expenditures for sus­ taining capital and replacing equipment. Total project coat estimated at $42 million, of which about $20 million in for­ eign exchange.

Nacional Finan­ 75.0 Irrigation Rehabilitation - Re­ No decision made whether Project preparation under ciers (NAFIN) (Bank) habilitation of existing irriga­ consultants will be re­ way. tion investments, and streng­ quired. thening operation and management activities of implementing agency.

Nacional 20.0 Agricultural Extension - To be determined. Appraisal report Financiera (Bank) Strengthening Government' a being prepared. (NAFIN) agricultural extension and research programs.

Nacional 400.0 Agricultural Credit - FIRA - Some consultants would be Negotiations in progress. Financiers (Bank) General agricultural credit required for technical (NAFIN) support. To increase agric­ support and training. ultural productivity and pro­ duction with a view to in­ creasing exports, self­ sufficiency in food and real farm income. It would benefit directly about 100,000.fsmilies (550,000 beneficiaries) and would generate an additional 240,000 jobs. It would continue to assist the Government to im­ prove agricultural policies through the further reduction of interest rate subsidies to low income farmers.

Nacional 60.0 Forestry - To increase produc­ To be detennined. PreParation under way. Financier a (Bank) tion of logs from natural pine (NAFIN) forest areas, and improve log utilization by local forest industries in Durango/Chihuahua States.

Banco Nacional 250.0 (R) Export Development Project II - Consultants wi~l be Board presentation de Comercio (Bank) Continuation of Government required for technical on January 20. Exterior (BNCE) efforts to promote non-petroleum support. exports including support to in­ direct exporters.

Banco Nacional 100.0 (R) Porta IV - Support to port mo­ Consultant required for Appraisal report de Obraa y (Bank) dernization, rehabilitation and technical support. being prepared. Servicios equipment program. Publicoa (BANOBRAS)

See page 1 for footnotes. - 72 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency 1_/ Lender];_/ Consulting Services Action on Procurement!!_/

MEXICO (Cont'd)

Banco Nacional 125.0 (R) Urban Transport - Investment in Consultants required for Negotiations scheduled de Obras y (Bank) transport infrastructure and technical support. for end-January/February. Servicios traffic management in Publicos Guadalajara, Monterrey and the Bank Project Preparation (BANOBRAS) State of Mexico. Facility advance of $500,000 approved to help finance preparation of detailed technical, ec­ onomic and financial an­ alysis of urban transport improvements in project areas.

Nacional 125.0 Agro-Industries - To provide To be determined. Preparation under Financier a (Bank) credit and technical assistance way. (NAFIN) to the agro-industries sub­ sectors.

Nacional 250.0 (R) Fertilizer Sector Restructuring To be determined. Appraisal mission now Financiera (Bank) - Support for Fertimex's revised tentatively scheduled (NAFIN) investment program and its for March. financial restructuring.

Nacional 200.0 (R) Small and Medium Industry IV - Consulting services will Negotiations tenta­ Financier a (Bank) Support to integrated program of be required for system tively scheduled for (NAFIN) assistance to Small and Medium development and February. Industry. computerization.

Banco Nacional Up to Federal District Water and To be determined. Preparation under de Obras y 60.0 Sewerage - Technical assistance way. Servicios (Bank) and operational improvement in Publicos the D.F. (BANOBRAS)

Banco Nacional 175.0 Housing II - Support to housing To be determined. Preparation under de Obras y (Bank) credit provided by FOVI. way. Servicios Publicos (BANOBRAS)

Ministry of 45.0 Manpower Training and Devel­ Some consultants may be Preparation under Labor (STYPS) (Bank) opment - To establish a program required for financing way. for retraining workers, assist studies and start-up of in developing in-plant training pilot activities. Bank Project Preparation for existing workers and esta­ Facility advance of blish a manpower information $500,000 approved to help system. finance the preparation of detailed technical analyses and the ini­ tiation of pilot acti­ vities required to appraise the project and accelerate subsequent implementation.

To be determined 300.0 Agricultural Sector Loan I - To be determined. Preparation under (Bank) Sector loan to help reform way. subsidy control and targeting, pricing and marketing dereg­ ulation, and increased effi­ ciency of public sector invest­ ment management in agriculture.

Nacional 250.0 Industrial Restructuring - To To be determined. Preparation under Financiera (Bank) complement the Government's way. (NAFIN) trade liberalization policies I through (i) rationalization of relative prices and fiscal incentives in specific sub­ sectors; and (ii) development of subsector restructuring strat­ egies; and. (iii) financial and technical assistance to comp­ anies in need of restructuring.

See page 1 for footnotes. - 63 -

Member Country, Amount & and implementing Probale Stage of Processing and Agency J./ ~1.1 Consulting Services Action on Procurement!!_/

THE BAHAMAS

Water and 10.0 Water Supply and Sewerage Reha­ Private consultants al­ Approved by the Exec­ Sewerage (Bank) bilitation - Institutional deve­ ready working with WSC utive Directors on Corporation lopment and training; reduce would be engaged for some October 14. {Cofinancing (WSC) operating costs and unaccounted technical aosistance and arranged with EIB $7 mil­ for water; protection of water rehabilitation services. lion, CDB $4.3 million shipping facilities; technical and National Insurance assistance. Total project cost Board in the Bahamas estimated at $33.5 million, of $1.2 million.) which $21.4 million in foreign exchange. Procurement: Retroactive financing for project preparatory services started on September 1, 1985.

BARBADOS

Ministry of 8.6 National Low-Income Housing - Appointment of consult­ Appraisal report being Housing and (Bank) Rehabilitation of low-income ants deferred·pending prepared. Lands housing. Total project cost Government review of estimated at $17.6 million, of project. which $8.6 million in foreign exchange.

Ministry of 4.0 (R) Agriculture Development Project Consultants required for Board presentation Finance (Bank) with two components: (1) Agro­ technical assistance scheduled for end­ Industries credit; and (2) component. February. Technical assistance for agri­ /; cultural diversification and study of the sugar subsector. Total project cost estimated at $5.8 million, of which $4 mil­ lion in foreign exchange.

To be determined. Project preparation under way. To be determined 6.0 (N) Agricultural Credit - Credit (Bank) operation aimed at improvement of balance of payments and crea­ tion of increased employment opportunities through further increases in_ agricultural pro­ duction for exports.

Empresa Nacional 6.1 (R) Power Rehabilitation - Manage­ Consultants will be Appraisal report de E lee tricidad (IDA) ment information system, acqui­ required for supervision being prepared. S.A. sition of spare parts and trans­ mission facilities. Total project cost estimated at $7 .6 million of which $6.1 million in foreign exchang~.

Ministry of Fin­ 12.0 (R) Public Sector Financial Man­ Consultants will be Appraisal mission in ance; Central (IDA) agement - To institute financial required. January. Bank; and systems reforms and reorganize Comptroller public financial institutions. Procurement: Bank Pro­ General Total project cost estimated at ject Preparation Facility $19.5 million, of which $10.0 advance of $500,000 million in foreign exchange. approved for project preparation.

Empresa Nacional 25.0 (R) Power Distribution - Construc­ Consultants will be Project preparation under de Electricidad (Bank) tion of a transmission line to required for implement­ way. (ENDE) Larecaja region to supply energy ation and organization t"o mines. Rehabilitation of of ditribution. distribution systems of major cities of Bolivia to reduce losses and overloads and in­ crease coverage.

State of Bahia 171.0 Northeast Rural Development - Consultants to be Approved by the Executive (Bank) Bahia - Support of selected retained for irrigation Directors on October 21. rural development activities in component. the State of Bahia. Total pro­ ject cost estimated at $356.2 million, of which $46.8 million in foreign exchange.

See page 1 for footnotes.

,\ \ (' ' - 64 -

Member Country, Amount & and implementing Probale Stage of Processing and Agency!/ Lender y Consulting Services Action on Procurement 4/

BRAZIL (C~nt'd)

State of Piaui 78,0 Northeast Rural Development - Conaultante will be Approved by the Executive (Bank) Piaui- Support of selected rural required for irrigation Directors on October 21, development activities in the component. state of Piaui. Total project cost estimated at $160.3 mil­ lion, of which $15,3 million in foreign exchange,

Empress de Up to Ports II - Technical assistance To be determined, Project preparation Portoe do Brasil 50.0 and studies to improve ports under way. S,A, (PORTOBRAS) (Bank) operations and PORTOBRAS' institutional efficiency; and financing engineering works for rehabilitation improvements in infrastructure.

Ministry of Up to (R) Irrigation Subsector Loan - To be determined. Appraisal mission Irrigation 500.0 Financial and technical support planned for February, Bank) for private irrigation.

Ministry of Up to Municipal Strengthening for To be determined. Project preparation Urban Deve 1- 150.0 Medium Cities - Strengthening under way, opment (MDU) (Bank) urban finance and management for northeast secondary cities with a focus on improving urban efficiency.

Centrais Up to Rural Electrification II - Sup­ To be determined. Appraisal mission Eletricae 225.0 port for next phase of sector planned for August, Brasileirae S.A. (Bank) _rural electrification program. (ELETROBRAS)

Central Bank Up to Investment Finance - To support To be determined. Project preparation of Brazil 200.0 implementation of broader based under way. (Bank) financial sector reform under prepara.tion by Government.

Secretaria de Up to (R) Livestock Disease Control - Sup­ To be determined, Appraisal mission Defensa 50.0 port of Government efforts to in January. Sanitaria Animal (Bank) improve livestock disease con­ trol and production.

State of Ceara Up to Northeast Rural Development - Consultants will be Approved by the Exec­ 122,0 Ceara - Support of Ceara State required for irrigation utive Directors on (Bank) plan under N,E, rural develoment and special studies. October 21. program, Total project cost estimated at $254,3 million, of which $27.8 million in foreign exchange.

Ferrovia Up to (R) FEPASA Ra·ilways II - Financial Consultants will be Appraisal report Paulis ta S ,A, 100.0 rehabilitation of Sao Paulo required for institu­ being prepared. 1 (FEPASA) (Bank) State Railways, improvement of tional development its coumercial performance, and component. improvement and rehabilitation of track and other facilities. Total project cost estimated at $283,0 million, of which $150,0 million in foreign exchange,

Banco do Brasil Up to Agricultural Credit - Support To be determined. Project processing (Central Bank of 300.0 private sector financing for delayed due to changes Brazil) (Bank) agricultural investment. in project design.

Empreea 200.0 Urban Transport IV - Sector Consultants will be Appraisal report being Brasileira dos (Bank) lending for urban transport required for institu­ prepared. Transportes systems in Brazil's 9 metro­ tional development Urbanos (EBTU) politan regions. Project component. includes investment and main­ tenance to conserve energy; improve urban efficiency; lower transport system user-costs, particularly to the urban poor, and institutional streng­ thening, Total project cost estimated at $468 million, of which $153 million in foreign exchange,

See page l for footnotes. - 73 -

Member CountTy, Amount & and implementing Probable Stage of Processing and Agency )J ~ll Consulting Services Action on Procurement!!_/

~ (Cont'd)

Nacional 300,0 Industrial Sector Loan - To To be determined, Project preparation Financier a (Bank) address domestic fiscal and under way, (NAFIN) regulatory issues which con­ strain the development of the sector.

Nacional 100,0 Dairy Development - To increase To be determined, Preparation under Financiera (Bank) milk production in temperate and way. (NAFIN) humid tropics with concentration of investment on selected milk shed and lesser concentration in other pilot areas in about five states.

Banco Nacional 600.0 Trade Policy Loan II - Assist'­ Consultants may be Project preparation Comercio (Bank) ance to the Government trade required. under way, Exterior liberalization. (BANCOMEXT)

Comision Federal 400,0 Power I - Financial rehabili­ To be determined. Project preparation de Electricidad (Bank) tation of the Power Sector to under way, (CFE) improve operation, maintenance and utility management prac­ tices; and new investment in generation and distribution,

Nacional 100.0 Health - Assistance in improving To be determined, -Project preparation Financiera (Bank) the efficiency of social sec­ under way. (NAFIN) urity, health services and im­ proving coverage to the poor,

Banco Nacional 130.0 Highway Maintenance - To finance To be determined, Appraisal report being de obrae y (Bank) periodic maintenance, maint­ prepared, Servicios enance equipment and related Publicoe ·facilities in support of the (BANOBRAS) Government's highway maintenance program,

Banco Nacional 350.0 Steel Restructuring - To finance To be determined, Project identification/ de Comercio (Bank) maintenance backlog and rehabil­ preparation under way. Exterior itation of existing steel ( BANCOMEXT) plants, incremental working capital of steel companies, steel imports due to reduced domestic capacity, and technical assistance for SIDERMEX re­ structuring and long-term strategy,

Ministry of 100.0 (R) SAL II - Support to Government None planned. Approved by the Executive Planning and (Bank) structural program in agricultu­ Directors on.December 11. Economic Policy re, industry and public sector Loan signed on December reform. 12,

Ministry of Up to (R) Technical Assistance - Studies Will be required, Project preparation Planning and s.o to support the ongoing struc­ under way. Economic Policy (Bank) tural adjustment reform with particlllar attention to effi­ ciency of public utilities, Total project coot estimated at $7 million,

Autoridad Up to (R) Balboa Port - Assist APN in To be determined, Appraisal mission sched­ Portuaria 20,0 increasing its container hand­ uled for February 1987, Nacional (APN) (Bank) ling and storage capacity, and enhance the transit capability and efficiency of the port,

PARAGUAY

Banco Nacional 50,0 Second Stage National Agri­ To be determined, Project identification de Fomento (Bank) cultural Credit Project, under way. I

I See page 1 for footnotes, - 74 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency l/ Lender y Consulting Services Action on Procurement 4/

PARAGUAY (Cont'd)

Ministry of 35,0 Road Maintenance - Routine and Consultants will be re­ Project preparation Public Works and (Bank) periodic maintenance programs quired for supervision of under way. Communications including asphalt, concrete civil works and technical overlays, traffic safety, and assistance in road maint­ technical assistance. Total enance related subjects, project cost estimated at $65.0 million, of which $36,0 million in foreign exchange.

Servicio Up to Provision of technical assist­ Consultants would be re­ Project preparation Nacional de 20.0 .ance for institution building, quired for management of awaiting resolution of Abastecimiento (Bank) Water supply and sewerage in water systems. outstanding issues. de Agua Potable several secondary-sized cities y Alcantarillado and towns with special emphasis (SENAPA) on rehabilitation, and technical assistance.

Ministry of Up to Irrigation Rehabilitation III - Not decided, Project preparation Agriculture 40.0 Rehabilitation of drainage and pending resolution of (Bank) irrigation systems in two coast­ issues. al valleys; operations and maintenance program. Bank Project Preparation Facility advance of $500,000 approved to fi­ nance aerial mapping for pre-feasibility study.

Ministry of Up to Public Sector Management II - To be determined, Project preparation Finance 15.0 Training; and Central Government depending on resolution (Bank) and State-owned enterprise of issues. management.

PETROPERU 60.0 Petroleum III - Increase oil To be determined, Project preparation (Bank) production through secondary awaiting resolution of recovery; exploration promotion issues. for private companies; and technical assistance.

National Center 4.0 Energy Conservation - Establish­ Consultants will be re­ Approved by the Executive for Energy Con­ (Bank) ment of national energy ration­ quired to assist with Directors on May 9, 1985, servation and alization center to do energy energy audits and train­ Rationalization audits and carry out other ener­ ing. gy saving activities. Total cost about $6.l million, inclu­ ding $4,0 million in foreign exchange.

ELECTROPERU 13.5 (R) Power Engineering II - Institu­ Approved by the Exec­ (Bank) tional strengthening of regional utive Directors on July utilities, and evaluation of re­ 2, 1985. This project habilitation and development has been withdrawn at the needs. request of the Govern­ ment; and therefore the loan will not be signed; reporting will be discon­ tinued,

Empresa Nacional 10.1 Railway Technical Assistance - Consultants will be Project preparation de Ferrocarriles (Bank) Institut~onal assistance to required to assist with awaiting resolution of del Peru ENAFER and purchase of spare operations, maintenance, outstanding issues. (ENAFER) parts. finance, planning and micro computer based management systemo.

Obras Sanitarias 19.0 (R) Water Supply and Sewerage, Rehab­ Consultants will be re­ Appraisal.mission del Estado (OSE) (Bank) ilitation - Rehabilitation and quired to assist in oper­ scheduled for February, expansion of Montevideo and ations, maintenance and interior systems; technical institutional devel­ Procurement: Retroactive assistance for company operation opment. financing to be proposed and maintenance improvement; for project preparation preparation of investment services after appraisal. studies, Total project cost estimated at $29.0 million, of which $19.0 million in foreign exchange.

See page 1 for footnotes. - 75 -

Member Country, Amount & and implementing Probable Stage of Processing and Agency 1/ ~y Consulting Services .. Aci:'ion on Procurement if

URUGUAY (Cont'd)

Adminietracion 30.0 Oil Refinery Modernization - Consultants will be Appraisal report Nacional de (Bank) Revamping of existing facilities required for project en­ being prepared. Combustibles and related technical gineering, supervision of Alcohol and assistance. construction; project im­ Portland (ANCAP) plementation and insti­ tutional development studies.

'1I

/ j

r ! ,,'t I See page 1 for footnotes, - 76 -

Member Country, Amount & . and Implementing Probable Stage of Processing and Agency Lender Consulting Services Action on Procurement

VII. NEW PROJECTS ADDED IN THIS ISSUE

I. EASTERN AND SOUTHERN AFRICA

ETHIOPIA

Irrigation Devel­ About Irrigation - Small scale irrigation Consultants will be Negotiations conclu­ opment Department, 7.0 and conservation. required. ded. (This project was Ministry of Agri­ (IDA) developed by IFAD.) culture P.O. Box 1232 Addis Ababa, Ethiopia

Ministry of Transport About Telecommunications II - To follow up Consultants will be Project under prepa­ and Telecommu­ 22.0 first telecommunications project to required. ration. nications (IDA) support sector restructuring. Kigali, Rwanda

II. WESTERN AFRICA

CONGO, PEOPLE'S REPUBLIC OF THE

To be determined 50.0 SAL - To support macro-economic To be determined. Project being prep­ (Bank) policy adjustment measures. ared. Appraisal contingent on satis­ factory resolution of credit worthiness issue.

Bank of Ghana 60.0 Industrial Sector Adjustment II - To be determined. Preparation to start P.O. BOX 2674 (IDA) Restructuring of Industrial Public in June. Accra, Ghana Enterprises; reform of incentive Telex: 974-2052 policies; provision of finance for inputs and rehabilitation; ins­ titutional strengthening of Ministry of Industry, Bank of Ghana and commercial banks.

MAURITANIA

To be determined 20.0 Irrigation IV - To finance the first To be determined. Project identification (IDA) phase of the post-Manantali under way. investments, probably limited to the Government's contribution to joint­ venture irrigation projects. Total project costs estimated at $21.0 million.

Ministry of Finance so.a -Public Enterprise Restructuring and To be determined. Preparation mission Federal Secretariat (Bank) Technical Assistance - Assistance to tentatively scheduled Lagos, Nigeria Government to implement measures to for January/ privatize and commercialize public February. enterprise sector.

Ministry of Finance 500.0 Trade Policy II - To support trade To be determined. Preparation to start Federal Secretariat (Bank) reform initiatives c01IDD.enced under in early 1987. Lagos, Nigeria first Trade Policy Loan. Central Bank of Nigeria P.M.B 12194 Lagos, Nigeria Telex: 21450 CEBANK NG

Ministry of Indus­ tries and Commerce Federal Secretariat Ikoyi Lagos, Nigeria - 77 -

Member Country, Amount & and Implementing Probable Stage of Processing and Agency Lender Consulting Services Action on Procureme"nt i WESTERN AFRICA (Cont'd) 'I I SENEGAL Project identification To be determined 40.0 Rainfed Agriculture - Main To be determined. un~er way. (IDA) objectives will be the rehabi- . litation of land as a social capital and to finance interventions which will rapidly increase income in the rainfed sector (i.e., groundnuts, cereals and other rainfed crops). Individual investment cpmponents not yet defined. Project will also consider sector-wide operatione such as seed. Total project cost estimated at $40.0 million.

TOGO

Ministry of Rural 25.0 Third Cotton Rural Development - No decision made on need Project being I Development (IDA) Cotton and fpodcrop development. for consultant~ identified. \ Lome, Togo ) III. EAST ASIA AND. PACIFIC

FIJI I I) Department of Posts 10.5 TE!':lecommunications III - To assist Consultants· vil·l be ~roject preparation ( and Telecom- (Bank) Government of Fiji to restructure required to assist with under way. munications the telecommunications sector .. restr:ucturing. 'P.O. Box 40 Total project cost about $33.0 I Suva, Fiji million.

II INDONESIA

BAPPENAS 5.0 Technical Assistance VI - To provide Consultant services Project preparation l JL. Taman (Bank) follow-up technical assistance and will be required. under way. )Suropati 2 studies in support of the Trade ( Djarkarta,. Indonesia Policy Adjustment loan and other I Telex: 61623 requirements to be determined.

I PAPUA NEW GUINEA I ' 1 Agriculture Devel- 25.0 Agricultural Credit IV - Insti­ To be determined. Government is preparing opment Bank (Bank) tutional strengthening for Agri­ project. I P.O. Box 309, culture Development Bank and 1 Port Moresby financial support, primarily for r Papua New Guinea smallholders, for agricultural l Telex: NE 52075 expansion.

PAPUA NEW GUINEA

Department of Lands 25 .o NES III - Collingwood or Mamai­ To be determined. Govermnent is preparing and Physical Planning (Bank) Baibara area; development of tree project. Pineapple Building crop estate and smallholder Waigani, settlements. Papua New Guinea Telex: NE 22327

Ministry of Education 40.0 Education V - Manpower training and To be determined. Government is preparing P.S.A. Haus, (Bani development to overcome key skills project. I Private Mail Bag gaps in selected high-priority '(Post Office, Boroko, sectors. [ Papua New Guinea I Telex: NE 22193 I Department of 40.0 Transport Improvement II - To be determined. Government is preparing Transport (Bank) Continuation of institutional project. P.O. Box 2457 strengthening of key line Konedoba, department, and financial support Papua New Guinea for expansion and maintenance of Ii Te lex: NE 22203 transport infrastructure. i'

J I, - 78 -

Member· Country, Amount & and Implementing Probable Stage of Processing and Agency Lender Consulting Services Action on P~o~urement. ·

EAST AS.IA AND PACIFIC (Cont'd)

PHILIPPINES

Ministry of Finance 10.0 Economic Recovery Program - Consultants will·be Negotiations in Agrifina Circle (Bank) Technical assistance. required to carry out progress. financial studies and , institutional streng­ Philippines thening. Telex: 4268 CBPCONF PM

V. EUROPE, MIDDLE EAST AND NORTH AFRICA

To be determined To be Ankara Gas Distribution - Natural No decision yet on need Preparation under deter­ gas distribution system in the city for consultants. way. mined of Ankara. (Bank)

VI. LATIN AMERICA AND CARIBBEAN

ARGENTINA

Secretaria de 150.0 Agriculture Sector II - Agricultural To be determined. Project preparation Agricultura y (Bank) credit for technological adjustment; · under way. Ganaderia financing medium-term credit for· (Secretariat of modernization of farm machinery, Agriculture and crop storage and handling Livestock facilities. Alrenidat Paseo Colon 974 Piao Buenos Aires, Argentina Telex: 21535

To be determined 6.0 Agricultural Credit - Credit To be determined. Project preparation (Bank) operation aimed at improvement of under way. balance of payments and creation of incre~sed employment opportunities through further increases in agricultural production for exports.

Corporacion de 50.0 Forestry Development - Credit for To be determined. Project preparation Fomento la Producion, (Bank) financing harvesting, transport, and under way. CORFO prim$ry processing of wood products. Monedif- 921 Santiago, Chile Telex: 240 690 CORFO CL 240 421

Banco Ecuatoriano de· 60.0 Housing - Construction and mortgage To be determined. Appraisal mission la Vivienda (BEV) (Bank) financing for low-income ho.using; planned for early 1987. Ave. 10 de Agosto technical assistance for 2252 Quito institutional development. Ecuador Telex: 2399

Ministerio de 40.0 Flood Control and Drainage - Lower Consultants will be Project preparation Agricultura y (Bank) Guayas River Basin Flood Control and required planned to begin April. Ganaderia Drainage in an area of about 150,000 (MAG/INHERHI/ ha for agriculture production. CEDEGE) Guayaquil 1740 Quito, Ecuador Telex: 393-22291 MAG-ED - 79 -

Member Country, 1 Amount & and Implementing Probable ., ,. Stage of Processing' and Agency Lender CO~sulting Services Action on Procurement

LATIN AMERICA AND CARIBBEAN

Fonds de Develop­ 25.0 Industrial Restructuring and To ,be 4etermined. · Project preparation pement (FD!) Angle (IDA) Development -_To provide financing under way. Rue des Miracles, and technical assistance for the Blvd Jean-Jacques restructuring of industrial Des salines enterprises affected by the trade 2 etage B. P. 2597 reform and to promote export­ Port-au-Prince, Haiti oriented industries.

Centrale Autonome 24.0 Port-au-Prince Water Supply - To.be determined. Project preparation Metropolitaine d'Eau (IDA) Development of new water sources, under way. Potable (CAMEP) and installatio'n of networks and Rue des Casernes connections. No. 104,B.P. 1012 Port-au-Prince, Haiti

Clarendon Alumina 10.0 Clarendon Alumina Ptoduction - To be determined. Preparation under Production Co. (Bank) Construction of red mud lake; way. c/o Jamaica Bauxite engineering and ecOnomic studies; Institute and expenditures for sustaining Old Hope Ro11d capital and replacing equipment. Kingston, Jamaica Total project coat estimated at $42 Telex: 2003 million, of which about $20 million JAMBAUX JA in foreign exchange.

\

/ I

f